Agenda
Working with the Project Center
Managing views and notifications settings
Proposals and Demand Management
Office 365 PPM (Project Online) Overview
Agenda
Working with Project Professional
Managing Resources
Managing Tasks and Approvals
Managing Timesheets and Approvals
Agenda
Managing Issues, Risks and Documents
Managing the Project Site
Working with Status Reports
Portfolio Management & Analysis
Business Intelligence and Power BI
Topics
Components of an O365
PPM Solution
Office 365 PPM Overview
What is O365 PPM
Role of the Project Manager
1.1 What is O365 PPM/Project Online
• Project has a long history and is used
by millions of Project Managers
around the world.
• Powerful tool to help develop a plan,
manage resources and tasks, track
progress and analyse workloads and
performance.
Originated
from Project
on the
desktop
Microsoft Project was the company’s
third Windows-based application…
What is O365 PPM/Project Online
What is O365
PPM/Project
Online?
What is O365 PPM/Project Online
• Deliver to almost any device
• Think of the Evolution of tools as follows:
• Outlook/Excel
• SharePoint Online (Task Lists)
• Project Pro (Office 365)
• Project Online
Microsoft’s
Strategy
What is O365 PPM/Project Online
• Project Online (Project Server in the cloud)
• Office 365 with Project Professional
• SharePoint & SharePoint Online (Task Lists)
• Office 365 Project Lite (Team Members)
• Project Professional vs Project Standard
So many ways
to manage
projects
1.2 Role of the Project Manager
• Project Managers are responsible for the
execution and management of projects
within the organization. PM’s will use the tool
to initiate, plan, manage and close projects.
• They will also have team building and
collaboration features available to them.
Sophisticated reporting capabilities will also
be part of their toolset.
Project Manager
Role of the Project Manager
• Resource Managers gain visibility and insight
into availability and assignments of resources
across the enterprise. This information
improves the ability to forecast work load
and resource demands.
Resource
Manager
Role of the Project Manager
• Team Members participate in the success of
the project by providing status of their
assignments, reporting issues and
collaborating with other team members and
stake holders. The tool provides an easy to
use and familiar interface for TM’s to get the
job done.
Team Member
Role of the Project Manager
• Portfolio Managers have broad visibility and
editing permissions. They will typically need
access to projects across departments and
business units.
• Portfolio Viewers (Executives) have similar
visibility but without the editing permissions.
They are meant to see the projects but not
edit them.
Portfolio Viewers
(Executives) &
Portfolio
Managers
1.3 Components of O365 PPM
Functional
Components
of PPM
Microsoft Project Online (MSPO) is made up of
multiple functional components that enable
Project Managers to be effective at creating,
managing and reporting against projects ,
programs and portfolios in the organization.
• Project Management
• Resource Management
• Task Management
• Timesheet Management
• Demand Management
• Risk & Issue Management
• Document Management
• Site Management
• Status Reporting
• Portfolio Management
• Business Intelligence &
Reporting
• Project Online
Administration
Topics
Enterprise Projects &
SharePoint Task Lists
Working in the Project Center
Managing Projects in the
Project Center
Creating new projects
Managing Projects in the Project Center
• Project Center provides a central
repository for projects
• Projects can be organized by grouping
and filtering
• Columns/Fields can be moved, hidden
and managed for each individual PM
Managing
Projects
Managing Projects in the Project Center
• Projects must be “checked out” to be
edited
• Only one user can have a project
checked out at any given time (in PWA
or Project Pro)
• Other PM’s can view the project in “read
only”
Checking In
and Checking
Out
Managing Projects in the Project Center
• Projects that are checked out and being edited are in a
“draft” state or being managed in what's known as the
Draft Store.
• PM’s can continue to update and modify project
schedules and save them
• Using the Publish command then transfers the updates
to what's known as the Publish Store
• PM’s with read only access can only see updates sent to
this published location
Saving and
Publishing
Managing Projects in the Project Center
• PM’s can set “direct” permissions against their projects
• These permissions sit on top of the underlying security
model in place
• PM’s can determine rights such as opening, editing,
publishing and viewing site information
• PM’s can determine which projects and which users
these permissions apply to
Setting direct
Permissions
Managing Projects in the Project Center
• PM’s will also manage project
properties from here
• This includes fields such as the Start
Date, Project Owner and other custom
field information
• Updates made to project properties do
not need to be published, just saved.
Project
Properties
Creating new projects
• PM’s will initiate new projects from this
location
• Templates and other settings will be
configured to help the PM determine
what “type” of project they are creating
• This is often the preferred method when
creating a new project
Creating new
projects
Creating new projects
• Each project may have a project site and
is the central site repository for
documents, issues, and risks related to
that project
• The site is generated when the project
is published can then be customized by
each project manager (owner)
Working with
Project Sites
3 Configuration options:
• Create the site
automatically
• Don’t Create the Site
at all
• Allow the Project
Manager to decide
Enterprise Projects and SharePoint Task Lists
• Enterprise Projects include additional functionality
including “check-in” and “check-out”
• Direct permission settings and browser based editing
• SharePoint tasks lists provide a “synchronization” of
tasks
• SharePoint tasks lists can be promoted into an
enterprise project and can be used as a starting point
for many PM’s
Enterprise
Projects and
Tasks Lists
Topics
Managing Delegates
Managing Personal Settings
Managing Views
Working with Alerts
Managing Views
• Views can be created or copied from existing Out of
the Box (OOTB) views
• Custom Enterprise fields can be added to the views
• Filtering and Grouping can be accomplished with
Views
• Views are associated to Security Categories to
determine who can interact with the View (when
configured with Project Server security mode)
Working with
Views
Managing Views
• Project
• Project Center
• Resource Center
• Resource
Assignments
• My Work
• Resource Plans
• Project
• Team Tasks
• Team Builder
• Timesheets
• Portfolio Analyses
• Portfolio Analysis
PWA View
Areas
Managing Views
• Resource Assignments
• Resources are first
selected
• Contains resource
assignment
information
• Not editable from this
area
• Display, grouping and
filtering options are
available
Resource
Center Views
• Resource Availability
Contains availability
information about
resources that are
selected
A subset of views are
available from this area:
• Assignment work
by resource
• Assignment work
by project
• Remaining
Availability
• Work
Managing Views
• Jobs that you send to Project Server are managed in the
Queue Area
• The Personal Settings area allows you to view Jobs that
have been sent to the server
• This allows you to pass information along to the
Administrator for troubleshooting purposes
Personal
Settings
Managing Delegates
• Project Online allows for user delegation.
This feature allows for one user acting as
another in every part of the Project Web
App.
• The permission level difference of one user
compared to the other does not affect the
ability to use the delegate feature.
Delegates
Topics
Proposals & Demand Management
Demand Management
Overview
Proposals & Workflow
Management
Working with EPT’s and PDP’s
Demand Management Overview
• Allows the ability to capture all “demand” (i.e. work
proposals) in one single place
• Provides decision making opportunities on which
proposals to approve and then track their progress
• Demand Management in Project Online can be simple or
complex
Demand
Management
Overview
Demand Management Terms
• Created in the Project Center by PM
• Governs project and proposal lifecycle
• Most often aligned with Departments
Enterprise
Project Type
(EPT’s)
Demand Management Terms
• Represented as a single web part page in
PWA
• Used to drive the project lifecycle
Project Details
Pages (PDP’s)
Demand Management Terms
• Supports the notion of multi-stage
lifecycles with approvals
• Provides Stages within Phases which
are then connected to form complete
project lifecycles via workflows
Workflow
(Phases,
Stages and
Approvals)
Topics
Working with Project Professional
Managing Enterprise Projects
with Project Pro
Saving and Publishing Projects
Building teams with Project
Pro
Importing Projects
Taking projects offline and
maintaining projects
Working with multiple projects
Managing enterprise projects with Project
• Draft vs Publish options
• Browser based project editing
• Performance enhancements over task
lists
• Assignment management and control
• Leverage the power and functionality of
Project Professional
Enterprise
Projects
Saving and Publishing projects
• Publishing moves Schedule to Published
Database
• Project Manager is prompted to create
the Project Site
• Team Members are notified
• Schedule is available in the Project
Center
Saving = Draft
Publishing =
Publish
Building teams with Project
• Project Managers have multiple means to
built teams including with Project Pro
• PM’s can filter and search for the right
resources
• Similar functionality is found in PWA
Team Building
Importing projects
• Importing stand alone projects
• Vendors or consultants may send
projects that need to be imported
• Resources and custom fields need to be
mapped to enterprises resources and
enterprise fields
Stand alone
projects
imported
Taking projects offline and maintaining
projects
• Working offline when not connected to Project
Server
• Project Managers may be in the field or the
project server may not be available
• Synching updates when connection is
reestablished and the changes made offline are
automatically synched back to the server
• Renaming and deleting projects
Offline allows
PM’s to
continue to
work
Working with multiple projects
• Opening multiple projects has many benefits by
opening projects from PWA into Project
Professional
• The “temporary” master project will not be saved
• Dependencies and allocations can be managed
with multiple projects open and they can create
dependencies and resolve over/under allocations
when multiple projects are open
Managing
multiple
projects
Topics
Managing Resources
Managing and Analyzing
Enterprise Resources
Team Building with the
Enterprise Resource Pool
Requesting and approving
Enterprise Resources
Enterprise Resource Pool Overview
• Contains all enterprise resources
• People, equipment and material
• Are elements of direct costs
• Uses Project Professional when editing
resources
Resource Pool
Understanding Resource Categories and
Types
• Project Professional
• Work Resources = resources to model people and
equipment
• Material Resources = resources to represent the
supplies consumed during the project
• Cost Resources= resources that allow PM’s to apply
cost at the point of assignment
Resource
Types
Understanding Resource Categories and
Types
• PWA and visible in Project Professional
• Enterprise Resource Named (Joe Blow) that login’s
(Windows Account/Office 365 Account
• Enterprise Resource Unnamed (Carpenter)
• Enterprise Resources Named (Joe Blow) that
doesn’t login (No PWA license)
• Generic Resources = Placeholder (no actuals
being tracked)
• Local Resources = Just for that project
Resource
Categories
Team Building with PWA
• Team’s can be built from the Project Center
• This allows for Resource Managers or project
managers to identify the necessary resources to build
onto a project schedule
• Team’s can be built from within Project Professional
• While project managers have the project schedule
open, they can identify and build team members on
to their project schedules
Building Teams
Topics
Managing tasks and approvals
Assigning tasks to resources
Managing Updates
Managing Approvals and
setting rules
Publishing Assignments
• Assigning and Notifying Team Members
• Project Managers can use PWA or Project Professional to
assign resources
• Project Managers will assign the same way they would if
they were not connected to Project Server
• Controlling the Notifications
• Project Managers can use the “publish” task field to
determine when team members are notified
Assigning
Tasks
Tracking Method
• Current Configuration Settings
• What is the Tracking Method?
• Crawl, Walk, Run approach
• Tracking Options:
• % Work Complete
• Actual work done and work remaining
• Hours of work done per period
• Free Form
Assigning
Tasks
Publishing Assignments
• Assigning and Notifying Team Members
• Project Managers can use PWA or Project Professional to
assign resources
• Project Managers will assign the same way they would if
they were not connected to Project Server
• Controlling the Notifications
• Project Managers can use the “publish” task field to
determine when team members are notified
Assigning
Tasks
Managing Updates
• Keeping Schedules “Up to Date”
• Determine when Schedules are published
• Setting Deadlines to team member
submissions
• For example, EBD (End of Business) on
Thursday
Updating
Tasks
Approval Center
• Central location for approving task updates
• This central location makes it easy for the project manager
to accept or reject updates
• The project manager can also preview updates before
approving
• Project Manager can control auto updates and auto publishing
• The project manager can control updates by automating
the acceptance based on users
• Project managers can also control the publishing of the
projects from this area
Approving
Tasks
Topics
Managing timesheets and
approvals
Creating and submitting
timesheets
Managing Timesheet
approvals, rejections and
recalls
Creating and Submitting Timesheets
• Team members create timesheets to track non-project
time for a given period
• Team members will then submit their time for approval
• Administrative time categories and vacation requests can
be managed here
• Team members can add line items where appropriate to
“charge” time against those categories
• Vacation requests can also be managed here
Timesheet
Management
Managing Timesheets
• Timesheet managers will review, approve or reject
timesheets as part of their job role
• Timesheet settings can be auto-approved, or have a fixed
approval routing based on the system configuration
• Approval Center provides a central location for managing
timesheets
• The Approval Center gives the timesheet manager many
areas to see pending timesheets, recall timesheets where
appropriate and review historical timesheets
Timesheets
Topics
Issues, Risks and Documents
Managing issues, risks and
documents
Managing relating items
Managing Issues, Risks and Documents
• The project site is the central repository for project
content such as issue and risk information
• Issues and risks are stored as lists in the project site
• Issues and risks have the ability to be linked back to a
specific task in the project schedule
• Managing list information provides a central location
and reporting capabilities
• These list items can then be aggregated across multiple
projects for reporting purposes
Issues, Risks
and &
Documents
Managing Documents
• The project site is also a repository for supporting documents
• The project site document library can also have links back
to the project schedule
• Documents here can include any number of document
types such as Office and PDF documents
• Project Managers can leverage the power of SharePoint for
project artifacts
• Because its built on SharePoint, project managers can
leverage alerts, versioning, check-in/check out and
security at the library and file level
Documents
Topics
Managing permissions and
users
Managing the Project Site
Working with Site Contents
and Site Settings
Creating and Managing site
Apps
Site Management
• Project site management includes the creation and
management of site assets and features
• Project managers can create additional lists, libraries,
pages and sub sites to support the project initiatives
• Site management gives the Project Manager full control of
the site
• Project Managers can also control access to site assets
down to the file level
• Alerts can also be set to notify team members of new
items being added to the site.
Managing
Project Sites
Managing Deliverables
• Deliverables managed from PWA and Project
Professional
• Project managers can create and edit deliverables
from PWA and Professional
• A dedicated deliverables pane available in Project
Professional
• Deliverables list made available to stake holders
leadership
• Deliverables show up in deliverables list without
publishing and updates work back and forth
Deliverables
Working with Lists and Libraries
• New libraries and lists can be created and managed on
a site by site basis
• Project managers can create new lists and libraries and
configure versioning, custom columns and workflow
when appropriate
• Customization can be preserved as a template
• New project site templates can be created and then
associated to Enterprise Project Types when custom
sites are required
Customizing
the Site
Topics
Working with Status Reports
Create and manage Status
Reports
Managing status report
responses
Creating Status Reports
• Status reports help with communication
• Project managers can use status reports to
gather status information from team members
• This is not the same as task and timesheet
updates
• Status reports can be asked of one or many
team members and resources and are not
project or initiative based
Status Reports
Replying to Status Reports
• Team members and other PWA users will be notified of
pending status reports
• Team members can also add additional areas to comment
and respond
• They can also choose to include other management
during the status report response
• Team member can also create an unsolicited response
• Team members can be proactive and create an unsolicited
response and add line items at their discretion
Replying to
Status Reports
Topics
Portfolio Management & Analysis
Understanding Portfolio
Management
Creating and Managing a
Portfolio Analysis
12.1 Understanding Portfolio Management
• Project portfolio is a term that refers to
an organization's group of projects and
the process in which they are selected
and managed.
• The project portfolio is strategically
selected to advance the corporation's
organizational goals.
Project
Portfolio
Defined
Understanding Portfolio Management
• The centralized management of the processes,
methods, and technologies used by project managers
and project management offices (PMOs) to analyze
and collectively manage current or proposed projects
based on numerous key characteristics.*
• The objectives of PPM are to determine the optimal
resource mix for delivery and to schedule activities to
best achieve an organization’s operational and
financial goals, while honouring constraints imposed
by customers, strategic objectives, or external real-
world factors.*
Project
Portfolio
Management
(PPM)
*Defined by Wikipedia
Understanding Portfolio Management
• Portfolio and Project Managers can use
predefined organizational strategies to
drive proposal selections
• Proposals capture cost and impact on
defined business drivers generating
relative project/value scores across a
portfolio
Strategy and
Drivers
Understanding Portfolio Management
• Business drivers are used to assess
project strategic value and to assure
that project selection supports the
organizational strategy.
• The prioritization exercise takes into
account both objective and subjective
concerns regarding relative driver
weights.
Driver
Prioritizations
12.2 Creating and managing a new Analysis
• Proposals and Projects can be
compared and analyzed against cost
and resource constraints.
• After proposals are submitted, the next
step is to determine which proposals
will be approved as projects.
• The portfolio analysis features in the
Project Web App can help you evaluate
cost relative to strategic value for each
proposal.
Portfolio
Analyses
Topics
Business Intelligence and Power BI
Learn about existing BI
reports
Learn about Dashboard
Reporting using Power BI
Working with sample reports
• Microsoft provides a number of Out of
the Box (OOB) reports to help you get
started
• OOB reports can be saved with new
names and pointed to new customized
Office Data Connection (ODC) files
Sample
Reports
Working with Office Data Connections
• ODC files provide connectivity and
queries for pulling data forward from
the PWA reporting database
• ODC files need to be exported while
editing
Sample
Reports
Dashboard Pages
• Dashboard pages provide distinct
areas to consume various online,
dynamic reports
• Web parts such as Excel Web Access
web parts can be added in various
zones on a dashboard page
Sample
Reports
Power BI
• PWA Data in a self-service business
intelligence and analytics environment built
on the foundation of Excel and other services
• Power Query, Power Pivot, Power View are all
powerful additions available with Excel and
Office 365
• The Power BI for Office 365 Project Online is
a cloud-based solution that enable
communication and collaboration and
reduces the obstacles for deploying powerful
data-driven reports
Power BI

Microsoft Project Online for Project Managers

  • 2.
    Agenda Working with theProject Center Managing views and notifications settings Proposals and Demand Management Office 365 PPM (Project Online) Overview
  • 3.
    Agenda Working with ProjectProfessional Managing Resources Managing Tasks and Approvals Managing Timesheets and Approvals
  • 4.
    Agenda Managing Issues, Risksand Documents Managing the Project Site Working with Status Reports Portfolio Management & Analysis Business Intelligence and Power BI
  • 6.
    Topics Components of anO365 PPM Solution Office 365 PPM Overview What is O365 PPM Role of the Project Manager
  • 7.
    1.1 What isO365 PPM/Project Online • Project has a long history and is used by millions of Project Managers around the world. • Powerful tool to help develop a plan, manage resources and tasks, track progress and analyse workloads and performance. Originated from Project on the desktop Microsoft Project was the company’s third Windows-based application…
  • 8.
    What is O365PPM/Project Online What is O365 PPM/Project Online?
  • 9.
    What is O365PPM/Project Online • Deliver to almost any device • Think of the Evolution of tools as follows: • Outlook/Excel • SharePoint Online (Task Lists) • Project Pro (Office 365) • Project Online Microsoft’s Strategy
  • 10.
    What is O365PPM/Project Online • Project Online (Project Server in the cloud) • Office 365 with Project Professional • SharePoint & SharePoint Online (Task Lists) • Office 365 Project Lite (Team Members) • Project Professional vs Project Standard So many ways to manage projects
  • 11.
    1.2 Role ofthe Project Manager • Project Managers are responsible for the execution and management of projects within the organization. PM’s will use the tool to initiate, plan, manage and close projects. • They will also have team building and collaboration features available to them. Sophisticated reporting capabilities will also be part of their toolset. Project Manager
  • 12.
    Role of theProject Manager • Resource Managers gain visibility and insight into availability and assignments of resources across the enterprise. This information improves the ability to forecast work load and resource demands. Resource Manager
  • 13.
    Role of theProject Manager • Team Members participate in the success of the project by providing status of their assignments, reporting issues and collaborating with other team members and stake holders. The tool provides an easy to use and familiar interface for TM’s to get the job done. Team Member
  • 14.
    Role of theProject Manager • Portfolio Managers have broad visibility and editing permissions. They will typically need access to projects across departments and business units. • Portfolio Viewers (Executives) have similar visibility but without the editing permissions. They are meant to see the projects but not edit them. Portfolio Viewers (Executives) & Portfolio Managers
  • 15.
    1.3 Components ofO365 PPM Functional Components of PPM Microsoft Project Online (MSPO) is made up of multiple functional components that enable Project Managers to be effective at creating, managing and reporting against projects , programs and portfolios in the organization. • Project Management • Resource Management • Task Management • Timesheet Management • Demand Management • Risk & Issue Management • Document Management • Site Management • Status Reporting • Portfolio Management • Business Intelligence & Reporting • Project Online Administration
  • 17.
    Topics Enterprise Projects & SharePointTask Lists Working in the Project Center Managing Projects in the Project Center Creating new projects
  • 18.
    Managing Projects inthe Project Center • Project Center provides a central repository for projects • Projects can be organized by grouping and filtering • Columns/Fields can be moved, hidden and managed for each individual PM Managing Projects
  • 19.
    Managing Projects inthe Project Center • Projects must be “checked out” to be edited • Only one user can have a project checked out at any given time (in PWA or Project Pro) • Other PM’s can view the project in “read only” Checking In and Checking Out
  • 20.
    Managing Projects inthe Project Center • Projects that are checked out and being edited are in a “draft” state or being managed in what's known as the Draft Store. • PM’s can continue to update and modify project schedules and save them • Using the Publish command then transfers the updates to what's known as the Publish Store • PM’s with read only access can only see updates sent to this published location Saving and Publishing
  • 21.
    Managing Projects inthe Project Center • PM’s can set “direct” permissions against their projects • These permissions sit on top of the underlying security model in place • PM’s can determine rights such as opening, editing, publishing and viewing site information • PM’s can determine which projects and which users these permissions apply to Setting direct Permissions
  • 22.
    Managing Projects inthe Project Center • PM’s will also manage project properties from here • This includes fields such as the Start Date, Project Owner and other custom field information • Updates made to project properties do not need to be published, just saved. Project Properties
  • 23.
    Creating new projects •PM’s will initiate new projects from this location • Templates and other settings will be configured to help the PM determine what “type” of project they are creating • This is often the preferred method when creating a new project Creating new projects
  • 24.
    Creating new projects •Each project may have a project site and is the central site repository for documents, issues, and risks related to that project • The site is generated when the project is published can then be customized by each project manager (owner) Working with Project Sites 3 Configuration options: • Create the site automatically • Don’t Create the Site at all • Allow the Project Manager to decide
  • 25.
    Enterprise Projects andSharePoint Task Lists • Enterprise Projects include additional functionality including “check-in” and “check-out” • Direct permission settings and browser based editing • SharePoint tasks lists provide a “synchronization” of tasks • SharePoint tasks lists can be promoted into an enterprise project and can be used as a starting point for many PM’s Enterprise Projects and Tasks Lists
  • 27.
    Topics Managing Delegates Managing PersonalSettings Managing Views Working with Alerts
  • 28.
    Managing Views • Viewscan be created or copied from existing Out of the Box (OOTB) views • Custom Enterprise fields can be added to the views • Filtering and Grouping can be accomplished with Views • Views are associated to Security Categories to determine who can interact with the View (when configured with Project Server security mode) Working with Views
  • 29.
    Managing Views • Project •Project Center • Resource Center • Resource Assignments • My Work • Resource Plans • Project • Team Tasks • Team Builder • Timesheets • Portfolio Analyses • Portfolio Analysis PWA View Areas
  • 30.
    Managing Views • ResourceAssignments • Resources are first selected • Contains resource assignment information • Not editable from this area • Display, grouping and filtering options are available Resource Center Views • Resource Availability Contains availability information about resources that are selected A subset of views are available from this area: • Assignment work by resource • Assignment work by project • Remaining Availability • Work
  • 31.
    Managing Views • Jobsthat you send to Project Server are managed in the Queue Area • The Personal Settings area allows you to view Jobs that have been sent to the server • This allows you to pass information along to the Administrator for troubleshooting purposes Personal Settings
  • 32.
    Managing Delegates • ProjectOnline allows for user delegation. This feature allows for one user acting as another in every part of the Project Web App. • The permission level difference of one user compared to the other does not affect the ability to use the delegate feature. Delegates
  • 34.
    Topics Proposals & DemandManagement Demand Management Overview Proposals & Workflow Management Working with EPT’s and PDP’s
  • 35.
    Demand Management Overview •Allows the ability to capture all “demand” (i.e. work proposals) in one single place • Provides decision making opportunities on which proposals to approve and then track their progress • Demand Management in Project Online can be simple or complex Demand Management Overview
  • 36.
    Demand Management Terms •Created in the Project Center by PM • Governs project and proposal lifecycle • Most often aligned with Departments Enterprise Project Type (EPT’s)
  • 37.
    Demand Management Terms •Represented as a single web part page in PWA • Used to drive the project lifecycle Project Details Pages (PDP’s)
  • 38.
    Demand Management Terms •Supports the notion of multi-stage lifecycles with approvals • Provides Stages within Phases which are then connected to form complete project lifecycles via workflows Workflow (Phases, Stages and Approvals)
  • 40.
    Topics Working with ProjectProfessional Managing Enterprise Projects with Project Pro Saving and Publishing Projects Building teams with Project Pro Importing Projects Taking projects offline and maintaining projects Working with multiple projects
  • 41.
    Managing enterprise projectswith Project • Draft vs Publish options • Browser based project editing • Performance enhancements over task lists • Assignment management and control • Leverage the power and functionality of Project Professional Enterprise Projects
  • 42.
    Saving and Publishingprojects • Publishing moves Schedule to Published Database • Project Manager is prompted to create the Project Site • Team Members are notified • Schedule is available in the Project Center Saving = Draft Publishing = Publish
  • 43.
    Building teams withProject • Project Managers have multiple means to built teams including with Project Pro • PM’s can filter and search for the right resources • Similar functionality is found in PWA Team Building
  • 44.
    Importing projects • Importingstand alone projects • Vendors or consultants may send projects that need to be imported • Resources and custom fields need to be mapped to enterprises resources and enterprise fields Stand alone projects imported
  • 45.
    Taking projects offlineand maintaining projects • Working offline when not connected to Project Server • Project Managers may be in the field or the project server may not be available • Synching updates when connection is reestablished and the changes made offline are automatically synched back to the server • Renaming and deleting projects Offline allows PM’s to continue to work
  • 46.
    Working with multipleprojects • Opening multiple projects has many benefits by opening projects from PWA into Project Professional • The “temporary” master project will not be saved • Dependencies and allocations can be managed with multiple projects open and they can create dependencies and resolve over/under allocations when multiple projects are open Managing multiple projects
  • 48.
    Topics Managing Resources Managing andAnalyzing Enterprise Resources Team Building with the Enterprise Resource Pool Requesting and approving Enterprise Resources
  • 49.
    Enterprise Resource PoolOverview • Contains all enterprise resources • People, equipment and material • Are elements of direct costs • Uses Project Professional when editing resources Resource Pool
  • 50.
    Understanding Resource Categoriesand Types • Project Professional • Work Resources = resources to model people and equipment • Material Resources = resources to represent the supplies consumed during the project • Cost Resources= resources that allow PM’s to apply cost at the point of assignment Resource Types
  • 51.
    Understanding Resource Categoriesand Types • PWA and visible in Project Professional • Enterprise Resource Named (Joe Blow) that login’s (Windows Account/Office 365 Account • Enterprise Resource Unnamed (Carpenter) • Enterprise Resources Named (Joe Blow) that doesn’t login (No PWA license) • Generic Resources = Placeholder (no actuals being tracked) • Local Resources = Just for that project Resource Categories
  • 52.
    Team Building withPWA • Team’s can be built from the Project Center • This allows for Resource Managers or project managers to identify the necessary resources to build onto a project schedule • Team’s can be built from within Project Professional • While project managers have the project schedule open, they can identify and build team members on to their project schedules Building Teams
  • 54.
    Topics Managing tasks andapprovals Assigning tasks to resources Managing Updates Managing Approvals and setting rules
  • 55.
    Publishing Assignments • Assigningand Notifying Team Members • Project Managers can use PWA or Project Professional to assign resources • Project Managers will assign the same way they would if they were not connected to Project Server • Controlling the Notifications • Project Managers can use the “publish” task field to determine when team members are notified Assigning Tasks
  • 56.
    Tracking Method • CurrentConfiguration Settings • What is the Tracking Method? • Crawl, Walk, Run approach • Tracking Options: • % Work Complete • Actual work done and work remaining • Hours of work done per period • Free Form Assigning Tasks
  • 57.
    Publishing Assignments • Assigningand Notifying Team Members • Project Managers can use PWA or Project Professional to assign resources • Project Managers will assign the same way they would if they were not connected to Project Server • Controlling the Notifications • Project Managers can use the “publish” task field to determine when team members are notified Assigning Tasks
  • 58.
    Managing Updates • KeepingSchedules “Up to Date” • Determine when Schedules are published • Setting Deadlines to team member submissions • For example, EBD (End of Business) on Thursday Updating Tasks
  • 59.
    Approval Center • Centrallocation for approving task updates • This central location makes it easy for the project manager to accept or reject updates • The project manager can also preview updates before approving • Project Manager can control auto updates and auto publishing • The project manager can control updates by automating the acceptance based on users • Project managers can also control the publishing of the projects from this area Approving Tasks
  • 61.
    Topics Managing timesheets and approvals Creatingand submitting timesheets Managing Timesheet approvals, rejections and recalls
  • 62.
    Creating and SubmittingTimesheets • Team members create timesheets to track non-project time for a given period • Team members will then submit their time for approval • Administrative time categories and vacation requests can be managed here • Team members can add line items where appropriate to “charge” time against those categories • Vacation requests can also be managed here Timesheet Management
  • 63.
    Managing Timesheets • Timesheetmanagers will review, approve or reject timesheets as part of their job role • Timesheet settings can be auto-approved, or have a fixed approval routing based on the system configuration • Approval Center provides a central location for managing timesheets • The Approval Center gives the timesheet manager many areas to see pending timesheets, recall timesheets where appropriate and review historical timesheets Timesheets
  • 65.
    Topics Issues, Risks andDocuments Managing issues, risks and documents Managing relating items
  • 66.
    Managing Issues, Risksand Documents • The project site is the central repository for project content such as issue and risk information • Issues and risks are stored as lists in the project site • Issues and risks have the ability to be linked back to a specific task in the project schedule • Managing list information provides a central location and reporting capabilities • These list items can then be aggregated across multiple projects for reporting purposes Issues, Risks and & Documents
  • 67.
    Managing Documents • Theproject site is also a repository for supporting documents • The project site document library can also have links back to the project schedule • Documents here can include any number of document types such as Office and PDF documents • Project Managers can leverage the power of SharePoint for project artifacts • Because its built on SharePoint, project managers can leverage alerts, versioning, check-in/check out and security at the library and file level Documents
  • 69.
    Topics Managing permissions and users Managingthe Project Site Working with Site Contents and Site Settings Creating and Managing site Apps
  • 70.
    Site Management • Projectsite management includes the creation and management of site assets and features • Project managers can create additional lists, libraries, pages and sub sites to support the project initiatives • Site management gives the Project Manager full control of the site • Project Managers can also control access to site assets down to the file level • Alerts can also be set to notify team members of new items being added to the site. Managing Project Sites
  • 71.
    Managing Deliverables • Deliverablesmanaged from PWA and Project Professional • Project managers can create and edit deliverables from PWA and Professional • A dedicated deliverables pane available in Project Professional • Deliverables list made available to stake holders leadership • Deliverables show up in deliverables list without publishing and updates work back and forth Deliverables
  • 72.
    Working with Listsand Libraries • New libraries and lists can be created and managed on a site by site basis • Project managers can create new lists and libraries and configure versioning, custom columns and workflow when appropriate • Customization can be preserved as a template • New project site templates can be created and then associated to Enterprise Project Types when custom sites are required Customizing the Site
  • 74.
    Topics Working with StatusReports Create and manage Status Reports Managing status report responses
  • 75.
    Creating Status Reports •Status reports help with communication • Project managers can use status reports to gather status information from team members • This is not the same as task and timesheet updates • Status reports can be asked of one or many team members and resources and are not project or initiative based Status Reports
  • 76.
    Replying to StatusReports • Team members and other PWA users will be notified of pending status reports • Team members can also add additional areas to comment and respond • They can also choose to include other management during the status report response • Team member can also create an unsolicited response • Team members can be proactive and create an unsolicited response and add line items at their discretion Replying to Status Reports
  • 78.
    Topics Portfolio Management &Analysis Understanding Portfolio Management Creating and Managing a Portfolio Analysis
  • 79.
    12.1 Understanding PortfolioManagement • Project portfolio is a term that refers to an organization's group of projects and the process in which they are selected and managed. • The project portfolio is strategically selected to advance the corporation's organizational goals. Project Portfolio Defined
  • 80.
    Understanding Portfolio Management •The centralized management of the processes, methods, and technologies used by project managers and project management offices (PMOs) to analyze and collectively manage current or proposed projects based on numerous key characteristics.* • The objectives of PPM are to determine the optimal resource mix for delivery and to schedule activities to best achieve an organization’s operational and financial goals, while honouring constraints imposed by customers, strategic objectives, or external real- world factors.* Project Portfolio Management (PPM) *Defined by Wikipedia
  • 81.
    Understanding Portfolio Management •Portfolio and Project Managers can use predefined organizational strategies to drive proposal selections • Proposals capture cost and impact on defined business drivers generating relative project/value scores across a portfolio Strategy and Drivers
  • 82.
    Understanding Portfolio Management •Business drivers are used to assess project strategic value and to assure that project selection supports the organizational strategy. • The prioritization exercise takes into account both objective and subjective concerns regarding relative driver weights. Driver Prioritizations
  • 83.
    12.2 Creating andmanaging a new Analysis • Proposals and Projects can be compared and analyzed against cost and resource constraints. • After proposals are submitted, the next step is to determine which proposals will be approved as projects. • The portfolio analysis features in the Project Web App can help you evaluate cost relative to strategic value for each proposal. Portfolio Analyses
  • 85.
    Topics Business Intelligence andPower BI Learn about existing BI reports Learn about Dashboard Reporting using Power BI
  • 86.
    Working with samplereports • Microsoft provides a number of Out of the Box (OOB) reports to help you get started • OOB reports can be saved with new names and pointed to new customized Office Data Connection (ODC) files Sample Reports
  • 87.
    Working with OfficeData Connections • ODC files provide connectivity and queries for pulling data forward from the PWA reporting database • ODC files need to be exported while editing Sample Reports
  • 88.
    Dashboard Pages • Dashboardpages provide distinct areas to consume various online, dynamic reports • Web parts such as Excel Web Access web parts can be added in various zones on a dashboard page Sample Reports
  • 89.
    Power BI • PWAData in a self-service business intelligence and analytics environment built on the foundation of Excel and other services • Power Query, Power Pivot, Power View are all powerful additions available with Excel and Office 365 • The Power BI for Office 365 Project Online is a cloud-based solution that enable communication and collaboration and reduces the obstacles for deploying powerful data-driven reports Power BI

Editor's Notes

  • #2 Greetings and introductions
  • #6 The final section highlights some key business rules.
  • #21 The final section highlights some key business rules.
  • #31 The final section highlights some key business rules.
  • #52 The final section highlights some key business rules.
  • #53 When Open volume license customers get to the page to create an Office 365 account, they will go through the same experience that customers would go through if they were creating an account using the Microsoft direct website.   Customers are asked for their country, first name, last name, email address, and company address.
  • #65 The final section highlights some key business rules.
  • #73 The final section highlights some key business rules.
  • #82 The final section highlights some key business rules.
  • #89 The final section highlights some key business rules.