1
ANNA UNIVERSITY, CHENNAI
AFFILIATED INSTITUTIONS
B.E. ELECTRONICS AND COMMUNICATION ENGINEERING
REGULATIONS – 2017
PROGRAMME EDUCATIONAL OBJECTIVES:
PEO1: To enable graduates to pursue research, or have a successful career in academia or
industries associated with Electronics and Communication Engineering, or as
entrepreneurs.
PEO2: To provide students with strong foundational concepts and also advanced techniques
and tools in order to enable them to build solutions or systems of varying complexity.
PEO3: To prepare students to critically analyze existing literature in an area of specialization
and ethically develop innovative and research oriented methodologies to solve the
problems identified.
PROGRAMME OUTCOMES:
Engineering Graduates will be able to:
1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering
fundamentals, and an engineering specialization to the solution of complex engineering
problems.
2. Problem analysis: Identify, formulate, review research literature, and analyze complex
engineering problems reaching substantiated conclusions using first principles of
mathematics, natural sciences, and engineering sciences.
3. Design/development of solutions: Design solutions for complex engineering problems
and design system components or processes that meet the specified needs with
appropriate consideration for the public health and safety, and the cultural, societal, and
environmental considerations.
4. Conduct investigations of complex problems: Use research-based knowledge and
research methods including design of experiments, analysis and interpretation of data, and
synthesis of the information to provide valid conclusions.
5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and
modern engineering and IT tools including prediction and modeling to complex engineering
activities with an understanding of the limitations.
6. The engineer and society: Apply reasoning informed by the contextual knowledge to
assess societal, health, safety, legal and cultural issues and the consequent
responsibilities relevant to the professional engineering practice.
7. Environment and sustainability: Understand the impact of the professional engineering
solutions in societal and environmental contexts, and demonstrate the knowledge of, and
need for sustainable development.
2
8. Ethics: Apply ethical principles and commit to professional ethics and responsibilities and
norms of the engineering practice.
9. Individual and team work: Function effectively as an individual, and as a member or
leader in diverse teams, and in multidisciplinary settings.
10. Communication: Communicate effectively on complex engineering activities with the
engineering community and with society at large, such as, being able to comprehend and
write effective reports and design documentation, make effective presentations, and give
and receive clear instructions.
11. Project management and finance: Demonstrate knowledge and understanding of the
engineering and management principles and apply these to one‘s own work, as a member
and leader in a team, to manage projects and in multidisciplinary environments.
12. Life-long learning: Recognize the need for, and have the preparation and ability to
engage in independent and life-long learning in the broadest context of technological
change.
PROGRAM SPECIFIC OBJECTIVES (PSOs)
1. To analyze, design and develop solutions by applying foundational concepts of electronics
and communication engineering.
2. To apply design principles and best practices for developing quality products for scientific
and business applications.
3. To adapt to emerging information and communication technologies (ICT) to innovate ideas
and solutions to existing/novel problems.
Contribution 1: Reasonable 2: Significant 3: Strong
3
MAPPING OF PROGRAMME EDUCATIONAL OBJECTIVES WITH PROGRAMME
OUTCOMES
A broad relation between the programme objective and the outcomes is given in the following table
MAPPING OF PROGRAM SPECIFIC OBJECTIVES WITH PROGRAMME OUTCOMES
A broad relation between the Program Specific Objectives and the outcomes is given in the
following table
PROGRAMME
EDUCATIONAL
OBJECTIVES
PROGRAMME OUTCOMES
A B C D E F G H I J K L
1 3 3 2 3 2 1 1 2 1 1 3 1
2 3 3 3 3 3 1 1 1 1 1 1 2
3 3 3 3 3 3 2 2 3 1 2 2 2
PROGRAM
SPECIFIC
OBJECTIVES
PROGRAMME OUTCOMES
A B C D E F G H I J K L
1 3 3 2 3 2 1 1 1 1 1 1 2
2 3 3 3 3 3 2 2 3 1 3 3 3
3 3 3 3 3 3 3 3 2 1 1 1 3
4
ANNA UNIVERSITY, CHENNAI
AFFILIATED INSTITUTIONS
B.E. ELECTRONICS AND COMMUNICATION ENGINEERING
REGULATIONS – 2017
CHOICE BASED CREDIT SYSTEM
MAPPING OF COURSE OUTCOMES WITH PROGRAMME OUTCOMES:
A broad relation between the Course Outcomes and Programme Outcomes is given in the
following table
COURSE OUTCOMES PROGRAMME OUTCOMES
Sem Course Name a b c d e f g h i j k l
I
Communicative English      
Engineering Mathematics – I      
Engineering Physics      
Engineering Chemistry      
Problem Solving and Python Programming       
Engineering Graphics    
Problem Solving and Python Programming
Laboratory
      
Physics and Chemistry Laboratory      
II
Technical English        
Engineering Mathematics – II      
Physics for Electronics Engineering      
Basic Electrical and Instrumentation Engineering        
Circuit Analysis        
Electronic Devices        
Circuits and Devices Laboratory       
Engineering Practices Laboratory       
III
Linear Algebra and Partial Differential Equations       
Fundamentals of Data Structures In C        
Electronic Circuits- I        
Signals and Systems        
Digital Electronics        
Control System Engineering        
Fundamentals of Data Structures in C
Laboratory
       
Analog and Digital Circuits Laboratory        
Interpersonal Skills/Listening &Speaking      
IV
Probability and Random Processes       
Electronic Circuits II        
Communication Theory        
Electromagnetic Fields        
Linear Integrated Circuits        
Environmental Science and Engineering        
Circuits Design and Simulation Laboratory        
5
COURSE OUTCOMES PROGRAMME OUTCOMES
Sem Course Name a b c d e f g h i j k l
Linear Integrated Circuits Laboratory        
V
Digital Communication        
Discrete-Time Signal Processing        
Computer Architecture and Organization       
Communication Networks        
Professional Elective I
Open Elective I
Digital Signal Processing Laboratory        
Communication Systems Laboratory        
Networks Laboratory        
VI
Microprocessors and Microcontrollers        
VLSI Design        
Wireless Communication        
Principles of Management      
Transmission Lines and RF Systems        
Professional Elective -II
Microprocessors and Microcontrollers Laboratory        
VLSI Design Laboratory        
Technical Seminar         
VII
Antennas and Microwave Engineering        
Optical Communication       
Embedded and Real Time Systems        
Ad hoc and Wireless Sensor Networks        
Professional Elective -III
Open Elective - II
Embedded Laboratory        
Advanced Communication Laboratory        
VIII
Professional Elective - IV
Professional Elective - V
Project Work           
6
ANNA UNIVERSITY, CHENNAI
AFFILIATED INSTITUTIONS
B.E. ELECTRONICS AND COMMUNICATION ENGINEERING
REGULATIONS – 2017
CHOICE BASED CREDIT SYSTEM
I - VIII SEMESTERS CURRICULA AND SYLLABI
SEMESTER I
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. HS8151 Communicative English HS 4 4 0 0 4
2. MA8151 Engineering
Mathematics - I
BS 4 4 0 0 4
3. PH8151 Engineering Physics BS 3 3 0 0 3
4. CY8151 Engineering Chemistry BS
3
3 0 0 3
5. GE8151 Problem Solving and Python
Programming
ES 3 3 0 0 3
6. GE8152 Engineering Graphics ES 6 2 0 4 4
PRACTICALS
7. GE8161 Problem Solving and Python
Programming Laboratory
ES 4 0 0 4 2
8. BS8161 Physics and Chemistry
Laboratory
BS 4 0 0 4 2
TOTAL 31 19 0 12 25
SEMESTER II
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. HS8251 Technical English HS 4 4 0 0 4
2. MA8251 Engineering
Mathematics - II
BS 4 4 0 0 4
3. PH8253 Physics for Electronics
Engineering
BS 3 3 0 0 3
4. BE8254 Basic Electrical and
Instrumentation
Engineering
ES 3 3 0 0 3
5. EC8251 Circuit Analysis PC 4 4 0 0 4
6. EC8252 Electronic Devices PC 3 3 0 0 3
PRACTICALS
7. EC8261 Circuits and Devices
Laboratory
PC
4 0 0 4 2
8. GE8261 Engineering Practices
Laboratory
ES
4 0 0 4 2
TOTAL 29 21 0 8 25
7
SEMESTER III
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MA8352 Linear Algebra and Partial
Differential Equations
BS 4 4 0 0 4
2. EC8393 Fundamentals of Data
Structures In C
ES 3 3 0 0 3
3. EC8351 Electronic Circuits- I PC 3 3 0 0 3
4. EC8352 Signals and Systems PC 4 4 0 0 4
5. EC8392 Digital Electronics PC 3 3 0 0 3
6. EC8391 Control Systems
Engineering
PC 3 3 0 0 3
PRACTICALS
7. EC8381 Fundamentals of Data
Structures in C Laboratory
ES 4 0 0 4 2
8. EC8361 Analog and Digital
Circuits Laboratory
PC 4 0 0 4 2
9. HS8381 Interpersonal
Skills/Listening
&Speaking
EEC 2 0 0 2 1
TOTAL 30 20 0 10 25
SEMESTER IV
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MA8451 Probability and Random
Processes
BS 4 4 0 0 4
2. EC8452 Electronic Circuits II PC 3 3 0 0 3
3. EC8491 Communication Theory PC 3 3 0 0 3
4. EC8451 Electromagnetic Fields PC 4 4 0 0 4
5. EC8453 Linear Integrated Circuits PC 3 3 0 0 3
6. GE8291 Environmental Science and
Engineering
HS
3 3 0 0 3
PRACTICALS
7. EC8461 Circuits Design and
Simulation Laboratory
PC
4 0 0 4 2
8. EC8462 Linear Integrated Circuits
Laboratory
PC
4 0 0 4 2
TOTAL 28 20 0 8 24
8
SEMESTER V
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. EC8501 Digital Communication PC 3 3 0 0 3
2. EC8553 Discrete-Time Signal
Processing
PC 4 4 0 0 4
3. EC8552 Computer Architecture and
Organization
PC 3 3 0 0 3
4. EC8551 Communication Networks PC 3 3 0 0 3
5. Professional Elective I PE 3 3 0 0 3
6. Open Elective I OE 3 3 0 0 3
PRACTICALS
7. EC8562 Digital Signal Processing
Laboratory
PC 4 0 0 4 2
8. EC8561 Communication Systems
Laboratory
PC 4 0 0 4 2
9. EC8563 Communication Networks
Laboratory
PC 4 0 0 4 2
TOTAL 31 19 0 12 25
SEMESTER VI
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. EC8691 Microprocessors and
Microcontrollers
PC 3 3 0 0 3
2. EC8095 VLSI Design PC 3 3 0 0 3
3. EC8652 Wireless Communication PC 3 3 0 0 3
4. MG8591 Principles of Management HS 3 3 0 0 3
5. EC8651 Transmission Lines and RF
Systems
PC 3 3 0 0 3
6. Professional
Elective -II
PE 3
3 0 0 3
PRACTICALS
7. EC8681 Microprocessors and
Microcontrollers Laboratory
PC 4 0 0 4 2
8. EC8661 VLSI Design Laboratory PC 4 0 0 4 2
9. EC8611 Technical Seminar EEC 2 0 0 2 1
TOTAL 28 18 0 10 23
9
SEMESTER VII
SI.No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. EC8701 Antennas and Microwave
Engineering
PC 3 3 0 0 3
2. EC8751 Optical Communication PC 3 3 0 0 3
3. EC8791 Embedded and Real Time
Systems
PC 3 3 0 0 3
4. EC8702 Ad hoc and Wireless
Sensor Networks
PC 3 3 0 0 3
5. Professional Elective -III PE 3 3 0 0 3
6. Open Elective - II OE 3 3 0 0 3
PRACTICALS
7. EC8711 Embedded Laboratory PC 4 0 0 4 2
8. EC8761 Advanced Communication
Laboratory
PC
4 0 0 4 2
TOTAL 26 18 0 8 22
SEMESTER VIII
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. Professional
Elective IV
PE 3 3 0 0 3
2. Professional Elective V PE 3 3 0 0 3
PRACTICALS
3. EC8811 Project Work EEC 20 0 0 20 10
TOTAL 26 6 0 20 16
TOTAL NO. OF CREDITS: 185
10
HUMANITIES AND SOCIALSCIENCES (HS)
Sl.NO
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. HS8151 Communicative English HS 4 4 0 0 4
2. HS8251 Technical English HS 4 4 0 0 4
3. GE8291 Environmental Science
and Engineering
HS 3 3 0 0 3
4. MG8591 Principles of
Management
HS 3 3 0 0 3
BASIC SCIENCES (BS)
Sl.NO COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. MA8151 Engineering
Mathematics I
BS 4 4 0 0 4
2. PH8151 Engineering Physics BS 3 3 0 0 3
3. CY8151 Engineering Chemistry BS 3 3 0 0 3
4. BS8161 Physics and Chemistry
Laboratory
BS 4 0 0 4 2
5. MA8251 Engineering
Mathematics II
BS 4 4 0 0 4
6. PH8253 Physics for Electronics
Engineering
BS 3 3 0 0 3
7. MA8352 Linear Algebra and
Partial Differential
Equations
BS 4 4 0 0 4
8. MA8451 Probability and Random
Processes
BS 4 4 0 0 4
ENGINEERING SCIENCES (ES)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. GE8151 Problem Solving and Python
Programming
ES 3 3 0 0 3
2. GE8152 Engineering Graphics ES 6 2 0 4 4
3. GE8161 Problem Solving and Python
Programming Laboratory
ES 4 0 0 4 2
4. BE8254 Basic Electrical and
Instrumentation Engineering
ES 3 3 0 0 3
5. GE8261 Engineering Practices
Laboratory
ES
4 0 0 4 2
6. EC8393 Fundamentals of Data
Structures In C
ES 3 3 0 0 3
7. EC8381 Fundamentals of Data
Structures in C
Laboratory
ES
4 0 0 4 2
11
PROFESSIONAL CORE (PC)
Sl.NO COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. EC8251 Circuit Analysis PC 4 4 0 0 4
2. EC8252 Electronic Devices PC 3 3 0 0 3
3. EC8261 Circuits and Devices
Lab
PC 4 0 0 4 2
4. EC8351 Electronic Circuits- I
PC 3 3 0 0 3
5. EC8352 Signals and Systems
PC 4 4 0 0 4
6. EC8392 Digital Electronics
PC 3 3 0 0 3
7. EC8391 Control System
Engineering
PC 3 3 0 0 3
8. EC8361 Analog and Digital
Circuits Laboratory
PC 4 0 0 4 2
9. EC8452 Electronic
Circuits II
PC 3 3 0 0 3
10. EC8491 Communication
Theory
PC 3 3 0 0 3
11. EC8451 Electromagnetic
Fields
PC 4 4 0 0 4
12. EC8453 Linear Integrated
Circuits
PC 3 3 0 0 3
13. EC8461 Circuits Design and
Simulation
Laboratory
PC 4 0 0 4 2
14. EC8462 Linear Integrated
Circuits Laboratory
PC 4 0 0 4 2
15. EC8501 Digital
Communication
PC 3 3 0 0 3
16. EC8553 Discrete-Time Signal
Processing
PC 4 4 0 0 4
17. EC8651 Transmission Lines
and RF Systems
PC 3 3 0 0 3
18. EC8552 Computer
Architecture and
Organization
PC 3 3 0 0 3
19. EC8551 Communication
Networks
PC 3 3 0 0 3
20. EC8562 Digital Signal
Processing
Laboratory
PC 4 0 0 4 2
21. EC8561 Communication
Systems Laboratory
PC 4 0 0 4 2
22. EC8563 Communication
Networks Laboratory
PC 4 0 0 4 2
23. EC8691 Microprocessors and
Microcontrollers
PC 3 3 0 0 3
24. EC8095 VLSI Design PC 3 3 0 0 3
25. EC8652 Wireless
Communication
PC 3 3 0 0 3
26. EC8661 VLSI Design PC 4 0 0 4 2
12
Laboratory
27. EC8681 Microprocessors and
Microcontrollers
Laboratory
PC 4 0 0 4 2
28. EC8701 Antennas and
Microwave
Engineering
PC 3 3 0 0 3
29. EC8751 Optical
Communication
PC 3 3 0 0 3
30. EC8791 Embedded and Real
Time Systems
PC 3 3 0 0 3
31. EC8702 Ad hoc and Wireless
Sensor Networks
PC 3 3 0 0 3
32. EC8711 Embedded
Laboratory
PC 4 0 0 4 2
33. EC8761 Advanced
Communication
Laboratory
PC 4 0 0 4 2
13
PROFESSIONAL ELECTIVES (PE)*
SEMESTER V
ELECTIVE I
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8392 Object Oriented
Programming
PE 3 3 0 0 3
2. EC8073 Medical Electronics PE 3 3 0 0 3
3. CS8493 Operating Systems PE 3 3 0 0 3
4. EC8074 Robotics and Automation PE 3 3 0 0 3
5. EC8075 Nano Technology and
Applications
PE 3 3 0 0 3
6. GE8074 Human Rights PE 3 3 0 0 3
7. GE8077 Total Quality Management PE 3 3 0 0 3
SEMESTER VI
ELECTIVE II
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8792 Cryptography and Network
Security
PE 3 3 0 0 3
2. EC8091 Advanced Digital Signal
Processing
PE 3 3 0 0 3
3. EC8001 MEMS and NEMS PE 3 3 0 0 3
4. EC8002 Multimedia Compression
and Communication
PE 3 3 0 0 3
5. EC8003 CMOS Analog IC Design PE 3 3 0 0 3
6. EC8004 Wireless Networks PE 3 3 0 0 3
7. GE8075 Intellectual Property Rights PE 3 3 0 0 3
SEMESTER VII
ELECTIVE III
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. EC8092 Advanced Wireless
Communication
PE
3 3 0 0 3
2. EC8071 Cognitive Radio PE 3 3 0 0 3
3. GE8072 Foundation Skills in
Integrated Product
Development
PE 3 3 0 0 3
4. CS8082 Machine Learning
Techniques
PE 3 3 0 0 3
5. EC8005 Electronics Packaging and
Testing
PE 3 3 0 0 3
6. EC8006 Mixed Signal IC Design PE 3 3 0 0 3
7. GE8071 Disaster Management PE 3 3 0 0 3
14
SEMESTER VIII
ELECTIVE IV
SI.No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. EC8072 Electro Magnetic
Interference and
Compatibility
PE 3 3 0 0 3
2. EC8007 Low power SoC Design PE 3 3 0 0 3
3. EC8008 Photonic Networks PE 3 3 0 0 3
4. EC8009 Compressive Sensing PE 3 3 0 0 3
5. EC8093 Digital Image
Processing
PE
3 3 0 0 3
6. GE8076 Professional Ethics in
Engineering
PE 3 3 0 0 3
SEMESTER VIII
ELECTIVE V
SI.No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. EC8010 Video Analytics PE 3 3 0 0 3
2. EC8011 DSP Architecture and
Programming
PE 3 3 0 0 3
3. EC8094 Satellite
Communication
PE 3 3 0 0 3
4. CS8086 Soft Computing PE 3 3 0 0 3
5. IT8006 Principles of Speech
Processing
PE 3 3 0 0 3
6. GE8073 Fundamentals of Nano
Science
PE 3 3 0 0 3
*Professional Electives are grouped according to elective number as was done previously.
EMPLOYABILITY ENHANCEMENT COURSES (EEC)
S.NO COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. HS8381 Interpersonal
Skills/Listening &
Speaking
EEC 2 0 0 2 1
2. EC8611 Technical Seminar
EEC 2 0 0 2 1
3. EC8811 Project Work EEC 20 0 0 20 10
15
SUMMARY
S.NO. SUBJECT
AREA
CREDITS AS PER SEMESTER CREDITS
TOTAL
Percentage
I
II III IV V VI VII VIII
1. HS 4 4 3 3 14 7.56%
2. BS 12 7 4 4 27 14.6%
3. ES 9 5 5 19 10.27%
4. PC 9 15 17 19 16 16 92 50%
5. PE 3 3 3 6 15 8.10%
6. OE 3 3 6 3.24%
7. EEC 1 1 10 12 6.48%
Total 25 25 25 24 25 23 22 16 185
8.
Non Credit /
Mandatory
16
HS8151 COMMUNICATIVE ENGLISH
L T P C
4 0 0 4
OBJECTIVES:
 To develop the basic reading and writing skills of first year engineering and technology
students.
 To help learners develop their listening skills, which will, enable them listen to lectures and
comprehend them by asking questions; seeking clarifications.
 To help learners develop their speaking skills and speak fluently in real contexts.
 To help learners develop vocabulary of a general kind by developing their reading skills
UNIT I SHARING INFORMATION RELATED TO ONESELF/FAMILY& FRIENDS 12
Reading- short comprehension passages, practice in skimming-scanning and predicting- Writing-
completing sentences- - developing hints. Listening- short texts- short formal and informal
conversations. Speaking- introducing oneself - exchanging personal information- Language
development- Wh- Questions- asking and answering-yes or no questions- parts of speech.
Vocabulary development-- prefixes- suffixes- articles.- count/ uncount nouns.
UNIT II GENERAL READING AND FREE WRITING 12
Reading - comprehension-pre-reading-post reading- comprehension questions (multiple choice
questions and /or short questions/ open-ended questions)-inductive reading- short narratives and
descriptions from newspapers including dialogues and conversations (also used as short Listening
texts)- register- Writing – paragraph writing- topic sentence- main ideas- free writing, short
narrative descriptions using some suggested vocabulary and structures –Listening- telephonic
conversations. Speaking – sharing information of a personal kind—greeting – taking leave-
Language development – prepositions, conjunctions Vocabulary development- guessing
meanings of words in context.
UNIT III GRAMMAR AND LANGUAGE DEVELOPMENT 12
Reading- short texts and longer passages (close reading) Writing- understanding text structure-
use of reference words and discourse markers-coherence-jumbled sentences Listening –
listening to longer texts and filling up the table- product description- narratives from different
sources. Speaking- asking about routine actions and expressing opinions. Language
development- degrees of comparison- pronouns- direct vs indirect questions- Vocabulary
development – single word substitutes- adverbs.
UNIT IV READING AND LANGUAGE DEVELOPMENT 12
Reading- comprehension-reading longer texts- reading different types of texts- magazines
Writing- letter writing, informal or personal letters-e-mails-conventions of personal email-
Listening- listening to dialogues or conversations and completing exercises based on them.
Speaking- speaking about oneself- speaking about one‘s friend- Language development-
Tenses- simple present-simple past- present continuous and past continuous- Vocabulary
development- synonyms-antonyms- phrasal verbs
17
UNIT V EXTENDED WRITING 12
Reading- longer texts- close reading –Writing- brainstorming -writing short essays – developing
an outline- identifying main and subordinate ideas- dialogue writing-Listening – listening to talks-
conversations- Speaking – participating in conversations- short group conversations-Language
development-modal verbs- present/ past perfect tense - Vocabulary development-collocations-
fixed and semi-fixed expressions.
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, learners will be able to:
• Read articles of a general kind in magazines and newspapers.
• Participate effectively in informal conversations; introduce themselves and their friends and
express opinions in English.
• Comprehend conversations and short talks delivered in English
• Write short essays of a general kind and personal letters and emails in English.
TEXT BOOKS:
1. Board of Editors. Using English A Coursebook for Undergarduate Engineers and
Technologists. Orient BlackSwan Limited, Hyderabad: 2015
2. Richards, C. Jack. Interchange Students’ Book-2 New Delhi: CUP, 2015.
REFERENCES:
1. Bailey, Stephen. Academic Writing: A practical guide for students. New York:
Rutledge,2011.
2. Means,L. Thomas and Elaine Langlois. English & Communication For Colleges.
CengageLearning ,USA: 2007
3. Redston, Chris &Gillies Cunningham Face2Face (Pre-intermediate Student‘s Book&
Workbook) Cambridge University Press, New Delhi: 2005
4. Comfort, Jeremy, et al. Speaking Effectively: Developing Speaking Skills for Business
English. Cambridge University Press, Cambridge: Reprint 2011
5. Dutt P. Kiranmai and Rajeevan Geeta. Basic Communication Skills, Foundation Books:
2013.
18
MA8151 ENGINEERING MATHEMATICS – I L T P C
4 0 0 4
OBJECTIVES :
The goal of this course is to achieve conceptual understanding and to retain the best traditions of
traditional calculus. The syllabus is designed to provide the basic tools of calculus mainly for the
purpose of modelling the engineering problems mathematically and obtaining solutions. This is a
foundation course which mainly deals with topics such as single variable and multivariable
calculus and plays an important role in the understanding of science, engineering, economics and
computer science, among other disciplines.
UNIT I DIFFERENTIAL CALCULUS 12
Representation of functions - Limit of a function - Continuity - Derivatives - Differentiation rules -
Maxima and Minima of functions of one variable.
UNIT II FUNCTIONS OF SEVERAL VARIABLES 12
Partial differentiation – Homogeneous functions and Euler‘s theorem – Total derivative – Change
of variables – Jacobians – Partial differentiation of implicit functions – Taylor‘s series for functions
of two variables – Maxima and minima of functions of two variables – Lagrange‘s method of
undetermined multipliers.
UNIT III INTEGRAL CALCULUS 12
Definite and Indefinite integrals - Substitution rule - Techniques of Integration - Integration by
parts, Trigonometric integrals, Trigonometric substitutions, Integration of rational functions by
partial fraction, Integration of irrational functions - Improper integrals.
UNIT IV MULTIPLE INTEGRALS 12
Double integrals – Change of order of integration – Double integrals in polar coordinates – Area
enclosed by plane curves – Triple integrals – Volume of solids – Change of variables in double
and triple integrals.
UNIT V DIFFERENTIAL EQUATIONS 12
Higher order linear differential equations with constant coefficients - Method of variation of
parameters – Homogenous equation of Euler‘s and Legendre‘s type – System of simultaneous
linear differential equations with constant coefficients - Method of undetermined coefficients.
TOTAL : 60 PERIODS
OUTCOMES:
After completing this course, students should demonstrate competency in the following
skills:
 Use both the limit definition and rules of differentiation to differentiate functions.
 Apply differentiation to solve maxima and minima problems.
 Evaluate integrals both by using Riemann sums and by using the Fundamental Theorem of
Calculus.
 Apply integration to compute multiple integrals, area, volume, integrals in polar
coordinates, in addition to change of order and change of variables.
 Evaluate integrals using techniques of integration, such as substitution, partial fractions
and integration by parts.
 Determine convergence/divergence of improper integrals and evaluate convergent
improper integrals.
 Apply various techniques in solving differential equations.
19
TEXT BOOKS :
1. Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi, 43rd
Edition,
2014.
2. James Stewart, "Calculus: Early Transcendentals", Cengage Learning, 7th
Edition, New
Delhi, 2015. [For Units I & III - Sections 1.1, 2.2, 2.3, 2.5, 2.7(Tangents problems only), 2.8,
3.1 to 3.6, 3.11, 4.1, 4.3, 5.1(Area problems only), 5.2, 5.3, 5.4 (excluding net change
theorem), 5.5, 7.1 - 7.4 and 7.8].
REFERENCES :
1. Anton, H, Bivens, I and Davis, S, "Calculus", Wiley, 10th
Edition, 2016.
2. Jain R.K. and Iyengar S.R.K., ―Advanced Engineering Mathematics‖, Narosa Publications,
New Delhi, 3rd
Edition, 2007.
3. Narayanan, S. and Manicavachagom Pillai, T. K., ―Calculus" Volume I and II,
S. Viswanathan Publishers Pvt. Ltd., Chennai, 2007.
4. Srimantha Pal and Bhunia, S.C, "Engineering Mathematics" Oxford University Press, 2015.
5. Weir, M.D and Joel Hass, "Thomas Calculus", 12th
Edition, Pearson India, 2016.
PH8151 ENGINEERING PHYSICS
L T P C
3 0 0 3
OBJECTIVES:
 To enhance the fundamental knowledge in Physics and its applications relevant to various
streams of Engineering and Technology.
UNIT I PROPERTIES OF MATTER 9
Elasticity – Stress-strain diagram and its uses - factors affecting elastic modulus and tensile
strength – torsional stress and deformations – twisting couple - torsion pendulum: theory and
experiment - bending of beams - bending moment – cantilever: theory and experiment –
uniform and non-uniform bending: theory and experiment - I-shaped girders - stress due to
bending in beams.
UNIT II WAVES AND FIBER OPTICS 9
Oscillatory motion – forced and damped oscillations: differential equation and its solution –
plane progressive waves – wave equation. Lasers : population of energy levels, Einstein‘s A
and B coefficients derivation – resonant cavity, optical amplification (qualitative) –
Semiconductor lasers: homojunction and heterojunction – Fiber optics: principle, numerical
aperture and acceptance angle - types of optical fibres (material, refractive index, mode) –
losses associated with optical fibers - fibre optic sensors: pressure and displacement.
UNIT III THERMAL PHYSICS 9
Transfer of heat energy – thermal expansion of solids and liquids – expansion joints - bimetallic
strips - thermal conduction, convection and radiation – heat conductions in solids – thermal
conductivity - Forbe‘s and Lee‘s disc method: theory and experiment - conduction through
compound media (series and parallel) – thermal insulation – applications: heat exchangers,
refrigerators, ovens and solar water heaters.
UNIT IV QUANTUM PHYSICS 9
Black body radiation – Planck‘s theory (derivation) – Compton effect: theory and experimental
verification – wave particle duality – electron diffraction – concept of wave function and its
physical significance – Schrödinger‘s wave equation – time independent and time dependent
equations – particle in a one-dimensional rigid box – tunnelling (qualitative) - scanning
tunnelling microscope.
20
UNIT V CRYSTAL PHYSICS 9
Single crystalline, polycrystalline and amorphous materials – single crystals: unit cell, crystal
systems, Bravais lattices, directions and planes in a crystal, Miller indices – inter-planar
distances - coordination number and packing factor for SC, BCC, FCC, HCP and diamond
structures - crystal imperfections: point defects, line defects – Burger vectors, stacking faults –
role of imperfections in plastic deformation - growth of single crystals: solution and melt growth
techniques.
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of this course,
 the students will gain knowledge on the basics of properties of matter and its
applications,
 the students will acquire knowledge on the concepts of waves and optical devices and
their applications in fibre optics,
 the students will have adequate knowledge on the concepts of thermal properties of
materials and their applications in expansion joints and heat exchangers,
 the students will get knowledge on advanced physics concepts of quantum theory and
its applications in tunneling microscopes, and
 the students will understand the basics of crystals, their structures and different crystal
growth techniques.
TEXT BOOKS:
1. Bhattacharya, D.K. & Poonam, T. ―Engineering Physics‖. Oxford University Press,
2015.
2. Gaur, R.K. & Gupta, S.L. ―Engineering Physics‖. Dhanpat Rai Publishers, 2012.
3. Pandey, B.K. & Chaturvedi, S. ―Engineering Physics‖. Cengage Learning India, 2012.
REFERENCES:
1. Halliday, D., Resnick, R. & Walker, J. ―Principles of Physics‖. Wiley, 2015.
2. Serway, R.A. & Jewett, J.W. ―Physics for Scientists and Engineers‖. Cengage
Learning, 2010.
3. Tipler, P.A. & Mosca, G. ―Physics for Scientists and Engineers with Modern Physics‘.
W.H.Freeman, 2007.
CY8151 ENGINEERING CHEMISTRY L T P C
3 0 0 3
OBJECTIVES:
 To make the students conversant with boiler feed water requirements, related problems and
water treatment techniques.
 To develop an understanding of the basic concepts of phase rule and its applications to single
and two component systems and appreciate the purpose and significance of alloys.
 Preparation, properties and applications of engineering materials.
 Types of fuels, calorific value calculations, manufacture of solid, liquid and gaseous fuels.
 Principles and generation of energy in batteries, nuclear reactors, solar cells, wind mills and
fuel cells.
21
UNIT I WATER AND ITS TREATMENT 9
Hardness of water – types – expression of hardness – units – estimation of hardness of water by
EDTA – numerical problems – boiler troubles (scale and sludge) – treatment of boiler feed water –
Internal treatment (phosphate, colloidal, sodium aluminate and calgon conditioning) external
treatment – Ion exchange process, zeolite process – desalination of brackish water - Reverse
Osmosis.
UNIT II SURFACE CHEMISTRY AND CATALYSIS 9
Adsorption: Types of adsorption – adsorption of gases on solids – adsorption of solute from
solutions – adsorption isotherms – Freundlich‘s adsorption isotherm – Langmuir‘s adsorption
isotherm – contact theory – kinetics of surface reactions, unimolecular reactions, Langmuir -
applications of adsorption on pollution abatement. Catalysis: Catalyst – types of catalysis – criteria
– autocatalysis – catalytic poisoning and catalytic promoters - acid base catalysis – applications
(catalytic convertor) – enzyme catalysis– Michaelis – Menten equation.
UNIT III ALLOYS AND PHASE RULE 9
Alloys: Introduction- Definition- properties of alloys- significance of alloying, functions and effect of
alloying elements- Nichrome and stainless steel (18/8) – heat treatment of steel. Phase rule:
Introduction, definition of terms with examples, one component system -water system - reduced
phase rule - thermal analysis and cooling curves - two component systems - lead-silver system -
Pattinson process.
UNIT IV FUELS AND COMBUSTION 9
Fuels: Introduction - classification of fuels - coal - analysis of coal (proximate and ultimate) -
carbonization - manufacture of metallurgical coke (Otto Hoffmann method) - petroleum -
manufacture of synthetic petrol (Bergius process) - knocking - octane number - diesel oil - cetane
number - natural gas - compressed natural gas (CNG) - liquefied petroleum gases (LPG) - power
alcohol and biodiesel. Combustion of fuels: Introduction - calorific value - higher and lower calorific
values- theoretical calculation of calorific value - ignition temperature - spontaneous ignition
temperature - explosive range - flue gas analysis (ORSAT Method).
UNIT V ENERGY SOURCES AND STORAGE DEVICES 9
Nuclear fission - controlled nuclear fission - nuclear fusion - differences between nuclear fission
and fusion - nuclear chain reactions - nuclear energy - light water nuclear power plant - breeder
reactor - solar energy conversion - solar cells - wind energy. Batteries, fuel cells and
supercapacitors: Types of batteries – primary battery (dry cell) secondary battery (lead acid
battery, lithium-ion-battery) fuel cells – H2-O2 fuel cell.
TOTAL: 45 PERIODS
OUTCOMES:
 The knowledge gained on engineering materials, fuels, energy sources and water treatment
techniques will facilitate better understanding of engineering processes and applications for
further learning.
TEXT BOOKS:
1. S. S. Dara and S. S. Umare, ―A Textbook of Engineering Chemistry‖, S. Chand & Company
LTD, New Delhi, 2015
2. P. C. Jain and Monika Jain, ―Engineering Chemistry‖ Dhanpat Rai Publishing Company (P)
LTD, New Delhi, 2015
3. S. Vairam, P. Kalyani and Suba Ramesh, ―Engineering Chemistry‖, Wiley India PVT, LTD,
New Delhi, 2013.
22
REFERENCES:
1. Friedrich Emich, ―Engineering Chemistry‖, Scientific International PVT, LTD, New Delhi, 2014.
2. Prasanta Rath, ―Engineering Chemistry‖, Cengage Learning India PVT, LTD, Delhi, 2015.
3. Shikha Agarwal, ―Engineering Chemistry-Fundamentals and Applications‖, Cambridge
University Press, Delhi, 2015.
GE8151 PROBLEM SOLVING AND PYTHON PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To know the basics of algorithmic problem solving
 To read and write simple Python programs.
 To develop Python programs with conditionals and loops.
 To define Python functions and call them.
 To use Python data structures –- lists, tuples, dictionaries.
 To do input/output with files in Python.
UNIT I ALGORITHMIC PROBLEM SOLVING 9
Algorithms, building blocks of algorithms (statements, state, control flow, functions), notation
(pseudo code, flow chart, programming language), algorithmic problem solving, simple strategies
for developing algorithms (iteration, recursion). Illustrative problems: find minimum in a list, insert a
card in a list of sorted cards, guess an integer number in a range, Towers of Hanoi.
UNIT II DATA, EXPRESSIONS, STATEMENTS 9
Python interpreter and interactive mode; values and types: int, float, boolean, string, and list;
variables, expressions, statements, tuple assignment, precedence of operators, comments;
modules and functions, function definition and use, flow of execution, parameters and arguments;
Illustrative programs: exchange the values of two variables, circulate the values of n variables,
distance between two points.
UNIT III CONTROL FLOW, FUNCTIONS 9
Conditionals: Boolean values and operators, conditional (if), alternative (if-else), chained
conditional (if-elif-else); Iteration: state, while, for, break, continue, pass; Fruitful functions: return
values, parameters, local and global scope, function composition, recursion; Strings: string slices,
immutability, string functions and methods, string module; Lists as arrays. Illustrative programs:
square root, gcd, exponentiation, sum an array of numbers, linear search, binary search.
UNIT IV LISTS, TUPLES, DICTIONARIES 9
Lists: list operations, list slices, list methods, list loop, mutability, aliasing, cloning lists, list
parameters; Tuples: tuple assignment, tuple as return value; Dictionaries: operations and
methods; advanced list processing - list comprehension; Illustrative programs: selection sort,
insertion sort, mergesort, histogram.
UNIT V FILES, MODULES, PACKAGES 9
Files and exception: text files, reading and writing files, format operator; command line arguments,
errors and exceptions, handling exceptions, modules, packages; Illustrative programs: word count,
copy file.
TOTAL : 45 PERIODS
23
OUTCOMES:
Upon completion of the course, students will be able to
 Develop algorithmic solutions to simple computational problems
 Read, write, execute by hand simple Python programs.
 Structure simple Python programs for solving problems.
 Decompose a Python program into functions.
 Represent compound data using Python lists, tuples, dictionaries.
 Read and write data from/to files in Python Programs.
TEXT BOOKS:
1. Allen B. Downey, ``Think Python: How to Think Like a Computer Scientist‘‘, 2nd
edition,
Updated for Python 3, Shroff/O‘Reilly Publishers, 2016 (http://greenteapress.com/wp/think-
python/)
2. Guido van Rossum and Fred L. Drake Jr, ―An Introduction to Python – Revised and
updated for Python 3.2, Network Theory Ltd., 2011.
REFERENCES:
1. John V Guttag, ―Introduction to Computation and Programming Using Python‘‘, Revised
and expanded Edition, MIT Press , 2013
2. Robert Sedgewick, Kevin Wayne, Robert Dondero, ―Introduction to Programming in
Python: An Inter-disciplinary Approach, Pearson India Education Services Pvt. Ltd., 2016.
3. Timothy A. Budd, ―Exploring Python‖, Mc-Graw Hill Education (India) Private Ltd.,, 2015.
4. Kenneth A. Lambert, ―Fundamentals of Python: First Programs‖, CENGAGE Learning,
2012.
5. Charles Dierbach, ―Introduction to Computer Science using Python: A Computational
Problem-Solving Focus, Wiley India Edition, 2013.
6. Paul Gries, Jennifer Campbell and Jason Montojo, ―Practical Programming: An Introduction
to Computer Science using Python 3‖, Second edition, Pragmatic Programmers, LLC,
2013.
GE8152 ENGINEERING GRAPHICS L T P C
2 0 4 4
OBJECTIVES:
 To develop in students, graphic skills for communication of concepts, ideas and
design of Engineering products.
 T o expose them to existing national standards related to technical drawings.
CONCEPTS AND CONVENTIONS (Not for Examination) 1
Importance of graphics in engineering applications – Use of drafting instruments – BIS
conventions and specifications – Size, layout and folding of drawing sheets – Lettering and
dimensioning.
UNIT I PLANE CURVES AND FREEHAND SKETCHING 7+12
Basic Geometrical constructions, Curves used in engineering practices: Conics – Construction of
ellipse, parabola and hyperbola by eccentricity method – Construction of cycloid – construction of
involutes of square and circle – Drawing of tangents and normal to the above curves.
Visualization concepts and Free Hand sketching: Visualization principles –Representation of Three
Dimensional objects – Layout of views- Freehand sketching of multiple views from pictorial views
of objects
24
UNIT II PROJECTION OF POINTS, LINES AND PLANE SURFACE 6+12
Orthographic projection- principles-Principal planes-First angle projection-projection of points.
Projection of straight lines (only First angle projections) inclined to both the principal planes -
Determination of true lengths and true inclinations by rotating line method and traces Projection
of planes (polygonal and circular surfaces) inclined to both the principal planes by rotating object
method.
UNIT III PROJECTION OF SOLIDS 5+12
Projection of simple solids like prisms, pyramids, cylinder, cone and truncated solids when the
axis is inclined to one of the principal planes by rotating object method.
UNIT IV PROJECTION OF SECTIONED SOLIDS AND DEVELOPMENT OF
SURFACES 5+12
Sectioning of above solids in simple vertical position when the cutting plane is inclined to the one
of the principal planes and perpendicular to the other – obtaining true shape of section.
Development of lateral surfaces of simple and sectioned solids – Prisms, pyramids cylinders and
cones.
UNIT V ISOMETRIC AND PERSPECTIVE PROJECTIONS 6+12
Principles of isometric projection – isometric scale –Isometric projections of simple solids and
truncated solids - Prisms, pyramids, cylinders, cones- combination of two solid objects in simple
vertical positions - Perspective projection of simple solids-Prisms, pyramids and cylinders by
visual ray method .
TOTAL: 90 PERIODS
OUTCOMES:
On successful completion of this course, the student will be able to:
 Familiarize with the fundamentals and standards of Engineering graphics
 Perform freehand sketching of basic geometrical constructions and multiple views of objects.
 Project orthographic projections of lines and plane surfaces.
 Draw projections and solids and development of surfaces.
 Visualize and to project isometric and perspective sections of simple solids.
TEXT BOOKS:
1. Natrajan K.V., ―A text book of Engineering Graphics‖, Dhanalakshmi Publishers, Chennai,
2009.
2. Venugopal K. and Prabhu Raja V., ―Engineering Graphics‖, New Age International (P)
Limited, 2008.
REFERENCES:
1. Bhatt N.D. and Panchal V.M., ―Engineering Drawing‖, Charotar Publishing House, 50th
Edition, 2010.
2. Basant Agarwal and Agarwal C.M., ―Engineering Drawing‖, Tata McGraw Hill Publishing
Company Limited, New Delhi, 2008.
3. Gopalakrishna K.R., ―Engineering Drawing‖ (Vol. I&II combined), Subhas Stores,
Bangalore, 2007.
4. Luzzader, Warren.J. and Duff,John M., ―Fundamentals of Engineering Drawing with an
introduction to Interactive Computer Graphics for Design and Production, Eastern
Economy Edition, Prentice Hall of India Pvt. Ltd, New Delhi, 2005.
5. N S Parthasarathy And Vela Murali, ―Engineering Graphics‖, Oxford University, Press, New
Delhi, 2015.
6. Shah M.B., and Rana B.C., ―Engineering Drawing‖, Pearson, 2nd
Edition, 2009.
25
Publication of Bureau of Indian Standards:
1. IS 10711 – 2001: Technical products Documentation – Size and lay out of drawing
sheets.
2. IS 9609 (Parts 0 & 1) – 2001: Technical products Documentation – Lettering.
3. IS 10714 (Part 20) – 2001 & SP 46 – 2003: Lines for technical drawings.
4. IS 11669 – 1986 & SP 46 – 2003: Dimensioning of Technical Drawings.
5. IS 15021 (Parts 1 to 4) – 2001: Technical drawings – Projection Methods.
Special points applicable to University Examinations on Engineering Graphics:
1. There will be five questions, each of either or type covering all units of the syllabus.
2. All questions will carry equal marks of 20 each making a total of 100.
3. The answer paper shall consist of drawing sheets of A3 size only. The
4. students will be permitted to use appropriate scale to fit solution within A3 size.
5. The examination will be conducted in appropriate sessions on the same day
GE8161 PROBLEM SOLVING ANDPYTHON PROGRAMMING LABORATORY L T P C
0 0 4 2
OBJECTIVES
 To write, test, and debug simple Python programs.
 To implement Python programs with conditionals and loops.
 Use functions for structuring Python programs.
 Represent compound data using Python lists, tuples, dictionaries.
 Read and write data from/to files in Python.
LIST OF PROGRAMS
1. Compute the GCD of two numbers.
2. Find the square root of a number (Newton‘s method)
3. Exponentiation (power of a number)
4. Find the maximum of a list of numbers
5. Linear search and Binary search
6. Selection sort, Insertion sort
7. Merge sort
8. First n prime numbers
9. Multiply matrices
10. Programs that take command line arguments (word count)
11. Find the most frequent words in a text read from a file
12. Simulate elliptical orbits in Pygame
13. Simulate bouncing ball using Pygame
PLATFORM NEEDED
Python 3 interpreter for Windows/Linux
OUTCOMES
Upon completion of the course, students will be able to:
 Write, test, and debug simple Python programs.
 Implement Python programs with conditionals and loops.
 Develop Python programs step-wise by defining functions and calling them.
 Use Python lists, tuples, dictionaries for representing compound data.
 Read and write data from/to files in Python.
TOTAL: 60 PERIODS
26
BS8161 PHYSICS AND CHEMISTRY LABORATORY
(Common to all branches of B.E. / B.Tech Programmes)
L T P C
0 0 4 2
OBJECTIVES:
 To introduce different experiments to test basic understanding of physics concepts applied in
optics, thermal physics, properties of matter and liquids.
LIST OF EXPERIMENTS: PHYSICS LABORATORY (Any 5 Experiments)
1. Determination of rigidity modulus – Torsion pendulum
2. Determination of Young‘s modulus by non-uniform bending method
3. (a) Determination of wavelength, and particle size using Laser
(b) Determination of acceptance angle in an optical fiber.
4. Determination of thermal conductivity of a bad conductor – Lee‘s Disc method.
5. Determination of velocity of sound and compressibility of liquid – Ultrasonic interferometer
6. Determination of wavelength of mercury spectrum – spectrometer grating
7. Determination of band gap of a semiconductor
8. Determination of thickness of a thin wire – Air wedge method
TOTAL: 30 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to
 apply principles of elasticity, optics and thermal properties for engineering applications.
CHEMISTRY LABORATORY: (Any seven experiments to be conducted)
OBJECTIVES:
 To make the student to acquire practical skills in the determination of water quality
parameters through volumetric and instrumental analysis.
 To acquaint the students with the determination of molecular weight of a polymer by
viscometery.
1. Estimation of HCl using Na2CO3 as primary standard and Determination of alkalinity in water
sample.
2. Determination of total, temporary & permanent hardness of water by EDTA method.
3. Determination of DO content of water sample by Winkler‘s method.
4. Determination of chloride content of water sample by argentometric method.
5. Estimation of copper content of the given solution by Iodometry.
6. Determination of strength of given hydrochloric acid using pH meter.
7. Determination of strength of acids in a mixture of acids using conductivity meter.
8. Estimation of iron content of the given solution using potentiometer.
9. Estimation of iron content of the water sample using spectrophotometer (1, 10-
Phenanthroline / thiocyanate method).
10. Estimation of sodium and potassium present in water using flame photometer.
11. Determination of molecular weight of polyvinyl alcohol using Ostwald viscometer.
12. Pseudo first order kinetics-ester hydrolysis.
13. Corrosion experiment-weight loss method.
14. Determination of CMC.
15. Phase change in a solid.
16. Conductometric titration of strong acid vs strong base.
OUTCOMES:
 The students will be outfitted with hands-on knowledge in the quantitative chemical analysis
of water quality related parameters.
TOTAL: 30 PERIODS
TEXTBOOKS:
27
1. Vogel‘s Textbook of Quantitative Chemical Analysis (8TH
edition, 2014)
HS8251
TECHNICAL ENGLISH
L T P C
4 0 0 4
OBJECTIVES:
The Course prepares second semester engineering and Technology students to:
• Develop strategies and skills to enhance their ability to read and comprehend engineering
and technology texts.
• Foster their ability to write convincing job applications and effective reports.
• Develop their speaking skills to make technical presentations, participate in group
discussions.
• Strengthen their listening skill which will help them comprehend lectures and talks in their
areas of specialization.
UNIT I INTRODUCTION TECHNICAL ENGLISH 12
Listening- Listening to talks mostly of a scientific/technical nature and completing information-gap
exercises- Speaking –Asking for and giving directions- Reading – reading short technical texts
from journals- newsapapers- Writing- purpose statements – extended definitions – issue- writing
instructions – checklists-recommendations-Vocabulary Development- technical vocabulary
Language Development –subject verb agreement - compound words.
UNIT II READING AND STUDY SKILLS 12
Listening- Listening to longer technical talks and completing exercises based on them-Speaking
– describing a process-Reading – reading longer technical texts- identifying the various transitions
in a text- paragraphing- Writing- interpreting cgarts, graphs- Vocabulary Development-
vocabularyused in formal letters/emails and reports Language Development- impersonal
passive voice, numerical adjectives.
UNIT III TECHNICAL WRITING AND GRAMMAR 12
Listening- Listening to classroom lectures/ talkls on engineering/technology -Speaking –
introduction to technical presentations- Reading – longer texts both general and technical,
practice in speed reading; Writing-Describing a process, use of sequence words- Vocabulary
Development- sequence words- Misspelled words. Language Development- embedded
sentences
UNIT IV REPORT WRITING 12
Listening- Listening to documentaries and making notes. Speaking – mechanics of
presentations- Reading – reading for detailed comprehension- Writing- email etiquette- job
application – cover letter –Résumé preparation( via email and hard copy)- analytical essays and
issue based essays--Vocabulary Development- finding suitable synonyms-paraphrasing-.
Language Development- clauses- if conditionals.
UNIT V GROUP DISCUSSION AND JOB APPLICATIONS 12
Listening- TED/Ink talks; Speaking –participating in a group discussion -Reading– reading and
understanding technical articles Writing– Writing reports- minutes of a meeting- accident and
survey-Vocabulary Development- verbal analogies Language Development- reported speech
TOTAL :60 PERIODS
OUTCOMES:
At the end of the course learners will be able to:
28
 Read technical texts and write area- specific texts effortlessly.
 Listen and comprehend lectures and talks in their area of specialisation successfully.
 Speak appropriately and effectively in varied formal and informal contexts.
 Write reports and winning job applications.
TEXT BOOKS:
1. Board of editors. Fluency in English A Course book for Engineering and Technology.
Orient Blackswan, Hyderabad: 2016
2. Sudharshana.N.P and Saveetha. C. English for Technical Communication. Cambridge
University Press: New Delhi, 2016.
REFERENCES:
1. Raman, Meenakshi and Sharma, Sangeetha- Technical Communication Principles and
Practice.Oxford University Press: New Delhi,2014.
2. Kumar, Suresh. E. Engineering English. Orient Blackswan: Hyderabad,2015
3. Booth-L. Diana, Project Work, Oxford University Press, Oxford: 2014.
4. Grussendorf, Marion, English for Presentations, Oxford University Press, Oxford: 2007
5. Means, L. Thomas and Elaine Langlois, English & Communication For Colleges.
Cengage Learning, USA: 2007
Students can be asked to read Tagore, Chetan Bhagat and for supplementary
reading.
MA8251 ENGINEERING MATHEMATICS – II L T P C
4 0 0 4
OBJECTIVES :
This course is designed to cover topics such as Matrix Algebra, Vector Calculus, Complex
Analysis and Laplace Transform. Matrix Algebra is one of the powerful tools to handle practical
problems arising in the field of engineering. Vector calculus can be widely used for modelling the
various laws of physics. The various methods of complex analysis and Laplace transforms can be
used for efficiently solving the problems that occur in various branches of engineering disciplines.
UNIT I MATRICES 12
Eigenvalues and Eigenvectors of a real matrix – Characteristic equation – Properties of
Eigenvalues and Eigenvectors – Cayley-Hamilton theorem – Diagonalization of matrices –
Reduction of a quadratic form to canonical form by orthogonal transformation – Nature of quadratic
forms.
UNIT II VECTOR CALCULUS 12
Gradient and directional derivative – Divergence and curl - Vector identities – Irrotational and
Solenoidal vector fields – Line integral over a plane curve – Surface integral - Area of a curved
surface - Volume integral - Green‘s, Gauss divergence and Stoke‘s theorems – Verification and
application in evaluating line, surface and volume integrals.
UNIT III ANALYTIC FUNCTIONS 12
Analytic functions – Necessary and sufficient conditions for analyticity in Cartesian and polar
coordinates - Properties – Harmonic conjugates – Construction of analytic function - Conformal
mapping – Mapping by functions
21
z
z
czczw ,,, - Bilinear transformation.
UNIT IV COMPLEX INTEGRATION 12
29
Line integral - Cauchy‘s integral theorem – Cauchy‘s integral formula – Taylor‘s and Laurent‘s
series – Singularities – Residues – Residue theorem – Application of residue theorem for
evaluation of real integrals – Use of circular contour and semicircular contour.
UNIT V LAPLACE TRANSFORMS 12
Existence conditions – Transforms of elementary functions – Transform of unit step function and
unit impulse function – Basic properties – Shifting theorems -Transforms of derivatives and
integrals – Initial and final value theorems – Inverse transforms – Convolution theorem –
Transform of periodic functions – Application to solution of linear second order ordinary differential
equations with constant coefficients.
TOTAL: 60 PERIODS
OUTCOMES:
After successfully completing the course, the student will have a good understanding of
the following topics and their applications:
 Eigenvalues and eigenvectors, diagonalization of a matrix, Symmetric matrices, Positive
definite matrices and similar matrices.
 Gradient, divergence and curl of a vector point function and related identities.
 Evaluation of line, surface and volume integrals using Gauss, Stokes and Green‘s
theorems and their verification.
 Analytic functions, conformal mapping and complex integration.
 Laplace transform and inverse transform of simple functions, properties, various related
theorems and application to differential equations with constant coefficients.
TEXT BOOKS :
1. Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi,
43rd
Edition, 2014.
2. Kreyszig Erwin, "Advanced Engineering Mathematics ", John Wiley and Sons,
10th
Edition, New Delhi, 2016.
REFERENCES :
1. Bali N., Goyal M. and Watkins C., ―Advanced Engineering Mathematics‖, Firewall
Media (An imprint of Lakshmi Publications Pvt., Ltd.,), New Delhi, 7th
Edition, 2009.
2. Jain R.K. and Iyengar S.R.K., ― Advanced Engineering Mathematics ‖, Narosa
Publications, New Delhi , 3rd
Edition, 2007.
3. O‘Neil, P.V. ―Advanced Engineering Mathematics‖, Cengage Learning India
Pvt., Ltd, New Delhi, 2007.
4. Sastry, S.S, ―Engineering Mathematics", Vol. I & II, PHI Learning Pvt. Ltd,
4th
Edition, New Delhi, 2014.
5. Wylie, R.C. and Barrett, L.C., ―Advanced Engineering Mathematics ―Tata McGraw Hill
Education Pvt. Ltd, 6th Edition, New Delhi, 2012.
PH8253 PHYSICS FOR ELECTRONICS ENGINEERING
(Common to BME, ME, CC, ECE, EEE, E&I, ICE)
L T P C
3 0 0 3
OBJECTIVES:
 To understand the essential principles of Physics of semiconductor device and Electron
transport properties. Become proficient in magnetic, dielectric and optical properties of
materials and nano devices.
UNIT I ELECTRICAL PROPERTIES OF MATERIALS 9
Classical free electron theory - Expression for electrical conductivity – Thermal conductivity,
expression - Wiedemann-Franz law – Success and failures - electrons in metals – Particle in a
three dimensional box – degenerate states – Fermi- Dirac statistics – Density of energy states –
30
Electron in periodic potential: Bloch thorem – metals and insulators - Energy bands in solids– tight
binding approximation - Electron effective mass – concept of hole.
UNIT II SEMICONDUCTOR PHYSICS 9
Intrinsic Semiconductors – Energy band diagram – direct and indirect semiconductors – Carrier
concentration in intrinsic semiconductors – extrinsic semiconductors - Carrier concentration in N-
type & P-type semiconductors – Carrier transport: Velocity-electric field relations – drift and
diffusion transport - Einstein‘s relation – Hall effect and devices – Zener and avalanche
breakdown in p-n junctions - Ohmic contacts – tunnel diode - Schottky diode – MOS capacitor -
power transistor.
UNIT III MAGNETIC AND DIELECTRIC PROPERTIES OF MATERIALS 9
Magnetism in materials – magnetic field and induction – magnetization - magnetic permeability
and susceptibility–types of magnetic materials – microscopic classification of magnetic materials -
Ferromagnetism: origin and exchange interaction- saturation magnetization and Curie temperature
– Domain Theory. Dielectric materials: Polarization processes – dielectric loss – internal field –
Clausius-Mosotti relation- dielectric breakdown – high-k dielectrics.
UNIT IV OPTICAL PROPERTIES OF MATERIALS 9
Classification of optical materials – carrier generation and recombination processes - Absorption
emission and scattering of light in metals, insulators and Semiconductors (concepts only) - photo
current in a P- N diode – solar cell –photo detectors - LED – Organic LED – Laser diodes –
excitons - quantum confined Stark effect – quantum dot laser.
UNIT V NANOELECTRONIC DEVICES 9
Introduction - electron density in bulk material – Size dependence of Fermi energy– quantum
confinement – quantum structures - Density of states in quantum well, quantum wire and quantum
dot structures –Zener-Bloch oscillations – resonant tunneling – quantum interference effects –
mesoscopic structures: conductance fluctuations and coherent transport – Coulomb blockade
effects - Single electron phenomena and Single electron Transistor – magnetic semiconductors–
spintronics - Carbon nanotubes: Properties and applications.
TOTAL :45 PERIODS
OUTCOMES:
At the end of the course, the students will able to
 Gain knowledge on classical and quantum electron theories, and energy band structuues,
 Acquire knowledge on basics of semiconductor physics and its applications in various
devices,
 Get knowledge on magnetic and dielectric properties of materials,
 Have the necessary understanding on the functioning of optical materials for
optoelectronics,
 Understand the basics of quantum structures and their applications in spintronics and
carbon electronics..
TEXT BOOKS:
1. Kasap, S.O. ―Principles of Electronic Materials and Devices‖, McGraw-Hill Education,
2007.
2. Umesh K Mishra & Jasprit Singh, ―Semiconductor Device Physics and Design‖, Springer,
2008.
3. Wahab, M.A. ―Solid State Physics: Structure and Properties of Materials‖. Narosa
Publishing House, 2009.
REFERENCES:
1. Garcia, N. & Damask, A. ―Physics for Computer Science Students‖. Springer-Verlag,
2012.
2. Hanson, G.W. ―Fundamentals of Nanoelectronics‖. Pearson Education, 2009
31
3. Rogers, B., Adams, J. & Pennathur, S. ―Nanotechnology: Understanding
Small Systems‖. CRC Press, 2014
BE8254 BASIC ELECTRICAL AND INSTRUMENTATION ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
To impart knowledge on
 Operation of Three phase electrical circuits and power measurement
 Working principles of Electrical Machines
 Working principle of Various measuring instruments
UNIT I AC CIRCUITS AND POWER SYSTEMS 9
Three phase power supply – Star connection – Delta connection – Balanced and Unbalanced
Loads- Power equation – Star Delta Conversion – Three Phase Power Measurement -
Transmission & Distribution of electrical energy – Over head Vs Underground system – Protection
of power system – types of tariff – power factor improvement
UNIT II TRANSFORMER 9
Introduction - Ideal Transformer – Accounting For Finite Permeability And Core Loss – Circuit
Model Of Transformer – Per Unit System – Determination Of Parameters Of Circuit Model Of
Transformer – Voltage Regulation – Name Plate Rating – Efficiency – Three Phase Transformers -
Auto Transformers
UNIT III DC MACHINES 9
Introduction – Constructional Features– Motoring and generation principle - Emf And Torque
equation – Circuit Model – Methods of Excitation and magnetisation characteristics – Starting and
Speed Control – Universal Motor
UNIT IV AC MACHINES 9
Principle of operation of three-phase induction motors – Construction –Types – Equivalent circuit,
Single phase Induction motors -Construction– Types–starting and speed control methods.
Alternator- working principle–Equation of induced EMF – Voltage regulation, Synchronous motors-
working principle-starting methods -– Torque equation – Stepper Motors – Brushless DC Motors
UNIT V MEASUREMENT AND INSTRUMENTATION 9
Type of Electrical and electronic instruments – Classification- Types of indicating Instruments –
Principles of Electrical Instruments –Multimeters, Oscilloscopes- Static and Dynamic
Characteristics of Measurement – Errors in Measurement – Transducers - Classification of
Transducers: Resistive, Inductive, Capacitive, Thermoelectric, piezoelectric, photoelectric, Hall
effect and Mechanical
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course the students will be able to
 Understand the concept of three phase power circuits and measurement.
 Comprehend the concepts in electrical generators, motors and transformers
 Choose appropriate measuring instruments for given application
TEXT BOOKS:
1. D P Kothari and I.J Nagarath, ―Basic Electrical and Electronics Engineering‖, McGraw Hill
Education(India) Private Limited, Third Reprint ,2016
2. Giorgio Rizzoni, ―Principles and Applications of Electrical Engineering‖, McGraw Hill
Education(India) Private Limited, 2010
3. S.K.Bhattacharya ―Basic Electrical and Electronics Engineering‖, Pearson India, 2011
REFERENCES:
1. Del Toro ,‖Electrical Engineering Fundamentals‖, Pearson Education, New Delhi, 2015.
32
2. Leonard S Bobrow, ― Foundations of Electrical Engineering‖, Oxford University Press, 2013
3. Rajendra Prasad ,‖Fundamentals of Electrical engineering‖, Prentice Hall of India, 2006.
4. Mittle N., ―Basic Electrical Engineering‖, Tata McGraw Hill Edition, 24th
reprint 2016
5. A.E.Fitzgerald, David E Higginbotham and Arvin Grabel, ―Basic Electrical Engineering‖,
McGraw Hill Education(India) Private Limited, 2009
EC8251 CIRCUIT ANALYSIS L T P C
4 0 0 4
OBJECTIVES:
 To introduce the basic concepts of DC and AC circuits behavior
 To study the transient and steady state response of the circuits subjected to step and
sinusoidal excitations.
 To introduce different methods of circuit analysis using Network theorems, duality and
topology.
UNIT I BASIC CIRCUITS ANALYSIS AND NETWORK TOPOLOGY 12
Ohm‘s Law – Kirchhoff‘s laws – Mesh current and node voltage method of analysis for D.C and
A.C. circuits - Network terminology - Graph of a network - Incidence and reduced incidence
matrices – Trees –Cutsets - Fundamental cutsets - Cutset matrix – Tie sets - Link currents and
Tie set schedules -Twig voltages and Cutset schedules, Duality and dual networks.
UNIT II NETWORK THEOREMS FOR DC AND AC CIRCUITS 12
Network theorems -Superposition theorem, Thevenin‘s theorem, Norton‘s theorem,
Reciprocity theorem, Millman‘s theorem, and Maximum power transfer theorem ,application of
Network theorems- Network reduction: voltage and current division, source transformation – star
delta conversion.
UNIT III RESONANCE AND COUPLED CIRCUITS 12
Resonance - Series resonance - Parallel resonance - Variation of impedance with frequency -
Variation in current through and voltage across L and C with frequency – Bandwidth - Q factor -
Selectivity. Self inductance - Mutual inductance - Dot rule - Coefficient of coupling - Analysis
of multiwinding coupled circuits - Series, Parallel connection of coupled inductors - Single tuned
and double tuned coupled circuits.
UNITIV TRANSIENT ANALYSIS 12
Natural response-Forced response - Transient response of RC, RL and RLC circuits to excitation
by Step Signal, Impulse Signal and exponential sources - Complete response of RC, RL and RLC
Circuits to sinusoidal excitation.
UNIT V TWO PORT NETWORKS 12
Two port networks, Z parameters, Y parameters, Transmission (ABCD) parameters, Hybrid(H)
Parameters, Interconnection of two port networks, Symmetrical properties of T and π networks.
TOTAL : 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Develop the capacity to analyze electrical circuits, apply the circuit theorems in real time
 Design and understand and evaluate the AC and DC circuits.
TEXT BOOKS:
1. William H. Hayt, Jr. Jack E. Kemmerly and Steven M. Durbin, ―Engineering Circuit
Analysis‖ , McGraw Hill Science Engineering, Eighth Edition, 11th
Reprint 2016.
2. Joseph Edminister and Mahmood Nahvi, ―Electric Circuits‖, Schaum‘s Outline Series,
Tata McGraw Hill Publishing Company, New Delhi, Fifth Edition Reprint 2016.
REFERENCES:
33
1. Charles K. Alexander, Mathew N.O. Sadiku, ―Fundamentals of Electric Circuits‖, Fifth
Edition,
McGraw Hill, 9th
Reprint 2015.
2. A.Bruce Carlson, ―Cicuits: Engineering Concepts and Analysis of Linear Electric Circuits‖,
Cengage Learning, India Edition 2nd
Indian Reprint 2009.
3. Allan H.Robbins, Wilhelm C.Miller, ―Circuit Analysis Theory and Practice‖, Cengage
Learning, Fifth Edition, 1st
Indian Reprint 2013.
EC8252 ELECTRONIC DEVICES L T P C
3 0 0 3
OBJECTIVES:
 To acquaint the students with the construction, theory and operation of the basic
electronic devices such as PN junction diode, Bipolar and Field effect Transistors, Power
control devices, LED, LCD and other Opto-electronic devices
UNIT I SEMICONDUCTOR DIODE 9
PN junction diode, Current equations, Energy Band diagram, Diffusion and drift current densities,
forward and reverse bias characteristics, Transition and Diffusion Capacitances, Switching
Characteristics, Breakdown in PN Junction Diodes.
UNIT II BIPOLAR JUNCTION TRANSISTORS 9
NPN -PNP -Operations-Early effect-Current equations – Input and Output characteristics of CE,
CB, CC - Hybrid -π model - h-parameter model, Ebers Moll Model- Gummel Poon-model, Multi
Emitter Transistor.
UNIT III FIELD EFFECT TRANSISTORS 9
JFETs – Drain and Transfer characteristics,-Current equations-Pinch off voltage and its
significance- MOSFET- Characteristics- Threshold voltage -Channel length modulation, D-
MOSFET, E-MOSFET- Characteristics – Comparison of MOSFET with JFET.
UNIT IV SPECIAL SEMICONDUCTOR DEVICES 9
Metal-Semiconductor Junction- MESFET, FINFET, PINFET, CNTFET, DUAL GATE MOSFET,
Schottky barrier diode-Zener diode-Varactor diode –Tunnel diode- Gallium Arsenide device,
LASER diode, LDR.
UNIT V POWER DEVICES AND DISPLAY DEVICES 9
UJT, SCR, Diac, Triac, Power BJT- Power MOSFET- DMOS-VMOS. LED, LCD, Photo transistor,
Opto Coupler, Solar cell, CCD.
TOTAL : 45 PERIODS
OUTCOMES:
At the end of the course the students will be able to:
 Explain the V-I characteristic of diode, UJT and SCR
 Describe the equivalence circuits of transistors
 Operate the basic electronic devices such as PN junction diode, Bipolar and Field effect
Transistors, Power control devices, LED, LCD and other Opto-electronic devices
TEXT BOOKS:
1. Donald A Neaman, ―Semiconductor Physics and Devices‖, Fourth Edition, Tata Mc GrawHill
Inc. 2012.
2. Salivahanan. S, Suresh Kumar. N, Vallavaraj.A, ―Electronic Devices and circuits‖, Third Edition,
Tata McGraw- Hill, 2008.
REFERENCES:
1. Robert Boylestad and Louis Nashelsky, ―Electron Devices and Circuit Theory‖ Pearson
Prentice Hall, 10th edition, July 2008.
2. R.S.Sedha, ― A Text Book of Applied Electronics‖ S.Chand Publications, 2006.
3. Yang, ―Fundamentals of Semiconductor devices‖, McGraw Hill International Edition, 1978.
34
EC8261 CIRCUITS AND DEVICES LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To learn the characteristics of basic electronic devices such as Diode, BJT,FET, SCR
 To understand the working of RL,RC and RLC circuits
 To gain hand on experience in Thevinin & Norton theorem, KVL & KCL, and Super Position
Theorems
1. Characteristics of PN Junction Diode
2. Zener diode Characteristics & Regulator using Zener diode
3. Common Emitter input-output Characteristics
4. Common Base input-output Characteristics
5. FET Characteristics
6. SCR Characteristics
7. Clipper and Clamper & FWR
8. Verifications Of Thevinin & Norton theorem
9. Verifications Of KVL & KCL
10. Verifications Of Super Position Theorem
11. verifications of maximum power transfer & reciprocity theorem
12. Determination Of Resonance Frequency of Series & Parallel RLC Circuits
13. Transient analysis of RL and RC circuits
LABORATORY REQUIREMENTS
BC 107, BC 148,2N2646,BFW10 - 25 each
1N4007, Zener diodes - 25 each
Resistors, Capacitors, Inductors - sufficient quantities
Bread Boards - 15 Nos
CRO (30MHz) – 10 Nos.
Function Generators (3MHz) – 10 Nos.
Dual Regulated Power Supplies ( 0 – 30V) – 10 Nos.
TOTAL : 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Analyze the characteristics of basic electronic devices
 Design RL and RC circuits
 Verify Thevinin & Norton theorem KVL & KCL, and Super Position Theorems
GE8261 ENGINEERING PRACTICES LABORATORY L T P C
0 0 4 2
OBJECTIVES:
To provide exposure to the students with hands on experience on various basic
engineering practices in Civil, Mechanical, Electrical and Electronics Engineering.
GROUP A (CIVIL & MECHANICAL)
35
I CIVIL ENGINEERING PRACTICE 13
Buildings:
(a) Study of plumbing and carpentry components of residential and industrial buildings. Safety
aspects.
Plumbing Works:
(a) Study of pipeline joints, its location and functions: valves, taps, couplings, unions,
reducers,
elbows in household fittings.
(b) Study of pipe connections requirements for pumps and turbines.
(c) Preparation of plumbing line sketches for water supply and sewage works.
(d) Hands-on-exercise:
Basic pipe connections – Mixed pipe material connection – Pipe connections with different joining
components.
(e) Demonstration of plumbing requirements of high-rise buildings.
Carpentry using Power Tools only:
(a) Study of the joints in roofs, doors, windows and furniture.
(b) Hands-on-exercise:
Wood work, joints by sawing, planing and cutting.
II MECHANICAL ENGINEERING PRACTICE 18
Welding:
(a) Preparation of butt joints, lap joints and T- joints by Shielded metal arc welding.
(b) Gas welding practice
Basic Machining:
(a) Simple Turning and Taper turning
(b) Drilling Practice
Sheet Metal Work:
(a) Forming & Bending:
(b) Model making – Trays and funnels.
(c) Different type of joints.
Machine assembly practice:
(a) Study of centrifugal pump
(b) Study of air conditioner
Demonstration on:
(a) Smithy operations, upsetting, swaging, setting down and bending. Example –
Exercise – Production of hexagonal headed bolt.
(b) Foundry operations like mould preparation for gear and step cone pulley.
(c) Fitting – Exercises – Preparation of square fitting and V – fitting models.
GROUP B (ELECTRICAL & ELECTRONICS)
III ELECTRICAL ENGINEERING PRACTICE 13
1. Residential house wiring using switches, fuse, indicator, lamp and energy meter.
2. Fluorescent lamp wiring.
3. Stair case wiring
4. Measurement of electrical quantities – voltage, current, power & power factor in RLC
36
circuit.
5. Measurement of energy using single phase energy meter.
6. Measurement of resistance to earth of an electrical equipment.
IV ELECTRONICS ENGINEERING PRACTICE 16
1. Study of Electronic components and equipments – Resistor, colour coding
measurement of AC signal parameter (peak-peak, rms period, frequency) using CR.
2. Study of logic gates AND, OR, EX-OR and NOT.
3. Generation of Clock Signal.
4. Soldering practice – Components Devices and Circuits – Using general purpose
PCB.
5. Measurement of ripple factor of HWR and FWR.
TOTAL: 60 PERIODS
OUTCOMES:
On successful completion of this course, the student will be able to
 Fabricate carpentry components and pipe connections including plumbing works.
 Use welding equipments to join the structures.
 Carry out the basic machining operations
 Make the models using sheet metal works
 Illustrate on centrifugal pump, Air conditioner, operations of smithy, foundary and
 fittings
 Carry out basic home electrical works and appliances
 Measure the electrical quantities
 Elaborate on the components, gates, soldering practices.
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS:
CIVIL
1. Assorted components for plumbing consisting of metallic pipes,
plastic pipes, flexible pipes, couplings, unions, elbows, plugs and
other fittings. 15 Sets.
2. Carpentry vice (fitted to work bench) 15 Nos.
3. Standard woodworking tools 15 Sets.
4. Models of industrial trusses, door joints, furniture joints 5 each
5. Power Tools: (a) Rotary Hammer 2 Nos
(b) Demolition Hammer 2 Nos
(c) Circular Saw 2 Nos
(d) Planer 2 Nos
(e) Hand Drilling Machine 2 Nos
(f) Jigsaw 2 Nos
MECHANICAL
1. Arc welding transformer with cables and holders 5 Nos.
2. Welding booth with exhaust facility 5 Nos.
3. Welding accessories like welding shield, chipping hammer,
wire brush, etc. 5 Sets.
4. Oxygen and acetylene gas cylinders, blow pipe and other
welding outfit. 2 Nos.
5. Centre lathe 2 Nos.
6. Hearth furnace, anvil and smithy tools 2 Sets.
7. Moulding table, foundry tools 2 Sets.
8. Power Tool: Angle Grinder 2 Nos
9. Study-purpose items: centrifugal pump, air-conditioner One each.
ELECTRICAL
37
1. Assorted electrical components for house wiring 15 Sets
2. Electrical measuring instruments 10 Sets
3. Study purpose items: Iron box, fan and regulator, emergency lamp 1 each
4. Megger (250V/500V) 1 No.
5. Power Tools: (a) Range Finder 2 Nos
(b) Digital Live-wire detector 2 Nos
ELECTRONICS
1. Soldering guns 10 Nos.
2. Assorted electronic components for making circuits 50 Nos.
3. Small PCBs 10 Nos.
4. Multimeters 10 Nos.
5. Study purpose items: Telephone, FM radio, low-voltage power
supply
MA8352 LINEAR ALGEBRA AND PARTIAL DIFFERENTIAL EQUATIONS L T P C
4 0 0 4
OBJECTIVES:
 To introduce the basic notions of groups, rings, fields which will then be used to solve
related problems.
 To understand the concepts of vector space, linear transformations and diagonalization.
 To apply the concept of inner product spaces in orthogonalization.
 To understand the procedure to solve partial differential equations.
 To give an integrated approach to number theory and abstract algebra, and provide a firm
basis for further reading and study in the subject.
UNIT I VECTOR SPACES 12
Vector spaces – Subspaces – Linear combinations and linear system of equations – Linear
independence and linear dependence – Bases and dimensions.
UNIT II LINEAR TRANSFORMATION AND DIAGONALIZATION 12
Linear transformation - Null spaces and ranges - Dimension theorem - Matrix representation of a
linear transformations - Eigenvalues and eigenvectors - Diagonalizability.
UNIT III INNER PRODUCT SPACES 12
Inner product, norms - Gram Schmidt orthogonalization process - Adjoint of linear operations -
Least square approximation.
UNIT IV PARTIAL DIFFERENTIAL EQUATIONS 12
Formation – Solutions of first order equations – Standard types and equations reducible to
standard types – Singular solutions – Lagrange‘s linear equation – Integral surface passing
through a given curve – Classification of partial differential equations - Solution of linear equations
of higher order with constant coefficients – Linear non-homogeneous partial differential equations.
UNIT V FOURIER SERIES SOLUTIONS OF PARTIAL DIFFERENTIAL EQUATIONS 12
Dirichlet‘s conditions – General Fourier series – Half range sine and cosine series - Method of
separation of variables – Solutions of one dimensional wave equation and one-dimensional heat
equation – Steady state solution of two-dimensional heat equation – Fourier series solutions in
Cartesian coordinates.
TOTAL: 60 PERIODS
OUTCOMES:
Upon successful completion of the course, students should be able to:
 Explain the fundamental concepts of advanced algebra and their role in modern
38
mathematics and applied contexts.
 Demonstrate accurate and efficient use of advanced algebraic techniques.
 Demonstrate their mastery by solving non - trivial problems related to the concepts and by
proving simple theorems about the statements proven by the text.
 Able to solve various types of partial differential equations.
Able to solve engineering problems using Fourier series.
TEXTBOOKS:
1. Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi, 43rd
Edition,
2014.
2. Friedberg, A.H., Insel, A.J. and Spence, L., ―Linear Algebra‖, Prentice Hall of India, New Delhi,
2004.
REFERENCES:
1. Burden, R.L. and Faires, J.D, "Numerical Analysis", 9th
Edition, Cengage Learning, 2016.
2. James, G. ―Advanced Modern Engineering Mathematics‖, Pearson Education, 2007.
3. Kolman, B. Hill, D.R., ―Introductory Linear Algebra‖, Pearson Education, New Delhi, First
Reprint, 2009.
4. Kumaresan, S., ―Linear Algebra – A Geometric Approach‖, Prentice – Hall of India, New
Delhi, Reprint, 2010.
5. Lay, D.C., ―Linear Algebra and its Applications‖, 5th
Edition, Pearson Education, 2015.
6. O‘Neil, P.V., ―Advanced Engineering Mathematics‖, Cengage Learning, 2007.
7. Strang, G., ―Linear Algebra and its applications‖, Thomson (Brooks/Cole), New Delhi, 2005.
8. Sundarapandian, V. ―Numerical Linear Algebra‖, Prentice Hall of India, New Delhi, 2008.
EC8393 FUNDAMENTALS OF DATA STRUCTURES IN C L T P C
3 0 0 3
OBJECTIVES:
 To learn the features of C
 To learn the linear and non-linear data structures
 To explore the applications of linear and non-linear data structures
 To learn to represent data using graph data structure
 To learn the basic sorting and searching algorithms
UNIT I C PROGRAMMING BASICS 9
Structure of a C program – compilation and linking processes – Constants, Variables – Data Types
– Expressions using operators in C – Managing Input and Output operations – Decision Making
and Branching – Looping statements. Arrays – Initialization – Declaration – One dimensional and
Two-dimensional arrays. Strings- String operations – String Arrays. Simple programs- sorting-
searching – matrix operations.
UNIT II FUNCTIONS, POINTERS, STRUCTURES AND UNIONS 9
Functions – Pass by value – Pass by reference – Recursion – Pointers - Definition – Initialization –
Pointers arithmetic. Structures and unions - definition – Structure within a structure - Union -
Programs using structures and Unions – Storage classes, Pre-processor directives.
UNIT III LINEAR DATA STRUCTURES 9
Arrays and its representations – Stacks and Queues – Linked lists – Linked list-based
implementation of Stacks and Queues – Evaluation of Expressions – Linked list based polynomial
addition.
UNIT IV NON-LINEAR DATA STRUCTURES 9
Trees – Binary Trees – Binary tree representation and traversals –Binary Search Trees –
Applications of trees. Set representations - Union-Find operations. Graph and its representations –
Graph Traversals.
39
UNIT V SEARCHING AND SORTING ALGORITHMS 9
Linear Search – Binary Search. Bubble Sort, Insertion sort – Merge sort – Quick sort - Hash tables
– Overflow handling.
TOTAL: 45 PERIODS
40
OUTCOMES:
Upon completion of the course, students will be able to:
 Implement linear and non-linear data structure operations using C
 Suggest appropriate linear / non-linear data structure for any given data set.
 Apply hashing concepts for a given problem
 Modify or suggest new data structure for an application
 Appropriately choose the sorting algorithm for an application
TEXTBOOKS:
1. Pradip Dey and Manas Ghosh, ―Programming in C, Second Edition, Oxford University
Press, 2011.
2. Ellis Horowitz, Sartaj Sahni, Susan Anderson-Freed, ―Fundamentals of Data Structures in
C, Second Edition, University Press, 2008.
REFERENCES:
1. Mark Allen Weiss, ―Data Structures and Algorithm Analysis in C, Second Edition,
Pearson Education, 1996
2. Alfred V. Aho, John E. Hopcroft and Jeffrey D. Ullman, ―Data Structures and Algorithms,
Pearson Education, 1983.
3. Robert Kruse, C.L.Tondo, Bruce Leung, Shashi Mogalla , ― Data Structures and Program
Design in C, Second Edition, Pearson Education, 2007
4. Jean-Paul Tremblay and Paul G. Sorenson, ―An Introduction to Data Structures with
Applications, Second Edition, Tata McGraw-Hill, 1991.
EC8351 ELECTRONIC CIRCUITS I L T P C
3 0 0 3
OBJECTIVES:
 To understand the methods of biasing transistors
 To design and analyze single stage and multistage amplifier circuits
 To analyze the frequency response of small signal amplifiers
 To design and analyze the regulated DC power supplies.
 To troubleshoot and fault analysis of power supplies.
UNIT I BIASING OF DISCRETE BJT, JFET AND MOSFET 9
BJT– Need for biasing - DC Load Line and Bias Point – DC analysis of Transistor circuits - Various
biasing methods of BJT – Bias Circuit Design - Thermal stability - Stability factors - Bias
compensation techniques using Diode, thermistor and sensistor – Biasing BJT Switching Circuits-
JFET - DC Load Line and Bias Point - Various biasing methods of JFET - JFET Bias Circuit
Design - MOSFET Biasing - Biasing FET Switching Circuits.
UNIT II BJT AMPLIFIERS 9
Small Signal Hybrid π equivalent circuit of BJT – Early effect - Analysis of CE, CC and CB
amplifiers using Hybrid π equivalent circuits - AC Load Line Analysis- Darlington Amplifier -
Bootstrap technique - Cascade, Cascode configurations - Differential amplifier, Basic BJT
differential pair – Small signal analysis and CMRR.
UNIT III SINGLE STAGE FET, MOSFET AMPLIFIERS 9
41
Small Signal Hybrid π equivalent circuit of FET and MOSFET - Analysis of CS, CD and CG
amplifiers using Hybrid π equivalent circuits - Basic FET differential pair- BiCMOS circuits.
UNIT IV FREQUENCY RESPONSE OF AMPLIFIERS 9
Amplifier frequency response – Frequency response of transistor amplifiers with circuit capacitors
– BJT frequency response – short circuit current gain - cut off frequency – fα, fβ and unity gain
bandwidth – Miller effect - frequency response of FET - High frequency analysis of CE and
MOSFET CS amplifier - Transistor Switching Times.
UNIT V POWER SUPPLIES AND ELECTRONIC DEVICE TESTING 9
Linear mode power supply - Rectifiers - Filters - Half-Wave Rectifier Power Supply - Full-Wave
Rectifier Power Supply - Voltage regulators: Voltage regulation - Linear series, shunt and
switching Voltage Regulators - Over voltage protection - BJT and MOSFET – Switched mode
power supply (SMPS) - Power Supply Performance and Testing - Troubleshooting and Fault
Analysis, Design of Regulated DC Power Supply.
TOTAL: 45 PERIODS
OUTCOMES:
After studying this course, the student should be able to:
 Acquire knowledge of
 Working principles, characteristics and applications of BJT and FET
 Frequency response characteristics of BJT and FET amplifiers
 Analyze the performance of small signal BJT and FET amplifiers - single stage and multi
stage amplifiers
 Apply the knowledge gained in the design of Electronic circuits
TEXT BOOKS:
1. Donald. A. Neamen, Electronic Circuits Analysis and Design, 3rd
Edition, Mc Graw Hill
Education (India) Private Ltd., 2010. (Unit I-IV)
2. Robert L. Boylestad and Louis Nasheresky, ―Electronic Devices and Circuit Theory‖, 11th
Edition, Pearson Education, 2013. (Unit V)
REFERENCES
1. Millman J, Halkias.C.and Sathyabrada Jit, Electronic Devices and Circuits, 4
th
Edition, Mc Graw Hill
Education (India) Private Ltd., 2015.
2. Salivahanan and N. Suresh Kumar, Electronic Devices and Circuits, 4
th
Edition, , Mc Graw Hill
Education (India) Private Ltd., 2017.
3. Floyd, Electronic Devices, Ninth Edition, Pearson Education, 2012.
4. David A. Bell, Electronic Devices & Circuits, 5
th
Edition, Oxford University Press, 2008.
5. Anwar A. Khan and Kanchan K. Dey, A First Course on Electronics, PHI, 2006.
6. Rashid M, Microelectronics Circuits, Thomson Learning, 2007.
EC8352 SIGNALS AND SYSTEMS L T P C
4 0 0 4
OBJECTIVES:
 To understand the basic properties of signal & systems
 To know the methods of characterization of LTI systems in time domain
 To analyze continuous time signals and system in the Fourier and Laplace domain
 To analyze discrete time signals and system in the Fourier and Z transform domain
UNIT I CLASSIFICATION OF SIGNALS AND SYSTEMS 12
Standard signals- Step, Ramp, Pulse, Impulse, Real and complex exponentials and Sinusoids_
Classification of signals – Continuous time (CT) and Discrete Time (DT) signals, Periodic &
Aperiodic signals, Deterministic & Random signals, Energy & Power signals - Classification of
42
systems- CT systems and DT systems- – Linear & Nonlinear, Time-variant & Time-invariant,
Causal & Non-causal, Stable & Unstable.
UNIT II ANALYSIS OF CONTINUOUS TIME SIGNALS 12
Fourier series for periodic signals - Fourier Transform – properties- Laplace Transforms and
properties
UNIT III LINEAR TIME INVARIANT CONTINUOUS TIME SYSTEMS 12
Impulse response - convolution integrals- Differential Equation- Fourier and Laplace transforms in
Analysis of CT systems - Systems connected in series / parallel.
UNIT IV ANALYSIS OF DISCRETE TIME SIGNALS 12
Baseband signal Sampling – Fourier Transform of discrete time signals (DTFT) – Properties of
DTFT - Z Transform & Properties
UNIT V LINEAR TIME INVARIANT-DISCRETE TIME SYSTEMS 12
Impulse response – Difference equations-Convolution sum- Discrete Fourier Transform and Z
Transform Analysis of Recursive & Non-Recursive systems-DT systems connected in series and
parallel.
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 To be able to determine if a given system is linear/causal/stable
 Capable of determining the frequency components present in a deterministic signal
 Capable of characterizing LTI systems in the time domain and frequency domain
 To be able to compute the output of an LTI system in the time and frequency domains
TEXT BOOK:
1. Allan V.Oppenheim, S.Wilsky and S.H.Nawab, ―Signals and Systems‖, Pearson, 2015.(Unit 1-
V)
REFERENCES
1. B. P. Lathi, ―Principles of Linear Systems and Signals‖, Second Edition, Oxford, 2009.
2. R.E.Zeimer, W.H.Tranter and R.D.Fannin, ―Signals & Systems - Continuous and
Discrete‖, Pearson, 2007.
3. John Alan Stuller, ―An Introduction to Signals and Systems‖, Thomson, 2007.
EC8392 DIGITAL ELECTRONICS L T P C
3 0 0 3
OBJECTIVES:
43
 To present the Digital fundamentals, Boolean algebra and its applications in digital
systems
 To familiarize with the design of various combinational digital circuits using logic gates
 To introduce the analysis and design procedures for synchronous and asynchronous
sequential circuits
 To explain the various semiconductor memories and related technology
 To introduce the electronic circuits involved in the making of logic gates
UNIT I DIGITAL FUNDAMENTALS 9
Number Systems – Decimal, Binary, Octal, Hexadecimal, 1‗s and 2‗s complements, Codes –
Binary, BCD, Excess 3, Gray, Alphanumeric codes, Boolean theorems, Logic gates, Universal
gates, Sum of products and product of sums, Minterms and Maxterms, Karnaugh map
Minimization and Quine-McCluskey method of minimization.
UNIT II COMBINATIONAL CIRCUIT DESIGN 9
Design of Half and Full Adders, Half and Full Subtractors, Binary Parallel Adder – Carry look
ahead Adder, BCD Adder, Multiplexer, Demultiplexer, Magnitude Comparator, Decoder,
Encoder, Priority Encoder.
UNIT III SYNCHRONOUS SEQUENTIAL CIRCUITS 9
Flip flops – SR, JK, T, D, Master/Slave FF – operation and excitation tables, Triggering of FF,
Analysis and design of clocked sequential circuits – Design - Moore/Mealy models, state
minimization, state assignment, circuit implementation – Design of Counters- Ripple Counters,
Ring Counters, Shift registers, Universal Shift Register.
UNIT IV ASYNCHRONOUS SEQUENTIAL CIRCUITS 9
Stable and Unstable states, output specifications, cycles and races, state reduction, race free
assignments, Hazards, Essential Hazards, Pulse mode sequential circuits, Design of Hazard
free circuits.
UNIT V MEMORY DEVICES AND DIGITAL INTEGRATED CIRCUITS 9
Basic memory structure – ROM -PROM – EPROM – EEPROM –EAPROM, RAM – Static and
dynamic RAM - Programmable Logic Devices – Programmable Logic Array (PLA) -
Programmable Array Logic (PAL) – Field Programmable Gate Arrays (FPGA) - Implementation
of combinational logic circuits using PLA, PAL.
Digital integrated circuits: Logic levels, propagation delay, power dissipation, fan-out and fan-
in, noise margin, logic families and their characteristics-RTL, TTL, ECL, CMOS
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course:
 Use digital electronics in the present contemporary world
 Design various combinational digital circuits using logic gates
 Do the analysis and design procedures for synchronous and asynchronous sequential
circuits
 Use the semiconductor memories and related technology
 Use electronic circuits involved in the design of logic gates
TEXT BOOK:
44
1. M. Morris Mano and Michael D. Ciletti, ―Digital Design‖, 5th Edition, Pearson, 2014.
REFERENCES:
1. Charles H.Roth. ―Fundamentals of Logic Design‖, 6th Edition, Thomson Learning, 2013.
2. Thomas L. Floyd, ―Digital Fundamentals‖, 10th Edition, Pearson Education Inc, 2011
3. S.Salivahanan and S.Arivazhagan―Digital Electronics‖, Ist Edition, Vikas Publishing
House pvt Ltd, 2012.
4. Anil K.Maini ―Digital Electronics‖, Wiley, 2014.
5. A.Anand Kumar ―Fundamentals of Digital Circuits‖, 4th Edition, PHI Learning Private
Limited, 2016.
6. Soumitra Kumar Mandal ― Digital Electronics‖, McGraw Hill Education Private Limited,
2016.
EC8391 CONTROL SYSTEMS ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
 To introduce the components and their representation of control systems
 To learn various methods for analyzing the time response, frequency response and stability
of the systems.
 To learn the various approach for the state variable analysis.
UNIT I SYSTEMS COMPONENTS AND THEIR REPRESENTATION 9
Control System: Terminology and Basic Structure-Feed forward and Feedback control theory-
Electrical and Mechanical Transfer Function Models-Block diagram Models-Signal flow graphs
models-DC and AC servo Systems-Synchronous -Multivariable control system
UNIT II TIME RESPONSE ANALYSIS 9
Transient response-steady state response-Measures of performance of the standard first order
and second order system-effect on an additional zero and an additional pole-steady error constant
and system- type number-PID control-Analytical design for PD, PI,PID control systems
UNIT III FREQUENCY RESPONSE AND SYSTEM ANALYSIS 9
Closed loop frequency response-Performance specification in frequency domain-Frequency
response of standard second order system- Bode Plot - Polar Plot- Nyquist plots-Design of
compensators using Bode plots-Cascade lead compensation-Cascade lag compensation-Cascade
lag-lead compensation
UNIT IV CONCEPTS OF STABILITY ANALYSIS 9
Concept of stability-Bounded - Input Bounded - Output stability-Routh stability criterion-Relative
stability-Root locus concept-Guidelines for sketching root locus-Nyquist stability criterion.
UNIT V CONTROL SYSTEM ANALYSIS USING STATE VARIABLE METHODS 9
State variable representation-Conversion of state variable models to transfer functions-Conversion
of transfer functions to state variable models-Solution of state equations-Concepts of
Controllability and Observability-Stability of linear systems-Equivalence between transfer function
and state variable representations-State variable analysis of digital control system-Digital control
design using state feedback.
TOTAL:45 PERIODS
OUTCOMES:
45
Upon completion of the course, the student should be able to:
 Identify the various control system components and their representations.
 Analyze the various time domain parameters.
 Analysis the various frequency response plots and its system.
 Apply the concepts of various system stability criterions.
 Design various transfer functions of digital control system using state variable models.
TEXT BOOK:
1. M.Gopal, ―Control System – Principles and Design‖, Tata McGraw Hill, 4th Edition, 2012.
REFERENCES:
1. J.Nagrath and M.Gopal, ―Control System Engineering‖, New Age International Publishers,
5 th
Edition, 2007.
2. K. Ogata, ‗Modern Control Engineering‘, 5th edition, PHI, 2012.
3. S.K.Bhattacharya, Control System Engineering, 3rd Edition, Pearson, 2013.
4. Benjamin.C.Kuo, ―Automatic control systems‖, Prentice Hall of India, 7th Edition,1995.
46
EC8381 FUNDAMENTALS OF DATA STRUCTURES IN C LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To understand and implement basic data structures using C
 To apply linear and non-linear data structures in problem solving.
 To learn to implement functions and recursive functions by means of data
structures
 To implement searching and sorting algorithms
LIST OF EXERCISES
1. Basic C Programs – looping, data manipulations, arrays
2. Programs using strings – string function implementation
3. Programs using structures and pointers
4. Programs involving dynamic memory allocations
5. Array implementation of stacks and queues
6. Linked list implementation of stacks and queues
7. Application of Stacks and Queues
8. Implementation of Trees, Tree Traversals
9. Implementation of Binary Search trees
10. Implementation of Linear search and binary search
11. Implementation Insertion sort, Bubble sort, Quick sort and Merge Sort
12. Implementation Hash functions, collision resolution technique
TOTAL:60 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Write basic and advanced programs in C
 Implement functions and recursive functions in C
 Implement data structures using C
 Choose appropriate sorting algorithm for an application and implement it in a modularized
way
EC8361 ANALOG AND DIGITAL CIRCUITS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made to:
 Study the Frequency response of CE, CB and CC Amplifier
 Learn the frequency response of CS Amplifiers
 Study the Transfer characteristics of differential amplifier
 Perform experiment to obtain the bandwidth of single stage and multistage amplifiers
 Perform SPICE simulation of Electronic Circuits
 Design and implement the Combinational and sequential logic circuits
LIST OF ANALOG EXPERIMENTS:
1. 1. Design of Regulated Power supplies
2. 2. Frequency Response of CE, CB, CC and CS amplifiers
3. 3. Darlington Amplifier
4. 4. Differential Amplifiers - Transfer characteristics, CMRR Measurement
5. 5. Cascode and Cascade amplifiers
6. 6. Determination of bandwidth of single stage and multistage amplifiers
7. 7. Analysis of BJT with Fixed bias and Voltage divider bias using Spice
8. 8. Analysis of FET, MOSFET with fixed bias, self-bias and voltage divider bias using
47
simulation software like Spice
9. 9. Analysis of Cascode and Cascade amplifiers using Spice
10. Analysis of Frequency Response of BJT and FET using Spice
LIST OF DIGITAL EXPERIMENTS
1. Design and implementation of code converters using logic gates(i) BCD to
excess-3 code and vice versa (ii) Binary to gray and vice-versa
2. Design and implementation of 4 bit binary Adder/ Subtractor and BCD adder
using IC 7483
3. Design and implementation of Multiplexer and De-multiplexer using logic gates
4. Design and implementation of encoder and decoder using logic gates
5. Construction and verification of 4 bit ripple counter and Mod-10 / Mod-12
Ripple counters
6. Design and implementation of 3-bit synchronous up/down counter
TOTAL : 60 PERIODS
OUTCOMES:
On completion of this laboratory course, the student should be able to:
 Design and Test rectifiers, filters and regulated power supplies.
 Design and Test BJT/JFET amplifiers.
 Differentiate cascode and cascade amplifiers.
 Analyze the limitation in bandwidth of single stage and multi stage amplifier
 Measure CMRR in differential amplifier
 Simulate and analyze amplifier circuits using PSpice.
 Design and Test the digital logic circuits.
LAB REQUIREMENTS FOR A BATCH OF 30 STUDENTS, 2 STUDENTS / EXPERIMENT:
S.NO EQUIPMENTS FOR ANALOG LAB
1 CRO/DSO (30MHz) – 15 Nos.
2 Signal Generator /Function Generators (3 MHz) – 15 Nos
3 Dual Regulated Power Supplies ( 0 – 30V) – 15 Nos.
4 Standalone desktop PCs with SPICE software – 15 Nos.
5 Transistor/FET (BJT-NPN-PNP and NMOS/PMOS) – 50 Nos
6 Components and Accessories: Resistors, Capacitors, Inductors, diodes, Zener
Diodes, Bread Boards, Transformers.
7 SPICE Circuit Simulation Software: (any public domain or commercial software)
S.NO EQUIPMENTS FOR DIGITAL LAB
1 Dual power supply/ single mode power supply - 15 Nos
2 IC Trainer Kit - 15 Nos
3 Bread Boards - 15 Nos
4 Seven segment display -15 Nos
5 Multimeter - 15 Nos
6 ICs each 50 Nos
7400/ 7402 / 7404 / 7486 / 7408 / 7432 / 7483 / 74150 /
74151 / 74147 / 7445 / 7476/7491/ 555 / 7494 / 7447 / 74180 /
7485 / 7473 / 74138 / 7411 / 7474
48
HS8381 INTERPERSONAL SKILLS/LISTENING&SPEAKING L T P C
0 0 2 1
OBJECTIVES:
The Course will enable learners to:
• Equip students with the English language skills required for the successful undertaking of
academic studies with primary emphasis on academic speaking and listening skills.
• Provide guidance and practice in basic general and classroom conversation and to engage
in specific academic speaking activities.
• improve general and academic listening skills
• Make effective presentations.
UNIT I
Listening as a key skill- its importance- speaking - give personal information - ask for personal
information - express ability - enquire about ability - ask for clarification Improving pronunciation
- pronunciation basics taking lecture notes - preparing to listen to a lecture - articulate a
complete idea as opposed to producing fragmented utterances.
UNIT II
Listen to a process information- give information, as part of a simple explanation - conversation
starters: small talk - stressing syllables and speaking clearly - intonation patterns - compare and
contrast information and ideas from multiple sources- converse with reasonable accuracy over
a wide range of everyday topics.
UNIT III
Lexical chunking for accuracy and fluency- factors influence fluency, deliver a five-minute
informal talk - greet - respond to greetings - describe health and symptoms - invite and offer -
accept - decline - take leave - listen for and follow the gist- listen for detail
UNIT IV
Being an active listener: giving verbal and non-verbal feedback - participating in a group
discussion - summarizing academic readings and lectures conversational speech listening to
and participating in conversations - persuade.
UNIT V
Formal and informal talk - listen to follow and respond to explanations, directions and instructions
in academic and business contexts - strategies for presentations and interactive communication -
group/pair presentations - negotiate disagreement in group work.
TOTAL :30PERIODS
OUTCOMES:
At the end of the course Learners will be able to:
 Listen and respond appropriately.
 Participate in group discussions
 Make effective presentations
 Participate confidently and appropriately in conversations both formal and informal
49
TEXT BOOKS:
1. Brooks,Margret. Skills for Success. Listening and Speaking. Level 4 Oxford University Press,
Oxford: 2011.
2. Richards,C. Jack. & David Bholke. Speak Now Level 3. Oxford University Press, Oxford: 2010
REFERENCES
1. Bhatnagar, Nitin and MamtaBhatnagar. Communicative English for Engineers and
Professionals. Pearson: New Delhi, 2010.
2. Hughes, Glyn and Josephine Moate. Practical English Classroom. Oxford University Press:
Oxford, 2014.
3. Vargo, Mari. Speak Now Level 4. Oxford University Press: Oxford, 2013.
4. Richards C. Jack. Person to Person (Starter). Oxford University Press: Oxford, 2006.
5. Ladousse, Gillian Porter. Role Play. Oxford University Press: Oxford, 2014
MA8451 PROBABILITY AND RANDOM PROCESSES L T P C
4 0 0 4
OBJECTIVES :
 To provide necessary basic concepts in probability and random processes for applications
such as random signals, linear systems in communication engineering.
 To understand the basic concepts of probability, one and two dimensional random
variables and to introduce some standard distributions applicable to engineering which can
describe real life phenomenon.
 To understand the basic concepts of random processes which are widely used in IT fields.
 To understand the concept of correlation and spectral densities.
 To understand the significance of linear systems with random inputs.
UNIT I PROBABILITY AND RANDOM VARIABLES 12
Probability – Axioms of probability – Conditional probability – Baye‘s theorem - Discrete and
continuous random variables – Moments – Moment generating functions – Binomial, Poisson,
Geometric, Uniform, Exponential and Normal distributions.
UNIT II TWO - DIMENSIONAL RANDOM VARIABLES 12
Joint distributions – Marginal and conditional distributions – Covariance – Correlation and linear
regression – Transformation of random variables – Central limit theorem (for independent and
identically distributed random variables).
UNIT III RANDOM PROCESSES 12
Classification – Stationary process – Markov process - Markov chain - Poisson process – Random
telegraph process.
UNIT IV CORRELATION AND SPECTRAL DENSITIES 12
Auto correlation functions – Cross correlation functions – Properties – Power spectral density –
Cross spectral density – Properties.
UNIT V LINEAR SYSTEMS WITH RANDOM INPUTS 12
Linear time invariant system – System transfer function – Linear systems with random inputs –
Auto correlation and cross correlation functions of input and output.
TOTAL : 60 PERIODS
50
OUTCOMES:
Upon successful completion of the course, students should be able to:
 Understand the fundamental knowledge of the concepts of probability and have knowledge
of standard distributions which can describe real life phenomenon.
 Understand the basic concepts of one and two dimensional random variables and apply in
engineering applications.
 Apply the concept random processes in engineering disciplines.
 Understand and apply the concept of correlation and spectral densities.
 The students will have an exposure of various distribution functions and help in acquiring
skills in handling situations involving more than one variable. Able to analyze the response
of random inputs to linear time invariant systems.
TEXT BOOKS:
1. Ibe, O.C.," Fundamentals of Applied Probability and Random Processes ", 1st
Indian Reprint,
Elsevier, 2007.
2. Peebles, P.Z., "Probability, Random Variables and Random Signal Principles ", Tata McGraw
Hill, 4th
Edition, New Delhi, 2002.
REFERENCES:
1. Cooper. G.R., McGillem. C.D., "Probabilistic Methods of Signal and System Analysis", Oxford
University Press, New Delhi, 3rd
Indian Edition, 2012.
2. Hwei Hsu, "Schaum‘s Outline of Theory and Problems of Probability, Random
Variables and Random Processes ", Tata McGraw Hill Edition, New Delhi, 2004.
3. Miller. S.L. and Childers. D.G., ―Probability and Random Processes with Applications to Signal
Processing and Communications ", Academic Press, 2004.
4. Stark. H. and Woods. J.W., ―Probability and Random Processes with Applications to Signal
Processing ", Pearson Education, Asia, 3rd
Edition, 2002.
5. Yates. R.D. and Goodman. D.J., ―Probability and Stochastic Processes", Wiley India Pvt. Ltd.,
Bangalore, 2nd
Edition, 2012.
EC8452 ELECTRONIC CIRCUITS II L T P C
3 0 0 3
OBJECTIVES:
 To give a comprehensive exposure to all types of amplifiers and oscillators
constructed with discrete components. This helps to develop a strong basis for
building linear and digital integrated circuits
 To study about feedback amplifiers and oscillators principles
 To design oscillators.
 To study about turned amplifier.
 To understand the analysis and design of LC and RC oscillators, amplifiers, multi
vibrators, power amplifiers and DC convertors.
UNIT I FEEDBACK AMPLIFIERS AND STABILITY 9
Feedback Concepts – gain with feedback – effect of feedback on gain stability, distortion,
bandwidth, input and output impedances; topologies of feedback amplifiers – analysis of
series-series, shunt-shunt and shunt-series feedback amplifiers-stability problem-Gain and
Phase-margins-Frequency compensation.
51
UNIT II OSCILLATORS 9
Barkhausen criterion for oscillation – phase shift, Wien bridge - Hartley & Colpitt‘s
oscillators – Clapp oscillator-Ring oscillators and crystal oscillators – oscillator amplitude
stabilization.
UNIT III TUNED AMPLIFIERS 9
Coil losses, unloaded and loaded Q of tank circuits, small signal tuned amplifiers –
Analysis of capacitor coupled single tuned amplifier – double tuned amplifier - effect of
cascading single tuned and double tuned amplifiers on bandwidth – Stagger tuned
amplifiers - Stability of tuned amplifiers – Neutralization - Hazeltine neutralization method.
UNIT IV WAVE SHAPING AND MULTIVIBRATOR CIRCUITS 9
Pulse circuits – attenuators – RC integrator and differentiator circuits – diode clampers
and clippers –Multivibrators - Schmitt Trigger- UJT Oscillator.
UNIT V POWER AMPLIFIERS AND DC CONVERTERS 9
Power amplifiers- class A-Class B-Class AB-Class C-Power MOSFET-Temperature
Effect- Class AB Power amplifier using MOSFET –DC/DC convertors – Buck, Boost,
Buck-Boost analysis and design
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the student should be able to:
 Analyze different types of amplifier, oscillator and multivibrator circuits
 Design BJT amplifier and oscillator circuits
 Analyze transistorized amplifier and oscillator circuits
 Design and analyze feedback amplifiers
 Design LC and RC oscillators, tuned amplifiers, wave shaping circuits,
multivibrators, power amplifier and DC convertors.
TEXT BOOKS:
1. Sedra and Smith, ―Micro Electronic Circuits‖; Sixth Edition, Oxford University Press,
2011. (UNIT I, III,IV,V)
2. Jacob Millman, ‗Microelectronics‘, McGraw Hill, 2nd Edition, Reprinted, 2009.
(UNIT I,II,IV,V)
REFERENCES:
1. Robert L. Boylestad and Louis Nasheresky, ―Electronic Devices and Circuit
Theory‖, 10th Edition, Pearson Education / PHI, 2008
2. David A. Bell, ―Electronic Devices and Circuits‖, Fifth Edition, Oxford University
Press, 2008.
3. Millman J. and Taub H., ―Pulse Digital and Switching Waveforms‖, TMH, 2000.
4. Millman and Halkias. C., Integrated Electronics, TMH, 2007.
52
EC8491 COMMUNICATION THEORY L T P C
3 0 0 3
OBJECTIVES:
 To introduce the concepts of various analog modulations and their spectral characteristics
 To understand the properties of random process
 To know the effect of noise on communication systems
 To study the limits set by Information Theory
UNIT I AMPLITUDE MODULATION 9
Amplitude Modulation- DSBSC, DSBFC, SSB, VSB - Modulation index, Spectra, Power relations
and Bandwidth – AM Generation – Square law and Switching modulator, DSBSC Generation –
Balanced and Ring Modulator, SSB Generation – Filter, Phase Shift and Third Methods, VSB
Generation – Filter Method, Hilbert Transform, Pre-envelope & complex envelope –comparison of
different AM techniques, Superheterodyne Receiver
UNIT II ANGLE MODULATION 9
Phase and frequency modulation, Narrow Band and Wide band FM – Modulation index, Spectra,
Power relations and Transmission Bandwidth - FM modulation –Direct and Indirect methods, FM
Demodulation – FM to AM conversion, FM Discriminator - PLL as FM Demodulator.
UNIT III RANDOM PROCESS 9
Random variables, Random Process, Stationary Processes, Mean, Correlation & Covariance
functions, Power Spectral Density, Ergodic Processes, Gaussian Process, Transmission of a
Random Process Through a LTI filter.
UNIT IV NOISE CHARACTERIZATION 9
Noise sources – Noise figure, noise temperature and noise bandwidth – Noise in cascaded
systems. Representation of Narrow band noise –In-phase and quadrature, Envelope and Phase –
Noise performance analysis in AM & FM systems – Threshold effect, Pre-emphasis and de-
emphasis for FM.
UNIT V SAMPLING & QUANTIZATION 9
Low pass sampling – Aliasing- Signal Reconstruction-Quantization - Uniform & non-uniform
quantization - quantization noise - Logarithmic Companding –PAM, PPM, PWM, PCM – TDM,
FDM.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Design AM communication systems
 Design Angle modulated communication systems
 Apply the concepts of Random Process to the design of Communication systems
 Analyze the noise performance of AM and FM systems
 Gain knowledge in sampling and quantization
TEXT BOOKS:
1. J.G.Proakis, M.Salehi, ―Fundamentals of Communication Systems‖, Pearson Education
2014. (UNIT I-IV)
2. Simon Haykin, ―Communication Systems‖, 4th Edition, Wiley, 2014.(UNIT I-V)
53
REFERENCES:
1. B.P.Lathi, ―Modern Digital and Analog Communication Systems‖, 3rd Edition, Oxford
University Press, 2007.
2. D.Roody, J.Coolen, ―Electronic Communications, 4th edition PHI 2006
3. A.Papoulis, ―Probability, Random variables and Stochastic Processes‖, McGraw Hill, 3rd
edition, 1991.
4. B.Sklar, ―Digital Communications Fundamentals and Applications‖, 2nd Edition Pearson
Education 2007
5. H P Hsu, Schaum Outline Series - ―Analog and Digital Communications‖ TMH 2006
6. Couch.L., "Modern Communication Systems", Pearson, 2001.
EC8451 ELECTROMAGNETIC FIELDS L T P C
4 0 0 4
OBJECTIVES:
 To gain conceptual and basic mathematical understanding of electric and magnetic fields in
free space and in materials
 To understand the coupling between electric and magnetic fields through Faraday's law,
displacement current and Maxwell's equations
 To understand wave propagation in lossless and in lossy media
 To be able to solve problems based on the above concepts
UNIT I INTRODUCTION 12
Electromagnetic model, Units and constants, Review of vector algebra, Rectangular, cylindrical
and spherical coordinate systems, Line, surface and volume integrals, Gradient of a scalar field,
Divergence of a vector field, Divergence theorem, Curl of a vector field, Stoke's theorem, Null
identities, Helmholtz's theorem
UNIT II ELECTROSTATICS 12
Electric field, Coulomb's law, Gauss's law and applications, Electric potential, Conductors in static
electric field, Dielectrics in static electric field, Electric flux density and dielectric constant,
Boundary conditions, Capacitance, Parallel, cylindrical and spherical capacitors, Electrostatic
energy, Poisson's and Laplace's equations, Uniqueness of electrostatic solutions, Current density
and Ohm's law, Electromotive force and Kirchhoff's voltage law, Equation of continuity and
Kirchhoff's current law
UNIT III MAGNETOSTATICS 12
Lorentz force equation, Law of no magnetic monopoles, Ampere's law, Vector magnetic potential,
Biot-Savart law and applications, Magnetic field intensity and idea of relative permeability,
Magnetic circuits, Behaviour of magnetic materials, Boundary conditions, Inductance and
inductors, Magnetic energy, Magnetic forces and torques
UNIT IV TIME-VARYING FIELDS AND MAXWELL's EQUATIONS 12
Faraday's law, Displacement current and Maxwell-Ampere law, Maxwell's equations, Potential
functions, Electromagnetic boundary conditions, Wave equations and solutions, Time-harmonic
fields
54
UNIT V PLANE ELECTROMAGNETIC WAVES 12
Plane waves in lossless media, Plane waves in lossy media (low-loss dielectrics and good
conductors), Group velocity, Electromagnetic power flow and Poynting vector, Normal incidence at
a plane conducting boundary, Normal incidence at a plane dielectric boundary
TOTAL:60 PERIODS
OUTCOMES:
By the end of this course, the student should be able to:
 Display an understanding of fundamental electromagnetic laws and concepts
 Write Maxwell's equations in integral, differential and phasor forms and explain their physical
meaning
 Explain electromagnetic wave propagation in lossy and in lossless media
 Solve simple problems requiring estimation of electric and magnetic field quantities based on
these concepts and laws
TEXT BOOKS:
1. D.K. Cheng, Field and wave electromagnetics, 2nd ed., Pearson (India), 1989 (UNIT I, II,III
IV,V)
2. W.H. Hayt and J.A. Buck, Engineering electrmagnetics, 7th ed., McGraw-Hill (India), 2006
(UNIT I-V)
REFERENCES
1. D.J. Griffiths, Introduction to electrodynamics, 4th ed., Pearson (India), 2013
2. B.M. Notaros, Electromagnetics, Pearson: New Jersey, 2011
3. M.N.O. Sadiku and S.V. Kulkarni, Principles of electromagnetics, 6th ed., Oxford (Asian
Edition), 2015
EC8453 LINEAR INTEGRATED CIRCUITS
L T P C
3 0 0 3
OBJECTIVES:
 To introduce the basic building blocks of linear integrated circuits
 To learn the linear and non-linear applications of operational amplifiers
 To introduce the theory and applications of analog multipliers and PLL
 To learn the theory of ADC and DAC
 To introduce the concepts of waveform generation and introduce some special function
ICs
UNIT I BASICS OF OPERATIONAL AMPLIFIERS 9
Current mirror and current sources, Current sources as active loads, Voltage sources, Voltage
References, BJT Differential amplifier with active loads, Basic information about op-amps – Ideal
Operational Amplifier - General operational amplifier stages -and internal circuit diagrams of IC
741, DC and AC performance characteristics, slew rate, Open and closed loop configurations –
JFET Operational Amplifiers – LF155 and TL082.
UNIT II APPLICATIONS OF OPERATIONAL AMPLIFIERS 9
Sign Changer, Scale Changer, Phase Shift Circuits, Voltage Follower, V-to-I and I-to-V converters,
adder, subtractor, Instrumentation amplifier, Integrator, Differentiator, Logarithmic amplifier,
Antilogarithmic amplifier, Comparators, Schmitt trigger, Precision rectifier, peak detector, clipper
55
and clamper, Low-pass, high-pass and band-pass Butterworth filters.
UNIT III ANALOG MULTIPLIER AND PLL 9
Analog Multiplier using Emitter Coupled Transistor Pair - Gilbert Multiplier cell – Variable
transconductance technique, analog multiplier ICs and their applications, Operation of the basic
PLL, Closed loop analysis, Voltage controlled oscillator, Monolithic PLL IC 565, application of PLL
for AM detection, FM detection, FSK modulation and demodulation and Frequency synthesizing
and clock synchronisation.
UNIT IV ANALOG TO DIGITAL AND DIGITAL TO ANALOG
CONVERTERS
9
Analog and Digital Data Conversions, D/A converter – specifications - weighted resistor type, R-2R
Ladder type, Voltage Mode and Current-Mode R - 2R Ladder types - switches for D/A converters,
high speed sample-and-hold circuits, A/D Converters – specifications - Flash type - Successive
Approximation type - Single Slope type – Dual Slope type - A/D Converter using Voltage-to-Time
Conversion - Over-sampling A/D Converters, Sigma – Delta converters.
UNIT V WAVEFORM GENERATORS AND SPECIAL FUNCTION ICS 9
Sine-wave generators, Multivibrators and Triangular wave generator, Saw-tooth wave generator,
ICL8038 function generator, Timer IC 555, IC Voltage regulators – Three terminal fixed and
adjustable voltage regulators - IC 723 general purpose regulator - Monolithic switching regulator,
Low Drop – Out(LDO) Regulators - Switched capacitor filter IC MF10, Frequency to Voltage and
Voltage to Frequency converters, Audio Power amplifier, Video Amplifier, Isolation Amplifier, Opto-
couplers and fibre optic IC.
TOTAL:45 PERIODS
OUTCOMES:
Upon completion of the course, the student should be able to:
 Design linear and non linear applications of OP – AMPS
 Design applications using analog multiplier and PLL
 Design ADC and DAC using OP – AMPS
 Generate waveforms using OP – AMP Circuits
 Analyze special function ICs
TEXT BOOKS:
1. D.Roy Choudhry, Shail Jain, ―Linear Integrated Circuits‖, New Age International
Pvt. Ltd., 2018, Fifth Edition. (Unit I – V)
2. Sergio Franco, ―Design with Operational Amplifiers and Analog Integrated
Circuits‖, 4th Edition, Tata Mc Graw-Hill, 2016 (Unit I – V)
REFERENCES:
1. Ramakant A. Gayakwad, ―OP-AMP and Linear ICs‖, 4th Edition, Prentice Hall / Pearson
Education, 2015.
2. Robert F.Coughlin, Frederick F.Driscoll, ―Operational Amplifiers and Linear Integrated
Circuits‖, Sixth Edition, PHI, 2001.
3. B.S.Sonde, ―System design using Integrated Circuits‖ , 2nd Edition, New Age Pub, 2001.
4. Gray and Meyer, ―Analysis and Design of Analog Integrated Circuits‖, Wiley
International,5th
Edition, 2009.
5. William D.Stanley, ―Operational Amplifiers with Linear Integrated Circuits‖, Pearson
Education,4th
Edition,2001.
6. S.Salivahanan & V.S. Kanchana Bhaskaran, ―Linear Integrated Circuits‖, TMH,2nd
Edition,
4th
Reprint, 2016.
56
GE8291 ENVIRONMENTAL SCIENCE AND ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
 To study the nature and facts about environment.
 To finding and implementing scientific, technological, economic and political solutions to
environmental problems.
 To study the interrelationship between living organism and environment.
 To appreciate the importance of environment by assessing its impact on the human world;
envision the surrounding environment, its functions and its value.
 To study the dynamic processes and understand the features of the earth‟s interior and
surface.
 To study the integrated themes and biodiversity, natural resources, pollution control and
waste management.
UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY 14
Definition, scope and importance of environment – need for public awareness - concept of an
ecosystem – structure and function of an ecosystem – producers, consumers and decomposers –
energy flow in the ecosystem – ecological succession – food chains, food webs and ecological
pyramids – Introduction, types, characteristic features, structure and function of the (a) forest
ecosystem (b) grassland ecosystem (c) desert ecosystem (d) aquatic ecosystems (ponds,
streams, lakes, rivers, oceans, estuaries) – Introduction to biodiversity definition: genetic, species
and ecosystem diversity – biogeographical classification of India – value of biodiversity:
consumptive use, productive use, social, ethical, aesthetic and option values – Biodiversity at
global, national and local levels – India as a mega-diversity nation – hot-spots of biodiversity –
threats to biodiversity: habitat loss, poaching of wildlife, man-wildlife conflicts – endangered and
endemic species of India – conservation of biodiversity: In-situ and ex-situ conservation of
biodiversity. Field study of common plants, insects, birds; Field study of simple ecosystems –
pond, river, hill slopes, etc.
UNIT II ENVIRONMENTAL POLLUTION 8
Definition – causes, effects and control measures of: (a) Air pollution (b) Water pollution (c) Soil
pollution (d) Marine pollution (e) Noise pollution (f) Thermal pollution (g) Nuclear hazards – solid
waste management: causes, effects and control measures of municipal solid wastes – role of an
individual in prevention of pollution – pollution case studies – disaster management: floods,
earthquake, cyclone and landslides. Field study of local polluted site – Urban / Rural / Industrial /
Agricultural.
UNIT III NATURAL RESOURCES 10
Forest resources: Use and over-exploitation, deforestation, case studies- timber extraction, mining,
dams and their effects on forests and tribal people – Water resources: Use and over- utilization of
surface and ground water, floods, drought, conflicts over water, dams-benefits and problems –
Mineral resources: Use and exploitation, environmental effects of extracting and using mineral
resources, case studies – Food resources: World food problems, changes caused by agriculture
and overgrazing, effects of modern agriculture, fertilizer-pesticide problems, water logging, salinity,
case studies – Energy resources: Growing energy needs, renewable and non renewable energy
sources, use of alternate energy sources. case studies – Land resources: Land as a resource,
land degradation, man induced landslides, soil erosion and desertification – role of an individual in
57
conservation of natural resources – Equitable use of resources for sustainable lifestyles. Field
study of local area to document environmental assets – river / forest / grassland / hill / mountain.
58
UNIT IV SOCIAL ISSUES AND THE ENVIRONMENT 7
From unsustainable to sustainable development – urban problems related to energy –
water conservation, rain water harvesting, watershed management – resettlement and
rehabilitation of people; its problems and concerns, case studies – role of non-governmental
organization- environmental ethics: Issues and possible solutions – climate change, global
warming, acid rain, ozone layer depletion, nuclear accidents and holocaust, case studies. –
wasteland reclamation – consumerism and waste products – environment production act – Air
(Prevention and Control of Pollution) act – Water (Prevention and control of Pollution) act – Wildlife
protection act – Forest conservation act – enforcement machinery involved in environmental
legislation- central and state pollution control boards- Public awareness.
UNIT V HUMAN POPULATION AND THE ENVIRONMENT 6
Population growth, variation among nations – population explosion – family welfare programme –
environment and human health – human rights – value education – HIV / AIDS – women and child
welfare – role of information technology in environment and human health – Case studies.
TOTAL: 45 PERIODS
OUTCOMES:
 Environmental Pollution or problems cannot be solved by mere laws. Public participation is
an important aspect which serves the environmental Protection. One will obtain knowledge
on the following after completing the course.
 Public awareness of environmental is at infant stage.
 Ignorance and incomplete knowledge has lead to misconceptions
 Development and improvement in std. of living has lead to serious environmental disasters
TEXTBOOKS:
1. Benny Joseph, ‗Environmental Science and Engineering‘, Tata McGraw-Hill, New Delhi,
2006.
2. Gilbert M.Masters, ‗Introduction to Environmental Engineering and Science‘, 2nd
edition,
Pearson Education, 2004.
REFERENCES :
1. Dharmendra S. Sengar, ‗Environmental law‘, Prentice hall of India PVT LTD,New Delhi,
2007.
2. Erach Bharucha, ―Textbook of Environmental Studies‖, Universities Press(I) PVT, LTD,
Hydrabad, 2015.
3. Rajagopalan, R, ‗Environmental Studies-From Crisis to Cure‘, Oxford University Press,
2005.
4. G. Tyler Miller and Scott E. Spoolman, ―Environmental Science‖, Cengage Learning India
PVT, LTD, Delhi, 2014.
EC8461 CIRCUITS DESIGN AND SIMULATION LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To gain hands on experience in designing electronic circuits
 To learn simulation software used in circuit design
 To learn the fundamental principles of amplifier circuits
 To differentiate feedback amplifiers and oscillators.
 To differentiate the operation of various multivibrators
59
DESIGN AND ANALYSIS OF THE FOLLOWING CIRCUITS
1. Series and Shunt feedback amplifiers-Frequency response, Input and output
impedance
2. RC Phase shift oscillator and Wien Bridge Oscillator
3. Hartley Oscillator and Colpitts Oscillator
4. Single Tuned Amplifier
5. RC Integrator and Differentiator circuits
6. Astable and Monostable multivibrators
7. Clippers and Clampers
SIMULATION USING SPICE (Using Transistor):
1. Tuned Collector Oscillator
2. Twin -T Oscillator / Wein Bridge Oscillator
3. Double and Stagger tuned Amplifiers
4. Bistable Multivibrator
5. Schmitt Trigger circuit with Predictable hysteresis
6. Analysis of power amplifier
TOTAL: 60 PERIODS
OUTCOMES:
On completion of this laboratory course, the student should be able to:
 Analyze various types of feedback amplifiers
 Design oscillators, tuned amplifiers, wave-shaping circuits and multivibrators
 Design and simulate feedback amplifiers, oscillators, tuned amplifiers, wave-shaping
circuits and multivibrators using SPICE Tool.
LAB REQUIREMENT FOR A BATCH OF 30 STUDENTS / 2 STUDENTS PER EXPERIMENT:
Components and Accessories:
Transistors, Resistors, Capacitors, Inductors, diodes, Zener Diodes, Bread Boards, Transformers.
SPICE Circuit Simulation Software: (any public domain or commercial software)
S.NO EQUIPMENTS
1 CRO (Min 30MHz) - 15 Nos
2 Signal Generator /Function Generators (2 MHz) – 15 Nos
3 Dual Regulated Power Supplies (0 – 30V) - 15 Nos
4 Digital Multimeter - 15 Nos
5 Digital LCR Meter - 2 Nos
6 Standalone desktops PC - 15 Nos
7 Transistor/FET (BJT-NPN-PNP and NMOS/PMOS) - 50 Nos
60
EC8462 LINEAR INTEGRATED CIRCUITS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To understand the basics of linear integrated circuits and available ICs
 To understand the characteristics of the operational amplifier.
 To apply operational amplifiers in linear and nonlinear applications.
 To acquire the basic knowledge of special function IC.
 To use SPICE software for circuit design
DESIGN AND TESTING OF THE FOLLOWING CIRCUITS
1. Inverting, Non inverting and differential amplifiers.
2. Integrator and Differentiator.
3. Instrumentation amplifier
4. Active low-pass, High-pass and band-pass filters.
5. Astable & Monostable multivibrators using Op-amp
6. Schmitt Trigger using op-amp.
7. Phase shift and Wien bridge oscillators using Op-amp.
8. Astable and Monostable multivibrators using NE555 Timer.
9. PLL characteristics and its use as Frequency Multiplier, Clock synchronization
10. R-2R Ladder Type D- A Converter using Op-amp.
11. DC power supply using LM317 and LM723.
12. Study of SMPS
SIMULATION USING SPICE:
1. Active low-pass, High-pass and band-pass filters using Op-amp
2. Astable and Monostable multivibrators using NE555 Timer.
3. A/ D converter
4. Analog multiplier
TOTAL: 60 PERIODS
OUTCOMES:
On completion of this laboratory course, the student should be able to:
 Design amplifiers, oscillators, D-A converters using operational amplifiers.
 Design filters using op-amp and performs an experiment on frequency response.
 Analyze the working of PLL and describe its application as a frequency multiplier.
 Design DC power supply using ICs.
 Analyze the performance of filters, multivibrators, A/D converter and analog
multiplier using SPICE.
LAB REQUIREMENT FOR A BATCH OF 30 STUDENTS / 2 STUDENTS PER EXPERIMENT:
S.NO EQUIPMENTS
1 CRO/DSO (Min 30MHz) -- 15 Nos
2 Signal Generator /Function Generators (2 MHz) – 15 Nos
3 Dual Regulated Power Supplies (0 – 30V) -- 15 Nos
4 Digital Multimeter -- 15 Nos
5 IC Tester -- 5 Nos
61
Components and Accessories:
Transistors, Resistors, Capacitors, diodes, Zener diodes, Bread Boards, Transformers, wires,
Power transistors, Potentiometer, A/D and D/A convertors, LEDs .
Note: Op-Amps uA741, LM 301, LM311, LM 324, LM317, LM723, 7805, 7812, 2N3524, 2N3525,
2N3391, AD 633, LM 555, LM 565 may be used.
EC8501 DIGITAL COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
 To know the principles of sampling & quantization
 To study the various waveform coding schemes
 To learn the various baseband transmission schemes
 To understand the various band pass signaling schemes
 To know the fundamentals of channel coding
UNIT I INFORMATION THEORY 9
Discrete Memoryless source, Information, Entropy, Mutual Information - Discrete Memoryless
channels – Binary Symmetric Channel, Channel Capacity - Hartley - Shannon law - Source coding
theorem - Shannon - Fano & Huffman codes.
UNIT II WAVEFORM CODING & REPRESENTATION 9
Prediction filtering and DPCM - Delta Modulation - ADPCM & ADM principles-Linear Predictive
Coding- Properties of Line codes- Power Spectral Density of Unipolar / Polar RZ & NRZ – Bipolar
NRZ - Manchester
UNIT III BASEBAND TRANSMISSION & RECEPTION 9
ISI – Nyquist criterion for distortion less transmission – Pulse shaping – Correlative coding - Eye
pattern – Receiving Filters- Matched Filter, Correlation receiver, Adaptive Equalization
UNIT IV DIGITAL MODULATION SCHEME 9
Geometric Representation of signals - Generation, detection, PSD & BER of Coherent BPSK,
BFSK & QPSK - QAM - Carrier Synchronization - Structure of Non-coherent Receivers - Principle
of DPSK.
UNIT V ERROR CONTROL CODING 9
Channel coding theorem - Linear Block codes - Hamming codes - Cyclic codes - Convolutional
codes - Viterbi Decoder.
TOTAL:45 PERIODS
6 Standalone desktops PC -- 15 Nos
7 Components and Accessories – 50 Nos
62
OUTCOMES:
Upon completion of the course, the student should be able to
 Design PCM systems
 Design and implement base band transmission schemes
 Design and implement band pass signaling schemes
 Analyze the spectral characteristics of band pass signaling schemes and their noise
performance
 Design error control coding schemes
TEXT BOOK:
1. S. Haykin, ―Digital Communications‖, John Wiley, 2005 (Unit I –V)
REFERENCES
1. B. Sklar, ―Digital Communication Fundamentals and Applications‖, 2nd Edition, Pearson
Education, 2009
2. B.P.Lathi, ―Modern Digital and Analog Communication Systems‖ 3rd Edition, Oxford University
Press 2007.
3. H P Hsu, Schaum Outline Series - ―Analog and Digital Communications‖, TMH 2006
4. J.G Proakis, ―Digital Communication‖, 4th Edition, Tata Mc Graw Hill Company, 2001.
EC8553 DISCRETE-TIME SIGNAL PROCESSING L T P C
4 0 0 4
OBJECTIVES:
 To learn discrete fourier transform, properties of DFT and its application to linear filtering
 To understand the characteristics of digital filters, design digital IIR and FIR filters and
apply these filters to filter undesirable signals in various frequency bands
 To understand the effects of finite precision representation on digital filters
 To understand the fundamental concepts of multi rate signal processing and its
applications
 To introduce the concepts of adaptive filters and its application to communication
engineering
UNIT I DISCRETE FOURIER TRANSFORM 12
Review of signals and systems, concept of frequency in discrete-time signals, summary of
analysis & synthesis equations for FT & DTFT, frequency domain sampling, Discrete Fourier
transform (DFT) - deriving DFT from DTFT, properties of DFT - periodicity, symmetry, circular
convolution. Linear filtering using DFT. Filtering long data sequences - overlap save and overlap
add method. Fast computation of DFT - Radix-2 Decimation-in-time (DIT) Fast Fourier transform
(FFT), Decimation-in-frequency (DIF) Fast Fourier transform (FFT). Linear filtering using FFT.
UNIT II INFINITE IMPULSE RESPONSE FILTERS 12
Characteristics of practical frequency selective filters. characteristics of commonly used analog
filters - Butterworth filters, Chebyshev filters. Design of IIR filters from analog filters (LPF, HPF,
BPF, BRF) - Approximation of derivatives, Impulse invariance method, Bilinear transformation.
Frequency transformation in the analog domain. Structure of IIR filter - direct form I, direct form II,
Cascade, parallel realizations.
UNIT III FINITE IMPULSE RESPONSE FILTERS 12
63
Design of FIR filters - symmetric and Anti-symmetric FIR filters - design of linear phase FIR filters
using Fourier series method - FIR filter design using windows (Rectangular, Hamming and
Hanning window), Frequency sampling method. FIR filter structures - linear phase structure,
direct form realizations
UNIT IV FINITE WORD LENGTH EFFECTS 12
Fixed point and floating point number representation - ADC - quantization - truncation and
rounding - quantization noise - input / output quantization - coefficient quantization error - product
quantization error - overflow error - limit cycle oscillations due to product quantization and
summation - scaling to prevent overflow.
UNIT V INTRODUCTION TO DIGITAL SIGNAL PROCESSORS 12
DSP functionalities - circular buffering – DSP architecture – Fixed and Floating point architecture
principles – Programming – Application examples.
TOTAL:60PERIODS
OUTCOMES:
At the end of the course, the student should be able to
 Apply DFT for the analysis of digital signals and systems
 Design IIR and FIR filters
 Characterize the effects of finite precision representation on digital filters
 Design multirate filters
 Apply adaptive filters appropriately in communication systems
TEXT BOOK:
1. John G. Proakis & Dimitris G.Manolakis, ―Digital Signal Processing – Principles,
Algorithms & Applications‖, Fourth Edition, Pearson Education / Prentice Hall, 2007.
(UNIT I – V)
REFERENCES:
1. Emmanuel C. Ifeachor & Barrie. W. Jervis, ―Digital Signal Processing‖, Second Edition,
Pearson Education / Prentice Hall, 2002.
2. A. V. Oppenheim, R.W. Schafer and J.R. Buck, ―Discrete-Time Signal Processing‖, 8th
Indian Reprint, Pearson, 2004.
3. Sanjit K. Mitra, ―Digital Signal Processing – A Computer Based Approach‖, Tata Mc Graw
Hill, 2007.
4. Andreas Antoniou, ―Digital Signal Processing‖, Tata Mc Graw Hill, 2006.
EC8552 COMPUTER ARCHITECTURE AND ORGANIZATION L T P C
3 0 0 3
OBJECTIVES:
 To make students understand the basic structure and operation of digital computer
 To familiarize with implementation of fixed point and floating-point arithmetic operations
 To study the design of data path unit and control unit for processor
 To understand the concept of various memories and interfacing
 To introduce the parallel processing technique
64
UNIT I COMPUTER ORGANIZATION & INSTRUCTIONS 9
Basics of a computer system: Evolution, Ideas, Technology, Performance, Power wall,
Uniprocessors to Multiprocessors. Addressing and addressing modes. Instructions: Operations
and Operands, Representing instructions, Logical operations, control operations.
UNIT II ARITHMETIC 9
Fixed point Addition, Subtraction, Multiplication and Division. Floating Point arithmetic, High
performance arithmetic, Subword parallelism
UNIT III THE PROCESSOR 9
Introduction, Logic Design Conventions, Building a Datapath - A Simple Implementation scheme -
An Overview of Pipelining - Pipelined Datapath and Control. Data Hazards: Forwarding versus
Stalling, Control Hazards, Exceptions, Parallelism via Instructions.
UNIT IV MEMORY AND I/O ORGANIZATION 9
Memory hierarchy, Memory Chip Organization, Cache memory, Virtual memory.
Parallel Bus Architectures, Internal Communication Methodologies, Serial Bus Architectures, Mass
storage, Input and Output Devices.
UNIT V ADVANCED COMPUTER ARCHITECTURE 9
Parallel processing architectures and challenges, Hardware multithreading, Multicore and shared
memory multiprocessors, Introduction to Graphics Processing Units, Clusters and Warehouse
scale computers - Introduction to Multiprocessor network topologies.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to
 Describe data representation, instruction formats and the operation of a digital computer
 Illustrate the fixed point and floating-point arithmetic for ALU operation
 Discuss about implementation schemes of control unit and pipeline performance
 Explain the concept of various memories, interfacing and organization of multiple processors
 Discuss parallel processing technique and unconventional architectures
TEXT BOOKS:
1. David A. Patterson and John L. Hennessey, ―Computer Organization and Design‖, Fifth
edition, Morgan Kauffman / Elsevier, 2014. (UNIT I-V)
2. Miles J. Murdocca and Vincent P. Heuring, ―Computer Architecture and Organization: An
Integrated approach‖, Second edition, Wiley India Pvt Ltd, 2015 (UNIT IV,V)
REFERENCES
1. V. Carl Hamacher, Zvonko G. Varanesic and Safat G. Zaky, ―Computer Organization―, Fifth
edition, Mc Graw-Hill Education India Pvt Ltd, 2014.
2. William Stallings ―Computer Organization and Architecture‖, Seventh Edition, Pearson
Education, 2006.
65
3. Govindarajalu, ―Computer Architecture and Organization, Design Principles and Applications",
Second edition, McGraw-Hill Education India Pvt Ltd, 2014.
EC8551 COMMUNICATION NETWORKS L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Understand the division of network functionalities into layers.
 Be familiar with the components required to build different types of networks
 Be exposed to the required functionality at each layer
 Learn the flow control and congestion control algorithms
UNIT I FUNDAMENTALS & LINK LAYER 9
Overview of Data Communications- Networks – Building Network and its types– Overview of
Internet - Protocol Layering - OSI Mode – Physical Layer – Overview of Data and Signals -
introduction to Data Link Layer - Link layer Addressing- Error Detection and Correction
UNIT II MEDIA ACCESS & INTERNETWORKING 9
Overview of Data link Control and Media access control - Ethernet (802.3) - Wireless LANs –
Available Protocols – Bluetooth – Bluetooth Low Energy – WiFi – 6LowPAN–Zigbee - Network
layer services – Packet Switching – IPV4 Address – Network layer protocols ( IP, ICMP, Mobile IP)
UNIT III ROUTING 9
Routing - Unicast Routing – Algorithms – Protocols – Multicast Routing and its basics – Overview
of Intradomain and interdomain protocols – Overview of IPv6 Addressing – Transition from IPv4 to
IPv6
UNIT IV TRANSPORT LAYER 9
Introduction to Transport layer –Protocols- User Datagram Protocols (UDP) and Transmission
Control Protocols (TCP) –Services – Features – TCP Connection – State Transition Diagram –
Flow, Error and Congestion Control - Congestion avoidance (DECbit, RED) – QoS – Application
requirements
UNIT V APPLICATION LAYER 9
Application Layer Paradigms – Client Server Programming – World Wide Web and HTTP - DNS- -
Electronic Mail (SMTP, POP3, IMAP, MIME) – Introduction to Peer to Peer Networks – Need for
Cryptography and Network Security – Firewalls.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Identify the components required to build different types of networks
 Choose the required functionality at each layer for given application
 Identify solution for each functionality at each layer
 Trace the flow of information from one node to another node in the network
TEXT BOOK:
1. Behrouz A. Forouzan, ―Data communication and Networking‖, Fifth Edition, Tata McGraw –
Hill, 2013 (UNIT I –V)
66
REFERENCES
1. James F. Kurose, Keith W. Ross, ―Computer Networking - A Top-Down Approach
Featuring the Internet‖, Seventh Edition, Pearson Education, 2016.
2. Nader. F. Mir,― Computer and Communication Networks‖, Pearson Prentice Hall
Publishers, 2nd
Edition, 2014.
3. Ying-Dar Lin, Ren-Hung Hwang, Fred Baker, ―Computer Networks: An Open Source
Approach‖, Mc Graw Hill Publisher, 2011.
4. Larry L. Peterson, Bruce S. Davie, ―Computer Networks: A Systems Approach‖, Fifth
Edition, Morgan Kaufmann Publishers, 2011.
67
EC8562 DIGITAL SIGNAL PROCESSING LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made:
 To perform basic signal processing operations such as Linear Convolution, Circular
Convolution, Auto Correlation, Cross Correlation and Frequency analysis in MATLAB
 To implement FIR and IIR filters in MATLAB and DSP Processor
 To study the architecture of DSP processor
 To design a DSP system to demonstrate the Multi-rate and Adaptive signal processing
concepts.
LIST OF EXPERIMENTS: MATLAB / EQUIVALENT SOFTWARE PACKAGE
1. Generation of elementary Discrete-Time sequences
2. Linear and Circular convolutions
3. Auto correlation and Cross Correlation
4. Frequency Analysis using DFT
5. Design of FIR filters (LPF/HPF/BPF/BSF) and demonstrates the filtering operation
6. Design of Butterworth and Chebyshev IIR filters (LPF/HPF/BPF/BSF) and
demonstrate the filtering operations
DSP PROCESSOR BASED IMPLEMENTATION
1. Study of architecture of Digital Signal Processor
2. Perform MAC operation using various addressing modes
3. Generation of various signals and random noise
4. Design and demonstration of FIR Filter for Low pass, High pass, Band pass and
Band stop filtering
5. Design and demonstration of Butter worth and Chebyshev IIR Filters for Low pass,
High pass, Band pass and Band stop filtering
6. Implement an Up-sampling and Down-sampling operation in DSP Processor
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Carryout basic signal processing operations
 Demonstrate their abilities towards MATLAB based implementation of various DSP
systems
 Analyze the architecture of a DSP Processor
 Design and Implement the FIR and IIR Filters in DSP Processor for performing
filtering operation over real-time signals
 Design a DSP system for various applications of DSP
EC8561 COMMUNICATION SYSTEMS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made:
 To visualize the effects of sampling and TDM
 To Implement AM & FM modulation and demodulation
 To implement PCM & DM
 To simulate Digital Modulation schemes
 To simulate Error control coding schemes
68
LIST OF EXPERIMENTS:
1. Signal Sampling and reconstruction
2. Time Division Multiplexing
3. AM Modulator and Demodulator
4. FM Modulator and Demodulator
5. Pulse Code Modulation and Demodulation
6. Delta Modulation and Demodulation
7. Line coding schemes
8. Simulation of ASK, FSK, and BPSK generation schemes
9. Simulation of DPSK, QPSK and QAM generation schemes
10. Simulation of signal constellations of BPSK, QPSK and QAM
11. Simulation of ASK, FSK and BPSK detection schemes
12. Simulation of Linear Block and Cyclic error control coding schemes
13. Simulation of Convolutional coding scheme
14. Communication link simulation
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Simulate & validate the various functional modules of a communication system
 Demonstrate their knowledge in base band signaling schemes through
implementation of digital modulation schemes
 Apply various channel coding schemes & demonstrate their capabilities
towards the improvement of the noise performance of communication system
 Simulate end-to-end communication Link
LAB Requirements for a Batch of 30 students (3 students per experiment):
i) Kits for Signal Sampling, TDM, AM, FM, PCM, DM and Line Coding Schemes
ii) CROs/DSOs – 15 Nos, Function Generators – 15 Nos.
iii) MATLAB or equivalent software package for simulation experiments
iv) PCs - 15 Nos
EC8563 COMMUNICATION NETWORKS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made to:
 Learn to communicate between two desktop computers
 Learn to implement the different protocols
 Be familiar with IP Configuration
 Be familiar with the various routing algorithms
 Be familiar with simulation tools
LIST OF EXPERIMENTS:
1. Implementation of Error Detection / Error Correction Techniques
2. Implementation of Stop and Wait Protocol and sliding window
3. Implementation and study of Goback-N and selective repeat protocols
4. Implementation of High Level Data Link Control
5. Implementation of IP Commands such as ping, Traceroute, nslookup.
6. Implementation of IP address configuration.
7. To create scenario and study the performance of network with CSMA / CA protocol
and compare with CSMA/CD protocols.
69
8. Network Topology - Star, Bus, Ring
9. Implementation of distance vector routing algorithm
10. Implementation of Link state routing algorithm
11. Study of Network simulator (NS) and simulation of Congestion Control Algorithms
using NS
12. Implementation of Encryption and Decryption Algorithms using any programming
language
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Communicate between two desktop computers
 Implement the different protocols
 Program using sockets.
 Implement and compare the various routing algorithms
 Use the simulation tool.
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS
SOFTWARE
• C / Python / Java / Equivalent Compiler
• MATLAB SOFTWARE (Few experiments can be practiced with MATLAB)
• Standard LAN Trainer Kits 4 Nos
• Network simulator like NS2/ NS3 / Glomosim/OPNET/ 30 Equivalent
HARDWARE
Standalone Desktops 30 Nos
EC8691 MICROPROCESSORS AND MICROCONTROLLERS L T P C
3 0 0 3
OBJECTIVES:
 To understand the Architecture of 8086 microprocessor.
 To learn the design aspects of I/O and Memory Interfacing circuits.
 To interface microprocessors with supporting chips.
 To study the Architecture of 8051 microcontroller.
 To design a microcontroller based system
UNIT I THE 8086 MICROPROCESSOR 9
Introduction to 8086 – Microprocessor architecture – Addressing modes - Instruction set and
assembler directives – Assembly language programming – Modular Programming - Linking and
Relocation - Stacks - Procedures – Macros – Interrupts and interrupt service routines – Byte and
String Manipulation.
UNIT II 8086 SYSTEM BUS STRUCTURE 9
8086 signals – Basic configurations – System bus timing –System design using 8086 – I/O
programming – Introduction to Multiprogramming – System Bus Structure – Multiprocessor
configurations – Coprocessor, Closely coupled and loosely Coupled configurations – Introduction
to advanced processors.
UNIT III I/O INTERFACING 9
Memory Interfacing and I/O interfacing - Parallel communication interface – Serial communication
interface – D/A and A/D Interface - Timer – Keyboard /display controller – Interrupt controller –
DMA controller – Programming and applications Case studies: Traffic Light control, LED display ,
LCD display, Keyboard display interface and Alarm Controller.
70
UNIT IV MICROCONTROLLER 9
Architecture of 8051 – Special Function Registers(SFRs) - I/O Pins Ports and Circuits - Instruction
set - Addressing modes - Assembly language programming.
UNIT V INTERFACING MICROCONTROLLER 9
Programming 8051 Timers - Serial Port Programming - Interrupts Programming – LCD &
Keyboard Interfacing - ADC, DAC & Sensor Interfacing - External Memory Interface- Stepper
Motor and Waveform generation - Comparison of Microprocessor, Microcontroller, PIC and ARM
processors
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Understand and execute programs based on 8086 microprocessor.
 Design Memory Interfacing circuits.
 Design and interface I/O circuits.
 Design and implement 8051 microcontroller based systems.
TEXT BOOKS:
1. Yu-Cheng Liu, Glenn A.Gibson, ―Microcomputer Systems: The 8086 / 8088 Family -
Architecture, Programming and Design‖, Second Edition, Prentice Hall of India, 2007. (UNIT I-
III)
2. Mohamed Ali Mazidi, Janice Gillispie Mazidi, Rolin McKinlay, ―The 8051 Microcontroller and
Embedded Systems: Using Assembly and C‖, Second Edition, Pearson education, 2011. (UNIT
IV-V)
REFERENCES:
1. Doughlas V.Hall, ―Microprocessors and Interfacing, Programming and Hardware‖,TMH,2012
2. A.K.Ray,K.M.Bhurchandi, "Advanced Microprocessors and Peripherals" 3rd
edition, Tata
McGrawHill, 2012
EC8095 VLSI DESIGN L T P C
3 0 0 3
OBJECTIVES:
 Study the fundamentals of CMOS circuits and its characteristics.
 Learn the design and realization of combinational & sequential digital circuits.
 Architectural choices and performance tradeoffs involved in designing and realizing the
circuits in CMOS technology are discussed
 Learn the different FPGA architectures and testability of VLSI circuits.
UNIT I INTRODUCTION TO MOS TRANSISTOR 9
MOS Transistor, CMOS logic, Inverter, Pass Transistor, Transmission gate, Layout Design Rules,
Gate Layouts, Stick Diagrams, Long-Channel I-V Charters tics, C-V Charters tics, Non ideal I-V
Effects, DC Transfer characteristics, RC Delay Model, Elmore Delay, Linear Delay Model, Logical
effort, Parasitic Delay, Delay in Logic Gate, Scaling.
UNIT II COMBINATIONAL MOS LOGIC CIRCUITS 9
Circuit Families: Static CMOS, Ratioed Circuits, Cascode Voltage Switch Logic, Dynamic
Circuits, Pass Transistor Logic, Transmission Gates, Domino, Dual Rail Domino, CPL, DCVSPG,
DPL, Circuit Pitfalls.
Power: Dynamic Power, Static Power, Low Power Architecture.
71
UNIT III SEQUENTIAL CIRCUIT DESIGN 9
Static latches and Registers, Dynamic latches and Registers, Pulse Registers, Sense Amplifier
Based Register, Pipelining, Schmitt Trigger, Monostable Sequential Circuits, Astable Sequential
Circuits.
Timing Issues : Timing Classification Of Digital System, Synchronous Design.
UNIT IV DESIGN OF ARITHMETIC BUILDING BLOCKS AND SUBSYSTEM 9
Arithmetic Building Blocks: Data Paths, Adders, Multipliers, Shifters, ALUs, power and speed
tradeoffs, Case Study: Design as a tradeoff.
Designing Memory and Array structures: Memory Architectures and Building Blocks, Memory
Core, Memory Peripheral Circuitry.
UNIT V IMPLEMENTATION STRATEGIES AND TESTING 9
FPGA Building Block Architectures, FPGA Interconnect Routing Procedures. Design for
Testability: Ad Hoc Testing, Scan Design, BIST, IDDQ Testing, Design for Manufacturability,
Boundary Scan.
TOTAL : 45 PERIODS
OUTCOMES:
UPON COMPLETION OF THE COURSE, STUDENTS SHOULD be ABLE TO
 Realize the concepts of digital building blocks using MOS transistor.
 Design combinational MOS circuits and power strategies.
 Design and construct Sequential Circuits and Timing systems.
 Design arithmetic building blocks and memory subsystems.
 Apply and implement FPGA design flow and testing.
TEXT BOOKS:
1. Neil H.E. Weste, David Money Harris ―CMOS VLSI Design: A Circuits and Systems
Perspective‖, 4th
Edition, Pearson , 2017 (UNIT I,II,V)
2. Jan M. Rabaey ,Anantha Chandrakasan, Borivoje. Nikolic, ‖Digital Integrated Circuits:A
Design perspective‖, Second Edition , Pearson , 2016.(UNIT III,IV)
REFERENCES
1. M.J. Smith, ―Application Specific Integrated Circuits‖, Addisson Wesley, 1997
2. Sung-Mo kang, Yusuf leblebici, Chulwoo Kim ―CMOS Digital Integrated Circuits:Analysis
& Design‖,4th
edition McGraw Hill Education,2013
3. Wayne Wolf, ―Modern VLSI Design: System On Chip‖, Pearson Education, 2007
4. R.Jacob Baker, Harry W.LI., David E.Boyee, ―CMOS Circuit Design, Layout and
Simulation‖, Prentice Hall of India 2005.
EC8652 WIRELESS COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
 To study the characteristic of wireless channel
 To understand the design of a cellular system
 To study the various digital signaling techniques and multipath mitigation techniques
 To understand the concepts of multiple antenna techniques
72
UNIT I WIRELESS CHANNELS 9
Large scale path loss – Path loss models: Free Space and Two-Ray models -Link Budget
design – Small scale fading- Parameters of mobile multipath channels – Time dispersion
parameters-Coherence bandwidth – Doppler spread & Coherence time, fading due to
Multipath time delay spread – flat fading – frequency selective fading – Fading due to
Doppler spread – fast fading – slow fading.
UNIT II CELLULAR ARCHITECTURE 9
Multiple Access techniques - FDMA, TDMA, CDMA – Capacity calculations–Cellular
concept- Frequency reuse - channel assignment- hand off- interference & system capacity-
trunking & grade of service – Coverage and capacity improvement.
UNIT III DIGITAL SIGNALING FOR FADING CHANNELS 9
Structure of a wireless communication link, Principles of Offset-QPSK, p/4-DQPSK,
Minimum Shift Keying, Gaussian Minimum Shift Keying, Error performance in fading
channels, OFDM principle – Cyclic prefix, Windowing, PAPR.
UNIT IV MULTIPATH MITIGATION TECHNIQUES 9
Equalisation – Adaptive equalization, Linear and Non-Linear equalization, Zero forcing and
LMS Algorithms. Diversity – Micro and Macro diversity, Diversity combining techniques,
Error probability in fading channels with diversity reception, Rake receiver.
UNIT V MULTIPLE ANTENNA TECHNIQUES 9
MIMO systems – spatial multiplexing -System model -Pre-coding - Beam forming -
transmitter diversity, receiver diversity- Channel state information-capacity in fading and
non-fading channels.
TOTAL: 45 PERIODS
OUTCOMES:
The student should be able to:
• Characterize a wireless channel and evolve the system design specifications
• Design a cellular system based on resource availability and traffic demands
• Identify suitable signaling and multipath mitigation techniques for the wireless
channel and system under consideration.
TEXT BOOKS:
1. Rappaport,T.S., ―Wireless communications‖, Pearson Education, Second Edition,
2010.(UNIT I, II, IV)
2. Andreas.F. Molisch, ―Wireless Communications‖, John Wiley – India, 2006. (UNIT
III,V)
REFERENCES:
1. Wireless Communication –Andrea Goldsmith, Cambridge University Press, 2011
2. Van Nee, R. and Ramji Prasad, ―OFDM for wireless multimedia communications,
Artech House, 2000
3. David Tse and Pramod Viswanath, ―Fundamentals of Wireless Communication,
Cambridge University Press, 2005.
4. Upena Dalal, ―Wireless Communication‖, Oxford University Press, 2009.
73
MG8591 PRINCIPLES OF MANAGEMENT L T P C
3 0 0 3
OBJECTIVE:
 To enable the students to study the evolution of Management, to study the functions and
principles of management and to learn the application of the principles in an organization .
UNIT I INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS 9
Definition of Management – Science or Art – Manager Vs Entrepreneur - types of managers -
managerial roles and skills – Evolution of Management – Scientific, human relations, system and
contingency approaches – Types of Business organization - Sole proprietorship, partnership,
company-public and private sector enterprises - Organization culture and Environment – Current
trends and issues in Management.
UNIT II PLANNING 9
Nature and purpose of planning – planning process – types of planning – objectives – setting
objectives – policies – Planning premises – Strategic Management – Planning Tools and
Techniques – Decision making steps and process.
UNIT III ORGANISING 9
Nature and purpose – Formal and informal organization – organization chart – organization
structure – types – Line and staff authority – departmentalization – delegation of authority –
centralization and decentralization – Job Design - Human Resource Management – HR Planning,
Recruitment, selection, Training and Development, Performance Management, Career planning
and management
UNIT IV DIRECTING 9
Foundations of individual and group behaviour – motivation – motivation theories – motivational
techniques – job satisfaction – job enrichment – leadership – types and theories of leadership –
communication – process of communication – barrier in communication – effective communication
–communication and IT.
UNIT V CONTROLLING 9
System and process of controlling – budgetary and non-budgetary control techniques – use of
computers and IT in Management control – Productivity problems and management – control and
performance – direct and preventive control – reporting.
TOTAL: 45 PERIODS
OUTCOME:
 Upon completion of the course, students will be able to have clear understanding
 Managerial functions like planning, organizing, staffing, leading & controlling and have same
basic knowledge on international aspect of management
TEXTBOOKS:
1. Stephen P. Robbins & Mary Coulter, ―Management‖, Prentice Hall (India) Pvt. Ltd., 10th
Edition,
2009.
2. JAF Stoner, Freeman R.E and Daniel R Gilbert ―Management‖, Pearson Education, 6th
Edition, 2004.
REFERENCES:
1. Stephen A. Robbins & David A. Decenzo & Mary Coulter, ―Fundamentals of Management‖
Pearson Education, 7th Edition, 2011.
2. Robert Kreitner & Mamata Mohapatra, ― Management‖, Biztantra, 2008.
3. Harold Koontz & Heinz Weihrich ―Essentials of management‖ Tata McGraw Hill,1998.
74
4. Tripathy PC & Reddy PN, ―Principles of Management‖, Tata McGraw Hill, 1999
EC8651 TRANSMISSION LINES AND RF SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
 To introduce the various types of transmission lines and its characteristics
 To give thorough understanding about high frequency line, power and impedance
measurements
 To impart technical knowledge in impedance matching using smith chart
 To introduce passive filters and basic knowledge of active RF components
 To get acquaintance with RF system transceiver design
UNIT I TRANSMISSION LINE THEORY 9
General theory of Transmission lines - the transmission line - general solution - The infinite line -
Wavelength, velocity of propagation - Waveform distortion - the distortion-less line - Loading and
different methods of loading - Line not terminated in Z0 - Reflection coefficient - calculation of
current, voltage, power delivered and efficiency of transmission - Input and transfer impedance -
Open and short circuited lines - reflection factor and reflection loss.
UNIT II HIGH FREQUENCY TRANSMISSION LINES 9
Transmission line equations at radio frequencies - Line of Zero dissipation - Voltage and current
on the dissipation-less line, Standing Waves, Nodes, Standing Wave Ratio - Input impedance of
the dissipation-less line - Open and short circuited lines - Power and impedance measurement
on lines - Reflection losses - Measurement of VSWR and wavelength.
UNIT III IMPEDANCE MATCHING IN HIGH FREQUENCY LINES 9
Impedance matching: Quarter wave transformer - Impedance matching by stubs - Single stub
and double stub matching - Smith chart - Solutions of problems using Smith chart - Single and
double stub matching using Smith chart.
UNIT IV WAVEGUIDES 9
General Wave behavior along uniform guiding structures – Transverse Electromagnetic Waves,
Transverse Magnetic Waves, Transverse Electric Waves – TM and TE Waves between parallel
plates. Field Equations in rectangular waveguides, TM and TE waves in rectangular
waveguides, Bessel Functions, TM and TE waves in Circular waveguides.
UNIT V RF SYSTEM DESIGN CONCEPTS 9
Active RF components: Semiconductor basics in RF, bipolar junction transistors, RF field effect
transistors, High electron mobility transistors Basic concepts of RF design, Mixers, Low noise
amplifiers, voltage control oscillators, Power amplifiers, transducer power gain and stability
considerations.
TOTAL:45 PERIODS
OUTCOMES:
Upon completion of the course, the student should be able to:
 Explain the characteristics of transmission lines and its losses
 Write about the standing wave ratio and input impedance in high frequency
transmission lines
 Analyze impedance matching by stubs using smith charts
 Analyze the characteristics of TE and TM waves
 Design a RF transceiver system for wireless communication
TEXT BOOKS:
75
1. John D Ryder, ―Networks, lines and fields‖, 2nd Edition, Prentice Hall India, 2015. (UNIT I-
IV)
2. Mathew M. Radmanesh, ―Radio Frequency &Microwave Electronics‖, Pearson Education
Asia, Second Edition,2002. (UNIT V)
REFERENCES:
1. Reinhold Ludwig and Powel Bretchko,‖ RF Circuit Design – Theory and Applications‖,
Pearson Education Asia, First Edition,2001.
2. D. K. Misra, ―Radio Frequency and Microwave Communication Circuits- Analysis and
Design‖, John Wiley & Sons, 2004.
3. E.C.Jordan and K.G. Balmain, ―Electromagnetic Waves and Radiating Systems Prentice
Hall of India, 2006.
4. G.S.N Raju, "Electromagnetic Field Theory and Transmission Lines Pearson Education,
First edition 2005.
EC8681 MICROPROCESSORS AND MICROCONTROLLERS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To Introduce ALP concepts, features and Coding methods
 Write ALP for arithmetic and logical operations in 8086 and 8051
 Differentiate Serial and Parallel Interface
 Interface different I/Os with Microprocessors
 Be familiar with MASM
LIST OF EXPERIMENTS:
8086 Programs using kits and MASM
1. Basic arithmetic and Logical operations
2. Move a data block without overlap
3. Code conversion, decimal arithmetic and Matrix operations.
4. Floating point operations, string manipulations, sorting and searching
5. Password checking, Print RAM size and system date
6. Counters and Time Delay
Peripherals and Interfacing Experiments
7. Traffic light controller
8. Stepper motor control
9. Digital clock
10. Key board and Display
11. Printer status
12. Serial interface and Parallel interface
13. A/D and D/A interface and Waveform Generation
8051 Experiments using kits and MASM
14. Basic arithmetic and Logical operations
15. Square and Cube program, Find 2‘s complement of a number
16. Unpacked BCD to ASCII
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Write ALP Programmes for fixed and Floating Point and Arithmetic operations
 Interface different I/Os with processor
 Generate waveforms using Microprocessors
76
 Execute Programs in 8051
 Explain the difference between simulator and Emulator
LAB EQUIPMENT FOR A BATCH OF 30 STUDENTS:
HARDWARE:
8086 development kits - 30 nos
Interfacing Units - Each 10 nos
Microcontroller - 30 nos
SOFTWARE:
Intel Desktop Systems with MASM - 30 nos
8086 Assembler
8051 Cross Assembler
EC8661 VLSI DESIGN LABORATORY
L T P C
0 0 4 2
OBJECTIVES:
The student should be made:
 To learn Hardware Descriptive Language(Verilog/VHDL)
 To learn the fundamental principles of VLSI circuit design in digital and analog
domain
 To familiarize fusing of logical modules on FPGAs
 To provide hands on design experience with professional design (EDA) platforms
LIST OF EXPERIMENTS:
Part I: Digital System Design using HDL & FPGA (24 Periods)
1.
Design an Adder (Min 8 Bit) using HDL. Simulate it using Xilinx/Altera Software and
implement by Xilinx/Altera FPGA
2.
Design a Multiplier (4 Bit Min) using HDL. Simulate it using Xilinx/Altera Software and
implement by Xilinx/Altera FPGA
3.
Design an ALU using HDL. Simulate it using Xilinx/Altera Software and implement by
Xilinx/Altera FPGA
4.
Design a Universal Shift Register using HDL. Simulate it using Xilinx/Altera Software
and implement by Xilinx/Altera FPGA
5.
Design Finite State Machine (Moore/Mealy) using HDL. Simulate it using Xilinx/Altera
Software and implement by Xilinx/Altera FPGA
6.
Design Memories using HDL. Simulate it using Xilinx/Altera Software and implement
by Xilinx/Altera FPGA
Compare pre synthesis and post synthesis simulation for experiments 1 to 6.
Requirements: Xilinx ISE/Altera Quartus/ equivalent EDA Tools along with
Xilinx/Altera/equivalent FPGA Boards
Part-II Digital Circuit Design (24 Periods)
7. Design and simulate a CMOS inverter using digital flow
8. Design and simulate a CMOS Basic Gates & Flip-Flops
9. Design and simulate a 4-bit synchronous counter using a Flip-Flops
Manual/Automatic Layout Generation and Post Layout Extraction for experiments 7
to 9
Analyze the power, area and timing for experiments 7 to 9 by performing Pre Layout
and Post Layout Simulations.
77
Part-III Analog Circuit Design (12 Periods)
10. Design and Simulate a CMOS Inverting Amplifier.
11.
Design and Simulate basic Common Source, Common Gate and Common Drain
Amplifiers.
Analyze the input impedance, output impedance, gain and bandwidth for
experiments 10 and 11 by performing Schematic Simulations.
12.
Design and simulate simple 5 transistor differential amplifier. Analyze Gain,
Bandwidth and CMRR by performing Schematic Simulations.
Requirements: Cadence/Synopsis/ Mentor Graphics/Tanner/equivalent EDA Tools
TOTAL :60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Write HDL code for basic as well as advanced digital integrated circuit
 Import the logic modules into FPGA Boards
 Synthesize Place and Route the digital IPs
 Design, Simulate and Extract the layouts of Digital & Analog IC Blocks using EDA
tools
LIST OF EQUIPMENTS FOR A BATCH OF 30 STUDENTS
EC8701 ANTENNAS AND MICROWAVE ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
• To enable the student to understand the basic principles in antenna and microwave
system design
• To enhance the student knowledge in the area of various antenna designs.
• To enhance the student knowledge in the area of microwave components and
antenna for practical applications.
S.NO EQUIPMENT REQUIRED
1
Xilinx ISE/Altera Quartus/ equivalent
EDA Tools
10 User License
2 Xilinx/Altera/equivalent FPGA Boards 10 no
3
Cadence/Synopsis/ Mentor
Graphics/Tanner/equivalent EDA Tools
10 User License
4 Personal Computer 30 no
78
UNIT I INTRODUCTION TO MICROWAVE SYSTEMS AND ANTENNAS 9
Microwave frequency bands, Physical concept of radiation, Near- and far-field regions,
Fields and Power Radiated by an Antenna, Antenna Pattern Characteristics, Antenna Gain
and Efficiency, Aperture Efficiency and Effective Area, Antenna Noise Temperature and G/T,
Impedance matching, Friis transmission equation, Link budget and link margin, Noise
Characterization of a microwave receiver.
UNIT II RADIATION MECHANISMS AND DESIGN ASPECTS 9
Radiation Mechanisms of Linear Wire and Loop antennas, Aperture antennas, Reflector
antennas, Microstrip antennas and Frequency independent antennas, Design considerations
and applications.
UNIT III ANTENNA ARRAYS AND APPLICATIONS 9
Two-element array, Array factor, Pattern multiplication, Uniformly spaced arrays with uniform
and non-uniform excitation amplitudes, Smart antennas.
UNIT IV PASSIVE AND ACTIVE MICROWAVE DEVICES 9
Microwave Passive components: Directional Coupler, Power Divider, Magic Tee, attenuator,
resonator, Principles of Microwave Semiconductor Devices: Gunn Diodes, IMPATT diodes,
Schottky Barrier diodes, PIN diodes, Microwave tubes: Klystron, TWT, Magnetron.
UNIT V MICROWAVE DESIGN PRINCIPLES 9
Impedance transformation, Impedance Matching, Microwave Filter Design, RF and
Microwave Amplifier Design, Microwave Power amplifier Design, Low Noise Amplifier
Design, Microwave Mixer Design, Microwave Oscillator Design
TOTAL: 45 PERIODS
OUTCOMES:
The student should be able to:
• Apply the basic principles and evaluate antenna parameters and link power budgets
• Design and assess the performance of various antennas
• Design a microwave system given the application specifications
TEXTBOOKS:
1. John D Krauss, Ronald J Marhefka and Ahmad S. Khan, "Antennas and Wave
Propagation: Fourth Edition, Tata McGraw-Hill, 2006. (UNIT I, II, III)
2. David M. Pozar, "Microwave Engineering", Fourth Edition, Wiley India, 2012.(UNIT
I,IV,V)
REFERENCES:
1. Constantine A.Balanis, ―Antenna Theory Analysis and Design‖, Third edition, John
Wiley India Pvt Ltd., 2005.
2. R.E.Collin, "Foundations for Microwave Engineering", Second edition,
IEEE Press, 2001
79
EC8751 OPTICAL COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
 To study about the various optical fiber modes, configuration and transmission
characteristics of optical fibers
 To learn about the various optical sources, detectors and transmission techniques
 To explore various idea about optical fiber measurements and various coupling
techniques
 To enrich the knowledge about optical communication systems and networks

UNIT I INTRODUCTION TO OPTICAL FIBERS 9
Introduction-general optical fiber communication system- basic optical laws and definitions-
optical modes and configurations -mode analysis for optical propagation through fibers-
modes in planar wave guide-modes in cylindrical optical fiber-transverse electric and
transverse magnetic modes- fiber materials-fiber fabrication techniques-fiber optic cables-
classification of optical fiber-single mode fiber-graded index fiber.
UNIT II TRANSMISSION CHARACTERISTIC OF OPTICAL FIBER 9
Attenuation-absorption --scattering losses-bending losses-core and cladding losses-signal
dispersion –inter symbol interference and bandwidth-intra model dispersion-material
dispersion- waveguide dispersion-polarization mode dispersion-intermodal dispersion-
dispersion optimization of single mode fiber-characteristics of single mode fiber-R-I Profile-
cutoff wave length-dispersion calculation-mode field diameter.
UNIT III OPTICAL SOURCES AND DETECTORS 9
Sources: Intrinsic and extrinsic material-direct and indirect band gaps-LED-LED structures-
surface emitting LED-Edge emitting LED-quantum efficiency and LED power-light source
materials-modulation of LED-LASER diodes-modes and threshold conditions-Rate
equations-external quantum efficiency-resonant frequencies-structures and radiation
patterns-single mode laser-external modulation-temperature effort.
Detectors: PIN photo detector-Avalanche photo diodes-Photo detector noise-noise
sources-SNR-detector response time-Avalanche multiplication noise-temperature effects-
comparisons of photo detectors.
UNIT IV OPTICAL RECEIVER, MEASUREMENTS AND COUPLING 9
Fundamental receiver operation-preamplifiers-digital signal transmission-error sources-Front
end amplifiers-digital receiver performance-probability of error-receiver sensitivity-quantum
limit.
Optical power measurement-attenuation measurement-dispersion measurement- Fiber
Numerical Aperture Measurements- Fiber cut- off Wave length Measurements- Fiber
diameter measurements-Source to Fiber Power Launching-Lensing Schemes for Coupling
Management-Fiber to Fiber Joints-LED Coupling to Single Mode Fibers-Fiber Splicing-
Optical Fiber connectors.
UNIT V OPTICAL COMMUNICATION SYSTEMS AND NETWORKS 9
System design consideration Point – to –Point link design –Link power budget –rise time
budget, WDM –Passive DWDM Components-Elements of optical networks-SONET/SDH-
Optical Interfaces-SONET/SDH Rings and Networks-High speed light wave Links-OADM
configuration-Optical ETHERNET-Soliton.
80
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Realize basic elements in optical fibers, different modes and configurations.
 Analyze the transmission characteristics associated with dispersion and polarization
techniques.
 Design optical sources and detectors with their use in optical communication system.
 Construct fiber optic receiver systems, measurements and coupling techniques.
 Design optical communication systems and its networks.
TEXT BOOKS:
1. P Chakrabarti, "Optical Fiber Communication‖, McGraw Hill Education (India)Private
Limited, 2016 (UNIT I, II, III)
2. Gred Keiser,"Optical Fiber Communication‖, McGraw Hill Education (India) Private
Limited. Fifth Edition, Reprint 2013. (UNIT I, IV, V)
REFERENCES:
1. John M.Senior, ―Optical fiber communication‖, Pearson Education, second
edition.2007.
2. Rajiv Ramaswami, ―Optical Networks ― , Second Edition, Elsevier , 2004.
3. J.Gower, ―Optical Communication System‖, Prentice Hall of India, 2001.
4. Govind P. Agrawal, ―Fiber-optic communication systems‖, third edition, John Wiley
& sons, 2004.
EC8791 EMBEDDED AND REAL TIME SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Understand the concepts of embedded system design and analysis
 Learn the architecture and programming of ARM processor
 Be exposed to the basic concepts of embedded programming
 Learn the real time operating systems
UNIT I INTRODUCTION TO EMBEDDEDSYSTEM DESIGN 9
Complex systems and micro processors– Embedded system design process –Design
example: Model train controller- Design methodologies- Design flows - Requirement
Analysis – Specifications-System analysis and architecture design – Quality Assurance
techniques - Designing with computing platforms – consumer electronics architecture –
platform-level performance analysis.
UNIT II ARM PROCESSOR AND PERIPHERALS
9
ARM Architecture Versions – ARM Architecture – Instruction Set – Stacks and
Subroutines – Features of the LPC 214X Family – Peripherals – The Timer Unit – Pulse
Width Modulation Unit – UART – Block Diagram of ARM9 and ARM Cortex M3 MCU.
81
UNIT III EMBEDDED PROGRAMMING 9
Components for embedded programs- Models of programs- Assembly, linking and loading
– compilation techniques- Program level performance analysis – Software performance
optimization – Program level energy and power analysis and optimization – Analysis and
optimization of program size- Program validation and testing.
UNIT IV REAL TIME SYSTEMS 9
Structure of a Real Time System –– Estimating program run times – Task Assignment and
Scheduling – Fault Tolerance Techniques – Reliability, Evaluation – Clock Synchronisation.
UNIT V PROCESSES AND OPERATING SYSTEMS 9
Introduction – Multiple tasks and multiple processes – Multirate systems- Preemptive real-
time operating systems- Priority based scheduling- Interprocess communication mechanisms
– Evaluating operating system performance- power optimization strategies for processes –
Example Real time operating systems-POSIX-Windows CE. - Distributed embedded systems
– MPSoCs and shared memory multiprocessors. – Design Example - Audio player, Engine
control unit – Video accelerator.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Describe the architecture and programming of ARM processor
 Outline the concepts of embedded systems
 Explain the basic concepts of real time operating system design
 Model real-time applications using embedded-system concepts
TEXT BOOKS:
1. Marilyn Wolf, ―Computers as Components - Principles of Embedded Computing System
Design‖, Third Edition ―Morgan Kaufmann Publisher (An imprint from Elsevier), 2012. (UNIT
I, II, III, V)
2. Jane W.S.Liu,‖ Real Time Systems‖, Pearson Education, Third Indian Reprint, 2003.(UNIT
IV)
REFERENCES:
1. Lyla B.Das, ―Embedded Systems : An Integrated Approach‖ Pearson Education, 2013.
2. Jonathan W.Valvano, ―Embedded Microcomputer Systems Real Time Interfacing‖, Third
Edition Cengage Learning, 2012.
3. David. E. Simon, ―An Embedded Software Primer‖, 1st Edition, Fifth Impression, Addison-
Wesley Professional, 2007.
4. Raymond J.A. Buhr, Donald L.Bailey, ―An Introduction to Real-Time Systems- From Design
to Networking with C/C++‖, Prentice Hall, 1999.
5. C.M. Krishna, Kang G. Shin, ―Real-Time Systems‖, International Editions, Mc Graw Hill 1997
6. K.V.K.K.Prasad, ―Embedded Real-Time Systems: Concepts, Design & Programming‖,
Dream Tech Press, 2005.
7. Sriram V Iyer, Pankaj Gupta, ―Embedded Real Time Systems Programming‖, Tata Mc Graw
Hill, 2004.
82
EC8702 AD HOC AND WIRELESS SENSOR NETWORKS L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Learn Ad hoc network and Sensor Network fundamentals
 Understand the different routing protocols
 Have an in-depth knowledge on sensor network architecture and design issues
 Understand the transport layer and security issues possible in Ad hoc and Sensor
networks
 Have an exposure to mote programming platforms and tools
UNIT I AD HOC NETWORKS – INTRODUCTION AND ROUTING
PROTOCOLS
9
Elements of Ad hoc Wireless Networks, Issues in Ad hoc wireless networks, Example
commercial applications of Ad hoc networking, Ad hoc wireless Internet, Issues in Designing
a Routing Protocol for Ad Hoc Wireless Networks, Classifications of Routing Protocols, Table
Driven Routing Protocols - Destination Sequenced Distance Vector (DSDV), On–Demand
Routing protocols –Ad hoc On–Demand Distance Vector Routing (AODV).
UNIT II SENSOR NETWORKS – INTRODUCTION & ARCHITECTURES 9
Challenges for Wireless Sensor Networks, Enabling Technologies for Wireless Sensor
Networks, WSN application examples, Single-Node Architecture - Hardware Components,
Energy Consumption of Sensor Nodes, Network Architecture - Sensor Network Scenarios,
Transceiver Design Considerations, Optimization Goals and Figures of Merit.
UNIT III WSN NETWORKING CONCEPTS AND PROTOCOLS 9
MAC Protocols for Wireless Sensor Networks, Low Duty Cycle Protocols And Wakeup
Concepts - S-MAC, The Mediation Device Protocol, Contention based protocols - PAMAS,
Schedule based protocols – LEACH, IEEE 802.15.4 MAC protocol, Routing Protocols-
Energy Efficient Routing, Challenges and Issues in Transport layer protocol.
UNIT IV SENSOR NETWORK SECURITY 9
Network Security Requirements, Issues and Challenges in Security Provisioning, Network
Security Attacks, Layer wise attacks in wireless sensor networks, possible solutions for
jamming, tampering, black hole attack, flooding attack. Key Distribution and Management,
Secure Routing – SPINS, reliability requirements in sensor networks.
UNIT V SENSOR NETWORK PLATFORMS AND TOOLS 9
Sensor Node Hardware – Berkeley Motes, Programming Challenges, Node-level software
platforms – TinyOS, nesC, CONTIKIOS, Node-level Simulators – NS2 and its extension to
sensor networks, COOJA, TOSSIM, Programming beyond individual nodes – State centric
programming.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student would be able to:
 Know the basics of Ad hoc networks and Wireless Sensor Networks
83
 Apply this knowledge to identify the suitable routing algorithm based on the network and
user requirement
 Apply the knowledge to identify appropriate physical and MAC layer protocols
 Understand the transport layer and security issues possible in Ad hoc and sensor
networks.
 Be familiar with the OS used in Wireless Sensor Networks and build basic modules
84
TEXT BOOKS:
1. C. Siva Ram Murthy and B. S. Manoj, ―Ad Hoc Wireless Networks Architectures and
Protocols‖, Prentice Hall, PTR, 2004. (UNIT I)
2. Holger Karl , Andreas willig, ―Protocol and Architecture for Wireless Sensor Networks‖,
John wiley publication, Jan 2006.(UNIT II-V)
REFERENCES:
1. Feng Zhao, Leonidas Guibas, ―Wireless Sensor Networks: an information processing
approach‖, Elsevier publication, 2004.
2. Charles E. Perkins, ―Ad Hoc Networking‖, Addison Wesley, 2000.
3. I.F. Akyildiz, W. Su, Sankarasubramaniam, E. Cayirci, ―Wireless sensor networks: a
survey‖, computer networks, Elsevier, 2002, 394 - 422.
EC8711 EMBEDDED LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made to:
 Learn the working of ARM processor
 Understand the Building Blocks of Embedded Systems
 Learn the concept of memory map and memory interface
 Write programs to interface memory, I/Os with processor
 Study the interrupt performance
LIST OF EXPERIMENTS:
1. Study of ARM evaluation system
2. Interfacing ADC and DAC.
3. Interfacing LED and PWM.
4. Interfacing real time clock and serial port.
5. Interfacing keyboard and LCD.
6. Interfacing EPROM and interrupt.
7. Mailbox.
8. Interrupt performance characteristics of ARM and FPGA.
9. Flashing of LEDS.
10. Interfacing stepper motor and temperature sensor.
11. Implementing zigbee protocol with ARM.
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Write programs in ARM for a specific Application
 Interface memory, A/D and D/A convertors with ARM system
 Analyze the performance of interrupt
 Write program for interfacing keyboard, display, motor and sensor.
 Formulate a mini project using embedded system
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS (3 students per batch)
Embedded trainer kits with ARM board 10 Nos
Embedded trainer kits suitable for wireless communication 10 Nos
Adequate quantities of Hardware, software and consumables
85
EC8761 ADVANCED COMMUNICATION LABORATORY L T P C
0 0 4 2
OBJECTIVES:
The student should be made to:
 Understand the working principle of optical sources, detector, fibers
 Develop understanding of simple optical communication link
 Understand the measurement of BER, Pulse broadening
 Understand and capture an experimental approach to digital wireless communication
 Understand actual communication waveforms that will be sent and received across
wireless channel
LIST OF OPTICAL EXPERIMENTS
1. Measurement of connector, bending and fiber attenuation losses.
2. Numerical Aperture and Mode Characteristics of Fibers.
3. DC Characteristics of LED and PIN Photo diode.
4. Fiber optic Analog and Digital Link Characterization - frequency response(analog), eye diagram
and BER (digital)
LIST OF WIRELESS COMMUNICATION EXPERIMENTS
1. Wireless Channel Simulation including fading and Doppler effects
2. Simulation of Channel Estimation, Synchronization & Equalization techniques
3. Analysing Impact of Pulse Shaping and Matched Filtering using Software Defined Radios
4. OFDM Signal Transmission and Reception using Software Defined Radios
LIST OF MICROWAVE EXPERIMENTS
1. VSWR and Impedance Measurement and Impedance Matching
2. Characterization of Directional Couplers, Isolators, Circulators
3. Gunn Diode Characteristics
4. Microwave IC – Filter Characteristics
TOTAL: 60 PERIODS
OUTCOMES:
On completion of this lab course, the student would be able to
 Analyze the performance of simple optical link by measurement of losses and Analyzing
the mode characteristics of fiber
 Analyze the Eye Pattern, Pulse broadening of optical fiber and the impact on BER
 Estimate the Wireless Channel Characteristics and Analyze the performance of Wireless
Communication System
 Understand the intricacies in Microwave System design
86
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS 3 STUDENTS PER EXPERIMENT:
S.NO NAME OF THE EQUIPMENT REQUIRED
1 Trainer kit for carrying out LED and PIN diode
characteristics, Digital multi meter, optical power
meter
2 Nos
2 Trainer kit for determining the mode characteristics,
losses in optical fiber
2 Nos
3 Trainer kit for analyzing Analog and Digital link
performance, 2 Mbps PRBS Data source, 10 MHz
signal generator, 20 MHz Digital storage
Oscilloscope
2 Nos
4 Kit for measuring Numerical aperture and
Attenuation of fiber
2 Nos
5 Advanced Optical fiber trainer kit for PC to PC
communication, BER Measurement, Pulse
broadening.
2 Nos
5 MM/SM Glass and plastic fiber patch chords with
ST/SC/E2000 connectors
2 sets
6 LEDs with ST / SC / E2000 receptacles – 650 / 850
nm
2 sets
7 PIN PDs with ST / SC / E2000 receptacles – 650 /
850 nm
2 sets
8 Digital Communications Teaching Bundle
(LabVIEW/MATLAB/Equivalent software tools)
10 Users
9 Transmit/receive pair of NI USRP-2920 transceivers
(50 MHz to 2.2 GHz)
2 Nos
CS8392 OBJECT ORIENTED PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To understand Object Oriented Programming concepts and basic characteristics of Java
 To know the principles of packages, inheritance and interfaces
 To define exceptions and use I/O streams
 To develop a java application with threads and generics classes
 To design and build simple Graphical User Interfaces
UNIT I INTRODUCTION TO OOP AND JAVA FUNDAMENTALS 10
Object Oriented Programming - Abstraction – objects and classes - Encapsulation- Inheritance -
Polymorphism- OOP in Java – Characteristics of Java – The Java Environment - Java Source File
-Structure – Compilation. Fundamental Programming Structures in Java – Defining classes in Java
– constructors, methods -access specifiers - static members -Comments, Data Types, Variables,
Operators, Control Flow, Arrays , Packages - JavaDoc comments.
87
88
UNIT II INHERITANCE AND INTERFACES 9
Inheritance – Super classes- sub classes –Protected members – constructors in sub classes- the
Object class – abstract classes and methods- final methods and classes – Interfaces – defining an
interface, implementing interface, differences between classes and interfaces and extending
interfaces - Object cloning -inner classes, Array Lists - Strings
UNIT III EXCEPTION HANDLING AND I/O 9
Exceptions - exception hierarchy - throwing and catching exceptions - built in exceptions, creating
own exception, Stack Trace Elements.
Input / Output Basics – Streams – Byte streams and Character streams – Reading and Writing
Console – Reading and Writing Files
UNIT IV MULTITHREADING AND GENERIC PROGRAMMING 8
Differences between multi-threading and multitasking, thread life cycle, creating threads,
synchronizing threads, Inter thread communication, daemon threads, thread groups.
Generic Programming – Generic classes – generic methods – Bounded Types – Restrictions and
Limitations.
UNIT V EVENT DRIVEN PROGRAMMING 9
Graphics programming - Frame – Components - working with 2D shapes - Using color, fonts, and
images - Basics of event handling - event handlers - adapter classes - actions - mouse events -
AWT event hierarchy - Introduction to Swing – layout management - Swing Components – Text
Fields , Text Areas – Buttons- Check Boxes – Radio Buttons – Lists- choices- Scrollbars –
Windows –Menus – Dialog Boxes.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, students will be able to:
 Develop Java programs using OOP principles
 Develop Java programs with the concepts inheritance and interfaces
 Build Java applications using exceptions and I/O streams
 Develop Java applications with threads and generics classes
 Develop interactive Java programs using swings
TEXT BOOKS:
1. Herbert Schildt, ―Java The complete reference‖, 8th
Edition, McGraw Hill Education, 2011.
2. Cay S. Horstmann, Gary cornell, ―Core Java Volume –I Fundamentals‖, 9th
Edition,
Prentice Hall, 2013.
REFERENCES:
1. Paul Deitel, Harvey Deitel, ―Java SE 8 for programmers‖, 3rd
Edition, Pearson, 2015.
2. Steven Holzner, ―Java 2 Black book‖, Dreamtech press, 2011.
3. Timothy Budd, ―Understanding Object-oriented programming with Java‖, Updated Edition,
Pearson Education, 2000.
89
EC8073 MEDICAL ELECTRONICS L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To gain knowledge about the various physiological parameters both electrical and non
electrical and the methods of recording and also the method of transmitting these
parameters
 To study about the various assist devices used in the hospitals
 To gain knowledge about equipment used for physical medicine and the various recently
developed diagnostic and therapeutic techniques.
UNIT I ELECTRO-PHYSIOLOGY AND BIO-POTENTIAL RECORDING 9
Sources of bio medical signals, Bio-potentials, Biopotential electrodes, biological amplifiers, ECG,
EEG, EMG, PCG, typical waveforms and signal characteristics
UNIT II BIO-CHEMICAL AND NON ELECTRICAL PARAMETER
MEASUREMENT
9
pH, PO2, PCO2, Colorimeter, Blood flow meter, Cardiac output, respiratory, blood pressure,
temperature and pulse measurement, Blood Cell Counters.
UNIT III ASSIST DEVICES 9
Cardiac pacemakers, DC Defibrillator, Dialyser, Ventilators, Magnetic Resonance Imaging
Systems, Ultrasonic Imaging Systems.
UNIT IV PHYSICAL MEDICINE AND BIOTELEMETRY 9
Diathermies- Shortwave, ultrasonic and microwave type and their applications, Surgical
Diathermy, Biotelemetry.
UNIT V RECENT TRENDS IN MEDICAL INSTRUMENTATION 9
Telemedicine, Insulin Pumps, Radio pill, Endomicroscopy, Brain machine interface, Lab on a chip.
TOTAL:45 PERIODS
OUTCOMES:
On successful completion of this course, the student should be able to:
 Know the human body electro- physiological parameters and recording of bio-potentials
 Comprehend the non-electrical physiological parameters and their measurement – body
temperature, blood pressure, pulse, blood cell count, blood flow meter etc.
 Interpret the various assist devices used in the hospitals viz. pacemakers, defibrillators,
dialyzers and ventilators
 Comprehend physical medicine methods eg. ultrasonic, shortwave, microwave surgical
diathermies , and bio-telemetry principles and methods
 Know about recent trends in medical instrumentation
TEXT BOOK:
1. Leslie Cromwell, ―Biomedical Instrumentation and Measurement‖, Prentice Hall of India, New
Delhi, 2007. (UNIT I – V)
REFERENCES:
1. Khandpur, R.S., ―Handbook of Biomedical Instrumentation‖, TATA Mc Graw-Hill, New Delhi,
2003.
2. John G.Webster, ―Medical Instrumentation Application and Design‖, 3rd Edition, Wiley India
90
Edition, 2007
3. Joseph J.Carr and John M.Brown, ―Introduction to Biomedical Equipment Technology‖, John
Wiley and Sons, New York, 2004.
CS8493 OPERATING SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
 To understand the basic concepts and functions of operating systems.
 To understand Processes and Threads
 To analyze Scheduling algorithms.
 To understand the concept of Deadlocks.
 To analyze various memory management schemes.
 To understand I/O management and File systems.
 To be familiar with the basics of Linux system and Mobile OS like iOS and Android.
UNIT I OPERATING SYSTEM OVERVIEW 7
Computer System Overview-Basic Elements, Instruction Execution, Interrupts, Memory Hierarchy,
Cache Memory, Direct Memory Access, Multiprocessor and Multicore Organization. Operating
system overview-objectives and functions, Evolution of Operating System.- Computer System
Organization Operating System Structure and Operations- System Calls, System Programs, OS
Generation and System Boot.
UNIT II PROCESS MANAGEMENT 11
Processes - Process Concept, Process Scheduling, Operations on Processes, Interprocess
Communication; CPU Scheduling - Scheduling criteria, Scheduling algorithms, Multiple-processor
scheduling, Real time scheduling; Threads- Overview, Multithreading models, Threading issues;
Process Synchronization - The critical-section problem, Synchronization hardware, Mutex locks,
Semaphores, Classic problems of synchronization, Critical regions, Monitors; Deadlock - System
model, Deadlock characterization, Methods for handling deadlocks, Deadlock prevention,
Deadlock avoidance, Deadlock detection, Recovery from deadlock.
UNIT III STORAGE MANAGEMENT 9
Main Memory – Background, Swapping, Contiguous Memory Allocation, Paging, Segmentation,
Segmentation with paging, 32 and 64 bit architecture Examples; Virtual Memory – Background,
Demand Paging, Page Replacement, Allocation, Thrashing; Allocating Kernel Memory, OS
Examples.
UNIT IV FILE SYSTEMS AND I/O SYSTEMS 9
Mass Storage system – Overview of Mass Storage Structure, Disk Structure, Disk Scheduling and
Management, swap space management; File-System Interface - File concept, Access methods,
Directory Structure, Directory organization, File system mounting, File Sharing and Protection; File
System Implementation- File System Structure, Directory implementation, Allocation Methods,
Free Space Management, Efficiency and Performance, Recovery; I/O Systems – I/O Hardware,
Application I/O interface, Kernel I/O subsystem, Streams, Performance.
UNIT V CASE STUDY 9
Linux System - Design Principles, Kernel Modules, Process Management, Scheduling, Memory
Management, Input-Output Management, File System, Interprocess Communication; Mobile OS -
iOS and Android - Architecture and SDK Framework, Media Layer, Services Layer, Core OS
Layer, File System.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Analyze various scheduling algorithms.
 Understand deadlock, prevention and avoidance algorithms.
91
 Compare and contrast various memory management schemes.
 Understand the functionality of file systems.
 Perform administrative tasks on Linux Servers and compare iOS and Android Operating
Systems.
TEXT BOOK :
1. Abraham Silberschatz, Peter Baer Galvin and Greg Gagne, ―Operating System Concepts‖, 9th
Edition, John Wiley and Sons Inc., 2012.
REFERENCES :
1. Ramaz Elmasri, A. Gil Carrick, David Levine, ―Operating Systems – A Spiral Approach‖,
Tata McGraw Hill Edition, 2010.
2. Achyut S.Godbole, Atul Kahate, ― Operating Systems‖, McGraw Hill Education, 2016.
3. Andrew S. Tanenbaum, ―Modern Operating Systems‖, Second Edition, Pearson
Education, 2004.
4. Gary Nutt, ―Operating Systems‖, Third Edition, Pearson Education, 2004.
5. Harvey M. Deital, ―Operating Systems‖, Third Edition, Pearson Education, 2004.
6. Daniel P Bovet and Marco Cesati, ―Understanding the Linux kernel‖, 3rd edition, O‘Reilly,
2005.
7. Neil Smyth, ―iPhone iOS 4 Development Essentials – Xcode‖, Fourth Edition, Payload media,
2011.
EC8074 ROBOTICS AND AUTOMATION L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the basic concepts associated with the design, functioning, applications and
social aspects of robots
 To study about the electrical drive systems and sensors used in robotics for various
applications
 To learn about analyzing robot kinematics, dynamics through different methodologies and
study various design aspects of robot arm manipulator and end-effector
 To learn about various motion planning techniques and the associated control architecture
 To understand the implications of AI and other trending concepts of robotics
UNIT I FOUNDATION FOR BEGINNERS 9
Introduction -- brief history, definition, anatomy, types, classification, specification and need based
applications; role and need of robots for the immediate problems of the society, future of mankind
and automation-ethical issues; industrial scenario local and global, case studies on mobile robot
research platform and industrial serial arm manipulator
UNIT II BUILDING BLOCKS OF A ROBOT 9
Types of electric motors - DC, Servo, Stepper; specification, drives for motors - speed & direction
control and circuitry, Selection criterion for actuators, direct drives, non-traditional actuators;
Sensors for localization, navigation, obstacle avoidance and path planning in known and unknown
environments – optical, inertial, thermal, chemical, biosensor, other common sensors; Case study
on choice of sensors and actuators for maze solving robot and self driving cars
92
UNIT III KINEMATICS, DYNAMICS AND DESIGN OF ROBOTS & END-EFFECTORS 9
Robot kinematics - Geometric approach for 2R, 3R manipulators, homogenous transformation
using D-H representation, kinematics of WMR, Lagrangian formulation for 2R robot dynamics;
Mechanical design aspects of a 2R manipulator, WMR; End-effector - common types and design
case study.
UNIT IV NAVIGATION, PATH PLANNING AND CONTROL ARCHITECTURE 9
Mapping & Navigation – SLAM, Path planning for serial manipulators; types of control
architectures - Cartesian control, Force control and hybrid position/force control, Behaviour based
control, application of Neural network, fuzzy logic, optimization algorithms for navigation problems,
programming methodologies of a robot
UNIT V AI AND OTHER RESEARCH TRENDS IN ROBOTICS 9
Application of Machine learning - AI, Expert systems; Tele-robotics and Virtual Reality, Micro &
Nanorobots, Unmanned vehicles, Cognitive robotics, Evolutionary robotics, Humanoids
TOTAL:45 PERIODS
OUTCOMES:
The student should be able to:
 Explain the concepts of industrial robots in terms of classification, specifications and
coordinate systems, along with the need and application of robots & automation
 Examine different sensors and actuators for applications like maze solving and self driving
cars.
 Design a 2R robot & an end-effector and solve the kinematics and dynamics of motion for
robots.
 Explain navigation and path planning techniques along with the control architectures
adopted for robot motion planning.
 Describe the impact and progress in AI and other research trends in the field of robotics
TEXT BOOKS:
1. Saeed. B. Niku, Introduction to Robotics, Analysis, system, Applications, Pearson
educations, 2002
2. Roland Siegwart, Illah Reza Nourbakhsh, Introduction to Autonomous Mobile Robots, MIT
Press, 2011
REFERENCES:
1. Richard David Klafter, Thomas A. Chmielewski, Michael Negin, Robotic engineering: an
integrated approach, Prentice Hall, 1989
2. Craig, J. J., Introduction to Robotics: Mechanics and Control, 2nd Edition, Addison-Wesley,
1989.
3. K.S. Fu, R.C. Gonzalez and C.S.G. Lee, Robotics: Control, Sensing, Vision and Intelligence,
McGraw-Hill, 1987.
4. Wesley E Snyder R, Industrial Robots, Computer Interfacing and Control, Prentice Hall
International Edition, 1988.
5. Robin Murphy, Introduction to AI Robotics, MIT Press, 2000
6. Ronald C. Arkin, Behavior-based Robotics, MIT Press, 1998
7. N. P. Padhy, Artificial Intelligence and Intelligent Systems, Oxford University Press, 2005
8. Stefano Nolfi, Dario Floreano, Evolutionary Robotics – The Biology, Intelligence and
93
Technology of Self–Organizing Machines (Intelligent Robotics and Autonomous Agents
series), MIT Press, 2004.
EC8075 NANOTECHNOLOGY AND APPLICATIONS L T P C
3 0 0 3
OBJECTIVES:
 To provide a broad view of the nascent field of nanoscience and nanotechnology to
undergraduates
 To explore the basics of nanomaterial synthesis and characterization.
 To introduce the applications of nanotechnology
UINI I INTRODUCTION TO NANOTECHNOLOGY 9
Basic Structure of Nanoparticles- Kinetics in Nanostructured Materials- Zero dimensional, size and
shape of nanoparticles; one-dimensional and two dimensional nanostructures- clusters of metals
and semiconductors, bio nano-particles.
UNIT II FABRICATION AND CHARACTERIZATION OF NANOMATERIALS 9
Types of Nanomaterials (Quantum dots, Nanoparticles, Nanocrystals, Dendrimers, Buckyballs,
Nanotubes); Gas, liquid, and solid –phase synthesis of nanomaterials; Lithography techniques
(Photolithography, Dip-pen and Electron beam lithography); Thin film deposition; Electrospinning.
Bio-synthesis of nanomaterials.
UNIT III PROPERTIES AND MEASUREMENT OF NANOMATERIALS 9
Optical Properties: Absorption, Fluorescence, and Resonance; Methods for the measurement of
nanomaterials; Microscopy measurements: SEM, TEM, AFM and STM. Confocal and TIRF
imaging.
UNIT IV NANO STRUCTURES 9
Carbon Nanotubes, Fullerenes, Nanowires, Quantum Dots. Applications of nanostructures.
Reinforcement in Ceramics, Drug delivery, Giant magnetoresistance, etc. Cells response to
Nanostructures.
UNIT V APPLICATIONS OF NANOTECHNOLOGY 9
Nano electronics, Nano sensors, Nanotechnology in Diagnostics applications, Environmental and
Agricultural Applications of nanotechnology, Nano technology for energy systems
TOTAL : 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Describe the basic science behind the properties of materials.
 Interpret the creation, characterization, and manipulation of nanoscale materials.
 Comprehend the exciting applications of nanotechnology at the leading edge of scientific
research
 Apply their knowledge of nanotechnology to identify how they can be exploited for new
applications.
TEXT BOOKS:
1. Springer Handbook of Nanotechnology by Bharat Bhushan 2004.(Unit I – V)
2. Encyclopedia of Nanotechnology - Hari Singh Nalwa 2004. (Unit I – V)
REFERENCES:
94
1. Nanomaterials, Nanotechnologies and Design: an Introduction to Engineers and
Architects, D. Michael Ashby, Paulo Ferreira, Daniel L. Schodek, Butterworth-Heinemann,
2009.
2. Handbook of Nanophase and Nanostructured Materials (in four volumes), Eds: Z.L. Wang,
Y. Liu, Z. Zhang, Kluwer Academic/Plenum Publishers, 2003.
3. Handbook of Nanoceramics and their Based Nanodevices (Vol. 2) Edited by Tseung-Yuen
Tseng and Hari Singh Nalwa, American Scientific Publishers.
GE8074 HUMAN RIGHTS L T P C
3 0 0 3
OBJECTIVE:
 To sensitize the Engineering students to various aspects of Human Rights.
UNIT I 9
Human Rights – Meaning, origin and Development. Notion and classification of Rights – Natural,
Moral and Legal Rights. Civil and Political Rights, Economic, Social and Cultural Rights; collective /
Solidarity Rights.
UNIT II 9
Evolution of the concept of Human Rights Magana carta – Geneva convention of 1864. Universal
Declaration of Human Rights, 1948. Theories of Human Rights.
UNIT III 9
Theories and perspectives of UN Laws – UN Agencies to monitor and compliance.
UNIT IV 9
Human Rights in India – Constitutional Provisions / Guarantees.
UNIT V 9
Human Rights of Disadvantaged People – Women, Children, Displaced persons and Disabled
persons, including Aged and HIV Infected People. Implementation of Human Rights – National and
State Human Rights Commission – Judiciary – Role of NGO‘s, Media, Educational Institutions,
Social Movements.
TOTAL : 45 PERIODS
OUTCOME :
 Engineering students will acquire the basic knowledge of human rights.
REFERENCES:
1. Kapoor S.K., ―Human Rights under International law and Indian Laws‖, Central Law Agency,
Allahabad, 2014.
2. Chandra U., ―Human Rights‖, Allahabad Law Agency, Allahabad, 2014.
3. Upendra Baxi, The Future of Human Rights, Oxford University Press, New Delhi.
GE8077 TOTAL QUALITY MANAGEMENT L T P C
3 0 0 3
OBJECTIVE:
 To facilitate the understanding of Quality Management principles and process.
UNIT I INTRODUCTION 9
Introduction - Need for quality - Evolution of quality - Definitions of quality - Dimensions of product
and service quality - Basic concepts of TQM - TQM Framework - Contributions of Deming, Juran
95
and Crosby - Barriers to TQM - Customer focus - Customer orientation, Customer satisfaction,
Customer complaints, Customer retention.
96
UNIT II TQM PRINCIPLES 9
Leadership - Quality Statements, Strategic quality planning, Quality Councils - Employee
involvement - Motivation, Empowerment, Team and Teamwork, Recognition and Reward,
Performance appraisal - Continuous process improvement - PDCA cycle, 5S, Kaizen - Supplier
partnership - Partnering, Supplier selection, Supplier Rating.
UNIT III TQM TOOLS AND TECHNIQUES I 9
The seven traditional tools of quality - New management tools - Six sigma: Concepts,
Methodology, applications to manufacturing, service sector including IT - Bench marking - Reason
to bench mark, Bench marking process - FMEA - Stages, Types.
UNIT IV TQM TOOLS AND TECHNIQUES II 9
Quality Circles - Cost of Quality - Quality Function Deployment (QFD) - Taguchi quality loss
function - TPM - Concepts, improvement needs - Performance measures.
UNIT V QUALITY MANAGEMENT SYSTEM 9
Introduction—Benefits of ISO Registration—ISO 9000 Series of Standards—Sector-Specific
Standards—AS 9100, TS16949 and TL 9000-- ISO 9001 Requirements—Implementation—
Documentation—Internal Audits—Registration- ENVIRONMENTAL MANAGEMENT SYSTEM:
Introduction—ISO 14000 Series Standards—Concepts of ISO 14001—Requirements of ISO
14001—Benefits of EMS.
TOTAL: 45 PERIODS
OUTCOME:
 The student would be able to apply the tools and techniques of quality management to
manufacturing and services processes.
TEXT BOOK:
1. Dale H.Besterfiled, Carol B.Michna,Glen H. Besterfield,Mary B.Sacre,Hemant Urdhwareshe
and Rashmi Urdhwareshe, ―Total Quality Management‖, Pearson Education Asia, Revised
Third Edition, Indian Reprint, Sixth Impression, 2013.
REFERENCES:
1. James R. Evans and William M. Lindsay, "The Management and Control of Quality",
8th
Edition, First Indian Edition, Cengage Learning, 2012.
2. Janakiraman. B and Gopal .R.K., "Total Quality Management - Text and Cases", Prentice Hall
(India) Pvt. Ltd., 2006.
3. Suganthi.L and Anand Samuel, "Total Quality Management", Prentice Hall (India) Pvt. Ltd.,
2006.
4. ISO9001-2015 standards
CS8792 CRYPTOGRAPHY AND NETWORK SECURITY
L T P C
3 0 0 3
OBJECTIVES:
 To understand Cryptography Theories, Algorithms and Systems.
 To understand necessary Approaches and Techniques to build protection
mechanisms in order to secure computer networks.
97
UNIT I INTRODUCTION 9
Security trends - Legal, Ethical and Professional Aspects of Security, Need for Security at
Multiple levels, Security Policies - Model of network security – Security attacks, services and
mechanisms – OSI security architecture – Classical encryption techniques: substitution
techniques, transposition techniques, steganography).- Foundations of modern
cryptography: perfect security – information theory – product cryptosystem – cryptanalysis.
UNIT II SYMMETRIC CRYPTOGRAPHY 9
MATHEMATICS OF SYMMETRIC KEY CRYPTOGRAPHY: Algebraic structures - Modular
arithmetic-Euclid‘s algorithm- Congruence and matrices - Groups, Rings, Fields- Finite
fields- SYMMETRIC KEY CIPHERS: SDES – Block cipher Principles of DES – Strength of
DES – Differential and linear cryptanalysis - Block cipher design principles – Block cipher
mode of operation – Evaluation criteria for AES – Advanced Encryption Standard - RC4 –
Key distribution.
UNIT III PUBLIC KEY CRYPTOGRAPHY 9
MATHEMATICS OF ASYMMETRIC KEY CRYPTOGRAPHY: Primes – Primality Testing –
Factorization – Euler‘s totient function, Fermat‘s and Euler‘s Theorem - Chinese Remainder
Theorem – Exponentiation and logarithm - ASYMMETRIC KEY CIPHERS: RSA
cryptosystem – Key distribution – Key management – Diffie Hellman key exchange -
ElGamal cryptosystem – Elliptic curve arithmetic-Elliptic curve cryptography.
UNIT IV MESSAGE AUTHENTICATION AND INTEGRITY 9
Authentication requirement – Authentication function – MAC – Hash function – Security of
hash function and MAC – SHA –Digital signature and authentication protocols – DSS- Entity
Authentication: Biometrics, Passwords, Challenge Response protocols- Authentication
applications - Kerberos, X.509
UNIT V SECURITY PRACTICE AND SYSTEM SECURITY 9
Electronic Mail security – PGP, S/MIME – IP security – Web Security - SYSTEM
SECURITY: Intruders – Malicious software – viruses – Firewalls.
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Understand the fundamentals of networks security, security architecture, threats and
vulnerabilities
 Apply the different cryptographic operations of symmetric cryptographic algorithms
 Apply the different cryptographic operations of public key cryptography
 Apply the various Authentication schemes to simulate different applications.
 Understand various Security practices and System security standards
TEXT BOOK:
1. William Stallings, Cryptography and Network Security: Principles and Practice, PHI
3rd Edition, 2006.
REFERENCES
1. C K Shyamala, N Harini and Dr. T R Padmanabhan: Cryptography and Network
Security, Wiley India Pvt.Ltd
2. BehrouzA.Foruzan, Cryptography and Network Security, Tata McGraw Hill 2007.
3. Charlie Kaufman, Radia Perlman, and Mike Speciner, Network Security: PRIVATE
Communication in a PUBLIC World, Prentice Hall, ISBN 0-13-046019-2
98
EC8091 ADVANCED DIGITAL SIGNAL PROCESSING L T P C
3 0 0 3
OBJECTIVES:
 To learn and understand the concepts of stationary and non-stationary random signals and
analysis & characterization of discrete-time random processes
 To enunciate the significance of estimation of power spectral density of random processes
 To introduce the principles of optimum filters such as Wiener and Kalman filters
 To introduce the principles of adaptive filters and their applications to communication
engineering
 To introduce the concepts of multi-resolution analysis
UNIT I DISCRETE-TIME RANDOM PROCESSES 9
Random variables - ensemble averages a review, random processes - ensemble averages,
autocorrelation and autocovariance matrices, ergodic random process, white noise, filtering
random processes, spectral factorization, special types of random processes - AR, MA, ARMA
UNIT II SPECTRUM ESTIMATION 10
Bias and consistency, Non-parametric methods - Periodogram, modified-Periodogram -
performance analysis. Bartlett's method, Welch's method, Blackman-Tukey method. Performance
comparison. Parametric methods - autoregressive (AR) spectrum estimation - autocorrelation
method, Prony's method, solution using Levinson Durbin recursion.
UNIT III OPTIMUM FILTERS 9
Wiener filters - FIR Wiener filter - discrete Wiener Hopf equation, Applications - filtering, linear
prediction. IIR Wiener filter - causal and non-causal filters. Recursive estimators - discrete Kalman
filter.
UNIT IV ADAPTIVE FILTERS 9
Principles and properties of adaptive filters - FIR adaptive filters. Adaptive algorithms - steepest
descent algorithm, the LMS algorithm - convergence. Applications of adaptive filtering - noise
cancellation, channel equalization.
UNIT V MULTIRESOLUTION ANALYSIS 8
Short-time Fourier transform - Heisenberg uncertainty principle. Principles of multi-resolution
analysis - sub-band coding, the continuous and discrete wavelet transform - properties.
Applications of wavelet transform - noise reduction, image compression.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Articulate and apply the concepts of special random processes in practical applications
 Choose appropriate spectrum estimation techniques for a given random process
 Apply optimum filters appropriately for a given communication application
 Apply appropriate adaptive algorithm for processing non-stationary signals
 Apply and analyse wavelet transforms for signal and image processing based applications
99
TEXT BOOKS
1. Monson H. Hayes, "Statistical digital signal processing and modeling", John Wiley and Sons
Inc. New York, Indian reprint 2008. (UNIT I-IV)
2. P. P. Vaidyanathan, "Multirate systems and filter banks", Prentice Hall Inc. 1993 (UNIT V)
REFERENCES:
1. John G. Proakis & Dimitris G.Manolakis, ―Digital Signal Processing – Principles, Algorithms
& Applications‖, Fourth Edition, Pearson Education / Prentice Hall, 2007.
2. Sophoncles J. Orfanidis, "Optimum signal processing", McGraw Hill, 2000
EC8001 MEMS AND NEMS L T P C
3 0 0 3
OBJECTIVES:
 To introduce the concepts of micro and nano electromechanical devices
 To know the fabrication process of Microsystems
 To know the design concepts of micro sensors and micro actuators
 To introduce the concepts of quantum mechanics and nano systems
UNIT I INTRODUCTION TO MEMS AND NEMS 9
Introduction to Design of MEMS and NEMS, Overview of Nano and Microelectromechanical
Systems, Applications of Micro and Nanoelectromechanical systems, Materials for MEMS and
NEMS: Silicon, silicon compounds, polymers, metals.
UNIT II MEMS FABRICATION TECHNOLOGIES 9
Photolithography, Ion Implantation, Diffusion, Oxidation, CVD, Sputtering Etching techniques,
Micromachining: Bulk Micromachining, Surface Micromachining, LIGA.
UNIT III MICRO SENSORS 9
MEMS Sensors: Design of Acoustic wave sensors, Vibratory gyroscope, Capacitive Pressure
sensors, Case study: Piezoelectric energy harvester
UNIT IV MICRO ACTUATORS 9
Design of Actuators: Actuation using thermal forces, Actuation using shape memory Alloys,
Actuation using piezoelectric crystals, Actuation using Electrostatic forces, Case Study:RF Switch.
UNIT V NANO DEVICES 9
Atomic Structures and Quantum Mechanics, Shrodinger Equation, ZnO nanorods based NEMS
device: Gas sensor.
TOTAL: 45 PERIODS
OUTCOMES:
On successful completion of this course, the student should be able to:
 Interpret the basics of micro/nano electromechanical systems including their applications
and advantages
 Recognize the use of materials in micro fabrication and describe the fabrication processes
including surface micromachining, bulk micromachining and LIGA.
100
 Analyze the key performance aspects of electromechanical transducers including sensors
and actuators
 Comprehend the theoretical foundations of quantum mechanics and Nano systems
REFERENCES:
1. Marc Madou, ―Fundamentals of Microfabrication‖, CRC press 1997.
2. Stephen D. Senturia,‖ Micro system Design‖, Kluwer Academic Publishers,2001
3. Tai Ran Hsu ,‖MEMS and Microsystems Design and Manufacture‖ ,Tata Mcraw Hill, 2002.
4. Chang Liu, ―Foundations of MEMS‖, Pearson education India limited, 2006,
5. Sergey Edward Lyshevski, ―MEMS and NEMS: Systems, Devices, and Structures‖ CRC
Press, 2002
EC8002 MULTIMEDIA COMPRESSION AND COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the compression schemes for text, voice, image and video
 To understand the QoS issues in multimedia network
 To know the communication protocols for multimedia networking
UNIT I AUDIO COMPRESSION 9
Sampling and Quantization of Speech (PCM) - Adaptive differential PCM - Delta Modulation -
Vector Quantization- Linear predictive coding (LPC) - Code excited Linear predictive Coding
(CELP)
UNIT II IMAGE AND VIDEO COMPRESSION 9
Graphics Interchange format- Tagged image file format-Digitized documents- Digitized pictures-
JPEG-Video Encoding-Motion estimation –Overview of H.263 and MPEG-2
UNIT III TEXT COMPRESSION 7
Static and Dynamic Huffman coding – Arithmetic coding –Lempel-Ziv coding – LZW coding
UNIT IV GUARANTEED SERVICE MODEL 10
Best Effort service model – Scheduling and Dropping policies – Network Performance Parameters
– Quality of Service and metrics – WFQ and its variants – Random Early Detection – QoS aware
Routing – Admission Control – Resource Reservation – RSVP - Traffic Shaping Algorithms –
Caching – Laissez Faire Approach - Possible Architectures – An Overview of QoS Architectures
UNIT V MULTIMEDIA COMMUNICATION 10
Stream characteristics for Continuous media – Temporal Relationship – Object Stream
Interactions, Media Levity, Media Synchronization – Models for Temporal Specifications –
Streaming of Audio and Video – Jitter – Fixed playout and Adaptive playout – Recovering from
packet loss – RTSP –– Multimedia Communication Standards – RTP/RTCP – SIP and H.263
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Design audio compression techniques
101
 Configure Text, image and video compression techniques
 Select suitable service model for specific application
 Configure multimedia communication network
TEXT BOOK:
1. Fred Halsall, ―Multimedia communication- Applications, Networks, Protocols and
Standards‖, Pearson education, 2007.
REFERENCES
1. Tay Vaughan, ―Multimedia Making it work , McGraw-Hill Osborne Media, 2006.
2. Kurose and W. Ross, ―Computer Networking ―A Top Down Approach, Pearson education,
3rd ed, 2005.
3. KR. Rao,Z S Bojkovic, D A Milovanovic, ―Multimedia Communication Systems: Techniques,
Standards, and Networks‖, Pearson Education 2007
4. R. Steimnetz, K. Nahrstedt, ―Multimedia Computing, Communications and Applications‖,
Pearson Education, First ed, 1995.
5. Nalin K Sharda, ‗Multimedia Information Networking‘, Prentice Hall of India, 1999
6. Aura Ganz, Zvi Ganz and Kitti Wongthawaravat, ‗Multimedia Wireless Networks:
Technologies, Standards and QoS‘, Prentice Hall, 2003.
7. Ellen Kayata Wesel, ‗Wireless Multimedia Communications: Networking Video, Voice and
Data‘, Addision Wesley, 1998
EC8003 CMOS ANALOG IC DESIGN L T P C
3 0 0 3
OBJECTIVES:
 To study the fundamentals of analog circuits and MOS device models
 To gain knowledge on various configurations of MOS transistors and feedback concepts
 To study the characteristics of noise and frequency response of the amplifier
 To learn the concepts of Op-Amp frequency compensation, capacitor switches and PLLs
UNIT I INTRODUCTION TO ANALOG IC DESIGN AND CURRENT MIRRORS 9
Concepts of Analog Design - General consideration of MOS devices – MOS I/V Characteristics –
Second order effects – MOS device models. Basic current mirrors- Cascode current mirrors-
Active current mirrors- Large and Small signal analysis- Common mode properties.
UNIT II AMPLIFIERS AND FEEDBACK 9
Basic Concepts – Common source stage- Source follower- Common gate stage- Cascode stage.
Single ended and differential operation- Basic Differential pair- Common mode response-
Differential pair with MOS loads- Gilbert Cell. Feedback- General Consideration of feedback
circuits- Feedback topologies- Effect of loading- Effect of feedback on Noise.
UNIT III FREQUENCY RESPONSE OF AMPLIFIERS AND NOISE 9
General considerations- Miller Effect and Association of Poles with Nodes, Common source
stage- Source followers- Common gate stage- Cascode stage- Differential pair. Noise- Statistical
characteristics of noise- Types of noise- Representation of noise in circuits- Noise in single stage
amplifiers- Noise in differential pairs- Noise Bandwidth.
102
UNIT IV OPERATIONAL AMPLIFIER STABILITY AND FREQUENCY
COMPENSATION
9
General Considerations- One and Two Stage Op Amps- Gain Boosting- Comparison- Common
mode feedback- Input range limitations- Slew rate- Power Supply Rejection- Noise in Op Amps-
General consideration of stability and frequency compensation- Multipole system- Phase margin-
Frequency compensation- Compensation of two stage op Amps- Other compensation techniques.
UNIT V SWITCHED CAPACITOR CIRCUITS AND PLLS 9
General Considerations- Sampling switches- Switched Capacitor Amplifiers- Switched Capacitor
Integrator- Switched Capacitor Common mode feedback. Phase Locked Loops-Simple PLL-
Charge pump PLLs - Non ideal Effects in PLLs- Delay locked loops- its Applications.
TOTAL:45 PERIODS
OUTCOMES:
Upon completion of the course, student should be able to:
 Realize the concepts of Analog MOS devices and current mirror circuits.
 Design different configuration of Amplifiers and feedback circuits.
 Analyze the characteristics of frequency response of the amplifier and its noise.
 Analyze the performance of the stability and frequency compensation techniques of Op-
Amp Circuits.
 Construct switched capacitor circuits and PLLs
TEXT BOOK:
1. Behzad Razavi, ―Design of Analog CMOS Integrated Circuits‖, Tata McGraw Hill, 2001,
33rd
re-print, 2016.
REFERENCES:
1. Phillip Allen and Douglas Holmberg ―CMOS Analog Circuit Design‖ Second Edition, Oxford
University Press, 2004.
2. Paul R. Gray, Paul J. Hurst, Stephen H. Lewis, Robert G. Meyer, Analysis and Design of
Analog Integrated Circuits, 5th Edition, Wiley, 2009
3. Grebene, ―Bipolar and MOS Analog Integrated circuit design‖, John Wiley & sons, Inc.,
2003
EC8004 WIRELESS NETWORKS L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the concept about Wireless networks, protocol stack and standards
 To understand and analyse the network layer solutions for Wireless networks
 To study about fundamentals of 3G Services, its protocols and applications
 To have in depth knowledge on internetworking of WLAN and WWAN
 To learn about evolution of 4G Networks, its architecture and applications

103
UNIT I WIRELESS LAN 9
Introduction-WLAN technologies: - IEEE802.11: System architecture, protocol architecture,
802.11b, 802.11a – Hiper LAN: WATM, BRAN, HiperLAN2 – Bluetooth: Architecture, WPAN –
IEEE 802.15.4, Wireless USB, Zigbee, 6LoWPAN, WirelessHART
UNIT II MOBILE NETWORK LAYER 9
Introduction - Mobile IP: IP packet delivery, Agent discovery, tunneling and encapsulation,
IPV6-Network layer in the internet- Mobile IP session initiation protocol - mobile ad-hoc
network: Routing: Destination Sequence distance vector, IoT: CoAP
UNIT III 3G OVERVIEW 9
Overview of UTMS Terrestrial Radio access network-UMTS Core network Architecture: 3GPP
Architecture, User equipment, CDMA2000 overview- Radio and Network components,
Network structure, Radio Network, TD-CDMA, TD – SCDMA.
UNIT IV INTERNETWORKING BETWEEN WLANS AND WWANS 9
Internetworking objectives and requirements, Schemes to connect WLANS and 3G Networks,
Session Mobility, Internetworking Architecture for WLAN and GPRS, System Description,
Local Multipoint Distribution Service, Multichannel Multipoint Distribution System.
UNIT V 4G & Beyond 9
Introduction – 4G vision – 4G features and challenges - Applications of 4G – 4G Technologies:
Multicarrier Modulation, Smart antenna techniques, IMS Architecture, LTE, Advanced
Broadband Wireless Access and Services, MVNO.
TOTAL:45 PERIODS
OUTCOMES:
Upon completion of the course, the student would be able to:
 Conversant with the latest 3G/4G networks and its architecture
 Design and implement wireless network environment for any application using latest
wireless protocols and standards
 Ability to select the suitable network depending on the availability and requirement
 Implement different type of applications for smart phones and mobile devices with
latest network strategies
TEXT BOOKS:
1. Jochen Schiller, ‖Mobile Communications‖, Second Edition, Pearson Education
2012.(Unit I,II,III)
2. Vijay Garg, ―Wireless Communications and networking‖, First Edition, Elsevier 2007.(Unit
IV,V)
REFERENCES:
1. Erik Dahlman, Stefan Parkvall, Johan Skold and Per Beming, "3G Evolution HSPA and LTE
for Mobile Broadband‖, Second Edition, Academic Press, 2008.
2. Anurag Kumar, D.Manjunath, Joy kuri, ―Wireless Networking‖, First Edition, Elsevier 2011.
3. Simon Haykin , Michael Moher, David Koilpillai, ―Modern Wireless Communications‖, First
Edition, Pearson Education 2013
104
GE8075 INTELLECTUAL PROPERTY RIGHTS L T P C
3 0 0 3
OBJECTIVE:
 To give an idea about IPR, registration and its enforcement.
UNIT I INTRODUCTION 9
Introduction to IPRs, Basic concepts and need for Intellectual Property - Patents, Copyrights,
Geographical Indications, IPR in India and Abroad – Genesis and Development – the way from
WTO to WIPO –TRIPS, Nature of Intellectual Property, Industrial Property, technological
Research, Inventions and Innovations – Important examples of IPR.
UNIT II REGISTRATION OF IPRs 10
Meaning and practical aspects of registration of Copy Rights, Trademarks, Patents, Geographical
Indications, Trade Secrets and Industrial Design registration in India and Abroad
UNIT III AGREEMENTS AND LEGISLATIONS 10
International Treaties and Conventions on IPRs, TRIPS Agreement, PCT Agreement, Patent Act
of India, Patent Amendment Act, Design Act, Trademark Act, Geographical Indication Act.
UNIT IV DIGITAL PRODUCTS AND LAW 9
Digital Innovations and Developments as Knowledge Assets – IP Laws, Cyber Law and Digital
Content Protection – Unfair Competition – Meaning and Relationship between Unfair Competition
and IP Laws – Case Studies.
UNIT V ENFORCEMENT OF IPRs 7
Infringement of IPRs, Enforcement Measures, Emerging issues – Case Studies.
TOTAL : 45 PERIODS
OUTCOME:
 Ability to manage Intellectual Property portfolio to enhance the value of the firm.
TEXT BOOKS:
1. V. Scople Vinod, Managing Intellectual Property, Prentice Hall of India pvt Ltd, 2012
2. S. V. Satakar, ―Intellectual Property Rights and Copy Rights, Ess Ess Publications, New Delhi,
2002.
REFERENCES:
1. Deborah E. Bouchoux, ―Intellectual Property: The Law of Trademarks, Copyrights, Patents and
Trade Secrets‖, Cengage Learning, Third Edition, 2012.
2. Prabuddha Ganguli,‖Intellectual Property Rights: Unleashing the Knowledge Economy‖,
McGraw Hill Education, 2011.
3. Edited by Derek Bosworth and Elizabeth Webster, The Management of Intellectual Property,
Edward Elgar Publishing Ltd., 2013.
105
EC8092 ADVANCED WIRELESS COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
 To expose the students to the importance of improving capacity of wireless channel
using MIMO
 To enable understanding of channel impairment mitigation using space-time block and
Trellis codes
 To teach advanced MIMO system like layered space time codes, MU-MIMO System
and MIMO-OFDM systems
UNIT I CAPACITY OF WIRELESS CHANNELS 9
The crowded spectrum, need for high data rate, MIMO systems – Array Gain, Diversity Gain,
Data Pipes, Spatial MUX, MIMO System Model. MIMO System Capacity – channel known at
the TX, Channel unknown to the TX – capacity of deterministic channels, Random channels
and frequency selective channels.
UNIT II RADIO WAVE PROPAGATION 9
Radio wave propagation – Macroscopic fading- free space and out door, small scale fading
Fading measurements – Direct pulse measurements, spread spectrum correlation channel
sounding frequency domain channel sounding, Antenna Diversity – Diversity combining
methods.
UNIT III SPACE TIME BLOCK CODES 9
Delay Diversity scheme, Alamoti space time code – Maximum likelihood decoding maximum
ratio combining. Transmit diversity space time block codes for real signal constellation and
complex signal constellation - decoding of STBC.
UNIT IV SPACE TIME TRELLIS CODES 9
Space time coded systems, space time code word design criteria, design of space time T C
on slow fading channels, design of STTC on Fast Fading channels, performance analysis in
slow and fast fading channels, effect of imperfect channel estimation and Antenna correlation
on performance, comparison of STBC & STTC.
UNIT V LAYERED SPACE TIME CODES 9
LST transmitter – Horizontal and Vertical LST receiver – ML Rx, Zero forcing Rx; MMSE Rx,
SIC Rx, ZF V-blast Rx- MMSE V-blast Rx, Iterative Rx - capacity of MIMO – OFDM systems
– capacity of MIMO multi user systems.
TOTAL : 45 PERIODS
OUTCOMES:
The student should be able to:
 Comprehend and appreciate the significance and role of this course in the present
contemporary world
 Apply the knowledge about the importance of MIMO in today's communication
 Appreciate the various methods for improving the data rate of wireless communication
system
REFERENCES:
1. Mohinder Jankiraman, Space-time codes and MIMO systems, Artech House,
Boston, London . www.artech house.com, ISBN 1-58053-865-7-2004
2. Paulraj Rohit Nabar, Dhananjay Gore, Introduction of space time wireless
communication systems, Cambridge University Press, 2003.
3. David Tse and Pramod Viswanath, ―Fundamentals of Wireless Communication‖,
Cambridge University Press, 2005.
106
4. Sergio Verdu ― Multi User Detection‖ Cambridge University Press, 1998
EC8071 COGNITIVE RADIO L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the evolving software defined radio and cognitive radio techniques and their
essential functionalities
 To study the basic architecture and standard for cognitive radio
 To understand the physical, MAC and Network layer design of cognitive radio
 To expose the student to evolving applications and advanced features of cognitive radio
UNIT I INTRODUCTION TO SOFTWARE-DEFINED RADIO AND COGNITIVE
RADIO 9
Evolution of Software Defined Radio and Cognitive radio: goals, benefits, definitions, architectures,
relations with other radios, issues, enabling technologies, radio frequency spectrum and
regulations.
UNIT II COGNITIVE RADIO ARCHITECTURE 9
Cognition cycle – orient, plan, decide and act phases, Organization, SDR as a platform for
Cognitive Radio – Hardware and Software Architectures, Overview of IEEE 802.22 standard for
broadband wireless access in TV bands.
UNIT III SPECTRUM SENSING AND DYNAMIC SPECTRUM ACCESS 9
Introduction – Primary user detection techniques – energy detection, feature detection, matched
filtering, cooperative detection and other approaches, Fundamental Tradeoffs in spectrum sensing,
Spectrum Sharing Models of Dynamic Spectrum Access - Unlicensed and Licensed Spectrum
Sharing, Fundamental Limits of Cognitive Radio.
UNIT IV MAC AND NETWORK LAYER DESIGN FOR COGNITIVE RADIO 9
MAC for cognitive radios – Polling, ALOHA, slotted ALOHA, CSMA, CSMA / CA, Network layer
design – routing in cognitive radios, flow control and error control techniques.
UNIT V ADVANCED TOPICS IN COGNITIVE RADIO 9
Overview of security issues in cognitive radios, auction based spectrum markets in cognitive radio
networks, public safety and cognitive radio, cognitive radio for Internet of Things.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Gain knowledge on the design principles on software defined radio and cognitive radio
 Develop the ability to design and implement algorithms for cognitive radio spectrum sensing
and dynamic spectrum access
 Build experiments and projects with real time wireless applications
 Apply the knowledge of advanced features of cognitive radio for real world applications
TEXT BOOKS:
1. Alexander M. Wyglinski, Maziar Nekovee, Thomas Hou, ―Cognitive Radio Communications
and Networks‖, Academic Press, Elsevier, 2010. (Unit I to IV)
2. Huseyin Arslan (Ed.), ―Cognitive Radio, Software Defined Radio, and Adaptive Wireless
Systems, Springer, 2007. (Unit V)
107
REFERENCES:
1. Bruce Fette, ―Cognitive Radio Technology‖, Newnes, 2006.
2. Kwang-Cheng Chen, Ramjee Prasad, ― Cognitive Radio Networks‖, John Wiley and Sons,
2009.
3. Ezio Biglieri, Professor Andrea J. Goldsmith, Dr Larry J. Greenstein, Narayan B. Mandayam,
H. Vincent Poor, ―Principles of Cognitive Radio‖ , Cambridge University Press, 2012.
GE8072 FOUNDATION SKILLS IN INTEGRATED PRODUCT
DEVELOPMENT
L T P C
3 0 0 3
OBJECTIVES:
 To understand the global trends and development methodologies of various types of
products and services
 To conceptualize, prototype and develop product management plan for a new product
based on the type of the new product and development methodology integrating the
hardware, software, controls, electronics and mechanical systems
 To understand requirement engineering and know how to collect, analyze and arrive at
requirements for new product development and convert them in to design specification
 To understand system modeling for system, sub-system and their interfaces and arrive at
the optimum system specification and characteristics
 To develop documentation, test specifications and coordinate with various teams to
validate and sustain up to the EoL (End of Life) support activities for engineering customer
UNIT I FUNDAMENTALS OF PRODUCT DEVELOPMENT 9
Global Trends Analysis and Product decision - Social Trends - Technical Trends- Economical
Trends - Environmental Trends - Political/Policy Trends - Introduction to Product Development
Methodologies and Management - Overview of Products and Services - Types of Product
Development - Overview of Product Development methodologies - Product Life Cycle – Product
Development Planning and Management.
UNIT II REQUIREMENTS AND SYSTEM DESIGN 9
Requirement Engineering - Types of Requirements - Requirement Engineering - traceability
Matrix and Analysis - Requirement Management - System Design & Modeling - Introduction to
System Modeling - System Optimization - System Specification - Sub-System Design - Interface
Design.
UNIT III DESIGN AND TESTING 9
Conceptualization - Industrial Design and User Interface Design - Introduction to Concept
generation Techniques – Challenges in Integration of Engineering Disciplines - Concept
Screening & Evaluation - Detailed Design - Component Design and Verification – Mechanical,
Electronics and Software Subsystems - High Level Design/Low Level Design of S/W Program -
Types of Prototypes, S/W Testing- Hardware Schematic, Component design, Layout and
Hardware Testing – Prototyping - Introduction to Rapid Prototyping and Rapid Manufacturing -
System Integration, Testing, Certification and Documentation
108
UNIT IV SUSTENANCE ENGINEERING AND END-OF-LIFE (EOL) SUPPORT 9
Introduction to Product verification processes and stages - Introduction to Product Validation
processes and stages - Product Testing Standards and Certification - Product Documentation -
Sustenance -Maintenance and Repair – Enhancements - Product EoL - Obsolescence
Management – Configuration Management - EoL Disposal
UNIT V BUSINESS DYNAMICS – ENGINEERING SERVICES INDUSTRY 9
The Industry - Engineering Services Industry - Product Development in Industry versus
Academia –The IPD Essentials - Introduction to Vertical Specific Product Development
processes -Manufacturing/Purchase and Assembly of Systems - Integration of Mechanical,
Embedded and Software Systems – Product Development Trade-offs - Intellectual Property
Rights and Confidentiality – Security and Configuration Management.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Define, formulate and analyze a problem
 Solve specific problems independently or as part of a team
 Gain knowledge of the Innovation & Product Development process in the Business
Context
 Work independently as well as in teams
 Manage a project from start to finish
TEXTBOOKS:
1. Book specially prepared by NASSCOM as per the MoU.
2. Karl T Ulrich and Stephen D Eppinger, "Product Design and Development", Tata McGraw
Hill, Fifth Edition, 2011.
3. John W Newstorm and Keith Davis, "Organizational Behavior", Tata McGraw Hill,
Eleventh Edition, 2005.
REFERENCES:
1. Hiriyappa B, ―Corporate Strategy – Managing the Business‖, Author House, 2013.
2. Peter F Drucker, ―People and Performance‖, Butterworth – Heinemann [Elsevier], Oxford,
2004.
3. Vinod Kumar Garg and Venkita Krishnan N K, ―Enterprise Resource Planning –
Concepts‖, Second Edition, Prentice Hall, 2003.
4. Mark S Sanders and Ernest J McCormick, "Human Factors in Engineering and Design",
McGraw Hill Education, Seventh Edition, 2013
CS8082 MACHINE LEARNING TECHNIQUES L T P C
3 0 0 3
OBJECTIVES:
 To understand the need for machine learning for various problem solving
 To study the various supervised, semi-supervised and unsupervised learning algorithms in
machine learning
 To learn the new approaches in machine learning
 To design appropriate machine learning algorithms for problem solving
UNIT I INTRODUCTION 9
Learning Problems – Perspectives and Issues – Concept Learning – Version Spaces and
Candidate Eliminations – Inductive bias – Decision Tree learning – Representation – Algorithm –
Heuristic Space Search.
109
UNIT II NEURAL NETWORKS AND GENETIC ALGORITHMS 9
Neural Network Representation – Problems – Perceptrons – Multilayer Networks and Back
Propagation Algorithms – Advanced Topics – Genetic Algorithms – Hypothesis Space Search –
Genetic Programming – Models of Evaluation and Learning.
UNIT III BAYESIAN AND COMPUTATIONAL LEARNING 9
Bayes Theorem – Concept Learning – Maximum Likelihood – Minimum Description Length
Principle – Bayes Optimal Classifier – Gibbs Algorithm – Naïve Bayes Classifier – Bayesian
Belief Network – EM Algorithm – Probability Learning – Sample Complexity – Finite and Infinite
Hypothesis Spaces – Mistake Bound Model.
UNIT IV INSTANT BASED LEARNING 9
K- Nearest Neighbour Learning – Locally weighted Regression – Radial Bases
Functions – Case Based Learning.
UNIT V ADVANCED LEARNING 9
Learning Sets of Rules – Sequential Covering Algorithm – Learning Rule Set – First Order
Rules – Sets of First Order Rules – Induction on Inverted Deduction – Inverting Resolution –
Analytical Learning – Perfect Domain Theories – Explanation Base Learning – FOCL
Algorithm – Reinforcement Learning – Task – Q-Learning – Temporal Difference Learning
TOTAL : 45 PERIODS
OUTCOMES:
At the end of the course, the students will be able to
 Differentiate between supervised, unsupervised, semi-supervised machine learning
approaches
 Apply specific supervised or unsupervised machine learning algorithm for a particular
problem
 Analyse and suggest the appropriate machine learning approach for the various
types of problem
 Design and make modifications to existing machine learning algorithms to suit an
individual application
 Provide useful case studies on the advanced machine learning algorithms
TEXT BOOK:
1. Tom M. Mitchell, ―Machine Learning‖, McGraw-Hill Education (India) Private Limited, 2013.
REFERENCES:
1. Ethem Alpaydin, ―Introduction to Machine Learning (Adaptive Computation and
Machine Learning)‖, The MIT Press 2004.
2. Stephen Marsland, ―Machine Learning: An Algorithmic Perspective‖, CRC Press, 2009.
EC8005 ELECTRONIC PACKAGING AND TESTING L T P C
3 0 0 3
OBJECTIVE:
 To introduce and discuss various issues related to the system packaging
UNIT I OVERVIEW OF ELECTRONIC SYSTEMS PACKAGING 9
Functions of an Electronic Package, Packaging Hierarchy, IC packaging: MEMS packaging,
consumer electronics packaging, medical electronics packaging, Trends, Challenges, Driving
Forces on Packaging Technology, Materials for Microelectronic packaging, Packaging Material
Properties, Ceramics, Polymers, and Metals in Packaging, Material for high density interconnect
substrates
110
UNIT II ELECTRICAL ISSUES IN PACKAGING 9
Electrical Issues of Systems Packaging, Signal Distribution, Power Distribution, Electromagnetic
Interference, Transmission Lines, Clock Distribution, Noise Sources, Digital and RF Issues. Design
Process Electrical Design: Interconnect Capacitance, Resistance and Inductance fundamentals;
Packaging roadmaps - Hybrid circuits - Resistive, Capacitive and Inductive parasitics
UNIT III CHIP PACKAGES 9
IC Assembly - Purpose, Requirements, Technologies, Wire bonding, Tape Automated Bonding,
Flip Chip, Wafer Level Packaging, reliability, wafer level burn – in and test. Single chip packaging:
functions, types, materials processes, properties, characteristics, trends. Multi chip packaging:
types, design, comparison, trends. System – in - package (SIP); Passives: discrete, integrated,
and embedded
UNIT IV PCB, SURFACE MOUNT TECHNOLOGY AND THERMAL
CONSIDERATIONS
9
Printed Circuit Board: Anatomy, CAD tools for PCB design, Standard fabrication, Micro via Boards.
Board Assembly: Surface Mount Technology, Through Hole Technology, Process Control and
Design challenges. Thermal Management, Heat transfer fundamentals, Thermal conductivity and
resistance, Conduction, convection and radiation – Cooling requirements
UNIT V TESTING 9
Reliability, Basic concepts, Environmental interactions. Thermal mismatch and fatigue – failures –
thermo mechanically induced –electrically induced – chemically induced. Electrical Testing:
System level electrical testing, Interconnection tests, Active Circuit Testing, Design for Testability
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Give a comprehensive introduction to the various packaging types used along with the
associated thermal, speed, signal and integrity power issues
 Enable design of packages which can withstand higher temperature, vibrations and shock
 Design of PCBs which minimize the EMI and operate at higher frequency
 Analyze the concepts of Testing and testing methods
TEXT BOOK:
1. Tummala, Rao R., Fundamentals of Microsystems Packaging, McGraw Hill, 2001
REFERENCES:
1. Blackwell (Ed), The electronic packaging handbook, CRC Press, 2000.
2. Tummala, Rao R, Microelectronics packaging handbook, McGraw Hill, 2008.
3. Bosshart, Printed Circuit Boards Design and Technology, TataMcGraw Hill, 1988.
4. R.G. Kaduskar and V.B.Baru, Electronic Product design, Wiley India, 2011
5. R.S.Khandpur, Printed Circuit Board, Tata McGraw Hill, 2005
6. Recent literature in Electronic Packaging
7. Michael L. Bushnell &Vishwani D. Agrawal,‖ Essentials of Electronic Testing for Digital,
memory & Mixed signal VLSI Circuits‖, Kluwer Academic Publishers.2000.
8. M. Abramovici, M. A. Breuer, and A.D. Friedman, ―Digital System Testing and Testable
Design‖, Computer Science Press,1990
111
EC8006 MIXED SIGNAL IC DESIGN L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Study the mixed signal of submicron CMOS circuits
 Understand the various integrated based filters and topologies
 Learn the data converters architecture, modeling and signal to noise ratio
 Study the integrated circuit of oscillators and PLLs
UNIT I SUBMICRON CMOS CIRCUIT DESIGN 9
Submicron CMOS: Overview and Models, CMOS process flow, Capacitors and Resistors.
Digital circuit design: The MOSFET Switch, Delay Elements, An Adder. Analog Circuit
Design: Biasing, Op-Amp Design, Circuit Noise.
UNIT II INTEGRATOR BASED CMOS FILTERS 9
Integrator Building Blocks- low pass filter, Active RC integrators, MOSFET-C Integrators, gm-
C integrators, Discrete time integrators. Filtering Topologies: The Bilinear transfer function,
The Biquadratic transfer function, Filters using Noise shaping.
UNIT III DATA CONVERTER ARCHITECTURES 9
DAC Architectures- Resistor string, R-2R ladder Networks, Current Steering, Charge Scaling
DACs, Cyclic DAC, and Pipeline DAC. ADC Architectures- Flash, Two-step flash ADC,
Pipeline ADC, Integrating ADC‘s, Successive Approximation ADC.
UNIT IV DATA CONVERTER MODELING AND SNR 9
Sampling and Aliasing: A modeling approach, Impulse sampling, The sample and Hold,
Quantization noise. Data converter SNR: An overview, Clock Jitter, Improving SNR using
Averaging, Decimating filter for ADCs, Interpolating filter for DACs, Band pass and High pass
sinc filters - Using feedback to improve SNR.
UNIT V OSCILLATORS AND PLL 9
LC oscillators, Voltage Controlled Oscillators. Simple PLL, Charge pumps PLLs, Non ideal
effects in PLLs, Delay Locked Loops.
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of the course, student should be able to
 Apply the concepts for mixed signal MOS circuit.
 Analyze the characteristics of IC based CMOS filters.
 Design of various data converter architecture circuits.
 Analyze the signal to noise ratio and modeling of mixed signals.
 Design of oscillators and phase lock loop circuit.
REFERENCES:
1. CMOS Mixed Signal Circuit Design by R.Jacob Baker, Wiley India, IEEE Press, reprint
2008.
2. CMOS Circuit Design, Layout and Simulation by R.Jacob Baker, Wiley India, IEEE
Press, Second Edition, reprint 2009.
3. Design of Analog CMOS Integrated Circuits by Behzad Razavi, McGraw Hill, 33rd
Re-
print, 2016.
112
GE8071 DISASTER MANAGEMENT LT P C
3 0 0 3
OBJECTIVES:
 To provide students an exposure to disasters, their significance and types.
 To ensure that students begin to understand the relationship between vulnerability,
disasters, disaster prevention and risk reduction
 To gain a preliminary understanding of approaches of Disaster Risk Reduction (DRR)
 To enhance awareness of institutional processes in the country and
 To develop rudimentary ability to respond to their surroundings with potential
disaster response in areas where they live, with due sensitivity
UNIT I INTRODUCTION TO DISASTERS 9
Definition: Disaster, Hazard, Vulnerability, Resilience, Risks – Disasters: Types of disasters –
Earthquake, Landslide, Flood, Drought, Fire etc - Classification, Causes, Impacts including social,
economic, political, environmental, health, psychosocial, etc.- Differential impacts- in terms of
caste, class, gender, age, location, disability - Global trends in disasters: urban disasters,
pandemics, complex emergencies, Climate change- Dos and Don‘ts during various types of
Disasters.
UNIT II APPROACHES TO DISASTER RISK REDUCTION (DRR) 9
Disaster cycle - Phases, Culture of safety, prevention, mitigation and preparedness community
based DRR, Structural- nonstructural measures, Roles and responsibilities of- community,
Panchayati Raj Institutions/Urban Local Bodies (PRIs/ULBs), States, Centre, and other stake-
holders- Institutional Processes and Framework at State and Central Level- State Disaster
Management Authority(SDMA) – Early Warning System – Advisories from Appropriate Agencies.
UNIT III INTER-RELATIONSHIP BETWEEN DISASTERS AND DEVELOPMENT 9
Factors affecting Vulnerabilities, differential impacts, impact of Development projects such as
dams, embankments, changes in Land-use etc.- Climate Change Adaptation- IPCC Scenario and
Scenarios in the context of India - Relevance of indigenous knowledge, appropriate technology
and local resources.
UNIT IV DISASTER RISK MANAGEMENT IN INDIA 9
Hazard and Vulnerability profile of India, Components of Disaster Relief: Water, Food, Sanitation,
Shelter, Health, Waste Management, Institutional arrangements (Mitigation, Response and
Preparedness, Disaster Management Act and Policy - Other related policies, plans, programmes
and legislation – Role of GIS and Information Technology Components in Preparedness, Risk
Assessment, Response and Recovery Phases of Disaster – Disaster Damage Assessment.
UNIT V DISASTER MANAGEMENT: APPLICATIONS AND CASE STUDIES AND FIELD
WORKS 9
Landslide Hazard Zonation: Case Studies, Earthquake Vulnerability Assessment of Buildings and
Infrastructure: Case Studies, Drought Assessment: Case Studies, Coastal Flooding: Storm Surge
Assessment, Floods: Fluvial and Pluvial Flooding: Case Studies; Forest Fire: Case Studies, Man
Made disasters: Case Studies, Space Based Inputs for Disaster Mitigation and Management and
field works related to disaster management.
TOTAL: 45 PERIODS
OUTCOMES:
The students will be able to
 Differentiate the types of disasters, causes and their impact on environment and society
 Assess vulnerability and various methods of risk reduction measures as well as mitigation.
 Draw the hazard and vulnerability profile of India, Scenarios in the Indian context, Disaster
damage assessment and management.
113
114
TEXTBOOKS:
1. Singhal J.P. ―Disaster Management‖, Laxmi Publications, 2010. ISBN-10: 9380386427 ISBN-
13: 978-9380386423
2. Tushar Bhattacharya, ―Disaster Science and Management‖, McGraw Hill India Education Pvt.
Ltd., 2012. ISBN-10: 1259007367, ISBN-13: 978-1259007361]
3. Gupta Anil K, Sreeja S. Nair. Environmental Knowledge for Disaster Risk Management, NIDM,
New Delhi, 2011
4. Kapur Anu Vulnerable India: A Geographical Study of Disasters, IIAS and Sage Publishers,
New Delhi, 2010.
REFERENCES:
1. Govt. of India: Disaster Management Act , Government of India, New Delhi, 2005
2. Government of India, National Disaster Management Policy,2009.
EC8072 ELECTROMAGNETIC INTERFERENCE AND
COMPATIBILITY
L T P C
3 0 0 3
OBJECTIVES:
 To introduce the basic concepts of Electromagnetic Interference
 To teach the importance of Electromagnetic Compatible designs
 To explain the existing standards for Electromagnetic Compatibility
UNIT I EMI/EMC CONCEPTS 9
EMI-EMC definitions; Sources and Victims of EMI; Conducted and Radiated EMI Emission and
Susceptibility; Case Histories; Radiation Hazards to humans.
UNIT II EMI COUPLING PRINCIPLES 9
Conducted, radiated and transient coupling; Common ground impedance coupling; Common mode
and ground loop coupling; Differential mode coupling; Near field cable to cable coupling; Field to
cable coupling; Power mains and Power supply coupling; Transient EMI, ESD.
UNIT III EMI CONTROL 9
Shielding; EMI Filters; Grounding; Bonding; Isolation transformer; Transient suppressors; EMI
Suppression Cables.
UNIT IV EMC DESIGN FOR CIRCUITS AND PCBS 9
Noise from Relays and Switches; Nonlinearities in Circuits; Cross talk in transmission line and
cross talk control; Component selection and mounting; PCB trace impedance; Routing; Power
distribution decoupling; Zoning; Grounding; VIAs; Terminations.
UNIT V EMI MEASUREMENTS AND STANDARDS 9
Open area test site; TEM cell; EMI test shielded chamber and shielded ferrite lined anechoic
chamber; Line impedance stabilization networks; EMI Rx and spectrum analyzer; Civilian
standards - CISPR, FCC, IEC, EN; Military standards-MIL461E/462.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
115
 Identify the various types and mechanisms of Electromagnetic Interference
 Propose a suitable EMI mitigation technique
 Describe the various EMC Standards and methods to measure them
TEXT BOOKS:
1. V.P.Kodali, ―Engineering EMC Principles, Measurements and Technologies‖, IEEE Press,
Newyork, 1996.(Unit I – V)
2. Henry W.Ott., Noise Reduction Techniques in Electronic Systems‖, A Wiley Inter Science
Publications, John Wiley and Sons, Newyork, 1988. (Unit – IV)
REFERENCES:
1. C.R.Paul,‖Introduction to Electromagnetic Compatibility‖ , John Wiley and Sons, Inc, 1992.
2. Bemhard Keiser, ―Principles of Electromagnetic Compatibility‖, 3rd Ed, Artech house,
Norwood, 1986.
3. Don R. J.White Consultant Incorporate, ―Handbook of EMI/EMC‖, Vol I-V, 1988.
EC8007 LOW POWER SoC DESIGN L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Identify sources of power in an IC.
 Understand basic principle of System on Chip design
 Learn optimization of power in combinational and sequential logic machines for SoC
Design
 Identify suitable techniques to reduce the power dissipation and design circuits with low
power dissipation.
UNIT I POWER CONSUMPTION IN CMOS 9
Physics of power dissipation in CMOS FET devices – Hierarchy of limits of power – Sources of
power consumption – Static Power Dissipation, Active Power Dissipation - Designing for Low
Power, Circuit Techniques for Leakage Power Reduction - Basic principle of low power design,
Logic level power optimization – Circuit level low power design.
UNIT II SYSTEM-ON-CHIP DESIGN 9
System-on-Chip Concept, Design Principles in SoC Architecture, SoC Design Flow, Platform-
based and IP based SoC Designs, Basic Concepts of Bus-Based Communication Architectures.
High performance algorithms for ASICs/ SoCs as case studies – Canonic Signed Digit Arithmetic,
KCM, Distributed Arithmetic, High performance digital filters for sigma-delta ADC
UNIT III POWER OPTIMIZATION OF COMBINATIONAL AND SEQUENTIAL
LOGIC MACHINES FOR SOC
9
Introduction to Standard Cell-Based Layout – Simulation - Combinational Network Delay - Logic
and interconnect Design - Power Optimization - Switch Logic Networks. Introduction - Latches and
Flip-Flops - Sequential Systems and Clocking Disciplines - Sequential System Design - Power
Optimization - Design Validation - Sequential Testing.
UNIT IV DESIGN OF LOW POWER CIRCUITS FOR SUB SYSTEM ON A
SOC
9
Subsystem Design Principles - Combinational Shifters – Adders – ALUs – Multipliers – High
Density Memory – Field Programmable Gate Arrays - Programmable Logic Arrays - Computer
arithmetic techniques for low power system – low voltage low power static Random access and
116
dynamic Random access memories, low power clock, Inter connect and layout design
UNIT V FLOOR PLANNING 9
Floor-planning Methods – Block Placement & Channel Definition - Global Routing - switchbox
Routing - Power Distribution - Clock Distributions - Floor-planning Tips - Design Validation - Off-
Chip Connections – Packages, The I/O Architecture - PAD Design
TOTAL:45 PERIODS
OUTCOME:
At the end of the course, the student should be able to:
 Analyze and design low-power VLSI circuits using different circuit technologies for system on
chip design
TEXT BOOKS:
1. J.Rabaey, ―Low Power Design Essentials (Integrated Circuits and Systems)‖, Springer, 2009
2. Wayne Wolf, ―Modern VLSI Design – System – on – Chip Design‖, Prentice Hall, 3rd Edition,
2008.
REFERENCES:
1. J.B.Kuo & J.H.Lou, ―Low-voltage CMOS VLSI Circuits‖, Wiley, 1999.
2. A.Bellaowar & M.I.Elmasry,‖Low power Digital VLSI Design, Circuits and Systems‖, Kluwer,
1996.
3. Wayne Wolf, ―Modern VLSI Design – IP based Design‖, Prentice Hall, 4th Edition, 2008.
4. M.J.S. Smith : Application Specific Integrated Circuits, Pearson, 2003
5. Sudeep Pasricha and NikilDutt, On-Chip Communication Architectures System on Chip
Interconnect, Elsevier, 2008
6. Recent literature in Low Power VLSI Circuits.
7. Recent literature in Design of ASICs
EC8008 PHOTONIC NETWORKS L T P C
3 0 0 3
OBJECTIVES:
• To enable the student to understand the importance of the backbone infrastructure
for our present and future communication needs and familiarize them with the
architectures and the protocol stack in use
• To enable the student to understand the differences in the design of data plane and
the control plane and the routing, switching and the resource allocation methods
and the network management and protection methods in vogue
• To expose the student to the advances in networking and switching domains and
the future trends
UNIT I OPTICAL SYSTEM COMPONENTS 9
Light Propagation in optical fibers – Loss & bandwidth, System limitations, Nonlinear
effects; Solitons; Optical Network Components – Couplers, Isolators & Circulators,
Multiplexers & Filters, Optical Amplifiers, Switches, Wavelength Converters.
UNIT II OPTICAL NETWORK ARCHITECTURES 9
117
Introduction to Optical Networks; SONET / SDH, Metropolitan-Area Networks, Layered
Architecture; Broadcast and Select Networks – Topologies for Broadcast Networks, Media-
Access Control Protocols, Wavelength Routing Architecture.
UNIT III WAVELENGTH ROUTING NETWORKS 9
The optical layer, Optical Network Nodes, Routing and wavelength assignment, Traffic
Grooming in Optical Networks, Architectural variations- Linear Light wave networks,
Logically Routed Networks.
UNIT IV PACKET SWITCHING AND ACCESS NETWORKS 9
Photonic Packet Switching – OTDM, Multiplexing and Demultiplexing, Synchronization,
Broadcast OTDM networks, Switch-based networks, Contention Resolution Access
Networks – Network Architecture overview, Optical Access Network Architectures and
OTDM networks.
UNIT V NETWORK DESIGN AND MANAGEMENT 9
Transmission System Engineering – System model, Power penalty - transmitter, receiver,
Optical amplifiers, crosstalk, dispersion, Wavelength stabilization, Overall design
considerations, Control and Management – Network management functions, Configuration
management, Performance management, Fault management, Optical safety, Service
interface.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student would be able to:
 Use the backbone infrastructure for our present and future communication needs
 Analyze the architectures and the protocol stack
 Compare the differences in the design of data plane, control plane, routing,
switching, resource allocation methods, network management and protection
methods in vogue
REFERENCES:
1. Rajiv Ramaswami and Kumar N. Sivarajan, ―Optical Networks: A Practical Perspective‖,
Harcourt Asia Pte Ltd., Second Edition 2004.
2. C. Siva Ram Moorthy and Mohan Gurusamy, ―WDM Optical Networks: Concept, Design
and Algorithms‖, Prentice Hall of India, Ist Edition, 2002.
3. P.E. Green, Jr., ―Fiber Optic Networks‖, Prentice Hall, NJ, 1993.
4. Biswanath Mukherjee, ―Optical WDM Networks‖, Springer Series, 2006.
EC8009 COMPRESSIVE SENSING L T P C
3 0 0 3
OBJECTIVES:
 To present the basic theory and ideas showing when it is possible to reconstruct sparse or
nearly sparse signals from undersampled data
 To expose students to recent ideas in modern convex optimization allowing rapid signal
recovery
 To give students a sense of real time applications that might benefit from compressive
sensing ideas
UNIT I INTRODUCTION TO COMPRESSED SENSING 9
118
Introduction; Motivation; Mathematical Background; Traditional Sampling; Traditional
Compression; Conventional Data Acquisition System; Drawbacks of Transform coding;
Compressed Sensing (CS).
UNIT II SPARSITY AND SIGNAL RECOVERY 9
Signal Representation; Basis vectors; Sensing matrices; Restricted Isometric Property;
Coherence; Stable recovery; Number of measurements.
UNIT III RECOVERY ALGORITHMS 9
Basis Pursuit algorithm: L1 minimization; Matching pursuit: Orthogonal Matching Pursuit(OMP),
Stagewise OMP, Regularized OMP, Compressive Sampling Matching Pursuit (CoSaMP); Iterative
Thresholding algorithm: Hard thresholding, Soft thresholding; Model based : Model based
CoSaMP, Model based HIT.
UNIT IV COMPRESSIVE SENSING FOR WSN 9
Basics of WSN; Wireless Sensor without Compressive Sensing; Wireless Sensor with
Compressive Sensing; Compressive Wireless Sensing: Spatial compression in WSNs, Projections
in WSNs, Compressed Sensing in WSNs.
UNIT V APPLICATIONS OF COMPRESSIVE SENSING 9
Compressed Sensing for Real-Time Energy-Efficient Compression on Wireless Body Sensor
Nodes; Compressive sensing in video surveillance; An Application of Compressive Sensing for
Image Fusion; Single-Pixel Imaging via Compressive Sampling.
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Appreciate the motivation and the necessity for compressed sensing technology.
 Design a new algorithm or modify an existing algorithm for different application areas in
wireless sensor network.
TEXT BOOKS:
1. Radha S, Hemalatha R, Aasha Nandhini S, ―Compressive Sensing for Wireless
Communication: Challenges and Opportunities‖, River publication, 2016. (UNIT I-V)
2. Mark A. Davenport, Marco F. Duarte, Yonina C. Eldar and Gitta Kutyniok, ―Introduction to
Compressed Sensing,‖ in Compressed Sensing: Theory and Applications, Y. Eldar and G.
Kutyniok, eds., Cambridge University Press, 2011 (UNIT I)
REFERENCES:
1. Duarte, M.F.; Davenport, M.A.; Takhar, D.; Laska, J.N.; Ting Sun; Kelly, K.F.; Baraniuk,
R.G.; , "Single-Pixel Imaging via Compressive Sampling," Signal Processing Magazine,
IEEE, vol.25, no.2, pp.83-91, March 2008.
2. Tao Wan.; Zengchang Qin.; , ―An application of compressive sensing for image fusion‖, CIVR
'10 Proceedings of the ACM International Conference on Image and Video Retrieval, Pages
3-9.
3. H. Mamaghanian , N. Khaled , D. Atienza and P. Vandergheynst "Compressed sensing for
real-time energy-efficient ecg compression on wireless body sensor nodes", IEEE Trans.
Biomed. Eng., vol. 58, no. 9, pp.2456 -2466 2011.
4. Mohammadreza Balouchestani.; Kaamran Raahemifar.; and Sridhar Krishnan.;,
―COMPRESSED SENSING IN WIRELESS SENSOR NETWORKS: SURVEY‖ , Canadian
Journal on Multimedia and Wireless Networks Vol. 2, No. 1, February 2011.
119
EC8093 DIGITAL IMAGE PROCESSING L T P C
3 0 0 3
OBJECTIVES:
 To become familiar with digital image fundamentals
 To get exposed to simple image enhancement techniques in Spatial and Frequency domain.
 To learn concepts of degradation function and restoration techniques.
 To study the image segmentation and representation techniques.
 To become familiar with image compression and recognition methods
UNIT I DIGITAL IMAGE FUNDAMENTALS 9
Steps in Digital Image Processing – Components – Elements of Visual Perception – Image
Sensing and Acquisition – Image Sampling and Quantization – Relationships between pixels -
Color image fundamentals - RGB, HSI models, Two-dimensional mathematical preliminaries, 2D
transforms - DFT, DCT.
UNIT II IMAGE ENHANCEMENT 9
Spatial Domain: Gray level transformations – Histogram processing – Basics of Spatial Filtering–
Smoothing and Sharpening Spatial Filtering, Frequency Domain: Introduction to Fourier
Transform– Smoothing and Sharpening frequency domain filters – Ideal, Butterworth and
Gaussian filters, Homomorphic filtering, Color image enhancement.
UNIT III IMAGE RESTORATION 9
Image Restoration - degradation model, Properties, Noise models – Mean Filters – Order
Statistics – Adaptive filters – Band reject Filters – Band pass Filters – Notch Filters – Optimum
Notch Filtering – Inverse Filtering – Wiener filtering
UNIT IV IMAGE SEGMENTATION 9
Edge detection, Edge linking via Hough transform – Thresholding - Region based segmentation –
Region growing – Region splitting and merging – Morphological processing- erosion and dilation,
Segmentation by morphological watersheds – basic concepts – Dam construction – Watershed
segmentation algorithm.
UNIT V IMAGE COMPRESSION AND RECOGNITION 9
Need for data compression, Huffman, Run Length Encoding, Shift codes, Arithmetic coding, JPEG
standard, MPEG. Boundary representation, Boundary description, Fourier Descriptor, Regional
Descriptors – Topological feature, Texture - Patterns and Pattern classes - Recognition based on
matching.
TOTAL :45 PERIODS
120
OUTCOMES:
At the end of the course, the students should be able to:
 Know and understand the basics and fundamentals of digital image processing, such as
digitization, sampling, quantization, and 2D-transforms.
 Operate on images using the techniques of smoothing, sharpening and enhancement.
 Understand the restoration concepts and filtering techniques.
 Learn the basics of segmentation, features extraction, compression and recognition
methods for color models.
TEXT BOOKS:
1. Rafael C. Gonzalez, Richard E. Woods, ‗Digital Image Processing‘, Pearson, Third Edition,
2010.
2. Anil K. Jain, ‗Fundamentals of Digital Image Processing‘, Pearson, 2002.
REFERENCES
1. Kenneth R. Castleman, ‗Digital Image Processing‘, Pearson, 2006.
2. Rafael C. Gonzalez, Richard E. Woods, Steven Eddins, ‗Digital Image Processing using
MATLAB‘, Pearson Education, Inc., 2011.
3. D,E. Dudgeon and RM. Mersereau, ‗Multidimensional Digital Signal Processing‘, Prentice
Hall Professional Technical Reference, 1990.
4. William K. Pratt, ‗Digital Image Processing‘, John Wiley, New York, 2002
5. Milan Sonka et al ‗Image processing, analysis and machine vision‘, Brookes/Cole, Vikas
Publishing House, 2nd edition, 1999.
GE8076 PROFESSIONAL ETHICS IN ENGINEERING LT P C
3 0 0 3
OBJECTIVE:
 To enable the students to create an awareness on Engineering Ethics and Human Values,
to instill Moral and Social Values and Loyalty and to appreciate the rights of others.
UNIT I HUMAN VALUES 10
Morals, values and Ethics – Integrity – Work ethic – Service learning – Civic virtue – Respect for
others – Living peacefully – Caring – Sharing – Honesty – Courage – Valuing time – Cooperation –
Commitment – Empathy – Self confidence – Character – Spirituality – Introduction to Yoga and
meditation for professional excellence and stress management.
UNIT II ENGINEERING ETHICS 9
Senses of ‗Engineering Ethics‘ – Variety of moral issues – Types of inquiry – Moral dilemmas –
Moral Autonomy – Kohlberg‘s theory – Gilligan‘s theory – Consensus and Controversy – Models of
professional roles - Theories about right action – Self-interest – Customs and Religion – Uses of
Ethical Theories.
UNIT III ENGINEERING AS SOCIAL EXPERIMENTATION 9
Engineering as Experimentation – Engineers as responsible Experimenters – Codes of Ethics –
A Balanced Outlook on Law.
UNIT IV SAFETY, RESPONSIBILITIES AND RIGHTS 9
Safety and Risk – Assessment of Safety and Risk – Risk Benefit Analysis and Reducing Risk -
121
Respect for Authority – Collective Bargaining – Confidentiality – Conflicts of Interest –
Occupational Crime – Professional Rights – Employee Rights – Intellectual Property Rights (IPR)
– Discrimination.
UNIT V GLOBAL ISSUES 8
Multinational Corporations – Environmental Ethics – Computer Ethics – Weapons Development –
Engineers as Managers – Consulting Engineers – Engineers as Expert Witnesses and Advisors –
Moral Leadership –Code of Conduct – Corporate Social Responsibility.
TOTAL: 45 PERIODS
OUTCOMES:
 Upon completion of the course, the student should be able to apply ethics in society, discuss
the ethical issues related to engineering and realize the responsibilities and rights in the
society.
TEXT BOOKS:
1. Mike W. Martin and Roland Schinzinger, ―Ethics in Engineering‖, Tata McGraw Hill, New Delhi,
2003.
2. Govindarajan M, Natarajan S, Senthil Kumar V. S, ―Engineering Ethics‖, Prentice Hall of India,
New Delhi, 2004.
REFERENCES:
1. Charles B. Fleddermann, ―Engineering Ethics‖, Pearson Prentice Hall, New Jersey, 2004.
2. Charles E. Harris, Michael S. Pritchard and Michael J. Rabins, ―Engineering Ethics –
Concepts and Cases‖, Cengage Learning, 2009.
3. John R Boatright, ―Ethics and the Conduct of Business‖, Pearson Education, New Delhi, 2003
4. Edmund G Seebauer and Robert L Barry, ―Fundamentals of Ethics for Scientists and
Engineers‖, Oxford University Press, Oxford, 2001.
5. Laura P. Hartman and Joe Desjardins, ―Business Ethics: Decision Making for Personal
Integrity and Social Responsibility‖ Mc Graw Hill education, India Pvt. Ltd.,New Delhi, 2013.
6. World Community Service Centre, ‗ Value Education‘, Vethathiri publications, Erode, 2011.
Web sources:
1. www.onlineethics.org
2. www.nspe.org
3. www.globalethics.org
4. www.ethics.org
EC8010 VIDEO ANALYTICS L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the need for video Analytics
 To understand the basic configuration of video analytics
 To understand the functional blocks of a video analytic system
 To get exposed to the various applications of video analytics
UNIT I VIDEO ANALYTIC COMPONENTS 9
Need for Video Analytics-Overview of video Analytics- Foreground extraction- Feature extraction-
classifier - Preprocessing- edge detection- smoothening- Feature space-PCA-FLD-SIFT features
UNIT II FOREGROUND EXTRACTION 9
122
Background estimation- Averaging- Gaussian Mixture Model- Optical Flow based- Image
Segmentation- Region growing- Region splitting-Morphological operations- erosion-Dilation-
Tracking in a multiple camera environment
UNIT III CLASSIFIERS 9
Neural networks (back propagation) - Deep learning networks- Fuzzy Classifier- Bayesian
classifier-HMM based classifier
123
UNIT IV VIDEO ANALYTICS FOR SECURITY 9
Abandoned object detection- human behavioral analysis -human action recognition- perimeter security-
crowd analysis and prediction of crowd congestion
UNIT V VIDEO ANALYTICS FOR BUSINESS INTELLIGENCE &
TRAFFIC MONITIRING AND ASSISTANCE
9
Customer behavior analysis - people counting- Traffic rule violation detection- traffic congestion
identification for route planning- driver assistance- lane change warning
TOTAL :45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Design video analytic algorithms for security applications
 Design video analytic algorithms for business intelligence
 Design custom made video analytics system for the given target application
REFERENCES:
1. Graeme A. Jones (Editor), Nikos Paragios (Editor), Carlo S. Regazzoni (Editor) Video-Based
Surveillance Systems: Computer Vision and Distributed Processing , Kluwer academic
publisher, 2001
2. Nilanjan Dey (Editor), Amira Ashour (Editor) and Suvojit Acharjee (Editor), Applied Video
Processing in Surveillance and Monitoring Systems (IGI global) 2016
3. Zhihao Chen (Author), Ye Yang (Author), Jingyu Xue (Author), Liping Ye (Author), Feng
Guo (Author), The Next Generation of Video Surveillance and Video Analytics: The Unified
Intelligent Video Analytics Suite, CreateSpace Independent Publishing Platform, 2014
4. Caifeng Shan (Editor), Fatih Porikli (Editor), Tao Xiang (Editor), Shaogang Gong (Editor)
Video Analytics for Business Intelligence, Springer, 2012
EC8011 DSP PROCESSOR ARCHITECTURE AND
PROGRAMMING
L T P C
3 0 0 3
OBJECTIVES:
The objective of this course is to provide knowledge on:
 Basics on Digital Signal Processors
 Programmable DSP‘s Architecture, On-chip Peripherals and Instruction set
 Programming for signal processing applications
 Advanced Programmable DSP Processors
UNIT I FUNDAMENTALS OF PROGRAMMABLE DSPs 9
Introduction to Programmable DSPs, Architectural Features of PDSPs - Multiplier and Multiplier
accumulator – Modified Bus Structures and Memory access – Multiple access memory – Multi-port
memory – VLIW architecture- Pipelining – Special Addressing modes in P-DSPs – On chip
Peripherals, Applications of Programmable DSPs.
UNIT II TMS320C5X PROCESSOR 9
124
Architecture of C5X Processor – Addressing modes – Assembly language Instructions - Pipeline
structure, On-chip Peripherals – Block Diagram of DSP starter kit (DSK) – Software Tools, DSK
on-board peripherals, Application Programs for processing real time signals.
UNIT III TMS320C6X PROCESSOR 9
Architecture of the C6x Processor - Instruction Set – Addressing modes, Assembler directives, On-
chip peripherals, DSP Development System: DSP Starter Kit - Code Composer Studio - Support
Files – Introduction to AIC23 codec and other on-board peripherals, Real-Time Programming
Examples for Signals and Noise generation, Frequency analysis, Filter design.
UNIT IV ADSP PROCESSORS 9
Architecture of ADSP-21XX and ADSP-210XX series of DSP processors- Addressing modes and
assembly language instructions – Application programs –Filter design, FFT calculation.
UNIT V ADVANCED PROCESSORS 9
Study of TI‘s advanced processors - TMS320C674x and TMS320C55x DSPs, ADSP‘s Blackfin
and SigmaDSP Processors, NXP‘s DSP56Fxx Family of DSP Processors, Comparison of the
features of TI, ADSP and NXP DSP family processors.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Analyze the concepts of Digital Signal Processors
 Demonstrate their ability to program the DSP processor for signal processing applications
 Discuss, compare and select the suitable Advanced DSP Processors for real-time signal
processing applications
REFERENCES:
1. B. Venkataramani and M. Bhaskar, ―Digital Signal Processors – Architecture, Programming
and Applications‖ – Tata McGraw – Hill Publishing Company Limited. New Delhi, 2003.
2. Avtar Singh and S. Srinivasan, Digital Signal Processing – Implementations using DSP
Microprocessors with Examples from TMS320C54xx, Cengage Learning India Private
Limited, Delhi 2012.
3. Rulph Chassaing and Donald Reay, Digital Signal Processing and Applications with the
C6713 and C6416 DSK, John Wiley & Sons, Inc., Publication, 2012 (Reprint).
4. User guides Texas Instruments, Analog Devices and NXP.
EC8094 SATELLITE COMMUNICATION L T P C
3 0 0 3
OBJECTIVES:
The student should be made to:
 Understand the basics of satellite orbits
 Understand the satellite segment and earth segment
 Analyze the various methods of satellite access
 Understand the applications of satellites
 Understand the basics of satellite Networks
125
UNIT I SATELLITE ORBITS 9
Kepler‟s Laws, Newton‟s law, orbital parameters, orbital perturbations, station keeping, geo
stationary and non Geo-stationary orbits – Look Angle Determination- Limits of visibility –
eclipse-Sub satellite point –Sun transit outage-Launching Procedures - launch vehicles and
propulsion.
UNIT II SPACE SEGMENT 9
Spacecraft Technology- Structure, Primary power, Attitude and Orbit control, Thermal control
and Propulsion, communication Payload and supporting subsystems, Telemetry, Tracking and
command-Transponders-The Antenna Subsystem.
UNIT III SATELLITE LINK DESIGN 9
Basic link analysis, Interference analysis, Rain induced attenuation and interference,
Ionospheric characteristics, Link Design with and without frequency reuse.
UNIT IV SATELLITE ACCESS AND CODING METHODS 9
Modulation and Multiplexing: Voice, Data, Video, Analog – digital transmission system, Digital
video Broadcast, multiple access: FDMA, TDMA, CDMA, DAMA Assignment Methods,
compression – encryption, Coding Schemes.
UNIT V SATELLITE APPLICATIONS 9
INTELSAT Series, INSAT, VSAT, Mobile satellite services: GSM, GPS, INMARSAT, LEO,
MEO, Satellite Navigational System. GPS Position Location Principles, Differential GPS,
Direct Broadcast satellites (DBS/DTH).
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student would be able to:
 Analyze the satellite orbits
 Analyze the earth segment and space segment
 Analyze the satellite Link design
 Design various satellite applications
TEXT BOOKS:
1. Dennis Roddy, ―Satellite Communication‖, 4th Edition, Mc Graw Hill International, 2006.
2. Timothy,Pratt,Charles,W.Bostain,JeremyE.Allnutt,"SatelliteCommunication‖,2nd
Edition,
Wiley Publications,2002
REFERENCES:
1. Wilbur L.Pritchard, Hendri G. Suyderhoud, Robert A. Nelson, ―Satellite Communication
Systems Engineering‖, Prentice Hall/Pearson, 2007.
2. N.Agarwal, ―Design of Geosynchronous Space Craft‖, Prentice Hall, 1986.
3. Bruce R. Elbert, ―The Satellite Communication Applications‖, Hand Book, Artech House
Bostan London, 1997.
4. Tri T. Ha, ―Digital Satellite Communication‖, II nd edition, 1990.
5. Emanuel Fthenakis, ―Manual of Satellite Communications‖, Mc Graw Hill Book Co.,
1984.
6. Robert G. Winch, ―Telecommunication Trans Mission Systems‖, Mc Graw-Hill Book Co.,
1983.
126
7. Brian Ackroyd, ―World Satellite Communication and earth station Design‖, BSP
professional Books, 1990.
8. G.B.Bleazard, ―Introducing Satellite communications―, NCC Publication, 1985.
9. M.Richharia, ―Satellite Communication Systems-Design Principles‖, Macmillan 2003.
CS8086 SOFT COMPUTING L T P C
3 0 0 3
OBJECTIVES:
 To learn the basic concepts of Soft Computing
 To become familiar with various techniques like neural networks, genetic algorithms
and fuzzy systems.
 To apply soft computing techniques to solve problems.
UNIT I INTRODUCTION TO SOFT COMPUTING 9
Introduction-Artificial Intelligence-Artificial Neural Networks-Fuzzy Systems-Genetic
Algorithm and Evolutionary Programming-Swarm Intelligent Systems-Classification of
ANNs-McCulloch and Pitts Neuron Model-Learning Rules: Hebbian and Delta- Perceptron
Network-Adaline Network-Madaline Network.
UNIT II ARTIFICIAL NEURAL NETWORKS 9
Back propagation Neural Networks - Kohonen Neural Network -Learning Vector
Quantization -Hamming Neural Network - Hopfield Neural Network- Bi-directional
Associative Memory -Adaptive Resonance Theory Neural Networks- Support Vector
Machines - Spike Neuron Models.
UNIT III FUZZY SYSTEMS 9
Introduction to Fuzzy Logic, Classical Sets and Fuzzy Sets - Classical Relations and Fuzzy
Relations -Membership Functions -Defuzzification - Fuzzy Arithmetic and Fuzzy Measures -
Fuzzy Rule Base and Approximate Reasoning - Introduction to Fuzzy Decision Making.
UNIT IV GENETIC ALGORITHMS 9
Basic Concepts- Working Principles -Encoding- Fitness Function - Reproduction -
Inheritance Operators - Cross Over - Inversion and Deletion -Mutation Operator - Bit-wise
Operators -Convergence of Genetic Algorithm.
UNIT V HYBRID SYSTEMS 9
Hybrid Systems -Neural Networks, Fuzzy Logic and Genetic -GA Based Weight
Determination - LR-Type Fuzzy Numbers - Fuzzy Neuron - Fuzzy BP Architecture -
Learning in Fuzzy BP- Inference by Fuzzy BP - Fuzzy ArtMap: A Brief Introduction - Soft
Computing Tools - GA in Fuzzy Logic Controller Design - Fuzzy Logic Controller
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of this course, the students should be able to
 Apply suitable soft computing techniques for various applications.
 Integrate various soft computing techniques for complex problems.
TEXT BOOKS:
1. N.P.Padhy, S.P.Simon, "Soft Computing with MATLAB Programming", Oxford
127
University Press, 2015.
2. S.N.Sivanandam , S.N.Deepa, "Principles of Soft Computing", Wiley India Pvt.Ltd.,
2nd Edition, 2011.
3. S.Rajasekaran, G.A.Vijayalakshmi Pai, "Neural Networks, Fuzzy Logic and Genetic
Algorithm, Synthesis and Applications ", PHI Learning Pvt.Ltd., 2017.
REFERENCES:
1. Jyh-Shing Roger Jang, Chuen-Tsai Sun, Eiji Mizutani, ―Neuro-Fuzzy and Soft
Computing‖, Prentice-Hall of India, 2002.
2. Kwang H.Lee, ―First course on Fuzzy Theory and Applications‖, Springer, 2005.
3. George J. Klir and Bo Yuan, ―Fuzzy Sets and Fuzzy Logic-Theory and Applications‖,
Prentice Hall, 1996.
4. James A. Freeman and David M. Skapura, ―Neural Networks Algorithms,
Applications, and Programming Techniques‖, Addison Wesley, 2003.
IT8006 PRINCIPLES OF SPEECH PROCESSING L T P C
3 0 0 3
OBJECTIVES:
The student should be made:
 To understand the speech production mechanism and the various speech analysis
techniques and speech models
 To understand the speech compression techniques
 To understand the speech recognition techniques
 To know the speaker recognition and text to speech synthesis techniques
UNIT I SPEECH SIGNAL CHARACTERISTICS & ANALYSIS 11
Speech production process - speech sounds and features- - Phonetic Representation of Speech --
representing= speech in time and frequency domains - Short-Time Analysis of Speech - Short-
Time Energy and Zero-Crossing Rate - Short-Time Autocorrelation Function - Short-Time Fourier
Transform (STFT) - Speech Spectrum - Cepstrum - Mel-Frequency Cepstrum Coefficients -
Hearing and Auditory Perception - Perception of Loudness - Critical Bands - Pitch Perception
UNIT II SPEECH COMPRESSION 12
Sampling and Quantization of Speech (PCM) - Adaptive differential PCM - Delta Modulation -
Vector Quantization- Linear predictive coding (LPC) - Code excited Linear predictive Coding
(CELP)
UNIT III SPEECH RECOGNITION 12
LPC for speech recognition- Hidden Markov Model (HMM)- training procedure for HMM- subword
unit model based on HMM- language models for large vocabulary speech recognition - Overall
recognition system based on subword units - Context dependent subword units- Semantic post
processor for speech recognition
UNIT IV SPEAKER RECOGNITION 5
Acoustic parameters for speaker verification- Feature space for speaker recognition-similarity
measures- Text dependent speaker verification-Text independent speaker verification techniques
UNIT V SPEAKER RECOGNITION AND TEXT TO SPEECH SYNTHESIS 5
Text to speech synthesis(TTS)-Concatenative and waveform synthesis methods, sub-word units
for TTS, intelligibility and naturalness-role of prosody
128
TOTAL:45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Design speech compression techniques
 Configure speech recognition techniques
 Design speaker recognition systems
 Design text to speech synthesis systems
TEXT BOOKS:
1. L. R. Rabiner and R. W. Schafer, Introduction to Digital Signal Processing, Foundations and
Trendsin Signal Processing Vol. 1, Nos. 1–2 (2007) 1–194
2. Ben Gold and Nelson Morgan ―Speech and Audio signal processing- processing and
perception of speech and music‖, John Wiley and sons 2006
REFERENCES
1. Lawrence Rabiner, Biiing and– Hwang Juang and B.Yegnanarayana ―Fundamentals of Speech
Recognition‖, Pearson Education, 2009
2. Claudio Becchetti and Lucio Prina Ricotti, ―Speech Recognition‖, John Wiley and Sons, 1999
3. Donglos O shanhnessy ―Speech Communication: Human and Machine ―, 2nd Ed. University
press 2001.
GE8073 FUNDAMENTALS OF NANOSCIENCE L T P C
3 0 0 3
OBJECTIVE:
To learn about basis of nanomaterial science, preparation method, types and application
UNIT I INTRODUCTION 8
Nanoscale Science and Technology- Implications for Physics, Chemistry, Biology and
Engineering-Classifications of nanostructured materials- nano particles- quantum dots, nanowires-
ultra-thin films-multilayered materials. Length Scales involved and effect on properties:
Mechanical, Electronic, Optical, Magnetic and Thermal properties. Introduction to properties
and motivation for study (qualitative only).
UNIT II GENERAL METHODS OF PREPARATION 9
Bottom-up Synthesis-Top-down Approach: Co-Precipitation, Ultrasonication, Mechanical Milling,
Colloidal routes, Self-assembly, Vapour phase deposition, MOCVD, Sputtering, Evaporation,
Molecular Beam Epitaxy, Atomic Layer Epitaxy, MOMBE.
UNIT III NANOMATERIALS 12
Nanoforms of Carbon - Buckminster fullerene- graphene and carbon nanotube, Single wall carbon
Nanotubes (SWCNT) and Multi wall carbon nanotubes (MWCNT)- methods of synthesis(arc-
growth, laser ablation, CVD routes, Plasma CVD), structure-property Relationships applications-
Nanometal oxides-ZnO, TiO2,MgO, ZrO2, NiO, Nano alumina, CaO, AgTiO2, Ferrites, Nano
clays-functionalization and applications-Quantum wires, Quantum dots-preparation, properties and
applications.
UNIT IV CHARACTERIZATION TECHNIQUES 9
X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques,
Transmission Electron Microscopy including high-resolution imaging, Surface Analysis techniques-
AFM, SPM, STM, SNOM, ESCA, SIMS-Nanoindentation.
129
UNIT V APPLICATIONS 7
Nano InfoTech: Information storage- Nano computer, molecular switch, super chip, nanocrystal,
Nano biotechnology: nanoprobes in medical diagnostics and biotechnology, Nano medicines,
Targeted drug delivery, Bioimaging - Micro Electro Mechanical Systems (MEMS), Nano Electro
Mechanical Systems (NEMS)- Nano sensors, nano crystalline silver for bacterial inhibition,
Nanoparticles for sun barrier products - In Photostat, printing, solar cell, battery.
TOTAL : 45 PERIODS
130
OUTCOMES:
 Will familiarize about the science of nanomaterials
 Will demonstrate the preparation of nanomaterials
 Will develop knowledge in characteristic nanomaterial
TEXT BOOKS:
1. A.S. Edelstein and R.C. Cammearata, eds., ―Nanomaterials: Synthesis, Properties
and Applications‖, Institute of Physics Publishing, Bristol and Philadelphia, 1996.
2. N John Dinardo, ―Nanoscale Characterization of surfaces & Interfaces‖, 2nd edition,
Weinheim Cambridge, Wiley-VCH, 2000.
REFERENCES:
1. G Timp, ―Nanotechnology‖, AIP press/Springer, 1999.
2. Akhlesh Lakhtakia,―The Hand Book of Nano Technology, Nanometer Structure,
Theory, Modeling and Simulations‖. Prentice-Hall of India (P) Ltd, New Delhi, 2007.

2017 reg ece syllabus

  • 1.
    1 ANNA UNIVERSITY, CHENNAI AFFILIATEDINSTITUTIONS B.E. ELECTRONICS AND COMMUNICATION ENGINEERING REGULATIONS – 2017 PROGRAMME EDUCATIONAL OBJECTIVES: PEO1: To enable graduates to pursue research, or have a successful career in academia or industries associated with Electronics and Communication Engineering, or as entrepreneurs. PEO2: To provide students with strong foundational concepts and also advanced techniques and tools in order to enable them to build solutions or systems of varying complexity. PEO3: To prepare students to critically analyze existing literature in an area of specialization and ethically develop innovative and research oriented methodologies to solve the problems identified. PROGRAMME OUTCOMES: Engineering Graduates will be able to: 1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering fundamentals, and an engineering specialization to the solution of complex engineering problems. 2. Problem analysis: Identify, formulate, review research literature, and analyze complex engineering problems reaching substantiated conclusions using first principles of mathematics, natural sciences, and engineering sciences. 3. Design/development of solutions: Design solutions for complex engineering problems and design system components or processes that meet the specified needs with appropriate consideration for the public health and safety, and the cultural, societal, and environmental considerations. 4. Conduct investigations of complex problems: Use research-based knowledge and research methods including design of experiments, analysis and interpretation of data, and synthesis of the information to provide valid conclusions. 5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and modern engineering and IT tools including prediction and modeling to complex engineering activities with an understanding of the limitations. 6. The engineer and society: Apply reasoning informed by the contextual knowledge to assess societal, health, safety, legal and cultural issues and the consequent responsibilities relevant to the professional engineering practice. 7. Environment and sustainability: Understand the impact of the professional engineering solutions in societal and environmental contexts, and demonstrate the knowledge of, and need for sustainable development.
  • 2.
    2 8. Ethics: Applyethical principles and commit to professional ethics and responsibilities and norms of the engineering practice. 9. Individual and team work: Function effectively as an individual, and as a member or leader in diverse teams, and in multidisciplinary settings. 10. Communication: Communicate effectively on complex engineering activities with the engineering community and with society at large, such as, being able to comprehend and write effective reports and design documentation, make effective presentations, and give and receive clear instructions. 11. Project management and finance: Demonstrate knowledge and understanding of the engineering and management principles and apply these to one‘s own work, as a member and leader in a team, to manage projects and in multidisciplinary environments. 12. Life-long learning: Recognize the need for, and have the preparation and ability to engage in independent and life-long learning in the broadest context of technological change. PROGRAM SPECIFIC OBJECTIVES (PSOs) 1. To analyze, design and develop solutions by applying foundational concepts of electronics and communication engineering. 2. To apply design principles and best practices for developing quality products for scientific and business applications. 3. To adapt to emerging information and communication technologies (ICT) to innovate ideas and solutions to existing/novel problems. Contribution 1: Reasonable 2: Significant 3: Strong
  • 3.
    3 MAPPING OF PROGRAMMEEDUCATIONAL OBJECTIVES WITH PROGRAMME OUTCOMES A broad relation between the programme objective and the outcomes is given in the following table MAPPING OF PROGRAM SPECIFIC OBJECTIVES WITH PROGRAMME OUTCOMES A broad relation between the Program Specific Objectives and the outcomes is given in the following table PROGRAMME EDUCATIONAL OBJECTIVES PROGRAMME OUTCOMES A B C D E F G H I J K L 1 3 3 2 3 2 1 1 2 1 1 3 1 2 3 3 3 3 3 1 1 1 1 1 1 2 3 3 3 3 3 3 2 2 3 1 2 2 2 PROGRAM SPECIFIC OBJECTIVES PROGRAMME OUTCOMES A B C D E F G H I J K L 1 3 3 2 3 2 1 1 1 1 1 1 2 2 3 3 3 3 3 2 2 3 1 3 3 3 3 3 3 3 3 3 3 3 2 1 1 1 3
  • 4.
    4 ANNA UNIVERSITY, CHENNAI AFFILIATEDINSTITUTIONS B.E. ELECTRONICS AND COMMUNICATION ENGINEERING REGULATIONS – 2017 CHOICE BASED CREDIT SYSTEM MAPPING OF COURSE OUTCOMES WITH PROGRAMME OUTCOMES: A broad relation between the Course Outcomes and Programme Outcomes is given in the following table COURSE OUTCOMES PROGRAMME OUTCOMES Sem Course Name a b c d e f g h i j k l I Communicative English       Engineering Mathematics – I       Engineering Physics       Engineering Chemistry       Problem Solving and Python Programming        Engineering Graphics     Problem Solving and Python Programming Laboratory        Physics and Chemistry Laboratory       II Technical English         Engineering Mathematics – II       Physics for Electronics Engineering       Basic Electrical and Instrumentation Engineering         Circuit Analysis         Electronic Devices         Circuits and Devices Laboratory        Engineering Practices Laboratory        III Linear Algebra and Partial Differential Equations        Fundamentals of Data Structures In C         Electronic Circuits- I         Signals and Systems         Digital Electronics         Control System Engineering         Fundamentals of Data Structures in C Laboratory         Analog and Digital Circuits Laboratory         Interpersonal Skills/Listening &Speaking       IV Probability and Random Processes        Electronic Circuits II         Communication Theory         Electromagnetic Fields         Linear Integrated Circuits         Environmental Science and Engineering         Circuits Design and Simulation Laboratory        
  • 5.
    5 COURSE OUTCOMES PROGRAMMEOUTCOMES Sem Course Name a b c d e f g h i j k l Linear Integrated Circuits Laboratory         V Digital Communication         Discrete-Time Signal Processing         Computer Architecture and Organization        Communication Networks         Professional Elective I Open Elective I Digital Signal Processing Laboratory         Communication Systems Laboratory         Networks Laboratory         VI Microprocessors and Microcontrollers         VLSI Design         Wireless Communication         Principles of Management       Transmission Lines and RF Systems         Professional Elective -II Microprocessors and Microcontrollers Laboratory         VLSI Design Laboratory         Technical Seminar          VII Antennas and Microwave Engineering         Optical Communication        Embedded and Real Time Systems         Ad hoc and Wireless Sensor Networks         Professional Elective -III Open Elective - II Embedded Laboratory         Advanced Communication Laboratory         VIII Professional Elective - IV Professional Elective - V Project Work           
  • 6.
    6 ANNA UNIVERSITY, CHENNAI AFFILIATEDINSTITUTIONS B.E. ELECTRONICS AND COMMUNICATION ENGINEERING REGULATIONS – 2017 CHOICE BASED CREDIT SYSTEM I - VIII SEMESTERS CURRICULA AND SYLLABI SEMESTER I SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. HS8151 Communicative English HS 4 4 0 0 4 2. MA8151 Engineering Mathematics - I BS 4 4 0 0 4 3. PH8151 Engineering Physics BS 3 3 0 0 3 4. CY8151 Engineering Chemistry BS 3 3 0 0 3 5. GE8151 Problem Solving and Python Programming ES 3 3 0 0 3 6. GE8152 Engineering Graphics ES 6 2 0 4 4 PRACTICALS 7. GE8161 Problem Solving and Python Programming Laboratory ES 4 0 0 4 2 8. BS8161 Physics and Chemistry Laboratory BS 4 0 0 4 2 TOTAL 31 19 0 12 25 SEMESTER II SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. HS8251 Technical English HS 4 4 0 0 4 2. MA8251 Engineering Mathematics - II BS 4 4 0 0 4 3. PH8253 Physics for Electronics Engineering BS 3 3 0 0 3 4. BE8254 Basic Electrical and Instrumentation Engineering ES 3 3 0 0 3 5. EC8251 Circuit Analysis PC 4 4 0 0 4 6. EC8252 Electronic Devices PC 3 3 0 0 3 PRACTICALS 7. EC8261 Circuits and Devices Laboratory PC 4 0 0 4 2 8. GE8261 Engineering Practices Laboratory ES 4 0 0 4 2 TOTAL 29 21 0 8 25
  • 7.
    7 SEMESTER III SI. No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. MA8352 Linear Algebra and Partial Differential Equations BS 4 4 0 0 4 2. EC8393 Fundamentals of Data Structures In C ES 3 3 0 0 3 3. EC8351 Electronic Circuits- I PC 3 3 0 0 3 4. EC8352 Signals and Systems PC 4 4 0 0 4 5. EC8392 Digital Electronics PC 3 3 0 0 3 6. EC8391 Control Systems Engineering PC 3 3 0 0 3 PRACTICALS 7. EC8381 Fundamentals of Data Structures in C Laboratory ES 4 0 0 4 2 8. EC8361 Analog and Digital Circuits Laboratory PC 4 0 0 4 2 9. HS8381 Interpersonal Skills/Listening &Speaking EEC 2 0 0 2 1 TOTAL 30 20 0 10 25 SEMESTER IV Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. MA8451 Probability and Random Processes BS 4 4 0 0 4 2. EC8452 Electronic Circuits II PC 3 3 0 0 3 3. EC8491 Communication Theory PC 3 3 0 0 3 4. EC8451 Electromagnetic Fields PC 4 4 0 0 4 5. EC8453 Linear Integrated Circuits PC 3 3 0 0 3 6. GE8291 Environmental Science and Engineering HS 3 3 0 0 3 PRACTICALS 7. EC8461 Circuits Design and Simulation Laboratory PC 4 0 0 4 2 8. EC8462 Linear Integrated Circuits Laboratory PC 4 0 0 4 2 TOTAL 28 20 0 8 24
  • 8.
    8 SEMESTER V Sl. No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. EC8501 Digital Communication PC 3 3 0 0 3 2. EC8553 Discrete-Time Signal Processing PC 4 4 0 0 4 3. EC8552 Computer Architecture and Organization PC 3 3 0 0 3 4. EC8551 Communication Networks PC 3 3 0 0 3 5. Professional Elective I PE 3 3 0 0 3 6. Open Elective I OE 3 3 0 0 3 PRACTICALS 7. EC8562 Digital Signal Processing Laboratory PC 4 0 0 4 2 8. EC8561 Communication Systems Laboratory PC 4 0 0 4 2 9. EC8563 Communication Networks Laboratory PC 4 0 0 4 2 TOTAL 31 19 0 12 25 SEMESTER VI Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. EC8691 Microprocessors and Microcontrollers PC 3 3 0 0 3 2. EC8095 VLSI Design PC 3 3 0 0 3 3. EC8652 Wireless Communication PC 3 3 0 0 3 4. MG8591 Principles of Management HS 3 3 0 0 3 5. EC8651 Transmission Lines and RF Systems PC 3 3 0 0 3 6. Professional Elective -II PE 3 3 0 0 3 PRACTICALS 7. EC8681 Microprocessors and Microcontrollers Laboratory PC 4 0 0 4 2 8. EC8661 VLSI Design Laboratory PC 4 0 0 4 2 9. EC8611 Technical Seminar EEC 2 0 0 2 1 TOTAL 28 18 0 10 23
  • 9.
    9 SEMESTER VII SI.No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. EC8701 Antennas and Microwave Engineering PC 3 3 0 0 3 2. EC8751 Optical Communication PC 3 3 0 0 3 3. EC8791 Embedded and Real Time Systems PC 3 3 0 0 3 4. EC8702 Ad hoc and Wireless Sensor Networks PC 3 3 0 0 3 5. Professional Elective -III PE 3 3 0 0 3 6. Open Elective - II OE 3 3 0 0 3 PRACTICALS 7. EC8711 Embedded Laboratory PC 4 0 0 4 2 8. EC8761 Advanced Communication Laboratory PC 4 0 0 4 2 TOTAL 26 18 0 8 22 SEMESTER VIII Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. Professional Elective IV PE 3 3 0 0 3 2. Professional Elective V PE 3 3 0 0 3 PRACTICALS 3. EC8811 Project Work EEC 20 0 0 20 10 TOTAL 26 6 0 20 16 TOTAL NO. OF CREDITS: 185
  • 10.
    10 HUMANITIES AND SOCIALSCIENCES(HS) Sl.NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. HS8151 Communicative English HS 4 4 0 0 4 2. HS8251 Technical English HS 4 4 0 0 4 3. GE8291 Environmental Science and Engineering HS 3 3 0 0 3 4. MG8591 Principles of Management HS 3 3 0 0 3 BASIC SCIENCES (BS) Sl.NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. MA8151 Engineering Mathematics I BS 4 4 0 0 4 2. PH8151 Engineering Physics BS 3 3 0 0 3 3. CY8151 Engineering Chemistry BS 3 3 0 0 3 4. BS8161 Physics and Chemistry Laboratory BS 4 0 0 4 2 5. MA8251 Engineering Mathematics II BS 4 4 0 0 4 6. PH8253 Physics for Electronics Engineering BS 3 3 0 0 3 7. MA8352 Linear Algebra and Partial Differential Equations BS 4 4 0 0 4 8. MA8451 Probability and Random Processes BS 4 4 0 0 4 ENGINEERING SCIENCES (ES) Sl. NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. GE8151 Problem Solving and Python Programming ES 3 3 0 0 3 2. GE8152 Engineering Graphics ES 6 2 0 4 4 3. GE8161 Problem Solving and Python Programming Laboratory ES 4 0 0 4 2 4. BE8254 Basic Electrical and Instrumentation Engineering ES 3 3 0 0 3 5. GE8261 Engineering Practices Laboratory ES 4 0 0 4 2 6. EC8393 Fundamentals of Data Structures In C ES 3 3 0 0 3 7. EC8381 Fundamentals of Data Structures in C Laboratory ES 4 0 0 4 2
  • 11.
    11 PROFESSIONAL CORE (PC) Sl.NOCOURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. EC8251 Circuit Analysis PC 4 4 0 0 4 2. EC8252 Electronic Devices PC 3 3 0 0 3 3. EC8261 Circuits and Devices Lab PC 4 0 0 4 2 4. EC8351 Electronic Circuits- I PC 3 3 0 0 3 5. EC8352 Signals and Systems PC 4 4 0 0 4 6. EC8392 Digital Electronics PC 3 3 0 0 3 7. EC8391 Control System Engineering PC 3 3 0 0 3 8. EC8361 Analog and Digital Circuits Laboratory PC 4 0 0 4 2 9. EC8452 Electronic Circuits II PC 3 3 0 0 3 10. EC8491 Communication Theory PC 3 3 0 0 3 11. EC8451 Electromagnetic Fields PC 4 4 0 0 4 12. EC8453 Linear Integrated Circuits PC 3 3 0 0 3 13. EC8461 Circuits Design and Simulation Laboratory PC 4 0 0 4 2 14. EC8462 Linear Integrated Circuits Laboratory PC 4 0 0 4 2 15. EC8501 Digital Communication PC 3 3 0 0 3 16. EC8553 Discrete-Time Signal Processing PC 4 4 0 0 4 17. EC8651 Transmission Lines and RF Systems PC 3 3 0 0 3 18. EC8552 Computer Architecture and Organization PC 3 3 0 0 3 19. EC8551 Communication Networks PC 3 3 0 0 3 20. EC8562 Digital Signal Processing Laboratory PC 4 0 0 4 2 21. EC8561 Communication Systems Laboratory PC 4 0 0 4 2 22. EC8563 Communication Networks Laboratory PC 4 0 0 4 2 23. EC8691 Microprocessors and Microcontrollers PC 3 3 0 0 3 24. EC8095 VLSI Design PC 3 3 0 0 3 25. EC8652 Wireless Communication PC 3 3 0 0 3 26. EC8661 VLSI Design PC 4 0 0 4 2
  • 12.
    12 Laboratory 27. EC8681 Microprocessorsand Microcontrollers Laboratory PC 4 0 0 4 2 28. EC8701 Antennas and Microwave Engineering PC 3 3 0 0 3 29. EC8751 Optical Communication PC 3 3 0 0 3 30. EC8791 Embedded and Real Time Systems PC 3 3 0 0 3 31. EC8702 Ad hoc and Wireless Sensor Networks PC 3 3 0 0 3 32. EC8711 Embedded Laboratory PC 4 0 0 4 2 33. EC8761 Advanced Communication Laboratory PC 4 0 0 4 2
  • 13.
    13 PROFESSIONAL ELECTIVES (PE)* SEMESTERV ELECTIVE I SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8392 Object Oriented Programming PE 3 3 0 0 3 2. EC8073 Medical Electronics PE 3 3 0 0 3 3. CS8493 Operating Systems PE 3 3 0 0 3 4. EC8074 Robotics and Automation PE 3 3 0 0 3 5. EC8075 Nano Technology and Applications PE 3 3 0 0 3 6. GE8074 Human Rights PE 3 3 0 0 3 7. GE8077 Total Quality Management PE 3 3 0 0 3 SEMESTER VI ELECTIVE II SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8792 Cryptography and Network Security PE 3 3 0 0 3 2. EC8091 Advanced Digital Signal Processing PE 3 3 0 0 3 3. EC8001 MEMS and NEMS PE 3 3 0 0 3 4. EC8002 Multimedia Compression and Communication PE 3 3 0 0 3 5. EC8003 CMOS Analog IC Design PE 3 3 0 0 3 6. EC8004 Wireless Networks PE 3 3 0 0 3 7. GE8075 Intellectual Property Rights PE 3 3 0 0 3 SEMESTER VII ELECTIVE III SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. EC8092 Advanced Wireless Communication PE 3 3 0 0 3 2. EC8071 Cognitive Radio PE 3 3 0 0 3 3. GE8072 Foundation Skills in Integrated Product Development PE 3 3 0 0 3 4. CS8082 Machine Learning Techniques PE 3 3 0 0 3 5. EC8005 Electronics Packaging and Testing PE 3 3 0 0 3 6. EC8006 Mixed Signal IC Design PE 3 3 0 0 3 7. GE8071 Disaster Management PE 3 3 0 0 3
  • 14.
    14 SEMESTER VIII ELECTIVE IV SI.No COURSE CODE COURSETITLE CATEGORY CONTACT PERIODS L T P C 1. EC8072 Electro Magnetic Interference and Compatibility PE 3 3 0 0 3 2. EC8007 Low power SoC Design PE 3 3 0 0 3 3. EC8008 Photonic Networks PE 3 3 0 0 3 4. EC8009 Compressive Sensing PE 3 3 0 0 3 5. EC8093 Digital Image Processing PE 3 3 0 0 3 6. GE8076 Professional Ethics in Engineering PE 3 3 0 0 3 SEMESTER VIII ELECTIVE V SI.No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. EC8010 Video Analytics PE 3 3 0 0 3 2. EC8011 DSP Architecture and Programming PE 3 3 0 0 3 3. EC8094 Satellite Communication PE 3 3 0 0 3 4. CS8086 Soft Computing PE 3 3 0 0 3 5. IT8006 Principles of Speech Processing PE 3 3 0 0 3 6. GE8073 Fundamentals of Nano Science PE 3 3 0 0 3 *Professional Electives are grouped according to elective number as was done previously. EMPLOYABILITY ENHANCEMENT COURSES (EEC) S.NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. HS8381 Interpersonal Skills/Listening & Speaking EEC 2 0 0 2 1 2. EC8611 Technical Seminar EEC 2 0 0 2 1 3. EC8811 Project Work EEC 20 0 0 20 10
  • 15.
    15 SUMMARY S.NO. SUBJECT AREA CREDITS ASPER SEMESTER CREDITS TOTAL Percentage I II III IV V VI VII VIII 1. HS 4 4 3 3 14 7.56% 2. BS 12 7 4 4 27 14.6% 3. ES 9 5 5 19 10.27% 4. PC 9 15 17 19 16 16 92 50% 5. PE 3 3 3 6 15 8.10% 6. OE 3 3 6 3.24% 7. EEC 1 1 10 12 6.48% Total 25 25 25 24 25 23 22 16 185 8. Non Credit / Mandatory
  • 16.
    16 HS8151 COMMUNICATIVE ENGLISH LT P C 4 0 0 4 OBJECTIVES:  To develop the basic reading and writing skills of first year engineering and technology students.  To help learners develop their listening skills, which will, enable them listen to lectures and comprehend them by asking questions; seeking clarifications.  To help learners develop their speaking skills and speak fluently in real contexts.  To help learners develop vocabulary of a general kind by developing their reading skills UNIT I SHARING INFORMATION RELATED TO ONESELF/FAMILY& FRIENDS 12 Reading- short comprehension passages, practice in skimming-scanning and predicting- Writing- completing sentences- - developing hints. Listening- short texts- short formal and informal conversations. Speaking- introducing oneself - exchanging personal information- Language development- Wh- Questions- asking and answering-yes or no questions- parts of speech. Vocabulary development-- prefixes- suffixes- articles.- count/ uncount nouns. UNIT II GENERAL READING AND FREE WRITING 12 Reading - comprehension-pre-reading-post reading- comprehension questions (multiple choice questions and /or short questions/ open-ended questions)-inductive reading- short narratives and descriptions from newspapers including dialogues and conversations (also used as short Listening texts)- register- Writing – paragraph writing- topic sentence- main ideas- free writing, short narrative descriptions using some suggested vocabulary and structures –Listening- telephonic conversations. Speaking – sharing information of a personal kind—greeting – taking leave- Language development – prepositions, conjunctions Vocabulary development- guessing meanings of words in context. UNIT III GRAMMAR AND LANGUAGE DEVELOPMENT 12 Reading- short texts and longer passages (close reading) Writing- understanding text structure- use of reference words and discourse markers-coherence-jumbled sentences Listening – listening to longer texts and filling up the table- product description- narratives from different sources. Speaking- asking about routine actions and expressing opinions. Language development- degrees of comparison- pronouns- direct vs indirect questions- Vocabulary development – single word substitutes- adverbs. UNIT IV READING AND LANGUAGE DEVELOPMENT 12 Reading- comprehension-reading longer texts- reading different types of texts- magazines Writing- letter writing, informal or personal letters-e-mails-conventions of personal email- Listening- listening to dialogues or conversations and completing exercises based on them. Speaking- speaking about oneself- speaking about one‘s friend- Language development- Tenses- simple present-simple past- present continuous and past continuous- Vocabulary development- synonyms-antonyms- phrasal verbs
  • 17.
    17 UNIT V EXTENDEDWRITING 12 Reading- longer texts- close reading –Writing- brainstorming -writing short essays – developing an outline- identifying main and subordinate ideas- dialogue writing-Listening – listening to talks- conversations- Speaking – participating in conversations- short group conversations-Language development-modal verbs- present/ past perfect tense - Vocabulary development-collocations- fixed and semi-fixed expressions. TOTAL: 60 PERIODS OUTCOMES: At the end of the course, learners will be able to: • Read articles of a general kind in magazines and newspapers. • Participate effectively in informal conversations; introduce themselves and their friends and express opinions in English. • Comprehend conversations and short talks delivered in English • Write short essays of a general kind and personal letters and emails in English. TEXT BOOKS: 1. Board of Editors. Using English A Coursebook for Undergarduate Engineers and Technologists. Orient BlackSwan Limited, Hyderabad: 2015 2. Richards, C. Jack. Interchange Students’ Book-2 New Delhi: CUP, 2015. REFERENCES: 1. Bailey, Stephen. Academic Writing: A practical guide for students. New York: Rutledge,2011. 2. Means,L. Thomas and Elaine Langlois. English & Communication For Colleges. CengageLearning ,USA: 2007 3. Redston, Chris &Gillies Cunningham Face2Face (Pre-intermediate Student‘s Book& Workbook) Cambridge University Press, New Delhi: 2005 4. Comfort, Jeremy, et al. Speaking Effectively: Developing Speaking Skills for Business English. Cambridge University Press, Cambridge: Reprint 2011 5. Dutt P. Kiranmai and Rajeevan Geeta. Basic Communication Skills, Foundation Books: 2013.
  • 18.
    18 MA8151 ENGINEERING MATHEMATICS– I L T P C 4 0 0 4 OBJECTIVES : The goal of this course is to achieve conceptual understanding and to retain the best traditions of traditional calculus. The syllabus is designed to provide the basic tools of calculus mainly for the purpose of modelling the engineering problems mathematically and obtaining solutions. This is a foundation course which mainly deals with topics such as single variable and multivariable calculus and plays an important role in the understanding of science, engineering, economics and computer science, among other disciplines. UNIT I DIFFERENTIAL CALCULUS 12 Representation of functions - Limit of a function - Continuity - Derivatives - Differentiation rules - Maxima and Minima of functions of one variable. UNIT II FUNCTIONS OF SEVERAL VARIABLES 12 Partial differentiation – Homogeneous functions and Euler‘s theorem – Total derivative – Change of variables – Jacobians – Partial differentiation of implicit functions – Taylor‘s series for functions of two variables – Maxima and minima of functions of two variables – Lagrange‘s method of undetermined multipliers. UNIT III INTEGRAL CALCULUS 12 Definite and Indefinite integrals - Substitution rule - Techniques of Integration - Integration by parts, Trigonometric integrals, Trigonometric substitutions, Integration of rational functions by partial fraction, Integration of irrational functions - Improper integrals. UNIT IV MULTIPLE INTEGRALS 12 Double integrals – Change of order of integration – Double integrals in polar coordinates – Area enclosed by plane curves – Triple integrals – Volume of solids – Change of variables in double and triple integrals. UNIT V DIFFERENTIAL EQUATIONS 12 Higher order linear differential equations with constant coefficients - Method of variation of parameters – Homogenous equation of Euler‘s and Legendre‘s type – System of simultaneous linear differential equations with constant coefficients - Method of undetermined coefficients. TOTAL : 60 PERIODS OUTCOMES: After completing this course, students should demonstrate competency in the following skills:  Use both the limit definition and rules of differentiation to differentiate functions.  Apply differentiation to solve maxima and minima problems.  Evaluate integrals both by using Riemann sums and by using the Fundamental Theorem of Calculus.  Apply integration to compute multiple integrals, area, volume, integrals in polar coordinates, in addition to change of order and change of variables.  Evaluate integrals using techniques of integration, such as substitution, partial fractions and integration by parts.  Determine convergence/divergence of improper integrals and evaluate convergent improper integrals.  Apply various techniques in solving differential equations.
  • 19.
    19 TEXT BOOKS : 1.Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi, 43rd Edition, 2014. 2. James Stewart, "Calculus: Early Transcendentals", Cengage Learning, 7th Edition, New Delhi, 2015. [For Units I & III - Sections 1.1, 2.2, 2.3, 2.5, 2.7(Tangents problems only), 2.8, 3.1 to 3.6, 3.11, 4.1, 4.3, 5.1(Area problems only), 5.2, 5.3, 5.4 (excluding net change theorem), 5.5, 7.1 - 7.4 and 7.8]. REFERENCES : 1. Anton, H, Bivens, I and Davis, S, "Calculus", Wiley, 10th Edition, 2016. 2. Jain R.K. and Iyengar S.R.K., ―Advanced Engineering Mathematics‖, Narosa Publications, New Delhi, 3rd Edition, 2007. 3. Narayanan, S. and Manicavachagom Pillai, T. K., ―Calculus" Volume I and II, S. Viswanathan Publishers Pvt. Ltd., Chennai, 2007. 4. Srimantha Pal and Bhunia, S.C, "Engineering Mathematics" Oxford University Press, 2015. 5. Weir, M.D and Joel Hass, "Thomas Calculus", 12th Edition, Pearson India, 2016. PH8151 ENGINEERING PHYSICS L T P C 3 0 0 3 OBJECTIVES:  To enhance the fundamental knowledge in Physics and its applications relevant to various streams of Engineering and Technology. UNIT I PROPERTIES OF MATTER 9 Elasticity – Stress-strain diagram and its uses - factors affecting elastic modulus and tensile strength – torsional stress and deformations – twisting couple - torsion pendulum: theory and experiment - bending of beams - bending moment – cantilever: theory and experiment – uniform and non-uniform bending: theory and experiment - I-shaped girders - stress due to bending in beams. UNIT II WAVES AND FIBER OPTICS 9 Oscillatory motion – forced and damped oscillations: differential equation and its solution – plane progressive waves – wave equation. Lasers : population of energy levels, Einstein‘s A and B coefficients derivation – resonant cavity, optical amplification (qualitative) – Semiconductor lasers: homojunction and heterojunction – Fiber optics: principle, numerical aperture and acceptance angle - types of optical fibres (material, refractive index, mode) – losses associated with optical fibers - fibre optic sensors: pressure and displacement. UNIT III THERMAL PHYSICS 9 Transfer of heat energy – thermal expansion of solids and liquids – expansion joints - bimetallic strips - thermal conduction, convection and radiation – heat conductions in solids – thermal conductivity - Forbe‘s and Lee‘s disc method: theory and experiment - conduction through compound media (series and parallel) – thermal insulation – applications: heat exchangers, refrigerators, ovens and solar water heaters. UNIT IV QUANTUM PHYSICS 9 Black body radiation – Planck‘s theory (derivation) – Compton effect: theory and experimental verification – wave particle duality – electron diffraction – concept of wave function and its physical significance – Schrödinger‘s wave equation – time independent and time dependent equations – particle in a one-dimensional rigid box – tunnelling (qualitative) - scanning tunnelling microscope.
  • 20.
    20 UNIT V CRYSTALPHYSICS 9 Single crystalline, polycrystalline and amorphous materials – single crystals: unit cell, crystal systems, Bravais lattices, directions and planes in a crystal, Miller indices – inter-planar distances - coordination number and packing factor for SC, BCC, FCC, HCP and diamond structures - crystal imperfections: point defects, line defects – Burger vectors, stacking faults – role of imperfections in plastic deformation - growth of single crystals: solution and melt growth techniques. TOTAL : 45 PERIODS OUTCOMES: Upon completion of this course,  the students will gain knowledge on the basics of properties of matter and its applications,  the students will acquire knowledge on the concepts of waves and optical devices and their applications in fibre optics,  the students will have adequate knowledge on the concepts of thermal properties of materials and their applications in expansion joints and heat exchangers,  the students will get knowledge on advanced physics concepts of quantum theory and its applications in tunneling microscopes, and  the students will understand the basics of crystals, their structures and different crystal growth techniques. TEXT BOOKS: 1. Bhattacharya, D.K. & Poonam, T. ―Engineering Physics‖. Oxford University Press, 2015. 2. Gaur, R.K. & Gupta, S.L. ―Engineering Physics‖. Dhanpat Rai Publishers, 2012. 3. Pandey, B.K. & Chaturvedi, S. ―Engineering Physics‖. Cengage Learning India, 2012. REFERENCES: 1. Halliday, D., Resnick, R. & Walker, J. ―Principles of Physics‖. Wiley, 2015. 2. Serway, R.A. & Jewett, J.W. ―Physics for Scientists and Engineers‖. Cengage Learning, 2010. 3. Tipler, P.A. & Mosca, G. ―Physics for Scientists and Engineers with Modern Physics‘. W.H.Freeman, 2007. CY8151 ENGINEERING CHEMISTRY L T P C 3 0 0 3 OBJECTIVES:  To make the students conversant with boiler feed water requirements, related problems and water treatment techniques.  To develop an understanding of the basic concepts of phase rule and its applications to single and two component systems and appreciate the purpose and significance of alloys.  Preparation, properties and applications of engineering materials.  Types of fuels, calorific value calculations, manufacture of solid, liquid and gaseous fuels.  Principles and generation of energy in batteries, nuclear reactors, solar cells, wind mills and fuel cells.
  • 21.
    21 UNIT I WATERAND ITS TREATMENT 9 Hardness of water – types – expression of hardness – units – estimation of hardness of water by EDTA – numerical problems – boiler troubles (scale and sludge) – treatment of boiler feed water – Internal treatment (phosphate, colloidal, sodium aluminate and calgon conditioning) external treatment – Ion exchange process, zeolite process – desalination of brackish water - Reverse Osmosis. UNIT II SURFACE CHEMISTRY AND CATALYSIS 9 Adsorption: Types of adsorption – adsorption of gases on solids – adsorption of solute from solutions – adsorption isotherms – Freundlich‘s adsorption isotherm – Langmuir‘s adsorption isotherm – contact theory – kinetics of surface reactions, unimolecular reactions, Langmuir - applications of adsorption on pollution abatement. Catalysis: Catalyst – types of catalysis – criteria – autocatalysis – catalytic poisoning and catalytic promoters - acid base catalysis – applications (catalytic convertor) – enzyme catalysis– Michaelis – Menten equation. UNIT III ALLOYS AND PHASE RULE 9 Alloys: Introduction- Definition- properties of alloys- significance of alloying, functions and effect of alloying elements- Nichrome and stainless steel (18/8) – heat treatment of steel. Phase rule: Introduction, definition of terms with examples, one component system -water system - reduced phase rule - thermal analysis and cooling curves - two component systems - lead-silver system - Pattinson process. UNIT IV FUELS AND COMBUSTION 9 Fuels: Introduction - classification of fuels - coal - analysis of coal (proximate and ultimate) - carbonization - manufacture of metallurgical coke (Otto Hoffmann method) - petroleum - manufacture of synthetic petrol (Bergius process) - knocking - octane number - diesel oil - cetane number - natural gas - compressed natural gas (CNG) - liquefied petroleum gases (LPG) - power alcohol and biodiesel. Combustion of fuels: Introduction - calorific value - higher and lower calorific values- theoretical calculation of calorific value - ignition temperature - spontaneous ignition temperature - explosive range - flue gas analysis (ORSAT Method). UNIT V ENERGY SOURCES AND STORAGE DEVICES 9 Nuclear fission - controlled nuclear fission - nuclear fusion - differences between nuclear fission and fusion - nuclear chain reactions - nuclear energy - light water nuclear power plant - breeder reactor - solar energy conversion - solar cells - wind energy. Batteries, fuel cells and supercapacitors: Types of batteries – primary battery (dry cell) secondary battery (lead acid battery, lithium-ion-battery) fuel cells – H2-O2 fuel cell. TOTAL: 45 PERIODS OUTCOMES:  The knowledge gained on engineering materials, fuels, energy sources and water treatment techniques will facilitate better understanding of engineering processes and applications for further learning. TEXT BOOKS: 1. S. S. Dara and S. S. Umare, ―A Textbook of Engineering Chemistry‖, S. Chand & Company LTD, New Delhi, 2015 2. P. C. Jain and Monika Jain, ―Engineering Chemistry‖ Dhanpat Rai Publishing Company (P) LTD, New Delhi, 2015 3. S. Vairam, P. Kalyani and Suba Ramesh, ―Engineering Chemistry‖, Wiley India PVT, LTD, New Delhi, 2013.
  • 22.
    22 REFERENCES: 1. Friedrich Emich,―Engineering Chemistry‖, Scientific International PVT, LTD, New Delhi, 2014. 2. Prasanta Rath, ―Engineering Chemistry‖, Cengage Learning India PVT, LTD, Delhi, 2015. 3. Shikha Agarwal, ―Engineering Chemistry-Fundamentals and Applications‖, Cambridge University Press, Delhi, 2015. GE8151 PROBLEM SOLVING AND PYTHON PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To know the basics of algorithmic problem solving  To read and write simple Python programs.  To develop Python programs with conditionals and loops.  To define Python functions and call them.  To use Python data structures –- lists, tuples, dictionaries.  To do input/output with files in Python. UNIT I ALGORITHMIC PROBLEM SOLVING 9 Algorithms, building blocks of algorithms (statements, state, control flow, functions), notation (pseudo code, flow chart, programming language), algorithmic problem solving, simple strategies for developing algorithms (iteration, recursion). Illustrative problems: find minimum in a list, insert a card in a list of sorted cards, guess an integer number in a range, Towers of Hanoi. UNIT II DATA, EXPRESSIONS, STATEMENTS 9 Python interpreter and interactive mode; values and types: int, float, boolean, string, and list; variables, expressions, statements, tuple assignment, precedence of operators, comments; modules and functions, function definition and use, flow of execution, parameters and arguments; Illustrative programs: exchange the values of two variables, circulate the values of n variables, distance between two points. UNIT III CONTROL FLOW, FUNCTIONS 9 Conditionals: Boolean values and operators, conditional (if), alternative (if-else), chained conditional (if-elif-else); Iteration: state, while, for, break, continue, pass; Fruitful functions: return values, parameters, local and global scope, function composition, recursion; Strings: string slices, immutability, string functions and methods, string module; Lists as arrays. Illustrative programs: square root, gcd, exponentiation, sum an array of numbers, linear search, binary search. UNIT IV LISTS, TUPLES, DICTIONARIES 9 Lists: list operations, list slices, list methods, list loop, mutability, aliasing, cloning lists, list parameters; Tuples: tuple assignment, tuple as return value; Dictionaries: operations and methods; advanced list processing - list comprehension; Illustrative programs: selection sort, insertion sort, mergesort, histogram. UNIT V FILES, MODULES, PACKAGES 9 Files and exception: text files, reading and writing files, format operator; command line arguments, errors and exceptions, handling exceptions, modules, packages; Illustrative programs: word count, copy file. TOTAL : 45 PERIODS
  • 23.
    23 OUTCOMES: Upon completion ofthe course, students will be able to  Develop algorithmic solutions to simple computational problems  Read, write, execute by hand simple Python programs.  Structure simple Python programs for solving problems.  Decompose a Python program into functions.  Represent compound data using Python lists, tuples, dictionaries.  Read and write data from/to files in Python Programs. TEXT BOOKS: 1. Allen B. Downey, ``Think Python: How to Think Like a Computer Scientist‘‘, 2nd edition, Updated for Python 3, Shroff/O‘Reilly Publishers, 2016 (http://greenteapress.com/wp/think- python/) 2. Guido van Rossum and Fred L. Drake Jr, ―An Introduction to Python – Revised and updated for Python 3.2, Network Theory Ltd., 2011. REFERENCES: 1. John V Guttag, ―Introduction to Computation and Programming Using Python‘‘, Revised and expanded Edition, MIT Press , 2013 2. Robert Sedgewick, Kevin Wayne, Robert Dondero, ―Introduction to Programming in Python: An Inter-disciplinary Approach, Pearson India Education Services Pvt. Ltd., 2016. 3. Timothy A. Budd, ―Exploring Python‖, Mc-Graw Hill Education (India) Private Ltd.,, 2015. 4. Kenneth A. Lambert, ―Fundamentals of Python: First Programs‖, CENGAGE Learning, 2012. 5. Charles Dierbach, ―Introduction to Computer Science using Python: A Computational Problem-Solving Focus, Wiley India Edition, 2013. 6. Paul Gries, Jennifer Campbell and Jason Montojo, ―Practical Programming: An Introduction to Computer Science using Python 3‖, Second edition, Pragmatic Programmers, LLC, 2013. GE8152 ENGINEERING GRAPHICS L T P C 2 0 4 4 OBJECTIVES:  To develop in students, graphic skills for communication of concepts, ideas and design of Engineering products.  T o expose them to existing national standards related to technical drawings. CONCEPTS AND CONVENTIONS (Not for Examination) 1 Importance of graphics in engineering applications – Use of drafting instruments – BIS conventions and specifications – Size, layout and folding of drawing sheets – Lettering and dimensioning. UNIT I PLANE CURVES AND FREEHAND SKETCHING 7+12 Basic Geometrical constructions, Curves used in engineering practices: Conics – Construction of ellipse, parabola and hyperbola by eccentricity method – Construction of cycloid – construction of involutes of square and circle – Drawing of tangents and normal to the above curves. Visualization concepts and Free Hand sketching: Visualization principles –Representation of Three Dimensional objects – Layout of views- Freehand sketching of multiple views from pictorial views of objects
  • 24.
    24 UNIT II PROJECTIONOF POINTS, LINES AND PLANE SURFACE 6+12 Orthographic projection- principles-Principal planes-First angle projection-projection of points. Projection of straight lines (only First angle projections) inclined to both the principal planes - Determination of true lengths and true inclinations by rotating line method and traces Projection of planes (polygonal and circular surfaces) inclined to both the principal planes by rotating object method. UNIT III PROJECTION OF SOLIDS 5+12 Projection of simple solids like prisms, pyramids, cylinder, cone and truncated solids when the axis is inclined to one of the principal planes by rotating object method. UNIT IV PROJECTION OF SECTIONED SOLIDS AND DEVELOPMENT OF SURFACES 5+12 Sectioning of above solids in simple vertical position when the cutting plane is inclined to the one of the principal planes and perpendicular to the other – obtaining true shape of section. Development of lateral surfaces of simple and sectioned solids – Prisms, pyramids cylinders and cones. UNIT V ISOMETRIC AND PERSPECTIVE PROJECTIONS 6+12 Principles of isometric projection – isometric scale –Isometric projections of simple solids and truncated solids - Prisms, pyramids, cylinders, cones- combination of two solid objects in simple vertical positions - Perspective projection of simple solids-Prisms, pyramids and cylinders by visual ray method . TOTAL: 90 PERIODS OUTCOMES: On successful completion of this course, the student will be able to:  Familiarize with the fundamentals and standards of Engineering graphics  Perform freehand sketching of basic geometrical constructions and multiple views of objects.  Project orthographic projections of lines and plane surfaces.  Draw projections and solids and development of surfaces.  Visualize and to project isometric and perspective sections of simple solids. TEXT BOOKS: 1. Natrajan K.V., ―A text book of Engineering Graphics‖, Dhanalakshmi Publishers, Chennai, 2009. 2. Venugopal K. and Prabhu Raja V., ―Engineering Graphics‖, New Age International (P) Limited, 2008. REFERENCES: 1. Bhatt N.D. and Panchal V.M., ―Engineering Drawing‖, Charotar Publishing House, 50th Edition, 2010. 2. Basant Agarwal and Agarwal C.M., ―Engineering Drawing‖, Tata McGraw Hill Publishing Company Limited, New Delhi, 2008. 3. Gopalakrishna K.R., ―Engineering Drawing‖ (Vol. I&II combined), Subhas Stores, Bangalore, 2007. 4. Luzzader, Warren.J. and Duff,John M., ―Fundamentals of Engineering Drawing with an introduction to Interactive Computer Graphics for Design and Production, Eastern Economy Edition, Prentice Hall of India Pvt. Ltd, New Delhi, 2005. 5. N S Parthasarathy And Vela Murali, ―Engineering Graphics‖, Oxford University, Press, New Delhi, 2015. 6. Shah M.B., and Rana B.C., ―Engineering Drawing‖, Pearson, 2nd Edition, 2009.
  • 25.
    25 Publication of Bureauof Indian Standards: 1. IS 10711 – 2001: Technical products Documentation – Size and lay out of drawing sheets. 2. IS 9609 (Parts 0 & 1) – 2001: Technical products Documentation – Lettering. 3. IS 10714 (Part 20) – 2001 & SP 46 – 2003: Lines for technical drawings. 4. IS 11669 – 1986 & SP 46 – 2003: Dimensioning of Technical Drawings. 5. IS 15021 (Parts 1 to 4) – 2001: Technical drawings – Projection Methods. Special points applicable to University Examinations on Engineering Graphics: 1. There will be five questions, each of either or type covering all units of the syllabus. 2. All questions will carry equal marks of 20 each making a total of 100. 3. The answer paper shall consist of drawing sheets of A3 size only. The 4. students will be permitted to use appropriate scale to fit solution within A3 size. 5. The examination will be conducted in appropriate sessions on the same day GE8161 PROBLEM SOLVING ANDPYTHON PROGRAMMING LABORATORY L T P C 0 0 4 2 OBJECTIVES  To write, test, and debug simple Python programs.  To implement Python programs with conditionals and loops.  Use functions for structuring Python programs.  Represent compound data using Python lists, tuples, dictionaries.  Read and write data from/to files in Python. LIST OF PROGRAMS 1. Compute the GCD of two numbers. 2. Find the square root of a number (Newton‘s method) 3. Exponentiation (power of a number) 4. Find the maximum of a list of numbers 5. Linear search and Binary search 6. Selection sort, Insertion sort 7. Merge sort 8. First n prime numbers 9. Multiply matrices 10. Programs that take command line arguments (word count) 11. Find the most frequent words in a text read from a file 12. Simulate elliptical orbits in Pygame 13. Simulate bouncing ball using Pygame PLATFORM NEEDED Python 3 interpreter for Windows/Linux OUTCOMES Upon completion of the course, students will be able to:  Write, test, and debug simple Python programs.  Implement Python programs with conditionals and loops.  Develop Python programs step-wise by defining functions and calling them.  Use Python lists, tuples, dictionaries for representing compound data.  Read and write data from/to files in Python. TOTAL: 60 PERIODS
  • 26.
    26 BS8161 PHYSICS ANDCHEMISTRY LABORATORY (Common to all branches of B.E. / B.Tech Programmes) L T P C 0 0 4 2 OBJECTIVES:  To introduce different experiments to test basic understanding of physics concepts applied in optics, thermal physics, properties of matter and liquids. LIST OF EXPERIMENTS: PHYSICS LABORATORY (Any 5 Experiments) 1. Determination of rigidity modulus – Torsion pendulum 2. Determination of Young‘s modulus by non-uniform bending method 3. (a) Determination of wavelength, and particle size using Laser (b) Determination of acceptance angle in an optical fiber. 4. Determination of thermal conductivity of a bad conductor – Lee‘s Disc method. 5. Determination of velocity of sound and compressibility of liquid – Ultrasonic interferometer 6. Determination of wavelength of mercury spectrum – spectrometer grating 7. Determination of band gap of a semiconductor 8. Determination of thickness of a thin wire – Air wedge method TOTAL: 30 PERIODS OUTCOMES: Upon completion of the course, the students will be able to  apply principles of elasticity, optics and thermal properties for engineering applications. CHEMISTRY LABORATORY: (Any seven experiments to be conducted) OBJECTIVES:  To make the student to acquire practical skills in the determination of water quality parameters through volumetric and instrumental analysis.  To acquaint the students with the determination of molecular weight of a polymer by viscometery. 1. Estimation of HCl using Na2CO3 as primary standard and Determination of alkalinity in water sample. 2. Determination of total, temporary & permanent hardness of water by EDTA method. 3. Determination of DO content of water sample by Winkler‘s method. 4. Determination of chloride content of water sample by argentometric method. 5. Estimation of copper content of the given solution by Iodometry. 6. Determination of strength of given hydrochloric acid using pH meter. 7. Determination of strength of acids in a mixture of acids using conductivity meter. 8. Estimation of iron content of the given solution using potentiometer. 9. Estimation of iron content of the water sample using spectrophotometer (1, 10- Phenanthroline / thiocyanate method). 10. Estimation of sodium and potassium present in water using flame photometer. 11. Determination of molecular weight of polyvinyl alcohol using Ostwald viscometer. 12. Pseudo first order kinetics-ester hydrolysis. 13. Corrosion experiment-weight loss method. 14. Determination of CMC. 15. Phase change in a solid. 16. Conductometric titration of strong acid vs strong base. OUTCOMES:  The students will be outfitted with hands-on knowledge in the quantitative chemical analysis of water quality related parameters. TOTAL: 30 PERIODS TEXTBOOKS:
  • 27.
    27 1. Vogel‘s Textbookof Quantitative Chemical Analysis (8TH edition, 2014) HS8251 TECHNICAL ENGLISH L T P C 4 0 0 4 OBJECTIVES: The Course prepares second semester engineering and Technology students to: • Develop strategies and skills to enhance their ability to read and comprehend engineering and technology texts. • Foster their ability to write convincing job applications and effective reports. • Develop their speaking skills to make technical presentations, participate in group discussions. • Strengthen their listening skill which will help them comprehend lectures and talks in their areas of specialization. UNIT I INTRODUCTION TECHNICAL ENGLISH 12 Listening- Listening to talks mostly of a scientific/technical nature and completing information-gap exercises- Speaking –Asking for and giving directions- Reading – reading short technical texts from journals- newsapapers- Writing- purpose statements – extended definitions – issue- writing instructions – checklists-recommendations-Vocabulary Development- technical vocabulary Language Development –subject verb agreement - compound words. UNIT II READING AND STUDY SKILLS 12 Listening- Listening to longer technical talks and completing exercises based on them-Speaking – describing a process-Reading – reading longer technical texts- identifying the various transitions in a text- paragraphing- Writing- interpreting cgarts, graphs- Vocabulary Development- vocabularyused in formal letters/emails and reports Language Development- impersonal passive voice, numerical adjectives. UNIT III TECHNICAL WRITING AND GRAMMAR 12 Listening- Listening to classroom lectures/ talkls on engineering/technology -Speaking – introduction to technical presentations- Reading – longer texts both general and technical, practice in speed reading; Writing-Describing a process, use of sequence words- Vocabulary Development- sequence words- Misspelled words. Language Development- embedded sentences UNIT IV REPORT WRITING 12 Listening- Listening to documentaries and making notes. Speaking – mechanics of presentations- Reading – reading for detailed comprehension- Writing- email etiquette- job application – cover letter –Résumé preparation( via email and hard copy)- analytical essays and issue based essays--Vocabulary Development- finding suitable synonyms-paraphrasing-. Language Development- clauses- if conditionals. UNIT V GROUP DISCUSSION AND JOB APPLICATIONS 12 Listening- TED/Ink talks; Speaking –participating in a group discussion -Reading– reading and understanding technical articles Writing– Writing reports- minutes of a meeting- accident and survey-Vocabulary Development- verbal analogies Language Development- reported speech TOTAL :60 PERIODS OUTCOMES: At the end of the course learners will be able to:
  • 28.
    28  Read technicaltexts and write area- specific texts effortlessly.  Listen and comprehend lectures and talks in their area of specialisation successfully.  Speak appropriately and effectively in varied formal and informal contexts.  Write reports and winning job applications. TEXT BOOKS: 1. Board of editors. Fluency in English A Course book for Engineering and Technology. Orient Blackswan, Hyderabad: 2016 2. Sudharshana.N.P and Saveetha. C. English for Technical Communication. Cambridge University Press: New Delhi, 2016. REFERENCES: 1. Raman, Meenakshi and Sharma, Sangeetha- Technical Communication Principles and Practice.Oxford University Press: New Delhi,2014. 2. Kumar, Suresh. E. Engineering English. Orient Blackswan: Hyderabad,2015 3. Booth-L. Diana, Project Work, Oxford University Press, Oxford: 2014. 4. Grussendorf, Marion, English for Presentations, Oxford University Press, Oxford: 2007 5. Means, L. Thomas and Elaine Langlois, English & Communication For Colleges. Cengage Learning, USA: 2007 Students can be asked to read Tagore, Chetan Bhagat and for supplementary reading. MA8251 ENGINEERING MATHEMATICS – II L T P C 4 0 0 4 OBJECTIVES : This course is designed to cover topics such as Matrix Algebra, Vector Calculus, Complex Analysis and Laplace Transform. Matrix Algebra is one of the powerful tools to handle practical problems arising in the field of engineering. Vector calculus can be widely used for modelling the various laws of physics. The various methods of complex analysis and Laplace transforms can be used for efficiently solving the problems that occur in various branches of engineering disciplines. UNIT I MATRICES 12 Eigenvalues and Eigenvectors of a real matrix – Characteristic equation – Properties of Eigenvalues and Eigenvectors – Cayley-Hamilton theorem – Diagonalization of matrices – Reduction of a quadratic form to canonical form by orthogonal transformation – Nature of quadratic forms. UNIT II VECTOR CALCULUS 12 Gradient and directional derivative – Divergence and curl - Vector identities – Irrotational and Solenoidal vector fields – Line integral over a plane curve – Surface integral - Area of a curved surface - Volume integral - Green‘s, Gauss divergence and Stoke‘s theorems – Verification and application in evaluating line, surface and volume integrals. UNIT III ANALYTIC FUNCTIONS 12 Analytic functions – Necessary and sufficient conditions for analyticity in Cartesian and polar coordinates - Properties – Harmonic conjugates – Construction of analytic function - Conformal mapping – Mapping by functions 21 z z czczw ,,, - Bilinear transformation. UNIT IV COMPLEX INTEGRATION 12
  • 29.
    29 Line integral -Cauchy‘s integral theorem – Cauchy‘s integral formula – Taylor‘s and Laurent‘s series – Singularities – Residues – Residue theorem – Application of residue theorem for evaluation of real integrals – Use of circular contour and semicircular contour. UNIT V LAPLACE TRANSFORMS 12 Existence conditions – Transforms of elementary functions – Transform of unit step function and unit impulse function – Basic properties – Shifting theorems -Transforms of derivatives and integrals – Initial and final value theorems – Inverse transforms – Convolution theorem – Transform of periodic functions – Application to solution of linear second order ordinary differential equations with constant coefficients. TOTAL: 60 PERIODS OUTCOMES: After successfully completing the course, the student will have a good understanding of the following topics and their applications:  Eigenvalues and eigenvectors, diagonalization of a matrix, Symmetric matrices, Positive definite matrices and similar matrices.  Gradient, divergence and curl of a vector point function and related identities.  Evaluation of line, surface and volume integrals using Gauss, Stokes and Green‘s theorems and their verification.  Analytic functions, conformal mapping and complex integration.  Laplace transform and inverse transform of simple functions, properties, various related theorems and application to differential equations with constant coefficients. TEXT BOOKS : 1. Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi, 43rd Edition, 2014. 2. Kreyszig Erwin, "Advanced Engineering Mathematics ", John Wiley and Sons, 10th Edition, New Delhi, 2016. REFERENCES : 1. Bali N., Goyal M. and Watkins C., ―Advanced Engineering Mathematics‖, Firewall Media (An imprint of Lakshmi Publications Pvt., Ltd.,), New Delhi, 7th Edition, 2009. 2. Jain R.K. and Iyengar S.R.K., ― Advanced Engineering Mathematics ‖, Narosa Publications, New Delhi , 3rd Edition, 2007. 3. O‘Neil, P.V. ―Advanced Engineering Mathematics‖, Cengage Learning India Pvt., Ltd, New Delhi, 2007. 4. Sastry, S.S, ―Engineering Mathematics", Vol. I & II, PHI Learning Pvt. Ltd, 4th Edition, New Delhi, 2014. 5. Wylie, R.C. and Barrett, L.C., ―Advanced Engineering Mathematics ―Tata McGraw Hill Education Pvt. Ltd, 6th Edition, New Delhi, 2012. PH8253 PHYSICS FOR ELECTRONICS ENGINEERING (Common to BME, ME, CC, ECE, EEE, E&I, ICE) L T P C 3 0 0 3 OBJECTIVES:  To understand the essential principles of Physics of semiconductor device and Electron transport properties. Become proficient in magnetic, dielectric and optical properties of materials and nano devices. UNIT I ELECTRICAL PROPERTIES OF MATERIALS 9 Classical free electron theory - Expression for electrical conductivity – Thermal conductivity, expression - Wiedemann-Franz law – Success and failures - electrons in metals – Particle in a three dimensional box – degenerate states – Fermi- Dirac statistics – Density of energy states –
  • 30.
    30 Electron in periodicpotential: Bloch thorem – metals and insulators - Energy bands in solids– tight binding approximation - Electron effective mass – concept of hole. UNIT II SEMICONDUCTOR PHYSICS 9 Intrinsic Semiconductors – Energy band diagram – direct and indirect semiconductors – Carrier concentration in intrinsic semiconductors – extrinsic semiconductors - Carrier concentration in N- type & P-type semiconductors – Carrier transport: Velocity-electric field relations – drift and diffusion transport - Einstein‘s relation – Hall effect and devices – Zener and avalanche breakdown in p-n junctions - Ohmic contacts – tunnel diode - Schottky diode – MOS capacitor - power transistor. UNIT III MAGNETIC AND DIELECTRIC PROPERTIES OF MATERIALS 9 Magnetism in materials – magnetic field and induction – magnetization - magnetic permeability and susceptibility–types of magnetic materials – microscopic classification of magnetic materials - Ferromagnetism: origin and exchange interaction- saturation magnetization and Curie temperature – Domain Theory. Dielectric materials: Polarization processes – dielectric loss – internal field – Clausius-Mosotti relation- dielectric breakdown – high-k dielectrics. UNIT IV OPTICAL PROPERTIES OF MATERIALS 9 Classification of optical materials – carrier generation and recombination processes - Absorption emission and scattering of light in metals, insulators and Semiconductors (concepts only) - photo current in a P- N diode – solar cell –photo detectors - LED – Organic LED – Laser diodes – excitons - quantum confined Stark effect – quantum dot laser. UNIT V NANOELECTRONIC DEVICES 9 Introduction - electron density in bulk material – Size dependence of Fermi energy– quantum confinement – quantum structures - Density of states in quantum well, quantum wire and quantum dot structures –Zener-Bloch oscillations – resonant tunneling – quantum interference effects – mesoscopic structures: conductance fluctuations and coherent transport – Coulomb blockade effects - Single electron phenomena and Single electron Transistor – magnetic semiconductors– spintronics - Carbon nanotubes: Properties and applications. TOTAL :45 PERIODS OUTCOMES: At the end of the course, the students will able to  Gain knowledge on classical and quantum electron theories, and energy band structuues,  Acquire knowledge on basics of semiconductor physics and its applications in various devices,  Get knowledge on magnetic and dielectric properties of materials,  Have the necessary understanding on the functioning of optical materials for optoelectronics,  Understand the basics of quantum structures and their applications in spintronics and carbon electronics.. TEXT BOOKS: 1. Kasap, S.O. ―Principles of Electronic Materials and Devices‖, McGraw-Hill Education, 2007. 2. Umesh K Mishra & Jasprit Singh, ―Semiconductor Device Physics and Design‖, Springer, 2008. 3. Wahab, M.A. ―Solid State Physics: Structure and Properties of Materials‖. Narosa Publishing House, 2009. REFERENCES: 1. Garcia, N. & Damask, A. ―Physics for Computer Science Students‖. Springer-Verlag, 2012. 2. Hanson, G.W. ―Fundamentals of Nanoelectronics‖. Pearson Education, 2009
  • 31.
    31 3. Rogers, B.,Adams, J. & Pennathur, S. ―Nanotechnology: Understanding Small Systems‖. CRC Press, 2014 BE8254 BASIC ELECTRICAL AND INSTRUMENTATION ENGINEERING L T P C 3 0 0 3 OBJECTIVES: To impart knowledge on  Operation of Three phase electrical circuits and power measurement  Working principles of Electrical Machines  Working principle of Various measuring instruments UNIT I AC CIRCUITS AND POWER SYSTEMS 9 Three phase power supply – Star connection – Delta connection – Balanced and Unbalanced Loads- Power equation – Star Delta Conversion – Three Phase Power Measurement - Transmission & Distribution of electrical energy – Over head Vs Underground system – Protection of power system – types of tariff – power factor improvement UNIT II TRANSFORMER 9 Introduction - Ideal Transformer – Accounting For Finite Permeability And Core Loss – Circuit Model Of Transformer – Per Unit System – Determination Of Parameters Of Circuit Model Of Transformer – Voltage Regulation – Name Plate Rating – Efficiency – Three Phase Transformers - Auto Transformers UNIT III DC MACHINES 9 Introduction – Constructional Features– Motoring and generation principle - Emf And Torque equation – Circuit Model – Methods of Excitation and magnetisation characteristics – Starting and Speed Control – Universal Motor UNIT IV AC MACHINES 9 Principle of operation of three-phase induction motors – Construction –Types – Equivalent circuit, Single phase Induction motors -Construction– Types–starting and speed control methods. Alternator- working principle–Equation of induced EMF – Voltage regulation, Synchronous motors- working principle-starting methods -– Torque equation – Stepper Motors – Brushless DC Motors UNIT V MEASUREMENT AND INSTRUMENTATION 9 Type of Electrical and electronic instruments – Classification- Types of indicating Instruments – Principles of Electrical Instruments –Multimeters, Oscilloscopes- Static and Dynamic Characteristics of Measurement – Errors in Measurement – Transducers - Classification of Transducers: Resistive, Inductive, Capacitive, Thermoelectric, piezoelectric, photoelectric, Hall effect and Mechanical TOTAL: 45 PERIODS OUTCOMES: At the end of the course the students will be able to  Understand the concept of three phase power circuits and measurement.  Comprehend the concepts in electrical generators, motors and transformers  Choose appropriate measuring instruments for given application TEXT BOOKS: 1. D P Kothari and I.J Nagarath, ―Basic Electrical and Electronics Engineering‖, McGraw Hill Education(India) Private Limited, Third Reprint ,2016 2. Giorgio Rizzoni, ―Principles and Applications of Electrical Engineering‖, McGraw Hill Education(India) Private Limited, 2010 3. S.K.Bhattacharya ―Basic Electrical and Electronics Engineering‖, Pearson India, 2011 REFERENCES: 1. Del Toro ,‖Electrical Engineering Fundamentals‖, Pearson Education, New Delhi, 2015.
  • 32.
    32 2. Leonard SBobrow, ― Foundations of Electrical Engineering‖, Oxford University Press, 2013 3. Rajendra Prasad ,‖Fundamentals of Electrical engineering‖, Prentice Hall of India, 2006. 4. Mittle N., ―Basic Electrical Engineering‖, Tata McGraw Hill Edition, 24th reprint 2016 5. A.E.Fitzgerald, David E Higginbotham and Arvin Grabel, ―Basic Electrical Engineering‖, McGraw Hill Education(India) Private Limited, 2009 EC8251 CIRCUIT ANALYSIS L T P C 4 0 0 4 OBJECTIVES:  To introduce the basic concepts of DC and AC circuits behavior  To study the transient and steady state response of the circuits subjected to step and sinusoidal excitations.  To introduce different methods of circuit analysis using Network theorems, duality and topology. UNIT I BASIC CIRCUITS ANALYSIS AND NETWORK TOPOLOGY 12 Ohm‘s Law – Kirchhoff‘s laws – Mesh current and node voltage method of analysis for D.C and A.C. circuits - Network terminology - Graph of a network - Incidence and reduced incidence matrices – Trees –Cutsets - Fundamental cutsets - Cutset matrix – Tie sets - Link currents and Tie set schedules -Twig voltages and Cutset schedules, Duality and dual networks. UNIT II NETWORK THEOREMS FOR DC AND AC CIRCUITS 12 Network theorems -Superposition theorem, Thevenin‘s theorem, Norton‘s theorem, Reciprocity theorem, Millman‘s theorem, and Maximum power transfer theorem ,application of Network theorems- Network reduction: voltage and current division, source transformation – star delta conversion. UNIT III RESONANCE AND COUPLED CIRCUITS 12 Resonance - Series resonance - Parallel resonance - Variation of impedance with frequency - Variation in current through and voltage across L and C with frequency – Bandwidth - Q factor - Selectivity. Self inductance - Mutual inductance - Dot rule - Coefficient of coupling - Analysis of multiwinding coupled circuits - Series, Parallel connection of coupled inductors - Single tuned and double tuned coupled circuits. UNITIV TRANSIENT ANALYSIS 12 Natural response-Forced response - Transient response of RC, RL and RLC circuits to excitation by Step Signal, Impulse Signal and exponential sources - Complete response of RC, RL and RLC Circuits to sinusoidal excitation. UNIT V TWO PORT NETWORKS 12 Two port networks, Z parameters, Y parameters, Transmission (ABCD) parameters, Hybrid(H) Parameters, Interconnection of two port networks, Symmetrical properties of T and π networks. TOTAL : 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Develop the capacity to analyze electrical circuits, apply the circuit theorems in real time  Design and understand and evaluate the AC and DC circuits. TEXT BOOKS: 1. William H. Hayt, Jr. Jack E. Kemmerly and Steven M. Durbin, ―Engineering Circuit Analysis‖ , McGraw Hill Science Engineering, Eighth Edition, 11th Reprint 2016. 2. Joseph Edminister and Mahmood Nahvi, ―Electric Circuits‖, Schaum‘s Outline Series, Tata McGraw Hill Publishing Company, New Delhi, Fifth Edition Reprint 2016. REFERENCES:
  • 33.
    33 1. Charles K.Alexander, Mathew N.O. Sadiku, ―Fundamentals of Electric Circuits‖, Fifth Edition, McGraw Hill, 9th Reprint 2015. 2. A.Bruce Carlson, ―Cicuits: Engineering Concepts and Analysis of Linear Electric Circuits‖, Cengage Learning, India Edition 2nd Indian Reprint 2009. 3. Allan H.Robbins, Wilhelm C.Miller, ―Circuit Analysis Theory and Practice‖, Cengage Learning, Fifth Edition, 1st Indian Reprint 2013. EC8252 ELECTRONIC DEVICES L T P C 3 0 0 3 OBJECTIVES:  To acquaint the students with the construction, theory and operation of the basic electronic devices such as PN junction diode, Bipolar and Field effect Transistors, Power control devices, LED, LCD and other Opto-electronic devices UNIT I SEMICONDUCTOR DIODE 9 PN junction diode, Current equations, Energy Band diagram, Diffusion and drift current densities, forward and reverse bias characteristics, Transition and Diffusion Capacitances, Switching Characteristics, Breakdown in PN Junction Diodes. UNIT II BIPOLAR JUNCTION TRANSISTORS 9 NPN -PNP -Operations-Early effect-Current equations – Input and Output characteristics of CE, CB, CC - Hybrid -π model - h-parameter model, Ebers Moll Model- Gummel Poon-model, Multi Emitter Transistor. UNIT III FIELD EFFECT TRANSISTORS 9 JFETs – Drain and Transfer characteristics,-Current equations-Pinch off voltage and its significance- MOSFET- Characteristics- Threshold voltage -Channel length modulation, D- MOSFET, E-MOSFET- Characteristics – Comparison of MOSFET with JFET. UNIT IV SPECIAL SEMICONDUCTOR DEVICES 9 Metal-Semiconductor Junction- MESFET, FINFET, PINFET, CNTFET, DUAL GATE MOSFET, Schottky barrier diode-Zener diode-Varactor diode –Tunnel diode- Gallium Arsenide device, LASER diode, LDR. UNIT V POWER DEVICES AND DISPLAY DEVICES 9 UJT, SCR, Diac, Triac, Power BJT- Power MOSFET- DMOS-VMOS. LED, LCD, Photo transistor, Opto Coupler, Solar cell, CCD. TOTAL : 45 PERIODS OUTCOMES: At the end of the course the students will be able to:  Explain the V-I characteristic of diode, UJT and SCR  Describe the equivalence circuits of transistors  Operate the basic electronic devices such as PN junction diode, Bipolar and Field effect Transistors, Power control devices, LED, LCD and other Opto-electronic devices TEXT BOOKS: 1. Donald A Neaman, ―Semiconductor Physics and Devices‖, Fourth Edition, Tata Mc GrawHill Inc. 2012. 2. Salivahanan. S, Suresh Kumar. N, Vallavaraj.A, ―Electronic Devices and circuits‖, Third Edition, Tata McGraw- Hill, 2008. REFERENCES: 1. Robert Boylestad and Louis Nashelsky, ―Electron Devices and Circuit Theory‖ Pearson Prentice Hall, 10th edition, July 2008. 2. R.S.Sedha, ― A Text Book of Applied Electronics‖ S.Chand Publications, 2006. 3. Yang, ―Fundamentals of Semiconductor devices‖, McGraw Hill International Edition, 1978.
  • 34.
    34 EC8261 CIRCUITS ANDDEVICES LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To learn the characteristics of basic electronic devices such as Diode, BJT,FET, SCR  To understand the working of RL,RC and RLC circuits  To gain hand on experience in Thevinin & Norton theorem, KVL & KCL, and Super Position Theorems 1. Characteristics of PN Junction Diode 2. Zener diode Characteristics & Regulator using Zener diode 3. Common Emitter input-output Characteristics 4. Common Base input-output Characteristics 5. FET Characteristics 6. SCR Characteristics 7. Clipper and Clamper & FWR 8. Verifications Of Thevinin & Norton theorem 9. Verifications Of KVL & KCL 10. Verifications Of Super Position Theorem 11. verifications of maximum power transfer & reciprocity theorem 12. Determination Of Resonance Frequency of Series & Parallel RLC Circuits 13. Transient analysis of RL and RC circuits LABORATORY REQUIREMENTS BC 107, BC 148,2N2646,BFW10 - 25 each 1N4007, Zener diodes - 25 each Resistors, Capacitors, Inductors - sufficient quantities Bread Boards - 15 Nos CRO (30MHz) – 10 Nos. Function Generators (3MHz) – 10 Nos. Dual Regulated Power Supplies ( 0 – 30V) – 10 Nos. TOTAL : 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Analyze the characteristics of basic electronic devices  Design RL and RC circuits  Verify Thevinin & Norton theorem KVL & KCL, and Super Position Theorems GE8261 ENGINEERING PRACTICES LABORATORY L T P C 0 0 4 2 OBJECTIVES: To provide exposure to the students with hands on experience on various basic engineering practices in Civil, Mechanical, Electrical and Electronics Engineering. GROUP A (CIVIL & MECHANICAL)
  • 35.
    35 I CIVIL ENGINEERINGPRACTICE 13 Buildings: (a) Study of plumbing and carpentry components of residential and industrial buildings. Safety aspects. Plumbing Works: (a) Study of pipeline joints, its location and functions: valves, taps, couplings, unions, reducers, elbows in household fittings. (b) Study of pipe connections requirements for pumps and turbines. (c) Preparation of plumbing line sketches for water supply and sewage works. (d) Hands-on-exercise: Basic pipe connections – Mixed pipe material connection – Pipe connections with different joining components. (e) Demonstration of plumbing requirements of high-rise buildings. Carpentry using Power Tools only: (a) Study of the joints in roofs, doors, windows and furniture. (b) Hands-on-exercise: Wood work, joints by sawing, planing and cutting. II MECHANICAL ENGINEERING PRACTICE 18 Welding: (a) Preparation of butt joints, lap joints and T- joints by Shielded metal arc welding. (b) Gas welding practice Basic Machining: (a) Simple Turning and Taper turning (b) Drilling Practice Sheet Metal Work: (a) Forming & Bending: (b) Model making – Trays and funnels. (c) Different type of joints. Machine assembly practice: (a) Study of centrifugal pump (b) Study of air conditioner Demonstration on: (a) Smithy operations, upsetting, swaging, setting down and bending. Example – Exercise – Production of hexagonal headed bolt. (b) Foundry operations like mould preparation for gear and step cone pulley. (c) Fitting – Exercises – Preparation of square fitting and V – fitting models. GROUP B (ELECTRICAL & ELECTRONICS) III ELECTRICAL ENGINEERING PRACTICE 13 1. Residential house wiring using switches, fuse, indicator, lamp and energy meter. 2. Fluorescent lamp wiring. 3. Stair case wiring 4. Measurement of electrical quantities – voltage, current, power & power factor in RLC
  • 36.
    36 circuit. 5. Measurement ofenergy using single phase energy meter. 6. Measurement of resistance to earth of an electrical equipment. IV ELECTRONICS ENGINEERING PRACTICE 16 1. Study of Electronic components and equipments – Resistor, colour coding measurement of AC signal parameter (peak-peak, rms period, frequency) using CR. 2. Study of logic gates AND, OR, EX-OR and NOT. 3. Generation of Clock Signal. 4. Soldering practice – Components Devices and Circuits – Using general purpose PCB. 5. Measurement of ripple factor of HWR and FWR. TOTAL: 60 PERIODS OUTCOMES: On successful completion of this course, the student will be able to  Fabricate carpentry components and pipe connections including plumbing works.  Use welding equipments to join the structures.  Carry out the basic machining operations  Make the models using sheet metal works  Illustrate on centrifugal pump, Air conditioner, operations of smithy, foundary and  fittings  Carry out basic home electrical works and appliances  Measure the electrical quantities  Elaborate on the components, gates, soldering practices. LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: CIVIL 1. Assorted components for plumbing consisting of metallic pipes, plastic pipes, flexible pipes, couplings, unions, elbows, plugs and other fittings. 15 Sets. 2. Carpentry vice (fitted to work bench) 15 Nos. 3. Standard woodworking tools 15 Sets. 4. Models of industrial trusses, door joints, furniture joints 5 each 5. Power Tools: (a) Rotary Hammer 2 Nos (b) Demolition Hammer 2 Nos (c) Circular Saw 2 Nos (d) Planer 2 Nos (e) Hand Drilling Machine 2 Nos (f) Jigsaw 2 Nos MECHANICAL 1. Arc welding transformer with cables and holders 5 Nos. 2. Welding booth with exhaust facility 5 Nos. 3. Welding accessories like welding shield, chipping hammer, wire brush, etc. 5 Sets. 4. Oxygen and acetylene gas cylinders, blow pipe and other welding outfit. 2 Nos. 5. Centre lathe 2 Nos. 6. Hearth furnace, anvil and smithy tools 2 Sets. 7. Moulding table, foundry tools 2 Sets. 8. Power Tool: Angle Grinder 2 Nos 9. Study-purpose items: centrifugal pump, air-conditioner One each. ELECTRICAL
  • 37.
    37 1. Assorted electricalcomponents for house wiring 15 Sets 2. Electrical measuring instruments 10 Sets 3. Study purpose items: Iron box, fan and regulator, emergency lamp 1 each 4. Megger (250V/500V) 1 No. 5. Power Tools: (a) Range Finder 2 Nos (b) Digital Live-wire detector 2 Nos ELECTRONICS 1. Soldering guns 10 Nos. 2. Assorted electronic components for making circuits 50 Nos. 3. Small PCBs 10 Nos. 4. Multimeters 10 Nos. 5. Study purpose items: Telephone, FM radio, low-voltage power supply MA8352 LINEAR ALGEBRA AND PARTIAL DIFFERENTIAL EQUATIONS L T P C 4 0 0 4 OBJECTIVES:  To introduce the basic notions of groups, rings, fields which will then be used to solve related problems.  To understand the concepts of vector space, linear transformations and diagonalization.  To apply the concept of inner product spaces in orthogonalization.  To understand the procedure to solve partial differential equations.  To give an integrated approach to number theory and abstract algebra, and provide a firm basis for further reading and study in the subject. UNIT I VECTOR SPACES 12 Vector spaces – Subspaces – Linear combinations and linear system of equations – Linear independence and linear dependence – Bases and dimensions. UNIT II LINEAR TRANSFORMATION AND DIAGONALIZATION 12 Linear transformation - Null spaces and ranges - Dimension theorem - Matrix representation of a linear transformations - Eigenvalues and eigenvectors - Diagonalizability. UNIT III INNER PRODUCT SPACES 12 Inner product, norms - Gram Schmidt orthogonalization process - Adjoint of linear operations - Least square approximation. UNIT IV PARTIAL DIFFERENTIAL EQUATIONS 12 Formation – Solutions of first order equations – Standard types and equations reducible to standard types – Singular solutions – Lagrange‘s linear equation – Integral surface passing through a given curve – Classification of partial differential equations - Solution of linear equations of higher order with constant coefficients – Linear non-homogeneous partial differential equations. UNIT V FOURIER SERIES SOLUTIONS OF PARTIAL DIFFERENTIAL EQUATIONS 12 Dirichlet‘s conditions – General Fourier series – Half range sine and cosine series - Method of separation of variables – Solutions of one dimensional wave equation and one-dimensional heat equation – Steady state solution of two-dimensional heat equation – Fourier series solutions in Cartesian coordinates. TOTAL: 60 PERIODS OUTCOMES: Upon successful completion of the course, students should be able to:  Explain the fundamental concepts of advanced algebra and their role in modern
  • 38.
    38 mathematics and appliedcontexts.  Demonstrate accurate and efficient use of advanced algebraic techniques.  Demonstrate their mastery by solving non - trivial problems related to the concepts and by proving simple theorems about the statements proven by the text.  Able to solve various types of partial differential equations. Able to solve engineering problems using Fourier series. TEXTBOOKS: 1. Grewal B.S., ―Higher Engineering Mathematics‖, Khanna Publishers, New Delhi, 43rd Edition, 2014. 2. Friedberg, A.H., Insel, A.J. and Spence, L., ―Linear Algebra‖, Prentice Hall of India, New Delhi, 2004. REFERENCES: 1. Burden, R.L. and Faires, J.D, "Numerical Analysis", 9th Edition, Cengage Learning, 2016. 2. James, G. ―Advanced Modern Engineering Mathematics‖, Pearson Education, 2007. 3. Kolman, B. Hill, D.R., ―Introductory Linear Algebra‖, Pearson Education, New Delhi, First Reprint, 2009. 4. Kumaresan, S., ―Linear Algebra – A Geometric Approach‖, Prentice – Hall of India, New Delhi, Reprint, 2010. 5. Lay, D.C., ―Linear Algebra and its Applications‖, 5th Edition, Pearson Education, 2015. 6. O‘Neil, P.V., ―Advanced Engineering Mathematics‖, Cengage Learning, 2007. 7. Strang, G., ―Linear Algebra and its applications‖, Thomson (Brooks/Cole), New Delhi, 2005. 8. Sundarapandian, V. ―Numerical Linear Algebra‖, Prentice Hall of India, New Delhi, 2008. EC8393 FUNDAMENTALS OF DATA STRUCTURES IN C L T P C 3 0 0 3 OBJECTIVES:  To learn the features of C  To learn the linear and non-linear data structures  To explore the applications of linear and non-linear data structures  To learn to represent data using graph data structure  To learn the basic sorting and searching algorithms UNIT I C PROGRAMMING BASICS 9 Structure of a C program – compilation and linking processes – Constants, Variables – Data Types – Expressions using operators in C – Managing Input and Output operations – Decision Making and Branching – Looping statements. Arrays – Initialization – Declaration – One dimensional and Two-dimensional arrays. Strings- String operations – String Arrays. Simple programs- sorting- searching – matrix operations. UNIT II FUNCTIONS, POINTERS, STRUCTURES AND UNIONS 9 Functions – Pass by value – Pass by reference – Recursion – Pointers - Definition – Initialization – Pointers arithmetic. Structures and unions - definition – Structure within a structure - Union - Programs using structures and Unions – Storage classes, Pre-processor directives. UNIT III LINEAR DATA STRUCTURES 9 Arrays and its representations – Stacks and Queues – Linked lists – Linked list-based implementation of Stacks and Queues – Evaluation of Expressions – Linked list based polynomial addition. UNIT IV NON-LINEAR DATA STRUCTURES 9 Trees – Binary Trees – Binary tree representation and traversals –Binary Search Trees – Applications of trees. Set representations - Union-Find operations. Graph and its representations – Graph Traversals.
  • 39.
    39 UNIT V SEARCHINGAND SORTING ALGORITHMS 9 Linear Search – Binary Search. Bubble Sort, Insertion sort – Merge sort – Quick sort - Hash tables – Overflow handling. TOTAL: 45 PERIODS
  • 40.
    40 OUTCOMES: Upon completion ofthe course, students will be able to:  Implement linear and non-linear data structure operations using C  Suggest appropriate linear / non-linear data structure for any given data set.  Apply hashing concepts for a given problem  Modify or suggest new data structure for an application  Appropriately choose the sorting algorithm for an application TEXTBOOKS: 1. Pradip Dey and Manas Ghosh, ―Programming in C, Second Edition, Oxford University Press, 2011. 2. Ellis Horowitz, Sartaj Sahni, Susan Anderson-Freed, ―Fundamentals of Data Structures in C, Second Edition, University Press, 2008. REFERENCES: 1. Mark Allen Weiss, ―Data Structures and Algorithm Analysis in C, Second Edition, Pearson Education, 1996 2. Alfred V. Aho, John E. Hopcroft and Jeffrey D. Ullman, ―Data Structures and Algorithms, Pearson Education, 1983. 3. Robert Kruse, C.L.Tondo, Bruce Leung, Shashi Mogalla , ― Data Structures and Program Design in C, Second Edition, Pearson Education, 2007 4. Jean-Paul Tremblay and Paul G. Sorenson, ―An Introduction to Data Structures with Applications, Second Edition, Tata McGraw-Hill, 1991. EC8351 ELECTRONIC CIRCUITS I L T P C 3 0 0 3 OBJECTIVES:  To understand the methods of biasing transistors  To design and analyze single stage and multistage amplifier circuits  To analyze the frequency response of small signal amplifiers  To design and analyze the regulated DC power supplies.  To troubleshoot and fault analysis of power supplies. UNIT I BIASING OF DISCRETE BJT, JFET AND MOSFET 9 BJT– Need for biasing - DC Load Line and Bias Point – DC analysis of Transistor circuits - Various biasing methods of BJT – Bias Circuit Design - Thermal stability - Stability factors - Bias compensation techniques using Diode, thermistor and sensistor – Biasing BJT Switching Circuits- JFET - DC Load Line and Bias Point - Various biasing methods of JFET - JFET Bias Circuit Design - MOSFET Biasing - Biasing FET Switching Circuits. UNIT II BJT AMPLIFIERS 9 Small Signal Hybrid π equivalent circuit of BJT – Early effect - Analysis of CE, CC and CB amplifiers using Hybrid π equivalent circuits - AC Load Line Analysis- Darlington Amplifier - Bootstrap technique - Cascade, Cascode configurations - Differential amplifier, Basic BJT differential pair – Small signal analysis and CMRR. UNIT III SINGLE STAGE FET, MOSFET AMPLIFIERS 9
  • 41.
    41 Small Signal Hybridπ equivalent circuit of FET and MOSFET - Analysis of CS, CD and CG amplifiers using Hybrid π equivalent circuits - Basic FET differential pair- BiCMOS circuits. UNIT IV FREQUENCY RESPONSE OF AMPLIFIERS 9 Amplifier frequency response – Frequency response of transistor amplifiers with circuit capacitors – BJT frequency response – short circuit current gain - cut off frequency – fα, fβ and unity gain bandwidth – Miller effect - frequency response of FET - High frequency analysis of CE and MOSFET CS amplifier - Transistor Switching Times. UNIT V POWER SUPPLIES AND ELECTRONIC DEVICE TESTING 9 Linear mode power supply - Rectifiers - Filters - Half-Wave Rectifier Power Supply - Full-Wave Rectifier Power Supply - Voltage regulators: Voltage regulation - Linear series, shunt and switching Voltage Regulators - Over voltage protection - BJT and MOSFET – Switched mode power supply (SMPS) - Power Supply Performance and Testing - Troubleshooting and Fault Analysis, Design of Regulated DC Power Supply. TOTAL: 45 PERIODS OUTCOMES: After studying this course, the student should be able to:  Acquire knowledge of  Working principles, characteristics and applications of BJT and FET  Frequency response characteristics of BJT and FET amplifiers  Analyze the performance of small signal BJT and FET amplifiers - single stage and multi stage amplifiers  Apply the knowledge gained in the design of Electronic circuits TEXT BOOKS: 1. Donald. A. Neamen, Electronic Circuits Analysis and Design, 3rd Edition, Mc Graw Hill Education (India) Private Ltd., 2010. (Unit I-IV) 2. Robert L. Boylestad and Louis Nasheresky, ―Electronic Devices and Circuit Theory‖, 11th Edition, Pearson Education, 2013. (Unit V) REFERENCES 1. Millman J, Halkias.C.and Sathyabrada Jit, Electronic Devices and Circuits, 4 th Edition, Mc Graw Hill Education (India) Private Ltd., 2015. 2. Salivahanan and N. Suresh Kumar, Electronic Devices and Circuits, 4 th Edition, , Mc Graw Hill Education (India) Private Ltd., 2017. 3. Floyd, Electronic Devices, Ninth Edition, Pearson Education, 2012. 4. David A. Bell, Electronic Devices & Circuits, 5 th Edition, Oxford University Press, 2008. 5. Anwar A. Khan and Kanchan K. Dey, A First Course on Electronics, PHI, 2006. 6. Rashid M, Microelectronics Circuits, Thomson Learning, 2007. EC8352 SIGNALS AND SYSTEMS L T P C 4 0 0 4 OBJECTIVES:  To understand the basic properties of signal & systems  To know the methods of characterization of LTI systems in time domain  To analyze continuous time signals and system in the Fourier and Laplace domain  To analyze discrete time signals and system in the Fourier and Z transform domain UNIT I CLASSIFICATION OF SIGNALS AND SYSTEMS 12 Standard signals- Step, Ramp, Pulse, Impulse, Real and complex exponentials and Sinusoids_ Classification of signals – Continuous time (CT) and Discrete Time (DT) signals, Periodic & Aperiodic signals, Deterministic & Random signals, Energy & Power signals - Classification of
  • 42.
    42 systems- CT systemsand DT systems- – Linear & Nonlinear, Time-variant & Time-invariant, Causal & Non-causal, Stable & Unstable. UNIT II ANALYSIS OF CONTINUOUS TIME SIGNALS 12 Fourier series for periodic signals - Fourier Transform – properties- Laplace Transforms and properties UNIT III LINEAR TIME INVARIANT CONTINUOUS TIME SYSTEMS 12 Impulse response - convolution integrals- Differential Equation- Fourier and Laplace transforms in Analysis of CT systems - Systems connected in series / parallel. UNIT IV ANALYSIS OF DISCRETE TIME SIGNALS 12 Baseband signal Sampling – Fourier Transform of discrete time signals (DTFT) – Properties of DTFT - Z Transform & Properties UNIT V LINEAR TIME INVARIANT-DISCRETE TIME SYSTEMS 12 Impulse response – Difference equations-Convolution sum- Discrete Fourier Transform and Z Transform Analysis of Recursive & Non-Recursive systems-DT systems connected in series and parallel. TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  To be able to determine if a given system is linear/causal/stable  Capable of determining the frequency components present in a deterministic signal  Capable of characterizing LTI systems in the time domain and frequency domain  To be able to compute the output of an LTI system in the time and frequency domains TEXT BOOK: 1. Allan V.Oppenheim, S.Wilsky and S.H.Nawab, ―Signals and Systems‖, Pearson, 2015.(Unit 1- V) REFERENCES 1. B. P. Lathi, ―Principles of Linear Systems and Signals‖, Second Edition, Oxford, 2009. 2. R.E.Zeimer, W.H.Tranter and R.D.Fannin, ―Signals & Systems - Continuous and Discrete‖, Pearson, 2007. 3. John Alan Stuller, ―An Introduction to Signals and Systems‖, Thomson, 2007. EC8392 DIGITAL ELECTRONICS L T P C 3 0 0 3 OBJECTIVES:
  • 43.
    43  To presentthe Digital fundamentals, Boolean algebra and its applications in digital systems  To familiarize with the design of various combinational digital circuits using logic gates  To introduce the analysis and design procedures for synchronous and asynchronous sequential circuits  To explain the various semiconductor memories and related technology  To introduce the electronic circuits involved in the making of logic gates UNIT I DIGITAL FUNDAMENTALS 9 Number Systems – Decimal, Binary, Octal, Hexadecimal, 1‗s and 2‗s complements, Codes – Binary, BCD, Excess 3, Gray, Alphanumeric codes, Boolean theorems, Logic gates, Universal gates, Sum of products and product of sums, Minterms and Maxterms, Karnaugh map Minimization and Quine-McCluskey method of minimization. UNIT II COMBINATIONAL CIRCUIT DESIGN 9 Design of Half and Full Adders, Half and Full Subtractors, Binary Parallel Adder – Carry look ahead Adder, BCD Adder, Multiplexer, Demultiplexer, Magnitude Comparator, Decoder, Encoder, Priority Encoder. UNIT III SYNCHRONOUS SEQUENTIAL CIRCUITS 9 Flip flops – SR, JK, T, D, Master/Slave FF – operation and excitation tables, Triggering of FF, Analysis and design of clocked sequential circuits – Design - Moore/Mealy models, state minimization, state assignment, circuit implementation – Design of Counters- Ripple Counters, Ring Counters, Shift registers, Universal Shift Register. UNIT IV ASYNCHRONOUS SEQUENTIAL CIRCUITS 9 Stable and Unstable states, output specifications, cycles and races, state reduction, race free assignments, Hazards, Essential Hazards, Pulse mode sequential circuits, Design of Hazard free circuits. UNIT V MEMORY DEVICES AND DIGITAL INTEGRATED CIRCUITS 9 Basic memory structure – ROM -PROM – EPROM – EEPROM –EAPROM, RAM – Static and dynamic RAM - Programmable Logic Devices – Programmable Logic Array (PLA) - Programmable Array Logic (PAL) – Field Programmable Gate Arrays (FPGA) - Implementation of combinational logic circuits using PLA, PAL. Digital integrated circuits: Logic levels, propagation delay, power dissipation, fan-out and fan- in, noise margin, logic families and their characteristics-RTL, TTL, ECL, CMOS TOTAL: 45 PERIODS OUTCOMES: At the end of the course:  Use digital electronics in the present contemporary world  Design various combinational digital circuits using logic gates  Do the analysis and design procedures for synchronous and asynchronous sequential circuits  Use the semiconductor memories and related technology  Use electronic circuits involved in the design of logic gates TEXT BOOK:
  • 44.
    44 1. M. MorrisMano and Michael D. Ciletti, ―Digital Design‖, 5th Edition, Pearson, 2014. REFERENCES: 1. Charles H.Roth. ―Fundamentals of Logic Design‖, 6th Edition, Thomson Learning, 2013. 2. Thomas L. Floyd, ―Digital Fundamentals‖, 10th Edition, Pearson Education Inc, 2011 3. S.Salivahanan and S.Arivazhagan―Digital Electronics‖, Ist Edition, Vikas Publishing House pvt Ltd, 2012. 4. Anil K.Maini ―Digital Electronics‖, Wiley, 2014. 5. A.Anand Kumar ―Fundamentals of Digital Circuits‖, 4th Edition, PHI Learning Private Limited, 2016. 6. Soumitra Kumar Mandal ― Digital Electronics‖, McGraw Hill Education Private Limited, 2016. EC8391 CONTROL SYSTEMS ENGINEERING L T P C 3 0 0 3 OBJECTIVES:  To introduce the components and their representation of control systems  To learn various methods for analyzing the time response, frequency response and stability of the systems.  To learn the various approach for the state variable analysis. UNIT I SYSTEMS COMPONENTS AND THEIR REPRESENTATION 9 Control System: Terminology and Basic Structure-Feed forward and Feedback control theory- Electrical and Mechanical Transfer Function Models-Block diagram Models-Signal flow graphs models-DC and AC servo Systems-Synchronous -Multivariable control system UNIT II TIME RESPONSE ANALYSIS 9 Transient response-steady state response-Measures of performance of the standard first order and second order system-effect on an additional zero and an additional pole-steady error constant and system- type number-PID control-Analytical design for PD, PI,PID control systems UNIT III FREQUENCY RESPONSE AND SYSTEM ANALYSIS 9 Closed loop frequency response-Performance specification in frequency domain-Frequency response of standard second order system- Bode Plot - Polar Plot- Nyquist plots-Design of compensators using Bode plots-Cascade lead compensation-Cascade lag compensation-Cascade lag-lead compensation UNIT IV CONCEPTS OF STABILITY ANALYSIS 9 Concept of stability-Bounded - Input Bounded - Output stability-Routh stability criterion-Relative stability-Root locus concept-Guidelines for sketching root locus-Nyquist stability criterion. UNIT V CONTROL SYSTEM ANALYSIS USING STATE VARIABLE METHODS 9 State variable representation-Conversion of state variable models to transfer functions-Conversion of transfer functions to state variable models-Solution of state equations-Concepts of Controllability and Observability-Stability of linear systems-Equivalence between transfer function and state variable representations-State variable analysis of digital control system-Digital control design using state feedback. TOTAL:45 PERIODS OUTCOMES:
  • 45.
    45 Upon completion ofthe course, the student should be able to:  Identify the various control system components and their representations.  Analyze the various time domain parameters.  Analysis the various frequency response plots and its system.  Apply the concepts of various system stability criterions.  Design various transfer functions of digital control system using state variable models. TEXT BOOK: 1. M.Gopal, ―Control System – Principles and Design‖, Tata McGraw Hill, 4th Edition, 2012. REFERENCES: 1. J.Nagrath and M.Gopal, ―Control System Engineering‖, New Age International Publishers, 5 th Edition, 2007. 2. K. Ogata, ‗Modern Control Engineering‘, 5th edition, PHI, 2012. 3. S.K.Bhattacharya, Control System Engineering, 3rd Edition, Pearson, 2013. 4. Benjamin.C.Kuo, ―Automatic control systems‖, Prentice Hall of India, 7th Edition,1995.
  • 46.
    46 EC8381 FUNDAMENTALS OFDATA STRUCTURES IN C LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To understand and implement basic data structures using C  To apply linear and non-linear data structures in problem solving.  To learn to implement functions and recursive functions by means of data structures  To implement searching and sorting algorithms LIST OF EXERCISES 1. Basic C Programs – looping, data manipulations, arrays 2. Programs using strings – string function implementation 3. Programs using structures and pointers 4. Programs involving dynamic memory allocations 5. Array implementation of stacks and queues 6. Linked list implementation of stacks and queues 7. Application of Stacks and Queues 8. Implementation of Trees, Tree Traversals 9. Implementation of Binary Search trees 10. Implementation of Linear search and binary search 11. Implementation Insertion sort, Bubble sort, Quick sort and Merge Sort 12. Implementation Hash functions, collision resolution technique TOTAL:60 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Write basic and advanced programs in C  Implement functions and recursive functions in C  Implement data structures using C  Choose appropriate sorting algorithm for an application and implement it in a modularized way EC8361 ANALOG AND DIGITAL CIRCUITS LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made to:  Study the Frequency response of CE, CB and CC Amplifier  Learn the frequency response of CS Amplifiers  Study the Transfer characteristics of differential amplifier  Perform experiment to obtain the bandwidth of single stage and multistage amplifiers  Perform SPICE simulation of Electronic Circuits  Design and implement the Combinational and sequential logic circuits LIST OF ANALOG EXPERIMENTS: 1. 1. Design of Regulated Power supplies 2. 2. Frequency Response of CE, CB, CC and CS amplifiers 3. 3. Darlington Amplifier 4. 4. Differential Amplifiers - Transfer characteristics, CMRR Measurement 5. 5. Cascode and Cascade amplifiers 6. 6. Determination of bandwidth of single stage and multistage amplifiers 7. 7. Analysis of BJT with Fixed bias and Voltage divider bias using Spice 8. 8. Analysis of FET, MOSFET with fixed bias, self-bias and voltage divider bias using
  • 47.
    47 simulation software likeSpice 9. 9. Analysis of Cascode and Cascade amplifiers using Spice 10. Analysis of Frequency Response of BJT and FET using Spice LIST OF DIGITAL EXPERIMENTS 1. Design and implementation of code converters using logic gates(i) BCD to excess-3 code and vice versa (ii) Binary to gray and vice-versa 2. Design and implementation of 4 bit binary Adder/ Subtractor and BCD adder using IC 7483 3. Design and implementation of Multiplexer and De-multiplexer using logic gates 4. Design and implementation of encoder and decoder using logic gates 5. Construction and verification of 4 bit ripple counter and Mod-10 / Mod-12 Ripple counters 6. Design and implementation of 3-bit synchronous up/down counter TOTAL : 60 PERIODS OUTCOMES: On completion of this laboratory course, the student should be able to:  Design and Test rectifiers, filters and regulated power supplies.  Design and Test BJT/JFET amplifiers.  Differentiate cascode and cascade amplifiers.  Analyze the limitation in bandwidth of single stage and multi stage amplifier  Measure CMRR in differential amplifier  Simulate and analyze amplifier circuits using PSpice.  Design and Test the digital logic circuits. LAB REQUIREMENTS FOR A BATCH OF 30 STUDENTS, 2 STUDENTS / EXPERIMENT: S.NO EQUIPMENTS FOR ANALOG LAB 1 CRO/DSO (30MHz) – 15 Nos. 2 Signal Generator /Function Generators (3 MHz) – 15 Nos 3 Dual Regulated Power Supplies ( 0 – 30V) – 15 Nos. 4 Standalone desktop PCs with SPICE software – 15 Nos. 5 Transistor/FET (BJT-NPN-PNP and NMOS/PMOS) – 50 Nos 6 Components and Accessories: Resistors, Capacitors, Inductors, diodes, Zener Diodes, Bread Boards, Transformers. 7 SPICE Circuit Simulation Software: (any public domain or commercial software) S.NO EQUIPMENTS FOR DIGITAL LAB 1 Dual power supply/ single mode power supply - 15 Nos 2 IC Trainer Kit - 15 Nos 3 Bread Boards - 15 Nos 4 Seven segment display -15 Nos 5 Multimeter - 15 Nos 6 ICs each 50 Nos 7400/ 7402 / 7404 / 7486 / 7408 / 7432 / 7483 / 74150 / 74151 / 74147 / 7445 / 7476/7491/ 555 / 7494 / 7447 / 74180 / 7485 / 7473 / 74138 / 7411 / 7474
  • 48.
    48 HS8381 INTERPERSONAL SKILLS/LISTENING&SPEAKINGL T P C 0 0 2 1 OBJECTIVES: The Course will enable learners to: • Equip students with the English language skills required for the successful undertaking of academic studies with primary emphasis on academic speaking and listening skills. • Provide guidance and practice in basic general and classroom conversation and to engage in specific academic speaking activities. • improve general and academic listening skills • Make effective presentations. UNIT I Listening as a key skill- its importance- speaking - give personal information - ask for personal information - express ability - enquire about ability - ask for clarification Improving pronunciation - pronunciation basics taking lecture notes - preparing to listen to a lecture - articulate a complete idea as opposed to producing fragmented utterances. UNIT II Listen to a process information- give information, as part of a simple explanation - conversation starters: small talk - stressing syllables and speaking clearly - intonation patterns - compare and contrast information and ideas from multiple sources- converse with reasonable accuracy over a wide range of everyday topics. UNIT III Lexical chunking for accuracy and fluency- factors influence fluency, deliver a five-minute informal talk - greet - respond to greetings - describe health and symptoms - invite and offer - accept - decline - take leave - listen for and follow the gist- listen for detail UNIT IV Being an active listener: giving verbal and non-verbal feedback - participating in a group discussion - summarizing academic readings and lectures conversational speech listening to and participating in conversations - persuade. UNIT V Formal and informal talk - listen to follow and respond to explanations, directions and instructions in academic and business contexts - strategies for presentations and interactive communication - group/pair presentations - negotiate disagreement in group work. TOTAL :30PERIODS OUTCOMES: At the end of the course Learners will be able to:  Listen and respond appropriately.  Participate in group discussions  Make effective presentations  Participate confidently and appropriately in conversations both formal and informal
  • 49.
    49 TEXT BOOKS: 1. Brooks,Margret.Skills for Success. Listening and Speaking. Level 4 Oxford University Press, Oxford: 2011. 2. Richards,C. Jack. & David Bholke. Speak Now Level 3. Oxford University Press, Oxford: 2010 REFERENCES 1. Bhatnagar, Nitin and MamtaBhatnagar. Communicative English for Engineers and Professionals. Pearson: New Delhi, 2010. 2. Hughes, Glyn and Josephine Moate. Practical English Classroom. Oxford University Press: Oxford, 2014. 3. Vargo, Mari. Speak Now Level 4. Oxford University Press: Oxford, 2013. 4. Richards C. Jack. Person to Person (Starter). Oxford University Press: Oxford, 2006. 5. Ladousse, Gillian Porter. Role Play. Oxford University Press: Oxford, 2014 MA8451 PROBABILITY AND RANDOM PROCESSES L T P C 4 0 0 4 OBJECTIVES :  To provide necessary basic concepts in probability and random processes for applications such as random signals, linear systems in communication engineering.  To understand the basic concepts of probability, one and two dimensional random variables and to introduce some standard distributions applicable to engineering which can describe real life phenomenon.  To understand the basic concepts of random processes which are widely used in IT fields.  To understand the concept of correlation and spectral densities.  To understand the significance of linear systems with random inputs. UNIT I PROBABILITY AND RANDOM VARIABLES 12 Probability – Axioms of probability – Conditional probability – Baye‘s theorem - Discrete and continuous random variables – Moments – Moment generating functions – Binomial, Poisson, Geometric, Uniform, Exponential and Normal distributions. UNIT II TWO - DIMENSIONAL RANDOM VARIABLES 12 Joint distributions – Marginal and conditional distributions – Covariance – Correlation and linear regression – Transformation of random variables – Central limit theorem (for independent and identically distributed random variables). UNIT III RANDOM PROCESSES 12 Classification – Stationary process – Markov process - Markov chain - Poisson process – Random telegraph process. UNIT IV CORRELATION AND SPECTRAL DENSITIES 12 Auto correlation functions – Cross correlation functions – Properties – Power spectral density – Cross spectral density – Properties. UNIT V LINEAR SYSTEMS WITH RANDOM INPUTS 12 Linear time invariant system – System transfer function – Linear systems with random inputs – Auto correlation and cross correlation functions of input and output. TOTAL : 60 PERIODS
  • 50.
    50 OUTCOMES: Upon successful completionof the course, students should be able to:  Understand the fundamental knowledge of the concepts of probability and have knowledge of standard distributions which can describe real life phenomenon.  Understand the basic concepts of one and two dimensional random variables and apply in engineering applications.  Apply the concept random processes in engineering disciplines.  Understand and apply the concept of correlation and spectral densities.  The students will have an exposure of various distribution functions and help in acquiring skills in handling situations involving more than one variable. Able to analyze the response of random inputs to linear time invariant systems. TEXT BOOKS: 1. Ibe, O.C.," Fundamentals of Applied Probability and Random Processes ", 1st Indian Reprint, Elsevier, 2007. 2. Peebles, P.Z., "Probability, Random Variables and Random Signal Principles ", Tata McGraw Hill, 4th Edition, New Delhi, 2002. REFERENCES: 1. Cooper. G.R., McGillem. C.D., "Probabilistic Methods of Signal and System Analysis", Oxford University Press, New Delhi, 3rd Indian Edition, 2012. 2. Hwei Hsu, "Schaum‘s Outline of Theory and Problems of Probability, Random Variables and Random Processes ", Tata McGraw Hill Edition, New Delhi, 2004. 3. Miller. S.L. and Childers. D.G., ―Probability and Random Processes with Applications to Signal Processing and Communications ", Academic Press, 2004. 4. Stark. H. and Woods. J.W., ―Probability and Random Processes with Applications to Signal Processing ", Pearson Education, Asia, 3rd Edition, 2002. 5. Yates. R.D. and Goodman. D.J., ―Probability and Stochastic Processes", Wiley India Pvt. Ltd., Bangalore, 2nd Edition, 2012. EC8452 ELECTRONIC CIRCUITS II L T P C 3 0 0 3 OBJECTIVES:  To give a comprehensive exposure to all types of amplifiers and oscillators constructed with discrete components. This helps to develop a strong basis for building linear and digital integrated circuits  To study about feedback amplifiers and oscillators principles  To design oscillators.  To study about turned amplifier.  To understand the analysis and design of LC and RC oscillators, amplifiers, multi vibrators, power amplifiers and DC convertors. UNIT I FEEDBACK AMPLIFIERS AND STABILITY 9 Feedback Concepts – gain with feedback – effect of feedback on gain stability, distortion, bandwidth, input and output impedances; topologies of feedback amplifiers – analysis of series-series, shunt-shunt and shunt-series feedback amplifiers-stability problem-Gain and Phase-margins-Frequency compensation.
  • 51.
    51 UNIT II OSCILLATORS9 Barkhausen criterion for oscillation – phase shift, Wien bridge - Hartley & Colpitt‘s oscillators – Clapp oscillator-Ring oscillators and crystal oscillators – oscillator amplitude stabilization. UNIT III TUNED AMPLIFIERS 9 Coil losses, unloaded and loaded Q of tank circuits, small signal tuned amplifiers – Analysis of capacitor coupled single tuned amplifier – double tuned amplifier - effect of cascading single tuned and double tuned amplifiers on bandwidth – Stagger tuned amplifiers - Stability of tuned amplifiers – Neutralization - Hazeltine neutralization method. UNIT IV WAVE SHAPING AND MULTIVIBRATOR CIRCUITS 9 Pulse circuits – attenuators – RC integrator and differentiator circuits – diode clampers and clippers –Multivibrators - Schmitt Trigger- UJT Oscillator. UNIT V POWER AMPLIFIERS AND DC CONVERTERS 9 Power amplifiers- class A-Class B-Class AB-Class C-Power MOSFET-Temperature Effect- Class AB Power amplifier using MOSFET –DC/DC convertors – Buck, Boost, Buck-Boost analysis and design TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the student should be able to:  Analyze different types of amplifier, oscillator and multivibrator circuits  Design BJT amplifier and oscillator circuits  Analyze transistorized amplifier and oscillator circuits  Design and analyze feedback amplifiers  Design LC and RC oscillators, tuned amplifiers, wave shaping circuits, multivibrators, power amplifier and DC convertors. TEXT BOOKS: 1. Sedra and Smith, ―Micro Electronic Circuits‖; Sixth Edition, Oxford University Press, 2011. (UNIT I, III,IV,V) 2. Jacob Millman, ‗Microelectronics‘, McGraw Hill, 2nd Edition, Reprinted, 2009. (UNIT I,II,IV,V) REFERENCES: 1. Robert L. Boylestad and Louis Nasheresky, ―Electronic Devices and Circuit Theory‖, 10th Edition, Pearson Education / PHI, 2008 2. David A. Bell, ―Electronic Devices and Circuits‖, Fifth Edition, Oxford University Press, 2008. 3. Millman J. and Taub H., ―Pulse Digital and Switching Waveforms‖, TMH, 2000. 4. Millman and Halkias. C., Integrated Electronics, TMH, 2007.
  • 52.
    52 EC8491 COMMUNICATION THEORYL T P C 3 0 0 3 OBJECTIVES:  To introduce the concepts of various analog modulations and their spectral characteristics  To understand the properties of random process  To know the effect of noise on communication systems  To study the limits set by Information Theory UNIT I AMPLITUDE MODULATION 9 Amplitude Modulation- DSBSC, DSBFC, SSB, VSB - Modulation index, Spectra, Power relations and Bandwidth – AM Generation – Square law and Switching modulator, DSBSC Generation – Balanced and Ring Modulator, SSB Generation – Filter, Phase Shift and Third Methods, VSB Generation – Filter Method, Hilbert Transform, Pre-envelope & complex envelope –comparison of different AM techniques, Superheterodyne Receiver UNIT II ANGLE MODULATION 9 Phase and frequency modulation, Narrow Band and Wide band FM – Modulation index, Spectra, Power relations and Transmission Bandwidth - FM modulation –Direct and Indirect methods, FM Demodulation – FM to AM conversion, FM Discriminator - PLL as FM Demodulator. UNIT III RANDOM PROCESS 9 Random variables, Random Process, Stationary Processes, Mean, Correlation & Covariance functions, Power Spectral Density, Ergodic Processes, Gaussian Process, Transmission of a Random Process Through a LTI filter. UNIT IV NOISE CHARACTERIZATION 9 Noise sources – Noise figure, noise temperature and noise bandwidth – Noise in cascaded systems. Representation of Narrow band noise –In-phase and quadrature, Envelope and Phase – Noise performance analysis in AM & FM systems – Threshold effect, Pre-emphasis and de- emphasis for FM. UNIT V SAMPLING & QUANTIZATION 9 Low pass sampling – Aliasing- Signal Reconstruction-Quantization - Uniform & non-uniform quantization - quantization noise - Logarithmic Companding –PAM, PPM, PWM, PCM – TDM, FDM. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Design AM communication systems  Design Angle modulated communication systems  Apply the concepts of Random Process to the design of Communication systems  Analyze the noise performance of AM and FM systems  Gain knowledge in sampling and quantization TEXT BOOKS: 1. J.G.Proakis, M.Salehi, ―Fundamentals of Communication Systems‖, Pearson Education 2014. (UNIT I-IV) 2. Simon Haykin, ―Communication Systems‖, 4th Edition, Wiley, 2014.(UNIT I-V)
  • 53.
    53 REFERENCES: 1. B.P.Lathi, ―ModernDigital and Analog Communication Systems‖, 3rd Edition, Oxford University Press, 2007. 2. D.Roody, J.Coolen, ―Electronic Communications, 4th edition PHI 2006 3. A.Papoulis, ―Probability, Random variables and Stochastic Processes‖, McGraw Hill, 3rd edition, 1991. 4. B.Sklar, ―Digital Communications Fundamentals and Applications‖, 2nd Edition Pearson Education 2007 5. H P Hsu, Schaum Outline Series - ―Analog and Digital Communications‖ TMH 2006 6. Couch.L., "Modern Communication Systems", Pearson, 2001. EC8451 ELECTROMAGNETIC FIELDS L T P C 4 0 0 4 OBJECTIVES:  To gain conceptual and basic mathematical understanding of electric and magnetic fields in free space and in materials  To understand the coupling between electric and magnetic fields through Faraday's law, displacement current and Maxwell's equations  To understand wave propagation in lossless and in lossy media  To be able to solve problems based on the above concepts UNIT I INTRODUCTION 12 Electromagnetic model, Units and constants, Review of vector algebra, Rectangular, cylindrical and spherical coordinate systems, Line, surface and volume integrals, Gradient of a scalar field, Divergence of a vector field, Divergence theorem, Curl of a vector field, Stoke's theorem, Null identities, Helmholtz's theorem UNIT II ELECTROSTATICS 12 Electric field, Coulomb's law, Gauss's law and applications, Electric potential, Conductors in static electric field, Dielectrics in static electric field, Electric flux density and dielectric constant, Boundary conditions, Capacitance, Parallel, cylindrical and spherical capacitors, Electrostatic energy, Poisson's and Laplace's equations, Uniqueness of electrostatic solutions, Current density and Ohm's law, Electromotive force and Kirchhoff's voltage law, Equation of continuity and Kirchhoff's current law UNIT III MAGNETOSTATICS 12 Lorentz force equation, Law of no magnetic monopoles, Ampere's law, Vector magnetic potential, Biot-Savart law and applications, Magnetic field intensity and idea of relative permeability, Magnetic circuits, Behaviour of magnetic materials, Boundary conditions, Inductance and inductors, Magnetic energy, Magnetic forces and torques UNIT IV TIME-VARYING FIELDS AND MAXWELL's EQUATIONS 12 Faraday's law, Displacement current and Maxwell-Ampere law, Maxwell's equations, Potential functions, Electromagnetic boundary conditions, Wave equations and solutions, Time-harmonic fields
  • 54.
    54 UNIT V PLANEELECTROMAGNETIC WAVES 12 Plane waves in lossless media, Plane waves in lossy media (low-loss dielectrics and good conductors), Group velocity, Electromagnetic power flow and Poynting vector, Normal incidence at a plane conducting boundary, Normal incidence at a plane dielectric boundary TOTAL:60 PERIODS OUTCOMES: By the end of this course, the student should be able to:  Display an understanding of fundamental electromagnetic laws and concepts  Write Maxwell's equations in integral, differential and phasor forms and explain their physical meaning  Explain electromagnetic wave propagation in lossy and in lossless media  Solve simple problems requiring estimation of electric and magnetic field quantities based on these concepts and laws TEXT BOOKS: 1. D.K. Cheng, Field and wave electromagnetics, 2nd ed., Pearson (India), 1989 (UNIT I, II,III IV,V) 2. W.H. Hayt and J.A. Buck, Engineering electrmagnetics, 7th ed., McGraw-Hill (India), 2006 (UNIT I-V) REFERENCES 1. D.J. Griffiths, Introduction to electrodynamics, 4th ed., Pearson (India), 2013 2. B.M. Notaros, Electromagnetics, Pearson: New Jersey, 2011 3. M.N.O. Sadiku and S.V. Kulkarni, Principles of electromagnetics, 6th ed., Oxford (Asian Edition), 2015 EC8453 LINEAR INTEGRATED CIRCUITS L T P C 3 0 0 3 OBJECTIVES:  To introduce the basic building blocks of linear integrated circuits  To learn the linear and non-linear applications of operational amplifiers  To introduce the theory and applications of analog multipliers and PLL  To learn the theory of ADC and DAC  To introduce the concepts of waveform generation and introduce some special function ICs UNIT I BASICS OF OPERATIONAL AMPLIFIERS 9 Current mirror and current sources, Current sources as active loads, Voltage sources, Voltage References, BJT Differential amplifier with active loads, Basic information about op-amps – Ideal Operational Amplifier - General operational amplifier stages -and internal circuit diagrams of IC 741, DC and AC performance characteristics, slew rate, Open and closed loop configurations – JFET Operational Amplifiers – LF155 and TL082. UNIT II APPLICATIONS OF OPERATIONAL AMPLIFIERS 9 Sign Changer, Scale Changer, Phase Shift Circuits, Voltage Follower, V-to-I and I-to-V converters, adder, subtractor, Instrumentation amplifier, Integrator, Differentiator, Logarithmic amplifier, Antilogarithmic amplifier, Comparators, Schmitt trigger, Precision rectifier, peak detector, clipper
  • 55.
    55 and clamper, Low-pass,high-pass and band-pass Butterworth filters. UNIT III ANALOG MULTIPLIER AND PLL 9 Analog Multiplier using Emitter Coupled Transistor Pair - Gilbert Multiplier cell – Variable transconductance technique, analog multiplier ICs and their applications, Operation of the basic PLL, Closed loop analysis, Voltage controlled oscillator, Monolithic PLL IC 565, application of PLL for AM detection, FM detection, FSK modulation and demodulation and Frequency synthesizing and clock synchronisation. UNIT IV ANALOG TO DIGITAL AND DIGITAL TO ANALOG CONVERTERS 9 Analog and Digital Data Conversions, D/A converter – specifications - weighted resistor type, R-2R Ladder type, Voltage Mode and Current-Mode R - 2R Ladder types - switches for D/A converters, high speed sample-and-hold circuits, A/D Converters – specifications - Flash type - Successive Approximation type - Single Slope type – Dual Slope type - A/D Converter using Voltage-to-Time Conversion - Over-sampling A/D Converters, Sigma – Delta converters. UNIT V WAVEFORM GENERATORS AND SPECIAL FUNCTION ICS 9 Sine-wave generators, Multivibrators and Triangular wave generator, Saw-tooth wave generator, ICL8038 function generator, Timer IC 555, IC Voltage regulators – Three terminal fixed and adjustable voltage regulators - IC 723 general purpose regulator - Monolithic switching regulator, Low Drop – Out(LDO) Regulators - Switched capacitor filter IC MF10, Frequency to Voltage and Voltage to Frequency converters, Audio Power amplifier, Video Amplifier, Isolation Amplifier, Opto- couplers and fibre optic IC. TOTAL:45 PERIODS OUTCOMES: Upon completion of the course, the student should be able to:  Design linear and non linear applications of OP – AMPS  Design applications using analog multiplier and PLL  Design ADC and DAC using OP – AMPS  Generate waveforms using OP – AMP Circuits  Analyze special function ICs TEXT BOOKS: 1. D.Roy Choudhry, Shail Jain, ―Linear Integrated Circuits‖, New Age International Pvt. Ltd., 2018, Fifth Edition. (Unit I – V) 2. Sergio Franco, ―Design with Operational Amplifiers and Analog Integrated Circuits‖, 4th Edition, Tata Mc Graw-Hill, 2016 (Unit I – V) REFERENCES: 1. Ramakant A. Gayakwad, ―OP-AMP and Linear ICs‖, 4th Edition, Prentice Hall / Pearson Education, 2015. 2. Robert F.Coughlin, Frederick F.Driscoll, ―Operational Amplifiers and Linear Integrated Circuits‖, Sixth Edition, PHI, 2001. 3. B.S.Sonde, ―System design using Integrated Circuits‖ , 2nd Edition, New Age Pub, 2001. 4. Gray and Meyer, ―Analysis and Design of Analog Integrated Circuits‖, Wiley International,5th Edition, 2009. 5. William D.Stanley, ―Operational Amplifiers with Linear Integrated Circuits‖, Pearson Education,4th Edition,2001. 6. S.Salivahanan & V.S. Kanchana Bhaskaran, ―Linear Integrated Circuits‖, TMH,2nd Edition, 4th Reprint, 2016.
  • 56.
    56 GE8291 ENVIRONMENTAL SCIENCEAND ENGINEERING L T P C 3 0 0 3 OBJECTIVES:  To study the nature and facts about environment.  To finding and implementing scientific, technological, economic and political solutions to environmental problems.  To study the interrelationship between living organism and environment.  To appreciate the importance of environment by assessing its impact on the human world; envision the surrounding environment, its functions and its value.  To study the dynamic processes and understand the features of the earth‟s interior and surface.  To study the integrated themes and biodiversity, natural resources, pollution control and waste management. UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY 14 Definition, scope and importance of environment – need for public awareness - concept of an ecosystem – structure and function of an ecosystem – producers, consumers and decomposers – energy flow in the ecosystem – ecological succession – food chains, food webs and ecological pyramids – Introduction, types, characteristic features, structure and function of the (a) forest ecosystem (b) grassland ecosystem (c) desert ecosystem (d) aquatic ecosystems (ponds, streams, lakes, rivers, oceans, estuaries) – Introduction to biodiversity definition: genetic, species and ecosystem diversity – biogeographical classification of India – value of biodiversity: consumptive use, productive use, social, ethical, aesthetic and option values – Biodiversity at global, national and local levels – India as a mega-diversity nation – hot-spots of biodiversity – threats to biodiversity: habitat loss, poaching of wildlife, man-wildlife conflicts – endangered and endemic species of India – conservation of biodiversity: In-situ and ex-situ conservation of biodiversity. Field study of common plants, insects, birds; Field study of simple ecosystems – pond, river, hill slopes, etc. UNIT II ENVIRONMENTAL POLLUTION 8 Definition – causes, effects and control measures of: (a) Air pollution (b) Water pollution (c) Soil pollution (d) Marine pollution (e) Noise pollution (f) Thermal pollution (g) Nuclear hazards – solid waste management: causes, effects and control measures of municipal solid wastes – role of an individual in prevention of pollution – pollution case studies – disaster management: floods, earthquake, cyclone and landslides. Field study of local polluted site – Urban / Rural / Industrial / Agricultural. UNIT III NATURAL RESOURCES 10 Forest resources: Use and over-exploitation, deforestation, case studies- timber extraction, mining, dams and their effects on forests and tribal people – Water resources: Use and over- utilization of surface and ground water, floods, drought, conflicts over water, dams-benefits and problems – Mineral resources: Use and exploitation, environmental effects of extracting and using mineral resources, case studies – Food resources: World food problems, changes caused by agriculture and overgrazing, effects of modern agriculture, fertilizer-pesticide problems, water logging, salinity, case studies – Energy resources: Growing energy needs, renewable and non renewable energy sources, use of alternate energy sources. case studies – Land resources: Land as a resource, land degradation, man induced landslides, soil erosion and desertification – role of an individual in
  • 57.
    57 conservation of naturalresources – Equitable use of resources for sustainable lifestyles. Field study of local area to document environmental assets – river / forest / grassland / hill / mountain.
  • 58.
    58 UNIT IV SOCIALISSUES AND THE ENVIRONMENT 7 From unsustainable to sustainable development – urban problems related to energy – water conservation, rain water harvesting, watershed management – resettlement and rehabilitation of people; its problems and concerns, case studies – role of non-governmental organization- environmental ethics: Issues and possible solutions – climate change, global warming, acid rain, ozone layer depletion, nuclear accidents and holocaust, case studies. – wasteland reclamation – consumerism and waste products – environment production act – Air (Prevention and Control of Pollution) act – Water (Prevention and control of Pollution) act – Wildlife protection act – Forest conservation act – enforcement machinery involved in environmental legislation- central and state pollution control boards- Public awareness. UNIT V HUMAN POPULATION AND THE ENVIRONMENT 6 Population growth, variation among nations – population explosion – family welfare programme – environment and human health – human rights – value education – HIV / AIDS – women and child welfare – role of information technology in environment and human health – Case studies. TOTAL: 45 PERIODS OUTCOMES:  Environmental Pollution or problems cannot be solved by mere laws. Public participation is an important aspect which serves the environmental Protection. One will obtain knowledge on the following after completing the course.  Public awareness of environmental is at infant stage.  Ignorance and incomplete knowledge has lead to misconceptions  Development and improvement in std. of living has lead to serious environmental disasters TEXTBOOKS: 1. Benny Joseph, ‗Environmental Science and Engineering‘, Tata McGraw-Hill, New Delhi, 2006. 2. Gilbert M.Masters, ‗Introduction to Environmental Engineering and Science‘, 2nd edition, Pearson Education, 2004. REFERENCES : 1. Dharmendra S. Sengar, ‗Environmental law‘, Prentice hall of India PVT LTD,New Delhi, 2007. 2. Erach Bharucha, ―Textbook of Environmental Studies‖, Universities Press(I) PVT, LTD, Hydrabad, 2015. 3. Rajagopalan, R, ‗Environmental Studies-From Crisis to Cure‘, Oxford University Press, 2005. 4. G. Tyler Miller and Scott E. Spoolman, ―Environmental Science‖, Cengage Learning India PVT, LTD, Delhi, 2014. EC8461 CIRCUITS DESIGN AND SIMULATION LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To gain hands on experience in designing electronic circuits  To learn simulation software used in circuit design  To learn the fundamental principles of amplifier circuits  To differentiate feedback amplifiers and oscillators.  To differentiate the operation of various multivibrators
  • 59.
    59 DESIGN AND ANALYSISOF THE FOLLOWING CIRCUITS 1. Series and Shunt feedback amplifiers-Frequency response, Input and output impedance 2. RC Phase shift oscillator and Wien Bridge Oscillator 3. Hartley Oscillator and Colpitts Oscillator 4. Single Tuned Amplifier 5. RC Integrator and Differentiator circuits 6. Astable and Monostable multivibrators 7. Clippers and Clampers SIMULATION USING SPICE (Using Transistor): 1. Tuned Collector Oscillator 2. Twin -T Oscillator / Wein Bridge Oscillator 3. Double and Stagger tuned Amplifiers 4. Bistable Multivibrator 5. Schmitt Trigger circuit with Predictable hysteresis 6. Analysis of power amplifier TOTAL: 60 PERIODS OUTCOMES: On completion of this laboratory course, the student should be able to:  Analyze various types of feedback amplifiers  Design oscillators, tuned amplifiers, wave-shaping circuits and multivibrators  Design and simulate feedback amplifiers, oscillators, tuned amplifiers, wave-shaping circuits and multivibrators using SPICE Tool. LAB REQUIREMENT FOR A BATCH OF 30 STUDENTS / 2 STUDENTS PER EXPERIMENT: Components and Accessories: Transistors, Resistors, Capacitors, Inductors, diodes, Zener Diodes, Bread Boards, Transformers. SPICE Circuit Simulation Software: (any public domain or commercial software) S.NO EQUIPMENTS 1 CRO (Min 30MHz) - 15 Nos 2 Signal Generator /Function Generators (2 MHz) – 15 Nos 3 Dual Regulated Power Supplies (0 – 30V) - 15 Nos 4 Digital Multimeter - 15 Nos 5 Digital LCR Meter - 2 Nos 6 Standalone desktops PC - 15 Nos 7 Transistor/FET (BJT-NPN-PNP and NMOS/PMOS) - 50 Nos
  • 60.
    60 EC8462 LINEAR INTEGRATEDCIRCUITS LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To understand the basics of linear integrated circuits and available ICs  To understand the characteristics of the operational amplifier.  To apply operational amplifiers in linear and nonlinear applications.  To acquire the basic knowledge of special function IC.  To use SPICE software for circuit design DESIGN AND TESTING OF THE FOLLOWING CIRCUITS 1. Inverting, Non inverting and differential amplifiers. 2. Integrator and Differentiator. 3. Instrumentation amplifier 4. Active low-pass, High-pass and band-pass filters. 5. Astable & Monostable multivibrators using Op-amp 6. Schmitt Trigger using op-amp. 7. Phase shift and Wien bridge oscillators using Op-amp. 8. Astable and Monostable multivibrators using NE555 Timer. 9. PLL characteristics and its use as Frequency Multiplier, Clock synchronization 10. R-2R Ladder Type D- A Converter using Op-amp. 11. DC power supply using LM317 and LM723. 12. Study of SMPS SIMULATION USING SPICE: 1. Active low-pass, High-pass and band-pass filters using Op-amp 2. Astable and Monostable multivibrators using NE555 Timer. 3. A/ D converter 4. Analog multiplier TOTAL: 60 PERIODS OUTCOMES: On completion of this laboratory course, the student should be able to:  Design amplifiers, oscillators, D-A converters using operational amplifiers.  Design filters using op-amp and performs an experiment on frequency response.  Analyze the working of PLL and describe its application as a frequency multiplier.  Design DC power supply using ICs.  Analyze the performance of filters, multivibrators, A/D converter and analog multiplier using SPICE. LAB REQUIREMENT FOR A BATCH OF 30 STUDENTS / 2 STUDENTS PER EXPERIMENT: S.NO EQUIPMENTS 1 CRO/DSO (Min 30MHz) -- 15 Nos 2 Signal Generator /Function Generators (2 MHz) – 15 Nos 3 Dual Regulated Power Supplies (0 – 30V) -- 15 Nos 4 Digital Multimeter -- 15 Nos 5 IC Tester -- 5 Nos
  • 61.
    61 Components and Accessories: Transistors,Resistors, Capacitors, diodes, Zener diodes, Bread Boards, Transformers, wires, Power transistors, Potentiometer, A/D and D/A convertors, LEDs . Note: Op-Amps uA741, LM 301, LM311, LM 324, LM317, LM723, 7805, 7812, 2N3524, 2N3525, 2N3391, AD 633, LM 555, LM 565 may be used. EC8501 DIGITAL COMMUNICATION L T P C 3 0 0 3 OBJECTIVES:  To know the principles of sampling & quantization  To study the various waveform coding schemes  To learn the various baseband transmission schemes  To understand the various band pass signaling schemes  To know the fundamentals of channel coding UNIT I INFORMATION THEORY 9 Discrete Memoryless source, Information, Entropy, Mutual Information - Discrete Memoryless channels – Binary Symmetric Channel, Channel Capacity - Hartley - Shannon law - Source coding theorem - Shannon - Fano & Huffman codes. UNIT II WAVEFORM CODING & REPRESENTATION 9 Prediction filtering and DPCM - Delta Modulation - ADPCM & ADM principles-Linear Predictive Coding- Properties of Line codes- Power Spectral Density of Unipolar / Polar RZ & NRZ – Bipolar NRZ - Manchester UNIT III BASEBAND TRANSMISSION & RECEPTION 9 ISI – Nyquist criterion for distortion less transmission – Pulse shaping – Correlative coding - Eye pattern – Receiving Filters- Matched Filter, Correlation receiver, Adaptive Equalization UNIT IV DIGITAL MODULATION SCHEME 9 Geometric Representation of signals - Generation, detection, PSD & BER of Coherent BPSK, BFSK & QPSK - QAM - Carrier Synchronization - Structure of Non-coherent Receivers - Principle of DPSK. UNIT V ERROR CONTROL CODING 9 Channel coding theorem - Linear Block codes - Hamming codes - Cyclic codes - Convolutional codes - Viterbi Decoder. TOTAL:45 PERIODS 6 Standalone desktops PC -- 15 Nos 7 Components and Accessories – 50 Nos
  • 62.
    62 OUTCOMES: Upon completion ofthe course, the student should be able to  Design PCM systems  Design and implement base band transmission schemes  Design and implement band pass signaling schemes  Analyze the spectral characteristics of band pass signaling schemes and their noise performance  Design error control coding schemes TEXT BOOK: 1. S. Haykin, ―Digital Communications‖, John Wiley, 2005 (Unit I –V) REFERENCES 1. B. Sklar, ―Digital Communication Fundamentals and Applications‖, 2nd Edition, Pearson Education, 2009 2. B.P.Lathi, ―Modern Digital and Analog Communication Systems‖ 3rd Edition, Oxford University Press 2007. 3. H P Hsu, Schaum Outline Series - ―Analog and Digital Communications‖, TMH 2006 4. J.G Proakis, ―Digital Communication‖, 4th Edition, Tata Mc Graw Hill Company, 2001. EC8553 DISCRETE-TIME SIGNAL PROCESSING L T P C 4 0 0 4 OBJECTIVES:  To learn discrete fourier transform, properties of DFT and its application to linear filtering  To understand the characteristics of digital filters, design digital IIR and FIR filters and apply these filters to filter undesirable signals in various frequency bands  To understand the effects of finite precision representation on digital filters  To understand the fundamental concepts of multi rate signal processing and its applications  To introduce the concepts of adaptive filters and its application to communication engineering UNIT I DISCRETE FOURIER TRANSFORM 12 Review of signals and systems, concept of frequency in discrete-time signals, summary of analysis & synthesis equations for FT & DTFT, frequency domain sampling, Discrete Fourier transform (DFT) - deriving DFT from DTFT, properties of DFT - periodicity, symmetry, circular convolution. Linear filtering using DFT. Filtering long data sequences - overlap save and overlap add method. Fast computation of DFT - Radix-2 Decimation-in-time (DIT) Fast Fourier transform (FFT), Decimation-in-frequency (DIF) Fast Fourier transform (FFT). Linear filtering using FFT. UNIT II INFINITE IMPULSE RESPONSE FILTERS 12 Characteristics of practical frequency selective filters. characteristics of commonly used analog filters - Butterworth filters, Chebyshev filters. Design of IIR filters from analog filters (LPF, HPF, BPF, BRF) - Approximation of derivatives, Impulse invariance method, Bilinear transformation. Frequency transformation in the analog domain. Structure of IIR filter - direct form I, direct form II, Cascade, parallel realizations. UNIT III FINITE IMPULSE RESPONSE FILTERS 12
  • 63.
    63 Design of FIRfilters - symmetric and Anti-symmetric FIR filters - design of linear phase FIR filters using Fourier series method - FIR filter design using windows (Rectangular, Hamming and Hanning window), Frequency sampling method. FIR filter structures - linear phase structure, direct form realizations UNIT IV FINITE WORD LENGTH EFFECTS 12 Fixed point and floating point number representation - ADC - quantization - truncation and rounding - quantization noise - input / output quantization - coefficient quantization error - product quantization error - overflow error - limit cycle oscillations due to product quantization and summation - scaling to prevent overflow. UNIT V INTRODUCTION TO DIGITAL SIGNAL PROCESSORS 12 DSP functionalities - circular buffering – DSP architecture – Fixed and Floating point architecture principles – Programming – Application examples. TOTAL:60PERIODS OUTCOMES: At the end of the course, the student should be able to  Apply DFT for the analysis of digital signals and systems  Design IIR and FIR filters  Characterize the effects of finite precision representation on digital filters  Design multirate filters  Apply adaptive filters appropriately in communication systems TEXT BOOK: 1. John G. Proakis & Dimitris G.Manolakis, ―Digital Signal Processing – Principles, Algorithms & Applications‖, Fourth Edition, Pearson Education / Prentice Hall, 2007. (UNIT I – V) REFERENCES: 1. Emmanuel C. Ifeachor & Barrie. W. Jervis, ―Digital Signal Processing‖, Second Edition, Pearson Education / Prentice Hall, 2002. 2. A. V. Oppenheim, R.W. Schafer and J.R. Buck, ―Discrete-Time Signal Processing‖, 8th Indian Reprint, Pearson, 2004. 3. Sanjit K. Mitra, ―Digital Signal Processing – A Computer Based Approach‖, Tata Mc Graw Hill, 2007. 4. Andreas Antoniou, ―Digital Signal Processing‖, Tata Mc Graw Hill, 2006. EC8552 COMPUTER ARCHITECTURE AND ORGANIZATION L T P C 3 0 0 3 OBJECTIVES:  To make students understand the basic structure and operation of digital computer  To familiarize with implementation of fixed point and floating-point arithmetic operations  To study the design of data path unit and control unit for processor  To understand the concept of various memories and interfacing  To introduce the parallel processing technique
  • 64.
    64 UNIT I COMPUTERORGANIZATION & INSTRUCTIONS 9 Basics of a computer system: Evolution, Ideas, Technology, Performance, Power wall, Uniprocessors to Multiprocessors. Addressing and addressing modes. Instructions: Operations and Operands, Representing instructions, Logical operations, control operations. UNIT II ARITHMETIC 9 Fixed point Addition, Subtraction, Multiplication and Division. Floating Point arithmetic, High performance arithmetic, Subword parallelism UNIT III THE PROCESSOR 9 Introduction, Logic Design Conventions, Building a Datapath - A Simple Implementation scheme - An Overview of Pipelining - Pipelined Datapath and Control. Data Hazards: Forwarding versus Stalling, Control Hazards, Exceptions, Parallelism via Instructions. UNIT IV MEMORY AND I/O ORGANIZATION 9 Memory hierarchy, Memory Chip Organization, Cache memory, Virtual memory. Parallel Bus Architectures, Internal Communication Methodologies, Serial Bus Architectures, Mass storage, Input and Output Devices. UNIT V ADVANCED COMPUTER ARCHITECTURE 9 Parallel processing architectures and challenges, Hardware multithreading, Multicore and shared memory multiprocessors, Introduction to Graphics Processing Units, Clusters and Warehouse scale computers - Introduction to Multiprocessor network topologies. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to  Describe data representation, instruction formats and the operation of a digital computer  Illustrate the fixed point and floating-point arithmetic for ALU operation  Discuss about implementation schemes of control unit and pipeline performance  Explain the concept of various memories, interfacing and organization of multiple processors  Discuss parallel processing technique and unconventional architectures TEXT BOOKS: 1. David A. Patterson and John L. Hennessey, ―Computer Organization and Design‖, Fifth edition, Morgan Kauffman / Elsevier, 2014. (UNIT I-V) 2. Miles J. Murdocca and Vincent P. Heuring, ―Computer Architecture and Organization: An Integrated approach‖, Second edition, Wiley India Pvt Ltd, 2015 (UNIT IV,V) REFERENCES 1. V. Carl Hamacher, Zvonko G. Varanesic and Safat G. Zaky, ―Computer Organization―, Fifth edition, Mc Graw-Hill Education India Pvt Ltd, 2014. 2. William Stallings ―Computer Organization and Architecture‖, Seventh Edition, Pearson Education, 2006.
  • 65.
    65 3. Govindarajalu, ―ComputerArchitecture and Organization, Design Principles and Applications", Second edition, McGraw-Hill Education India Pvt Ltd, 2014. EC8551 COMMUNICATION NETWORKS L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Understand the division of network functionalities into layers.  Be familiar with the components required to build different types of networks  Be exposed to the required functionality at each layer  Learn the flow control and congestion control algorithms UNIT I FUNDAMENTALS & LINK LAYER 9 Overview of Data Communications- Networks – Building Network and its types– Overview of Internet - Protocol Layering - OSI Mode – Physical Layer – Overview of Data and Signals - introduction to Data Link Layer - Link layer Addressing- Error Detection and Correction UNIT II MEDIA ACCESS & INTERNETWORKING 9 Overview of Data link Control and Media access control - Ethernet (802.3) - Wireless LANs – Available Protocols – Bluetooth – Bluetooth Low Energy – WiFi – 6LowPAN–Zigbee - Network layer services – Packet Switching – IPV4 Address – Network layer protocols ( IP, ICMP, Mobile IP) UNIT III ROUTING 9 Routing - Unicast Routing – Algorithms – Protocols – Multicast Routing and its basics – Overview of Intradomain and interdomain protocols – Overview of IPv6 Addressing – Transition from IPv4 to IPv6 UNIT IV TRANSPORT LAYER 9 Introduction to Transport layer –Protocols- User Datagram Protocols (UDP) and Transmission Control Protocols (TCP) –Services – Features – TCP Connection – State Transition Diagram – Flow, Error and Congestion Control - Congestion avoidance (DECbit, RED) – QoS – Application requirements UNIT V APPLICATION LAYER 9 Application Layer Paradigms – Client Server Programming – World Wide Web and HTTP - DNS- - Electronic Mail (SMTP, POP3, IMAP, MIME) – Introduction to Peer to Peer Networks – Need for Cryptography and Network Security – Firewalls. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Identify the components required to build different types of networks  Choose the required functionality at each layer for given application  Identify solution for each functionality at each layer  Trace the flow of information from one node to another node in the network TEXT BOOK: 1. Behrouz A. Forouzan, ―Data communication and Networking‖, Fifth Edition, Tata McGraw – Hill, 2013 (UNIT I –V)
  • 66.
    66 REFERENCES 1. James F.Kurose, Keith W. Ross, ―Computer Networking - A Top-Down Approach Featuring the Internet‖, Seventh Edition, Pearson Education, 2016. 2. Nader. F. Mir,― Computer and Communication Networks‖, Pearson Prentice Hall Publishers, 2nd Edition, 2014. 3. Ying-Dar Lin, Ren-Hung Hwang, Fred Baker, ―Computer Networks: An Open Source Approach‖, Mc Graw Hill Publisher, 2011. 4. Larry L. Peterson, Bruce S. Davie, ―Computer Networks: A Systems Approach‖, Fifth Edition, Morgan Kaufmann Publishers, 2011.
  • 67.
    67 EC8562 DIGITAL SIGNALPROCESSING LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made:  To perform basic signal processing operations such as Linear Convolution, Circular Convolution, Auto Correlation, Cross Correlation and Frequency analysis in MATLAB  To implement FIR and IIR filters in MATLAB and DSP Processor  To study the architecture of DSP processor  To design a DSP system to demonstrate the Multi-rate and Adaptive signal processing concepts. LIST OF EXPERIMENTS: MATLAB / EQUIVALENT SOFTWARE PACKAGE 1. Generation of elementary Discrete-Time sequences 2. Linear and Circular convolutions 3. Auto correlation and Cross Correlation 4. Frequency Analysis using DFT 5. Design of FIR filters (LPF/HPF/BPF/BSF) and demonstrates the filtering operation 6. Design of Butterworth and Chebyshev IIR filters (LPF/HPF/BPF/BSF) and demonstrate the filtering operations DSP PROCESSOR BASED IMPLEMENTATION 1. Study of architecture of Digital Signal Processor 2. Perform MAC operation using various addressing modes 3. Generation of various signals and random noise 4. Design and demonstration of FIR Filter for Low pass, High pass, Band pass and Band stop filtering 5. Design and demonstration of Butter worth and Chebyshev IIR Filters for Low pass, High pass, Band pass and Band stop filtering 6. Implement an Up-sampling and Down-sampling operation in DSP Processor TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Carryout basic signal processing operations  Demonstrate their abilities towards MATLAB based implementation of various DSP systems  Analyze the architecture of a DSP Processor  Design and Implement the FIR and IIR Filters in DSP Processor for performing filtering operation over real-time signals  Design a DSP system for various applications of DSP EC8561 COMMUNICATION SYSTEMS LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made:  To visualize the effects of sampling and TDM  To Implement AM & FM modulation and demodulation  To implement PCM & DM  To simulate Digital Modulation schemes  To simulate Error control coding schemes
  • 68.
    68 LIST OF EXPERIMENTS: 1.Signal Sampling and reconstruction 2. Time Division Multiplexing 3. AM Modulator and Demodulator 4. FM Modulator and Demodulator 5. Pulse Code Modulation and Demodulation 6. Delta Modulation and Demodulation 7. Line coding schemes 8. Simulation of ASK, FSK, and BPSK generation schemes 9. Simulation of DPSK, QPSK and QAM generation schemes 10. Simulation of signal constellations of BPSK, QPSK and QAM 11. Simulation of ASK, FSK and BPSK detection schemes 12. Simulation of Linear Block and Cyclic error control coding schemes 13. Simulation of Convolutional coding scheme 14. Communication link simulation TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Simulate & validate the various functional modules of a communication system  Demonstrate their knowledge in base band signaling schemes through implementation of digital modulation schemes  Apply various channel coding schemes & demonstrate their capabilities towards the improvement of the noise performance of communication system  Simulate end-to-end communication Link LAB Requirements for a Batch of 30 students (3 students per experiment): i) Kits for Signal Sampling, TDM, AM, FM, PCM, DM and Line Coding Schemes ii) CROs/DSOs – 15 Nos, Function Generators – 15 Nos. iii) MATLAB or equivalent software package for simulation experiments iv) PCs - 15 Nos EC8563 COMMUNICATION NETWORKS LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made to:  Learn to communicate between two desktop computers  Learn to implement the different protocols  Be familiar with IP Configuration  Be familiar with the various routing algorithms  Be familiar with simulation tools LIST OF EXPERIMENTS: 1. Implementation of Error Detection / Error Correction Techniques 2. Implementation of Stop and Wait Protocol and sliding window 3. Implementation and study of Goback-N and selective repeat protocols 4. Implementation of High Level Data Link Control 5. Implementation of IP Commands such as ping, Traceroute, nslookup. 6. Implementation of IP address configuration. 7. To create scenario and study the performance of network with CSMA / CA protocol and compare with CSMA/CD protocols.
  • 69.
    69 8. Network Topology- Star, Bus, Ring 9. Implementation of distance vector routing algorithm 10. Implementation of Link state routing algorithm 11. Study of Network simulator (NS) and simulation of Congestion Control Algorithms using NS 12. Implementation of Encryption and Decryption Algorithms using any programming language TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Communicate between two desktop computers  Implement the different protocols  Program using sockets.  Implement and compare the various routing algorithms  Use the simulation tool. LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS SOFTWARE • C / Python / Java / Equivalent Compiler • MATLAB SOFTWARE (Few experiments can be practiced with MATLAB) • Standard LAN Trainer Kits 4 Nos • Network simulator like NS2/ NS3 / Glomosim/OPNET/ 30 Equivalent HARDWARE Standalone Desktops 30 Nos EC8691 MICROPROCESSORS AND MICROCONTROLLERS L T P C 3 0 0 3 OBJECTIVES:  To understand the Architecture of 8086 microprocessor.  To learn the design aspects of I/O and Memory Interfacing circuits.  To interface microprocessors with supporting chips.  To study the Architecture of 8051 microcontroller.  To design a microcontroller based system UNIT I THE 8086 MICROPROCESSOR 9 Introduction to 8086 – Microprocessor architecture – Addressing modes - Instruction set and assembler directives – Assembly language programming – Modular Programming - Linking and Relocation - Stacks - Procedures – Macros – Interrupts and interrupt service routines – Byte and String Manipulation. UNIT II 8086 SYSTEM BUS STRUCTURE 9 8086 signals – Basic configurations – System bus timing –System design using 8086 – I/O programming – Introduction to Multiprogramming – System Bus Structure – Multiprocessor configurations – Coprocessor, Closely coupled and loosely Coupled configurations – Introduction to advanced processors. UNIT III I/O INTERFACING 9 Memory Interfacing and I/O interfacing - Parallel communication interface – Serial communication interface – D/A and A/D Interface - Timer – Keyboard /display controller – Interrupt controller – DMA controller – Programming and applications Case studies: Traffic Light control, LED display , LCD display, Keyboard display interface and Alarm Controller.
  • 70.
    70 UNIT IV MICROCONTROLLER9 Architecture of 8051 – Special Function Registers(SFRs) - I/O Pins Ports and Circuits - Instruction set - Addressing modes - Assembly language programming. UNIT V INTERFACING MICROCONTROLLER 9 Programming 8051 Timers - Serial Port Programming - Interrupts Programming – LCD & Keyboard Interfacing - ADC, DAC & Sensor Interfacing - External Memory Interface- Stepper Motor and Waveform generation - Comparison of Microprocessor, Microcontroller, PIC and ARM processors TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Understand and execute programs based on 8086 microprocessor.  Design Memory Interfacing circuits.  Design and interface I/O circuits.  Design and implement 8051 microcontroller based systems. TEXT BOOKS: 1. Yu-Cheng Liu, Glenn A.Gibson, ―Microcomputer Systems: The 8086 / 8088 Family - Architecture, Programming and Design‖, Second Edition, Prentice Hall of India, 2007. (UNIT I- III) 2. Mohamed Ali Mazidi, Janice Gillispie Mazidi, Rolin McKinlay, ―The 8051 Microcontroller and Embedded Systems: Using Assembly and C‖, Second Edition, Pearson education, 2011. (UNIT IV-V) REFERENCES: 1. Doughlas V.Hall, ―Microprocessors and Interfacing, Programming and Hardware‖,TMH,2012 2. A.K.Ray,K.M.Bhurchandi, "Advanced Microprocessors and Peripherals" 3rd edition, Tata McGrawHill, 2012 EC8095 VLSI DESIGN L T P C 3 0 0 3 OBJECTIVES:  Study the fundamentals of CMOS circuits and its characteristics.  Learn the design and realization of combinational & sequential digital circuits.  Architectural choices and performance tradeoffs involved in designing and realizing the circuits in CMOS technology are discussed  Learn the different FPGA architectures and testability of VLSI circuits. UNIT I INTRODUCTION TO MOS TRANSISTOR 9 MOS Transistor, CMOS logic, Inverter, Pass Transistor, Transmission gate, Layout Design Rules, Gate Layouts, Stick Diagrams, Long-Channel I-V Charters tics, C-V Charters tics, Non ideal I-V Effects, DC Transfer characteristics, RC Delay Model, Elmore Delay, Linear Delay Model, Logical effort, Parasitic Delay, Delay in Logic Gate, Scaling. UNIT II COMBINATIONAL MOS LOGIC CIRCUITS 9 Circuit Families: Static CMOS, Ratioed Circuits, Cascode Voltage Switch Logic, Dynamic Circuits, Pass Transistor Logic, Transmission Gates, Domino, Dual Rail Domino, CPL, DCVSPG, DPL, Circuit Pitfalls. Power: Dynamic Power, Static Power, Low Power Architecture.
  • 71.
    71 UNIT III SEQUENTIALCIRCUIT DESIGN 9 Static latches and Registers, Dynamic latches and Registers, Pulse Registers, Sense Amplifier Based Register, Pipelining, Schmitt Trigger, Monostable Sequential Circuits, Astable Sequential Circuits. Timing Issues : Timing Classification Of Digital System, Synchronous Design. UNIT IV DESIGN OF ARITHMETIC BUILDING BLOCKS AND SUBSYSTEM 9 Arithmetic Building Blocks: Data Paths, Adders, Multipliers, Shifters, ALUs, power and speed tradeoffs, Case Study: Design as a tradeoff. Designing Memory and Array structures: Memory Architectures and Building Blocks, Memory Core, Memory Peripheral Circuitry. UNIT V IMPLEMENTATION STRATEGIES AND TESTING 9 FPGA Building Block Architectures, FPGA Interconnect Routing Procedures. Design for Testability: Ad Hoc Testing, Scan Design, BIST, IDDQ Testing, Design for Manufacturability, Boundary Scan. TOTAL : 45 PERIODS OUTCOMES: UPON COMPLETION OF THE COURSE, STUDENTS SHOULD be ABLE TO  Realize the concepts of digital building blocks using MOS transistor.  Design combinational MOS circuits and power strategies.  Design and construct Sequential Circuits and Timing systems.  Design arithmetic building blocks and memory subsystems.  Apply and implement FPGA design flow and testing. TEXT BOOKS: 1. Neil H.E. Weste, David Money Harris ―CMOS VLSI Design: A Circuits and Systems Perspective‖, 4th Edition, Pearson , 2017 (UNIT I,II,V) 2. Jan M. Rabaey ,Anantha Chandrakasan, Borivoje. Nikolic, ‖Digital Integrated Circuits:A Design perspective‖, Second Edition , Pearson , 2016.(UNIT III,IV) REFERENCES 1. M.J. Smith, ―Application Specific Integrated Circuits‖, Addisson Wesley, 1997 2. Sung-Mo kang, Yusuf leblebici, Chulwoo Kim ―CMOS Digital Integrated Circuits:Analysis & Design‖,4th edition McGraw Hill Education,2013 3. Wayne Wolf, ―Modern VLSI Design: System On Chip‖, Pearson Education, 2007 4. R.Jacob Baker, Harry W.LI., David E.Boyee, ―CMOS Circuit Design, Layout and Simulation‖, Prentice Hall of India 2005. EC8652 WIRELESS COMMUNICATION L T P C 3 0 0 3 OBJECTIVES:  To study the characteristic of wireless channel  To understand the design of a cellular system  To study the various digital signaling techniques and multipath mitigation techniques  To understand the concepts of multiple antenna techniques
  • 72.
    72 UNIT I WIRELESSCHANNELS 9 Large scale path loss – Path loss models: Free Space and Two-Ray models -Link Budget design – Small scale fading- Parameters of mobile multipath channels – Time dispersion parameters-Coherence bandwidth – Doppler spread & Coherence time, fading due to Multipath time delay spread – flat fading – frequency selective fading – Fading due to Doppler spread – fast fading – slow fading. UNIT II CELLULAR ARCHITECTURE 9 Multiple Access techniques - FDMA, TDMA, CDMA – Capacity calculations–Cellular concept- Frequency reuse - channel assignment- hand off- interference & system capacity- trunking & grade of service – Coverage and capacity improvement. UNIT III DIGITAL SIGNALING FOR FADING CHANNELS 9 Structure of a wireless communication link, Principles of Offset-QPSK, p/4-DQPSK, Minimum Shift Keying, Gaussian Minimum Shift Keying, Error performance in fading channels, OFDM principle – Cyclic prefix, Windowing, PAPR. UNIT IV MULTIPATH MITIGATION TECHNIQUES 9 Equalisation – Adaptive equalization, Linear and Non-Linear equalization, Zero forcing and LMS Algorithms. Diversity – Micro and Macro diversity, Diversity combining techniques, Error probability in fading channels with diversity reception, Rake receiver. UNIT V MULTIPLE ANTENNA TECHNIQUES 9 MIMO systems – spatial multiplexing -System model -Pre-coding - Beam forming - transmitter diversity, receiver diversity- Channel state information-capacity in fading and non-fading channels. TOTAL: 45 PERIODS OUTCOMES: The student should be able to: • Characterize a wireless channel and evolve the system design specifications • Design a cellular system based on resource availability and traffic demands • Identify suitable signaling and multipath mitigation techniques for the wireless channel and system under consideration. TEXT BOOKS: 1. Rappaport,T.S., ―Wireless communications‖, Pearson Education, Second Edition, 2010.(UNIT I, II, IV) 2. Andreas.F. Molisch, ―Wireless Communications‖, John Wiley – India, 2006. (UNIT III,V) REFERENCES: 1. Wireless Communication –Andrea Goldsmith, Cambridge University Press, 2011 2. Van Nee, R. and Ramji Prasad, ―OFDM for wireless multimedia communications, Artech House, 2000 3. David Tse and Pramod Viswanath, ―Fundamentals of Wireless Communication, Cambridge University Press, 2005. 4. Upena Dalal, ―Wireless Communication‖, Oxford University Press, 2009.
  • 73.
    73 MG8591 PRINCIPLES OFMANAGEMENT L T P C 3 0 0 3 OBJECTIVE:  To enable the students to study the evolution of Management, to study the functions and principles of management and to learn the application of the principles in an organization . UNIT I INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS 9 Definition of Management – Science or Art – Manager Vs Entrepreneur - types of managers - managerial roles and skills – Evolution of Management – Scientific, human relations, system and contingency approaches – Types of Business organization - Sole proprietorship, partnership, company-public and private sector enterprises - Organization culture and Environment – Current trends and issues in Management. UNIT II PLANNING 9 Nature and purpose of planning – planning process – types of planning – objectives – setting objectives – policies – Planning premises – Strategic Management – Planning Tools and Techniques – Decision making steps and process. UNIT III ORGANISING 9 Nature and purpose – Formal and informal organization – organization chart – organization structure – types – Line and staff authority – departmentalization – delegation of authority – centralization and decentralization – Job Design - Human Resource Management – HR Planning, Recruitment, selection, Training and Development, Performance Management, Career planning and management UNIT IV DIRECTING 9 Foundations of individual and group behaviour – motivation – motivation theories – motivational techniques – job satisfaction – job enrichment – leadership – types and theories of leadership – communication – process of communication – barrier in communication – effective communication –communication and IT. UNIT V CONTROLLING 9 System and process of controlling – budgetary and non-budgetary control techniques – use of computers and IT in Management control – Productivity problems and management – control and performance – direct and preventive control – reporting. TOTAL: 45 PERIODS OUTCOME:  Upon completion of the course, students will be able to have clear understanding  Managerial functions like planning, organizing, staffing, leading & controlling and have same basic knowledge on international aspect of management TEXTBOOKS: 1. Stephen P. Robbins & Mary Coulter, ―Management‖, Prentice Hall (India) Pvt. Ltd., 10th Edition, 2009. 2. JAF Stoner, Freeman R.E and Daniel R Gilbert ―Management‖, Pearson Education, 6th Edition, 2004. REFERENCES: 1. Stephen A. Robbins & David A. Decenzo & Mary Coulter, ―Fundamentals of Management‖ Pearson Education, 7th Edition, 2011. 2. Robert Kreitner & Mamata Mohapatra, ― Management‖, Biztantra, 2008. 3. Harold Koontz & Heinz Weihrich ―Essentials of management‖ Tata McGraw Hill,1998.
  • 74.
    74 4. Tripathy PC& Reddy PN, ―Principles of Management‖, Tata McGraw Hill, 1999 EC8651 TRANSMISSION LINES AND RF SYSTEMS L T P C 3 0 0 3 OBJECTIVES:  To introduce the various types of transmission lines and its characteristics  To give thorough understanding about high frequency line, power and impedance measurements  To impart technical knowledge in impedance matching using smith chart  To introduce passive filters and basic knowledge of active RF components  To get acquaintance with RF system transceiver design UNIT I TRANSMISSION LINE THEORY 9 General theory of Transmission lines - the transmission line - general solution - The infinite line - Wavelength, velocity of propagation - Waveform distortion - the distortion-less line - Loading and different methods of loading - Line not terminated in Z0 - Reflection coefficient - calculation of current, voltage, power delivered and efficiency of transmission - Input and transfer impedance - Open and short circuited lines - reflection factor and reflection loss. UNIT II HIGH FREQUENCY TRANSMISSION LINES 9 Transmission line equations at radio frequencies - Line of Zero dissipation - Voltage and current on the dissipation-less line, Standing Waves, Nodes, Standing Wave Ratio - Input impedance of the dissipation-less line - Open and short circuited lines - Power and impedance measurement on lines - Reflection losses - Measurement of VSWR and wavelength. UNIT III IMPEDANCE MATCHING IN HIGH FREQUENCY LINES 9 Impedance matching: Quarter wave transformer - Impedance matching by stubs - Single stub and double stub matching - Smith chart - Solutions of problems using Smith chart - Single and double stub matching using Smith chart. UNIT IV WAVEGUIDES 9 General Wave behavior along uniform guiding structures – Transverse Electromagnetic Waves, Transverse Magnetic Waves, Transverse Electric Waves – TM and TE Waves between parallel plates. Field Equations in rectangular waveguides, TM and TE waves in rectangular waveguides, Bessel Functions, TM and TE waves in Circular waveguides. UNIT V RF SYSTEM DESIGN CONCEPTS 9 Active RF components: Semiconductor basics in RF, bipolar junction transistors, RF field effect transistors, High electron mobility transistors Basic concepts of RF design, Mixers, Low noise amplifiers, voltage control oscillators, Power amplifiers, transducer power gain and stability considerations. TOTAL:45 PERIODS OUTCOMES: Upon completion of the course, the student should be able to:  Explain the characteristics of transmission lines and its losses  Write about the standing wave ratio and input impedance in high frequency transmission lines  Analyze impedance matching by stubs using smith charts  Analyze the characteristics of TE and TM waves  Design a RF transceiver system for wireless communication TEXT BOOKS:
  • 75.
    75 1. John DRyder, ―Networks, lines and fields‖, 2nd Edition, Prentice Hall India, 2015. (UNIT I- IV) 2. Mathew M. Radmanesh, ―Radio Frequency &Microwave Electronics‖, Pearson Education Asia, Second Edition,2002. (UNIT V) REFERENCES: 1. Reinhold Ludwig and Powel Bretchko,‖ RF Circuit Design – Theory and Applications‖, Pearson Education Asia, First Edition,2001. 2. D. K. Misra, ―Radio Frequency and Microwave Communication Circuits- Analysis and Design‖, John Wiley & Sons, 2004. 3. E.C.Jordan and K.G. Balmain, ―Electromagnetic Waves and Radiating Systems Prentice Hall of India, 2006. 4. G.S.N Raju, "Electromagnetic Field Theory and Transmission Lines Pearson Education, First edition 2005. EC8681 MICROPROCESSORS AND MICROCONTROLLERS LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To Introduce ALP concepts, features and Coding methods  Write ALP for arithmetic and logical operations in 8086 and 8051  Differentiate Serial and Parallel Interface  Interface different I/Os with Microprocessors  Be familiar with MASM LIST OF EXPERIMENTS: 8086 Programs using kits and MASM 1. Basic arithmetic and Logical operations 2. Move a data block without overlap 3. Code conversion, decimal arithmetic and Matrix operations. 4. Floating point operations, string manipulations, sorting and searching 5. Password checking, Print RAM size and system date 6. Counters and Time Delay Peripherals and Interfacing Experiments 7. Traffic light controller 8. Stepper motor control 9. Digital clock 10. Key board and Display 11. Printer status 12. Serial interface and Parallel interface 13. A/D and D/A interface and Waveform Generation 8051 Experiments using kits and MASM 14. Basic arithmetic and Logical operations 15. Square and Cube program, Find 2‘s complement of a number 16. Unpacked BCD to ASCII TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Write ALP Programmes for fixed and Floating Point and Arithmetic operations  Interface different I/Os with processor  Generate waveforms using Microprocessors
  • 76.
    76  Execute Programsin 8051  Explain the difference between simulator and Emulator LAB EQUIPMENT FOR A BATCH OF 30 STUDENTS: HARDWARE: 8086 development kits - 30 nos Interfacing Units - Each 10 nos Microcontroller - 30 nos SOFTWARE: Intel Desktop Systems with MASM - 30 nos 8086 Assembler 8051 Cross Assembler EC8661 VLSI DESIGN LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made:  To learn Hardware Descriptive Language(Verilog/VHDL)  To learn the fundamental principles of VLSI circuit design in digital and analog domain  To familiarize fusing of logical modules on FPGAs  To provide hands on design experience with professional design (EDA) platforms LIST OF EXPERIMENTS: Part I: Digital System Design using HDL & FPGA (24 Periods) 1. Design an Adder (Min 8 Bit) using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA 2. Design a Multiplier (4 Bit Min) using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA 3. Design an ALU using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA 4. Design a Universal Shift Register using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA 5. Design Finite State Machine (Moore/Mealy) using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA 6. Design Memories using HDL. Simulate it using Xilinx/Altera Software and implement by Xilinx/Altera FPGA Compare pre synthesis and post synthesis simulation for experiments 1 to 6. Requirements: Xilinx ISE/Altera Quartus/ equivalent EDA Tools along with Xilinx/Altera/equivalent FPGA Boards Part-II Digital Circuit Design (24 Periods) 7. Design and simulate a CMOS inverter using digital flow 8. Design and simulate a CMOS Basic Gates & Flip-Flops 9. Design and simulate a 4-bit synchronous counter using a Flip-Flops Manual/Automatic Layout Generation and Post Layout Extraction for experiments 7 to 9 Analyze the power, area and timing for experiments 7 to 9 by performing Pre Layout and Post Layout Simulations.
  • 77.
    77 Part-III Analog CircuitDesign (12 Periods) 10. Design and Simulate a CMOS Inverting Amplifier. 11. Design and Simulate basic Common Source, Common Gate and Common Drain Amplifiers. Analyze the input impedance, output impedance, gain and bandwidth for experiments 10 and 11 by performing Schematic Simulations. 12. Design and simulate simple 5 transistor differential amplifier. Analyze Gain, Bandwidth and CMRR by performing Schematic Simulations. Requirements: Cadence/Synopsis/ Mentor Graphics/Tanner/equivalent EDA Tools TOTAL :60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Write HDL code for basic as well as advanced digital integrated circuit  Import the logic modules into FPGA Boards  Synthesize Place and Route the digital IPs  Design, Simulate and Extract the layouts of Digital & Analog IC Blocks using EDA tools LIST OF EQUIPMENTS FOR A BATCH OF 30 STUDENTS EC8701 ANTENNAS AND MICROWAVE ENGINEERING L T P C 3 0 0 3 OBJECTIVES: • To enable the student to understand the basic principles in antenna and microwave system design • To enhance the student knowledge in the area of various antenna designs. • To enhance the student knowledge in the area of microwave components and antenna for practical applications. S.NO EQUIPMENT REQUIRED 1 Xilinx ISE/Altera Quartus/ equivalent EDA Tools 10 User License 2 Xilinx/Altera/equivalent FPGA Boards 10 no 3 Cadence/Synopsis/ Mentor Graphics/Tanner/equivalent EDA Tools 10 User License 4 Personal Computer 30 no
  • 78.
    78 UNIT I INTRODUCTIONTO MICROWAVE SYSTEMS AND ANTENNAS 9 Microwave frequency bands, Physical concept of radiation, Near- and far-field regions, Fields and Power Radiated by an Antenna, Antenna Pattern Characteristics, Antenna Gain and Efficiency, Aperture Efficiency and Effective Area, Antenna Noise Temperature and G/T, Impedance matching, Friis transmission equation, Link budget and link margin, Noise Characterization of a microwave receiver. UNIT II RADIATION MECHANISMS AND DESIGN ASPECTS 9 Radiation Mechanisms of Linear Wire and Loop antennas, Aperture antennas, Reflector antennas, Microstrip antennas and Frequency independent antennas, Design considerations and applications. UNIT III ANTENNA ARRAYS AND APPLICATIONS 9 Two-element array, Array factor, Pattern multiplication, Uniformly spaced arrays with uniform and non-uniform excitation amplitudes, Smart antennas. UNIT IV PASSIVE AND ACTIVE MICROWAVE DEVICES 9 Microwave Passive components: Directional Coupler, Power Divider, Magic Tee, attenuator, resonator, Principles of Microwave Semiconductor Devices: Gunn Diodes, IMPATT diodes, Schottky Barrier diodes, PIN diodes, Microwave tubes: Klystron, TWT, Magnetron. UNIT V MICROWAVE DESIGN PRINCIPLES 9 Impedance transformation, Impedance Matching, Microwave Filter Design, RF and Microwave Amplifier Design, Microwave Power amplifier Design, Low Noise Amplifier Design, Microwave Mixer Design, Microwave Oscillator Design TOTAL: 45 PERIODS OUTCOMES: The student should be able to: • Apply the basic principles and evaluate antenna parameters and link power budgets • Design and assess the performance of various antennas • Design a microwave system given the application specifications TEXTBOOKS: 1. John D Krauss, Ronald J Marhefka and Ahmad S. Khan, "Antennas and Wave Propagation: Fourth Edition, Tata McGraw-Hill, 2006. (UNIT I, II, III) 2. David M. Pozar, "Microwave Engineering", Fourth Edition, Wiley India, 2012.(UNIT I,IV,V) REFERENCES: 1. Constantine A.Balanis, ―Antenna Theory Analysis and Design‖, Third edition, John Wiley India Pvt Ltd., 2005. 2. R.E.Collin, "Foundations for Microwave Engineering", Second edition, IEEE Press, 2001
  • 79.
    79 EC8751 OPTICAL COMMUNICATIONL T P C 3 0 0 3 OBJECTIVES:  To study about the various optical fiber modes, configuration and transmission characteristics of optical fibers  To learn about the various optical sources, detectors and transmission techniques  To explore various idea about optical fiber measurements and various coupling techniques  To enrich the knowledge about optical communication systems and networks  UNIT I INTRODUCTION TO OPTICAL FIBERS 9 Introduction-general optical fiber communication system- basic optical laws and definitions- optical modes and configurations -mode analysis for optical propagation through fibers- modes in planar wave guide-modes in cylindrical optical fiber-transverse electric and transverse magnetic modes- fiber materials-fiber fabrication techniques-fiber optic cables- classification of optical fiber-single mode fiber-graded index fiber. UNIT II TRANSMISSION CHARACTERISTIC OF OPTICAL FIBER 9 Attenuation-absorption --scattering losses-bending losses-core and cladding losses-signal dispersion –inter symbol interference and bandwidth-intra model dispersion-material dispersion- waveguide dispersion-polarization mode dispersion-intermodal dispersion- dispersion optimization of single mode fiber-characteristics of single mode fiber-R-I Profile- cutoff wave length-dispersion calculation-mode field diameter. UNIT III OPTICAL SOURCES AND DETECTORS 9 Sources: Intrinsic and extrinsic material-direct and indirect band gaps-LED-LED structures- surface emitting LED-Edge emitting LED-quantum efficiency and LED power-light source materials-modulation of LED-LASER diodes-modes and threshold conditions-Rate equations-external quantum efficiency-resonant frequencies-structures and radiation patterns-single mode laser-external modulation-temperature effort. Detectors: PIN photo detector-Avalanche photo diodes-Photo detector noise-noise sources-SNR-detector response time-Avalanche multiplication noise-temperature effects- comparisons of photo detectors. UNIT IV OPTICAL RECEIVER, MEASUREMENTS AND COUPLING 9 Fundamental receiver operation-preamplifiers-digital signal transmission-error sources-Front end amplifiers-digital receiver performance-probability of error-receiver sensitivity-quantum limit. Optical power measurement-attenuation measurement-dispersion measurement- Fiber Numerical Aperture Measurements- Fiber cut- off Wave length Measurements- Fiber diameter measurements-Source to Fiber Power Launching-Lensing Schemes for Coupling Management-Fiber to Fiber Joints-LED Coupling to Single Mode Fibers-Fiber Splicing- Optical Fiber connectors. UNIT V OPTICAL COMMUNICATION SYSTEMS AND NETWORKS 9 System design consideration Point – to –Point link design –Link power budget –rise time budget, WDM –Passive DWDM Components-Elements of optical networks-SONET/SDH- Optical Interfaces-SONET/SDH Rings and Networks-High speed light wave Links-OADM configuration-Optical ETHERNET-Soliton.
  • 80.
    80 TOTAL:45 PERIODS OUTCOMES: At theend of the course, the student should be able to:  Realize basic elements in optical fibers, different modes and configurations.  Analyze the transmission characteristics associated with dispersion and polarization techniques.  Design optical sources and detectors with their use in optical communication system.  Construct fiber optic receiver systems, measurements and coupling techniques.  Design optical communication systems and its networks. TEXT BOOKS: 1. P Chakrabarti, "Optical Fiber Communication‖, McGraw Hill Education (India)Private Limited, 2016 (UNIT I, II, III) 2. Gred Keiser,"Optical Fiber Communication‖, McGraw Hill Education (India) Private Limited. Fifth Edition, Reprint 2013. (UNIT I, IV, V) REFERENCES: 1. John M.Senior, ―Optical fiber communication‖, Pearson Education, second edition.2007. 2. Rajiv Ramaswami, ―Optical Networks ― , Second Edition, Elsevier , 2004. 3. J.Gower, ―Optical Communication System‖, Prentice Hall of India, 2001. 4. Govind P. Agrawal, ―Fiber-optic communication systems‖, third edition, John Wiley & sons, 2004. EC8791 EMBEDDED AND REAL TIME SYSTEMS L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Understand the concepts of embedded system design and analysis  Learn the architecture and programming of ARM processor  Be exposed to the basic concepts of embedded programming  Learn the real time operating systems UNIT I INTRODUCTION TO EMBEDDEDSYSTEM DESIGN 9 Complex systems and micro processors– Embedded system design process –Design example: Model train controller- Design methodologies- Design flows - Requirement Analysis – Specifications-System analysis and architecture design – Quality Assurance techniques - Designing with computing platforms – consumer electronics architecture – platform-level performance analysis. UNIT II ARM PROCESSOR AND PERIPHERALS 9 ARM Architecture Versions – ARM Architecture – Instruction Set – Stacks and Subroutines – Features of the LPC 214X Family – Peripherals – The Timer Unit – Pulse Width Modulation Unit – UART – Block Diagram of ARM9 and ARM Cortex M3 MCU.
  • 81.
    81 UNIT III EMBEDDEDPROGRAMMING 9 Components for embedded programs- Models of programs- Assembly, linking and loading – compilation techniques- Program level performance analysis – Software performance optimization – Program level energy and power analysis and optimization – Analysis and optimization of program size- Program validation and testing. UNIT IV REAL TIME SYSTEMS 9 Structure of a Real Time System –– Estimating program run times – Task Assignment and Scheduling – Fault Tolerance Techniques – Reliability, Evaluation – Clock Synchronisation. UNIT V PROCESSES AND OPERATING SYSTEMS 9 Introduction – Multiple tasks and multiple processes – Multirate systems- Preemptive real- time operating systems- Priority based scheduling- Interprocess communication mechanisms – Evaluating operating system performance- power optimization strategies for processes – Example Real time operating systems-POSIX-Windows CE. - Distributed embedded systems – MPSoCs and shared memory multiprocessors. – Design Example - Audio player, Engine control unit – Video accelerator. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Describe the architecture and programming of ARM processor  Outline the concepts of embedded systems  Explain the basic concepts of real time operating system design  Model real-time applications using embedded-system concepts TEXT BOOKS: 1. Marilyn Wolf, ―Computers as Components - Principles of Embedded Computing System Design‖, Third Edition ―Morgan Kaufmann Publisher (An imprint from Elsevier), 2012. (UNIT I, II, III, V) 2. Jane W.S.Liu,‖ Real Time Systems‖, Pearson Education, Third Indian Reprint, 2003.(UNIT IV) REFERENCES: 1. Lyla B.Das, ―Embedded Systems : An Integrated Approach‖ Pearson Education, 2013. 2. Jonathan W.Valvano, ―Embedded Microcomputer Systems Real Time Interfacing‖, Third Edition Cengage Learning, 2012. 3. David. E. Simon, ―An Embedded Software Primer‖, 1st Edition, Fifth Impression, Addison- Wesley Professional, 2007. 4. Raymond J.A. Buhr, Donald L.Bailey, ―An Introduction to Real-Time Systems- From Design to Networking with C/C++‖, Prentice Hall, 1999. 5. C.M. Krishna, Kang G. Shin, ―Real-Time Systems‖, International Editions, Mc Graw Hill 1997 6. K.V.K.K.Prasad, ―Embedded Real-Time Systems: Concepts, Design & Programming‖, Dream Tech Press, 2005. 7. Sriram V Iyer, Pankaj Gupta, ―Embedded Real Time Systems Programming‖, Tata Mc Graw Hill, 2004.
  • 82.
    82 EC8702 AD HOCAND WIRELESS SENSOR NETWORKS L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Learn Ad hoc network and Sensor Network fundamentals  Understand the different routing protocols  Have an in-depth knowledge on sensor network architecture and design issues  Understand the transport layer and security issues possible in Ad hoc and Sensor networks  Have an exposure to mote programming platforms and tools UNIT I AD HOC NETWORKS – INTRODUCTION AND ROUTING PROTOCOLS 9 Elements of Ad hoc Wireless Networks, Issues in Ad hoc wireless networks, Example commercial applications of Ad hoc networking, Ad hoc wireless Internet, Issues in Designing a Routing Protocol for Ad Hoc Wireless Networks, Classifications of Routing Protocols, Table Driven Routing Protocols - Destination Sequenced Distance Vector (DSDV), On–Demand Routing protocols –Ad hoc On–Demand Distance Vector Routing (AODV). UNIT II SENSOR NETWORKS – INTRODUCTION & ARCHITECTURES 9 Challenges for Wireless Sensor Networks, Enabling Technologies for Wireless Sensor Networks, WSN application examples, Single-Node Architecture - Hardware Components, Energy Consumption of Sensor Nodes, Network Architecture - Sensor Network Scenarios, Transceiver Design Considerations, Optimization Goals and Figures of Merit. UNIT III WSN NETWORKING CONCEPTS AND PROTOCOLS 9 MAC Protocols for Wireless Sensor Networks, Low Duty Cycle Protocols And Wakeup Concepts - S-MAC, The Mediation Device Protocol, Contention based protocols - PAMAS, Schedule based protocols – LEACH, IEEE 802.15.4 MAC protocol, Routing Protocols- Energy Efficient Routing, Challenges and Issues in Transport layer protocol. UNIT IV SENSOR NETWORK SECURITY 9 Network Security Requirements, Issues and Challenges in Security Provisioning, Network Security Attacks, Layer wise attacks in wireless sensor networks, possible solutions for jamming, tampering, black hole attack, flooding attack. Key Distribution and Management, Secure Routing – SPINS, reliability requirements in sensor networks. UNIT V SENSOR NETWORK PLATFORMS AND TOOLS 9 Sensor Node Hardware – Berkeley Motes, Programming Challenges, Node-level software platforms – TinyOS, nesC, CONTIKIOS, Node-level Simulators – NS2 and its extension to sensor networks, COOJA, TOSSIM, Programming beyond individual nodes – State centric programming. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student would be able to:  Know the basics of Ad hoc networks and Wireless Sensor Networks
  • 83.
    83  Apply thisknowledge to identify the suitable routing algorithm based on the network and user requirement  Apply the knowledge to identify appropriate physical and MAC layer protocols  Understand the transport layer and security issues possible in Ad hoc and sensor networks.  Be familiar with the OS used in Wireless Sensor Networks and build basic modules
  • 84.
    84 TEXT BOOKS: 1. C.Siva Ram Murthy and B. S. Manoj, ―Ad Hoc Wireless Networks Architectures and Protocols‖, Prentice Hall, PTR, 2004. (UNIT I) 2. Holger Karl , Andreas willig, ―Protocol and Architecture for Wireless Sensor Networks‖, John wiley publication, Jan 2006.(UNIT II-V) REFERENCES: 1. Feng Zhao, Leonidas Guibas, ―Wireless Sensor Networks: an information processing approach‖, Elsevier publication, 2004. 2. Charles E. Perkins, ―Ad Hoc Networking‖, Addison Wesley, 2000. 3. I.F. Akyildiz, W. Su, Sankarasubramaniam, E. Cayirci, ―Wireless sensor networks: a survey‖, computer networks, Elsevier, 2002, 394 - 422. EC8711 EMBEDDED LABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made to:  Learn the working of ARM processor  Understand the Building Blocks of Embedded Systems  Learn the concept of memory map and memory interface  Write programs to interface memory, I/Os with processor  Study the interrupt performance LIST OF EXPERIMENTS: 1. Study of ARM evaluation system 2. Interfacing ADC and DAC. 3. Interfacing LED and PWM. 4. Interfacing real time clock and serial port. 5. Interfacing keyboard and LCD. 6. Interfacing EPROM and interrupt. 7. Mailbox. 8. Interrupt performance characteristics of ARM and FPGA. 9. Flashing of LEDS. 10. Interfacing stepper motor and temperature sensor. 11. Implementing zigbee protocol with ARM. TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Write programs in ARM for a specific Application  Interface memory, A/D and D/A convertors with ARM system  Analyze the performance of interrupt  Write program for interfacing keyboard, display, motor and sensor.  Formulate a mini project using embedded system LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS (3 students per batch) Embedded trainer kits with ARM board 10 Nos Embedded trainer kits suitable for wireless communication 10 Nos Adequate quantities of Hardware, software and consumables
  • 85.
    85 EC8761 ADVANCED COMMUNICATIONLABORATORY L T P C 0 0 4 2 OBJECTIVES: The student should be made to:  Understand the working principle of optical sources, detector, fibers  Develop understanding of simple optical communication link  Understand the measurement of BER, Pulse broadening  Understand and capture an experimental approach to digital wireless communication  Understand actual communication waveforms that will be sent and received across wireless channel LIST OF OPTICAL EXPERIMENTS 1. Measurement of connector, bending and fiber attenuation losses. 2. Numerical Aperture and Mode Characteristics of Fibers. 3. DC Characteristics of LED and PIN Photo diode. 4. Fiber optic Analog and Digital Link Characterization - frequency response(analog), eye diagram and BER (digital) LIST OF WIRELESS COMMUNICATION EXPERIMENTS 1. Wireless Channel Simulation including fading and Doppler effects 2. Simulation of Channel Estimation, Synchronization & Equalization techniques 3. Analysing Impact of Pulse Shaping and Matched Filtering using Software Defined Radios 4. OFDM Signal Transmission and Reception using Software Defined Radios LIST OF MICROWAVE EXPERIMENTS 1. VSWR and Impedance Measurement and Impedance Matching 2. Characterization of Directional Couplers, Isolators, Circulators 3. Gunn Diode Characteristics 4. Microwave IC – Filter Characteristics TOTAL: 60 PERIODS OUTCOMES: On completion of this lab course, the student would be able to  Analyze the performance of simple optical link by measurement of losses and Analyzing the mode characteristics of fiber  Analyze the Eye Pattern, Pulse broadening of optical fiber and the impact on BER  Estimate the Wireless Channel Characteristics and Analyze the performance of Wireless Communication System  Understand the intricacies in Microwave System design
  • 86.
    86 LIST OF EQUIPMENTFOR A BATCH OF 30 STUDENTS 3 STUDENTS PER EXPERIMENT: S.NO NAME OF THE EQUIPMENT REQUIRED 1 Trainer kit for carrying out LED and PIN diode characteristics, Digital multi meter, optical power meter 2 Nos 2 Trainer kit for determining the mode characteristics, losses in optical fiber 2 Nos 3 Trainer kit for analyzing Analog and Digital link performance, 2 Mbps PRBS Data source, 10 MHz signal generator, 20 MHz Digital storage Oscilloscope 2 Nos 4 Kit for measuring Numerical aperture and Attenuation of fiber 2 Nos 5 Advanced Optical fiber trainer kit for PC to PC communication, BER Measurement, Pulse broadening. 2 Nos 5 MM/SM Glass and plastic fiber patch chords with ST/SC/E2000 connectors 2 sets 6 LEDs with ST / SC / E2000 receptacles – 650 / 850 nm 2 sets 7 PIN PDs with ST / SC / E2000 receptacles – 650 / 850 nm 2 sets 8 Digital Communications Teaching Bundle (LabVIEW/MATLAB/Equivalent software tools) 10 Users 9 Transmit/receive pair of NI USRP-2920 transceivers (50 MHz to 2.2 GHz) 2 Nos CS8392 OBJECT ORIENTED PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To understand Object Oriented Programming concepts and basic characteristics of Java  To know the principles of packages, inheritance and interfaces  To define exceptions and use I/O streams  To develop a java application with threads and generics classes  To design and build simple Graphical User Interfaces UNIT I INTRODUCTION TO OOP AND JAVA FUNDAMENTALS 10 Object Oriented Programming - Abstraction – objects and classes - Encapsulation- Inheritance - Polymorphism- OOP in Java – Characteristics of Java – The Java Environment - Java Source File -Structure – Compilation. Fundamental Programming Structures in Java – Defining classes in Java – constructors, methods -access specifiers - static members -Comments, Data Types, Variables, Operators, Control Flow, Arrays , Packages - JavaDoc comments.
  • 87.
  • 88.
    88 UNIT II INHERITANCEAND INTERFACES 9 Inheritance – Super classes- sub classes –Protected members – constructors in sub classes- the Object class – abstract classes and methods- final methods and classes – Interfaces – defining an interface, implementing interface, differences between classes and interfaces and extending interfaces - Object cloning -inner classes, Array Lists - Strings UNIT III EXCEPTION HANDLING AND I/O 9 Exceptions - exception hierarchy - throwing and catching exceptions - built in exceptions, creating own exception, Stack Trace Elements. Input / Output Basics – Streams – Byte streams and Character streams – Reading and Writing Console – Reading and Writing Files UNIT IV MULTITHREADING AND GENERIC PROGRAMMING 8 Differences between multi-threading and multitasking, thread life cycle, creating threads, synchronizing threads, Inter thread communication, daemon threads, thread groups. Generic Programming – Generic classes – generic methods – Bounded Types – Restrictions and Limitations. UNIT V EVENT DRIVEN PROGRAMMING 9 Graphics programming - Frame – Components - working with 2D shapes - Using color, fonts, and images - Basics of event handling - event handlers - adapter classes - actions - mouse events - AWT event hierarchy - Introduction to Swing – layout management - Swing Components – Text Fields , Text Areas – Buttons- Check Boxes – Radio Buttons – Lists- choices- Scrollbars – Windows –Menus – Dialog Boxes. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, students will be able to:  Develop Java programs using OOP principles  Develop Java programs with the concepts inheritance and interfaces  Build Java applications using exceptions and I/O streams  Develop Java applications with threads and generics classes  Develop interactive Java programs using swings TEXT BOOKS: 1. Herbert Schildt, ―Java The complete reference‖, 8th Edition, McGraw Hill Education, 2011. 2. Cay S. Horstmann, Gary cornell, ―Core Java Volume –I Fundamentals‖, 9th Edition, Prentice Hall, 2013. REFERENCES: 1. Paul Deitel, Harvey Deitel, ―Java SE 8 for programmers‖, 3rd Edition, Pearson, 2015. 2. Steven Holzner, ―Java 2 Black book‖, Dreamtech press, 2011. 3. Timothy Budd, ―Understanding Object-oriented programming with Java‖, Updated Edition, Pearson Education, 2000.
  • 89.
    89 EC8073 MEDICAL ELECTRONICSL T P C 3 0 0 3 OBJECTIVES: The student should be made:  To gain knowledge about the various physiological parameters both electrical and non electrical and the methods of recording and also the method of transmitting these parameters  To study about the various assist devices used in the hospitals  To gain knowledge about equipment used for physical medicine and the various recently developed diagnostic and therapeutic techniques. UNIT I ELECTRO-PHYSIOLOGY AND BIO-POTENTIAL RECORDING 9 Sources of bio medical signals, Bio-potentials, Biopotential electrodes, biological amplifiers, ECG, EEG, EMG, PCG, typical waveforms and signal characteristics UNIT II BIO-CHEMICAL AND NON ELECTRICAL PARAMETER MEASUREMENT 9 pH, PO2, PCO2, Colorimeter, Blood flow meter, Cardiac output, respiratory, blood pressure, temperature and pulse measurement, Blood Cell Counters. UNIT III ASSIST DEVICES 9 Cardiac pacemakers, DC Defibrillator, Dialyser, Ventilators, Magnetic Resonance Imaging Systems, Ultrasonic Imaging Systems. UNIT IV PHYSICAL MEDICINE AND BIOTELEMETRY 9 Diathermies- Shortwave, ultrasonic and microwave type and their applications, Surgical Diathermy, Biotelemetry. UNIT V RECENT TRENDS IN MEDICAL INSTRUMENTATION 9 Telemedicine, Insulin Pumps, Radio pill, Endomicroscopy, Brain machine interface, Lab on a chip. TOTAL:45 PERIODS OUTCOMES: On successful completion of this course, the student should be able to:  Know the human body electro- physiological parameters and recording of bio-potentials  Comprehend the non-electrical physiological parameters and their measurement – body temperature, blood pressure, pulse, blood cell count, blood flow meter etc.  Interpret the various assist devices used in the hospitals viz. pacemakers, defibrillators, dialyzers and ventilators  Comprehend physical medicine methods eg. ultrasonic, shortwave, microwave surgical diathermies , and bio-telemetry principles and methods  Know about recent trends in medical instrumentation TEXT BOOK: 1. Leslie Cromwell, ―Biomedical Instrumentation and Measurement‖, Prentice Hall of India, New Delhi, 2007. (UNIT I – V) REFERENCES: 1. Khandpur, R.S., ―Handbook of Biomedical Instrumentation‖, TATA Mc Graw-Hill, New Delhi, 2003. 2. John G.Webster, ―Medical Instrumentation Application and Design‖, 3rd Edition, Wiley India
  • 90.
    90 Edition, 2007 3. JosephJ.Carr and John M.Brown, ―Introduction to Biomedical Equipment Technology‖, John Wiley and Sons, New York, 2004. CS8493 OPERATING SYSTEMS L T P C 3 0 0 3 OBJECTIVES:  To understand the basic concepts and functions of operating systems.  To understand Processes and Threads  To analyze Scheduling algorithms.  To understand the concept of Deadlocks.  To analyze various memory management schemes.  To understand I/O management and File systems.  To be familiar with the basics of Linux system and Mobile OS like iOS and Android. UNIT I OPERATING SYSTEM OVERVIEW 7 Computer System Overview-Basic Elements, Instruction Execution, Interrupts, Memory Hierarchy, Cache Memory, Direct Memory Access, Multiprocessor and Multicore Organization. Operating system overview-objectives and functions, Evolution of Operating System.- Computer System Organization Operating System Structure and Operations- System Calls, System Programs, OS Generation and System Boot. UNIT II PROCESS MANAGEMENT 11 Processes - Process Concept, Process Scheduling, Operations on Processes, Interprocess Communication; CPU Scheduling - Scheduling criteria, Scheduling algorithms, Multiple-processor scheduling, Real time scheduling; Threads- Overview, Multithreading models, Threading issues; Process Synchronization - The critical-section problem, Synchronization hardware, Mutex locks, Semaphores, Classic problems of synchronization, Critical regions, Monitors; Deadlock - System model, Deadlock characterization, Methods for handling deadlocks, Deadlock prevention, Deadlock avoidance, Deadlock detection, Recovery from deadlock. UNIT III STORAGE MANAGEMENT 9 Main Memory – Background, Swapping, Contiguous Memory Allocation, Paging, Segmentation, Segmentation with paging, 32 and 64 bit architecture Examples; Virtual Memory – Background, Demand Paging, Page Replacement, Allocation, Thrashing; Allocating Kernel Memory, OS Examples. UNIT IV FILE SYSTEMS AND I/O SYSTEMS 9 Mass Storage system – Overview of Mass Storage Structure, Disk Structure, Disk Scheduling and Management, swap space management; File-System Interface - File concept, Access methods, Directory Structure, Directory organization, File system mounting, File Sharing and Protection; File System Implementation- File System Structure, Directory implementation, Allocation Methods, Free Space Management, Efficiency and Performance, Recovery; I/O Systems – I/O Hardware, Application I/O interface, Kernel I/O subsystem, Streams, Performance. UNIT V CASE STUDY 9 Linux System - Design Principles, Kernel Modules, Process Management, Scheduling, Memory Management, Input-Output Management, File System, Interprocess Communication; Mobile OS - iOS and Android - Architecture and SDK Framework, Media Layer, Services Layer, Core OS Layer, File System. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Analyze various scheduling algorithms.  Understand deadlock, prevention and avoidance algorithms.
  • 91.
    91  Compare andcontrast various memory management schemes.  Understand the functionality of file systems.  Perform administrative tasks on Linux Servers and compare iOS and Android Operating Systems. TEXT BOOK : 1. Abraham Silberschatz, Peter Baer Galvin and Greg Gagne, ―Operating System Concepts‖, 9th Edition, John Wiley and Sons Inc., 2012. REFERENCES : 1. Ramaz Elmasri, A. Gil Carrick, David Levine, ―Operating Systems – A Spiral Approach‖, Tata McGraw Hill Edition, 2010. 2. Achyut S.Godbole, Atul Kahate, ― Operating Systems‖, McGraw Hill Education, 2016. 3. Andrew S. Tanenbaum, ―Modern Operating Systems‖, Second Edition, Pearson Education, 2004. 4. Gary Nutt, ―Operating Systems‖, Third Edition, Pearson Education, 2004. 5. Harvey M. Deital, ―Operating Systems‖, Third Edition, Pearson Education, 2004. 6. Daniel P Bovet and Marco Cesati, ―Understanding the Linux kernel‖, 3rd edition, O‘Reilly, 2005. 7. Neil Smyth, ―iPhone iOS 4 Development Essentials – Xcode‖, Fourth Edition, Payload media, 2011. EC8074 ROBOTICS AND AUTOMATION L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the basic concepts associated with the design, functioning, applications and social aspects of robots  To study about the electrical drive systems and sensors used in robotics for various applications  To learn about analyzing robot kinematics, dynamics through different methodologies and study various design aspects of robot arm manipulator and end-effector  To learn about various motion planning techniques and the associated control architecture  To understand the implications of AI and other trending concepts of robotics UNIT I FOUNDATION FOR BEGINNERS 9 Introduction -- brief history, definition, anatomy, types, classification, specification and need based applications; role and need of robots for the immediate problems of the society, future of mankind and automation-ethical issues; industrial scenario local and global, case studies on mobile robot research platform and industrial serial arm manipulator UNIT II BUILDING BLOCKS OF A ROBOT 9 Types of electric motors - DC, Servo, Stepper; specification, drives for motors - speed & direction control and circuitry, Selection criterion for actuators, direct drives, non-traditional actuators; Sensors for localization, navigation, obstacle avoidance and path planning in known and unknown environments – optical, inertial, thermal, chemical, biosensor, other common sensors; Case study on choice of sensors and actuators for maze solving robot and self driving cars
  • 92.
    92 UNIT III KINEMATICS,DYNAMICS AND DESIGN OF ROBOTS & END-EFFECTORS 9 Robot kinematics - Geometric approach for 2R, 3R manipulators, homogenous transformation using D-H representation, kinematics of WMR, Lagrangian formulation for 2R robot dynamics; Mechanical design aspects of a 2R manipulator, WMR; End-effector - common types and design case study. UNIT IV NAVIGATION, PATH PLANNING AND CONTROL ARCHITECTURE 9 Mapping & Navigation – SLAM, Path planning for serial manipulators; types of control architectures - Cartesian control, Force control and hybrid position/force control, Behaviour based control, application of Neural network, fuzzy logic, optimization algorithms for navigation problems, programming methodologies of a robot UNIT V AI AND OTHER RESEARCH TRENDS IN ROBOTICS 9 Application of Machine learning - AI, Expert systems; Tele-robotics and Virtual Reality, Micro & Nanorobots, Unmanned vehicles, Cognitive robotics, Evolutionary robotics, Humanoids TOTAL:45 PERIODS OUTCOMES: The student should be able to:  Explain the concepts of industrial robots in terms of classification, specifications and coordinate systems, along with the need and application of robots & automation  Examine different sensors and actuators for applications like maze solving and self driving cars.  Design a 2R robot & an end-effector and solve the kinematics and dynamics of motion for robots.  Explain navigation and path planning techniques along with the control architectures adopted for robot motion planning.  Describe the impact and progress in AI and other research trends in the field of robotics TEXT BOOKS: 1. Saeed. B. Niku, Introduction to Robotics, Analysis, system, Applications, Pearson educations, 2002 2. Roland Siegwart, Illah Reza Nourbakhsh, Introduction to Autonomous Mobile Robots, MIT Press, 2011 REFERENCES: 1. Richard David Klafter, Thomas A. Chmielewski, Michael Negin, Robotic engineering: an integrated approach, Prentice Hall, 1989 2. Craig, J. J., Introduction to Robotics: Mechanics and Control, 2nd Edition, Addison-Wesley, 1989. 3. K.S. Fu, R.C. Gonzalez and C.S.G. Lee, Robotics: Control, Sensing, Vision and Intelligence, McGraw-Hill, 1987. 4. Wesley E Snyder R, Industrial Robots, Computer Interfacing and Control, Prentice Hall International Edition, 1988. 5. Robin Murphy, Introduction to AI Robotics, MIT Press, 2000 6. Ronald C. Arkin, Behavior-based Robotics, MIT Press, 1998 7. N. P. Padhy, Artificial Intelligence and Intelligent Systems, Oxford University Press, 2005 8. Stefano Nolfi, Dario Floreano, Evolutionary Robotics – The Biology, Intelligence and
  • 93.
    93 Technology of Self–OrganizingMachines (Intelligent Robotics and Autonomous Agents series), MIT Press, 2004. EC8075 NANOTECHNOLOGY AND APPLICATIONS L T P C 3 0 0 3 OBJECTIVES:  To provide a broad view of the nascent field of nanoscience and nanotechnology to undergraduates  To explore the basics of nanomaterial synthesis and characterization.  To introduce the applications of nanotechnology UINI I INTRODUCTION TO NANOTECHNOLOGY 9 Basic Structure of Nanoparticles- Kinetics in Nanostructured Materials- Zero dimensional, size and shape of nanoparticles; one-dimensional and two dimensional nanostructures- clusters of metals and semiconductors, bio nano-particles. UNIT II FABRICATION AND CHARACTERIZATION OF NANOMATERIALS 9 Types of Nanomaterials (Quantum dots, Nanoparticles, Nanocrystals, Dendrimers, Buckyballs, Nanotubes); Gas, liquid, and solid –phase synthesis of nanomaterials; Lithography techniques (Photolithography, Dip-pen and Electron beam lithography); Thin film deposition; Electrospinning. Bio-synthesis of nanomaterials. UNIT III PROPERTIES AND MEASUREMENT OF NANOMATERIALS 9 Optical Properties: Absorption, Fluorescence, and Resonance; Methods for the measurement of nanomaterials; Microscopy measurements: SEM, TEM, AFM and STM. Confocal and TIRF imaging. UNIT IV NANO STRUCTURES 9 Carbon Nanotubes, Fullerenes, Nanowires, Quantum Dots. Applications of nanostructures. Reinforcement in Ceramics, Drug delivery, Giant magnetoresistance, etc. Cells response to Nanostructures. UNIT V APPLICATIONS OF NANOTECHNOLOGY 9 Nano electronics, Nano sensors, Nanotechnology in Diagnostics applications, Environmental and Agricultural Applications of nanotechnology, Nano technology for energy systems TOTAL : 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Describe the basic science behind the properties of materials.  Interpret the creation, characterization, and manipulation of nanoscale materials.  Comprehend the exciting applications of nanotechnology at the leading edge of scientific research  Apply their knowledge of nanotechnology to identify how they can be exploited for new applications. TEXT BOOKS: 1. Springer Handbook of Nanotechnology by Bharat Bhushan 2004.(Unit I – V) 2. Encyclopedia of Nanotechnology - Hari Singh Nalwa 2004. (Unit I – V) REFERENCES:
  • 94.
    94 1. Nanomaterials, Nanotechnologiesand Design: an Introduction to Engineers and Architects, D. Michael Ashby, Paulo Ferreira, Daniel L. Schodek, Butterworth-Heinemann, 2009. 2. Handbook of Nanophase and Nanostructured Materials (in four volumes), Eds: Z.L. Wang, Y. Liu, Z. Zhang, Kluwer Academic/Plenum Publishers, 2003. 3. Handbook of Nanoceramics and their Based Nanodevices (Vol. 2) Edited by Tseung-Yuen Tseng and Hari Singh Nalwa, American Scientific Publishers. GE8074 HUMAN RIGHTS L T P C 3 0 0 3 OBJECTIVE:  To sensitize the Engineering students to various aspects of Human Rights. UNIT I 9 Human Rights – Meaning, origin and Development. Notion and classification of Rights – Natural, Moral and Legal Rights. Civil and Political Rights, Economic, Social and Cultural Rights; collective / Solidarity Rights. UNIT II 9 Evolution of the concept of Human Rights Magana carta – Geneva convention of 1864. Universal Declaration of Human Rights, 1948. Theories of Human Rights. UNIT III 9 Theories and perspectives of UN Laws – UN Agencies to monitor and compliance. UNIT IV 9 Human Rights in India – Constitutional Provisions / Guarantees. UNIT V 9 Human Rights of Disadvantaged People – Women, Children, Displaced persons and Disabled persons, including Aged and HIV Infected People. Implementation of Human Rights – National and State Human Rights Commission – Judiciary – Role of NGO‘s, Media, Educational Institutions, Social Movements. TOTAL : 45 PERIODS OUTCOME :  Engineering students will acquire the basic knowledge of human rights. REFERENCES: 1. Kapoor S.K., ―Human Rights under International law and Indian Laws‖, Central Law Agency, Allahabad, 2014. 2. Chandra U., ―Human Rights‖, Allahabad Law Agency, Allahabad, 2014. 3. Upendra Baxi, The Future of Human Rights, Oxford University Press, New Delhi. GE8077 TOTAL QUALITY MANAGEMENT L T P C 3 0 0 3 OBJECTIVE:  To facilitate the understanding of Quality Management principles and process. UNIT I INTRODUCTION 9 Introduction - Need for quality - Evolution of quality - Definitions of quality - Dimensions of product and service quality - Basic concepts of TQM - TQM Framework - Contributions of Deming, Juran
  • 95.
    95 and Crosby -Barriers to TQM - Customer focus - Customer orientation, Customer satisfaction, Customer complaints, Customer retention.
  • 96.
    96 UNIT II TQMPRINCIPLES 9 Leadership - Quality Statements, Strategic quality planning, Quality Councils - Employee involvement - Motivation, Empowerment, Team and Teamwork, Recognition and Reward, Performance appraisal - Continuous process improvement - PDCA cycle, 5S, Kaizen - Supplier partnership - Partnering, Supplier selection, Supplier Rating. UNIT III TQM TOOLS AND TECHNIQUES I 9 The seven traditional tools of quality - New management tools - Six sigma: Concepts, Methodology, applications to manufacturing, service sector including IT - Bench marking - Reason to bench mark, Bench marking process - FMEA - Stages, Types. UNIT IV TQM TOOLS AND TECHNIQUES II 9 Quality Circles - Cost of Quality - Quality Function Deployment (QFD) - Taguchi quality loss function - TPM - Concepts, improvement needs - Performance measures. UNIT V QUALITY MANAGEMENT SYSTEM 9 Introduction—Benefits of ISO Registration—ISO 9000 Series of Standards—Sector-Specific Standards—AS 9100, TS16949 and TL 9000-- ISO 9001 Requirements—Implementation— Documentation—Internal Audits—Registration- ENVIRONMENTAL MANAGEMENT SYSTEM: Introduction—ISO 14000 Series Standards—Concepts of ISO 14001—Requirements of ISO 14001—Benefits of EMS. TOTAL: 45 PERIODS OUTCOME:  The student would be able to apply the tools and techniques of quality management to manufacturing and services processes. TEXT BOOK: 1. Dale H.Besterfiled, Carol B.Michna,Glen H. Besterfield,Mary B.Sacre,Hemant Urdhwareshe and Rashmi Urdhwareshe, ―Total Quality Management‖, Pearson Education Asia, Revised Third Edition, Indian Reprint, Sixth Impression, 2013. REFERENCES: 1. James R. Evans and William M. Lindsay, "The Management and Control of Quality", 8th Edition, First Indian Edition, Cengage Learning, 2012. 2. Janakiraman. B and Gopal .R.K., "Total Quality Management - Text and Cases", Prentice Hall (India) Pvt. Ltd., 2006. 3. Suganthi.L and Anand Samuel, "Total Quality Management", Prentice Hall (India) Pvt. Ltd., 2006. 4. ISO9001-2015 standards CS8792 CRYPTOGRAPHY AND NETWORK SECURITY L T P C 3 0 0 3 OBJECTIVES:  To understand Cryptography Theories, Algorithms and Systems.  To understand necessary Approaches and Techniques to build protection mechanisms in order to secure computer networks.
  • 97.
    97 UNIT I INTRODUCTION9 Security trends - Legal, Ethical and Professional Aspects of Security, Need for Security at Multiple levels, Security Policies - Model of network security – Security attacks, services and mechanisms – OSI security architecture – Classical encryption techniques: substitution techniques, transposition techniques, steganography).- Foundations of modern cryptography: perfect security – information theory – product cryptosystem – cryptanalysis. UNIT II SYMMETRIC CRYPTOGRAPHY 9 MATHEMATICS OF SYMMETRIC KEY CRYPTOGRAPHY: Algebraic structures - Modular arithmetic-Euclid‘s algorithm- Congruence and matrices - Groups, Rings, Fields- Finite fields- SYMMETRIC KEY CIPHERS: SDES – Block cipher Principles of DES – Strength of DES – Differential and linear cryptanalysis - Block cipher design principles – Block cipher mode of operation – Evaluation criteria for AES – Advanced Encryption Standard - RC4 – Key distribution. UNIT III PUBLIC KEY CRYPTOGRAPHY 9 MATHEMATICS OF ASYMMETRIC KEY CRYPTOGRAPHY: Primes – Primality Testing – Factorization – Euler‘s totient function, Fermat‘s and Euler‘s Theorem - Chinese Remainder Theorem – Exponentiation and logarithm - ASYMMETRIC KEY CIPHERS: RSA cryptosystem – Key distribution – Key management – Diffie Hellman key exchange - ElGamal cryptosystem – Elliptic curve arithmetic-Elliptic curve cryptography. UNIT IV MESSAGE AUTHENTICATION AND INTEGRITY 9 Authentication requirement – Authentication function – MAC – Hash function – Security of hash function and MAC – SHA –Digital signature and authentication protocols – DSS- Entity Authentication: Biometrics, Passwords, Challenge Response protocols- Authentication applications - Kerberos, X.509 UNIT V SECURITY PRACTICE AND SYSTEM SECURITY 9 Electronic Mail security – PGP, S/MIME – IP security – Web Security - SYSTEM SECURITY: Intruders – Malicious software – viruses – Firewalls. TOTAL 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Understand the fundamentals of networks security, security architecture, threats and vulnerabilities  Apply the different cryptographic operations of symmetric cryptographic algorithms  Apply the different cryptographic operations of public key cryptography  Apply the various Authentication schemes to simulate different applications.  Understand various Security practices and System security standards TEXT BOOK: 1. William Stallings, Cryptography and Network Security: Principles and Practice, PHI 3rd Edition, 2006. REFERENCES 1. C K Shyamala, N Harini and Dr. T R Padmanabhan: Cryptography and Network Security, Wiley India Pvt.Ltd 2. BehrouzA.Foruzan, Cryptography and Network Security, Tata McGraw Hill 2007. 3. Charlie Kaufman, Radia Perlman, and Mike Speciner, Network Security: PRIVATE Communication in a PUBLIC World, Prentice Hall, ISBN 0-13-046019-2
  • 98.
    98 EC8091 ADVANCED DIGITALSIGNAL PROCESSING L T P C 3 0 0 3 OBJECTIVES:  To learn and understand the concepts of stationary and non-stationary random signals and analysis & characterization of discrete-time random processes  To enunciate the significance of estimation of power spectral density of random processes  To introduce the principles of optimum filters such as Wiener and Kalman filters  To introduce the principles of adaptive filters and their applications to communication engineering  To introduce the concepts of multi-resolution analysis UNIT I DISCRETE-TIME RANDOM PROCESSES 9 Random variables - ensemble averages a review, random processes - ensemble averages, autocorrelation and autocovariance matrices, ergodic random process, white noise, filtering random processes, spectral factorization, special types of random processes - AR, MA, ARMA UNIT II SPECTRUM ESTIMATION 10 Bias and consistency, Non-parametric methods - Periodogram, modified-Periodogram - performance analysis. Bartlett's method, Welch's method, Blackman-Tukey method. Performance comparison. Parametric methods - autoregressive (AR) spectrum estimation - autocorrelation method, Prony's method, solution using Levinson Durbin recursion. UNIT III OPTIMUM FILTERS 9 Wiener filters - FIR Wiener filter - discrete Wiener Hopf equation, Applications - filtering, linear prediction. IIR Wiener filter - causal and non-causal filters. Recursive estimators - discrete Kalman filter. UNIT IV ADAPTIVE FILTERS 9 Principles and properties of adaptive filters - FIR adaptive filters. Adaptive algorithms - steepest descent algorithm, the LMS algorithm - convergence. Applications of adaptive filtering - noise cancellation, channel equalization. UNIT V MULTIRESOLUTION ANALYSIS 8 Short-time Fourier transform - Heisenberg uncertainty principle. Principles of multi-resolution analysis - sub-band coding, the continuous and discrete wavelet transform - properties. Applications of wavelet transform - noise reduction, image compression. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Articulate and apply the concepts of special random processes in practical applications  Choose appropriate spectrum estimation techniques for a given random process  Apply optimum filters appropriately for a given communication application  Apply appropriate adaptive algorithm for processing non-stationary signals  Apply and analyse wavelet transforms for signal and image processing based applications
  • 99.
    99 TEXT BOOKS 1. MonsonH. Hayes, "Statistical digital signal processing and modeling", John Wiley and Sons Inc. New York, Indian reprint 2008. (UNIT I-IV) 2. P. P. Vaidyanathan, "Multirate systems and filter banks", Prentice Hall Inc. 1993 (UNIT V) REFERENCES: 1. John G. Proakis & Dimitris G.Manolakis, ―Digital Signal Processing – Principles, Algorithms & Applications‖, Fourth Edition, Pearson Education / Prentice Hall, 2007. 2. Sophoncles J. Orfanidis, "Optimum signal processing", McGraw Hill, 2000 EC8001 MEMS AND NEMS L T P C 3 0 0 3 OBJECTIVES:  To introduce the concepts of micro and nano electromechanical devices  To know the fabrication process of Microsystems  To know the design concepts of micro sensors and micro actuators  To introduce the concepts of quantum mechanics and nano systems UNIT I INTRODUCTION TO MEMS AND NEMS 9 Introduction to Design of MEMS and NEMS, Overview of Nano and Microelectromechanical Systems, Applications of Micro and Nanoelectromechanical systems, Materials for MEMS and NEMS: Silicon, silicon compounds, polymers, metals. UNIT II MEMS FABRICATION TECHNOLOGIES 9 Photolithography, Ion Implantation, Diffusion, Oxidation, CVD, Sputtering Etching techniques, Micromachining: Bulk Micromachining, Surface Micromachining, LIGA. UNIT III MICRO SENSORS 9 MEMS Sensors: Design of Acoustic wave sensors, Vibratory gyroscope, Capacitive Pressure sensors, Case study: Piezoelectric energy harvester UNIT IV MICRO ACTUATORS 9 Design of Actuators: Actuation using thermal forces, Actuation using shape memory Alloys, Actuation using piezoelectric crystals, Actuation using Electrostatic forces, Case Study:RF Switch. UNIT V NANO DEVICES 9 Atomic Structures and Quantum Mechanics, Shrodinger Equation, ZnO nanorods based NEMS device: Gas sensor. TOTAL: 45 PERIODS OUTCOMES: On successful completion of this course, the student should be able to:  Interpret the basics of micro/nano electromechanical systems including their applications and advantages  Recognize the use of materials in micro fabrication and describe the fabrication processes including surface micromachining, bulk micromachining and LIGA.
  • 100.
    100  Analyze thekey performance aspects of electromechanical transducers including sensors and actuators  Comprehend the theoretical foundations of quantum mechanics and Nano systems REFERENCES: 1. Marc Madou, ―Fundamentals of Microfabrication‖, CRC press 1997. 2. Stephen D. Senturia,‖ Micro system Design‖, Kluwer Academic Publishers,2001 3. Tai Ran Hsu ,‖MEMS and Microsystems Design and Manufacture‖ ,Tata Mcraw Hill, 2002. 4. Chang Liu, ―Foundations of MEMS‖, Pearson education India limited, 2006, 5. Sergey Edward Lyshevski, ―MEMS and NEMS: Systems, Devices, and Structures‖ CRC Press, 2002 EC8002 MULTIMEDIA COMPRESSION AND COMMUNICATION L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the compression schemes for text, voice, image and video  To understand the QoS issues in multimedia network  To know the communication protocols for multimedia networking UNIT I AUDIO COMPRESSION 9 Sampling and Quantization of Speech (PCM) - Adaptive differential PCM - Delta Modulation - Vector Quantization- Linear predictive coding (LPC) - Code excited Linear predictive Coding (CELP) UNIT II IMAGE AND VIDEO COMPRESSION 9 Graphics Interchange format- Tagged image file format-Digitized documents- Digitized pictures- JPEG-Video Encoding-Motion estimation –Overview of H.263 and MPEG-2 UNIT III TEXT COMPRESSION 7 Static and Dynamic Huffman coding – Arithmetic coding –Lempel-Ziv coding – LZW coding UNIT IV GUARANTEED SERVICE MODEL 10 Best Effort service model – Scheduling and Dropping policies – Network Performance Parameters – Quality of Service and metrics – WFQ and its variants – Random Early Detection – QoS aware Routing – Admission Control – Resource Reservation – RSVP - Traffic Shaping Algorithms – Caching – Laissez Faire Approach - Possible Architectures – An Overview of QoS Architectures UNIT V MULTIMEDIA COMMUNICATION 10 Stream characteristics for Continuous media – Temporal Relationship – Object Stream Interactions, Media Levity, Media Synchronization – Models for Temporal Specifications – Streaming of Audio and Video – Jitter – Fixed playout and Adaptive playout – Recovering from packet loss – RTSP –– Multimedia Communication Standards – RTP/RTCP – SIP and H.263 TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Design audio compression techniques
  • 101.
    101  Configure Text,image and video compression techniques  Select suitable service model for specific application  Configure multimedia communication network TEXT BOOK: 1. Fred Halsall, ―Multimedia communication- Applications, Networks, Protocols and Standards‖, Pearson education, 2007. REFERENCES 1. Tay Vaughan, ―Multimedia Making it work , McGraw-Hill Osborne Media, 2006. 2. Kurose and W. Ross, ―Computer Networking ―A Top Down Approach, Pearson education, 3rd ed, 2005. 3. KR. Rao,Z S Bojkovic, D A Milovanovic, ―Multimedia Communication Systems: Techniques, Standards, and Networks‖, Pearson Education 2007 4. R. Steimnetz, K. Nahrstedt, ―Multimedia Computing, Communications and Applications‖, Pearson Education, First ed, 1995. 5. Nalin K Sharda, ‗Multimedia Information Networking‘, Prentice Hall of India, 1999 6. Aura Ganz, Zvi Ganz and Kitti Wongthawaravat, ‗Multimedia Wireless Networks: Technologies, Standards and QoS‘, Prentice Hall, 2003. 7. Ellen Kayata Wesel, ‗Wireless Multimedia Communications: Networking Video, Voice and Data‘, Addision Wesley, 1998 EC8003 CMOS ANALOG IC DESIGN L T P C 3 0 0 3 OBJECTIVES:  To study the fundamentals of analog circuits and MOS device models  To gain knowledge on various configurations of MOS transistors and feedback concepts  To study the characteristics of noise and frequency response of the amplifier  To learn the concepts of Op-Amp frequency compensation, capacitor switches and PLLs UNIT I INTRODUCTION TO ANALOG IC DESIGN AND CURRENT MIRRORS 9 Concepts of Analog Design - General consideration of MOS devices – MOS I/V Characteristics – Second order effects – MOS device models. Basic current mirrors- Cascode current mirrors- Active current mirrors- Large and Small signal analysis- Common mode properties. UNIT II AMPLIFIERS AND FEEDBACK 9 Basic Concepts – Common source stage- Source follower- Common gate stage- Cascode stage. Single ended and differential operation- Basic Differential pair- Common mode response- Differential pair with MOS loads- Gilbert Cell. Feedback- General Consideration of feedback circuits- Feedback topologies- Effect of loading- Effect of feedback on Noise. UNIT III FREQUENCY RESPONSE OF AMPLIFIERS AND NOISE 9 General considerations- Miller Effect and Association of Poles with Nodes, Common source stage- Source followers- Common gate stage- Cascode stage- Differential pair. Noise- Statistical characteristics of noise- Types of noise- Representation of noise in circuits- Noise in single stage amplifiers- Noise in differential pairs- Noise Bandwidth.
  • 102.
    102 UNIT IV OPERATIONALAMPLIFIER STABILITY AND FREQUENCY COMPENSATION 9 General Considerations- One and Two Stage Op Amps- Gain Boosting- Comparison- Common mode feedback- Input range limitations- Slew rate- Power Supply Rejection- Noise in Op Amps- General consideration of stability and frequency compensation- Multipole system- Phase margin- Frequency compensation- Compensation of two stage op Amps- Other compensation techniques. UNIT V SWITCHED CAPACITOR CIRCUITS AND PLLS 9 General Considerations- Sampling switches- Switched Capacitor Amplifiers- Switched Capacitor Integrator- Switched Capacitor Common mode feedback. Phase Locked Loops-Simple PLL- Charge pump PLLs - Non ideal Effects in PLLs- Delay locked loops- its Applications. TOTAL:45 PERIODS OUTCOMES: Upon completion of the course, student should be able to:  Realize the concepts of Analog MOS devices and current mirror circuits.  Design different configuration of Amplifiers and feedback circuits.  Analyze the characteristics of frequency response of the amplifier and its noise.  Analyze the performance of the stability and frequency compensation techniques of Op- Amp Circuits.  Construct switched capacitor circuits and PLLs TEXT BOOK: 1. Behzad Razavi, ―Design of Analog CMOS Integrated Circuits‖, Tata McGraw Hill, 2001, 33rd re-print, 2016. REFERENCES: 1. Phillip Allen and Douglas Holmberg ―CMOS Analog Circuit Design‖ Second Edition, Oxford University Press, 2004. 2. Paul R. Gray, Paul J. Hurst, Stephen H. Lewis, Robert G. Meyer, Analysis and Design of Analog Integrated Circuits, 5th Edition, Wiley, 2009 3. Grebene, ―Bipolar and MOS Analog Integrated circuit design‖, John Wiley & sons, Inc., 2003 EC8004 WIRELESS NETWORKS L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the concept about Wireless networks, protocol stack and standards  To understand and analyse the network layer solutions for Wireless networks  To study about fundamentals of 3G Services, its protocols and applications  To have in depth knowledge on internetworking of WLAN and WWAN  To learn about evolution of 4G Networks, its architecture and applications 
  • 103.
    103 UNIT I WIRELESSLAN 9 Introduction-WLAN technologies: - IEEE802.11: System architecture, protocol architecture, 802.11b, 802.11a – Hiper LAN: WATM, BRAN, HiperLAN2 – Bluetooth: Architecture, WPAN – IEEE 802.15.4, Wireless USB, Zigbee, 6LoWPAN, WirelessHART UNIT II MOBILE NETWORK LAYER 9 Introduction - Mobile IP: IP packet delivery, Agent discovery, tunneling and encapsulation, IPV6-Network layer in the internet- Mobile IP session initiation protocol - mobile ad-hoc network: Routing: Destination Sequence distance vector, IoT: CoAP UNIT III 3G OVERVIEW 9 Overview of UTMS Terrestrial Radio access network-UMTS Core network Architecture: 3GPP Architecture, User equipment, CDMA2000 overview- Radio and Network components, Network structure, Radio Network, TD-CDMA, TD – SCDMA. UNIT IV INTERNETWORKING BETWEEN WLANS AND WWANS 9 Internetworking objectives and requirements, Schemes to connect WLANS and 3G Networks, Session Mobility, Internetworking Architecture for WLAN and GPRS, System Description, Local Multipoint Distribution Service, Multichannel Multipoint Distribution System. UNIT V 4G & Beyond 9 Introduction – 4G vision – 4G features and challenges - Applications of 4G – 4G Technologies: Multicarrier Modulation, Smart antenna techniques, IMS Architecture, LTE, Advanced Broadband Wireless Access and Services, MVNO. TOTAL:45 PERIODS OUTCOMES: Upon completion of the course, the student would be able to:  Conversant with the latest 3G/4G networks and its architecture  Design and implement wireless network environment for any application using latest wireless protocols and standards  Ability to select the suitable network depending on the availability and requirement  Implement different type of applications for smart phones and mobile devices with latest network strategies TEXT BOOKS: 1. Jochen Schiller, ‖Mobile Communications‖, Second Edition, Pearson Education 2012.(Unit I,II,III) 2. Vijay Garg, ―Wireless Communications and networking‖, First Edition, Elsevier 2007.(Unit IV,V) REFERENCES: 1. Erik Dahlman, Stefan Parkvall, Johan Skold and Per Beming, "3G Evolution HSPA and LTE for Mobile Broadband‖, Second Edition, Academic Press, 2008. 2. Anurag Kumar, D.Manjunath, Joy kuri, ―Wireless Networking‖, First Edition, Elsevier 2011. 3. Simon Haykin , Michael Moher, David Koilpillai, ―Modern Wireless Communications‖, First Edition, Pearson Education 2013
  • 104.
    104 GE8075 INTELLECTUAL PROPERTYRIGHTS L T P C 3 0 0 3 OBJECTIVE:  To give an idea about IPR, registration and its enforcement. UNIT I INTRODUCTION 9 Introduction to IPRs, Basic concepts and need for Intellectual Property - Patents, Copyrights, Geographical Indications, IPR in India and Abroad – Genesis and Development – the way from WTO to WIPO –TRIPS, Nature of Intellectual Property, Industrial Property, technological Research, Inventions and Innovations – Important examples of IPR. UNIT II REGISTRATION OF IPRs 10 Meaning and practical aspects of registration of Copy Rights, Trademarks, Patents, Geographical Indications, Trade Secrets and Industrial Design registration in India and Abroad UNIT III AGREEMENTS AND LEGISLATIONS 10 International Treaties and Conventions on IPRs, TRIPS Agreement, PCT Agreement, Patent Act of India, Patent Amendment Act, Design Act, Trademark Act, Geographical Indication Act. UNIT IV DIGITAL PRODUCTS AND LAW 9 Digital Innovations and Developments as Knowledge Assets – IP Laws, Cyber Law and Digital Content Protection – Unfair Competition – Meaning and Relationship between Unfair Competition and IP Laws – Case Studies. UNIT V ENFORCEMENT OF IPRs 7 Infringement of IPRs, Enforcement Measures, Emerging issues – Case Studies. TOTAL : 45 PERIODS OUTCOME:  Ability to manage Intellectual Property portfolio to enhance the value of the firm. TEXT BOOKS: 1. V. Scople Vinod, Managing Intellectual Property, Prentice Hall of India pvt Ltd, 2012 2. S. V. Satakar, ―Intellectual Property Rights and Copy Rights, Ess Ess Publications, New Delhi, 2002. REFERENCES: 1. Deborah E. Bouchoux, ―Intellectual Property: The Law of Trademarks, Copyrights, Patents and Trade Secrets‖, Cengage Learning, Third Edition, 2012. 2. Prabuddha Ganguli,‖Intellectual Property Rights: Unleashing the Knowledge Economy‖, McGraw Hill Education, 2011. 3. Edited by Derek Bosworth and Elizabeth Webster, The Management of Intellectual Property, Edward Elgar Publishing Ltd., 2013.
  • 105.
    105 EC8092 ADVANCED WIRELESSCOMMUNICATION L T P C 3 0 0 3 OBJECTIVES:  To expose the students to the importance of improving capacity of wireless channel using MIMO  To enable understanding of channel impairment mitigation using space-time block and Trellis codes  To teach advanced MIMO system like layered space time codes, MU-MIMO System and MIMO-OFDM systems UNIT I CAPACITY OF WIRELESS CHANNELS 9 The crowded spectrum, need for high data rate, MIMO systems – Array Gain, Diversity Gain, Data Pipes, Spatial MUX, MIMO System Model. MIMO System Capacity – channel known at the TX, Channel unknown to the TX – capacity of deterministic channels, Random channels and frequency selective channels. UNIT II RADIO WAVE PROPAGATION 9 Radio wave propagation – Macroscopic fading- free space and out door, small scale fading Fading measurements – Direct pulse measurements, spread spectrum correlation channel sounding frequency domain channel sounding, Antenna Diversity – Diversity combining methods. UNIT III SPACE TIME BLOCK CODES 9 Delay Diversity scheme, Alamoti space time code – Maximum likelihood decoding maximum ratio combining. Transmit diversity space time block codes for real signal constellation and complex signal constellation - decoding of STBC. UNIT IV SPACE TIME TRELLIS CODES 9 Space time coded systems, space time code word design criteria, design of space time T C on slow fading channels, design of STTC on Fast Fading channels, performance analysis in slow and fast fading channels, effect of imperfect channel estimation and Antenna correlation on performance, comparison of STBC & STTC. UNIT V LAYERED SPACE TIME CODES 9 LST transmitter – Horizontal and Vertical LST receiver – ML Rx, Zero forcing Rx; MMSE Rx, SIC Rx, ZF V-blast Rx- MMSE V-blast Rx, Iterative Rx - capacity of MIMO – OFDM systems – capacity of MIMO multi user systems. TOTAL : 45 PERIODS OUTCOMES: The student should be able to:  Comprehend and appreciate the significance and role of this course in the present contemporary world  Apply the knowledge about the importance of MIMO in today's communication  Appreciate the various methods for improving the data rate of wireless communication system REFERENCES: 1. Mohinder Jankiraman, Space-time codes and MIMO systems, Artech House, Boston, London . www.artech house.com, ISBN 1-58053-865-7-2004 2. Paulraj Rohit Nabar, Dhananjay Gore, Introduction of space time wireless communication systems, Cambridge University Press, 2003. 3. David Tse and Pramod Viswanath, ―Fundamentals of Wireless Communication‖, Cambridge University Press, 2005.
  • 106.
    106 4. Sergio Verdu― Multi User Detection‖ Cambridge University Press, 1998 EC8071 COGNITIVE RADIO L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the evolving software defined radio and cognitive radio techniques and their essential functionalities  To study the basic architecture and standard for cognitive radio  To understand the physical, MAC and Network layer design of cognitive radio  To expose the student to evolving applications and advanced features of cognitive radio UNIT I INTRODUCTION TO SOFTWARE-DEFINED RADIO AND COGNITIVE RADIO 9 Evolution of Software Defined Radio and Cognitive radio: goals, benefits, definitions, architectures, relations with other radios, issues, enabling technologies, radio frequency spectrum and regulations. UNIT II COGNITIVE RADIO ARCHITECTURE 9 Cognition cycle – orient, plan, decide and act phases, Organization, SDR as a platform for Cognitive Radio – Hardware and Software Architectures, Overview of IEEE 802.22 standard for broadband wireless access in TV bands. UNIT III SPECTRUM SENSING AND DYNAMIC SPECTRUM ACCESS 9 Introduction – Primary user detection techniques – energy detection, feature detection, matched filtering, cooperative detection and other approaches, Fundamental Tradeoffs in spectrum sensing, Spectrum Sharing Models of Dynamic Spectrum Access - Unlicensed and Licensed Spectrum Sharing, Fundamental Limits of Cognitive Radio. UNIT IV MAC AND NETWORK LAYER DESIGN FOR COGNITIVE RADIO 9 MAC for cognitive radios – Polling, ALOHA, slotted ALOHA, CSMA, CSMA / CA, Network layer design – routing in cognitive radios, flow control and error control techniques. UNIT V ADVANCED TOPICS IN COGNITIVE RADIO 9 Overview of security issues in cognitive radios, auction based spectrum markets in cognitive radio networks, public safety and cognitive radio, cognitive radio for Internet of Things. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Gain knowledge on the design principles on software defined radio and cognitive radio  Develop the ability to design and implement algorithms for cognitive radio spectrum sensing and dynamic spectrum access  Build experiments and projects with real time wireless applications  Apply the knowledge of advanced features of cognitive radio for real world applications TEXT BOOKS: 1. Alexander M. Wyglinski, Maziar Nekovee, Thomas Hou, ―Cognitive Radio Communications and Networks‖, Academic Press, Elsevier, 2010. (Unit I to IV) 2. Huseyin Arslan (Ed.), ―Cognitive Radio, Software Defined Radio, and Adaptive Wireless Systems, Springer, 2007. (Unit V)
  • 107.
    107 REFERENCES: 1. Bruce Fette,―Cognitive Radio Technology‖, Newnes, 2006. 2. Kwang-Cheng Chen, Ramjee Prasad, ― Cognitive Radio Networks‖, John Wiley and Sons, 2009. 3. Ezio Biglieri, Professor Andrea J. Goldsmith, Dr Larry J. Greenstein, Narayan B. Mandayam, H. Vincent Poor, ―Principles of Cognitive Radio‖ , Cambridge University Press, 2012. GE8072 FOUNDATION SKILLS IN INTEGRATED PRODUCT DEVELOPMENT L T P C 3 0 0 3 OBJECTIVES:  To understand the global trends and development methodologies of various types of products and services  To conceptualize, prototype and develop product management plan for a new product based on the type of the new product and development methodology integrating the hardware, software, controls, electronics and mechanical systems  To understand requirement engineering and know how to collect, analyze and arrive at requirements for new product development and convert them in to design specification  To understand system modeling for system, sub-system and their interfaces and arrive at the optimum system specification and characteristics  To develop documentation, test specifications and coordinate with various teams to validate and sustain up to the EoL (End of Life) support activities for engineering customer UNIT I FUNDAMENTALS OF PRODUCT DEVELOPMENT 9 Global Trends Analysis and Product decision - Social Trends - Technical Trends- Economical Trends - Environmental Trends - Political/Policy Trends - Introduction to Product Development Methodologies and Management - Overview of Products and Services - Types of Product Development - Overview of Product Development methodologies - Product Life Cycle – Product Development Planning and Management. UNIT II REQUIREMENTS AND SYSTEM DESIGN 9 Requirement Engineering - Types of Requirements - Requirement Engineering - traceability Matrix and Analysis - Requirement Management - System Design & Modeling - Introduction to System Modeling - System Optimization - System Specification - Sub-System Design - Interface Design. UNIT III DESIGN AND TESTING 9 Conceptualization - Industrial Design and User Interface Design - Introduction to Concept generation Techniques – Challenges in Integration of Engineering Disciplines - Concept Screening & Evaluation - Detailed Design - Component Design and Verification – Mechanical, Electronics and Software Subsystems - High Level Design/Low Level Design of S/W Program - Types of Prototypes, S/W Testing- Hardware Schematic, Component design, Layout and Hardware Testing – Prototyping - Introduction to Rapid Prototyping and Rapid Manufacturing - System Integration, Testing, Certification and Documentation
  • 108.
    108 UNIT IV SUSTENANCEENGINEERING AND END-OF-LIFE (EOL) SUPPORT 9 Introduction to Product verification processes and stages - Introduction to Product Validation processes and stages - Product Testing Standards and Certification - Product Documentation - Sustenance -Maintenance and Repair – Enhancements - Product EoL - Obsolescence Management – Configuration Management - EoL Disposal UNIT V BUSINESS DYNAMICS – ENGINEERING SERVICES INDUSTRY 9 The Industry - Engineering Services Industry - Product Development in Industry versus Academia –The IPD Essentials - Introduction to Vertical Specific Product Development processes -Manufacturing/Purchase and Assembly of Systems - Integration of Mechanical, Embedded and Software Systems – Product Development Trade-offs - Intellectual Property Rights and Confidentiality – Security and Configuration Management. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Define, formulate and analyze a problem  Solve specific problems independently or as part of a team  Gain knowledge of the Innovation & Product Development process in the Business Context  Work independently as well as in teams  Manage a project from start to finish TEXTBOOKS: 1. Book specially prepared by NASSCOM as per the MoU. 2. Karl T Ulrich and Stephen D Eppinger, "Product Design and Development", Tata McGraw Hill, Fifth Edition, 2011. 3. John W Newstorm and Keith Davis, "Organizational Behavior", Tata McGraw Hill, Eleventh Edition, 2005. REFERENCES: 1. Hiriyappa B, ―Corporate Strategy – Managing the Business‖, Author House, 2013. 2. Peter F Drucker, ―People and Performance‖, Butterworth – Heinemann [Elsevier], Oxford, 2004. 3. Vinod Kumar Garg and Venkita Krishnan N K, ―Enterprise Resource Planning – Concepts‖, Second Edition, Prentice Hall, 2003. 4. Mark S Sanders and Ernest J McCormick, "Human Factors in Engineering and Design", McGraw Hill Education, Seventh Edition, 2013 CS8082 MACHINE LEARNING TECHNIQUES L T P C 3 0 0 3 OBJECTIVES:  To understand the need for machine learning for various problem solving  To study the various supervised, semi-supervised and unsupervised learning algorithms in machine learning  To learn the new approaches in machine learning  To design appropriate machine learning algorithms for problem solving UNIT I INTRODUCTION 9 Learning Problems – Perspectives and Issues – Concept Learning – Version Spaces and Candidate Eliminations – Inductive bias – Decision Tree learning – Representation – Algorithm – Heuristic Space Search.
  • 109.
    109 UNIT II NEURALNETWORKS AND GENETIC ALGORITHMS 9 Neural Network Representation – Problems – Perceptrons – Multilayer Networks and Back Propagation Algorithms – Advanced Topics – Genetic Algorithms – Hypothesis Space Search – Genetic Programming – Models of Evaluation and Learning. UNIT III BAYESIAN AND COMPUTATIONAL LEARNING 9 Bayes Theorem – Concept Learning – Maximum Likelihood – Minimum Description Length Principle – Bayes Optimal Classifier – Gibbs Algorithm – Naïve Bayes Classifier – Bayesian Belief Network – EM Algorithm – Probability Learning – Sample Complexity – Finite and Infinite Hypothesis Spaces – Mistake Bound Model. UNIT IV INSTANT BASED LEARNING 9 K- Nearest Neighbour Learning – Locally weighted Regression – Radial Bases Functions – Case Based Learning. UNIT V ADVANCED LEARNING 9 Learning Sets of Rules – Sequential Covering Algorithm – Learning Rule Set – First Order Rules – Sets of First Order Rules – Induction on Inverted Deduction – Inverting Resolution – Analytical Learning – Perfect Domain Theories – Explanation Base Learning – FOCL Algorithm – Reinforcement Learning – Task – Q-Learning – Temporal Difference Learning TOTAL : 45 PERIODS OUTCOMES: At the end of the course, the students will be able to  Differentiate between supervised, unsupervised, semi-supervised machine learning approaches  Apply specific supervised or unsupervised machine learning algorithm for a particular problem  Analyse and suggest the appropriate machine learning approach for the various types of problem  Design and make modifications to existing machine learning algorithms to suit an individual application  Provide useful case studies on the advanced machine learning algorithms TEXT BOOK: 1. Tom M. Mitchell, ―Machine Learning‖, McGraw-Hill Education (India) Private Limited, 2013. REFERENCES: 1. Ethem Alpaydin, ―Introduction to Machine Learning (Adaptive Computation and Machine Learning)‖, The MIT Press 2004. 2. Stephen Marsland, ―Machine Learning: An Algorithmic Perspective‖, CRC Press, 2009. EC8005 ELECTRONIC PACKAGING AND TESTING L T P C 3 0 0 3 OBJECTIVE:  To introduce and discuss various issues related to the system packaging UNIT I OVERVIEW OF ELECTRONIC SYSTEMS PACKAGING 9 Functions of an Electronic Package, Packaging Hierarchy, IC packaging: MEMS packaging, consumer electronics packaging, medical electronics packaging, Trends, Challenges, Driving Forces on Packaging Technology, Materials for Microelectronic packaging, Packaging Material Properties, Ceramics, Polymers, and Metals in Packaging, Material for high density interconnect substrates
  • 110.
    110 UNIT II ELECTRICALISSUES IN PACKAGING 9 Electrical Issues of Systems Packaging, Signal Distribution, Power Distribution, Electromagnetic Interference, Transmission Lines, Clock Distribution, Noise Sources, Digital and RF Issues. Design Process Electrical Design: Interconnect Capacitance, Resistance and Inductance fundamentals; Packaging roadmaps - Hybrid circuits - Resistive, Capacitive and Inductive parasitics UNIT III CHIP PACKAGES 9 IC Assembly - Purpose, Requirements, Technologies, Wire bonding, Tape Automated Bonding, Flip Chip, Wafer Level Packaging, reliability, wafer level burn – in and test. Single chip packaging: functions, types, materials processes, properties, characteristics, trends. Multi chip packaging: types, design, comparison, trends. System – in - package (SIP); Passives: discrete, integrated, and embedded UNIT IV PCB, SURFACE MOUNT TECHNOLOGY AND THERMAL CONSIDERATIONS 9 Printed Circuit Board: Anatomy, CAD tools for PCB design, Standard fabrication, Micro via Boards. Board Assembly: Surface Mount Technology, Through Hole Technology, Process Control and Design challenges. Thermal Management, Heat transfer fundamentals, Thermal conductivity and resistance, Conduction, convection and radiation – Cooling requirements UNIT V TESTING 9 Reliability, Basic concepts, Environmental interactions. Thermal mismatch and fatigue – failures – thermo mechanically induced –electrically induced – chemically induced. Electrical Testing: System level electrical testing, Interconnection tests, Active Circuit Testing, Design for Testability TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Give a comprehensive introduction to the various packaging types used along with the associated thermal, speed, signal and integrity power issues  Enable design of packages which can withstand higher temperature, vibrations and shock  Design of PCBs which minimize the EMI and operate at higher frequency  Analyze the concepts of Testing and testing methods TEXT BOOK: 1. Tummala, Rao R., Fundamentals of Microsystems Packaging, McGraw Hill, 2001 REFERENCES: 1. Blackwell (Ed), The electronic packaging handbook, CRC Press, 2000. 2. Tummala, Rao R, Microelectronics packaging handbook, McGraw Hill, 2008. 3. Bosshart, Printed Circuit Boards Design and Technology, TataMcGraw Hill, 1988. 4. R.G. Kaduskar and V.B.Baru, Electronic Product design, Wiley India, 2011 5. R.S.Khandpur, Printed Circuit Board, Tata McGraw Hill, 2005 6. Recent literature in Electronic Packaging 7. Michael L. Bushnell &Vishwani D. Agrawal,‖ Essentials of Electronic Testing for Digital, memory & Mixed signal VLSI Circuits‖, Kluwer Academic Publishers.2000. 8. M. Abramovici, M. A. Breuer, and A.D. Friedman, ―Digital System Testing and Testable Design‖, Computer Science Press,1990
  • 111.
    111 EC8006 MIXED SIGNALIC DESIGN L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Study the mixed signal of submicron CMOS circuits  Understand the various integrated based filters and topologies  Learn the data converters architecture, modeling and signal to noise ratio  Study the integrated circuit of oscillators and PLLs UNIT I SUBMICRON CMOS CIRCUIT DESIGN 9 Submicron CMOS: Overview and Models, CMOS process flow, Capacitors and Resistors. Digital circuit design: The MOSFET Switch, Delay Elements, An Adder. Analog Circuit Design: Biasing, Op-Amp Design, Circuit Noise. UNIT II INTEGRATOR BASED CMOS FILTERS 9 Integrator Building Blocks- low pass filter, Active RC integrators, MOSFET-C Integrators, gm- C integrators, Discrete time integrators. Filtering Topologies: The Bilinear transfer function, The Biquadratic transfer function, Filters using Noise shaping. UNIT III DATA CONVERTER ARCHITECTURES 9 DAC Architectures- Resistor string, R-2R ladder Networks, Current Steering, Charge Scaling DACs, Cyclic DAC, and Pipeline DAC. ADC Architectures- Flash, Two-step flash ADC, Pipeline ADC, Integrating ADC‘s, Successive Approximation ADC. UNIT IV DATA CONVERTER MODELING AND SNR 9 Sampling and Aliasing: A modeling approach, Impulse sampling, The sample and Hold, Quantization noise. Data converter SNR: An overview, Clock Jitter, Improving SNR using Averaging, Decimating filter for ADCs, Interpolating filter for DACs, Band pass and High pass sinc filters - Using feedback to improve SNR. UNIT V OSCILLATORS AND PLL 9 LC oscillators, Voltage Controlled Oscillators. Simple PLL, Charge pumps PLLs, Non ideal effects in PLLs, Delay Locked Loops. TOTAL :45 PERIODS OUTCOMES: Upon completion of the course, student should be able to  Apply the concepts for mixed signal MOS circuit.  Analyze the characteristics of IC based CMOS filters.  Design of various data converter architecture circuits.  Analyze the signal to noise ratio and modeling of mixed signals.  Design of oscillators and phase lock loop circuit. REFERENCES: 1. CMOS Mixed Signal Circuit Design by R.Jacob Baker, Wiley India, IEEE Press, reprint 2008. 2. CMOS Circuit Design, Layout and Simulation by R.Jacob Baker, Wiley India, IEEE Press, Second Edition, reprint 2009. 3. Design of Analog CMOS Integrated Circuits by Behzad Razavi, McGraw Hill, 33rd Re- print, 2016.
  • 112.
    112 GE8071 DISASTER MANAGEMENTLT P C 3 0 0 3 OBJECTIVES:  To provide students an exposure to disasters, their significance and types.  To ensure that students begin to understand the relationship between vulnerability, disasters, disaster prevention and risk reduction  To gain a preliminary understanding of approaches of Disaster Risk Reduction (DRR)  To enhance awareness of institutional processes in the country and  To develop rudimentary ability to respond to their surroundings with potential disaster response in areas where they live, with due sensitivity UNIT I INTRODUCTION TO DISASTERS 9 Definition: Disaster, Hazard, Vulnerability, Resilience, Risks – Disasters: Types of disasters – Earthquake, Landslide, Flood, Drought, Fire etc - Classification, Causes, Impacts including social, economic, political, environmental, health, psychosocial, etc.- Differential impacts- in terms of caste, class, gender, age, location, disability - Global trends in disasters: urban disasters, pandemics, complex emergencies, Climate change- Dos and Don‘ts during various types of Disasters. UNIT II APPROACHES TO DISASTER RISK REDUCTION (DRR) 9 Disaster cycle - Phases, Culture of safety, prevention, mitigation and preparedness community based DRR, Structural- nonstructural measures, Roles and responsibilities of- community, Panchayati Raj Institutions/Urban Local Bodies (PRIs/ULBs), States, Centre, and other stake- holders- Institutional Processes and Framework at State and Central Level- State Disaster Management Authority(SDMA) – Early Warning System – Advisories from Appropriate Agencies. UNIT III INTER-RELATIONSHIP BETWEEN DISASTERS AND DEVELOPMENT 9 Factors affecting Vulnerabilities, differential impacts, impact of Development projects such as dams, embankments, changes in Land-use etc.- Climate Change Adaptation- IPCC Scenario and Scenarios in the context of India - Relevance of indigenous knowledge, appropriate technology and local resources. UNIT IV DISASTER RISK MANAGEMENT IN INDIA 9 Hazard and Vulnerability profile of India, Components of Disaster Relief: Water, Food, Sanitation, Shelter, Health, Waste Management, Institutional arrangements (Mitigation, Response and Preparedness, Disaster Management Act and Policy - Other related policies, plans, programmes and legislation – Role of GIS and Information Technology Components in Preparedness, Risk Assessment, Response and Recovery Phases of Disaster – Disaster Damage Assessment. UNIT V DISASTER MANAGEMENT: APPLICATIONS AND CASE STUDIES AND FIELD WORKS 9 Landslide Hazard Zonation: Case Studies, Earthquake Vulnerability Assessment of Buildings and Infrastructure: Case Studies, Drought Assessment: Case Studies, Coastal Flooding: Storm Surge Assessment, Floods: Fluvial and Pluvial Flooding: Case Studies; Forest Fire: Case Studies, Man Made disasters: Case Studies, Space Based Inputs for Disaster Mitigation and Management and field works related to disaster management. TOTAL: 45 PERIODS OUTCOMES: The students will be able to  Differentiate the types of disasters, causes and their impact on environment and society  Assess vulnerability and various methods of risk reduction measures as well as mitigation.  Draw the hazard and vulnerability profile of India, Scenarios in the Indian context, Disaster damage assessment and management.
  • 113.
  • 114.
    114 TEXTBOOKS: 1. Singhal J.P.―Disaster Management‖, Laxmi Publications, 2010. ISBN-10: 9380386427 ISBN- 13: 978-9380386423 2. Tushar Bhattacharya, ―Disaster Science and Management‖, McGraw Hill India Education Pvt. Ltd., 2012. ISBN-10: 1259007367, ISBN-13: 978-1259007361] 3. Gupta Anil K, Sreeja S. Nair. Environmental Knowledge for Disaster Risk Management, NIDM, New Delhi, 2011 4. Kapur Anu Vulnerable India: A Geographical Study of Disasters, IIAS and Sage Publishers, New Delhi, 2010. REFERENCES: 1. Govt. of India: Disaster Management Act , Government of India, New Delhi, 2005 2. Government of India, National Disaster Management Policy,2009. EC8072 ELECTROMAGNETIC INTERFERENCE AND COMPATIBILITY L T P C 3 0 0 3 OBJECTIVES:  To introduce the basic concepts of Electromagnetic Interference  To teach the importance of Electromagnetic Compatible designs  To explain the existing standards for Electromagnetic Compatibility UNIT I EMI/EMC CONCEPTS 9 EMI-EMC definitions; Sources and Victims of EMI; Conducted and Radiated EMI Emission and Susceptibility; Case Histories; Radiation Hazards to humans. UNIT II EMI COUPLING PRINCIPLES 9 Conducted, radiated and transient coupling; Common ground impedance coupling; Common mode and ground loop coupling; Differential mode coupling; Near field cable to cable coupling; Field to cable coupling; Power mains and Power supply coupling; Transient EMI, ESD. UNIT III EMI CONTROL 9 Shielding; EMI Filters; Grounding; Bonding; Isolation transformer; Transient suppressors; EMI Suppression Cables. UNIT IV EMC DESIGN FOR CIRCUITS AND PCBS 9 Noise from Relays and Switches; Nonlinearities in Circuits; Cross talk in transmission line and cross talk control; Component selection and mounting; PCB trace impedance; Routing; Power distribution decoupling; Zoning; Grounding; VIAs; Terminations. UNIT V EMI MEASUREMENTS AND STANDARDS 9 Open area test site; TEM cell; EMI test shielded chamber and shielded ferrite lined anechoic chamber; Line impedance stabilization networks; EMI Rx and spectrum analyzer; Civilian standards - CISPR, FCC, IEC, EN; Military standards-MIL461E/462. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:
  • 115.
    115  Identify thevarious types and mechanisms of Electromagnetic Interference  Propose a suitable EMI mitigation technique  Describe the various EMC Standards and methods to measure them TEXT BOOKS: 1. V.P.Kodali, ―Engineering EMC Principles, Measurements and Technologies‖, IEEE Press, Newyork, 1996.(Unit I – V) 2. Henry W.Ott., Noise Reduction Techniques in Electronic Systems‖, A Wiley Inter Science Publications, John Wiley and Sons, Newyork, 1988. (Unit – IV) REFERENCES: 1. C.R.Paul,‖Introduction to Electromagnetic Compatibility‖ , John Wiley and Sons, Inc, 1992. 2. Bemhard Keiser, ―Principles of Electromagnetic Compatibility‖, 3rd Ed, Artech house, Norwood, 1986. 3. Don R. J.White Consultant Incorporate, ―Handbook of EMI/EMC‖, Vol I-V, 1988. EC8007 LOW POWER SoC DESIGN L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Identify sources of power in an IC.  Understand basic principle of System on Chip design  Learn optimization of power in combinational and sequential logic machines for SoC Design  Identify suitable techniques to reduce the power dissipation and design circuits with low power dissipation. UNIT I POWER CONSUMPTION IN CMOS 9 Physics of power dissipation in CMOS FET devices – Hierarchy of limits of power – Sources of power consumption – Static Power Dissipation, Active Power Dissipation - Designing for Low Power, Circuit Techniques for Leakage Power Reduction - Basic principle of low power design, Logic level power optimization – Circuit level low power design. UNIT II SYSTEM-ON-CHIP DESIGN 9 System-on-Chip Concept, Design Principles in SoC Architecture, SoC Design Flow, Platform- based and IP based SoC Designs, Basic Concepts of Bus-Based Communication Architectures. High performance algorithms for ASICs/ SoCs as case studies – Canonic Signed Digit Arithmetic, KCM, Distributed Arithmetic, High performance digital filters for sigma-delta ADC UNIT III POWER OPTIMIZATION OF COMBINATIONAL AND SEQUENTIAL LOGIC MACHINES FOR SOC 9 Introduction to Standard Cell-Based Layout – Simulation - Combinational Network Delay - Logic and interconnect Design - Power Optimization - Switch Logic Networks. Introduction - Latches and Flip-Flops - Sequential Systems and Clocking Disciplines - Sequential System Design - Power Optimization - Design Validation - Sequential Testing. UNIT IV DESIGN OF LOW POWER CIRCUITS FOR SUB SYSTEM ON A SOC 9 Subsystem Design Principles - Combinational Shifters – Adders – ALUs – Multipliers – High Density Memory – Field Programmable Gate Arrays - Programmable Logic Arrays - Computer arithmetic techniques for low power system – low voltage low power static Random access and
  • 116.
    116 dynamic Random accessmemories, low power clock, Inter connect and layout design UNIT V FLOOR PLANNING 9 Floor-planning Methods – Block Placement & Channel Definition - Global Routing - switchbox Routing - Power Distribution - Clock Distributions - Floor-planning Tips - Design Validation - Off- Chip Connections – Packages, The I/O Architecture - PAD Design TOTAL:45 PERIODS OUTCOME: At the end of the course, the student should be able to:  Analyze and design low-power VLSI circuits using different circuit technologies for system on chip design TEXT BOOKS: 1. J.Rabaey, ―Low Power Design Essentials (Integrated Circuits and Systems)‖, Springer, 2009 2. Wayne Wolf, ―Modern VLSI Design – System – on – Chip Design‖, Prentice Hall, 3rd Edition, 2008. REFERENCES: 1. J.B.Kuo & J.H.Lou, ―Low-voltage CMOS VLSI Circuits‖, Wiley, 1999. 2. A.Bellaowar & M.I.Elmasry,‖Low power Digital VLSI Design, Circuits and Systems‖, Kluwer, 1996. 3. Wayne Wolf, ―Modern VLSI Design – IP based Design‖, Prentice Hall, 4th Edition, 2008. 4. M.J.S. Smith : Application Specific Integrated Circuits, Pearson, 2003 5. Sudeep Pasricha and NikilDutt, On-Chip Communication Architectures System on Chip Interconnect, Elsevier, 2008 6. Recent literature in Low Power VLSI Circuits. 7. Recent literature in Design of ASICs EC8008 PHOTONIC NETWORKS L T P C 3 0 0 3 OBJECTIVES: • To enable the student to understand the importance of the backbone infrastructure for our present and future communication needs and familiarize them with the architectures and the protocol stack in use • To enable the student to understand the differences in the design of data plane and the control plane and the routing, switching and the resource allocation methods and the network management and protection methods in vogue • To expose the student to the advances in networking and switching domains and the future trends UNIT I OPTICAL SYSTEM COMPONENTS 9 Light Propagation in optical fibers – Loss & bandwidth, System limitations, Nonlinear effects; Solitons; Optical Network Components – Couplers, Isolators & Circulators, Multiplexers & Filters, Optical Amplifiers, Switches, Wavelength Converters. UNIT II OPTICAL NETWORK ARCHITECTURES 9
  • 117.
    117 Introduction to OpticalNetworks; SONET / SDH, Metropolitan-Area Networks, Layered Architecture; Broadcast and Select Networks – Topologies for Broadcast Networks, Media- Access Control Protocols, Wavelength Routing Architecture. UNIT III WAVELENGTH ROUTING NETWORKS 9 The optical layer, Optical Network Nodes, Routing and wavelength assignment, Traffic Grooming in Optical Networks, Architectural variations- Linear Light wave networks, Logically Routed Networks. UNIT IV PACKET SWITCHING AND ACCESS NETWORKS 9 Photonic Packet Switching – OTDM, Multiplexing and Demultiplexing, Synchronization, Broadcast OTDM networks, Switch-based networks, Contention Resolution Access Networks – Network Architecture overview, Optical Access Network Architectures and OTDM networks. UNIT V NETWORK DESIGN AND MANAGEMENT 9 Transmission System Engineering – System model, Power penalty - transmitter, receiver, Optical amplifiers, crosstalk, dispersion, Wavelength stabilization, Overall design considerations, Control and Management – Network management functions, Configuration management, Performance management, Fault management, Optical safety, Service interface. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student would be able to:  Use the backbone infrastructure for our present and future communication needs  Analyze the architectures and the protocol stack  Compare the differences in the design of data plane, control plane, routing, switching, resource allocation methods, network management and protection methods in vogue REFERENCES: 1. Rajiv Ramaswami and Kumar N. Sivarajan, ―Optical Networks: A Practical Perspective‖, Harcourt Asia Pte Ltd., Second Edition 2004. 2. C. Siva Ram Moorthy and Mohan Gurusamy, ―WDM Optical Networks: Concept, Design and Algorithms‖, Prentice Hall of India, Ist Edition, 2002. 3. P.E. Green, Jr., ―Fiber Optic Networks‖, Prentice Hall, NJ, 1993. 4. Biswanath Mukherjee, ―Optical WDM Networks‖, Springer Series, 2006. EC8009 COMPRESSIVE SENSING L T P C 3 0 0 3 OBJECTIVES:  To present the basic theory and ideas showing when it is possible to reconstruct sparse or nearly sparse signals from undersampled data  To expose students to recent ideas in modern convex optimization allowing rapid signal recovery  To give students a sense of real time applications that might benefit from compressive sensing ideas UNIT I INTRODUCTION TO COMPRESSED SENSING 9
  • 118.
    118 Introduction; Motivation; MathematicalBackground; Traditional Sampling; Traditional Compression; Conventional Data Acquisition System; Drawbacks of Transform coding; Compressed Sensing (CS). UNIT II SPARSITY AND SIGNAL RECOVERY 9 Signal Representation; Basis vectors; Sensing matrices; Restricted Isometric Property; Coherence; Stable recovery; Number of measurements. UNIT III RECOVERY ALGORITHMS 9 Basis Pursuit algorithm: L1 minimization; Matching pursuit: Orthogonal Matching Pursuit(OMP), Stagewise OMP, Regularized OMP, Compressive Sampling Matching Pursuit (CoSaMP); Iterative Thresholding algorithm: Hard thresholding, Soft thresholding; Model based : Model based CoSaMP, Model based HIT. UNIT IV COMPRESSIVE SENSING FOR WSN 9 Basics of WSN; Wireless Sensor without Compressive Sensing; Wireless Sensor with Compressive Sensing; Compressive Wireless Sensing: Spatial compression in WSNs, Projections in WSNs, Compressed Sensing in WSNs. UNIT V APPLICATIONS OF COMPRESSIVE SENSING 9 Compressed Sensing for Real-Time Energy-Efficient Compression on Wireless Body Sensor Nodes; Compressive sensing in video surveillance; An Application of Compressive Sensing for Image Fusion; Single-Pixel Imaging via Compressive Sampling. TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Appreciate the motivation and the necessity for compressed sensing technology.  Design a new algorithm or modify an existing algorithm for different application areas in wireless sensor network. TEXT BOOKS: 1. Radha S, Hemalatha R, Aasha Nandhini S, ―Compressive Sensing for Wireless Communication: Challenges and Opportunities‖, River publication, 2016. (UNIT I-V) 2. Mark A. Davenport, Marco F. Duarte, Yonina C. Eldar and Gitta Kutyniok, ―Introduction to Compressed Sensing,‖ in Compressed Sensing: Theory and Applications, Y. Eldar and G. Kutyniok, eds., Cambridge University Press, 2011 (UNIT I) REFERENCES: 1. Duarte, M.F.; Davenport, M.A.; Takhar, D.; Laska, J.N.; Ting Sun; Kelly, K.F.; Baraniuk, R.G.; , "Single-Pixel Imaging via Compressive Sampling," Signal Processing Magazine, IEEE, vol.25, no.2, pp.83-91, March 2008. 2. Tao Wan.; Zengchang Qin.; , ―An application of compressive sensing for image fusion‖, CIVR '10 Proceedings of the ACM International Conference on Image and Video Retrieval, Pages 3-9. 3. H. Mamaghanian , N. Khaled , D. Atienza and P. Vandergheynst "Compressed sensing for real-time energy-efficient ecg compression on wireless body sensor nodes", IEEE Trans. Biomed. Eng., vol. 58, no. 9, pp.2456 -2466 2011. 4. Mohammadreza Balouchestani.; Kaamran Raahemifar.; and Sridhar Krishnan.;, ―COMPRESSED SENSING IN WIRELESS SENSOR NETWORKS: SURVEY‖ , Canadian Journal on Multimedia and Wireless Networks Vol. 2, No. 1, February 2011.
  • 119.
    119 EC8093 DIGITAL IMAGEPROCESSING L T P C 3 0 0 3 OBJECTIVES:  To become familiar with digital image fundamentals  To get exposed to simple image enhancement techniques in Spatial and Frequency domain.  To learn concepts of degradation function and restoration techniques.  To study the image segmentation and representation techniques.  To become familiar with image compression and recognition methods UNIT I DIGITAL IMAGE FUNDAMENTALS 9 Steps in Digital Image Processing – Components – Elements of Visual Perception – Image Sensing and Acquisition – Image Sampling and Quantization – Relationships between pixels - Color image fundamentals - RGB, HSI models, Two-dimensional mathematical preliminaries, 2D transforms - DFT, DCT. UNIT II IMAGE ENHANCEMENT 9 Spatial Domain: Gray level transformations – Histogram processing – Basics of Spatial Filtering– Smoothing and Sharpening Spatial Filtering, Frequency Domain: Introduction to Fourier Transform– Smoothing and Sharpening frequency domain filters – Ideal, Butterworth and Gaussian filters, Homomorphic filtering, Color image enhancement. UNIT III IMAGE RESTORATION 9 Image Restoration - degradation model, Properties, Noise models – Mean Filters – Order Statistics – Adaptive filters – Band reject Filters – Band pass Filters – Notch Filters – Optimum Notch Filtering – Inverse Filtering – Wiener filtering UNIT IV IMAGE SEGMENTATION 9 Edge detection, Edge linking via Hough transform – Thresholding - Region based segmentation – Region growing – Region splitting and merging – Morphological processing- erosion and dilation, Segmentation by morphological watersheds – basic concepts – Dam construction – Watershed segmentation algorithm. UNIT V IMAGE COMPRESSION AND RECOGNITION 9 Need for data compression, Huffman, Run Length Encoding, Shift codes, Arithmetic coding, JPEG standard, MPEG. Boundary representation, Boundary description, Fourier Descriptor, Regional Descriptors – Topological feature, Texture - Patterns and Pattern classes - Recognition based on matching. TOTAL :45 PERIODS
  • 120.
    120 OUTCOMES: At the endof the course, the students should be able to:  Know and understand the basics and fundamentals of digital image processing, such as digitization, sampling, quantization, and 2D-transforms.  Operate on images using the techniques of smoothing, sharpening and enhancement.  Understand the restoration concepts and filtering techniques.  Learn the basics of segmentation, features extraction, compression and recognition methods for color models. TEXT BOOKS: 1. Rafael C. Gonzalez, Richard E. Woods, ‗Digital Image Processing‘, Pearson, Third Edition, 2010. 2. Anil K. Jain, ‗Fundamentals of Digital Image Processing‘, Pearson, 2002. REFERENCES 1. Kenneth R. Castleman, ‗Digital Image Processing‘, Pearson, 2006. 2. Rafael C. Gonzalez, Richard E. Woods, Steven Eddins, ‗Digital Image Processing using MATLAB‘, Pearson Education, Inc., 2011. 3. D,E. Dudgeon and RM. Mersereau, ‗Multidimensional Digital Signal Processing‘, Prentice Hall Professional Technical Reference, 1990. 4. William K. Pratt, ‗Digital Image Processing‘, John Wiley, New York, 2002 5. Milan Sonka et al ‗Image processing, analysis and machine vision‘, Brookes/Cole, Vikas Publishing House, 2nd edition, 1999. GE8076 PROFESSIONAL ETHICS IN ENGINEERING LT P C 3 0 0 3 OBJECTIVE:  To enable the students to create an awareness on Engineering Ethics and Human Values, to instill Moral and Social Values and Loyalty and to appreciate the rights of others. UNIT I HUMAN VALUES 10 Morals, values and Ethics – Integrity – Work ethic – Service learning – Civic virtue – Respect for others – Living peacefully – Caring – Sharing – Honesty – Courage – Valuing time – Cooperation – Commitment – Empathy – Self confidence – Character – Spirituality – Introduction to Yoga and meditation for professional excellence and stress management. UNIT II ENGINEERING ETHICS 9 Senses of ‗Engineering Ethics‘ – Variety of moral issues – Types of inquiry – Moral dilemmas – Moral Autonomy – Kohlberg‘s theory – Gilligan‘s theory – Consensus and Controversy – Models of professional roles - Theories about right action – Self-interest – Customs and Religion – Uses of Ethical Theories. UNIT III ENGINEERING AS SOCIAL EXPERIMENTATION 9 Engineering as Experimentation – Engineers as responsible Experimenters – Codes of Ethics – A Balanced Outlook on Law. UNIT IV SAFETY, RESPONSIBILITIES AND RIGHTS 9 Safety and Risk – Assessment of Safety and Risk – Risk Benefit Analysis and Reducing Risk -
  • 121.
    121 Respect for Authority– Collective Bargaining – Confidentiality – Conflicts of Interest – Occupational Crime – Professional Rights – Employee Rights – Intellectual Property Rights (IPR) – Discrimination. UNIT V GLOBAL ISSUES 8 Multinational Corporations – Environmental Ethics – Computer Ethics – Weapons Development – Engineers as Managers – Consulting Engineers – Engineers as Expert Witnesses and Advisors – Moral Leadership –Code of Conduct – Corporate Social Responsibility. TOTAL: 45 PERIODS OUTCOMES:  Upon completion of the course, the student should be able to apply ethics in society, discuss the ethical issues related to engineering and realize the responsibilities and rights in the society. TEXT BOOKS: 1. Mike W. Martin and Roland Schinzinger, ―Ethics in Engineering‖, Tata McGraw Hill, New Delhi, 2003. 2. Govindarajan M, Natarajan S, Senthil Kumar V. S, ―Engineering Ethics‖, Prentice Hall of India, New Delhi, 2004. REFERENCES: 1. Charles B. Fleddermann, ―Engineering Ethics‖, Pearson Prentice Hall, New Jersey, 2004. 2. Charles E. Harris, Michael S. Pritchard and Michael J. Rabins, ―Engineering Ethics – Concepts and Cases‖, Cengage Learning, 2009. 3. John R Boatright, ―Ethics and the Conduct of Business‖, Pearson Education, New Delhi, 2003 4. Edmund G Seebauer and Robert L Barry, ―Fundamentals of Ethics for Scientists and Engineers‖, Oxford University Press, Oxford, 2001. 5. Laura P. Hartman and Joe Desjardins, ―Business Ethics: Decision Making for Personal Integrity and Social Responsibility‖ Mc Graw Hill education, India Pvt. Ltd.,New Delhi, 2013. 6. World Community Service Centre, ‗ Value Education‘, Vethathiri publications, Erode, 2011. Web sources: 1. www.onlineethics.org 2. www.nspe.org 3. www.globalethics.org 4. www.ethics.org EC8010 VIDEO ANALYTICS L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the need for video Analytics  To understand the basic configuration of video analytics  To understand the functional blocks of a video analytic system  To get exposed to the various applications of video analytics UNIT I VIDEO ANALYTIC COMPONENTS 9 Need for Video Analytics-Overview of video Analytics- Foreground extraction- Feature extraction- classifier - Preprocessing- edge detection- smoothening- Feature space-PCA-FLD-SIFT features UNIT II FOREGROUND EXTRACTION 9
  • 122.
    122 Background estimation- Averaging-Gaussian Mixture Model- Optical Flow based- Image Segmentation- Region growing- Region splitting-Morphological operations- erosion-Dilation- Tracking in a multiple camera environment UNIT III CLASSIFIERS 9 Neural networks (back propagation) - Deep learning networks- Fuzzy Classifier- Bayesian classifier-HMM based classifier
  • 123.
    123 UNIT IV VIDEOANALYTICS FOR SECURITY 9 Abandoned object detection- human behavioral analysis -human action recognition- perimeter security- crowd analysis and prediction of crowd congestion UNIT V VIDEO ANALYTICS FOR BUSINESS INTELLIGENCE & TRAFFIC MONITIRING AND ASSISTANCE 9 Customer behavior analysis - people counting- Traffic rule violation detection- traffic congestion identification for route planning- driver assistance- lane change warning TOTAL :45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Design video analytic algorithms for security applications  Design video analytic algorithms for business intelligence  Design custom made video analytics system for the given target application REFERENCES: 1. Graeme A. Jones (Editor), Nikos Paragios (Editor), Carlo S. Regazzoni (Editor) Video-Based Surveillance Systems: Computer Vision and Distributed Processing , Kluwer academic publisher, 2001 2. Nilanjan Dey (Editor), Amira Ashour (Editor) and Suvojit Acharjee (Editor), Applied Video Processing in Surveillance and Monitoring Systems (IGI global) 2016 3. Zhihao Chen (Author), Ye Yang (Author), Jingyu Xue (Author), Liping Ye (Author), Feng Guo (Author), The Next Generation of Video Surveillance and Video Analytics: The Unified Intelligent Video Analytics Suite, CreateSpace Independent Publishing Platform, 2014 4. Caifeng Shan (Editor), Fatih Porikli (Editor), Tao Xiang (Editor), Shaogang Gong (Editor) Video Analytics for Business Intelligence, Springer, 2012 EC8011 DSP PROCESSOR ARCHITECTURE AND PROGRAMMING L T P C 3 0 0 3 OBJECTIVES: The objective of this course is to provide knowledge on:  Basics on Digital Signal Processors  Programmable DSP‘s Architecture, On-chip Peripherals and Instruction set  Programming for signal processing applications  Advanced Programmable DSP Processors UNIT I FUNDAMENTALS OF PROGRAMMABLE DSPs 9 Introduction to Programmable DSPs, Architectural Features of PDSPs - Multiplier and Multiplier accumulator – Modified Bus Structures and Memory access – Multiple access memory – Multi-port memory – VLIW architecture- Pipelining – Special Addressing modes in P-DSPs – On chip Peripherals, Applications of Programmable DSPs. UNIT II TMS320C5X PROCESSOR 9
  • 124.
    124 Architecture of C5XProcessor – Addressing modes – Assembly language Instructions - Pipeline structure, On-chip Peripherals – Block Diagram of DSP starter kit (DSK) – Software Tools, DSK on-board peripherals, Application Programs for processing real time signals. UNIT III TMS320C6X PROCESSOR 9 Architecture of the C6x Processor - Instruction Set – Addressing modes, Assembler directives, On- chip peripherals, DSP Development System: DSP Starter Kit - Code Composer Studio - Support Files – Introduction to AIC23 codec and other on-board peripherals, Real-Time Programming Examples for Signals and Noise generation, Frequency analysis, Filter design. UNIT IV ADSP PROCESSORS 9 Architecture of ADSP-21XX and ADSP-210XX series of DSP processors- Addressing modes and assembly language instructions – Application programs –Filter design, FFT calculation. UNIT V ADVANCED PROCESSORS 9 Study of TI‘s advanced processors - TMS320C674x and TMS320C55x DSPs, ADSP‘s Blackfin and SigmaDSP Processors, NXP‘s DSP56Fxx Family of DSP Processors, Comparison of the features of TI, ADSP and NXP DSP family processors. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Analyze the concepts of Digital Signal Processors  Demonstrate their ability to program the DSP processor for signal processing applications  Discuss, compare and select the suitable Advanced DSP Processors for real-time signal processing applications REFERENCES: 1. B. Venkataramani and M. Bhaskar, ―Digital Signal Processors – Architecture, Programming and Applications‖ – Tata McGraw – Hill Publishing Company Limited. New Delhi, 2003. 2. Avtar Singh and S. Srinivasan, Digital Signal Processing – Implementations using DSP Microprocessors with Examples from TMS320C54xx, Cengage Learning India Private Limited, Delhi 2012. 3. Rulph Chassaing and Donald Reay, Digital Signal Processing and Applications with the C6713 and C6416 DSK, John Wiley & Sons, Inc., Publication, 2012 (Reprint). 4. User guides Texas Instruments, Analog Devices and NXP. EC8094 SATELLITE COMMUNICATION L T P C 3 0 0 3 OBJECTIVES: The student should be made to:  Understand the basics of satellite orbits  Understand the satellite segment and earth segment  Analyze the various methods of satellite access  Understand the applications of satellites  Understand the basics of satellite Networks
  • 125.
    125 UNIT I SATELLITEORBITS 9 Kepler‟s Laws, Newton‟s law, orbital parameters, orbital perturbations, station keeping, geo stationary and non Geo-stationary orbits – Look Angle Determination- Limits of visibility – eclipse-Sub satellite point –Sun transit outage-Launching Procedures - launch vehicles and propulsion. UNIT II SPACE SEGMENT 9 Spacecraft Technology- Structure, Primary power, Attitude and Orbit control, Thermal control and Propulsion, communication Payload and supporting subsystems, Telemetry, Tracking and command-Transponders-The Antenna Subsystem. UNIT III SATELLITE LINK DESIGN 9 Basic link analysis, Interference analysis, Rain induced attenuation and interference, Ionospheric characteristics, Link Design with and without frequency reuse. UNIT IV SATELLITE ACCESS AND CODING METHODS 9 Modulation and Multiplexing: Voice, Data, Video, Analog – digital transmission system, Digital video Broadcast, multiple access: FDMA, TDMA, CDMA, DAMA Assignment Methods, compression – encryption, Coding Schemes. UNIT V SATELLITE APPLICATIONS 9 INTELSAT Series, INSAT, VSAT, Mobile satellite services: GSM, GPS, INMARSAT, LEO, MEO, Satellite Navigational System. GPS Position Location Principles, Differential GPS, Direct Broadcast satellites (DBS/DTH). TOTAL:45 PERIODS OUTCOMES: At the end of the course, the student would be able to:  Analyze the satellite orbits  Analyze the earth segment and space segment  Analyze the satellite Link design  Design various satellite applications TEXT BOOKS: 1. Dennis Roddy, ―Satellite Communication‖, 4th Edition, Mc Graw Hill International, 2006. 2. Timothy,Pratt,Charles,W.Bostain,JeremyE.Allnutt,"SatelliteCommunication‖,2nd Edition, Wiley Publications,2002 REFERENCES: 1. Wilbur L.Pritchard, Hendri G. Suyderhoud, Robert A. Nelson, ―Satellite Communication Systems Engineering‖, Prentice Hall/Pearson, 2007. 2. N.Agarwal, ―Design of Geosynchronous Space Craft‖, Prentice Hall, 1986. 3. Bruce R. Elbert, ―The Satellite Communication Applications‖, Hand Book, Artech House Bostan London, 1997. 4. Tri T. Ha, ―Digital Satellite Communication‖, II nd edition, 1990. 5. Emanuel Fthenakis, ―Manual of Satellite Communications‖, Mc Graw Hill Book Co., 1984. 6. Robert G. Winch, ―Telecommunication Trans Mission Systems‖, Mc Graw-Hill Book Co., 1983.
  • 126.
    126 7. Brian Ackroyd,―World Satellite Communication and earth station Design‖, BSP professional Books, 1990. 8. G.B.Bleazard, ―Introducing Satellite communications―, NCC Publication, 1985. 9. M.Richharia, ―Satellite Communication Systems-Design Principles‖, Macmillan 2003. CS8086 SOFT COMPUTING L T P C 3 0 0 3 OBJECTIVES:  To learn the basic concepts of Soft Computing  To become familiar with various techniques like neural networks, genetic algorithms and fuzzy systems.  To apply soft computing techniques to solve problems. UNIT I INTRODUCTION TO SOFT COMPUTING 9 Introduction-Artificial Intelligence-Artificial Neural Networks-Fuzzy Systems-Genetic Algorithm and Evolutionary Programming-Swarm Intelligent Systems-Classification of ANNs-McCulloch and Pitts Neuron Model-Learning Rules: Hebbian and Delta- Perceptron Network-Adaline Network-Madaline Network. UNIT II ARTIFICIAL NEURAL NETWORKS 9 Back propagation Neural Networks - Kohonen Neural Network -Learning Vector Quantization -Hamming Neural Network - Hopfield Neural Network- Bi-directional Associative Memory -Adaptive Resonance Theory Neural Networks- Support Vector Machines - Spike Neuron Models. UNIT III FUZZY SYSTEMS 9 Introduction to Fuzzy Logic, Classical Sets and Fuzzy Sets - Classical Relations and Fuzzy Relations -Membership Functions -Defuzzification - Fuzzy Arithmetic and Fuzzy Measures - Fuzzy Rule Base and Approximate Reasoning - Introduction to Fuzzy Decision Making. UNIT IV GENETIC ALGORITHMS 9 Basic Concepts- Working Principles -Encoding- Fitness Function - Reproduction - Inheritance Operators - Cross Over - Inversion and Deletion -Mutation Operator - Bit-wise Operators -Convergence of Genetic Algorithm. UNIT V HYBRID SYSTEMS 9 Hybrid Systems -Neural Networks, Fuzzy Logic and Genetic -GA Based Weight Determination - LR-Type Fuzzy Numbers - Fuzzy Neuron - Fuzzy BP Architecture - Learning in Fuzzy BP- Inference by Fuzzy BP - Fuzzy ArtMap: A Brief Introduction - Soft Computing Tools - GA in Fuzzy Logic Controller Design - Fuzzy Logic Controller TOTAL : 45 PERIODS OUTCOMES: Upon completion of this course, the students should be able to  Apply suitable soft computing techniques for various applications.  Integrate various soft computing techniques for complex problems. TEXT BOOKS: 1. N.P.Padhy, S.P.Simon, "Soft Computing with MATLAB Programming", Oxford
  • 127.
    127 University Press, 2015. 2.S.N.Sivanandam , S.N.Deepa, "Principles of Soft Computing", Wiley India Pvt.Ltd., 2nd Edition, 2011. 3. S.Rajasekaran, G.A.Vijayalakshmi Pai, "Neural Networks, Fuzzy Logic and Genetic Algorithm, Synthesis and Applications ", PHI Learning Pvt.Ltd., 2017. REFERENCES: 1. Jyh-Shing Roger Jang, Chuen-Tsai Sun, Eiji Mizutani, ―Neuro-Fuzzy and Soft Computing‖, Prentice-Hall of India, 2002. 2. Kwang H.Lee, ―First course on Fuzzy Theory and Applications‖, Springer, 2005. 3. George J. Klir and Bo Yuan, ―Fuzzy Sets and Fuzzy Logic-Theory and Applications‖, Prentice Hall, 1996. 4. James A. Freeman and David M. Skapura, ―Neural Networks Algorithms, Applications, and Programming Techniques‖, Addison Wesley, 2003. IT8006 PRINCIPLES OF SPEECH PROCESSING L T P C 3 0 0 3 OBJECTIVES: The student should be made:  To understand the speech production mechanism and the various speech analysis techniques and speech models  To understand the speech compression techniques  To understand the speech recognition techniques  To know the speaker recognition and text to speech synthesis techniques UNIT I SPEECH SIGNAL CHARACTERISTICS & ANALYSIS 11 Speech production process - speech sounds and features- - Phonetic Representation of Speech -- representing= speech in time and frequency domains - Short-Time Analysis of Speech - Short- Time Energy and Zero-Crossing Rate - Short-Time Autocorrelation Function - Short-Time Fourier Transform (STFT) - Speech Spectrum - Cepstrum - Mel-Frequency Cepstrum Coefficients - Hearing and Auditory Perception - Perception of Loudness - Critical Bands - Pitch Perception UNIT II SPEECH COMPRESSION 12 Sampling and Quantization of Speech (PCM) - Adaptive differential PCM - Delta Modulation - Vector Quantization- Linear predictive coding (LPC) - Code excited Linear predictive Coding (CELP) UNIT III SPEECH RECOGNITION 12 LPC for speech recognition- Hidden Markov Model (HMM)- training procedure for HMM- subword unit model based on HMM- language models for large vocabulary speech recognition - Overall recognition system based on subword units - Context dependent subword units- Semantic post processor for speech recognition UNIT IV SPEAKER RECOGNITION 5 Acoustic parameters for speaker verification- Feature space for speaker recognition-similarity measures- Text dependent speaker verification-Text independent speaker verification techniques UNIT V SPEAKER RECOGNITION AND TEXT TO SPEECH SYNTHESIS 5 Text to speech synthesis(TTS)-Concatenative and waveform synthesis methods, sub-word units for TTS, intelligibility and naturalness-role of prosody
  • 128.
    128 TOTAL:45 PERIODS OUTCOMES: At theend of the course, the student should be able to:  Design speech compression techniques  Configure speech recognition techniques  Design speaker recognition systems  Design text to speech synthesis systems TEXT BOOKS: 1. L. R. Rabiner and R. W. Schafer, Introduction to Digital Signal Processing, Foundations and Trendsin Signal Processing Vol. 1, Nos. 1–2 (2007) 1–194 2. Ben Gold and Nelson Morgan ―Speech and Audio signal processing- processing and perception of speech and music‖, John Wiley and sons 2006 REFERENCES 1. Lawrence Rabiner, Biiing and– Hwang Juang and B.Yegnanarayana ―Fundamentals of Speech Recognition‖, Pearson Education, 2009 2. Claudio Becchetti and Lucio Prina Ricotti, ―Speech Recognition‖, John Wiley and Sons, 1999 3. Donglos O shanhnessy ―Speech Communication: Human and Machine ―, 2nd Ed. University press 2001. GE8073 FUNDAMENTALS OF NANOSCIENCE L T P C 3 0 0 3 OBJECTIVE: To learn about basis of nanomaterial science, preparation method, types and application UNIT I INTRODUCTION 8 Nanoscale Science and Technology- Implications for Physics, Chemistry, Biology and Engineering-Classifications of nanostructured materials- nano particles- quantum dots, nanowires- ultra-thin films-multilayered materials. Length Scales involved and effect on properties: Mechanical, Electronic, Optical, Magnetic and Thermal properties. Introduction to properties and motivation for study (qualitative only). UNIT II GENERAL METHODS OF PREPARATION 9 Bottom-up Synthesis-Top-down Approach: Co-Precipitation, Ultrasonication, Mechanical Milling, Colloidal routes, Self-assembly, Vapour phase deposition, MOCVD, Sputtering, Evaporation, Molecular Beam Epitaxy, Atomic Layer Epitaxy, MOMBE. UNIT III NANOMATERIALS 12 Nanoforms of Carbon - Buckminster fullerene- graphene and carbon nanotube, Single wall carbon Nanotubes (SWCNT) and Multi wall carbon nanotubes (MWCNT)- methods of synthesis(arc- growth, laser ablation, CVD routes, Plasma CVD), structure-property Relationships applications- Nanometal oxides-ZnO, TiO2,MgO, ZrO2, NiO, Nano alumina, CaO, AgTiO2, Ferrites, Nano clays-functionalization and applications-Quantum wires, Quantum dots-preparation, properties and applications. UNIT IV CHARACTERIZATION TECHNIQUES 9 X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques, Transmission Electron Microscopy including high-resolution imaging, Surface Analysis techniques- AFM, SPM, STM, SNOM, ESCA, SIMS-Nanoindentation.
  • 129.
    129 UNIT V APPLICATIONS7 Nano InfoTech: Information storage- Nano computer, molecular switch, super chip, nanocrystal, Nano biotechnology: nanoprobes in medical diagnostics and biotechnology, Nano medicines, Targeted drug delivery, Bioimaging - Micro Electro Mechanical Systems (MEMS), Nano Electro Mechanical Systems (NEMS)- Nano sensors, nano crystalline silver for bacterial inhibition, Nanoparticles for sun barrier products - In Photostat, printing, solar cell, battery. TOTAL : 45 PERIODS
  • 130.
    130 OUTCOMES:  Will familiarizeabout the science of nanomaterials  Will demonstrate the preparation of nanomaterials  Will develop knowledge in characteristic nanomaterial TEXT BOOKS: 1. A.S. Edelstein and R.C. Cammearata, eds., ―Nanomaterials: Synthesis, Properties and Applications‖, Institute of Physics Publishing, Bristol and Philadelphia, 1996. 2. N John Dinardo, ―Nanoscale Characterization of surfaces & Interfaces‖, 2nd edition, Weinheim Cambridge, Wiley-VCH, 2000. REFERENCES: 1. G Timp, ―Nanotechnology‖, AIP press/Springer, 1999. 2. Akhlesh Lakhtakia,―The Hand Book of Nano Technology, Nanometer Structure, Theory, Modeling and Simulations‖. Prentice-Hall of India (P) Ltd, New Delhi, 2007.