CAREER
FORWARD
THE TOOLS YOU NEED
TO START MOVING
2 | CAREER FORWARD
CONTENTS 	 INTRODUCTION P/3
01	 NETWORKING OPENS DOORS P/4
02	 JOB SEEKING WHILE EMPLOYED P/10
03	 SOCIAL MEDIA AND YOUR JOB SEARCH P/13
04	 WORKING WITH A RECRUITER P/19
05	 IMPRESS WITH YOUR RÉSUMÉ P/23
06	 THE EFFECTIVE COVER LETTER P/32
07	 NAILING THE INTERVIEW P/36
08	 FOLLOWING UP AFTER THE INTERVIEW P/47
09	 AN OFFER OF EMPLOYMENT P/52
10	 THE COUNTEROFFER DILEMMA P/60
11	 THE PROFESSIONAL EXIT P/63
12	 WHERE KELLY®
COMES IN P/67
	 SOURCES P/68
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
3 | CAREER FORWARD
INTRODUCTION You’re ready to move forward. You have the skills,
the experience, and the drive to take that
next step in your career. All you need now is the
right opportunity.
So now what?
This guide will provide you with what you need, from effective networking
to closing the deal on a job offer.
THE FINE PRINT:
Some of the suggestions here may seem obvious, but résumé and job search
mistakes can happen at all professional levels. Taking the time to review this
guide will help you avoid blunders and make your search a success.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
4 | CAREER FORWARD
01NETWORKING
OPENS DOORS
Who you know matters. The professional contacts
you have may lead to expanded career options
and opportunities, so cultivate a strong network.
But how you network also matters—because your
network, after all, is made up of relationships that
you want to protect and promote, not alienate.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
5 | CAREER FORWARD
01NETWORKING
OPENS DOORS
First things first: What is a network?
A network is an interconnected group
of supporters who serve as resources
for your job search and career
advancement.
THE BENEFITS OF NETWORKING
Networking has been and continues
to be the number one job search
strategy. Networking is your
investment into you. As you prepare,
determine what you would like
to achieve from networking. Your
primary goal is to get to know
people who can provide information
regarding careers and leads.
There are many other benefits to
networking and some include:
•	Getting hired! 4 in 10 job seekers
say they found their job through
personal connections
•	Visibility within your field
•	Positioning yourself as a thought
leader in your field
•	Professional development
•	Promotions and salary growth
•	Visibility into new vendors and
suppliers
•	Job satisfaction
•	Acquiring suitable mentors
GETTING STARTED
Develop your 60-second
presentation
Know yourself, your skills, experiences,
and education. A successful
introductory networking conversation/
meeting will include:
•	Introduction
•	Self-overview
•	QA
•	Obtaining referrals/closing
Identify your key contacts
Start with the handful of contacts
in your core professional and social
circles and track backwards. How and
where did you meet each of them?
Who introduced you to them? Who
helped you to get your current and
previous job? Those connectors serve
as your network brokers and could
possibly help you to expand your
network even further.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
6 | CAREER FORWARD
01NETWORKING
OPENS DOORS
Best networking methods
Now that you have developed your
personal 60-second presentation
and have identified your connections
and network brokers, you are ready
to begin.
The best way to connect with your
networking targets
Think outside of the box. Connect
virtually or in person. Connect
individually or in group-settings.
Nowadays, there are so many ways to
network that are more authentic and
more enjoyable than the traditional,
stuffy methods we have practiced
for years.
•	Start a new online group centered
on a particular topic that will attract
members.
•	Host a brainstorming or idea
exchange session.
•	Start an industry-specific blog.
•	Join professional groups and
interact with other members.
•	Author and share content and make
yourself the center of your own
network.
•	Attend webinars hosted by your
vendor partners.
•	Get involved in a local charity.
Volunteering presents a great
opportunity to meet other
professionals and exchange ideas as
well as gain referrals and leads.
•	Organize or lead a community
effort. Maybe your neighborhood
committee needs to raise funds for
a particular item or bring awareness
to an ongoing effort. By connecting
with like-minded neighbors you’ll
be able to expand your base.
•	Use your favorite hobby or
weekend team activity as a way to
build your network.
•	Start conversations. You never
know where your most valuable
connections will come from—
perhaps the local coffee shop,
restaurant, or library. The checkout
line at the grocery or hardware
store may also provide you with
unexpected connections.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
7 | CAREER FORWARD
01NETWORKING
OPENS DOORS
Networking questions
Specific to career or field
•	What do you like most or least about your work?
•	How did you get into that field or company?
•	What are you hoping to achieve next?
•	What advice would you give to someone trying to break into this field?
•	With whom would you recommend I speak?
Specific to networking event
•	How did you hear about this event?
•	What made you decide to come here?
•	Who else do you know here?
•	What professional groups or associations do you belong to?
•	What blogs or industry experts do you follow?
Personal focus
•	Are you from this area?
•	Where did you go to school?
•	What do you do for fun?
•	Where else do you go to network?
•	What’s the best book you’ve read lately?
Once you have identified whom
you will reach out to and the ways
in which you will connect with your
network, you must now focus on how
you will get the information that you
want. What questions will you ask?
The following list provides examples
of great questions to ask during a
networking conversation.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
8 | CAREER FORWARD
NETWORKING
OPENS DOORS
Don’t put it off
Don’t wait until you’re job searching
to begin networking. Initiate and
continue conversations with contacts
as opportunities arise. Share ideas
and information, and consider that
your expertise could possibly help
them, too. Make it your business to
connect with at least one person
professionally every day. Networking
gets easier and better with practice,
so don’t give up.
Be upfront
If you are serious about a career or job
change, make your intentions known
early on. If you’re merely exploring
possibilities, make that known as well.
Whatever you do, don’t waste your
contacts’ valuable time and influence
or they might not be motivated to
help you in the future.
Follow leads
If you get a job lead, follow up on
it immediately. Should a lead turn
into an interview, or even a new job,
remember to send your referring
contact a thank you note. It’s a
professional courtesy that may help
you even more down the road.
Be genuine
When connecting with a third-party
referral, it’s okay to drop names—
mention your shared contact or the
person who referred you. Take time
to get to know your new contacts’
background, knowledge, and
expertise. Showing genuine interest
in others will make them interested
in you.
Explore every angle
Use the style of networking that’s
best for you, but get out
of your
comfort zone. Reach out to circles of
friends, colleagues, social networks,
and professional organizations alike
when job searching.
Do something for someone
every day
Follow Adam Rifkin’s “Five Minute
Favor” (if you can do something for
someone that will take less than five
minutes, just do it.) What could be a
small investment for you could be of
large benefit to someone else.
Pay it forward
Introduce people who you think
would benefit from knowing one
another. Follow up with them in the
future to find out if the connection
was fruitful for one or both of them.
01 Keys to successful networking
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
9 | CAREER FORWARD
NETWORKING
OPENS DOORS
01 Be a friend
Replace the word “business” with
“relationship.” Think of how you
interact with your friends. With
friends, you engage over shared
interests. You share content, articles,
videos, music, and emails. Do the
same with information that would be
of interest to those who you would
like to have in your network.
Stay connected
Networking should be ongoing. Stay
connected with your contacts over
time and not just when you need
something from them. Networking
should be a part of your long-term
career plan.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
Remember, networking is
a two-way street. Down
the road, your expertise
and connections can boost
someone else’s career.
SOURCES
10 | CAREER FORWARD
02JOB SEEKING
WHILE
EMPLOYED
It’s possible to explore new job opportunities
without alerting your boss, alarming your
co-workers, or burning bridges with anyone in
your current organization.
At any given time, more than half of the U.S. workforce is considering switching from the job they
have to another. If you count yourself in this group, remember that changing companies (or making
the decision to stay where you are) is a process, and there’s an aboveboard way of letting it play out
that won’t damage your tenure, or the confidence placed in you by your employer and co-workers.
Unfortunately, some job seekers are careless, leaving an unnecessary trail of burnt bridges on their
way out the door. Others who tip off their employers to their job search intentions, and then opt
to stay at their current position, find that a negative perception becomes a barrier to future raises
or promotions—or worse: the employer associates the employee with a tenuous status and begins
searching for a replacement.
Here are tips for job seekers who are currently employed, and who want to explore the job market
without losing their good reputation—or their job.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
11 | CAREER FORWARD
02JOB SEEKING
WHILE
EMPLOYED
Respect your current employer
Keep a clear line drawn in the sand
between your job and your job search.
If you have a lull in your workload, you
might be tempted to make phone
calls or send emails from your office
that are related to your job search, but
refrain. Don’t use your work computer
and Internet to search for jobs—even
during a lunch break. Everyone should
always assume that the activity on
a work-issued PC, tablet, or laptop
is being monitored. Remember that
should you leave, another employee
will inherit your PC/laptop and
possibly your search history; leave
only work-related footprints of how
you’ve spent your work hours.
LinkedIn®
is a loud amplifier
You may not be devoting regular
attention to your business-facing
online profile, but since it’s likely
that prospective employers will be
checking out your LinkedIn presence
early in the hiring process, you may
be tempted to play catch-up. This
is a sure tip-off to anyone who’s
paying attention. Nothing broadcasts
to your network (and employer)
that you’re in the job market like
a sudden onslaught of profile
activity—especially when it includes
recommendations from past bosses
and associates, when there had been
very little previous engagement.
Adopt a slower ramp-up. If possible,
begin engaging with LinkedIn as far
ahead of your job search as possible.
If you don’t do this already, spend
time promoting your current employer
and industry through your LinkedIn
network. This is just good business
practice no matter where you work or
what your intentions are. Reach out to
your co-workers and associates with
invitations to connect. And be sure
to check the many resources LinkedIn
provides for job seekers.
Protect your reputation
No matter how “tell all” the flow of
conversation becomes at lunch, do
not reveal to fellow employees that
you are job hunting, or considering
leaving your company. Do not confide
in your associate, lunch buddy, or
even the one co-worker who you
consider to be a true friend. Your
professional reputation and your
current situation are worth protecting,
and if you don’t keep your own secret,
you can’t expect anyone else to. It
could be a mistake to overestimate a
co-worker’s loyalty to you once you
declare your intentions. Remember—if
it could be damaging in any way to
your career and work status to have
your job search discovered, keep this
information to yourself.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
12 | CAREER FORWARD
02JOB SEEKING
WHILE
EMPLOYED
Interview on your own time
While it’s truly no one’s idea of a
vacation, be sure to use your paid
time off (PTO) when scheduling your
interviews. If you are considering
changing companies, even within
the year, set aside a block of your
PTO days for this purpose. Keep
your search aboveboard—don’t
use all your vacation days and then
expect your current employer to
absorb your unplanned absences
in the guise of bogus sick days or
emergency family leave.
You may be able to fit in a phone
screening during a lunch break, but
for critical in-person interviews, you
will want to be completely devoted
to the moment. If an interview goes
well, and you’re offered an impromptu
tour or an extended conversation, you
can wholeheartedly engage, instead
of begging off to catch an afternoon
meeting you scheduled at work.
Be sure the grass is greener
It’s easy to start entertaining greener-
grass daydreams of how much better
a new work environment will be—but
leave your daydreams at home. It will
be extremely hard to check back in to
your current responsibilities at work
once you begin to mentally check out.
Stay grounded in reality, and check
your work ethic and your attitude
daily. The truth is, you may not find
an ideal position for some time, so be
fully engaged where you are.
Also, while expending energy
exploring external options, ask
yourself if you have honestly
exhausted all internal advancement
opportunities where you work.
Schedule time to discuss your career
goals and promotion opportunities
with your supervisor. You may find the
options you’re looking for within your
existing company.
Remain aboveboard throughout your
job search process, and avoid burning
bridges. If and when you actually
do give your notice to your current
employer, you can count their sincere
surprise and regret at your departure
as one measure of a class-act exit.Your professional reputation
and your current situation
are worth protecting, and
if you don’t keep your own
secret, you can’t expect
anyone else to.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
13 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
Social media is a big deal for job seekers today.
In the job search process, social media can help
you connect with recruiters and hiring managers—
and could ultimately lead to career or internship
opportunities at a wide range of companies.
Recruiters rely heavily on social media, with
73 percent having hired talent through a social
network. But social media can also be damaging if
your profiles are not professional and geared toward
the opportunities you wish to be considered for.
The guidelines in this chapter will help you make the
most of social media in your job search.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
14 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
More than 92 percent of recruiters use social
media—or social recruiting—to1
:
• Search for candidates
• Contact candidates
• Stay in touch with potential candidates
• Generate employee referrals
• Vet candidates before the interview
• Post jobs
Having a social media presence has become a must
for the serious candidate
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
15 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
Social media may be great for your personal life,
but it’s quite different when it comes to your work life
Your public profiles should be
professional in nature
First impressions start way before
the first handshake. A future
employer may want to interview
you at first, but decide not to move
forward after reading your profile
or online content. According to
Jobvite®
, 55 percent of recruiters
have reconsidered a candidate
based on their social profile, which
can lead to both positive and
negative reassessments.
Your professional profiles should
always be current
This includes posting your most
recent résumé, refreshing your online
profile, posting current projects,
and updating contact information.
When possible, ask colleagues for
recommendations to post on your
profile before you begin looking a
new job.
Your online content can leave a
good or bad impression
Always be mindful of what you
post and how it may come across.
Avoid using texting lingo, slang,
symbols, and abbreviations in your
online communication with contacts.
Write as if you are speaking to
the person face-to-face. This is a
simple and effective way to convey
professionalism. Regularly monitor
your profiles and avoid/delete any
comments that may put you in a
negative light. Whether good or
bad, never post sensitive information
about your past or current employers.
Pictures should always be
professional
Companies consider social media a
way to get to know their prospective
employees before meeting them.
Develop a strong profile that
highlights your skills and experiences,
and include a professional photo—
not a “selfie.” It’s a good idea to have
consistent professional images across
all of your social pages, including
Facebook®
, LinkedIn®
, Twitter®
,
Instagram®
, and Snapchat®
.
Find recommended tips and tools
Whenever you use a social network
for career opportunities, visit that
social network’s help section for
recommended tips and tools. This
can really assist you in leveraging the
site to your advantage.
KEEP IN MIND:
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
16 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
Create a professional brand ad campaign for yourself
with social media
Use social media wisely in your
job search
•	Use it as a networking tool
to increase your number of
connections.
•	Create and promote your personal
brand through your social media
profiles. Your brand consists of your
experiences, strengths, passions,
career goals, and specialties that
make you the individual you are.
•	Establish your credibility by
following experts and groups in
your field of interest.
•	Follow companies you may be
interested in working with, as well
as educational institutions or alumni
associations that often have their
own databases of jobs. Don’t be
afraid to reach out to someone who
intrigues you. Reply promptly when
someone reaches out to you.
•	Establish yourself as an expert
in your industry. Use your status
updates to share content about
industry topics, tips, and advice.
You don’t have to create original
content to be viewed as someone
in the know.
•	Stay engaged even when not
actively seeking new employment
opportunities by maintaining your
profiles. Comment, tweet, like,
share, and post on your social
media networks when applicable on
different sites.
•	Be consistent. Does the information
on your LinkedIn account align with
the information on your other social
accounts, and even on your résumé?
•	Review your privacy settings for each
social site so that you can control
what is viewed publicly vs. what is
viewed by those in your network.
•	Finally, don’t forget to Google®
your name from time to time to find
out what others can see about you
online.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
17 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
Commonly used social media sites:
LinkedIn
As the main social media source for
career opportunities, 79 percent
of recruiters claim to have hired
employees from connections made on
LinkedIn. Your profile should always
be complete, up-to-date, and should
highlight your skills and talents. Include
a well-written summary that describes
your experience, interests, and career
goals. Doing so will increase your
chances of connecting with the right
people and the right opportunities—
your profile could potentially be
viewed countless times on leading
search engines. And according to
LinkedIn, users with complete profiles
are 40 times more likely to receive job
opportunities! Add industry-specific
terms and keywords to your title on
LinkedIn, to your summary, and to your
experience section.
Promote your brand by commenting,
sharing, liking, and posting on your
LinkedIn home page. Recommendations
are one of the most valuable attributes
of LinkedIn—but can be difficult to
secure from time-crunched colleagues.
Be sure to recommend and endorse
colleagues when appropriate, so they
will be more likely to return the favor.
Facebook
After LinkedIn, Facebook is the site that
potential employers will most likely visit
before inviting you for an interview; 66
percent of recruiters use Facebook as a
recruitment tool across all industries.
As mentioned earlier, keep your
Facebook page—including pictures—
professional. But don’t completely
“sterilize” your profile page. Recruiters
want to see who you really are, and if
you’re a culture fit.
Facebook can be a great source of
information for job seekers. You can like
companies that you are interested in,
follow their posts, advertisements, and
even inquire about open positions.
Twitter
Another useful job search tool, here are
some tips to help you leverage Twitter
for career opportunities:
•	Create a descriptive username that
complements your job search.
•	Put a brief but powerful statement
in your personal bio. If there’s an
industry or career you are passionate
about, let that show.
•	Use a professional picture.
•	Have a custom background that will
give you a more professional look or
highlight your qualifications.
•	Include a link to your online résumé.
•	Follow experts in your industry on
Twitter—check out the tools found on
Twellow®
and Hootsuite®
for help with
this. Also, follow companies you may
be interested in working with.
•	Get targeted job tweets sent to your
Twitter feed or mobile device.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
18 | CAREER FORWARD
03SOCIAL MEDIA
AND YOUR
JOB SEARCH
Popular sites Primary use Ideal for
LinkedIn Professional networking and job search Tenured professionals and those who
want to separate their social sites
between life and work
Facebook Comprehensive social networking Workers who often use a social site for
both work and personal social activity
Twitter Instant messaging and microblogging Online reputation building and
appealing to employers
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
19 | CAREER FORWARD
04WORKING WITH
A RECRUITER
More and more, top employers rely on staffing agencies
and recruitment firms to help access the best talent in the
marketplace. When recruiters develop a track record of locating
qualified talent, a relationship of transparency and trust can
develop that benefits all parties concerned.
Although recruiters primarily work to place talent on behalf of
their clients, as a candidate you may find that a professional
recruiter can be a true advocate—providing you with helpful
information as you launch your job search.
But you don’t have to wait until you are in desperate need of
a new job before making first contact with a recruiter. Take
the time now to develop a foundational relationship built on
networking, give-and-take, and information sharing.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
20 | CAREER FORWARD
04WORKING WITH
A RECRUITER
Search your own network
Ask the most experienced
professionals in your network to refer
you to the recruiters they know. Reach
out to members of organizations you
belong to for referrals. The initial list
might be small at first but don’t be
discouraged.
Review the profiles of recruiters
that post positions online
Do an online keyword search on
LinkedIn®
, TheLadders®
, and Indeed®
to look for recruiters in your area of
specialty.
Search recruiter directories and
trade associations
Some directories will be free and
others will be fee based—but all will
provide lists of recruiters and search
firms for your field.
Blogs and message boards may
also contain recruiter referrals
Career networking sites as well
as alma maters and professional
societies could be of assistance in
connecting you with the appropriate
recruiters.
Join online recruiting groups and
organizations
Not only will you become visible
to industry-specific recruiters, job
opening information is often shared
openly in these groups. You may also
discover resources for assistance with
résumés and other job search efforts.
Remember, recruiters can
open doors
Recruiters may be the best way
to get your foot in the door of a
company, and they often have
access to jobs that are not posted
elsewhere. Recruiters often have
insight into a company’s culture and
salary structure—and can sometimes
elevate your résumé from a black hole
to a hiring manager’s inbox.
Identify and connect with recruiters who specialize
in your area of expertise
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
21 | CAREER FORWARD
04WORKING WITH
A RECRUITER
Make a strong first impression
Even though a recruiter is not a hiring
manager, don’t treat your initial
meeting casually. Present your best
self to your recruiter, so they feel
confident presenting you to hiring
managers. Bring your A-Game, just as
you would during a job interview.
Be transparent
Be open and honest with your
recruiter. Share
your career goals,
salary requirements, geographical,
employer or industry-specific desires
or restrictions, and work preferences
so that
your recruiter can feel
knowledgeable when presenting
you to employers. Tell a recruiter if
you’re working with other recruiters
simultaneously—this is perfectly
acceptable, but best to disclose up
front. Rule of thumb suggests that
you should pick no more than three
recruiters to work with at one time to
avoid going too broad.
Communicate openly
If you line up your own interview with
an employer, let your recruiter know.
Stay on your recruiter’s radar and
check in every few weeks.
Be patient
Success doesn’t necessarily happen
overnight, and the perfect job
may not be available immediately.
Develop a relationship of trust
with your recruiter so that you
feel comfortable soliciting honest
feedback about your qualifications
and fit for a position of interest—trust
that your recruiter will know when an
opportunity is right.
Make referrals
When appropriate, connect your
recruiter with qualified friends and
colleagues who are job searching.
This will strengthen your relationship
with your recruiter, while making
yourself a valuable resource to others.
Now that you have connected, make the most of the relationship
by following these guidelines:
It’s important to share your
interview experiences with
your recruiter. An open
dialogue will help your
recruiter be more helpful
down the road.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
22 | CAREER FORWARD
04WORKING WITH
A RECRUITER
How a recruiter can help you connect with a specific opportunity
After connecting via phone or email, a recruiter may send you a specific
job posting to review—one that aligns with your goals and qualifications.
Once you show interest, the recruiter may initiate a meeting—either on the phone,
in person, or through email.
The recruiter may make suggestions on ways to tailor your résumé
to the assignment, position, or organization.
If you reach the interview phase, your recruiter will help you prepare.
Job offer? The recruiter will likely act as a liaison
for the terms of offer and compensation.
No offer? The recruiter will have specific feedback
that will help you tailor your interview strategy in
the future.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
23 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
Your résumé makes an impression that can
determine whether or not you’ll be invited for an
interview. Your goal is to craft a powerful document
that shows off your accomplishments, experience,
skills, and strengths—getting you front and center
with recruiters and hiring managers.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
24 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
Customize your résumé so it’s as
relevant as possible to the specific
job for which you’re applying
This can mean highlighting specific
skills or experience differently for each
application.
Position yourself
Including an “objective” statement
on your résumé is outdated. Instead,
use a strong positioning statement to
show employers what you have to offer.
For example: “Highly accomplished
marketing professional with more than
10 years of experience developing
multi-million-dollar product lines.”
Be relevant
Going back 10 years, list your
experience and dates of employment
in reverse chronological order. Include
more dated positions only when they
may be critical in helping you obtain a
certain position.
Showcase your accomplishments
Highlight your most impressive projects,
incorporating measurable results
when possible. A statement such as
“Developed new direct mail campaign,
resulting in more than $4 million in
yearly sales” is specific and accurately
demonstrates abilities. Use action words
such as developed, established, or
managed, but omit personal pronouns.
For example, use “accomplished” rather
than “I accomplished.”
Summarize your daily tasks
Use bullet points to succinctly keep
descriptions short, and avoid company
lingo or acronyms.
Include industry-related keywords
Your résumé may be submitted or
placed into a searchable database
that uses software to locate specific
keywords or phrases. Always include
keywords related to your industry
and incorporate keywords that are
repeatedly mentioned in a job title,
description, or posting.
Be truthful
False or misstated information can
quickly cost you a job opportunity, or
come back to bite you even after you
get the job.
Proofread
Spell check your résumé and read it out
loud multiple times. Then have a friend
or colleague review it for mistakes
you may have missed. Even one
misspelled word can ruin your chances
of getting an interview. Remember, if
you are careless on your résumé, hiring
managers may think you will be careless
on the job, too.
Update your LinkedIn®
and other
social media profiles
Make sure the information on your
résumé corresponds with the data on
your LinkedIn and social media pages.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
Résumé best practices
SOURCES
25 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
Applicant tracking systems (ATS) are
software programs designed to help
employers electronically manage
the recruiting process. When you
submit your résumé online, it almost
always goes first to an ATS where the
information is parsed and loaded into
a searchable database. Unfortunately,
this means that any résumé that’s
not structured in a manner the ATS
recognizes won’t be interpreted
correctly. Experts estimate that up
to 75 percent of all résumés don’t
get past these systems2
—but since
they’re used by almost all companies
and recruiting agencies, you need
to make sure that your résumé will
be processed correctly. Keep the
following tips in mind:
Use keywords and phrases that are
specific to the job posting
In addition to industry-related
keywords, an ATS recognizes word
combinations that are unique to each
specific job posting,3
so pinpoint
the most distinct phrases and repeat
them in your résumé.
Label your professional experience
“Work Experience”
This is the term most applicant
tracking systems are programmed
to recognize. Avoid terms such as
“Professional Experience” or
“Work History.”
Don’t submit a PDF
Most applicant tracking systems can’t
process that file type. Instead, submit
your résumé as a Word document, text
file (.txt), or in rich text format (.rtf).
Getting your résumé noticed
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
26 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
How you organize and format your
résumé plays an important role in
getting it noticed, as well as getting
it past an ATS. Pay attention to the
following points:
Get organized
Use simple categories to organize your
résumé. Use the following categories:
“Qualifications,” “Accomplishments,”
“Work Experience,” “Education,”
“Certifications,” and “Associations.”
List the employer, job title, and
employment dates—in that order
In the “Work Experience” section, list
the name of the company first. On
the next line, list your job title and the
dates of employment.
List education, certifications, and
associations last
This information is important, but
not more important than direct
experience. Skip personal information
such as hobbies or awards that have
no professional relevance.
Be concise
Your résumé should be no more than
two pages.
Keep it simple
Stick with a clean, simple, and
professional look. Avoid multiple
fonts, font sizes, and complicated
formatting. Use white or off-white
paper for print versions.
Avoid using tables, multiple
columns, graphics, and expanded or
condensed text, as well as special
characters, italics, and underlines3
Applicant tracking systems can’t
correctly parse information presented
in this manner.
Use a standard font
Arial, Verdana, Calibri, Georgia, and
Tahoma are the best choices.
Don’t include a headshot
You should never include an image
of yourself (unless you’re applying
for a modeling, acting, or other type
of performing job).4
The U.S. Equal
Employment Opportunity Commission
explicitly prohibits employers from
discriminating against employees or
candidates based on ethnicity, gender,
religion, disability, age, national origin,
or genetic information.5
Providing
a photograph of yourself during
the recruitment process can put
employers in a difficult situation.
Organization and formatting
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
27 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
If you’re a recent college graduate
with little experience:
•	Highlight skills and experience
that are important to the job you
are applying for, such as classes,
volunteer efforts, internships,
and memberships in professional
organizations.
•	Try a functional résumé rather
than a chronological one, listing
your skills and accomplishments
first and putting less emphasis
on your previous positions and
dates of employment. Create a
robust qualifications section that
compensates for your lack of work
experience.
If you’re changing careers:
•	Consider using a functional résumé,
which allows you to highlight
transferable skills.
If you have gaps in your
work history:
•	Use your cover letter to explain
how you’ve kept your skills up to
date through temporary/contract
assignments, volunteer work, and
professional development courses.
If you’ve had several temporary/
contract positions:
•	List temporary/contract positions in
reverse chronological order, just as
you would full-time positions.
•	If you worked with a staffing
company, use its name as your
employer, grouping all of your
assignments together.
Listing your GPA:
•	Academic accomplishments become
less significant as work history
develops so don’t include your GPA if
you’ve been working for a few years.
•	An exception: If you are a recent
graduate with a high GPA or degree
from a distinguished university, list
this information near the top of your
résumé.
Special circumstances/types of résumés
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
28 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
SAMPLE RÉSUMÉ ONE: CHRONOLOGICAL P/1
JOHN SMITH
123 Any Street
Anytown, AT 12345
Phone: (123) 456-7890
Email: jsmith@anymail.com
Qualifications
Experienced management professional specializing in financial analysis, planning, and budgeting.
Demonstrated expertise in and dedication to developing innovative process improvements that
positively affect company profitability—with a consistent and documented record of creating
positive organizational enhancements.
Accomplishments
• Deep knowledge of asset management/wealth development built through 6 years of business
experience
• Created and implemented strategic planning and analysis process resulting in more than 200
enhancements to client organization
• Reduced labor costs by average of $500 per month by cutting 2 days off monthly close schedule
• Commended by CFO for developing model for long-term forecast of accounts payable
payments to determine cash requirements and timing of bank borrowing
Work Experience
Investment, Inc. – investment and consulting firm
Finance and Administration Director	 2012 – Present
Directed accounting, finance, and operations for the North American consumer division. Major
accomplishments include:
• Drove improvement in operating profits for division resulting in $80 million increase over the
course of 3 years
• Led $30 million acquisition of new operating unit resulting in a 25% increase in market penetration
• Implemented financial controls and managed $1.5 million budget
• Drove implementation of the CST.2 Active Accounting System throughout branch offices
resulting in increased efficiency and a $1 million YOY reduction in expenses
• Reduced monthly receivable write-offs by $556,000 by developing and implementing restricted
credit policies for the lowest margin customers
• Designed executive management, financial, and operational reporting for more than 100 branches
Planning Company, Inc. – publicly held capital management company
Senior Financial Manager	 2009 – 2012
Co-managed $5 – $10 million in domestic equities for private individuals. Selected securities, valued
portfolios, traded equities, and built personal customer relationships. Developed valuation models
and analytical framework for the equity management service. Major accomplishments include:
• Allocated and oversaw $50 million in corporate cash for a large public company, helping to
build and maintain the relationship for more than 3 years
• Secured new client relationships that resulted in $3.5 million in new business
• Analyzed more than 100 companies across various industries using traditional financial
statement analysis, qualitative analysis, break-up, and comparative valuation methods
• Won contract offering investment services through 14 branches of a local bank
• 	Developed a rapidly growing brokerage clientele of 275 accounts. Products included mutual
funds, stocks, bonds, individual and company retirement plans, insurance, and annuities
• Managed team of 7 financial managers
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
29 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
SAMPLE RÉSUMÉ ONE: CHRONOLOGICAL P/2
Interactive Company, Inc. – Management Consulting and Registered Commodity Trading Firm
Senior Financial Analyst	 2006 – 2009
Financial Analyst	 2005 – 2006
Provided customized analysis, software, charting, and data for clients. Major accomplishments
include:
• Expanded proprietary database to include numerous unique data sets, particularly in the cash
commodity markets
• 	Created 20 new and innovative products to meet specific customer needs
• User liaison for billing system in place in 40 offices throughout U.S.; new system showed
decrease in overdue accounts resulting in 34% more billable revenue each month
Education
Master of Business Administration in Finance	2010
Any State University, Anytown, Any State
Bachelor of Business Administration in Finance 	2004
Any State University, Anytown, Any State
Associations
Board of Directors – Anytown Foundation
• Responsible for organizing and managing monthly and yearly financial records
Fundraising Committee Chair – Any Foundation
• Raised donation in excess of $75,000
• Organized and managed fundraising efforts
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
30 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
SAMPLE RÉSUMÉ TWO: FUNCTIONAL P/1
JOHN SMITH
123 Any Street, Anytown, AT 12345
Phone: (123) 456-7890
Email: jsmith@anymail.com
QUALIFICATIONS
•	Executive-level, strategic marketing, and product development professional in the
financial services industry
•	Advanced strategic marketing and promotions
•	Extensive direct-to-consumer and business-to-business experience
•	P/L management
•	Online and traditional product development
•	Budget administration
•	Recognized leadership and team building
ACCOMPLISHMENTS
Strategic Marketing
Significant accomplishments include:
•	Generated $41 million in annual organic growth with $500,000 marketing investment
through client-focused lead generation, advertising, and promotion efforts
•	Development and execution of vertical industry strategy resulting in annual division
revenue increases of 38% depth of online product offerings, resulting in new account
growth averaging 37% per year
•	Led expansion efforts by identifying and capitalizing profitable markets, increasing
branch coverage by 25%
•	Led insurance investment group through intensive overhaul of sales and marketing
approach that increased penetration into personal investing by 20% and division
revenue by 23% in 2007
•	Improved online lead generation activity by 9,500 active leads each month
•	Worked directly with CEO to develop strategic marketing plan and determine
corporate direction
•	Leveraged CRM data to develop models to identify customers at greatest risk of
decline. Developed and implemented strategies to help retain key customers,
resulting in consistent double-digit YOY growth for this segment
New Product Development
Significant accomplishments include:
•	New product development resulting in more than $200 million in additional yearly
revenue
•	Developed premium account product for high-volume clients, which increased account
penetration by 46% in the financial services market
•	Developed and introduced specialty product for the business-to-business market,
which drove an additional contribution of $80 million in the first year
•	Enhanced existing offline products for the consumer market, improving margin by 24%
•	Introduced more than 50 enhancements to existing online product, resulting in 200%
more repeat visitors to consumer website
•	Established formalized product life cycle management approach, resulting in 10% YOY
growth in niche markets
•	Generated comprehensive product plans to address challenges and exploit
opportunities identified in product review
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
31 | CAREER FORWARD
05IMPRESS WITH
YOUR RÉSUMÉ
SAMPLE RÉSUMÉ TWO: FUNCTIONAL P/2
Leadership and Talent Management
Significant accomplishments include:
•	Lead cross-functional teams responsible for new product development, product
management, marketing, and promotions
•	Motivated teams to regularly exceed targets and financial forecasts
•	Built national team of 30 marketing professionals that drove sales growth an average
of 34% at the branch level
•	Identified and promoted key performers within the organization
•	Retained marketing team at 95% over a 5-year period
WORK EXPERIENCE
Investing Company, Inc., Anytown, AT
A publicly held investment firm with 200 locations worldwide
Vice President of Marketing 	 2014 to Present
Planning Company, Inc., Anytown, AT
A national financial planning agency with more than 100 locations nationwide
Director of Product Development and Marketing 	 2010 to 2014
Financial Investments, Anytown, AT
A boutique financial planning agency specializing in environmentally responsible
investments
Marketing Manager 	 2008 to 2010
Associate Marketing Manager 	 2005 to 2008
EDUCATION
Master of Business Administration
Any University, Anytown, AT
Bachelor of Business Administration in Accounting
Any University, Anytown, AT
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
32 | CAREER FORWARD
06THE EFFECTIVE
COVER LETTER
A well-written cover letter should be a part of
any job search strategy. It provides an additional
opportunity to market yourself and can establish
you as a serious candidate, as well as set you apart
from other applicants. Follow the advice ahead to
create a truly effective cover letter.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
33 | CAREER FORWARD
06THE EFFECTIVE
COVER LETTER
A cover letter is a letter of
introduction that highlights your key
accomplishments and qualifications
for a job opening. A cover letter
adds focus to your résumé and
should leave the reader with an
understanding of the type of position
that you are seeking.
Unlike your résumé, your cover letter
is an opportunity to reveal why you
are passionate about the position,
and should be used to convey
pertinent information not captured in
a traditional résumé format.
Even though much of the job
application process is now online,
few employers seriously consider
a résumé that is not accompanied
by a cover letter. Don’t treat the
cover letter as an afterthought in the
application process—make the time
investment so that you increase your
chances of receiving the coveted
interview invitation.
•	Tailor each cover letter to the
position and employer.
•	Be brief. Get to the point quickly. If
it looks like a long read, it will likely
be discarded.
•	Identify yourself, leveraging any
connection points you may have
with the company or reader.
•	Sell yourself! Show your passion and
demonstrate your communication
skills. Focus on your fit for the
position and company, highlighting
your 3 major accomplishments.
•	Explain unique circumstances
such as employment gaps, career
changes, relocations, or re-
introduction into the job market.
•	Include your LinkedIn®
profile and
relevant website links as well as your
reason for including them in your
cover letter, but don’t overdo it.
•	End the letter by requesting an
interview or meeting.
What is a cover letter?
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
34 | CAREER FORWARD
06THE EFFECTIVE
COVER LETTER
COVER LETTER FORMAT
Use the following template to help you write an effective cover letter introduction, main body, and closing.
Your name
Mailing address
City, State, and ZIP Code
Telephone number(s)
Email address
LinkedIn profile
Today’s date
Addressee’s name
Professional title
Organization name
Mailing address
City, State, and ZIP Code
Dear Mr. (or Ms.) last name,
Introduction: Begin with a statement that establishes a connection with your reader, such as a headline or
a probing question. Briefly state what job you are applying for.
Main body: The body should be one to two short paragraphs that make relevant points about your
qualifications. Do not summarize your résumé! Choose some qualifications that really target the position
you are interested in, but fight the tendency to oversell at this point. Demonstrate your passion and quickly
share any additional information about yourself that could be relevant to the position.
Closing: Your closing should initiate action by explaining what you will do next (e.g., call the employer) or
motivate the reader to contact you to set up an interview. Always close by showing appreciation.
Sincerely yours,
Your signature (handwritten)
Your name (typed)
Enclosure: Résumé
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
35 | CAREER FORWARD
06THE EFFECTIVE
COVER LETTER
SAMPLE OF AN EFFECTIVE COVER LETTER
John Smith
123 Any Street
Anytown, AT 12345
123.456.7890
jsmith@anymail.com
LinkedIn profile URL
Today’s date
Jane Jones
CEO
Any Company, Inc.
123 Any Street
Anytown, AT 12345
Dear Ms. Jones:
I read with interest your requirements for an account supervisor. I am interested in working for a
dynamic and fast growing interactive marketing firm such as yours and have noted your progress
since your company started in 2001.
In my position at Any Advertising, I was responsible for managing more than $17 million in
national advertising revenue, along with developing and executing new online and offline initiatives
designed to motivate consumer purchases and increase revenue. As the lead member of the account
team, I was responsible for moving overall client retention from 76 percent to 92 percent, as well as
growing several key verticals. I believe I can bring a high level of expertise and experience to your
organization while making an immediate impact.
The attached résumé and my LinkedIn profile provide more detail about my experience and
accomplishments. If it appears that my qualifications meet your current needs, I would be happy
to further discuss my background in a meeting with you. I will be contacting you the week of
September 1 to follow up and schedule a personal interview. Thank you.
Sincerely yours,
John Smith
Enclosure: Résumé
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
36 | CAREER FORWARD
07NAILING THE
INTERVIEW
No matter how impressive your résumé is, a great
interview is the key to landing your dream job.
Here’s what you need to know!
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
37 | CAREER FORWARD
07NAILING THE
INTERVIEW
•	Be ready to verbally walk
interviewers through your résumé.
Interviewers typically expect you to
give a clear and succinct overview
of each section.
•	Understand how your experience,
skills, background and aspirations
relate to the position. Interviewers
want to understand how your
accomplishments will translate into
their company’s environment, so be
prepared to give examples.
•	Play to your strengths. Identify areas
where you can offer the most value.
•	Don’t ignore your shortcomings.
Remember, no one is perfect. If
you have a specific weakness, be
honest and share the specific steps
you are taking to improve. Describe
a situation in which you put your
improvement plan into action.
•	Give examples. Be prepared to
describe specific situations in which
you made a real impact. Think of a
time when your contributions made
a real difference.
•	Expand on your résumé; use
the interview to explain the
“why” and “how” behind your
accomplishments, or share new
accomplishments not highlighted
on your résumé.
•	Share your goals. Talk about your
short- and long-term career goals.
Interviewers want to know you’re
career-minded and not just looking
for a job.
Know yourself inside and out
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
38 | CAREER FORWARD
07NAILING THE
INTERVIEW
Research the company, industry,
and position. This shows that you’re
prepared and serious about the
job. A company’s website will often
include information on the history of
the organization as well as its vision,
mission, and goals. If the company is
publicly traded, its annual reports can
provide an overview of its products,
services, and finances.
•	Explain how you can contribute.
The question on every interviewer’s
mind is: “what can you do for us?”
Give specific examples of how you
can help the company meet its
mission, goals, and objectives.
•	Understand the organizational
structure, and how this position fits
into that structure. This will help you
form relevant questions about your
career path while demonstrating
your interest in the job.
•	Know the company’s competition,
and how the company differs from
others. Demonstrate your interest in
the industry and marketplace.
•	Make your interest known. Tell the
interviewer specifically why this
particular position, company, and
industry appeal to you.
Do your homework
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
39 | CAREER FORWARD
07NAILING THE
INTERVIEW
Below are some sample work-related questions:
•	What are your long-term/short-term career goals?
•	What are the most important qualities you look for in a company, position,
and manager? Why are they important?
•	Why are you seeking a change in employment?
•	What would be your next position if you stayed with your current employer?
•	Describe one of your greatest accomplishments in a previous position.
•	Do you prefer a slow- or fast-paced environment?
•	Would you rather be part of a group, or lead?
•	How do you work under pressure?
•	How would co-workers describe your strengths and weaknesses?
•	What professional skills are you currently working to improve?
•	Describe how others perceive you as a manager.
•	Describe how you meet deadlines and goals.
•	What are the keys to successful business relationships?
•	What was your biggest challenge in a previous position?
•	What is missing in your current role?
All the right questions
The interviewer will ask work- and
behavior-based questions about
your past employment, your current
position and responsibilities, and
your long-term career goals. Respond
truthfully, and with an upbeat,
confident tone.
Avoid negative answers and instead
emphasize the positive. Focus on
your professional accomplishments,
and make your answers concise but
informative. Be sure not to go off
topic or discuss your personal life.
Note: Remember that all the
questions in this section are only
samples, and variations will occur in
the interview. You should expect that
at least three questions from each
category would be asked during the
interview process.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
40 | CAREER FORWARD
07NAILING THE
INTERVIEW
Below are some sample behavior-based questions:
•	Tell me about a situation in which you had to make a quick decision.
•	Describe how you’ve led a cross-functional team. What were the results?
•	Describe a situation with a difficult customer, and the outcome.
•	Tell me about the best decision you made.
•	How do you make sure you understand your customer’s needs?
•	Tell me about a time when you went the extra mile to support your team and
explain how you did it.
•	Describe a time when you were involved in a stressful situation, but still got
the job done.
•	Tell me about a time when you had to deal with conflict with a team member.
•	Tell me about a time when you had to show leadership among your peers/team.
Behavior-based questions
Employers frequently use behavior-
based questions to gauge an
employee’s past behavior and future
performance. All answers to behavior-
based questions should follow this
structure: first describe the situation,
explain what you did to impact the
situation, and then highlight the end
results. Interviewers may not always
be looking for a success story. If you’re
asked about a situation that went
wrong, describe how you dealt with it,
what you learned, and what steps you
took to create a positive outcome.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
41 | CAREER FORWARD
07NAILING THE
INTERVIEW
Company focused:
•	How would you describe the culture?
•	Where do you see the company among the competition?
•	What’s the management style?
•	Who thrives in this type of work environment?
•	What makes you want to work here?
•	What are the pros and cons of the company?
Department focused:
•	Where does this position fit in the organizational structure?
•	What concerns are currently facing this department?
•	Who would I be interacting with the most in this position, and what are those
individuals like?
•	What is the culture of the department, and what types of personalities work
well within it?
Questions for the interviewer
It’s just as important to ask questions
as it is to answer them during a
job interview. By asking informed
questions, you show the interviewer
that you have a strong, proactive
interest in the company and the
position. Following are some of the
questions you could ask:
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
42 | CAREER FORWARD
07NAILING THE
INTERVIEW
Position focused:
•	Describe a typical day.
•	What characteristics would the ideal candidate for this position possess?
•	How is performance measured?
•	What are the goals for this position?
•	How does the position align with the priorities established for the
organization as a whole?
•	What is the success profile for the position and why?
•	What areas of my background can I further clarify for you?
•	How do you feel my experience and personality would fit in this position?
•	Is there any additional information that I can provide to demonstrate that I
am the ideal candidate for this position?
•	What’s the next step?
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
43 | CAREER FORWARD
07NAILING THE
INTERVIEW
•	Print reference documents. During a phone interview, it’s perfectly acceptable
to have printed documents to refer to. Be sure to print your résumé, questions
for the interviewer, and a list of your accomplishments. These documents will
provide you with points of reference throughout the interview.
•	Eliminate distractions. Make sure the environment in your home or office is
clear of people and unnecessary noise.
•	Show enthusiasm. The first 15 seconds of a phone interview are critical and
the way you answer the phone is important. Speak clearly, distinctly, and
with confidence.
•	Establish a connection. Ask about the interviewer’s experience with the
company or mention something you have read about the company.
•	Confirm information. At the close of the interview, be sure to confirm the
interviewer’s title, name spelling, and street or email address. Then, use this
information to send a thank you note or email.
Phoning it in
Before an in-person interview, you
may be asked to complete a phone
interview. Phone interviews are
similar to in-person interviews, but
they are also a unique opportunity
that can give you an advantage
prior to meeting an employer. Take
the following suggestions into
consideration to help you prepare for
a phone interview.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
44 | CAREER FORWARD
07NAILING THE
INTERVIEW
Video interviews
Make sure that the background projects a professional environment void of
obvious distractions. Be sure that the camera is angled to provide the best
view of you. Line up your computer screen with the camera as you talk to
the interviewer. Try to limit sudden or nervous movements, which could be
annoying to the interviewer. You should dress professionally, just as you would
for an in-person interview, being mindful of colors that work well on video.
Panel interviews
Greet everyone on the interview panel when you walk in. If you must, write
down each person’s name and title so that you can address them personally
throughout the interview. Engage with each interviewer throughout the
interview and make sure that your comments and questions are relevant
to each person in the room. Send individual thank you notes to each panel
member after the interview.
Group interviews
A candidate’s ability to collaborate and function in a team is often evaluated
in this interview format. The interview may test multiple applicants at once
via group exercises, exams, and scenarios to determine which applicants
demonstrate leadership, creativity, confidence, and decisiveness in working
towards a solution.
Additional interview formats
In addition to telephone interviews,
there are also other types of
interview formats that have become
increasingly popular and their use
varies widely from company to
company. Video interviews, panel
interviews, and even group interviews
should all be prepared for a little
differently than the traditional one-
on-one interview.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
45 | CAREER FORWARD
07NAILING THE
INTERVIEW
Additional considerations
Certain aspects of an interview may not have much to do with your
qualifications, but will still speak volumes about the kind of employee you are.
Consider the following tips to make a good impression from start to finish:
INTERVIEW ETIQUETTE
•	Don’t be late. Factor in extra time for traffic and parking, and try to arrive
about 10 minutes early.
•	Don’t use your cell phone. Turn it completely off, or leave it in your car.
•	Leave food items at home. This includes coffee and gum. Bringing these
items into an interview is considered unprofessional.
•	Treat everyone you meet as if they were the interviewer. This shows your
ability to respect everyone at the company.
•	Don’t be fooled by a casual setting. You’re always interviewing, no matter
whom you’re talking to or where you are. Always stay professional!
•	Don’t read directly from your résumé. An interviewer will expect you to
succinctly summarize your experience, without relying on your résumé for help.
•	Bringing up money during an interview can send the wrong message. Wait
to discuss salary and benefits until the employer brings it up.
•	Reiterate your interest. Towards the end of the interview, remind the
interviewer of your interest and ask about next steps.
•	Say thank you. Show your appreciation for the opportunity, and tell the
interviewer you look forward to speaking to them again.
Coming to a close
The last impression you make is just as
important as the first. The end of the
interview is your final chance to let the
employer know that you’re the best
person for the job. Tell the interviewer
that you feel positive about the
position and about working for the
company. Ask how you compare
to other qualified candidates and
whether you can share any additional
information about yourself. Express
appreciation for the opportunity to
interview. Finally, thank the interviewer
for their time and ask about next
steps, including when you can expect
to hear back, and who to contact for
updates.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
46 | CAREER FORWARD
07NAILING THE
INTERVIEW
VERBAL COMMUNICATION
•	Use correct pronunciation. If an interviewer has a name
that’s difficult to pronounce, be sure to practice ahead
of time. Or, ask for clarification at the beginning of the
interview.
•	Listen carefully. Allow the interviewer to finish speaking
before you respond. And, don’t be afraid to ask for
clarification if you don’t understand a question.
•	Respond concisely. Don’t ramble or veer off topic.
•	Pay attention to non-verbal cues. Be attuned to the
interviewer’s body language and expressions and adjust
your responses accordingly. But never be tentative
about sharing your skills and abilities.
•	Avoid inappropriate language. Cursing or using slang
can cause an interview to end quickly.
•	Don’t be negative. Never share negative information
about previous employers or co-workers. Doing so
communicates that you are more likely to complain than
to try to fix problems.
NON-VERBAL COMMUNICATION
•	Dress the part. Professional dress is always appropriate,
whether you’re interviewing at a large corporation or a
small agency. Keep accessories, makeup, and cologne
to a minimum.
•	Take notes. Document important information that the
interviewer shares. This demonstrates that you take the
interview seriously.
•	Give a firm handshake. It shows self-confidence.
•	Maintain eye contact. A lack of eye contact can indicate
insecurity.
•	Be positive. Focus on using a positive tone of voice
and facial expressions. Keep your voice strong, steady,
and confident, and maintain a calm and composed
appearance.
•	Avoid overconfidence. Keep a careful balance between
confidence and respect. Interviewers are looking for a
team player, not a self-promoter.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
47 | CAREER FORWARD
08FOLLOWING
UP AFTER THE
INTERVIEW
Your work isn’t done when the interview ends—
this is the time to be outstanding in the follow up.
Within a day, take the following actions to be
established as a frontrunner.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
48 | CAREER FORWARD
08FOLLOWING
UP AFTER THE
INTERVIEW
Think about how the interview went. Focus on your own
impressions, and don’t try to guess what the interviewer
thought. Consider the following questions and write the
answers down so you can refer to them later:
•	What exactly was discussed?
•	What were your strong points?
•	What do you wish you had done differently?
If you spoke with more than one interviewer, repeat this
process for each conversation. You’ll use this data to
personalize your follow-up messages to each person.
An interview isn’t just an employer’s chance to evaluate
your fit, it’s also your opportunity to assess a position and
company. Ask yourself the following questions:
•	Now that the interview is over, are you still interested in
the opportunity?
•	How does the opportunity fit in with your career goals?
•	How does the opportunity compare with others that
you’re considering?
•	What did you like or dislike about the opportunity, the
company, and the people?
Conduct a self-assessment
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
49 | CAREER FORWARD
08FOLLOWING
UP AFTER THE
INTERVIEW
Following up with your interviewer(s)
is a critical step that can make a big
difference.
Send an email, letter, or note to
each interviewer
Thank each of them for their time
and reiterate your interest in the
position. To decide whether to
write a handwritten note or typed
letter versus an email, consider
the conservative or casual nature
of the company, the industry, and
the position level. For example, the
more traditional a company, the
more its people will likely appreciate
a handwritten note or letter. Your
communication should strike a
balance between gratitude and
self-promotion. Briefly summarize
your strengths, explaining why your
skills are a good fit for the position,
and what you can do to help the
company. Be sure to review your
communication for errors, and have a
friend proofread it as well. If you need
additional help, refer to the sample
letter provided on the next page.
Highlight and emphasize to
stand out
In individual correspondences,
emphasize one element of your
conversation with the recipient. This
will help you stand out among other
candidates.
Fix a missed opportunity
If you feel you missed an opportunity
to discuss something, briefly touch
upon it in your correspondence
in a manner that invites further
conversation.6
For example, if
the interviewer spoke about the
company’s plans to increase its focus
on mobile advertising campaigns
and you failed to mention your
experience with mobile marketing,
write something such as, “I’m excited
to talk more about your intention to
amp up the mobile aspect of your
marketing campaigns. In my previous
job, I successfully managed the
mobile advertising for a new product
launch and I believe my experience
could be beneficial.”
Interview follow up and thank you
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
50 | CAREER FORWARD
08FOLLOWING
UP AFTER THE
INTERVIEW
SAMPLE FOLLOW-UP LETTER
Today’s date
Jane Jones
CEO
Any Company, Inc.
123 Any Street
Anytown, AT 12345
RE: Interview Follow up
Dear Ms. Jones:
Thank you for taking the time to meet with me. I enjoyed learning more about your
company’s unique mission, culture, and impressive accomplishments. I appreciate the
opportunity to be considered for the insert job/position title at Any Company.
Given my unique experience and qualifications, I’m excited about the prospect of a career
at Any Company. If I can provide additional information, or answer any outstanding
questions, please don’t hesitate to reach out to me at any time. Thank you again for your
time and consideration.
Sincerely,
John Smith
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
51 | CAREER FORWARD
08FOLLOWING
UP AFTER THE
INTERVIEW
Next steps after follow up and
thank you
After your initial interview follow
up, it is a best practice to wait one
week and reach out by telephone.
Depending upon the feedback that
you received from the employer or
your recruiter regarding the hiring
timeline, plan additional follow up
as necessary. For example, if they
anticipate a lengthy hiring process of
a month or more, consider following
up again one month after your
interview. If you don’t hear back within
the timeline, it is probably time to
move on. But don’t be discouraged—
with each interview you are learning
more about yourself and perfecting
your interviewing skills.
Dealing with rejection
If you hear back from the interviewer
and you haven’t been selected, it’s
still important to remain professional
and positive. Thank the person for
informing you, and ask if he or she
can share any feedback about your
interview that you could use for
future reference. If the answer is yes,
then take the time to evaluate the
feedback carefully. If the answer is
no, at least it indicates that you’re
interested in improving, which might
prompt a hiring manager to consider
you for other opportunities.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
52 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
If your interview went well, you could soon receive
an offer of employment. But did you know that
preparing for an offer is just as important as
preparing for an interview? Preparing for an offer
will help you make a decision based on all the
available information.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
53 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
Note that when performing research
about the offer, it’s important to
protect yourself so your current
employer doesn’t find out you’re
considering another position. After
all, you might wind up declining the
offer, so you don’t want to set off
any alarm bells that could jeopardize
your employment situation. Avoid
doing any searches pertaining to
the offered position during work
hours or on devices that belong to
your employer. For example, don’t
look up salary information about
positions with the new company on
your computer at work—wait until
you’re home and can use a device of
your own. At the same time, if you
ask colleagues, friends, and family
for insights about the new job, avoid
doing so in a manner that could
come to your employer’s attention on
social media, or in an email on your
company account. In short, conduct
your information gathering on your
own time, on your own devices, and
in private communications.
The first thing to understand
is how long you have to
consider the offer, and
commit to making a decision
within the allotted time.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
54 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
The opportunity evaluation
•	Think about what you needed and wanted when you first considered making a
change. Does this opportunity (company, people, position, compensation, etc.)
satisfy your needs and provide what you wanted?
•	How does this position enhance your career? Think about where you might end
up 3 to 5 years from now if you were to take the position. Does this trajectory
correspond with your career plans? Are there opportunities for overseas
assignments, cutting-edge work, and/or advancement to a leadership position?
•	Would you feel proud to work for this company? Is it financially stable?
•	Does the corporate culture match your own values, attitudes, and goals?
•	Do you like the people you would work for and with? Would they positively
influence your skill set and career?
•	How do the non-monetary benefits compare to those at your current job and
those at other companies you may be considering? Non-monetary benefits
typically include healthcare options, 401(k), stock options, relocation packages,
and perks such as gym memberships, company day care, flexible work
arrangements, and even reimbursement for the costs of commuting. Evaluate
the monetary value of these benefits and consider how they would impact your
disposable income. If you find this difficult, it’s worthwhile consulting with a
financial advisor who can inform you as to the actual value of what’s on the table.
The following key questions will help
you evaluate how well the opportunity
fits you—and ultimately, whether
you think this opportunity will have a
positive impact on your career.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
55 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
•	Ask for a copy of the company’s employment terms and conditions, as well as
its employee handbook. They may contain additional information that can help
sway your decision one way or another.
•	Consider and disclose any conflicts that may arise from existing employment
agreements.
•	Have you spoken with friends, family, or colleagues to gain additional insight?
Sometimes, hearing other perspectives can help you make a decision.
•	Make sure you have all the information you need in order to make your best
decision. What do you need to know that you didn’t know before an offer of
employment was extended?
•	If you are clear with what you need and want in advance, and this opportunity
fits, don’t pass it up.
The first opportunity may be
the best one out there.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
56 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
The salary negotiation
•	Do your research. Use salary websites such as Glassdoor®
or Salary.com,
professional associations, or job boards to determine the compensation of those
in similar positions. Remember that compensation can vary by geography, so
make sure your research accurately reflects the appropriate marketplace. If the
position involves relocation, use a cost of living calculator like this one from
CNN Money to estimate the actual value of the salary in the new location.
•	Do not base your expectations on what you think someone else makes. No
2 people are the same, nor are 2 opportunities. If your friend has a similar
position at a similar company, you might not earn the same salary. In fact, you
might be able to earn more.
•	When compensation discussions have been introduced by the company, know
your 3 compensation numbers:
	1.	Target number—This is your ideal compensation. At this amount, you would
immediately accept an offer of employment.
	2.	Minimum number—Although this amount may be lower than you’d like,
you’ll still accept this offer because the overall opportunity is the best option
for you. Be sure not to pass up a good opportunity simply because you want
(not need) more money. If everything about a particular opportunity is better
than your current job except compensation, you may still be better off.
	3.	Turn down number—This is $1 less than your minimum number. An offer of
this amount would cause you to turn down an offer. You would be willing to
accept anything greater than your turn down number.
•	Know when to negotiate. If the offer comes in lower than expected, politely
request a conversation with the hiring manager and clearly state your
Once you’ve weighed the non-monetary
aspects of the opportunity, your final
step is to prepare for compensation
discussions or even a negotiation. Here
are some factors to consider:
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
57 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
reservations.7
This provides the company with the information it needs to
partially or entirely meet your demands.
•	Be open to compromise. An offer may not always be the exact number you
want, so be willing to compromise.
•	Focus on financials. At this point, you’ve already considered other aspects of
the job, so limit your decision to financial issues.
•	Understand counteroffers. Counteroffers are polite declines that leave the door
open for further discussions. If the company makes its own counteroffer, you
must be prepared to make an immediate decision.
•	Avoid emotional negotiating. Overly negative or positive reactions can send
up red flags. In fact, some companies start low as a strategy to see how one
responds. Your reaction can say more about you than your decision.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
58 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
STEPS FOR REJECTING THE OFFER:
•	If you have received an offer of employment but have
decided not to accept the offer, call the recruiter or hiring
manager as soon as possible to verbally decline the
opportunity and to express gratitude for receiving the
offer of employment.
•	Immediately follow the verbal decline with a written
communication. Avoid lengthy explanations. Simply state
that the opportunity was not the right fit due to timing or
other external factors, so that you keep yourself in good
standing for future consideration.8
•	Move on—don’t second guess your decision or spend
time feeling guilty.
•	When declining the offer, be concise and follow this
3-point rule:
	 1.	Express gratitude
	 2.	 Be polite
	 3.	 Wish the recruiter or employer well
Offer rejection
Try not to let the offer reach
the salary stage if you know
you will decline it based on
other important factors.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
59 | CAREER FORWARD
09AN OFFER OF
EMPLOYMENT
Offer acceptance
STEPS FOR ACCEPTING THE OFFER:
•	After receiving the offer in writing, review it thoroughly
to ensure that it contains all of the items that you
discussed during the negotiation stage (position title,
salary, bonus entitlements, leave time, and starting date).
•	If all of the information is in order, call the recruiter or
hiring manager to verbally express gratitude and accept
the offer. If adjustments to the letter are needed, then
you should request to have the letter updated before
verbally accepting.
•	Immediately follow the verbal acceptance with a written
letter of acceptance.
•	In your acceptance, make sure that you thank the
manager for the opportunity, and for granting the
terms of employment at the stated salary in the offer.
You should also give thanks for any special incentives
or conditions that were attached to your offer of
employment.9
•	Finally, immediately after accepting the offer, send a
thank you note to everyone that you met with during the
interview process. It will show each person how much
you appreciate the opportunity and get you off on the
right foot—since you may even work with some of these
individuals when you start your new position.
After accepting the offer
Take the next steps. Once you’ve accepted an offer, you’ll
want to do the following in order to indicate that you’re
fully committed to your decision:
•	Resign from your current position, and give at least 2
weeks’ notice.
•	Cancel all other remaining interviews.
•	Be prepared to turn down a counteroffer from your
current employer. The company’s opportunity to keep
you with the organization has already passed (see The
counteroffer dilemma for more).
•	Remove your résumé from job websites.
•	Contact your recruiters and let them know you are no
longer in the job market.
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
60 | CAREER FORWARD
Once you’ve handed in your resignation to your
current employer, your company might make you
a counteroffer in an attempt to entice you to stay.
This is a relatively common occurrence that can lead
you into a sticky situation if not handled carefully.
THE
COUNTEROFFER
DILEMMA
10
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
61 | CAREER FORWARD
THE
COUNTEROFFER
DILEMMA
However tempting a counteroffer may
sound, you’re best advised to think
your situation through very carefully
before accepting or declining. Since
you most likely haven’t disclosed why
you’re leaving, your employer can
only guess as to the driving factors
behind your resignation. This means
that what’s on the table with the
counteroffer is unlikely to address
all of your reasons for wanting to
move on. For example, in most cases
a counteroffer involves a raise or a
promotion—both of which can be
attractive. However, if you’re leaving
due to inflexible work arrangements,
a lack of challenging projects, or
differences between your values and
those of the company, the situation
isn’t going to improve with a higher
salary or a different job title.
Even if your present employer
is willing to negotiate and meet
your demands, it’s important
to note that, according to the
National Employment Association,
an astounding 80 percent of
professionals who accept a
counteroffer leave the company
within six months.10
This can be due
to an employer’s failure to deliver on
promised changes or simply because
the trust between the employee and
his or her manager has diminished
as a result of the earlier intention to
leave the company.
An astounding 80 percent
of professionals who accept
a counteroffer leave the
company within six months.10
10
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
62 | CAREER FORWARD
THE
COUNTEROFFER
DILEMMA
A counteroffer of more money
•	If your employer has offered you a
salary increase, ask yourself why the
company suddenly considers you
more valuable. In a work environment
where you’re respected and valued
for the work you do, you shouldn’t
have to announce you’re leaving in
order to be offered a raise.
•	It may be that your employer considers
it less expensive to offer you more
money than to train your replacement.
•	Your employer may simply be buying
additional time until your replacement
can be found, and that replacement
may be willing to work for less money.
•	It’s also possible that the raise you’ve
been offered is the same one that’s
due you upon your next review.
•	Never use a counteroffer to
renegotiate with your new employer.
Doing so may negatively influence your
new employer’s perception of you.
A counteroffer of additional
responsibility
•	If your employer offers you more
responsibility, it raises the question:
why are you suddenly deemed
capable of taking on more?
•	If offered a promotion, it could be
that your present employer wants to
appease you but isn’t able to provide
the interesting and/or challenging
work you’re looking for.
Diminished credibility
•	Even if your current employer makes a
counteroffer, your manager may have
felt betrayed when you announced
your decision to leave. And when
there’s a loss of trust between
manager and employee, it’s hard to
gain it back. As a result, your chances
of promotion may be diminished
down the road.
•	Accepting a counteroffer will negatively
impact your prospective employer.
When you accept a counteroffer, you’ve
wasted their time by giving mixed
signals with regard to your intentions—
trust is lost, and you probably won’t
be considered for future opportunities
with that employer.
•	Your recruiter, and anyone else who
helped you secure the new position,
may also feel slighted and may be less
likely to help you in the future.
Just remember that you began your
job search for very specific reasons
and a counteroffer may not address
your key issues. Remember that there
are risks with any path you choose but
when it makes sense, don’t be afraid
to stand firm and graciously decline a
counteroffer—and embrace the new
opportunity you’ve earned for yourself.
When faced with a counteroffer, consider these important points:10
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
63 | CAREER FORWARD
THE
PROFESSIONAL
EXIT
Once you’ve landed the new job, you still need
to make a professional exit from your current
employer. The following guidelines will help you
leave on good terms and maintain the positive
relationships you’ve built.
11
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
64 | CAREER FORWARD
THE
PROFESSIONAL
EXIT
Prepare a resignation letter
Express your gratitude for the
experiences you’ve had at the
company; thank your manager and
compliment the organization and
your colleagues. Indicate when your
last day will be, and mention that the
decision to leave is one that helps
you move your career forward.
Resign in person
To be completely professional, notify
your manager in person before
you tell any of your colleagues.
Give him or her a hard copy of your
resignation letter.
Refrain from giving your reasons
for leaving, and don’t reveal your
new employer
Though your manager will likely
inquire why you’re moving on and
which company you’re joining, you’re
under no obligation to tell him or
her. In fact, it’s advisable to keep this
information to yourself, just in case
you run into obstacles during the
resignation process.
Coordinate with your supervisor
on how and when to inform your
colleagues
Some managers prefer to make an
announcement during a meeting,
while others prefer that you compose
a group email. Work with your
supervisor to determine what will
be the least disruptive and most
effective method.
Send your resignation letter
via email
Using a personal email account,
follow up by sending your resignation
letter to both your manager and your
Human Resources department. This
ensures you have a digital record of
tendering your resignation.11
Withdraw from the job market
Notify everyone who’s actively
involved in your job search,
including recruiters, colleagues, and
professional connections. Thank them
for their time and assistance. Make
sure any upcoming interviews are
cancelled.
Remove your résumé from the
Internet
Your new employer shouldn’t see
your résumé still making the rounds.
It could be perceived as a lack of
commitment.
Connect with your current Human
Resources department
Confirm the grace periods and
continuation provisions of your
benefits.
11
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
65 | CAREER FORWARD
THE
PROFESSIONAL
EXIT
Be graceful and professional
This is not the time to burn bridges.
Unless your contract states otherwise,
at a minimum give the standard
two weeks’ notice. Anything less
is unprofessional. Anything more
is often appreciated, since it gives
your employer more time to find a
replacement.
Offer to train your replacement
This ensures that your essential duties
are covered once you leave.
Leave detailed work instructions/
project status updates
This will help your manager, team,
and/or replacement forge ahead
without missing a beat.
Resist the temptation to update your
professional social media profiles
Out of respect for your current
employer, wait until after you’ve
started your new position to
update your profiles with your new
employment information.
Inform stakeholders and clients
Make sure to communicate to any
stakeholders and clients that you’re
leaving, and inform them who will be
replacing you. Encourage them to reach
out while you’re still at the company if
they have any questions or concerns.
Keep working hard
Continue to put in as much effort
during your notice period as you did
on your first day. Don’t miss work or
come in late.
Thank your co-workers and
supervisors
Avoid making negative statements
about your company and/or
colleagues, and don’t gloat about your
new opportunity in person, through
email, or on social media. You don’t
want unprofessional statements
coming back to haunt you.
Leave on good terms
Don’t air your grievances about issues
you faced at work—you never know
whom you may be working with or for
in the future.
Depart professionally
Make sure your company-issued
devices are turned in promptly and
that your workspace is pristine when
you leave. Remove any personal items,
and organize both your digital and
hardcopy files properly.
And finally, don’t feel guilty about
leaving!
Remind yourself of your reasons for
moving on, and focus on the new
opportunity ahead of you.
Exit etiquette11
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
66 | CAREER FORWARD
THE
PROFESSIONAL
EXIT
SAMPLE RESIGNATION LETTER
Today’s date
John Smith
Insert company name 123 Any Street
Anytown, AT 12345
Dear Mr. Smith:
Please accept this letter as my formal notice of resignation from insert company
name, effective insert date. I trust the traditional two weeks’ notice is
sufficient to transition my responsibilities and commence the process of identifying
a replacement. If there is anything that I can do to ensure a seamless transition,
please let me know. I wish you and the entire team at insert company name the
best of luck in the future.
Sincerely,
Jane Jones, IT systems engineer
11
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
SOURCES
67 | CAREER FORWARD
12WHERE KELLY
COMES IN
At Kelly Services®
, we’re dedicated to providing the resources and
tools necessary for success. For 70 years, we’ve been working with
thousands of the nation’s top employers to set the bar high when it
comes to the recruitment and retention of valuable employees.
SO WHY WORK WITH KELLY?
The competition is tough. But if you have the right skills and the desire to succeed, partnering with
Kelly is a smart way to explore all your employment options and be exposed to jobs you won’t see
anywhere else.
Visit kellyservices.us today to find out more about how we can assist you in your job search!
Also, visit kellycareernetwork.com for the latest job postings.
Staffing Solutions
Contract
Contract to Hire
Direct Hire
Areas of Expertise
Contact Center
Creative Services
Education
Engineering
Finance and Accounting
Government
Healthcare
Information Technology
Law
Manufacturing and Logistics
Marketing
Office
Science
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
| kellyservices.us
SOURCES
SOURCES:
INTRODUCTION 01
NETWORKING
OPENS DOORS
02
JOB SEEKING
WHILE EMPLOYED
03
SOCIAL MEDIA
AND YOUR
JOB SEARCH
04
WORKING WITH
A RECRUITER
05
IMPRESS WITH
YOUR RÉSUMÉ
06
THE EFFECTIVE
COVER LETTER
07
NAILING THE
INTERVIEW
08
FOLLOWING UP
AFTER THE
INTERVIEW
09
AN OFFER OF
EMPLOYMENT
10
THE
COUNTEROFFER
DILEMMA
11
THE
PROFESSIONAL
EXIT
12
WHERE KELLY
COMES IN
HOME CONTENTS
theweek.com.articke.index/252204
theweek.com.articke.index/252204
http://blog.timesunion.com/careers/the-8-keys-to-networking/348/
http://www.forbes.com/sites/dailymuse/2012/04/10/5-new-ways-to-network-that-you-wont-dread/
http://www.askmen.com/money/successful_100/106b_success.html
http://www.entrepreneur.com/article/229440
http://theundercoverrecruiter.com/5-less-obvious-ways-to-network-with-people/
http://www.doncooper.com/27-great-networking-questions-to-ask/
1
Jobvite; Social Recruiting Survey Results 2014
2
http://biginterview.com/blog/2015/03/applicant-tracking-system.html
3
http://www.cio.com/article/2398753/careers-staffing/5-insider-secrets-for-beating-applicant-tracking-
4
http://www.personalbrandingblog.com/your-resume-should-not-include-a-headshot/
5
http://www.eeoc.gov/laws/practices/
http://www.forbes.com/sites/lizryan/2014/07/07/1132/2/
6
http://career-advice.monster.com/job-interview/following-up/after-the-interview-4-ways-to-follow-up-hot-jobs/article.aspx
http://www.forbes.com/sites/lizryan/2014/07/07/1132/
http://career-advice.monster.com/job-interview/following-up/after-the-interview-4-ways-to-follow-up-hot-jobs/article.aspx
7
http://www.forbes.com/sites/lizryan/2014/12/12/how-to-evaluate-a-job-offer/2/
8
http://work.chron.com/way-accept-job-offer-25306.html
9
http://www.bosstaff.com/2015/01/22/proper-etiquette-declining-job-offer/
http://money.cnn.com/calculator/pf/cost-of-living/
http://www.forbes.com/sites/lizryan/2014/12/12/how-to-evaluate-a-job-offer/2/
10
https://www.linkedin.com/pulse/20140318114519-10999323-counteroffers-should-i-stay-or-should-i-go
https://www.linkedin.com/pulse/20140318114519-10999323-counteroffers-should-i-stay-or-should-i-go
http://www.forbes.com/sites/lisaquast/2014/07/07/why-you-should-never-accept-a-counter-offer-when-you-resign/
11
http://www.prfutures.co.uk/jobseeker-tips/how-to-quit-your-job
http://www.prfutures.co.uk/jobseeker-tips/how-to-quit-your-job
EXIT
All trademarks are the property of their respective owners.
An Equal Opportunity Employer © 2016 Kelly Services, Inc. 15-0714 1/16
SOURCES

CAREER FORWARD - THE TOOLS YOU NEED TO START MOVING

  • 1.
    CAREER FORWARD THE TOOLS YOUNEED TO START MOVING
  • 2.
    2 | CAREERFORWARD CONTENTS INTRODUCTION P/3 01 NETWORKING OPENS DOORS P/4 02 JOB SEEKING WHILE EMPLOYED P/10 03 SOCIAL MEDIA AND YOUR JOB SEARCH P/13 04 WORKING WITH A RECRUITER P/19 05 IMPRESS WITH YOUR RÉSUMÉ P/23 06 THE EFFECTIVE COVER LETTER P/32 07 NAILING THE INTERVIEW P/36 08 FOLLOWING UP AFTER THE INTERVIEW P/47 09 AN OFFER OF EMPLOYMENT P/52 10 THE COUNTEROFFER DILEMMA P/60 11 THE PROFESSIONAL EXIT P/63 12 WHERE KELLY® COMES IN P/67 SOURCES P/68 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 3.
    3 | CAREERFORWARD INTRODUCTION You’re ready to move forward. You have the skills, the experience, and the drive to take that next step in your career. All you need now is the right opportunity. So now what? This guide will provide you with what you need, from effective networking to closing the deal on a job offer. THE FINE PRINT: Some of the suggestions here may seem obvious, but résumé and job search mistakes can happen at all professional levels. Taking the time to review this guide will help you avoid blunders and make your search a success. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 4.
    4 | CAREERFORWARD 01NETWORKING OPENS DOORS Who you know matters. The professional contacts you have may lead to expanded career options and opportunities, so cultivate a strong network. But how you network also matters—because your network, after all, is made up of relationships that you want to protect and promote, not alienate. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 5.
    5 | CAREERFORWARD 01NETWORKING OPENS DOORS First things first: What is a network? A network is an interconnected group of supporters who serve as resources for your job search and career advancement. THE BENEFITS OF NETWORKING Networking has been and continues to be the number one job search strategy. Networking is your investment into you. As you prepare, determine what you would like to achieve from networking. Your primary goal is to get to know people who can provide information regarding careers and leads. There are many other benefits to networking and some include: • Getting hired! 4 in 10 job seekers say they found their job through personal connections • Visibility within your field • Positioning yourself as a thought leader in your field • Professional development • Promotions and salary growth • Visibility into new vendors and suppliers • Job satisfaction • Acquiring suitable mentors GETTING STARTED Develop your 60-second presentation Know yourself, your skills, experiences, and education. A successful introductory networking conversation/ meeting will include: • Introduction • Self-overview • QA • Obtaining referrals/closing Identify your key contacts Start with the handful of contacts in your core professional and social circles and track backwards. How and where did you meet each of them? Who introduced you to them? Who helped you to get your current and previous job? Those connectors serve as your network brokers and could possibly help you to expand your network even further. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 6.
    6 | CAREERFORWARD 01NETWORKING OPENS DOORS Best networking methods Now that you have developed your personal 60-second presentation and have identified your connections and network brokers, you are ready to begin. The best way to connect with your networking targets Think outside of the box. Connect virtually or in person. Connect individually or in group-settings. Nowadays, there are so many ways to network that are more authentic and more enjoyable than the traditional, stuffy methods we have practiced for years. • Start a new online group centered on a particular topic that will attract members. • Host a brainstorming or idea exchange session. • Start an industry-specific blog. • Join professional groups and interact with other members. • Author and share content and make yourself the center of your own network. • Attend webinars hosted by your vendor partners. • Get involved in a local charity. Volunteering presents a great opportunity to meet other professionals and exchange ideas as well as gain referrals and leads. • Organize or lead a community effort. Maybe your neighborhood committee needs to raise funds for a particular item or bring awareness to an ongoing effort. By connecting with like-minded neighbors you’ll be able to expand your base. • Use your favorite hobby or weekend team activity as a way to build your network. • Start conversations. You never know where your most valuable connections will come from— perhaps the local coffee shop, restaurant, or library. The checkout line at the grocery or hardware store may also provide you with unexpected connections. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 7.
    7 | CAREERFORWARD 01NETWORKING OPENS DOORS Networking questions Specific to career or field • What do you like most or least about your work? • How did you get into that field or company? • What are you hoping to achieve next? • What advice would you give to someone trying to break into this field? • With whom would you recommend I speak? Specific to networking event • How did you hear about this event? • What made you decide to come here? • Who else do you know here? • What professional groups or associations do you belong to? • What blogs or industry experts do you follow? Personal focus • Are you from this area? • Where did you go to school? • What do you do for fun? • Where else do you go to network? • What’s the best book you’ve read lately? Once you have identified whom you will reach out to and the ways in which you will connect with your network, you must now focus on how you will get the information that you want. What questions will you ask? The following list provides examples of great questions to ask during a networking conversation. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 8.
    8 | CAREERFORWARD NETWORKING OPENS DOORS Don’t put it off Don’t wait until you’re job searching to begin networking. Initiate and continue conversations with contacts as opportunities arise. Share ideas and information, and consider that your expertise could possibly help them, too. Make it your business to connect with at least one person professionally every day. Networking gets easier and better with practice, so don’t give up. Be upfront If you are serious about a career or job change, make your intentions known early on. If you’re merely exploring possibilities, make that known as well. Whatever you do, don’t waste your contacts’ valuable time and influence or they might not be motivated to help you in the future. Follow leads If you get a job lead, follow up on it immediately. Should a lead turn into an interview, or even a new job, remember to send your referring contact a thank you note. It’s a professional courtesy that may help you even more down the road. Be genuine When connecting with a third-party referral, it’s okay to drop names— mention your shared contact or the person who referred you. Take time to get to know your new contacts’ background, knowledge, and expertise. Showing genuine interest in others will make them interested in you. Explore every angle Use the style of networking that’s best for you, but get out
of your comfort zone. Reach out to circles of friends, colleagues, social networks, and professional organizations alike when job searching. Do something for someone every day Follow Adam Rifkin’s “Five Minute Favor” (if you can do something for someone that will take less than five minutes, just do it.) What could be a small investment for you could be of large benefit to someone else. Pay it forward Introduce people who you think would benefit from knowing one another. Follow up with them in the future to find out if the connection was fruitful for one or both of them. 01 Keys to successful networking INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 9.
    9 | CAREERFORWARD NETWORKING OPENS DOORS 01 Be a friend Replace the word “business” with “relationship.” Think of how you interact with your friends. With friends, you engage over shared interests. You share content, articles, videos, music, and emails. Do the same with information that would be of interest to those who you would like to have in your network. Stay connected Networking should be ongoing. Stay connected with your contacts over time and not just when you need something from them. Networking should be a part of your long-term career plan. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS Remember, networking is a two-way street. Down the road, your expertise and connections can boost someone else’s career. SOURCES
  • 10.
    10 | CAREERFORWARD 02JOB SEEKING WHILE EMPLOYED It’s possible to explore new job opportunities without alerting your boss, alarming your co-workers, or burning bridges with anyone in your current organization. At any given time, more than half of the U.S. workforce is considering switching from the job they have to another. If you count yourself in this group, remember that changing companies (or making the decision to stay where you are) is a process, and there’s an aboveboard way of letting it play out that won’t damage your tenure, or the confidence placed in you by your employer and co-workers. Unfortunately, some job seekers are careless, leaving an unnecessary trail of burnt bridges on their way out the door. Others who tip off their employers to their job search intentions, and then opt to stay at their current position, find that a negative perception becomes a barrier to future raises or promotions—or worse: the employer associates the employee with a tenuous status and begins searching for a replacement. Here are tips for job seekers who are currently employed, and who want to explore the job market without losing their good reputation—or their job. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 11.
    11 | CAREERFORWARD 02JOB SEEKING WHILE EMPLOYED Respect your current employer Keep a clear line drawn in the sand between your job and your job search. If you have a lull in your workload, you might be tempted to make phone calls or send emails from your office that are related to your job search, but refrain. Don’t use your work computer and Internet to search for jobs—even during a lunch break. Everyone should always assume that the activity on a work-issued PC, tablet, or laptop is being monitored. Remember that should you leave, another employee will inherit your PC/laptop and possibly your search history; leave only work-related footprints of how you’ve spent your work hours. LinkedIn® is a loud amplifier You may not be devoting regular attention to your business-facing online profile, but since it’s likely that prospective employers will be checking out your LinkedIn presence early in the hiring process, you may be tempted to play catch-up. This is a sure tip-off to anyone who’s paying attention. Nothing broadcasts to your network (and employer) that you’re in the job market like a sudden onslaught of profile activity—especially when it includes recommendations from past bosses and associates, when there had been very little previous engagement. Adopt a slower ramp-up. If possible, begin engaging with LinkedIn as far ahead of your job search as possible. If you don’t do this already, spend time promoting your current employer and industry through your LinkedIn network. This is just good business practice no matter where you work or what your intentions are. Reach out to your co-workers and associates with invitations to connect. And be sure to check the many resources LinkedIn provides for job seekers. Protect your reputation No matter how “tell all” the flow of conversation becomes at lunch, do not reveal to fellow employees that you are job hunting, or considering leaving your company. Do not confide in your associate, lunch buddy, or even the one co-worker who you consider to be a true friend. Your professional reputation and your current situation are worth protecting, and if you don’t keep your own secret, you can’t expect anyone else to. It could be a mistake to overestimate a co-worker’s loyalty to you once you declare your intentions. Remember—if it could be damaging in any way to your career and work status to have your job search discovered, keep this information to yourself. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 12.
    12 | CAREERFORWARD 02JOB SEEKING WHILE EMPLOYED Interview on your own time While it’s truly no one’s idea of a vacation, be sure to use your paid time off (PTO) when scheduling your interviews. If you are considering changing companies, even within the year, set aside a block of your PTO days for this purpose. Keep your search aboveboard—don’t use all your vacation days and then expect your current employer to absorb your unplanned absences in the guise of bogus sick days or emergency family leave. You may be able to fit in a phone screening during a lunch break, but for critical in-person interviews, you will want to be completely devoted to the moment. If an interview goes well, and you’re offered an impromptu tour or an extended conversation, you can wholeheartedly engage, instead of begging off to catch an afternoon meeting you scheduled at work. Be sure the grass is greener It’s easy to start entertaining greener- grass daydreams of how much better a new work environment will be—but leave your daydreams at home. It will be extremely hard to check back in to your current responsibilities at work once you begin to mentally check out. Stay grounded in reality, and check your work ethic and your attitude daily. The truth is, you may not find an ideal position for some time, so be fully engaged where you are. Also, while expending energy exploring external options, ask yourself if you have honestly exhausted all internal advancement opportunities where you work. Schedule time to discuss your career goals and promotion opportunities with your supervisor. You may find the options you’re looking for within your existing company. Remain aboveboard throughout your job search process, and avoid burning bridges. If and when you actually do give your notice to your current employer, you can count their sincere surprise and regret at your departure as one measure of a class-act exit.Your professional reputation and your current situation are worth protecting, and if you don’t keep your own secret, you can’t expect anyone else to. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 13.
    13 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH Social media is a big deal for job seekers today. In the job search process, social media can help you connect with recruiters and hiring managers— and could ultimately lead to career or internship opportunities at a wide range of companies. Recruiters rely heavily on social media, with 73 percent having hired talent through a social network. But social media can also be damaging if your profiles are not professional and geared toward the opportunities you wish to be considered for. The guidelines in this chapter will help you make the most of social media in your job search. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 14.
    14 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH More than 92 percent of recruiters use social media—or social recruiting—to1 : • Search for candidates • Contact candidates • Stay in touch with potential candidates • Generate employee referrals • Vet candidates before the interview • Post jobs Having a social media presence has become a must for the serious candidate INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 15.
    15 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH Social media may be great for your personal life, but it’s quite different when it comes to your work life Your public profiles should be professional in nature First impressions start way before the first handshake. A future employer may want to interview you at first, but decide not to move forward after reading your profile or online content. According to Jobvite® , 55 percent of recruiters have reconsidered a candidate based on their social profile, which can lead to both positive and negative reassessments. Your professional profiles should always be current This includes posting your most recent résumé, refreshing your online profile, posting current projects, and updating contact information. When possible, ask colleagues for recommendations to post on your profile before you begin looking a new job. Your online content can leave a good or bad impression Always be mindful of what you post and how it may come across. Avoid using texting lingo, slang, symbols, and abbreviations in your online communication with contacts. Write as if you are speaking to the person face-to-face. This is a simple and effective way to convey professionalism. Regularly monitor your profiles and avoid/delete any comments that may put you in a negative light. Whether good or bad, never post sensitive information about your past or current employers. Pictures should always be professional Companies consider social media a way to get to know their prospective employees before meeting them. Develop a strong profile that highlights your skills and experiences, and include a professional photo— not a “selfie.” It’s a good idea to have consistent professional images across all of your social pages, including Facebook® , LinkedIn® , Twitter® , Instagram® , and Snapchat® . Find recommended tips and tools Whenever you use a social network for career opportunities, visit that social network’s help section for recommended tips and tools. This can really assist you in leveraging the site to your advantage. KEEP IN MIND: INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 16.
    16 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH Create a professional brand ad campaign for yourself with social media Use social media wisely in your job search • Use it as a networking tool to increase your number of connections. • Create and promote your personal brand through your social media profiles. Your brand consists of your experiences, strengths, passions, career goals, and specialties that make you the individual you are. • Establish your credibility by following experts and groups in your field of interest. • Follow companies you may be interested in working with, as well as educational institutions or alumni associations that often have their own databases of jobs. Don’t be afraid to reach out to someone who intrigues you. Reply promptly when someone reaches out to you. • Establish yourself as an expert in your industry. Use your status updates to share content about industry topics, tips, and advice. You don’t have to create original content to be viewed as someone in the know. • Stay engaged even when not actively seeking new employment opportunities by maintaining your profiles. Comment, tweet, like, share, and post on your social media networks when applicable on different sites. • Be consistent. Does the information on your LinkedIn account align with the information on your other social accounts, and even on your résumé? • Review your privacy settings for each social site so that you can control what is viewed publicly vs. what is viewed by those in your network. • Finally, don’t forget to Google® your name from time to time to find out what others can see about you online. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 17.
    17 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH Commonly used social media sites: LinkedIn As the main social media source for career opportunities, 79 percent of recruiters claim to have hired employees from connections made on LinkedIn. Your profile should always be complete, up-to-date, and should highlight your skills and talents. Include a well-written summary that describes your experience, interests, and career goals. Doing so will increase your chances of connecting with the right people and the right opportunities— your profile could potentially be viewed countless times on leading search engines. And according to LinkedIn, users with complete profiles are 40 times more likely to receive job opportunities! Add industry-specific terms and keywords to your title on LinkedIn, to your summary, and to your experience section. Promote your brand by commenting, sharing, liking, and posting on your LinkedIn home page. Recommendations are one of the most valuable attributes of LinkedIn—but can be difficult to secure from time-crunched colleagues. Be sure to recommend and endorse colleagues when appropriate, so they will be more likely to return the favor. Facebook After LinkedIn, Facebook is the site that potential employers will most likely visit before inviting you for an interview; 66 percent of recruiters use Facebook as a recruitment tool across all industries. As mentioned earlier, keep your Facebook page—including pictures— professional. But don’t completely “sterilize” your profile page. Recruiters want to see who you really are, and if you’re a culture fit. Facebook can be a great source of information for job seekers. You can like companies that you are interested in, follow their posts, advertisements, and even inquire about open positions. Twitter Another useful job search tool, here are some tips to help you leverage Twitter for career opportunities: • Create a descriptive username that complements your job search. • Put a brief but powerful statement in your personal bio. If there’s an industry or career you are passionate about, let that show. • Use a professional picture. • Have a custom background that will give you a more professional look or highlight your qualifications. • Include a link to your online résumé. • Follow experts in your industry on Twitter—check out the tools found on Twellow® and Hootsuite® for help with this. Also, follow companies you may be interested in working with. • Get targeted job tweets sent to your Twitter feed or mobile device. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 18.
    18 | CAREERFORWARD 03SOCIAL MEDIA AND YOUR JOB SEARCH Popular sites Primary use Ideal for LinkedIn Professional networking and job search Tenured professionals and those who want to separate their social sites between life and work Facebook Comprehensive social networking Workers who often use a social site for both work and personal social activity Twitter Instant messaging and microblogging Online reputation building and appealing to employers INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 19.
    19 | CAREERFORWARD 04WORKING WITH A RECRUITER More and more, top employers rely on staffing agencies and recruitment firms to help access the best talent in the marketplace. When recruiters develop a track record of locating qualified talent, a relationship of transparency and trust can develop that benefits all parties concerned. Although recruiters primarily work to place talent on behalf of their clients, as a candidate you may find that a professional recruiter can be a true advocate—providing you with helpful information as you launch your job search. But you don’t have to wait until you are in desperate need of a new job before making first contact with a recruiter. Take the time now to develop a foundational relationship built on networking, give-and-take, and information sharing. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 20.
    20 | CAREERFORWARD 04WORKING WITH A RECRUITER Search your own network Ask the most experienced professionals in your network to refer you to the recruiters they know. Reach out to members of organizations you belong to for referrals. The initial list might be small at first but don’t be discouraged. Review the profiles of recruiters that post positions online Do an online keyword search on LinkedIn® , TheLadders® , and Indeed® to look for recruiters in your area of specialty. Search recruiter directories and trade associations Some directories will be free and others will be fee based—but all will provide lists of recruiters and search firms for your field. Blogs and message boards may also contain recruiter referrals Career networking sites as well as alma maters and professional societies could be of assistance in connecting you with the appropriate recruiters. Join online recruiting groups and organizations Not only will you become visible to industry-specific recruiters, job opening information is often shared openly in these groups. You may also discover resources for assistance with résumés and other job search efforts. Remember, recruiters can open doors Recruiters may be the best way to get your foot in the door of a company, and they often have access to jobs that are not posted elsewhere. Recruiters often have insight into a company’s culture and salary structure—and can sometimes elevate your résumé from a black hole to a hiring manager’s inbox. Identify and connect with recruiters who specialize in your area of expertise INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 21.
    21 | CAREERFORWARD 04WORKING WITH A RECRUITER Make a strong first impression Even though a recruiter is not a hiring manager, don’t treat your initial meeting casually. Present your best self to your recruiter, so they feel confident presenting you to hiring managers. Bring your A-Game, just as you would during a job interview. Be transparent Be open and honest with your recruiter. Share
your career goals, salary requirements, geographical, employer or industry-specific desires or restrictions, and work preferences so that
your recruiter can feel knowledgeable when presenting you to employers. Tell a recruiter if you’re working with other recruiters simultaneously—this is perfectly acceptable, but best to disclose up front. Rule of thumb suggests that you should pick no more than three recruiters to work with at one time to avoid going too broad. Communicate openly If you line up your own interview with an employer, let your recruiter know. Stay on your recruiter’s radar and check in every few weeks. Be patient Success doesn’t necessarily happen overnight, and the perfect job may not be available immediately. Develop a relationship of trust with your recruiter so that you feel comfortable soliciting honest feedback about your qualifications and fit for a position of interest—trust that your recruiter will know when an opportunity is right. Make referrals When appropriate, connect your recruiter with qualified friends and colleagues who are job searching. This will strengthen your relationship with your recruiter, while making yourself a valuable resource to others. Now that you have connected, make the most of the relationship by following these guidelines: It’s important to share your interview experiences with your recruiter. An open dialogue will help your recruiter be more helpful down the road. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 22.
    22 | CAREERFORWARD 04WORKING WITH A RECRUITER How a recruiter can help you connect with a specific opportunity After connecting via phone or email, a recruiter may send you a specific job posting to review—one that aligns with your goals and qualifications. Once you show interest, the recruiter may initiate a meeting—either on the phone, in person, or through email. The recruiter may make suggestions on ways to tailor your résumé to the assignment, position, or organization. If you reach the interview phase, your recruiter will help you prepare. Job offer? The recruiter will likely act as a liaison for the terms of offer and compensation. No offer? The recruiter will have specific feedback that will help you tailor your interview strategy in the future. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 23.
    23 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ Your résumé makes an impression that can determine whether or not you’ll be invited for an interview. Your goal is to craft a powerful document that shows off your accomplishments, experience, skills, and strengths—getting you front and center with recruiters and hiring managers. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 24.
    24 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ Customize your résumé so it’s as relevant as possible to the specific job for which you’re applying This can mean highlighting specific skills or experience differently for each application. Position yourself Including an “objective” statement on your résumé is outdated. Instead, use a strong positioning statement to show employers what you have to offer. For example: “Highly accomplished marketing professional with more than 10 years of experience developing multi-million-dollar product lines.” Be relevant Going back 10 years, list your experience and dates of employment in reverse chronological order. Include more dated positions only when they may be critical in helping you obtain a certain position. Showcase your accomplishments Highlight your most impressive projects, incorporating measurable results when possible. A statement such as “Developed new direct mail campaign, resulting in more than $4 million in yearly sales” is specific and accurately demonstrates abilities. Use action words such as developed, established, or managed, but omit personal pronouns. For example, use “accomplished” rather than “I accomplished.” Summarize your daily tasks Use bullet points to succinctly keep descriptions short, and avoid company lingo or acronyms. Include industry-related keywords Your résumé may be submitted or placed into a searchable database that uses software to locate specific keywords or phrases. Always include keywords related to your industry and incorporate keywords that are repeatedly mentioned in a job title, description, or posting. Be truthful False or misstated information can quickly cost you a job opportunity, or come back to bite you even after you get the job. Proofread Spell check your résumé and read it out loud multiple times. Then have a friend or colleague review it for mistakes you may have missed. Even one misspelled word can ruin your chances of getting an interview. Remember, if you are careless on your résumé, hiring managers may think you will be careless on the job, too. Update your LinkedIn® and other social media profiles Make sure the information on your résumé corresponds with the data on your LinkedIn and social media pages. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS Résumé best practices SOURCES
  • 25.
    25 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ Applicant tracking systems (ATS) are software programs designed to help employers electronically manage the recruiting process. When you submit your résumé online, it almost always goes first to an ATS where the information is parsed and loaded into a searchable database. Unfortunately, this means that any résumé that’s not structured in a manner the ATS recognizes won’t be interpreted correctly. Experts estimate that up to 75 percent of all résumés don’t get past these systems2 —but since they’re used by almost all companies and recruiting agencies, you need to make sure that your résumé will be processed correctly. Keep the following tips in mind: Use keywords and phrases that are specific to the job posting In addition to industry-related keywords, an ATS recognizes word combinations that are unique to each specific job posting,3 so pinpoint the most distinct phrases and repeat them in your résumé. Label your professional experience “Work Experience” This is the term most applicant tracking systems are programmed to recognize. Avoid terms such as “Professional Experience” or “Work History.” Don’t submit a PDF Most applicant tracking systems can’t process that file type. Instead, submit your résumé as a Word document, text file (.txt), or in rich text format (.rtf). Getting your résumé noticed INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 26.
    26 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ How you organize and format your résumé plays an important role in getting it noticed, as well as getting it past an ATS. Pay attention to the following points: Get organized Use simple categories to organize your résumé. Use the following categories: “Qualifications,” “Accomplishments,” “Work Experience,” “Education,” “Certifications,” and “Associations.” List the employer, job title, and employment dates—in that order In the “Work Experience” section, list the name of the company first. On the next line, list your job title and the dates of employment. List education, certifications, and associations last This information is important, but not more important than direct experience. Skip personal information such as hobbies or awards that have no professional relevance. Be concise Your résumé should be no more than two pages. Keep it simple Stick with a clean, simple, and professional look. Avoid multiple fonts, font sizes, and complicated formatting. Use white or off-white paper for print versions. Avoid using tables, multiple columns, graphics, and expanded or condensed text, as well as special characters, italics, and underlines3 Applicant tracking systems can’t correctly parse information presented in this manner. Use a standard font Arial, Verdana, Calibri, Georgia, and Tahoma are the best choices. Don’t include a headshot You should never include an image of yourself (unless you’re applying for a modeling, acting, or other type of performing job).4 The U.S. Equal Employment Opportunity Commission explicitly prohibits employers from discriminating against employees or candidates based on ethnicity, gender, religion, disability, age, national origin, or genetic information.5 Providing a photograph of yourself during the recruitment process can put employers in a difficult situation. Organization and formatting INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 27.
    27 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ If you’re a recent college graduate with little experience: • Highlight skills and experience that are important to the job you are applying for, such as classes, volunteer efforts, internships, and memberships in professional organizations. • Try a functional résumé rather than a chronological one, listing your skills and accomplishments first and putting less emphasis on your previous positions and dates of employment. Create a robust qualifications section that compensates for your lack of work experience. If you’re changing careers: • Consider using a functional résumé, which allows you to highlight transferable skills. If you have gaps in your work history: • Use your cover letter to explain how you’ve kept your skills up to date through temporary/contract assignments, volunteer work, and professional development courses. If you’ve had several temporary/ contract positions: • List temporary/contract positions in reverse chronological order, just as you would full-time positions. • If you worked with a staffing company, use its name as your employer, grouping all of your assignments together. Listing your GPA: • Academic accomplishments become less significant as work history develops so don’t include your GPA if you’ve been working for a few years. • An exception: If you are a recent graduate with a high GPA or degree from a distinguished university, list this information near the top of your résumé. Special circumstances/types of résumés INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 28.
    28 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ SAMPLE RÉSUMÉ ONE: CHRONOLOGICAL P/1 JOHN SMITH 123 Any Street Anytown, AT 12345 Phone: (123) 456-7890 Email: jsmith@anymail.com Qualifications Experienced management professional specializing in financial analysis, planning, and budgeting. Demonstrated expertise in and dedication to developing innovative process improvements that positively affect company profitability—with a consistent and documented record of creating positive organizational enhancements. Accomplishments • Deep knowledge of asset management/wealth development built through 6 years of business experience • Created and implemented strategic planning and analysis process resulting in more than 200 enhancements to client organization • Reduced labor costs by average of $500 per month by cutting 2 days off monthly close schedule • Commended by CFO for developing model for long-term forecast of accounts payable payments to determine cash requirements and timing of bank borrowing Work Experience Investment, Inc. – investment and consulting firm Finance and Administration Director 2012 – Present Directed accounting, finance, and operations for the North American consumer division. Major accomplishments include: • Drove improvement in operating profits for division resulting in $80 million increase over the course of 3 years • Led $30 million acquisition of new operating unit resulting in a 25% increase in market penetration • Implemented financial controls and managed $1.5 million budget • Drove implementation of the CST.2 Active Accounting System throughout branch offices resulting in increased efficiency and a $1 million YOY reduction in expenses • Reduced monthly receivable write-offs by $556,000 by developing and implementing restricted credit policies for the lowest margin customers • Designed executive management, financial, and operational reporting for more than 100 branches Planning Company, Inc. – publicly held capital management company Senior Financial Manager 2009 – 2012 Co-managed $5 – $10 million in domestic equities for private individuals. Selected securities, valued portfolios, traded equities, and built personal customer relationships. Developed valuation models and analytical framework for the equity management service. Major accomplishments include: • Allocated and oversaw $50 million in corporate cash for a large public company, helping to build and maintain the relationship for more than 3 years • Secured new client relationships that resulted in $3.5 million in new business • Analyzed more than 100 companies across various industries using traditional financial statement analysis, qualitative analysis, break-up, and comparative valuation methods • Won contract offering investment services through 14 branches of a local bank • Developed a rapidly growing brokerage clientele of 275 accounts. Products included mutual funds, stocks, bonds, individual and company retirement plans, insurance, and annuities • Managed team of 7 financial managers INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 29.
    29 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ SAMPLE RÉSUMÉ ONE: CHRONOLOGICAL P/2 Interactive Company, Inc. – Management Consulting and Registered Commodity Trading Firm Senior Financial Analyst 2006 – 2009 Financial Analyst 2005 – 2006 Provided customized analysis, software, charting, and data for clients. Major accomplishments include: • Expanded proprietary database to include numerous unique data sets, particularly in the cash commodity markets • Created 20 new and innovative products to meet specific customer needs • User liaison for billing system in place in 40 offices throughout U.S.; new system showed decrease in overdue accounts resulting in 34% more billable revenue each month Education Master of Business Administration in Finance 2010 Any State University, Anytown, Any State Bachelor of Business Administration in Finance 2004 Any State University, Anytown, Any State Associations Board of Directors – Anytown Foundation • Responsible for organizing and managing monthly and yearly financial records Fundraising Committee Chair – Any Foundation • Raised donation in excess of $75,000 • Organized and managed fundraising efforts INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 30.
    30 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ SAMPLE RÉSUMÉ TWO: FUNCTIONAL P/1 JOHN SMITH 123 Any Street, Anytown, AT 12345 Phone: (123) 456-7890 Email: jsmith@anymail.com QUALIFICATIONS • Executive-level, strategic marketing, and product development professional in the financial services industry • Advanced strategic marketing and promotions • Extensive direct-to-consumer and business-to-business experience • P/L management • Online and traditional product development • Budget administration • Recognized leadership and team building ACCOMPLISHMENTS Strategic Marketing Significant accomplishments include: • Generated $41 million in annual organic growth with $500,000 marketing investment through client-focused lead generation, advertising, and promotion efforts • Development and execution of vertical industry strategy resulting in annual division revenue increases of 38% depth of online product offerings, resulting in new account growth averaging 37% per year • Led expansion efforts by identifying and capitalizing profitable markets, increasing branch coverage by 25% • Led insurance investment group through intensive overhaul of sales and marketing approach that increased penetration into personal investing by 20% and division revenue by 23% in 2007 • Improved online lead generation activity by 9,500 active leads each month • Worked directly with CEO to develop strategic marketing plan and determine corporate direction • Leveraged CRM data to develop models to identify customers at greatest risk of decline. Developed and implemented strategies to help retain key customers, resulting in consistent double-digit YOY growth for this segment New Product Development Significant accomplishments include: • New product development resulting in more than $200 million in additional yearly revenue • Developed premium account product for high-volume clients, which increased account penetration by 46% in the financial services market • Developed and introduced specialty product for the business-to-business market, which drove an additional contribution of $80 million in the first year • Enhanced existing offline products for the consumer market, improving margin by 24% • Introduced more than 50 enhancements to existing online product, resulting in 200% more repeat visitors to consumer website • Established formalized product life cycle management approach, resulting in 10% YOY growth in niche markets • Generated comprehensive product plans to address challenges and exploit opportunities identified in product review INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 31.
    31 | CAREERFORWARD 05IMPRESS WITH YOUR RÉSUMÉ SAMPLE RÉSUMÉ TWO: FUNCTIONAL P/2 Leadership and Talent Management Significant accomplishments include: • Lead cross-functional teams responsible for new product development, product management, marketing, and promotions • Motivated teams to regularly exceed targets and financial forecasts • Built national team of 30 marketing professionals that drove sales growth an average of 34% at the branch level • Identified and promoted key performers within the organization • Retained marketing team at 95% over a 5-year period WORK EXPERIENCE Investing Company, Inc., Anytown, AT A publicly held investment firm with 200 locations worldwide Vice President of Marketing 2014 to Present Planning Company, Inc., Anytown, AT A national financial planning agency with more than 100 locations nationwide Director of Product Development and Marketing 2010 to 2014 Financial Investments, Anytown, AT A boutique financial planning agency specializing in environmentally responsible investments Marketing Manager 2008 to 2010 Associate Marketing Manager 2005 to 2008 EDUCATION Master of Business Administration Any University, Anytown, AT Bachelor of Business Administration in Accounting Any University, Anytown, AT INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 32.
    32 | CAREERFORWARD 06THE EFFECTIVE COVER LETTER A well-written cover letter should be a part of any job search strategy. It provides an additional opportunity to market yourself and can establish you as a serious candidate, as well as set you apart from other applicants. Follow the advice ahead to create a truly effective cover letter. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 33.
    33 | CAREERFORWARD 06THE EFFECTIVE COVER LETTER A cover letter is a letter of introduction that highlights your key accomplishments and qualifications for a job opening. A cover letter adds focus to your résumé and should leave the reader with an understanding of the type of position that you are seeking. Unlike your résumé, your cover letter is an opportunity to reveal why you are passionate about the position, and should be used to convey pertinent information not captured in a traditional résumé format. Even though much of the job application process is now online, few employers seriously consider a résumé that is not accompanied by a cover letter. Don’t treat the cover letter as an afterthought in the application process—make the time investment so that you increase your chances of receiving the coveted interview invitation. • Tailor each cover letter to the position and employer. • Be brief. Get to the point quickly. If it looks like a long read, it will likely be discarded. • Identify yourself, leveraging any connection points you may have with the company or reader. • Sell yourself! Show your passion and demonstrate your communication skills. Focus on your fit for the position and company, highlighting your 3 major accomplishments. • Explain unique circumstances such as employment gaps, career changes, relocations, or re- introduction into the job market. • Include your LinkedIn® profile and relevant website links as well as your reason for including them in your cover letter, but don’t overdo it. • End the letter by requesting an interview or meeting. What is a cover letter? INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 34.
    34 | CAREERFORWARD 06THE EFFECTIVE COVER LETTER COVER LETTER FORMAT Use the following template to help you write an effective cover letter introduction, main body, and closing. Your name Mailing address City, State, and ZIP Code Telephone number(s) Email address LinkedIn profile Today’s date Addressee’s name Professional title Organization name Mailing address City, State, and ZIP Code Dear Mr. (or Ms.) last name, Introduction: Begin with a statement that establishes a connection with your reader, such as a headline or a probing question. Briefly state what job you are applying for. Main body: The body should be one to two short paragraphs that make relevant points about your qualifications. Do not summarize your résumé! Choose some qualifications that really target the position you are interested in, but fight the tendency to oversell at this point. Demonstrate your passion and quickly share any additional information about yourself that could be relevant to the position. Closing: Your closing should initiate action by explaining what you will do next (e.g., call the employer) or motivate the reader to contact you to set up an interview. Always close by showing appreciation. Sincerely yours, Your signature (handwritten) Your name (typed) Enclosure: Résumé INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 35.
    35 | CAREERFORWARD 06THE EFFECTIVE COVER LETTER SAMPLE OF AN EFFECTIVE COVER LETTER John Smith 123 Any Street Anytown, AT 12345 123.456.7890 jsmith@anymail.com LinkedIn profile URL Today’s date Jane Jones CEO Any Company, Inc. 123 Any Street Anytown, AT 12345 Dear Ms. Jones: I read with interest your requirements for an account supervisor. I am interested in working for a dynamic and fast growing interactive marketing firm such as yours and have noted your progress since your company started in 2001. In my position at Any Advertising, I was responsible for managing more than $17 million in national advertising revenue, along with developing and executing new online and offline initiatives designed to motivate consumer purchases and increase revenue. As the lead member of the account team, I was responsible for moving overall client retention from 76 percent to 92 percent, as well as growing several key verticals. I believe I can bring a high level of expertise and experience to your organization while making an immediate impact. The attached résumé and my LinkedIn profile provide more detail about my experience and accomplishments. If it appears that my qualifications meet your current needs, I would be happy to further discuss my background in a meeting with you. I will be contacting you the week of September 1 to follow up and schedule a personal interview. Thank you. Sincerely yours, John Smith Enclosure: Résumé INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 36.
    36 | CAREERFORWARD 07NAILING THE INTERVIEW No matter how impressive your résumé is, a great interview is the key to landing your dream job. Here’s what you need to know! INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 37.
    37 | CAREERFORWARD 07NAILING THE INTERVIEW • Be ready to verbally walk interviewers through your résumé. Interviewers typically expect you to give a clear and succinct overview of each section. • Understand how your experience, skills, background and aspirations relate to the position. Interviewers want to understand how your accomplishments will translate into their company’s environment, so be prepared to give examples. • Play to your strengths. Identify areas where you can offer the most value. • Don’t ignore your shortcomings. Remember, no one is perfect. If you have a specific weakness, be honest and share the specific steps you are taking to improve. Describe a situation in which you put your improvement plan into action. • Give examples. Be prepared to describe specific situations in which you made a real impact. Think of a time when your contributions made a real difference. • Expand on your résumé; use the interview to explain the “why” and “how” behind your accomplishments, or share new accomplishments not highlighted on your résumé. • Share your goals. Talk about your short- and long-term career goals. Interviewers want to know you’re career-minded and not just looking for a job. Know yourself inside and out INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 38.
    38 | CAREERFORWARD 07NAILING THE INTERVIEW Research the company, industry, and position. This shows that you’re prepared and serious about the job. A company’s website will often include information on the history of the organization as well as its vision, mission, and goals. If the company is publicly traded, its annual reports can provide an overview of its products, services, and finances. • Explain how you can contribute. The question on every interviewer’s mind is: “what can you do for us?” Give specific examples of how you can help the company meet its mission, goals, and objectives. • Understand the organizational structure, and how this position fits into that structure. This will help you form relevant questions about your career path while demonstrating your interest in the job. • Know the company’s competition, and how the company differs from others. Demonstrate your interest in the industry and marketplace. • Make your interest known. Tell the interviewer specifically why this particular position, company, and industry appeal to you. Do your homework INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 39.
    39 | CAREERFORWARD 07NAILING THE INTERVIEW Below are some sample work-related questions: • What are your long-term/short-term career goals? • What are the most important qualities you look for in a company, position, and manager? Why are they important? • Why are you seeking a change in employment? • What would be your next position if you stayed with your current employer? • Describe one of your greatest accomplishments in a previous position. • Do you prefer a slow- or fast-paced environment? • Would you rather be part of a group, or lead? • How do you work under pressure? • How would co-workers describe your strengths and weaknesses? • What professional skills are you currently working to improve? • Describe how others perceive you as a manager. • Describe how you meet deadlines and goals. • What are the keys to successful business relationships? • What was your biggest challenge in a previous position? • What is missing in your current role? All the right questions The interviewer will ask work- and behavior-based questions about your past employment, your current position and responsibilities, and your long-term career goals. Respond truthfully, and with an upbeat, confident tone. Avoid negative answers and instead emphasize the positive. Focus on your professional accomplishments, and make your answers concise but informative. Be sure not to go off topic or discuss your personal life. Note: Remember that all the questions in this section are only samples, and variations will occur in the interview. You should expect that at least three questions from each category would be asked during the interview process. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 40.
    40 | CAREERFORWARD 07NAILING THE INTERVIEW Below are some sample behavior-based questions: • Tell me about a situation in which you had to make a quick decision. • Describe how you’ve led a cross-functional team. What were the results? • Describe a situation with a difficult customer, and the outcome. • Tell me about the best decision you made. • How do you make sure you understand your customer’s needs? • Tell me about a time when you went the extra mile to support your team and explain how you did it. • Describe a time when you were involved in a stressful situation, but still got the job done. • Tell me about a time when you had to deal with conflict with a team member. • Tell me about a time when you had to show leadership among your peers/team. Behavior-based questions Employers frequently use behavior- based questions to gauge an employee’s past behavior and future performance. All answers to behavior- based questions should follow this structure: first describe the situation, explain what you did to impact the situation, and then highlight the end results. Interviewers may not always be looking for a success story. If you’re asked about a situation that went wrong, describe how you dealt with it, what you learned, and what steps you took to create a positive outcome. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 41.
    41 | CAREERFORWARD 07NAILING THE INTERVIEW Company focused: • How would you describe the culture? • Where do you see the company among the competition? • What’s the management style? • Who thrives in this type of work environment? • What makes you want to work here? • What are the pros and cons of the company? Department focused: • Where does this position fit in the organizational structure? • What concerns are currently facing this department? • Who would I be interacting with the most in this position, and what are those individuals like? • What is the culture of the department, and what types of personalities work well within it? Questions for the interviewer It’s just as important to ask questions as it is to answer them during a job interview. By asking informed questions, you show the interviewer that you have a strong, proactive interest in the company and the position. Following are some of the questions you could ask: INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 42.
    42 | CAREERFORWARD 07NAILING THE INTERVIEW Position focused: • Describe a typical day. • What characteristics would the ideal candidate for this position possess? • How is performance measured? • What are the goals for this position? • How does the position align with the priorities established for the organization as a whole? • What is the success profile for the position and why? • What areas of my background can I further clarify for you? • How do you feel my experience and personality would fit in this position? • Is there any additional information that I can provide to demonstrate that I am the ideal candidate for this position? • What’s the next step? INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 43.
    43 | CAREERFORWARD 07NAILING THE INTERVIEW • Print reference documents. During a phone interview, it’s perfectly acceptable to have printed documents to refer to. Be sure to print your résumé, questions for the interviewer, and a list of your accomplishments. These documents will provide you with points of reference throughout the interview. • Eliminate distractions. Make sure the environment in your home or office is clear of people and unnecessary noise. • Show enthusiasm. The first 15 seconds of a phone interview are critical and the way you answer the phone is important. Speak clearly, distinctly, and with confidence. • Establish a connection. Ask about the interviewer’s experience with the company or mention something you have read about the company. • Confirm information. At the close of the interview, be sure to confirm the interviewer’s title, name spelling, and street or email address. Then, use this information to send a thank you note or email. Phoning it in Before an in-person interview, you may be asked to complete a phone interview. Phone interviews are similar to in-person interviews, but they are also a unique opportunity that can give you an advantage prior to meeting an employer. Take the following suggestions into consideration to help you prepare for a phone interview. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 44.
    44 | CAREERFORWARD 07NAILING THE INTERVIEW Video interviews Make sure that the background projects a professional environment void of obvious distractions. Be sure that the camera is angled to provide the best view of you. Line up your computer screen with the camera as you talk to the interviewer. Try to limit sudden or nervous movements, which could be annoying to the interviewer. You should dress professionally, just as you would for an in-person interview, being mindful of colors that work well on video. Panel interviews Greet everyone on the interview panel when you walk in. If you must, write down each person’s name and title so that you can address them personally throughout the interview. Engage with each interviewer throughout the interview and make sure that your comments and questions are relevant to each person in the room. Send individual thank you notes to each panel member after the interview. Group interviews A candidate’s ability to collaborate and function in a team is often evaluated in this interview format. The interview may test multiple applicants at once via group exercises, exams, and scenarios to determine which applicants demonstrate leadership, creativity, confidence, and decisiveness in working towards a solution. Additional interview formats In addition to telephone interviews, there are also other types of interview formats that have become increasingly popular and their use varies widely from company to company. Video interviews, panel interviews, and even group interviews should all be prepared for a little differently than the traditional one- on-one interview. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 45.
    45 | CAREERFORWARD 07NAILING THE INTERVIEW Additional considerations Certain aspects of an interview may not have much to do with your qualifications, but will still speak volumes about the kind of employee you are. Consider the following tips to make a good impression from start to finish: INTERVIEW ETIQUETTE • Don’t be late. Factor in extra time for traffic and parking, and try to arrive about 10 minutes early. • Don’t use your cell phone. Turn it completely off, or leave it in your car. • Leave food items at home. This includes coffee and gum. Bringing these items into an interview is considered unprofessional. • Treat everyone you meet as if they were the interviewer. This shows your ability to respect everyone at the company. • Don’t be fooled by a casual setting. You’re always interviewing, no matter whom you’re talking to or where you are. Always stay professional! • Don’t read directly from your résumé. An interviewer will expect you to succinctly summarize your experience, without relying on your résumé for help. • Bringing up money during an interview can send the wrong message. Wait to discuss salary and benefits until the employer brings it up. • Reiterate your interest. Towards the end of the interview, remind the interviewer of your interest and ask about next steps. • Say thank you. Show your appreciation for the opportunity, and tell the interviewer you look forward to speaking to them again. Coming to a close The last impression you make is just as important as the first. The end of the interview is your final chance to let the employer know that you’re the best person for the job. Tell the interviewer that you feel positive about the position and about working for the company. Ask how you compare to other qualified candidates and whether you can share any additional information about yourself. Express appreciation for the opportunity to interview. Finally, thank the interviewer for their time and ask about next steps, including when you can expect to hear back, and who to contact for updates. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 46.
    46 | CAREERFORWARD 07NAILING THE INTERVIEW VERBAL COMMUNICATION • Use correct pronunciation. If an interviewer has a name that’s difficult to pronounce, be sure to practice ahead of time. Or, ask for clarification at the beginning of the interview. • Listen carefully. Allow the interviewer to finish speaking before you respond. And, don’t be afraid to ask for clarification if you don’t understand a question. • Respond concisely. Don’t ramble or veer off topic. • Pay attention to non-verbal cues. Be attuned to the interviewer’s body language and expressions and adjust your responses accordingly. But never be tentative about sharing your skills and abilities. • Avoid inappropriate language. Cursing or using slang can cause an interview to end quickly. • Don’t be negative. Never share negative information about previous employers or co-workers. Doing so communicates that you are more likely to complain than to try to fix problems. NON-VERBAL COMMUNICATION • Dress the part. Professional dress is always appropriate, whether you’re interviewing at a large corporation or a small agency. Keep accessories, makeup, and cologne to a minimum. • Take notes. Document important information that the interviewer shares. This demonstrates that you take the interview seriously. • Give a firm handshake. It shows self-confidence. • Maintain eye contact. A lack of eye contact can indicate insecurity. • Be positive. Focus on using a positive tone of voice and facial expressions. Keep your voice strong, steady, and confident, and maintain a calm and composed appearance. • Avoid overconfidence. Keep a careful balance between confidence and respect. Interviewers are looking for a team player, not a self-promoter. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 47.
    47 | CAREERFORWARD 08FOLLOWING UP AFTER THE INTERVIEW Your work isn’t done when the interview ends— this is the time to be outstanding in the follow up. Within a day, take the following actions to be established as a frontrunner. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 48.
    48 | CAREERFORWARD 08FOLLOWING UP AFTER THE INTERVIEW Think about how the interview went. Focus on your own impressions, and don’t try to guess what the interviewer thought. Consider the following questions and write the answers down so you can refer to them later: • What exactly was discussed? • What were your strong points? • What do you wish you had done differently? If you spoke with more than one interviewer, repeat this process for each conversation. You’ll use this data to personalize your follow-up messages to each person. An interview isn’t just an employer’s chance to evaluate your fit, it’s also your opportunity to assess a position and company. Ask yourself the following questions: • Now that the interview is over, are you still interested in the opportunity? • How does the opportunity fit in with your career goals? • How does the opportunity compare with others that you’re considering? • What did you like or dislike about the opportunity, the company, and the people? Conduct a self-assessment INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 49.
    49 | CAREERFORWARD 08FOLLOWING UP AFTER THE INTERVIEW Following up with your interviewer(s) is a critical step that can make a big difference. Send an email, letter, or note to each interviewer Thank each of them for their time and reiterate your interest in the position. To decide whether to write a handwritten note or typed letter versus an email, consider the conservative or casual nature of the company, the industry, and the position level. For example, the more traditional a company, the more its people will likely appreciate a handwritten note or letter. Your communication should strike a balance between gratitude and self-promotion. Briefly summarize your strengths, explaining why your skills are a good fit for the position, and what you can do to help the company. Be sure to review your communication for errors, and have a friend proofread it as well. If you need additional help, refer to the sample letter provided on the next page. Highlight and emphasize to stand out In individual correspondences, emphasize one element of your conversation with the recipient. This will help you stand out among other candidates. Fix a missed opportunity If you feel you missed an opportunity to discuss something, briefly touch upon it in your correspondence in a manner that invites further conversation.6 For example, if the interviewer spoke about the company’s plans to increase its focus on mobile advertising campaigns and you failed to mention your experience with mobile marketing, write something such as, “I’m excited to talk more about your intention to amp up the mobile aspect of your marketing campaigns. In my previous job, I successfully managed the mobile advertising for a new product launch and I believe my experience could be beneficial.” Interview follow up and thank you INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 50.
    50 | CAREERFORWARD 08FOLLOWING UP AFTER THE INTERVIEW SAMPLE FOLLOW-UP LETTER Today’s date Jane Jones CEO Any Company, Inc. 123 Any Street Anytown, AT 12345 RE: Interview Follow up Dear Ms. Jones: Thank you for taking the time to meet with me. I enjoyed learning more about your company’s unique mission, culture, and impressive accomplishments. I appreciate the opportunity to be considered for the insert job/position title at Any Company. Given my unique experience and qualifications, I’m excited about the prospect of a career at Any Company. If I can provide additional information, or answer any outstanding questions, please don’t hesitate to reach out to me at any time. Thank you again for your time and consideration. Sincerely, John Smith INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 51.
    51 | CAREERFORWARD 08FOLLOWING UP AFTER THE INTERVIEW Next steps after follow up and thank you After your initial interview follow up, it is a best practice to wait one week and reach out by telephone. Depending upon the feedback that you received from the employer or your recruiter regarding the hiring timeline, plan additional follow up as necessary. For example, if they anticipate a lengthy hiring process of a month or more, consider following up again one month after your interview. If you don’t hear back within the timeline, it is probably time to move on. But don’t be discouraged— with each interview you are learning more about yourself and perfecting your interviewing skills. Dealing with rejection If you hear back from the interviewer and you haven’t been selected, it’s still important to remain professional and positive. Thank the person for informing you, and ask if he or she can share any feedback about your interview that you could use for future reference. If the answer is yes, then take the time to evaluate the feedback carefully. If the answer is no, at least it indicates that you’re interested in improving, which might prompt a hiring manager to consider you for other opportunities. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 52.
    52 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT If your interview went well, you could soon receive an offer of employment. But did you know that preparing for an offer is just as important as preparing for an interview? Preparing for an offer will help you make a decision based on all the available information. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 53.
    53 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT Note that when performing research about the offer, it’s important to protect yourself so your current employer doesn’t find out you’re considering another position. After all, you might wind up declining the offer, so you don’t want to set off any alarm bells that could jeopardize your employment situation. Avoid doing any searches pertaining to the offered position during work hours or on devices that belong to your employer. For example, don’t look up salary information about positions with the new company on your computer at work—wait until you’re home and can use a device of your own. At the same time, if you ask colleagues, friends, and family for insights about the new job, avoid doing so in a manner that could come to your employer’s attention on social media, or in an email on your company account. In short, conduct your information gathering on your own time, on your own devices, and in private communications. The first thing to understand is how long you have to consider the offer, and commit to making a decision within the allotted time. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 54.
    54 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT The opportunity evaluation • Think about what you needed and wanted when you first considered making a change. Does this opportunity (company, people, position, compensation, etc.) satisfy your needs and provide what you wanted? • How does this position enhance your career? Think about where you might end up 3 to 5 years from now if you were to take the position. Does this trajectory correspond with your career plans? Are there opportunities for overseas assignments, cutting-edge work, and/or advancement to a leadership position? • Would you feel proud to work for this company? Is it financially stable? • Does the corporate culture match your own values, attitudes, and goals? • Do you like the people you would work for and with? Would they positively influence your skill set and career? • How do the non-monetary benefits compare to those at your current job and those at other companies you may be considering? Non-monetary benefits typically include healthcare options, 401(k), stock options, relocation packages, and perks such as gym memberships, company day care, flexible work arrangements, and even reimbursement for the costs of commuting. Evaluate the monetary value of these benefits and consider how they would impact your disposable income. If you find this difficult, it’s worthwhile consulting with a financial advisor who can inform you as to the actual value of what’s on the table. The following key questions will help you evaluate how well the opportunity fits you—and ultimately, whether you think this opportunity will have a positive impact on your career. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 55.
    55 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT • Ask for a copy of the company’s employment terms and conditions, as well as its employee handbook. They may contain additional information that can help sway your decision one way or another. • Consider and disclose any conflicts that may arise from existing employment agreements. • Have you spoken with friends, family, or colleagues to gain additional insight? Sometimes, hearing other perspectives can help you make a decision. • Make sure you have all the information you need in order to make your best decision. What do you need to know that you didn’t know before an offer of employment was extended? • If you are clear with what you need and want in advance, and this opportunity fits, don’t pass it up. The first opportunity may be the best one out there. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 56.
    56 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT The salary negotiation • Do your research. Use salary websites such as Glassdoor® or Salary.com, professional associations, or job boards to determine the compensation of those in similar positions. Remember that compensation can vary by geography, so make sure your research accurately reflects the appropriate marketplace. If the position involves relocation, use a cost of living calculator like this one from CNN Money to estimate the actual value of the salary in the new location. • Do not base your expectations on what you think someone else makes. No 2 people are the same, nor are 2 opportunities. If your friend has a similar position at a similar company, you might not earn the same salary. In fact, you might be able to earn more. • When compensation discussions have been introduced by the company, know your 3 compensation numbers: 1. Target number—This is your ideal compensation. At this amount, you would immediately accept an offer of employment. 2. Minimum number—Although this amount may be lower than you’d like, you’ll still accept this offer because the overall opportunity is the best option for you. Be sure not to pass up a good opportunity simply because you want (not need) more money. If everything about a particular opportunity is better than your current job except compensation, you may still be better off. 3. Turn down number—This is $1 less than your minimum number. An offer of this amount would cause you to turn down an offer. You would be willing to accept anything greater than your turn down number. • Know when to negotiate. If the offer comes in lower than expected, politely request a conversation with the hiring manager and clearly state your Once you’ve weighed the non-monetary aspects of the opportunity, your final step is to prepare for compensation discussions or even a negotiation. Here are some factors to consider: INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 57.
    57 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT reservations.7 This provides the company with the information it needs to partially or entirely meet your demands. • Be open to compromise. An offer may not always be the exact number you want, so be willing to compromise. • Focus on financials. At this point, you’ve already considered other aspects of the job, so limit your decision to financial issues. • Understand counteroffers. Counteroffers are polite declines that leave the door open for further discussions. If the company makes its own counteroffer, you must be prepared to make an immediate decision. • Avoid emotional negotiating. Overly negative or positive reactions can send up red flags. In fact, some companies start low as a strategy to see how one responds. Your reaction can say more about you than your decision. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 58.
    58 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT STEPS FOR REJECTING THE OFFER: • If you have received an offer of employment but have decided not to accept the offer, call the recruiter or hiring manager as soon as possible to verbally decline the opportunity and to express gratitude for receiving the offer of employment. • Immediately follow the verbal decline with a written communication. Avoid lengthy explanations. Simply state that the opportunity was not the right fit due to timing or other external factors, so that you keep yourself in good standing for future consideration.8 • Move on—don’t second guess your decision or spend time feeling guilty. • When declining the offer, be concise and follow this 3-point rule: 1. Express gratitude 2. Be polite 3. Wish the recruiter or employer well Offer rejection Try not to let the offer reach the salary stage if you know you will decline it based on other important factors. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 59.
    59 | CAREERFORWARD 09AN OFFER OF EMPLOYMENT Offer acceptance STEPS FOR ACCEPTING THE OFFER: • After receiving the offer in writing, review it thoroughly to ensure that it contains all of the items that you discussed during the negotiation stage (position title, salary, bonus entitlements, leave time, and starting date). • If all of the information is in order, call the recruiter or hiring manager to verbally express gratitude and accept the offer. If adjustments to the letter are needed, then you should request to have the letter updated before verbally accepting. • Immediately follow the verbal acceptance with a written letter of acceptance. • In your acceptance, make sure that you thank the manager for the opportunity, and for granting the terms of employment at the stated salary in the offer. You should also give thanks for any special incentives or conditions that were attached to your offer of employment.9 • Finally, immediately after accepting the offer, send a thank you note to everyone that you met with during the interview process. It will show each person how much you appreciate the opportunity and get you off on the right foot—since you may even work with some of these individuals when you start your new position. After accepting the offer Take the next steps. Once you’ve accepted an offer, you’ll want to do the following in order to indicate that you’re fully committed to your decision: • Resign from your current position, and give at least 2 weeks’ notice. • Cancel all other remaining interviews. • Be prepared to turn down a counteroffer from your current employer. The company’s opportunity to keep you with the organization has already passed (see The counteroffer dilemma for more). • Remove your résumé from job websites. • Contact your recruiters and let them know you are no longer in the job market. INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 60.
    60 | CAREERFORWARD Once you’ve handed in your resignation to your current employer, your company might make you a counteroffer in an attempt to entice you to stay. This is a relatively common occurrence that can lead you into a sticky situation if not handled carefully. THE COUNTEROFFER DILEMMA 10 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 61.
    61 | CAREERFORWARD THE COUNTEROFFER DILEMMA However tempting a counteroffer may sound, you’re best advised to think your situation through very carefully before accepting or declining. Since you most likely haven’t disclosed why you’re leaving, your employer can only guess as to the driving factors behind your resignation. This means that what’s on the table with the counteroffer is unlikely to address all of your reasons for wanting to move on. For example, in most cases a counteroffer involves a raise or a promotion—both of which can be attractive. However, if you’re leaving due to inflexible work arrangements, a lack of challenging projects, or differences between your values and those of the company, the situation isn’t going to improve with a higher salary or a different job title. Even if your present employer is willing to negotiate and meet your demands, it’s important to note that, according to the National Employment Association, an astounding 80 percent of professionals who accept a counteroffer leave the company within six months.10 This can be due to an employer’s failure to deliver on promised changes or simply because the trust between the employee and his or her manager has diminished as a result of the earlier intention to leave the company. An astounding 80 percent of professionals who accept a counteroffer leave the company within six months.10 10 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 62.
    62 | CAREERFORWARD THE COUNTEROFFER DILEMMA A counteroffer of more money • If your employer has offered you a salary increase, ask yourself why the company suddenly considers you more valuable. In a work environment where you’re respected and valued for the work you do, you shouldn’t have to announce you’re leaving in order to be offered a raise. • It may be that your employer considers it less expensive to offer you more money than to train your replacement. • Your employer may simply be buying additional time until your replacement can be found, and that replacement may be willing to work for less money. • It’s also possible that the raise you’ve been offered is the same one that’s due you upon your next review. • Never use a counteroffer to renegotiate with your new employer. Doing so may negatively influence your new employer’s perception of you. A counteroffer of additional responsibility • If your employer offers you more responsibility, it raises the question: why are you suddenly deemed capable of taking on more? • If offered a promotion, it could be that your present employer wants to appease you but isn’t able to provide the interesting and/or challenging work you’re looking for. Diminished credibility • Even if your current employer makes a counteroffer, your manager may have felt betrayed when you announced your decision to leave. And when there’s a loss of trust between manager and employee, it’s hard to gain it back. As a result, your chances of promotion may be diminished down the road. • Accepting a counteroffer will negatively impact your prospective employer. When you accept a counteroffer, you’ve wasted their time by giving mixed signals with regard to your intentions— trust is lost, and you probably won’t be considered for future opportunities with that employer. • Your recruiter, and anyone else who helped you secure the new position, may also feel slighted and may be less likely to help you in the future. Just remember that you began your job search for very specific reasons and a counteroffer may not address your key issues. Remember that there are risks with any path you choose but when it makes sense, don’t be afraid to stand firm and graciously decline a counteroffer—and embrace the new opportunity you’ve earned for yourself. When faced with a counteroffer, consider these important points:10 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 63.
    63 | CAREERFORWARD THE PROFESSIONAL EXIT Once you’ve landed the new job, you still need to make a professional exit from your current employer. The following guidelines will help you leave on good terms and maintain the positive relationships you’ve built. 11 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 64.
    64 | CAREERFORWARD THE PROFESSIONAL EXIT Prepare a resignation letter Express your gratitude for the experiences you’ve had at the company; thank your manager and compliment the organization and your colleagues. Indicate when your last day will be, and mention that the decision to leave is one that helps you move your career forward. Resign in person To be completely professional, notify your manager in person before you tell any of your colleagues. Give him or her a hard copy of your resignation letter. Refrain from giving your reasons for leaving, and don’t reveal your new employer Though your manager will likely inquire why you’re moving on and which company you’re joining, you’re under no obligation to tell him or her. In fact, it’s advisable to keep this information to yourself, just in case you run into obstacles during the resignation process. Coordinate with your supervisor on how and when to inform your colleagues Some managers prefer to make an announcement during a meeting, while others prefer that you compose a group email. Work with your supervisor to determine what will be the least disruptive and most effective method. Send your resignation letter via email Using a personal email account, follow up by sending your resignation letter to both your manager and your Human Resources department. This ensures you have a digital record of tendering your resignation.11 Withdraw from the job market Notify everyone who’s actively involved in your job search, including recruiters, colleagues, and professional connections. Thank them for their time and assistance. Make sure any upcoming interviews are cancelled. Remove your résumé from the Internet Your new employer shouldn’t see your résumé still making the rounds. It could be perceived as a lack of commitment. Connect with your current Human Resources department Confirm the grace periods and continuation provisions of your benefits. 11 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 65.
    65 | CAREERFORWARD THE PROFESSIONAL EXIT Be graceful and professional This is not the time to burn bridges. Unless your contract states otherwise, at a minimum give the standard two weeks’ notice. Anything less is unprofessional. Anything more is often appreciated, since it gives your employer more time to find a replacement. Offer to train your replacement This ensures that your essential duties are covered once you leave. Leave detailed work instructions/ project status updates This will help your manager, team, and/or replacement forge ahead without missing a beat. Resist the temptation to update your professional social media profiles Out of respect for your current employer, wait until after you’ve started your new position to update your profiles with your new employment information. Inform stakeholders and clients Make sure to communicate to any stakeholders and clients that you’re leaving, and inform them who will be replacing you. Encourage them to reach out while you’re still at the company if they have any questions or concerns. Keep working hard Continue to put in as much effort during your notice period as you did on your first day. Don’t miss work or come in late. Thank your co-workers and supervisors Avoid making negative statements about your company and/or colleagues, and don’t gloat about your new opportunity in person, through email, or on social media. You don’t want unprofessional statements coming back to haunt you. Leave on good terms Don’t air your grievances about issues you faced at work—you never know whom you may be working with or for in the future. Depart professionally Make sure your company-issued devices are turned in promptly and that your workspace is pristine when you leave. Remove any personal items, and organize both your digital and hardcopy files properly. And finally, don’t feel guilty about leaving! Remind yourself of your reasons for moving on, and focus on the new opportunity ahead of you. Exit etiquette11 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 66.
    66 | CAREERFORWARD THE PROFESSIONAL EXIT SAMPLE RESIGNATION LETTER Today’s date John Smith Insert company name 123 Any Street Anytown, AT 12345 Dear Mr. Smith: Please accept this letter as my formal notice of resignation from insert company name, effective insert date. I trust the traditional two weeks’ notice is sufficient to transition my responsibilities and commence the process of identifying a replacement. If there is anything that I can do to ensure a seamless transition, please let me know. I wish you and the entire team at insert company name the best of luck in the future. Sincerely, Jane Jones, IT systems engineer 11 INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS SOURCES
  • 67.
    67 | CAREERFORWARD 12WHERE KELLY COMES IN At Kelly Services® , we’re dedicated to providing the resources and tools necessary for success. For 70 years, we’ve been working with thousands of the nation’s top employers to set the bar high when it comes to the recruitment and retention of valuable employees. SO WHY WORK WITH KELLY? The competition is tough. But if you have the right skills and the desire to succeed, partnering with Kelly is a smart way to explore all your employment options and be exposed to jobs you won’t see anywhere else. Visit kellyservices.us today to find out more about how we can assist you in your job search! Also, visit kellycareernetwork.com for the latest job postings. Staffing Solutions Contract Contract to Hire Direct Hire Areas of Expertise Contact Center Creative Services Education Engineering Finance and Accounting Government Healthcare Information Technology Law Manufacturing and Logistics Marketing Office Science INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOB SEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS | kellyservices.us SOURCES
  • 68.
    SOURCES: INTRODUCTION 01 NETWORKING OPENS DOORS 02 JOBSEEKING WHILE EMPLOYED 03 SOCIAL MEDIA AND YOUR JOB SEARCH 04 WORKING WITH A RECRUITER 05 IMPRESS WITH YOUR RÉSUMÉ 06 THE EFFECTIVE COVER LETTER 07 NAILING THE INTERVIEW 08 FOLLOWING UP AFTER THE INTERVIEW 09 AN OFFER OF EMPLOYMENT 10 THE COUNTEROFFER DILEMMA 11 THE PROFESSIONAL EXIT 12 WHERE KELLY COMES IN HOME CONTENTS theweek.com.articke.index/252204 theweek.com.articke.index/252204 http://blog.timesunion.com/careers/the-8-keys-to-networking/348/ http://www.forbes.com/sites/dailymuse/2012/04/10/5-new-ways-to-network-that-you-wont-dread/ http://www.askmen.com/money/successful_100/106b_success.html http://www.entrepreneur.com/article/229440 http://theundercoverrecruiter.com/5-less-obvious-ways-to-network-with-people/ http://www.doncooper.com/27-great-networking-questions-to-ask/ 1 Jobvite; Social Recruiting Survey Results 2014 2 http://biginterview.com/blog/2015/03/applicant-tracking-system.html 3 http://www.cio.com/article/2398753/careers-staffing/5-insider-secrets-for-beating-applicant-tracking- 4 http://www.personalbrandingblog.com/your-resume-should-not-include-a-headshot/ 5 http://www.eeoc.gov/laws/practices/ http://www.forbes.com/sites/lizryan/2014/07/07/1132/2/ 6 http://career-advice.monster.com/job-interview/following-up/after-the-interview-4-ways-to-follow-up-hot-jobs/article.aspx http://www.forbes.com/sites/lizryan/2014/07/07/1132/ http://career-advice.monster.com/job-interview/following-up/after-the-interview-4-ways-to-follow-up-hot-jobs/article.aspx 7 http://www.forbes.com/sites/lizryan/2014/12/12/how-to-evaluate-a-job-offer/2/ 8 http://work.chron.com/way-accept-job-offer-25306.html 9 http://www.bosstaff.com/2015/01/22/proper-etiquette-declining-job-offer/ http://money.cnn.com/calculator/pf/cost-of-living/ http://www.forbes.com/sites/lizryan/2014/12/12/how-to-evaluate-a-job-offer/2/ 10 https://www.linkedin.com/pulse/20140318114519-10999323-counteroffers-should-i-stay-or-should-i-go https://www.linkedin.com/pulse/20140318114519-10999323-counteroffers-should-i-stay-or-should-i-go http://www.forbes.com/sites/lisaquast/2014/07/07/why-you-should-never-accept-a-counter-offer-when-you-resign/ 11 http://www.prfutures.co.uk/jobseeker-tips/how-to-quit-your-job http://www.prfutures.co.uk/jobseeker-tips/how-to-quit-your-job EXIT All trademarks are the property of their respective owners. An Equal Opportunity Employer © 2016 Kelly Services, Inc. 15-0714 1/16 SOURCES