BIOSTATISTICS
MS. KRUTIKA R. CHANNE
COURSE CONTENT
Unit-1 (Introduction, Measures of Central Tendency, Measures of Dispersion &
Correlation)
Unit-2 (Regression, Probability & Parametric Test)
Unit-3 (Non Parametric Test, Introduction to Research, Graph, Designing the
Methodology)
Unit-4 (Regression Modeling, Introduction to Practical Components of Industrial
and Clinical Trials Problems)
Unit-5 (Design and Analysis of Experiments- Factorial Design & Response Surface
Methodology)
UNIT- 1
‘Science of King’
Used to keep Records (Population, Births, Deaths, Livestock)
Administrative Purpose
Derived from the Latin word ‘status’, the Italian word ‘Statista’ or
German word ‘statistik’ c/d Political State k/n as STATISTICS
Widely used in Physics, Economics, Social Science & Medical Science
etc.
Introduction to Statistics, Biostatistics, Frequency Distribution
Meaning of Statistics
Plural Sense (Numerical statements or Facts)
Singular Sense (Refer to subject of study)
HORACE SECRIST- “Aggregate of facts affected to a marked extent by a
multiplicity of causes, numerically expressed, enumerated or estimated
according to a reasonable standard of accuracy, collection in a
systematic manner for a predetermined purpose & place in relation to
each other”.
CROXTON & COWDEN- “Statistics is the science which deals with
collection, classi
fi
cation, tabulation, presentation, analysis, testing &
interpretation of data.”
STATISTICAL DATA
A single
fi
gure is not called statistics e.g. sale of tablets in a shop A IS 500;
BUT sales of tablets in three shops A,B,C are 600,500,900.
If the phenomenon is of qualitative nature, it should be numerically
expressed.
Figures should be enumerated or estimated with reasonable standard of
accuracy.
DATA GRAPHICS
Data collected- represented in simple manner. Compare between 2 or more
fi
gure. Ex. Diagrams & Graphs. These types of graphs are called Data
Graphics
VARIABLES
Collect the information for various characteristics. These
characteristics are c/d as VARIABLES.
Qualitative Variables Quantitative Variables
Cannot be measured in any unit Can be measured in some unit
Ex. Gender, Education, Colour Ex. L, B, Vol, wt, h
Discrete Variables Continuous Variables
Gaps or interruptions in the values Relevent interval in the value
Ex. Size of Variable Ex. Height
Collection of Data
1st step in statistics; required for Problem/ Research.
Drug is useful in curing the disease or not?-v
Types of Sources- Primary Source ; Secondary Source
Primary Source First hand source
1. Observation Method Investigator records from his obsevation
2. Questionnaire Method Question are asked for inquiry; objective
3. Interview Method Information is collected in the form of interview
Secondary Source
Info is collected from Published Literature or Published
Repord
Classi
fi
cation of DATA
Collect from primary or secondary source
Dif
fi
cult to answer the question
Need to classify the data
Preliminary classi
fi
cation
Need to classify (single variable)
REQUIRE to group the observation in each group. This process is c/d
Frequency Distribution
FREQUENCY OF DISTRIBUTION
Frequency- Repetition of Observation (
fi
gure)
Class- Group of value c/d class e.g 0-10
Class Limits- (min value) lower class; (max value) upper class e.g 5-50
Class Boundaries- upper limit of previous class is equal to the lower
limit of next class e.g 10-19, 20-29 uL- 19 & LL- 20 they are not same
substract 0.5 from ll & Add 0.5 from ul e.g 9.5- 19.5, 19.5-29.5 cont
c/d class boundries.
Class Interval- difference between class boundries c/d
class intervals e.g 10-20, 20-30
Class Frequency- No. Of observation lying in particular
class
Tally Marks- (|) put for systematic counting
Frequency Distribution- Table of class limit &
Corresponding frequency c/d fd.
Cumulative Frequencies- Total of frequency
Preparation of Frequency Distribution
Ex. 1 Following data gives number of children in some families. Prepare a ungrouped frequency
distribution. Also
fi
nd cumulative frequency. No. 0,1,2,1,8,8,8,2,8,3,4,5,2,0,0,1,5,4,1,3,5,3,6,6,5,2,1,3,7,1,3,2,1,0,5,6.
X No. Of childrens Tally Marks Frequency
0 IIII 4
1 IIII II 7
2 IIII 5
3 IIII 5
4 II 2
5 IIII 5
6 III 3
7 I 1
8 IIII 4
TOTAL — 36
CUMULATIVE FREQUENCY
X No. Of childrens Frequency C. F.
0 4 4
1 7 11
2 5 16
3 5 21
4 2 23
5 5 28
6 3 31
7 1 32
8 4 36
Ex.2 The following data gives ages of patients in years. Prepare a
grouped frequency distribution.
Ages in years- 20, 63, 11, 65, 89, 11, 54, 57, 21, 86, 25, 67, 35, 59,
55, 25, 10, 19, 32, 38, 39, 67, 22, 17, 67, 12, 43, 28, 25, 40, 67, 16,
32, 65, 23, 47, 38.
DATA GRAPHICS
Data we collect & classify- REPORT
Attention to
fi
gures & compare two or more set of observation
A classi
fi
ed frequency data i.e grouped frequency data is presented
in the form of graph
1. Histogram
2. Frequency Polygon
3. Cumulative Frequency Polygon
Pie chart: A circle graph that shows the relationship of parts to a whole
Bar graph: A graph that uses bars to represent data, which can be vertical or horizontal
Line graph: A graph that shows points plotted on a graph, connected to form a line
Column chart: A graph that's ideal for presenting chronological data
Scatter plot: A graph that shows the relationship between items based on two different variables and data sets
Area graph: A graph that shows changes over time, similar to a line chart
Bubble chart: A graph that's similar to a scatter plot
Gauge chart: A graph that shows whether data values
fi
t on a scale of acceptable to not acceptable
Stacked Venn chart: A graph that shows overlapping relationships between multiple data sets
Mosaic plot: A graph that uses a grid of rectangles to show how categorical variables interact with each other
Gantt chart: A bar chart that illustrates a project schedule
Flowchart: A graph that displays a schematic process, often used by companies to depict the stages of a project
Ex. For the following data draw histogram, frequency polygon & cumulative
frequency polygon.
Soln- Histogram & Frequency Polygon
Class limit 20-40 40-60 60-80 80-100 100-120 120-140
Frequency 8 15 23 18 9 4
Class limit Frequency (f) Cumulative f (cf)
20-40 8 8
40-60 15 23
60-80 23 46
80-100 18 64
100-120 9 73
120-140 4 77
Total 77 -
0
6
12
18
24
Class Limit
Frequency Polygon
Scale- x- axis : 1 unit= 20 unit; Y- axis: 1 unit= 6 unit
Cumulative Frequency Polygon
0
20
40
60
80
77.00
73.00
64.00
46.00
23.00
8.00
Scale- x-axis : 1 unit= 20 units; y-axis : 20
Measures of Central Tendency
Statistical data may be in any form, individual, discrete series or continuous series.
Require to compare two or more series of observations, must form a representative
fi
gure for the data.
With such
fi
gure we may compare two or more series or the whole data.
To
fi
nd such representative
fi
gures if we look at the data we note down a general
tendency of
fi
gures.
This tendency is together at the centre or together about a particular value.
This Tendency is c/d Central Tendency
The
fi
gure about which all the remaining
fi
gures are gathered will be representative
fi
gure.
This is also called as Measure of Central Tendency.
(1) It should be simple to understand.
(2) It should be easy to calculate.
(3) It should be rigidly de
fi
ned.
(4) It should be based on each and every observation.
(5) It should have sampling stability.
(6) It should not be affected by extreme values.
(7) It should be capable of further algebraic treatment.
Different measures of central tendency.
ARITHMETIC MEAN
A.M= Sum of all observation/
Total number of observation
∑ X = Summation
X= Sum of all observation
N= Total number of observation
X̄= ∑ X/ N
X̄= ∑ fX/ N where N= ∑ f
X̄= A+ (∑ fd’/ N)* C
where A= assumed mean
d’= d/c’; c= common factor
d= X-A
N= ∑ f
Ex. The following data gives weight of tablets in mg. Calculate average weight of a tablet.
Weight of tablets (in mg) 25, 28, 25, 30, 29, 24, 23, 27, 28, 25.
Sol.: This is an individual type of data, hence
X̄= ∑ X/ N
= 25 + 28 + 25 + 30 + 29 + 24 + 23 + 27 + 28 + 25 / 10
= 264 / 10
=26.4
1. Calculate the mean from the data showing marks of students in a class in a test: 40, 530, 355, 758,
758,898,897, 234.
2. A total of 25 patients admitted to a hospital are tested for levels of blood sugar, (mg/dl) and the
results obtained were as follows:
87, 71, 83, 67, 85, 77, 69, 76, 65, 85, 85, 54, 70, 68, 80, 73, 78, 68, 85, 73, 81, 78, 81, 77, 75
Find the mean (mg/dl) of the above data.
Ex: Following data gives age in years in case of child deaths. Find the average age.
Age in Years 0 1 2 3 4 5
No. Of deaths 42 55 32 22 15 6
Sol. : This is a discrete data (discrete series). Hence Age in years is called 'X' and No. of
deaths is frequency ‘f'.
AGE (X) No. of Death (f) F * X
**
0
1
2
3
4
5
TOTAL N= ∑ f ∑ fX= ?
X̄= ∑ fX/ N
From the following Data Calculate Mean
Class limit 0-30 30-60 60-90 90-120 120-150 150-180
Frequency 8 13 22 27 18 7
Class limit Frequency f Mid point d= mp- A D’= d/c Fd’
Total N= ∑ F - - - ∑fd’
Different measures of central tendency.
ARITHMETIC MEDIAN
M= N+1/2 ; when n is odd
Avg of (n/2) & (n/2+1) ; when n is even
Median = l1 + (N/2-C.F./F*1)
Different measures of central tendency.
ARITHMETIC MODE
Most popular observation i.e. observation with highest frequency is called as mode
For grouped data Mode= l1+(f1-fo/ 2f1-fo-f2 * i)
l1= lower limit
f1= frequency
fo= frequency of previous class
f2= frequency of after class
i = Class interval
Scattering of DATA
Types of Measures- Absolute & Relative ; This are expressed as ratio c/d
coef
fi
cients.
Measures of Dispersion-
1. Range R= L - S where l= largest observation, s= smallest observation
Coef
fi
cient of R= L - S / L+ S * 100
Ex. The following data gives variations in a patient's blood pressure in 8
hours. Observation taken per hour. Find range and its cof
fi
cient.
Dispersion or variation of data
Hour 1 2 3 4 5 6 7 8
Blood Pressure 105 145 124 120 140 110 120 123
Range is calculated in single series
2. Mean Absolute Deviation (M.D)
M.D. = ∑ I D I / N
| D | = absolute value of D or Modulus value of D
D = X- Mean, X- Median, X- Mode
Coef
fi
cient of M.D.= M.D/Mean * 100 or M.D/Median * 100 or M.D/Mode * 100
For grouped data M.D. = ∑ f | D | / N
Ex. From given table calculate the mean FROM Mean deviation, X= 35, 40, 45, 20, 30
Mean = X̄ = ∑ X / N
X D= X- X̄ Bar | D |
Total - ∑ | D |
MD= ?, Coe of MD =?
Ex. From the following data calculate mean deviation from mode
Find mean deviation from median and its coef
fi
cient
X 3 6 9 12 15 18 21
F 5 15 21 32 18 12 5
Class limits 0-10 10-20 20-30 30-40 40-50
Frequency 8 15 22 15 8
STANDARD DEVIATION
σ = √ ∑ (X-X
̄)2 / N 0R σ = √ ∑ X2 / N - (X
̄)2
IF WE ASSUME MEAN THEN THE FORMULA IS,
σ = √ ∑ d2 / N - (∑ d / N)2
d= X-A
A= Assumed Mean
When n is small in number then we use the formula, σ = √ ∑ (X-X̄)2 / N -1
For grouped data or discrete series formula, σ = √ ∑ f d’2 / N - (√ ∑ fd’
/ N )2 * C
Where d’= d/C, d= M.P-A
C= Common factor
A= Assumed Mean
Coef
fi
cient of Variance (C.V.)
This is relative measure of dispersion
C.V. = σ/X*100
IF C.V. is less we can say that
fi
gures are more consistent.
Questions
Difference Between Statistics and Biostatistics ?
Describe Dispersion and Range
Enumerate different graphs used for representing qualitative data
Calculate Mean, Median, Mode (10m)
Write a short note on Historical Design (5m)
Class limit 0-30 30-60 60-90 90-120 120-150 150-180
Frequency 8 13 22 27 18 7

BIOSTATICS & RESEARCH METHODOLOGY UNIT-1.pdf

  • 1.
  • 2.
    COURSE CONTENT Unit-1 (Introduction,Measures of Central Tendency, Measures of Dispersion & Correlation) Unit-2 (Regression, Probability & Parametric Test) Unit-3 (Non Parametric Test, Introduction to Research, Graph, Designing the Methodology) Unit-4 (Regression Modeling, Introduction to Practical Components of Industrial and Clinical Trials Problems) Unit-5 (Design and Analysis of Experiments- Factorial Design & Response Surface Methodology)
  • 3.
    UNIT- 1 ‘Science ofKing’ Used to keep Records (Population, Births, Deaths, Livestock) Administrative Purpose Derived from the Latin word ‘status’, the Italian word ‘Statista’ or German word ‘statistik’ c/d Political State k/n as STATISTICS Widely used in Physics, Economics, Social Science & Medical Science etc. Introduction to Statistics, Biostatistics, Frequency Distribution
  • 4.
    Meaning of Statistics PluralSense (Numerical statements or Facts) Singular Sense (Refer to subject of study) HORACE SECRIST- “Aggregate of facts affected to a marked extent by a multiplicity of causes, numerically expressed, enumerated or estimated according to a reasonable standard of accuracy, collection in a systematic manner for a predetermined purpose & place in relation to each other”. CROXTON & COWDEN- “Statistics is the science which deals with collection, classi fi cation, tabulation, presentation, analysis, testing & interpretation of data.”
  • 5.
    STATISTICAL DATA A single fi gureis not called statistics e.g. sale of tablets in a shop A IS 500; BUT sales of tablets in three shops A,B,C are 600,500,900. If the phenomenon is of qualitative nature, it should be numerically expressed. Figures should be enumerated or estimated with reasonable standard of accuracy. DATA GRAPHICS Data collected- represented in simple manner. Compare between 2 or more fi gure. Ex. Diagrams & Graphs. These types of graphs are called Data Graphics
  • 6.
    VARIABLES Collect the informationfor various characteristics. These characteristics are c/d as VARIABLES. Qualitative Variables Quantitative Variables Cannot be measured in any unit Can be measured in some unit Ex. Gender, Education, Colour Ex. L, B, Vol, wt, h Discrete Variables Continuous Variables Gaps or interruptions in the values Relevent interval in the value Ex. Size of Variable Ex. Height
  • 7.
    Collection of Data 1ststep in statistics; required for Problem/ Research. Drug is useful in curing the disease or not?-v Types of Sources- Primary Source ; Secondary Source Primary Source First hand source 1. Observation Method Investigator records from his obsevation 2. Questionnaire Method Question are asked for inquiry; objective 3. Interview Method Information is collected in the form of interview Secondary Source Info is collected from Published Literature or Published Repord
  • 8.
    Classi fi cation of DATA Collectfrom primary or secondary source Dif fi cult to answer the question Need to classify the data Preliminary classi fi cation Need to classify (single variable) REQUIRE to group the observation in each group. This process is c/d Frequency Distribution
  • 9.
    FREQUENCY OF DISTRIBUTION Frequency-Repetition of Observation ( fi gure) Class- Group of value c/d class e.g 0-10 Class Limits- (min value) lower class; (max value) upper class e.g 5-50 Class Boundaries- upper limit of previous class is equal to the lower limit of next class e.g 10-19, 20-29 uL- 19 & LL- 20 they are not same substract 0.5 from ll & Add 0.5 from ul e.g 9.5- 19.5, 19.5-29.5 cont c/d class boundries.
  • 10.
    Class Interval- differencebetween class boundries c/d class intervals e.g 10-20, 20-30 Class Frequency- No. Of observation lying in particular class Tally Marks- (|) put for systematic counting Frequency Distribution- Table of class limit & Corresponding frequency c/d fd. Cumulative Frequencies- Total of frequency
  • 11.
    Preparation of FrequencyDistribution Ex. 1 Following data gives number of children in some families. Prepare a ungrouped frequency distribution. Also fi nd cumulative frequency. No. 0,1,2,1,8,8,8,2,8,3,4,5,2,0,0,1,5,4,1,3,5,3,6,6,5,2,1,3,7,1,3,2,1,0,5,6. X No. Of childrens Tally Marks Frequency 0 IIII 4 1 IIII II 7 2 IIII 5 3 IIII 5 4 II 2 5 IIII 5 6 III 3 7 I 1 8 IIII 4 TOTAL — 36
  • 12.
    CUMULATIVE FREQUENCY X No.Of childrens Frequency C. F. 0 4 4 1 7 11 2 5 16 3 5 21 4 2 23 5 5 28 6 3 31 7 1 32 8 4 36
  • 13.
    Ex.2 The followingdata gives ages of patients in years. Prepare a grouped frequency distribution. Ages in years- 20, 63, 11, 65, 89, 11, 54, 57, 21, 86, 25, 67, 35, 59, 55, 25, 10, 19, 32, 38, 39, 67, 22, 17, 67, 12, 43, 28, 25, 40, 67, 16, 32, 65, 23, 47, 38.
  • 14.
    DATA GRAPHICS Data wecollect & classify- REPORT Attention to fi gures & compare two or more set of observation A classi fi ed frequency data i.e grouped frequency data is presented in the form of graph 1. Histogram 2. Frequency Polygon 3. Cumulative Frequency Polygon
  • 15.
    Pie chart: Acircle graph that shows the relationship of parts to a whole Bar graph: A graph that uses bars to represent data, which can be vertical or horizontal Line graph: A graph that shows points plotted on a graph, connected to form a line Column chart: A graph that's ideal for presenting chronological data Scatter plot: A graph that shows the relationship between items based on two different variables and data sets Area graph: A graph that shows changes over time, similar to a line chart Bubble chart: A graph that's similar to a scatter plot Gauge chart: A graph that shows whether data values fi t on a scale of acceptable to not acceptable Stacked Venn chart: A graph that shows overlapping relationships between multiple data sets Mosaic plot: A graph that uses a grid of rectangles to show how categorical variables interact with each other Gantt chart: A bar chart that illustrates a project schedule Flowchart: A graph that displays a schematic process, often used by companies to depict the stages of a project
  • 16.
    Ex. For thefollowing data draw histogram, frequency polygon & cumulative frequency polygon. Soln- Histogram & Frequency Polygon Class limit 20-40 40-60 60-80 80-100 100-120 120-140 Frequency 8 15 23 18 9 4 Class limit Frequency (f) Cumulative f (cf) 20-40 8 8 40-60 15 23 60-80 23 46 80-100 18 64 100-120 9 73 120-140 4 77 Total 77 - 0 6 12 18 24 Class Limit Frequency Polygon Scale- x- axis : 1 unit= 20 unit; Y- axis: 1 unit= 6 unit
  • 17.
  • 18.
    Measures of CentralTendency Statistical data may be in any form, individual, discrete series or continuous series. Require to compare two or more series of observations, must form a representative fi gure for the data. With such fi gure we may compare two or more series or the whole data. To fi nd such representative fi gures if we look at the data we note down a general tendency of fi gures. This tendency is together at the centre or together about a particular value. This Tendency is c/d Central Tendency The fi gure about which all the remaining fi gures are gathered will be representative fi gure. This is also called as Measure of Central Tendency.
  • 19.
    (1) It shouldbe simple to understand. (2) It should be easy to calculate. (3) It should be rigidly de fi ned. (4) It should be based on each and every observation. (5) It should have sampling stability. (6) It should not be affected by extreme values. (7) It should be capable of further algebraic treatment.
  • 20.
    Different measures ofcentral tendency. ARITHMETIC MEAN A.M= Sum of all observation/ Total number of observation ∑ X = Summation X= Sum of all observation N= Total number of observation X̄= ∑ X/ N X̄= ∑ fX/ N where N= ∑ f X̄= A+ (∑ fd’/ N)* C where A= assumed mean d’= d/c’; c= common factor d= X-A N= ∑ f
  • 21.
    Ex. The followingdata gives weight of tablets in mg. Calculate average weight of a tablet. Weight of tablets (in mg) 25, 28, 25, 30, 29, 24, 23, 27, 28, 25. Sol.: This is an individual type of data, hence X̄= ∑ X/ N = 25 + 28 + 25 + 30 + 29 + 24 + 23 + 27 + 28 + 25 / 10 = 264 / 10 =26.4 1. Calculate the mean from the data showing marks of students in a class in a test: 40, 530, 355, 758, 758,898,897, 234. 2. A total of 25 patients admitted to a hospital are tested for levels of blood sugar, (mg/dl) and the results obtained were as follows: 87, 71, 83, 67, 85, 77, 69, 76, 65, 85, 85, 54, 70, 68, 80, 73, 78, 68, 85, 73, 81, 78, 81, 77, 75 Find the mean (mg/dl) of the above data.
  • 22.
    Ex: Following datagives age in years in case of child deaths. Find the average age. Age in Years 0 1 2 3 4 5 No. Of deaths 42 55 32 22 15 6 Sol. : This is a discrete data (discrete series). Hence Age in years is called 'X' and No. of deaths is frequency ‘f'. AGE (X) No. of Death (f) F * X ** 0 1 2 3 4 5 TOTAL N= ∑ f ∑ fX= ? X̄= ∑ fX/ N
  • 23.
    From the followingData Calculate Mean Class limit 0-30 30-60 60-90 90-120 120-150 150-180 Frequency 8 13 22 27 18 7 Class limit Frequency f Mid point d= mp- A D’= d/c Fd’ Total N= ∑ F - - - ∑fd’
  • 24.
    Different measures ofcentral tendency. ARITHMETIC MEDIAN M= N+1/2 ; when n is odd Avg of (n/2) & (n/2+1) ; when n is even Median = l1 + (N/2-C.F./F*1)
  • 25.
    Different measures ofcentral tendency. ARITHMETIC MODE Most popular observation i.e. observation with highest frequency is called as mode For grouped data Mode= l1+(f1-fo/ 2f1-fo-f2 * i) l1= lower limit f1= frequency fo= frequency of previous class f2= frequency of after class i = Class interval
  • 26.
    Scattering of DATA Typesof Measures- Absolute & Relative ; This are expressed as ratio c/d coef fi cients. Measures of Dispersion- 1. Range R= L - S where l= largest observation, s= smallest observation Coef fi cient of R= L - S / L+ S * 100 Ex. The following data gives variations in a patient's blood pressure in 8 hours. Observation taken per hour. Find range and its cof fi cient. Dispersion or variation of data Hour 1 2 3 4 5 6 7 8 Blood Pressure 105 145 124 120 140 110 120 123 Range is calculated in single series
  • 27.
    2. Mean AbsoluteDeviation (M.D) M.D. = ∑ I D I / N | D | = absolute value of D or Modulus value of D D = X- Mean, X- Median, X- Mode Coef fi cient of M.D.= M.D/Mean * 100 or M.D/Median * 100 or M.D/Mode * 100 For grouped data M.D. = ∑ f | D | / N Ex. From given table calculate the mean FROM Mean deviation, X= 35, 40, 45, 20, 30 Mean = X̄ = ∑ X / N X D= X- X̄ Bar | D | Total - ∑ | D | MD= ?, Coe of MD =?
  • 28.
    Ex. From thefollowing data calculate mean deviation from mode Find mean deviation from median and its coef fi cient X 3 6 9 12 15 18 21 F 5 15 21 32 18 12 5 Class limits 0-10 10-20 20-30 30-40 40-50 Frequency 8 15 22 15 8
  • 29.
    STANDARD DEVIATION σ =√ ∑ (X-X ̄)2 / N 0R σ = √ ∑ X2 / N - (X ̄)2 IF WE ASSUME MEAN THEN THE FORMULA IS, σ = √ ∑ d2 / N - (∑ d / N)2 d= X-A A= Assumed Mean When n is small in number then we use the formula, σ = √ ∑ (X-X̄)2 / N -1 For grouped data or discrete series formula, σ = √ ∑ f d’2 / N - (√ ∑ fd’ / N )2 * C Where d’= d/C, d= M.P-A C= Common factor A= Assumed Mean
  • 30.
    Coef fi cient of Variance(C.V.) This is relative measure of dispersion C.V. = σ/X*100 IF C.V. is less we can say that fi gures are more consistent.
  • 31.
    Questions Difference Between Statisticsand Biostatistics ? Describe Dispersion and Range Enumerate different graphs used for representing qualitative data Calculate Mean, Median, Mode (10m) Write a short note on Historical Design (5m) Class limit 0-30 30-60 60-90 90-120 120-150 150-180 Frequency 8 13 22 27 18 7