1
ANNA UNIVERSITY, CHENNAI
AFFILIATED INSTITUTIONS
B.E. COMPUTER SCIENCE AND ENGINEERING
REGULATIONS – 2017
CHOICE BASED CREDIT SYSTEM
PROGRAM EDUCATIONAL OBJECTIVES (PEOs):
1. To enable graduates to pursue higher education and research, or have a successful career
in industries associated with Computer Science and Engineering, or as entrepreneurs. To
ensure that graduates will have the ability and attitude to adapt to emerging technological
changes.
PROGRAM OUTCOMES POs:
Engineering Graduates will be able to:
1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering
fundamentals and an engineering specialization to the solution of complex engineering
problems.
2. Problem analysis: Identify, formulate, review research literature, and analyze complex
engineering problems reaching substantiated conclusions using first principles of
mathematics, natural sciences, and engineering sciences.
3. Design/development of solutions: Design solutions for complex engineering problems
and design system components or processes that meet the specified needs with
appropriate consideration for the public health and safety, and the cultural, societal, and
environmental considerations.
4. Conduct investigations of complex problems: Use research-based knowledge and
research methods including design of experiments, analysis and interpretation of data, and
synthesis of the information to provide valid conclusions.
5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and
modern engineering and IT tools including prediction and modeling to complex engineering
activities with an understanding of the limitations.
6. The engineer and society: Apply reasoning informed by the contextual knowledge to
assess societal, health, safety, legal and cultural issues and the consequent
responsibilities relevant to the professional engineering practice.
7. Environment and sustainability: Understand the impact of the professional engineering
solutions in societal and environmental contexts, and demonstrate the knowledge of, and
need for sustainable development.
8. Ethics: Apply ethical principles and commit to professional ethics and responsibilities and
norms of the engineering practice.
9. Individual and team work: Function effectively as an individual, and as a member or
leader in diverse teams, and in multidisciplinary settings.
10. Communication: Communicate effectively on complex engineering activities with the
engineering community and with society at large, such as, being able to comprehend and
write effective reports and design documentation, make effective presentations, and give
and receive clear instructions.
2
11. Project management and finance: Demonstrate knowledge and understanding of the
engineering and management principles and apply these to one’s own work, as a member
and leader in a team, to manage projects and in multidisciplinary environments.
12. Life-long learning: Recognize the need for, and have the preparation and ability to
engage in independent and life-long learning in the broadest context of technological
change.
PROGRAM SPECIFIC OBJECTIVES (PSOs)
To analyze, design and develop computing solutions by applying foundational concepts of
Computer Science and Engineering.
To apply software engineering principles and practices for developing quality software for scientific
and business applications.
To adapt to emerging Information and Communication Technologies (ICT) to innovate ideas and
solutions to existing/novel problems.
Mapping of POs/PSOs to PEOs
Contribution 1: Reasonable 2:Significant 3:Strong
3
PEOs
POs 1. Graduates will
pursue higher
education and
research, or have a
successful career in
industries associated
with Computer
Science and
Engineering, or as
entrepreneurs.
2. Graduates will
have the ability
and attitude to
adapt to
emerging
technological
changes.
1. Engineering knowledge: Apply the knowledge
of mathematics, science, engineering
fundamentals, and an engineering
specialization to the solution of complex
engineering problems.
3 1
2. Problem analysis: Identify, formulate, review
research literature, and analyze complex
engineering problems reaching substantiated
conclusions using first principles of
mathematics, natural sciences, and
engineering sciences.
3 1
3. Design/development of solutions: Design
solutions for complex engineering problems
and design system components or processes
that meet the specified needs with appropriate
consideration for the public health and safety,
and the cultural, societal, and environmental
considerations.
3 2
4. Conduct investigations of complex
problems: Use research-based knowledge and
research methods including design of
experiments, analysis and interpretation of
data, and synthesis of the information to
provide valid conclusions.
3 2
5. Modern tool usage: Create, select, and apply
appropriate techniques, resources, and modern
engineering and IT tools including prediction
and modeling to complex engineering activities
with an understanding of the limitations.
2 3
6. The engineer and society: Apply reasoning
informed by the contextual knowledge to
assess societal, health, safety, legal and
cultural issues and the consequent
responsibilities relevant to the professional
engineering practice.
2 2
4
7. Environment and sustainability:
Understand the impact of the professional
engineering solutions in societal and
environmental contexts, and demonstrate the
knowledge of, and need for sustainable
development.
2 1
8. Ethics: Apply ethical principles and commit to
professional ethics and responsibilities and
norms of the engineering practice.
3 1
9. Individual and team work: Function effectively
as an individual, and as a member or leader in
diverse teams, and in multidisciplinary settings.
3 2
10. Communication: Communicate effectively on
complex engineering activities with the
engineering community and with society at
large, such as, being able to comprehend and
write effective reports and design
documentation, make effective presentations,
and give and receive clear instructions.
3 2
11. Project management and finance:
Demonstrate knowledge and understanding of
the engineering and management principles and
apply these to one’s own work, as a member
and leader in a team, to manage projects and in
multidisciplinary environments.
2 2
12. Life-long learning: Recognize the need for,
and have the preparation and ability to engage
in independent and life-long learning in the
broadest context of technological change.
1 3
PSOs
1. Analyze, design and develop computing solutions by applying foundational concepts of
computer science and engineering.
3 1
2. Apply software engineering principles and practices for developing quality software for
scientific and business applications.
3 1
3. Adapt to emerging information and communication technologies (ICT) to innovate ideas
and solutions to existing/novel problems.
1 3
5
MAPPING OF COURSE OUTCOMES WITH PROGRAMME OUTCOMES
A broad relation between the Course Outcomes and Programme Outcomes is given in the
following table
Course Title Programme Outcome (PO)
1 2 3 4 5 6 7 8 9 10 11 12
SEMESTER
I
Communicative
English
√ √ √ √
Engineering
Mathematics - I
√ √ √
√
Engineering Physics √ √ √
Engineering
Chemistry
√ √ √
Problem Solving
and Python
Programming
√ √ √
Engineering
Graphics
√ √ √
√
√ √ √ √
Problem Solving
and Python
Programming
Laboratory
√ √ √ √ √ √ √
√
Physics and
Chemistry
Laboratory
√ √ √ √ √ √
SEMESTER
II
Technical English √ √ √ √
Engineering
Mathematics II
√ √ √
√
Physics for
Information
Science
√ √ √
Basic Electrical,
Electronics and
Measurement
Engineering
√ √ √
Environmental
Science and
Engineering
√ √ √
√ √ √ √
√
Programming in C √ √ √ √ √ √ √
Engineering
Practices
Laboratory
√ √ √
√ √ √
√ √ √ √
C Programming
Laboratory
√ √ √ √ √ √
√
6
PROGRAMME OUTCOME (PO)
YEAR
II
SEMESTER
III
COURSE
TITLE
1 2 3 4 5 6 7 8 9 10 11 12
Discrete
Mathematics
√ √ √ √
Digital
Principles and
Design
√ √ √
Data Structures √ √ √
Object Oriented
Programming
√ √ √
Communication
Engineering
√ √ √
Data Structures
Laboratory
√ √ √ √ √ √ √
Object Oriented
Programming
Laboratory
√ √ √ √ √ √ √
Digital Systems
Laboratory
√ √ √ √ √ √ √ √
Interpersonal
Skills/Listening
&Speaking
√ √ √ √
SEMESTER
IV
Probability and
Queueing
Theory
√ √ √ √ √ √
Computer
Architecture
√ √ √
Database
Management
Systems
√ √ √
Design and
Analysis of
Algorithms
√ √ √ √ √ √
Operating
Systems
√ √ √
Software
Engineering
√ √ √ √ √ √ √ √ √
Database
Management
Systems
Laboratory
√ √ √ √ √ √ √
Operating
Systems
Laboratory
√ √ √ √ √ √ √
Advanced
Reading and
Writing
√ √ √ √
7
YEAR
III
SEMESTER
V
Algebra and
Number Theory
√ √ √ √
Computer
Networks
√ √ √
Microprocessors
and
Microcontrollers
√ √ √
Theory of
Computation
√ √ √
Object Oriented
Analysis and
Design
√ √ √ √
Open Elective I
Microprocessors
and
Microcontrollers
Laboratory
√ √ √ √ √ √ √
Object Oriented
Analysis and
Design
Laboratory
√ √ √ √ √ √ √ √ √
Networks
Laboratory
√ √ √ √ √ √ √
SEMESTER
VI
Internet
Programming
√ √ √ √ √ √ √
Artificial
Intelligence
√ √ √
Mobile
Computing
√ √ √
Compiler Design √ √ √ √ √ √ √
Distributed
Systems
√ √ √
Professional
Elective I
Internet
Programming
Laboratory
√ √ √ √ √ √ √ √
Mobile
Application
Development
Laboratory
√ √ √ √ √ √ √ √ √
Mini Project √ √ √ √ √ √ √ √ √ √ √ √
Professional
Communication
 

YEAR
IV
SEMESTER
VII
Principles of
Management
√ √ √ √
Cryptography
and Network
Security
√ √ √
Cloud Computing √ √ √
Open Elective II
8
Professional
Elective II
Professional
Elective III
Cloud Computing
Laboratory
√ √ √ √ √ √ √ √
Security
Laboratory
√ √ √ √ √ √ √ √
SEMESTER
VIII
Professional
Elective IV
Professional
Elective V
Project Work
√ √ √ √ √ √ √ √ √ √ √ √
9
PROFESSIONAL ELECTIVES
SEM COURSE TITLE PROGRAMME OUTCOME (PO)
1 2 3 4 5 6 7 8 9 10 11 12
VI Data Warehousing and Data
Mining
√ √ √
Software Testing √ √ √ √ √ √
Embedded Systems √ √ √
Agile Methodologies √ √ √
Graph Theory and Applications- √ √ √
Intellectual Property Rights √ √ √ √ √ √ √
Digital Signal Processing √ √ √
VII Big Data Analytics √ √ √ √ √ √
Machine Learning Techniques √ √ √ √ √ √
Computer Graphics and
Multimedia
√ √ √
Software Project Management √ √ √ √ √ √ √ √ √
Internet of Things √ √ √
Service Oriented Architecture √ √ √
Total Quality Management √ √ √ √
Multi-core Architectures
and Programming
√ √ √
Human Computer Interaction √ √ √
C# and .Net Programming √ √ √ √ √ √
Wireless Adhoc and Sensor
Networks
√ √ √
Advanced Topics on Databases √ √ √
Foundation Skills in Integrated
Product Development
√ √ √
Human Rights √ √ √
Disaster Management √ √ √ √
VIII Digital Image Processing √ √ √
Social Network Analysis √ √ √
Information Security √ √ √ √
Software Defined Networks √ √ √
Cyber Forensics √ √ √ √
Soft Computing √ √ √
Professional Ethics in
Engineering
√ √ √ √ √ √
Information Retrieval Techniques √ √ √
Green Computing √ √ √
GPU Architecture and
Programming
√ √ √
Natural Language Processing √ √ √
Parallel Algorithms √ √ √
Speech Processing √ √ √
Fundamentals of Nanoscience √ √ √
10
ANNA UNIVERSITY, CHENNAI
AFFILIATED INSTITUTIONS
B.E. COMPUTER SCIENCE AND ENGINEERING
REGULATIONS – 2017
CHOICE BASED CREDIT SYSTEM
I - VIII SEMESTERS CURRICULA AND SYLLABI
SEMESTER I
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. HS8151 Communicative English HS 4 4 0 0 4
2. MA8151 Engineering
Mathematics - I
BS 4 4 0 0 4
3. PH8151 Engineering Physics BS 3 3 0 0 3
4. CY8151 Engineering Chemistry BS
3
3 0 0 3
5. GE8151 Problem Solving and
Python Programming
ES 3 3 0 0 3
6. GE8152 Engineering Graphics ES 6 2 0 4 4
PRACTICALS
7. GE8161 Problem Solving and
Python Programming
Laboratory
ES 4
0 0 4 2
8. BS8161 Physics and Chemistry
Laboratory
BS 4
0 0 4 2
TOTAL 31 19 0 12 25
SEMESTER II
SI.No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. HS8251 Technical English HS 4 4 0 0 4
2. MA8251 Engineering
Mathematics - II
BS
4 4 0 0 4
3. PH8252 Physics for Information
Science
BS
3 3 0 0 3
4. BE8255 Basic Electrical,
Electronics and
Measurement
Engineering
ES
3 3 0 0 3
5. GE8291 Environmental Science
and Engineering
HS
3 3 0 0 3
6. CS8251 Programming in C PC 3 3 0 0 3
PRACTICALS
7. GE8261 Engineering Practices
Laboratory
ES 4
0 0 4 2
8. CS8261 C Programming
Laboratory
PC 4
0 0 4 2
TOTAL 28 20 0 8 24
11
SEMESTER III
Sl.No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MA8351 Discrete Mathematics BS 4 4 0 0 4
2.
CS8351
Digital Principles and
System Design
ES 4 4 0 0 4
3. CS8391 Data Structures PC 3 3 0 0 3
4.
CS8392
Object Oriented
Programming
PC 3 3 0 0 3
5.
EC8395
Communication
Engineering
ES 3 3 0 0 3
PRACTICALS
6.
CS8381
Data Structures
Laboratory
PC 4 0 0 4 2
7.
CS8383
Object Oriented
Programming Laboratory
PC 4 0 0 4 2
8.
CS8382
Digital Systems
Laboratory
ES 4 0 0 4 2
9.
HS8381
Interpersonal
Skills/Listening
&Speaking
EEC 2 0 0 2 1
TOTAL 31 17 0 14 24
SEMESTER IV
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MA8402 Probability and Queueing
Theory
BS
4 4 0 0 4
2. CS8491 Computer Architecture PC 3 3 0 0 3
3. CS8492 Database Management
Systems
PC
3 3 0 0 3
4. CS8451 Design and Analysis of
Algorithms
PC
3 3 0 0 3
5. CS8493 Operating Systems PC 3 3 0 0 3
6. CS8494 Software Engineering PC 3 3 0 0 3
PRACTICALS
7. CS8481 Database Management
Systems Laboratory
PC
4 0 0 4 2
8. CS8461 Operating Systems
Laboratory
PC
4 0 0 4 2
9. HS8461 Advanced Reading and
Writing
EEC
2 0 0 2 1
TOTAL 29 19 0 10 24
12
SEMESTER V
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MA8551 Algebra and Number
Theory
BS 4 4 0 0 4
2. CS8591 Computer Networks PC 3 3 0 0 3
3. EC8691 Microprocessors and
Microcontrollers
PC 3 3 0 0 3
4. CS8501 Theory of Computation PC 3 3 0 0 3
5. CS8592 Object Oriented Analysis
and Design
PC 3 3 0 0 3
6. Open Elective I OE 3 3 0 0 3
PRACTICALS
7. EC8681 Microprocessors and
Microcontrollers Laboratory
PC 4 0 0 4 2
8. CS8582 Object Oriented Analysis
and Design Laboratory
PC 4 0 0 4 2
9. CS8581 Networks Laboratory PC 4 0 0 4 2
TOTAL 31 19 0 12 25
SEMESTER VI
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. CS8651 Internet Programming PC 3 3 0 0 3
2. CS8691 Artificial Intelligence PC 3 3 0 0 3
3. CS8601 Mobile Computing PC 3 3 0 0 3
4. CS8602 Compiler Design PC 5 3 0 2 4
5. CS8603 Distributed Systems PC 3 3 0 0 3
6. Professional Elective I PE 3 3 0 0 3
PRACTICALS
7. CS8661 Internet Programming
Laboratory
PC 4 0 0 4 2
8. CS8662 Mobile Application
Development Laboratory
PC 4 0 0 4 2
9. CS8611 Mini Project EEC 2 0 0 2 1
10. HS8581 Professional
Communication
EEC 2
0 0 2 1
TOTAL 32 18 0 14 25
13
SEMESTER VII
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. MG8591 Principles of
Management
HS 3 3 0 0 3
2. CS8792 Cryptography and
Network Security
PC 3 3 0 0 3
3. CS8791 Cloud Computing PC 3 3 0 0 3
4. Open Elective II OE 3 3 0 0 3
5. Professional Elective II PE 3 3 0 0 3
6. Professional
Elective III
PE 3 3 0 0 3
PRACTICALS
7. CS8711 Cloud Computing
Laboratory
PC 4 0 0 4 2
8. IT8761 Security Laboratory PC 4 0 0 4 2
TOTAL 26 18 0 8 22
SEMESTER VIII
Sl.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
THEORY
1. Professional Elective IV PE
3 3 0 0 3
2. Professional Elective V PE
3 3 0 0 3
PRACTICALS
3. CS8811 Project Work
EEC 20 0 0 20 10
TOTAL 26 6 0 20 16
TOTAL NO. OF CREDITS: 185
14
HUMANITIES AND SOCIAL SCIENCES (HS)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. HS8151 Communicative English HS 4 4 0 0 4
2. HS8251 Technical English HS 4 4 0 0 4
3. GE8291 Environmental Science
and Engineering
HS 3 3 0 0 3
4. MG8591 Principles of Management HS 3 3 0 0 3
BASIC SCIENCES (BS)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. MA8151 Engineering
Mathematics I
BS 4 4 0 0 4
2. PH8151 Engineering Physics BS 3 3 0 0 3
3. CY8151 Engineering Chemistry BS 3 3 0 0 3
4. BS8161 Physics and Chemistry
Laboratory
BS
4 0 0 4 2
5. MA8251 Engineering
Mathematics II
BS
4 4 0 0 4
6. PH8252 Physics for Information
Science
BS
3 3 0 0 3
7. MA8351 Discrete Mathematics BS 4 4 0 0 4
8. MA8402 Probability and Queueing
Theory
BS
4 4 0 0 4
9. MA8551 Algebra and Number
Theory
BS
4 4 0 0 4
ENGINEERING SCIENCES (ES)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. GE8151 Problem Solving and
Python Programming
ES 3 3 0 0 3
2. GE8152 Engineering Graphics ES 6 2 0 4 4
3.
GE8161
Problem Solving and
Python Programming
Laboratory
ES 4 0 0 4 2
4.
BE8255
Basic Electrical, Electronics
and Measurement
Engineering
ES 3 3 0 0 3
5. GE8261 Engineering Practices
Laboratory
ES 4 0 0 4 2
6. CS8351 Digital Principles and
System Design
ES 4 4 0 0 4
7. EC8395 Communication
Engineering
ES
3 3 0 0 3
8. CS8382 Digital Systems Laboratory ES 4 0 0 4 2
15
PROFESSIONAL CORE (PC)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. CS8251 Programming in C PC 3 3 0 0 3
2. CS8261 C Programming Laboratory PC 4 0 0 4 2
3. CS8391 Data Structures PC 3 3 0 0 3
4. CS8392 Object Oriented
Programming
PC 3 3 0 0 3
5. CS8381 Data Structures Laboratory PC 4 0 0 4 2
6. CS8383 Object Oriented
Programming Laboratory
PC 4 0 0 4 2
7. CS8491 Computer Architecture PC 3 3 0 0 3
8. CS8492 Database Management
Systems
PC 3 3 0 0 3
9. CS8451 Design and Analysis of
Algorithms
PC 3 3 0 0 3
10. CS8493 Operating Systems PC 3 3 0 0 3
11. CS8494 Software Engineering PC 3 3 0 0 3
12. CS8481 Database Management
Systems Laboratory
PC 4 0 0 4 2
13. CS8461 Operating Systems
Laboratory
PC 4 0 0 4 2
14. CS8591 Computer Networks PC 3 3 0 0 3
15. EC8691 Microprocessors and
Microcontrollers
PC 3 3 0 0 3
16. CS8501 Theory of Computation PC 3 3 0 0 3
17. CS8592 Object Oriented Analysis
and Design
PC 3 3 0 0 3
18. EC8681 Microprocessors and
Microcontrollers Laboratory
PC 4 0 0 4 2
19. CS8582 Object Oriented Analysis
and Design Laboratory
PC 4 0 0 4 2
20. CS8581 Networks Laboratory PC 4 0 0 4 2
21. CS8651 Internet Programming PC 3 3 0 0 3
22. CS8691 Artificial Intelligence PC 3 3 0 0 3
23. CS8601 Mobile Computing PC 3 3 0 0 3
24. CS8602 Compiler Design PC 5 3 0 2 4
25. CS8603 Distributed Systems PC 3 3 0 0 3
26. CS8661 Internet Programming
Laboratory
PC 4 0 0 4 2
27. CS8662 Mobile Application
Development Laboratory
PC 4 0 0 4 2
28. CS8792 Cryptography and Network
Security
PC 3 3 0 0 3
29. CS8791 Cloud Computing PC 3 3 0 0 3
30. CS8711 Cloud Computing
Laboratory
PC 4 0 0 4 2
31. IT8761 Security Laboratory PC 4 0 0 4 2
16
PROFESSIONAL ELECTIVES (PE)
SEMESTER VI
ELECTIVE - I
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8075 Data Warehousing and
Data Mining
PE 3 3 0 0 3
2. IT8076 Software Testing PE 3 3 0 0 3
3. IT8072 Embedded Systems PE 3 3 0 0 3
4. CS8072 Agile Methodologies PE 3 3 0 0 3
5. CS8077 Graph Theory and
Applications-
PE 3 3 0 0 3
6. IT8071 Digital Signal Processing PE 3 3 0 0 3
7. GE8075 Intellectual Property
Rights
PE 3 3 0 0 3
SEMESTER VII
ELECTIVE - II
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8091 Big Data Analytics PE 3 3 0 0 3
2. CS8082 Machine Learning
Techniques
PE 3 3 0 0 3
3. CS8092 Computer Graphics and
Multimedia
PE 3 3 0 0 3
4. IT8075 Software Project
Management
PE 3 3 0 0 3
5. CS8081 Internet of Things PE 3 3 0 0 3
6. IT8074 Service Oriented
Architecture
PE 3 3 0 0 3
7. GE8077 Total Quality Management PE 3 3 0 0 3
SEMESTER VII
ELECTIVE - III
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8083 Multi-core Architectures and
Programming
PE 3 3 0 0 3
2. CS8079 Human Computer
Interaction
PE 3 3 0 0 3
3. CS8073 C# and .Net Programming PE 3 3 0 0 3
4. CS8088 Wireless Adhoc and Sensor
Networks
PE 3 3 0 0 3
5. CS8071 Advanced Topics on
Databases
PE 3 3 0 0 3
6. GE8072 Foundation Skills in
Integrated Product
Development
PE 3 3 0 0 3
7. GE8074 Human Rights PE 3 3 0 0 3
8. GE8071 Disaster Management PE 3 3 0 0 3
17
SEMESTER VIII
ELECTIVE - IV
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. EC8093 Digital Image Processing PE 3 3 0 0 3
2. CS8085 Social Network Analysis PE 3 3 0 0 3
3. IT8073 Information Security PE 3 3 0 0 3
4. CS8087 Software Defined Networks PE 3 3 0 0 3
5. CS8074 Cyber Forensics PE 3 3 0 0 3
6. CS8086 Soft Computing PE 3 3 0 0 3
7. GE8076 Professional Ethics in
Engineering
PE 3 3 0 0 3
SEMESTER VIII
ELECTIVE - V
SI.
No
COURSE
CODE
COURSE TITLE CATEGORY
CONTACT
PERIODS
L T P C
1. CS8080 Information Retrieval
Techniques
PE 3 3 0 0 3
2. CS8078 Green Computing PE 3 3 0 0 3
3. CS8076 GPU Architecture and
Programming
PE 3 3 0 0 3
4. CS8084 Natural Language Processing PE 3 3 0 0 3
5. CS8001 Parallel Algorithms PE 3 3 0 0 3
6. IT8077 Speech Processing PE 3 3 0 0 3
7. GE8073 Fundamentals of Nanoscience PE 3 3 0 0 3
EMPLOYABILITY ENHANCEMENT COURSES (EEC)
Sl.
NO
COURSE
CODE
COURSE TITLE CATEGORY CONTACT
PERIODS
L T P C
1. HS8381 Interpersonal Skills/Listening
& Speaking
EEC 2 0 0 2 1
2. HS8461 Advanced Reading and
Writing
EEC 2 0 0 2 1
3. CS8611 Mini Project EEC 2 0 0 2 1
4. HS8581 Professional Communication EEC 2 0 0 2 1
5. CS8811 Project Work EEC 20 0 0 20 10
18
SUMMARY
S.NO. SUBJECT
AREA
CREDITS AS PER SEMESTER CREDITS
TOTAL
Percentage
I
II III IV V VI VII VIII
1. HS 4 7 3 14 7.60%
2. BS 12 7 4 4 4 31 16.8%
3. ES 9 5 9 23 12.5%
4. PC 5 10 19 18 20 10 82 44.5%
5. PE 3 6 6 15 8.15%
6. OE 3 3 6 3.3%
7. EEC 1 1 2 10 14 7.65%
Total 25 24 24 24 25 25 22 16 185
8.
Non Credit /
Mandatory
19
HS8151 COMMUNICATIVE ENGLISH
L T P C
4 0 0 4
OBJECTIVES:
 To develop the basic reading and writing skills of first year engineering and technology
students.
 To help learners develop their listening skills, which will, enable them listen to lectures and
comprehend them by asking questions; seeking clarifications.
 To help learners develop their speaking skills and speak fluently in real contexts.
 To help learners develop vocabulary of a general kind by developing their reading skills
UNIT I SHARING INFORMATION RELATED TO ONESELF/FAMILY& FRIENDS 12
Reading- short comprehension passages, practice in skimming-scanning and predicting- Writing-
completing sentences- - developing hints. Listening- short texts- short formal and informal
conversations. Speaking- introducing oneself - exchanging personal information- Language
development- Wh- Questions- asking and answering-yes or no questions- parts of speech.
Vocabulary development-- prefixes- suffixes- articles.- count/ uncount nouns.
UNIT II GENERAL READING AND FREE WRITING 12
Reading - comprehension-pre-reading-post reading- comprehension questions (multiple choice
questions and /or short questions/ open-ended questions)-inductive reading- short narratives and
descriptions from newspapers including dialogues and conversations (also used as short Listening
texts)- register- Writing – paragraph writing- topic sentence- main ideas- free writing, short
narrative descriptions using some suggested vocabulary and structures –Listening- telephonic
conversations. Speaking – sharing information of a personal kind—greeting – taking leave-
Language development – prepositions, conjunctions Vocabulary development- guessing
meanings of words in context.
UNIT III GRAMMAR AND LANGUAGE DEVELOPMENT 12
Reading- short texts and longer passages (close reading) Writing- understanding text structure-
use of reference words and discourse markers-coherence-jumbled sentences Listening – listening
to longer texts and filling up the table- product description- narratives from different sources.
Speaking- asking about routine actions and expressing opinions. Language development-
degrees of comparison- pronouns- direct vs indirect questions- Vocabulary development – single
word substitutes- adverbs.
UNIT IV READING AND LANGUAGE DEVELOPMENT 12
Reading- comprehension-reading longer texts- reading different types of texts- magazines
Writing- letter writing, informal or personal letters-e-mails-conventions of personal email-
Listening- listening to dialogues or conversations and completing exercises based on them.
Speaking- speaking about oneself- speaking about one’s friend- Language development-
Tenses- simple present-simple past- present continuous and past continuous- Vocabulary
development- synonyms-antonyms- phrasal verbs
20
MA8151 ENGINEERING MATHEMATICS – I L T P C
4 0 0 4
OBJECTIVES :
The goal of this course is to achieve conceptual understanding and to retain the best traditions of
traditional calculus. The syllabus is designed to provide the basic tools of calculus mainly for the
purpose of modelling the engineering problems mathematically and obtaining solutions. This is a
foundation course which mainly deals with topics such as single variable and multivariable
calculus and plays an important role in the understanding of science, engineering, economics and
computer science, among other disciplines.
UNIT I DIFFERENTIAL CALCULUS 12
Representation of functions - Limit of a function - Continuity - Derivatives - Differentiation rules -
Maxima and Minima of functions of one variable.
UNIT V EXTENDED WRITING 12
Reading- longer texts- close reading –Writing- brainstorming -writing short essays – developing
an outline- identifying main and subordinate ideas- dialogue writing-Listening – listening to talks-
conversations- Speaking – participating in conversations- short group conversations-Language
development-modal verbs- present/ past perfect tense - Vocabulary development-collocations-
fixed and semi-fixed expressions.
TOTAL: 60 PERIODS
OUTCOMES:
AT THE END OF THE COURSE, LEARNERS WILL BE ABLE TO:
• Read articles of a general kind in magazines and newspapers.
• Participate effectively in informal conversations; introduce themselves and their friends and
express opinions in English.
• Comprehend conversations and short talks delivered in English
• Write short essays of a general kind and personal letters and emails in English.
TEXT BOOKS:
1. Board of Editors. Using English A Coursebook for Undergarduate Engineers and
Technologists. Orient BlackSwan Limited, Hyderabad: 2015
2. Richards, C. Jack. Interchange Students’ Book-2 New Delhi: CUP, 2015.
REFERENCES:
1. Bailey, Stephen. Academic Writing: A practical guide for students. New York: Rutledge,2011.
2. Means,L. Thomas and Elaine Langlois. English & Communication For Colleges.
CengageLearning ,USA: 2007
3. Redston, Chris &Gillies Cunningham Face2Face (Pre-intermediate Student’s Book&
Workbook) Cambridge University Press, New Delhi: 2005
4. Comfort, Jeremy, et al. Speaking Effectively: Developing Speaking Skills for Business English.
Cambridge University Press, Cambridge: Reprint 2011
5. Dutt P. Kiranmai and Rajeevan Geeta. Basic Communication Skills, Foundation Books: 2013.
21
UNIT II FUNCTIONS OF SEVERAL VARIABLES 12
Partial differentiation – Homogeneous functions and Euler’s theorem – Total derivative – Change
of variables – Jacobians – Partial differentiation of implicit functions – Taylor’s series for functions
of two variables – Maxima and minima of functions of two variables – Lagrange’s method of
undetermined multipliers.
UNIT III INTEGRAL CALCULUS 12
Definite and Indefinite integrals - Substitution rule - Techniques of Integration - Integration by
parts, Trigonometric integrals, Trigonometric substitutions, Integration of rational functions by
partial fraction, Integration of irrational functions - Improper integrals.
UNIT IV MULTIPLE INTEGRALS 12
Double integrals – Change of order of integration – Double integrals in polar coordinates – Area
enclosed by plane curves – Triple integrals – Volume of solids – Change of variables in double
and triple integrals.
UNIT V DIFFERENTIAL EQUATIONS 12
Higher order linear differential equations with constant coefficients - Method of variation of
parameters – Homogenous equation of Euler’s and Legendre’s type – System of simultaneous
linear differential equations with constant coefficients - Method of undetermined coefficients.
TOTAL: 60 PERIODS
OUTCOMES:
After completing this course, students should demonstrate competency in the following
skills:
 Use both the limit definition and rules of differentiation to differentiate functions.
 Apply differentiation to solve maxima and minima problems.
 Evaluate integrals both by using Riemann sums and by using the Fundamental Theorem of
Calculus.
 Apply integration to compute multiple integrals, area, volume, integrals in polar
coordinates, in addition to change of order and change of variables.
 Evaluate integrals using techniques of integration, such as substitution, partial fractions
and integration by parts.
 Determine convergence/divergence of improper integrals and evaluate convergent
improper integrals.
 Apply various techniques in solving differential equations.
TEXT BOOKS :
1. Grewal B.S., “Higher Engineering Mathematics”, Khanna Publishers, New Delhi, 43rd
Edition,
2014.
2. James Stewart, "Calculus: Early Transcendentals", Cengage Learning, 7th
Edition, New
Delhi, 2015. [For Units I & III - Sections 1.1, 2.2, 2.3, 2.5, 2.7(Tangents problems only), 2.8,
3.1 to 3.6, 3.11, 4.1, 4.3, 5.1(Area problems only), 5.2, 5.3, 5.4 (excluding net change
theorem), 5.5, 7.1 - 7.4 and 7.8].
REFERENCES:
1. Anton, H, Bivens, I and Davis, S, "Calculus", Wiley, 10th
Edition, 2016.
2. Jain R.K. and Iyengar S.R.K., “Advanced Engineering Mathematics”, Narosa Publications,
New Delhi, 3rd
Edition, 2007.
3. Narayanan, S. and Manicavachagom Pillai, T. K., “Calculus" Volume I and II,
S. Viswanathan Publishers Pvt. Ltd., Chennai, 2007.
4. Srimantha Pal and Bhunia, S.C, "Engineering Mathematics" Oxford University Press, 2015.
5. Weir, M.D and Joel Hass, "Thomas Calculus", 12th
Edition, Pearson India, 2016.
22
PH8151 ENGINEERING PHYSICS
L T P C
3 0 0 3
OBJECTIVES:
 To enhance the fundamental knowledge in Physics and its applications relevant to various
streams of Engineering and Technology.
UNIT I PROPERTIES OF MATTER 9
Elasticity – Stress-strain diagram and its uses - factors affecting elastic modulus and tensile
strength – torsional stress and deformations – twisting couple - torsion pendulum: theory and
experiment - bending of beams - bending moment – cantilever: theory and experiment – uniform
and non-uniform bending: theory and experiment - I-shaped girders - stress due to bending in
beams.
UNIT II WAVES AND FIBER OPTICS 9
Oscillatory motion – forced and damped oscillations: differential equation and its solution – plane
progressive waves – wave equation. Lasers : population of energy levels, Einstein’s A and B
coefficients derivation – resonant cavity, optical amplification (qualitative) – Semiconductor lasers:
homojunction and heterojunction – Fiber optics: principle, numerical aperture and acceptance
angle - types of optical fibres (material, refractive index, mode) – losses associated with optical
fibers - fibre optic sensors: pressure and displacement.
UNIT III THERMAL PHYSICS 9
Transfer of heat energy – thermal expansion of solids and liquids – expansion joints - bimetallic
strips - thermal conduction, convection and radiation – heat conductions in solids – thermal
conductivity - Forbe’s and Lee’s disc method: theory and experiment - conduction through
compound media (series and parallel) – thermal insulation – applications: heat exchangers,
refrigerators, ovens and solar water heaters.
UNIT IV QUANTUM PHYSICS 9
Black body radiation – Planck’s theory (derivation) – Compton effect: theory and experimental
verification – wave particle duality – electron diffraction – concept of wave function and its physical
significance – Schrödinger’s wave equation – time independent and time dependent equations –
particle in a one-dimensional rigid box – tunnelling (qualitative) - scanning tunnelling microscope.
UNIT V CRYSTAL PHYSICS 9
Single crystalline, polycrystalline and amorphous materials – single crystals: unit cell, crystal
systems, Bravais lattices, directions and planes in a crystal, Miller indices – inter-planar distances
- coordination number and packing factor for SC, BCC, FCC, HCP and diamond structures -
crystal imperfections: point defects, line defects – Burger vectors, stacking faults – role of
imperfections in plastic deformation - growth of single crystals: solution and melt growth
techniques.
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of this course,
 The students will gain knowledge on the basics of properties of matter and its applications,
 The students will acquire knowledge on the concepts of waves and optical devices and
their applications in fibre optics,
 The students will have adequate knowledge on the concepts of thermal properties of
materials and their applications in expansion joints and heat exchangers,
 The students will get knowledge on advanced physics concepts of quantum theory and its
applications in tunneling microscopes, and
 The students will understand the basics of crystals, their structures and different crystal
growth techniques.
23
TEXT BOOKS:
1. Bhattacharya, D.K. & Poonam, T. “Engineering Physics”. Oxford University Press, 2015.
2. Gaur, R.K. & Gupta, S.L. “Engineering Physics”. Dhanpat Rai Publishers, 2012.
3. Pandey, B.K. & Chaturvedi, S. “Engineering Physics”. Cengage Learning India, 2012.
REFERENCES:
1. Halliday, D., Resnick, R. & Walker, J. “Principles of Physics”. Wiley, 2015.
2. Serway, R.A. & Jewett, J.W. “Physics for Scientists and Engineers”. Cengage Learning,
2010.
3. Tipler, P.A. & Mosca, G. “Physics for Scientists and Engineers with Modern Physics’.
W.H.Freeman, 2007.
CY8151 ENGINEERING CHEMISTRY L T P C
3 0 0 3
OBJECTIVES:
 To make the students conversant with boiler feed water requirements, related problems and
water treatment techniques.
 To develop an understanding of the basic concepts of phase rule and its applications to single
and two component systems and appreciate the purpose and significance of alloys.
 Preparation, properties and applications of engineering materials.
 Types of fuels, calorific value calculations, manufacture of solid, liquid and gaseous fuels.
 Principles and generation of energy in batteries, nuclear reactors, solar cells, wind mills and
fuel cells.
UNIT I WATER AND ITS TREATMENT 9
Hardness of water – types – expression of hardness – units – estimation of hardness of water by
EDTA – numerical problems – boiler troubles (scale and sludge) – treatment of boiler feed water –
Internal treatment (phosphate, colloidal, sodium aluminate and calgon conditioning) external
treatment – Ion exchange process, zeolite process – desalination of brackish water - Reverse
Osmosis.
UNIT II SURFACE CHEMISTRY AND CATALYSIS 9
Adsorption: Types of adsorption – adsorption of gases on solids – adsorption of solute from
solutions – adsorption isotherms – Freundlich’s adsorption isotherm – Langmuir’s adsorption
isotherm – contact theory – kinetics of surface reactions, unimolecular reactions, Langmuir -
applications of adsorption on pollution abatement. Catalysis: Catalyst – types of catalysis – criteria
– autocatalysis – catalytic poisoning and catalytic promoters - acid base catalysis – applications
(catalytic convertor) – enzyme catalysis– Michaelis – Menten equation.
UNIT III ALLOYS AND PHASE RULE 9
Alloys: Introduction- Definition- properties of alloys- significance of alloying, functions and effect of
alloying elements- Nichrome and stainless steel (18/8) – heat treatment of steel. Phase rule:
Introduction, definition of terms with examples, one component system -water system - reduced
phase rule - thermal analysis and cooling curves - two component systems - lead-silver system -
Pattinson process.
UNIT IV FUELS AND COMBUSTION 9
Fuels: Introduction - classification of fuels - coal - analysis of coal (proximate and ultimate) -
carbonization - manufacture of metallurgical coke (Otto Hoffmann method) - petroleum -
manufacture of synthetic petrol (Bergius process) - knocking - octane number - diesel oil - cetane
number - natural gas - compressed natural gas (CNG) - liquefied petroleum gases (LPG) - power
alcohol and biodiesel. Combustion of fuels: Introduction - calorific value - higher and lower calorific
values- theoretical calculation of calorific value - ignition temperature - spontaneous ignition
temperature - explosive range - flue gas analysis (ORSAT Method).
24
UNIT V ENERGY SOURCES AND STORAGE DEVICES 9
Nuclear fission - controlled nuclear fission - nuclear fusion - differences between nuclear fission
and fusion - nuclear chain reactions - nuclear energy - light water nuclear power plant - breeder
reactor - solar energy conversion - solar cells - wind energy. Batteries, fuel cells and
supercapacitors: Types of batteries – primary battery (dry cell) secondary battery (lead acid
battery, lithium-ion-battery) fuel cells – H2-O2 fuel cell.
TOTAL: 45 PERIODS
OUTCOMES:
 The knowledge gained on engineering materials, fuels, energy sources and water treatment
techniques will facilitate better understanding of engineering processes and applications for
further learning.
TEXT BOOKS:
1. S. S. Dara and S. S. Umare, “A Textbook of Engineering Chemistry”, S. Chand & Company
LTD, New Delhi, 2015
2. P. C. Jain and Monika Jain, “Engineering Chemistry” Dhanpat Rai Publishing Company (P)
LTD, New Delhi, 2015
3. S. Vairam, P. Kalyani and Suba Ramesh, “Engineering Chemistry”, Wiley India PVT, LTD,
New Delhi, 2013.
REFERENCES:
1. Friedrich Emich, “Engineering Chemistry”, Scientific International PVT, LTD, New Delhi,
2014.
2. Prasanta Rath, “Engineering Chemistry”, Cengage Learning India PVT, LTD, Delhi, 2015.
3. Shikha Agarwal, “Engineering Chemistry-Fundamentals and Applications”, Cambridge
University Press, Delhi, 2015.
GE8151 PROBLEM SOLVING AND PYTHON PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To know the basics of algorithmic problem solving
 To read and write simple Python programs.
 To develop Python programs with conditionals and loops.
 To define Python functions and call them.
 To use Python data structures –- lists, tuples, dictionaries.
 To do input/output with files in Python.
UNIT I ALGORITHMIC PROBLEM SOLVING 9
Algorithms, building blocks of algorithms (statements, state, control flow, functions), notation
(pseudo code, flow chart, programming language), algorithmic problem solving, simple strategies
for developing algorithms (iteration, recursion). Illustrative problems: find minimum in a list, insert a
card in a list of sorted cards, guess an integer number in a range, Towers of Hanoi.
UNIT II DATA, EXPRESSIONS, STATEMENTS 9
Python interpreter and interactive mode; values and types: int, float, boolean, string, and list;
variables, expressions, statements, tuple assignment, precedence of operators, comments;
modules and functions, function definition and use, flow of execution, parameters and arguments;
Illustrative programs: exchange the values of two variables, circulate the values of n variables,
distance between two points.
UNIT III CONTROL FLOW, FUNCTIONS 9
Conditionals: Boolean values and operators, conditional (if), alternative (if-else), chained
conditional (if-elif-else); Iteration: state, while, for, break, continue, pass; Fruitful functions: return
values, parameters, local and global scope, function composition, recursion; Strings: string slices,
25
immutability, string functions and methods, string module; Lists as arrays. Illustrative programs:
square root, gcd, exponentiation, sum an array of numbers, linear search, binary search.
UNIT IV LISTS, TUPLES, DICTIONARIES 9
Lists: list operations, list slices, list methods, list loop, mutability, aliasing, cloning lists, list
parameters; Tuples: tuple assignment, tuple as return value; Dictionaries: operations and
methods; advanced list processing - list comprehension; Illustrative programs: selection sort,
insertion sort, mergesort, histogram.
UNIT V FILES, MODULES, PACKAGES 9
Files and exception: text files, reading and writing files, format operator; command line arguments,
errors and exceptions, handling exceptions, modules, packages; Illustrative programs: word count,
copy file.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, students will be able to
 Develop algorithmic solutions to simple computational problems
 Read, write, execute by hand simple Python programs.
 Structure simple Python programs for solving problems.
 Decompose a Python program into functions.
 Represent compound data using Python lists, tuples, dictionaries.
 Read and write data from/to files in Python Programs.
TEXT BOOKS:
1. Allen B. Downey, ``Think Python: How to Think Like a Computer Scientist’’, 2nd
edition,
Updated for Python 3, Shroff/O’Reilly Publishers, 2016 (http://greenteapress.com/wp/think-
python/)
2. Guido van Rossum and Fred L. Drake Jr, “An Introduction to Python – Revised and
updated for Python 3.2, Network Theory Ltd., 2011.
REFERENCES:
1. John V Guttag, “Introduction to Computation and Programming Using Python’’, Revised
and expanded Edition, MIT Press , 2013
2. Robert Sedgewick, Kevin Wayne, Robert Dondero, “Introduction to Programming in
Python: An Inter-disciplinary Approach, Pearson India Education Services Pvt. Ltd., 2016.
3. Timothy A. Budd, “Exploring Python”, Mc-Graw Hill Education (India) Private Ltd.,, 2015.
4. Kenneth A. Lambert, “Fundamentals of Python: First Programs”, CENGAGE Learning,
2012.
5. Charles Dierbach, “Introduction to Computer Science using Python: A Computational
Problem-Solving Focus, Wiley India Edition, 2013.
6. Paul Gries, Jennifer Campbell and Jason Montojo, “Practical Programming: An Introduction
to Computer Science using Python 3”, Second edition, Pragmatic Programmers, LLC,
2013.
GE8152 ENGINEERING GRAPHICS L T P C
2 0 4 4
OBJECTIVES:
 To develop in students, graphic skills for communication of concepts, ideas and design of
Engineering products.
 To expose them to existing national standards related to technical drawings.
CONCEPTS AND CONVENTIONS (Not for Examination) 1
Importance of graphics in engineering applications – Use of drafting instruments – BIS
conventions and specifications – Size, layout and folding of drawing sheets – Lettering and
26
dimensioning.
UNIT I PLANE CURVES AND FREEHAND SKETCHING 7+12
Basic Geometrical constructions, Curves used in engineering practices: Conics – Construction of
ellipse, parabola and hyperbola by eccentricity method – Construction of cycloid – construction of
involutes of square and circle – Drawing of tangents and normal to the above curves.
Visualization concepts and Free Hand sketching: Visualization principles –Representation of
Three Dimensional objects – Layout of views- Freehand sketching of multiple views from pictorial
views of objects
UNIT II PROJECTION OF POINTS, LINES AND PLANE SURFACE 6+12
Orthographic projection- principles-Principal planes-First angle projection-projection of points.
Projection of straight lines (only First angle projections) inclined to both the principal planes -
Determination of true lengths and true inclinations by rotating line method and traces Projection
of planes (polygonal and circular surfaces) inclined to both the principal planes by rotating object
method.
UNIT III PROJECTION OF SOLIDS 5+12
Projection of simple solids like prisms, pyramids, cylinder, cone and truncated solids when the
axis is inclined to one of the principal planes by rotating object method.
UNIT IV PROJECTION OF SECTIONED SOLIDS AND DEVELOPMENT OF
SURFACES 5+12
Sectioning of above solids in simple vertical position when the cutting plane is inclined to the one
of the principal planes and perpendicular to the other – obtaining true shape of section.
Development of lateral surfaces of simple and sectioned solids – Prisms, pyramids cylinders and
cones.
UNIT V ISOMETRIC AND PERSPECTIVE PROJECTIONS 6 +12
Principles of isometric projection – isometric scale –Isometric projections of simple solids and
truncated solids - Prisms, pyramids, cylinders, cones- combination of two solid objects in simple
vertical positions - Perspective projection of simple solids-Prisms, pyramids and cylinders by
visual ray method .
TOTAL: 90 PERIODS
OUTCOMES:
On successful completion of this course, the student will be able to:
 Familiarize with the fundamentals and standards of Engineering graphics
 Perform freehand sketching of basic geometrical constructions and multiple views of
objects.
 Project orthographic projections of lines and plane surfaces.
 Draw projections and solids and development of surfaces.
 Visualize and to project isometric and perspective sections of simple solids.
TEXT BOOKS:
1. Natrajan K.V., “A text book of Engineering Graphics”, Dhanalakshmi Publishers, Chennai,
2009.
2. Venugopal K. and Prabhu Raja V., “Engineering Graphics”, New Age International (P)
Limited, 2008.
REFERENCES:
1. Bhatt N.D. and Panchal V.M., “Engineering Drawing”, Charotar Publishing House, 50th
Edition, 2010.
2. Basant Agarwal and Agarwal C.M., “Engineering Drawing”, Tata McGraw Hill Publishing
Company Limited, New Delhi, 2008.
3. Gopalakrishna K.R., “Engineering Drawing” (Vol. I&II combined), Subhas Stores,
Bangalore, 2007.
27
4. Luzzader, Warren.J. and Duff,John M., “Fundamentals of Engineering Drawing with an
introduction to Interactive Computer Graphics for Design and Production, Eastern
Economy Edition, Prentice Hall of India Pvt. Ltd, New Delhi, 2005.
5. N. S. Parthasarathy and Vela Murali, “Engineering Graphics”, Oxford University, Press,
New Delhi, 2015.
6. Shah M.B., and Rana B.C., “Engineering Drawing”, Pearson, 2nd
Edition, 2009.
Publication of Bureau of Indian Standards:
1. IS 10711 – 2001: Technical products Documentation – Size and lay out of drawing
sheets.
2. IS 9609 (Parts 0 & 1) – 2001: Technical products Documentation – Lettering.
3. IS 10714 (Part 20) – 2001 & SP 46 – 2003: Lines for technical drawings.
4. IS 11669 – 1986 & SP 46 – 2003: Dimensioning of Technical Drawings.
5. IS 15021 (Parts 1 to 4) – 2001: Technical drawings – Projection Methods.
Special points applicable to University Examinations on Engineering Graphics:
1. There will be five questions, each of either or type covering all units of the syllabus.
2. All questions will carry equal marks of 20 each making a total of 100.
3. The answer paper shall consist of drawing sheets of A3 size only. The
students will be permitted to use appropriate scale to fit solution within A3 size.
4. The examination will be conducted in appropriate sessions on the same day
GE8161 PROBLEM SOLVING AND PYTHON PROGRAMMING LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To write, test, and debug simple Python programs.
 To implement Python programs with conditionals and loops.
 Use functions for structuring Python programs.
 Represent compound data using Python lists, tuples, dictionaries.
 Read and write data from/to files in Python.
LIST OF PROGRAMS:
1. Compute the GCD of two numbers.
2. Find the square root of a number (Newton’s method)
3. Exponentiation (power of a number)
4. Find the maximum of a list of numbers
5. Linear search and Binary search
6. Selection sort, Insertion sort
7. Merge sort
8. First n prime numbers
9. Multiply matrices
10. Programs that take command line arguments (word count)
11. Find the most frequent words in a text read from a file
12. Simulate elliptical orbits in Pygame
13. Simulate bouncing ball using Pygame
PLATFORM NEEDED
Python 3 interpreter for Windows/Linux
TOTAL: 60 PERIODS
OUTCOMES:
Upon completion of the course, students will be able to:
 Write, test, and debug simple Python programs.
 Implement Python programs with conditionals and loops.
 Develop Python programs step-wise by defining functions and calling them.
28
 Use Python lists, tuples, dictionaries for representing compound data.
 Read and write data from/to files in Python.
BS8161
PHYSICS AND CHEMISTRY LABORATORY
(Common to all branches of B.E. / B.Tech Programmes)
L T P C
0 0 4 2
OBJECTIVES:
 To introduce different experiments to test basic understanding of physics concepts applied in optics,
thermal physics, properties of matter and liquids.
LIST OF EXPERIMENTS: PHYSICS LABORATORY (Any 5 Experiments)
1. Determination of rigidity modulus – Torsion pendulum
2. Determination of Young’s modulus by non-uniform bending method
3. (a) Determination of wavelength, and particle size using Laser
(b) Determination of acceptance angle in an optical fiber.
4. Determination of thermal conductivity of a bad conductor – Lee’s Disc method.
5. Determination of velocity of sound and compressibility of liquid – Ultrasonic interferometer
6. Determination of wavelength of mercury spectrum – spectrometer grating
7. Determination of band gap of a semiconductor
8. Determination of thickness of a thin wire – Air wedge method
TOTAL: 30 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to
 Apply principles of elasticity, optics and thermal properties for engineering applications.
CHEMISTRY LABORATORY: (Any seven experiments to be conducted)
OBJECTIVES:
 To make the student to acquire practical skills in the determination of water quality
parameters through volumetric and instrumental analysis.
 To acquaint the students with the determination of molecular weight of a polymer by
viscometery.
1. Estimation of HCl using Na2CO3 as primary standard and Determination of alkalinity in water
sample.
2. Determination of total, temporary & permanent hardness of water by EDTA method.
3. Determination of DO content of water sample by Winkler’s method.
4. Determination of chloride content of water sample by argentometric method.
5. Estimation of copper content of the given solution by Iodometry.
6. Determination of strength of given hydrochloric acid using pH meter.
7. Determination of strength of acids in a mixture of acids using conductivity meter.
8. Estimation of iron content of the given solution using potentiometer.
9. Estimation of iron content of the water sample using spectrophotometer (1, 10-
Phenanthroline / thiocyanate method).
10. Estimation of sodium and potassium present in water using flame photometer.
11. Determination of molecular weight of polyvinyl alcohol using Ostwald viscometer.
12. Pseudo first order kinetics-ester hydrolysis.
13. Corrosion experiment-weight loss method.
14. Determination of CMC.
15. Phase change in a solid.
29
16. Conductometric titration of strong acid vs strong base.
OUTCOMES:
 The students will be outfitted with hands-on knowledge in the quantitative chemical analysis
of water quality related parameters.
TOTAL: 30 PERIODS
TEXTBOOK:
1. Vogel’s Textbook of Quantitative Chemical Analysis (8TH
edition, 2014).
HS8251
TECHNICAL ENGLISH
L T P C
4 0 0 4
OBJECTIVES:
The Course prepares second semester engineering and Technology students to:
• Develop strategies and skills to enhance their ability to read and comprehend engineering
and technology texts.
• Foster their ability to write convincing job applications and effective reports.
• Develop their speaking skills to make technical presentations, participate in group
discussions.
• Strengthen their listening skill which will help them comprehend lectures and talks in their
areas of specialization.
UNIT I INTRODUCTION TECHNICAL ENGLISH 12
Listening- Listening to talks mostly of a scientific/technical nature and completing information-gap
exercises- Speaking –Asking for and giving directions- Reading – reading short technical texts
from journals- newsapapers- Writing- purpose statements – extended definitions – issue- writing
instructions – checklists-recommendations-Vocabulary Development- technical vocabulary
Language Development –subject verb agreement - compound words.
UNIT II READING AND STUDY SKILLS 12
Listening- Listening to longer technical talks and completing exercises based on them-Speaking
– describing a process-Reading – reading longer technical texts- identifying the various transitions
in a text- paragraphing- Writing- interpreting cgarts, graphs- Vocabulary Development-
vocabulary used in formal letters/emails and reports Language Development- impersonal
passive voice, numerical adjectives.
UNIT III TECHNICAL WRITING AND GRAMMAR 12
Listening- Listening to classroom lectures/ talkls on engineering/technology -Speaking –
introduction to technical presentations- Reading – longer texts both general and technical,
practice in speed reading; Writing-Describing a process, use of sequence words- Vocabulary
Development- sequence words- Misspelled words. Language Development- embedded
sentences
UNIT IV REPORT WRITING 12
Listening- Listening to documentaries and making notes. Speaking – mechanics of
presentations- Reading – reading for detailed comprehension- Writing- email etiquette- job
application – cover letter –Résumé preparation( via email and hard copy)- analytical essays and
issue based essays--Vocabulary Development- finding suitable synonyms-paraphrasing-.
Language Development- clauses- if conditionals.
30
UNIT V GROUP DISCUSSION AND JOB APPLICATIONS 12
Listening- TED/Ink talks; Speaking –participating in a group discussion -Reading– reading and
understanding technical articles Writing– Writing reports- minutes of a meeting- accident and
survey-Vocabulary Development- verbal analogies Language Development- reported
speech.
TOTAL :60 PERIODS
OUTCOMES:
At the end of the course learners will be able to:
 Read technical texts and write area- specific texts effortlessly.
 Listen and comprehend lectures and talks in their area of specialisation successfully.
 Speak appropriately and effectively in varied formal and informal contexts.
 Write reports and winning job applications.
TEXT BOOKS:
1. Board of editors. Fluency in English A Course book for Engineering and Technology.
Orient Blackswan, Hyderabad: 2016
2. Sudharshana.N.P and Saveetha. C. English for Technical Communication. Cambridge
University Press: New Delhi, 2016.
REFERENCES:
1. Raman, Meenakshi and Sharma, Sangeetha- Technical Communication Principles
and Practice.Oxford University Press: New Delhi,2014.
2. Kumar, Suresh. E. Engineering English. Orient Blackswan: Hyderabad,2015
3. Booth-L. Diana, Project Work, Oxford University Press, Oxford: 2014.
4. Grussendorf, Marion, English for Presentations, Oxford University Press, Oxford: 2007
5. Means, L. Thomas and Elaine Langlois, English & Communication For Colleges.
Cengage Learning, USA: 2007
Students can be asked to read Tagore, Chetan Bhagat and for supplementary
reading.
MA8251 ENGINEERING MATHEMATICS – II L T P C
4 0 0 4
OBJECTIVES:
This course is designed to cover topics such as Matrix Algebra, Vector Calculus, Complex
Analysis and Laplace Transform. Matrix Algebra is one of the powerful tools to handle practical
problems arising in the field of engineering. Vector calculus can be widely used for modelling the
various laws of physics. The various methods of complex analysis and Laplace transforms can be
used for efficiently solving the problems that occur in various branches of engineering disciplines.
UNIT I MATRICES 12
Eigenvalues and Eigenvectors of a real matrix – Characteristic equation – Properties of
Eigenvalues and Eigenvectors – Cayley-Hamilton theorem – Diagonalization of matrices –
Reduction of a quadratic form to canonical form by orthogonal transformation – Nature of quadratic
forms.
UNIT II VECTOR CALCULUS 12
Gradient and directional derivative – Divergence and curl - Vector identities – Irrotational and
Solenoidal vector fields – Line integral over a plane curve – Surface integral - Area of a curved
surface - Volume integral - Green’s, Gauss divergence and Stoke’s theorems – Verification and
application in evaluating line, surface and volume integrals.
31
UNIT III ANALYTIC FUNCTIONS 12
Analytic functions – Necessary and sufficient conditions for analyticity in Cartesian and polar
coordinates - Properties – Harmonic conjugates – Construction of analytic function - Conformal
mapping – Mapping by functions
2
1
z
z
cz
c
z
w ,
,
,

 - Bilinear transformation.
UNIT IV COMPLEX INTEGRATION 12
Line integral - Cauchy’s integral theorem – Cauchy’s integral formula – Taylor’s and Laurent’s
series – Singularities – Residues – Residue theorem – Application of residue theorem for
evaluation of real integrals – Use of circular contour and semicircular contour.
UNIT V LAPLACE TRANSFORMS 12
Existence conditions – Transforms of elementary functions – Transform of unit step function and
unit impulse function – Basic properties – Shifting theorems -Transforms of derivatives and
integrals – Initial and final value theorems – Inverse transforms – Convolution theorem –
Transform of periodic functions – Application to solution of linear second order ordinary differential
equations with constant coefficients.
TOTAL: 60 PERIODS
OUTCOMES :
After successfully completing the course, the student will have a good understanding of
the following topics and their applications:
 Eigen values and eigenvectors, diagonalization of a matrix, Symmetric matrices, Positive
definite matrices and similar matrices.
 Gradient, divergence and curl of a vector point function and related identities.
 Evaluation of line, surface and volume integrals using Gauss, Stokes and Green’s
theorems and their verification.
 Analytic functions, conformal mapping and complex integration.
 Laplace transform and inverse transform of simple functions, properties, various related
theorems and application to differential equations with constant coefficients.
TEXT BOOKS:
1. Grewal B.S., “Higher Engineering Mathematics”, Khanna Publishers, New Delhi,
43rd
Edition, 2014.
2. Kreyszig Erwin, "Advanced Engineering Mathematics ", John Wiley and Sons,
10th
Edition, New Delhi, 2016.
REFERENCES :
1. Bali N., Goyal M. and Watkins C., “Advanced Engineering Mathematics”, Firewall
Media (An imprint of Lakshmi Publications Pvt., Ltd.,), New Delhi, 7th
Edition, 2009.
2. Jain R.K. and Iyengar S.R.K., “ Advanced Engineering Mathematics ”, Narosa
Publications, New Delhi , 3rd
Edition, 2007.
3. O’Neil, P.V. “Advanced Engineering Mathematics”, Cengage Learning India
Pvt., Ltd, New Delhi, 2007.
4. Sastry, S.S, “Engineering Mathematics", Vol. I & II, PHI Learning Pvt. Ltd,
4th
Edition, New Delhi, 2014.
5. Wylie, R.C. and Barrett, L.C., “Advanced Engineering Mathematics “Tata McGraw Hill
Education Pvt. Ltd, 6th Edition, New Delhi, 2012.
PH8252
PHYSICS FOR INFORMATION SCIENCE
(Common to CSE & IT)
L T P C
3 0 0 3
OBJECTIVES:
 To understand the essential principles of Physics of semiconductor device and Electron
transport properties. Become proficient in magnetic and optical properties of materials and
Nano-electronic devices.
32
UNIT I ELECTRICAL PROPERTIES OF MATERIALS 9
Classical free electron theory - Expression for electrical conductivity – Thermal conductivity,
expression - Wiedemann-Franz law – Success and failures - electrons in metals – Particle in a
three dimensional box – degenerate states – Fermi- Dirac statistics – Density of energy states –
Electron in periodic potential – Energy bands in solids – tight binding approximation - Electron
effective mass – concept of hole.
UNIT II SEMICONDUCTOR PHYSICS 9
Intrinsic Semiconductors – Energy band diagram – direct and indirect band gap semiconductors
– Carrier concentration in intrinsic semiconductors – extrinsic semiconductors - Carrier
concentration in N-type & P-type semiconductors – Variation of carrier concentration with
temperature – variation of Fermi level with temperature and impurity concentration – Carrier
transport in Semiconductor: random motion, drift, mobility and diffusion – Hall effect and devices –
Ohmic contacts – Schottky diode.
UNIT III MAGNETIC PROPERTIES OF MATERIALS 9
Magnetic dipole moment – atomic magnetic moments- magnetic permeability and susceptibility -
Magnetic material classification: diamagnetism – paramagnetism – ferromagnetism –
antiferromagnetism – ferrimagnetism – Ferromagnetism: origin and exchange interaction-
saturation magnetization and Curie temperature – Domain Theory- M versus H behaviour – Hard
and soft magnetic materials – examples and uses-– Magnetic principle in computer data storage
– Magnetic hard disc (GMR sensor).
UNIT IV OPTICAL PROPERTIES OF MATERIALS 9
Classification of optical materials – carrier generation and recombination processes - Absorption
emission and scattering of light in metals, insulators and semiconductors (concepts only) - photo
current in a P-N diode – solar cell - LED – Organic LED – Laser diodes – Optical data storage
techniques.
UNIT V NANO DEVICES 9
Electron density in bulk material – Size dependence of Fermi energy – Quantum confinement –
Quantum structures – Density of states in quantum well, quantum wire and quantum dot structure
- Band gap of nanomaterials – Tunneling: single electron phenomena and single electron
transistor – Quantum dot laser. Conductivity of metallic nanowires – Ballistic transport – Quantum
resistance and conductance – Carbon nanotubes: Properties and applications .
TOTAL :45 PERIODS
OUTCOMES:
At the end of the course, the students will able to
 Gain knowledge on classical and quantum electron theories, and energy band structuues,
 Acquire knowledge on basics of semiconductor physics and its applications in various
devices,
 Get knowledge on magnetic properties of materials and their applications in data storage,
 Have the necessary understanding on the functioning of optical materials for
optoelectronics,
 Understand the basics of quantum structures and their applications in carbon electronics..
TEXT BOOKS:
1. Jasprit Singh, “Semiconductor Devices: Basic Principles”, Wiley 2012.
2. Kasap, S.O. “Principles of Electronic Materials and Devices”, McGraw-Hill Education, 2007.
3. Kittel, C. “Introduction to Solid State Physics”. Wiley, 2005.
33
REFERENCES:
1. Garcia, N. & Damask, A. “Physics for Computer Science Students”. Springer-Verlag, 2012.
2. Hanson, G.W. “Fundamentals of Nanoelectronics”. Pearson Education, 2009.
3. Rogers, B., Adams, J. & Pennathur, S. “Nanotechnology: Understanding
Small Systems”. CRC Press, 2014.
BE8255 BASIC ELECTRICAL, ELECTRONICS AND MEASUREMENT L T P C
ENGINEERING 3 0 0 3
OBJECTIVES:
 To understand the fundamentals of electronic circuit constructions.
 To learn the fundamental laws, theorems of electrical circuits and also to analyze them
 To study the basic principles of electrical machines and their performance
 To study the different energy sources, protective devices and their field applications
 To understand the principles and operation of measuring instruments and transducers
UNIT I ELECTRICAL CIRCUITS ANALYSIS 9
Ohms Law, Kirchhoff’s Law-Instantaneous power- series and parallel circuit analysis with resistive,
capacitive and inductive network - nodal analysis, mesh analysis- network theorems - Thevenins
theorem, Norton theorem, maximum power transfer theorem and superposition theorem, three
phase supply-Instantaneous, Reactive and apparent power-star delta conversion.
UNIT II ELECTRICAL MACHINES 9
DC and AC ROTATING MACHINES:Types, Construction, principle, Emf and torque equation,
application Speed Control- Basics of Stepper Motor – Brushless DC motors- Transformers-
Introduction- types and construction, working principle of Ideal transformer-Emf equation- All day
efficiency calculation.
UNIT III UTILIZATION OF ELECTRICAL POWER 9
Renewable energy sources-wind and solar panels. Illumination by lamps- Sodium Vapour,
Mercury vapour, Fluorescent tube. Domestic refrigerator and air conditioner-Electric circuit,
construction and working principle. Batteries-NiCd, Pb Acid and Li ion–Charge and Discharge
Characteristics. Protection-need for earthing, fuses and circuit breakers.Energy Tariff calculation
for domestic loads.
UNIT IV ELECTRONIC CIRCUITS 9
PN Junction-VI Characteristics of Diode, zener diode, Transistors configurations - amplifiers. Op
amps- Amplifiers, oscillator,rectifiers, differentiator, integrator, ADC, DAC. Multi vibrator using 555
Timer IC . Voltage regulator IC using LM 723,LM 317.
UNIT V ELECTRICAL MEASUREMENT 9
Characteristic of measurement-errors in measurement, torque in indicating instruments- moving
coil and moving iron meters, Energy meter and watt meter. Transducers- classification-thermo
electric, RTD, Strain gauge, LVDT, LDR and piezoelectric. Oscilloscope-CRO.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Discuss the essentials of electric circuits and analysis.
 Discuss the basic operation of electric machines and transformers
 Introduction of renewable sources and common domestic loads.
 Introduction to measurement and metering for electric circuits.
34
TEXT BOOKS:
1. D.P. Kotharti and I.J Nagarath, Basic Electrical and Electronics Engineering,
Mc Graw Hill, 2016,Third Edition.
2. M.S. Sukhija and T.K. Nagsarkar, Basic Electrical and Electronic Engineering, Oxford, 2016.
REFERENCES:
1. S.B. Lal Seksena and Kaustuv Dasgupta, Fundaments of Electrical Engineering,
Cambridge, 2016
2. B.L Theraja, Fundamentals of Electrical Engineering and Electronics. Chand
& Co, 2008.
3. S.K.Sahdev, Basic of Electrical Engineering, Pearson, 2015
4. John Bird, ―Electrical and Electronic Principles and Technologyǁ, Fourth Edition, Elsevier,
2010.
5. Mittle,Mittal, Basic Electrical Engineeringǁ, 2nd Edition, Tata McGraw-Hill Edition, 2016.
6. C.L.Wadhwa, “Generation, Distribution and Utilisation of Electrical Energy”, New Age
international pvt.ltd.,2003.
GE8291 ENVIRONMENTAL SCIENCE AND ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
 To study the nature and facts about environment.
 To finding and implementing scientific, technological, economic and political solutions to
environmental problems.
 To study the interrelationship between living organism and environment.
 To appreciate the importance of environment by assessing its impact on the human world;
envision the surrounding environment, its functions and its value.
 To study the dynamic processes and understand the features of the earth‟s interior and
surface.
 To study the integrated themes and biodiversity, natural resources, pollution control and
waste management.
UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY 14
Definition, scope and importance of environment – need for public awareness - concept of an
ecosystem – structure and function of an ecosystem – producers, consumers and decomposers –
energy flow in the ecosystem – ecological succession – food chains, food webs and ecological
pyramids – Introduction, types, characteristic features, structure and function of the (a) forest
ecosystem (b) grassland ecosystem (c) desert ecosystem (d) aquatic ecosystems (ponds, streams,
lakes, rivers, oceans, estuaries) – Introduction to biodiversity definition: genetic, species and
ecosystem diversity – biogeographical classification of India – value of biodiversity: consumptive
use, productive use, social, ethical, aesthetic and option values – Biodiversity at global, national
and local levels – India as a mega-diversity nation – hot-spots of biodiversity – threats to
biodiversity: habitat loss, poaching of wildlife, man-wildlife conflicts – endangered and endemic
species of India – conservation of biodiversity: In-situ and ex-situ conservation of biodiversity. Field
study of common plants, insects, birds; Field study of simple ecosystems – pond, river, hill slopes,
etc.
UNIT II ENVIRONMENTAL POLLUTION 8
Definition – causes, effects and control measures of: (a) Air pollution (b) Water pollution (c) Soil
pollution (d) Marine pollution (e) Noise pollution (f) Thermal pollution (g) Nuclear hazards – solid
waste management: causes, effects and control measures of municipal solid wastes – role of an
individual in prevention of pollution – pollution case studies – disaster management: floods,
earthquake, cyclone and landslides. Field study of local polluted site – Urban / Rural / Industrial /
Agricultural.
35
UNIT III NATURAL RESOURCES 10
Forest resources: Use and over-exploitation, deforestation, case studies- timber extraction, mining,
dams and their effects on forests and tribal people – Water resources: Use and over- utilization of
surface and ground water, floods, drought, conflicts over water, dams-benefits and problems –
Mineral resources: Use and exploitation, environmental effects of extracting and using mineral
resources, case studies – Food resources: World food problems, changes caused by agriculture
and overgrazing, effects of modern agriculture, fertilizer-pesticide problems, water logging, salinity,
case studies – Energy resources: Growing energy needs, renewable and non renewable energy
sources, use of alternate energy sources. case studies – Land resources: Land as a resource, land
degradation, man induced landslides, soil erosion and desertification – role of an individual in
conservation of natural resources – Equitable use of resources for sustainable lifestyles. Field
study of local area to document environmental assets – river / forest / grassland / hill / mountain.
UNIT IV SOCIAL ISSUES AND THE ENVIRONMENT 7
From unsustainable to sustainable development – urban problems related to energy –
water conservation, rain water harvesting, watershed management – resettlement and
rehabilitation of people; its problems and concerns, case studies – role of non-governmental
organization- environmental ethics: Issues and possible solutions – climate change, global
warming, acid rain, ozone layer depletion, nuclear accidents and holocaust, case studies. –
wasteland reclamation – consumerism and waste products – environment production act – Air
(Prevention and Control of Pollution) act – Water (Prevention and control of Pollution) act –
Wildlife protection act – Forest conservation act – enforcement machinery involved in
environmental legislation- central and state pollution control boards- Public awareness.
UNIT V HUMAN POPULATION AND THE ENVIRONMENT 6
Population growth, variation among nations – population explosion – family welfare programme –
environment and human health – human rights – value education – HIV / AIDS – women and
child welfare – role of information technology in environment and human health – Case studies.
TOTAL: 45 PERIODS
OUTCOMES:
 Environmental Pollution or problems cannot be solved by mere laws. Public participation is an
important aspect which serves the environmental Protection. One will obtain knowledge on
the following after completing the course.
 Public awareness of environmental is at infant stage.
 Ignorance and incomplete knowledge has lead to misconceptions
 Development and improvement in std. of living has lead to serious environmental disasters
TEXTBOOKS:
1. Benny Joseph, ‘Environmental Science and Engineering’, Tata McGraw-Hill, New Delhi, 2006.
2. Gilbert M.Masters, ‘Introduction to Environmental Engineering and Science’, 2nd
edition,
Pearson Education, 2004.
REFERENCES :
1. Dharmendra S. Sengar, ‘Environmental law’, Prentice hall of India PVT LTD,New Delhi, 2007.
2. Erach Bharucha, “Textbook of Environmental Studies”, Universities Press(I) PVT, LTD,
Hydrabad, 2015.
3. Rajagopalan, R, ‘Environmental Studies-From Crisis to Cure’, Oxford University Press, 2005.
4. G. Tyler Miller and Scott E. Spoolman, “Environmental Science”, Cengage Learning India
PVT, LTD, Delhi, 2014.
36
CS8251 PROGRAMMING IN C L T P C
3 0 0 3
OBJECTIVES:
 To develop C Programs using basic programming constructs
 To develop C programs using arrays and strings
 To develop applications in C using functions , pointers and structures
 To do input/output and file handling in C
UNIT I BASICS OF C PROGRAMMING 9
Introduction to programming paradigms - Structure of C program - C programming: Data Types –
Storage classes - Constants – Enumeration Constants - Keywords – Operators: Precedence and
Associativity - Expressions - Input/Output statements, Assignment statements – Decision making
statements - Switch statement - Looping statements – Pre-processor directives - Compilation
process
UNIT II ARRAYS AND STRINGS 9
Introduction to Arrays: Declaration, Initialization – One dimensional array – Example Program:
Computing Mean, Median and Mode - Two dimensional arrays – Example Program: Matrix
Operations (Addition, Scaling, Determinant and Transpose) - String operations: length, compare,
concatenate, copy – Selection sort, linear and binary search
UNIT III FUNCTIONS AND POINTERS 9
Introduction to functions: Function prototype, function definition, function call, Built-in functions
(string functions, math functions) – Recursion – Example Program: Computation of Sine series,
Scientific calculator using built-in functions, Binary Search using recursive functions – Pointers –
Pointer operators – Pointer arithmetic – Arrays and pointers – Array of pointers – Example
Program: Sorting of names – Parameter passing: Pass by value, Pass by reference – Example
Program: Swapping of two numbers and changing the value of a variable using pass by reference
UNIT IV STRUCTURES 9
Structure - Nested structures – Pointer and Structures – Array of structures – Example Program
using structures and pointers – Self referential structures – Dynamic memory allocation - Singly
linked list - typedef
UNIT V FILE PROCESSING 9
Files – Types of file processing: Sequential access, Random access – Sequential access file -
Example Program: Finding average of numbers stored in sequential access file - Random access
file - Example Program: Transaction processing using random access files – Command line
arguments
OUTCOMES:
Upon completion of the course, the students will be able to
 Develop simple applications in C using basic constructs
 Design and implement applications using arrays and strings
 Develop and implement applications in C using functions and pointers.
 Develop applications in C using structures.
 Design applications using sequential and random access file processing.
TEXT BOOKS:
1. Reema Thareja, “Programming in C”, Oxford University Press, Second Edition, 2016.
2. Kernighan, B.W and Ritchie,D.M, “The C Programming language”, Second Edition,
Pearson Education, 2006
REFERENCES:
1. Paul Deitel and Harvey Deitel, “C How to Program”, Seventh edition, Pearson Publication
2. Juneja, B. L and Anita Seth, “Programming in C”, CENGAGE Learning India pvt. Ltd., 2011
37
3. Pradip Dey, Manas Ghosh, “Fundamentals of Computing and Programming in C”, First
Edition, Oxford University Press, 2009.
4. Anita Goel and Ajay Mittal, “Computer Fundamentals and Programming in C”, Dorling
Kindersley (India) Pvt. Ltd., Pearson Education in South Asia, 2011.
5. Byron S. Gottfried, "Schaum's Outline of Theory and Problems of Programming with
C",McGraw-Hill Education, 1996.
GE8261 ENGINEERING PRACTICES LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To provide exposure to the students with hands on experience on various basic engineering
practices in Civil, Mechanical, Electrical and Electronics Engineering.
GROUP A (CIVIL & MECHANICAL)
I CIVIL ENGINEERING PRACTICE 13
BUILDINGS:
(a) Study of plumbing and carpentry components of residential and industrial buildings.
Safety
aspects.
PLUMBING WORKS:
(a) Study of pipeline joints, its location and functions: valves, taps, couplings, unions,
reducers,
elbows in household fittings.
(b) Study of pipe connections requirements for pumps and turbines.
(c) Preparation of plumbing line sketches for water supply and sewage works.
(d) Hands-on-exercise:
Basic pipe connections – Mixed pipe material connection – Pipe connections with
different joining components.
(e) Demonstration of plumbing requirements of high-rise buildings.
CARPENTRY USING POWER TOOLS ONLY:
(a) Study of the joints in roofs, doors, windows and furniture.
(b) Hands-on-exercise:
Wood work, joints by sawing, planing and cutting.
II MECHANICAL ENGINEERING PRACTICE 18
WELDING:
(a) Preparation of butt joints, lap joints and T- joints by Shielded metal arc welding.
(b) Gas welding practice
BASIC MACHINING:
(a) Simple Turning and Taper turning
(b) Drilling Practice
SHEET METAL WORK:
(a) Forming & Bending:
(b) Model making – Trays and funnels.
(c) Different type of joints.
MACHINE ASSEMBLY PRACTICE:
(a) Study of centrifugal pump
38
(b) Study of air conditioner
DEMONSTRATION ON:
(a) Smithy operations, upsetting, swaging, setting down and bending. Example –
Exercise – Production of hexagonal headed bolt.
(b) Foundry operations like mould preparation for gear and step cone pulley.
(c) Fitting – Exercises – Preparation of square fitting and V – fitting models.
GROUP B (ELECTRICAL & ELECTRONICS)
III ELECTRICAL ENGINEERING PRACTICE 13
1. Residential house wiring using switches, fuse, indicator, lamp and energy meter.
2. Fluorescent lamp wiring.
3. Stair case wiring
4. Measurement of electrical quantities – voltage, current, power & power factor in RLC
circuit.
5. Measurement of energy using single phase energy meter.
6. Measurement of resistance to earth of an electrical equipment.
IV ELECTRONICS ENGINEERING PRACTICE 16
1. Study of Electronic components and equipments – Resistor, colour coding
measurement of AC signal parameter (peak-peak, rms period, frequency) using CR.
2. Study of logic gates AND, OR, EX-OR and NOT.
3. Generation of Clock Signal.
4. Soldering practice – Components Devices and Circuits – Using general purpose
PCB.
5. Measurement of ripple factor of HWR and FWR.
TOTAL: 60 PERIODS
OUTCOMES:
On successful completion of this course, the student will be able to
Fabricate carpentry components and pipe connections including plumbing works.
Use welding equipments to join the structures.
Carry out the basic machining operations
Make the models using sheet metal works
Illustrate on centrifugal pump, Air conditioner, operations of smithy, foundary and
fittings
Carry out basic home electrical works and appliances
Measure the electrical quantities
Elaborate on the components, gates, soldering practices.
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS:
CIVIL
1. Assorted components for plumbing consisting of metallic pipes,
plastic pipes, flexible pipes, couplings, unions, elbows, plugs and
other fittings. 15 Sets.
2. Carpentry vice (fitted to work bench) 15 Nos.
3. Standard woodworking tools 15 Sets.
4. Models of industrial trusses, door joints, furniture joints 5 each
5. Power Tools: (a) Rotary Hammer 2 Nos
(b) Demolition Hammer 2 Nos
(c) Circular Saw 2 Nos
(d) Planer 2 Nos
(e) Hand Drilling Machine 2 Nos
(f) Jigsaw 2 Nos
MECHANICAL
1. Arc welding transformer with cables and holders 5 Nos.
39
2. Welding booth with exhaust facility 5 Nos.
3. Welding accessories like welding shield, chipping hammer,
wire brush, etc. 5 Sets.
4. Oxygen and acetylene gas cylinders, blow pipe and other
welding outfit. 2 Nos.
5. Centre lathe 2 Nos.
6. Hearth furnace, anvil and smithy tools 2 Sets.
7. Moulding table, foundry tools 2 Sets.
8. Power Tool: Angle Grinder 2 Nos
9. Study-purpose items: centrifugal pump, air-conditioner One each.
ELECTRICAL
1. Assorted electrical components for house wiring 15 Sets
2. Electrical measuring instruments 10 Sets
3. Study purpose items: Iron box, fan and regulator, emergency lamp 1 each
4. Megger (250V/500V) 1 No.
5. Power Tools: (a) Range Finder 2 Nos
(b) Digital Live-wire detector 2 Nos
ELECTRONICS
1. Soldering guns 10 Nos.
2. Assorted electronic components for making circuits 50 Nos.
3. Small PCBs 10 Nos.
4. Multimeters 10 Nos.
5. Study purpose items: Telephone, FM radio, low-voltage power
supply
CS8261 C PROGRAMMING LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To develop programs in C using basic constructs.
 To develop applications in C using strings, pointers, functions, structures.
 To develop applications in C using file processing.
LIST OF EXPERIMENTS:
1. Programs using I/O statements and expressions.
2. Programs using decision-making constructs.
3. Write a program to find whether the given year is leap year or Not? (Hint: not every
centurion year is a leap. For example 1700, 1800 and 1900 is not a leap year)
4. Design a calculator to perform the operations, namely, addition, subtraction, multiplication,
division and square of a number.
5. Check whether a given number is Armstrong number or not?
6. Given a set of numbers like <10, 36, 54, 89, 12, 27>, find sum of weights based on the
following conditions.
 5 if it is a perfect cube.
 4 if it is a multiple of 4 and divisible by 6.
 3 if it is a prime number.
Sort the numbers based on the weight in the increasing order as shown below
<10,its weight>,<36,its weight><89,its weight>
7. Populate an array with height of persons and find how many persons are above the
average height.
8. Populate a two dimensional array with height and weight of persons and compute the Body
Mass Index of the individuals.
9. Given a string “a$bcd./fg” find its reverse without changing the position of special
characters.
(Example input:a@gh%;j and output:j@hg%;a)
40
10. Convert the given decimal number into binary, octal and hexadecimal numbers using user
defined functions.
11. From a given paragraph perform the following using built-in functions:
a. Find the total number of words.
b. Capitalize the first word of each sentence.
c. Replace a given word with another word.
12. Solve towers of Hanoi using recursion.
13. Sort the list of numbers using pass by reference.
14. Generate salary slip of employees using structures and pointers.
15. Compute internal marks of students for five different subjects using structures and
functions.
16. Insert, update, delete and append telephone details of an individual or a company into a
telephone directory using random access file.
17. Count the number of account holders whose balance is less than the minimum balance
using sequential access file.
Mini project
18. Create a “Railway reservation system” with the following modules
 Booking
 Availability checking
 Cancellation
 Prepare chart
TOTAL: 60 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Develop C programs for simple applications making use of basic constructs, arrays and
strings.
 Develop C programs involving functions, recursion, pointers, and structures.
 Design applications using sequential and random access file processing.
MA8351 DISCRETE MATHEMATICS L T P C
4 0 0 4
OBJECTIVES:
 To extend student’s logical and mathematical maturity and ability to deal with abstraction.
 To introduce most of the basic terminologies used in computer science courses and
application of ideas to solve practical problems.
 To understand the basic concepts of combinatorics and graph theory.
 To familiarize the applications of algebraic structures.
 To understand the concepts and significance of lattices and boolean algebra which are
widely used in computer science and engineering.
UNIT I LOGIC AND PROOFS 12
Propositional logic – Propositional equivalences - Predicates and quantifiers – Nested quantifiers –
Rules of inference - Introduction to proofs – Proof methods and strategy.
UNIT II COMBINATORICS 12
Mathematical induction – Strong induction and well ordering – The basics of counting – The
pigeonhole principle – Permutations and combinations – Recurrence relations – Solving linear
recurrence relations – Generating functions – Inclusion and exclusion principle and its applications
UNIT III GRAPHS 12
Graphs and graph models – Graph terminology and special types of graphs – Matrix
representation of graphs and graph isomorphism – Connectivity – Euler and Hamilton paths.
41
UNIT IV ALGEBRAIC STRUCTURES 12
Algebraic systems – Semi groups and monoids - Groups – Subgroups – Homomorphism’s –
Normal subgroup and cosets – Lagrange’s theorem – Definitions and examples of Rings and
Fields.
UNIT V LATTICES AND BOOLEAN ALGEBRA 12
Partial ordering – Posets – Lattices as posets – Properties of lattices - Lattices as algebraic
systems – Sub lattices – Direct product and homomorphism – Some special lattices – Boolean
algebra.
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, students would:
 Have knowledge of the concepts needed to test the logic of a program.
 Have an understanding in identifying structures on many levels.
 Be aware of a class of functions which transform a finite set into another finite set which
relates to input and output functions in computer science.
 Be aware of the counting principles.
 Be exposed to concepts and properties of algebraic structures such as groups, rings and
fields.
TEXTBOOKS:
1. Rosen, K.H., "Discrete Mathematics and its Applications", 7th
Edition, Tata McGraw
Hill Pub. Co. Ltd., New Delhi, Special Indian Edition, 2011.
2. Tremblay, J.P. and Manohar.R, " Discrete Mathematical Structures with Applications to
Computer Science", Tata McGraw Hill Pub. Co. Ltd, New Delhi, 30th
Reprint, 2011.
REFERENCES:
1. Grimaldi, R.P. "Discrete and Combinatorial Mathematics: An Applied Introduction", 4th
Edition,
Pearson Education Asia, Delhi, 2007.
2. Lipschutz, S. and Mark Lipson., "Discrete Mathematics", Schaum’s Outlines, Tata McGraw Hill
Pub. Co. Ltd., New Delhi, 3rd
Edition, 2010.
3. Koshy, T. "Discrete Mathematics with Applications", Elsevier Publications, 2006.
CS8351 DIGITAL PRINCIPLES AND SYSTEM DESIGN L T P C
4 0 0 4
OBJECTIVES:
• To design digital circuits using simplified Boolean functions
• To analyze and design combinational circuits
• To analyze and design synchronous and asynchronous sequential circuits
• To understand Programmable Logic Devices
• To write HDL code for combinational and sequential circuits
UNIT I BOOLEAN ALGEBRA AND LOGIC GATES 12
Number Systems - Arithmetic Operations - Binary Codes- Boolean Algebra and Logic Gates
- Theorems and Properties of Boolean Algebra - Boolean Functions - Canonical and
Standard Forms - Simplification of Boolean Functions using Karnaugh Map - Logic Gates –
NAND and NOR Implementations.
UNIT II COMBINATIONAL LOGIC 12
Combinational Circuits – Analysis and Design Procedures - Binary Adder-Subtractor -
Decimal Adder - Binary Multiplier - Magnitude Comparator - Decoders – Encoders –
Multiplexers - Introduction to HDL – HDL Models of Combinational circuits.
42
UNIT III SYNCHRONOUS SEQUENTIAL LOGIC 12
Sequential Circuits - Storage Elements: Latches , Flip-Flops - Analysis of Clocked
Sequential Circuits - State Reduction and Assignment - Design Procedure - Registers and
Counters - HDL Models of Sequential Circuits.
UNIT IV ASYNCHRONOUS SEQUENTIAL LOGIC 12
Analysis and Design of Asynchronous Sequential Circuits – Reduction of State and Flow
Tables – Race-free State Assignment – Hazards.
UNIT V MEMORY AND PROGRAMMABLE LOGIC 12
RAM – Memory Decoding – Error Detection and Correction - ROM - Programmable Logic
Array – Programmable Array Logic – Sequential Programmable Devices.
TOTAL : 60 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Simplify Boolean functions using KMap
 Design and Analyze Combinational and Sequential Circuits
 Implement designs using Programmable Logic Devices
 Write HDL code for combinational and Sequential Circuits
TEXT BOOK:
1. M. Morris R. Mano, Michael D. Ciletti, “Digital Design: With an Introduction to the
Verilog HDL, VHDL, and SystemVerilog”, 6th
Edition, Pearson Education, 2017.
REFERENCES:
1. G. K. Kharate, Digital Electronics, Oxford University Press, 2010
2. John F. Wakerly, Digital Design Principles and Practices, Fifth Edition, Pearson
Education, 2017.
3. Charles H. Roth Jr, Larry L. Kinney, Fundamentals of Logic Design, Sixth Edition,
CENGAGE Learning, 2013
4. Donald D. Givone, Digital Principles and Designǁ, Tata Mc Graw Hill, 2003.
CS8391 DATA STRUCTURES L T P C
3 0 0 3
OBJECTIVES:
 To understand the concepts of ADTs
 To Learn linear data structures – lists, stacks, and queues
 To understand sorting, searching and hashing algorithms
 To apply Tree and Graph structures
UNIT I LINEAR DATA STRUCTURES – LIST 9
Abstract Data Types (ADTs) – List ADT – array-based implementation – linked list implementation
––singly linked lists- circularly linked lists- doubly-linked lists – applications of lists –Polynomial
Manipulation – All operations (Insertion, Deletion, Merge, Traversal).
UNIT II LINEAR DATA STRUCTURES – STACKS, QUEUES 9
Stack ADT – Operations - Applications - Evaluating arithmetic expressions- Conversion of Infix to
postfix expression - Queue ADT – Operations - Circular Queue – Priority Queue - deQueue –
applications of queues.
43
UNIT III NON LINEAR DATA STRUCTURES – TREES 9
Tree ADT – tree traversals - Binary Tree ADT – expression trees – applications of trees – binary
search tree ADT –Threaded Binary Trees- AVL Trees – B-Tree - B+ Tree - Heap – Applications of
heap.
UNIT IV NON LINEAR DATA STRUCTURES - GRAPHS 9
Definition – Representation of Graph – Types of graph - Breadth-first traversal - Depth-first
traversal – Topological Sort – Bi-connectivity – Cut vertex – Euler circuits – Applications of graphs.
UNIT V SEARCHING, SORTING AND HASHING TECHNIQUES 9
Searching- Linear Search - Binary Search. Sorting - Bubble sort - Selection sort - Insertion sort -
Shell sort – Radix sort. Hashing- Hash Functions – Separate Chaining – Open Addressing –
Rehashing – Extendible Hashing.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Implement abstract data types for linear data structures.
 Apply the different linear and non-linear data structures to problem solutions.
 Critically analyze the various sorting algorithms.
TEXT BOOKS:
1. Mark Allen Weiss, “Data Structures and Algorithm Analysis in C”, 2nd Edition, Pearson
Education,1997.
2. Reema Thareja, “Data Structures Using C”, Second Edition , Oxford University Press, 2011
REFERENCES:
1. Thomas H. Cormen, Charles E. Leiserson, Ronald L.Rivest, Clifford Stein, “Introduction to
Algorithms", Second Edition, Mcgraw Hill, 2002.
2. Aho, Hopcroft and Ullman, “Data Structures and Algorithms”, Pearson Education,1983.
3. Stephen G. Kochan, “Programming in C”, 3rd edition, Pearson Education.
4. Ellis Horowitz, Sartaj Sahni, Susan Anderson-Freed, “Fundamentals of Data Structures in C”,
Second Edition, University Press, 2008
CS8392 OBJECT ORIENTED PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To understand Object Oriented Programming concepts and basic characteristics of Java
 To know the principles of packages, inheritance and interfaces
 To define exceptions and use I/O streams
 To develop a java application with threads and generics classes
 To design and build simple Graphical User Interfaces
UNIT I INTRODUCTION TO OOP AND JAVA FUNDAMENTALS 10
Object Oriented Programming - Abstraction – objects and classes - Encapsulation- Inheritance -
Polymorphism- OOP in Java – Characteristics of Java – The Java Environment - Java Source
File -Structure – Compilation. Fundamental Programming Structures in Java – Defining classes in
Java – constructors, methods -access specifiers - static members -Comments, Data Types,
Variables, Operators, Control Flow, Arrays , Packages - JavaDoc comments.
UNIT II INHERITANCE AND INTERFACES 9
Inheritance – Super classes- sub classes –Protected members – constructors in sub classes- the
Object class – abstract classes and methods- final methods and classes – Interfaces – defining an
interface, implementing interface, differences between classes and interfaces and extending
44
interfaces - Object cloning -inner classes, Array Lists - Strings
UNIT III EXCEPTION HANDLING AND I/O 9
Exceptions - exception hierarchy - throwing and catching exceptions – built-in exceptions, creating
own exceptions, Stack Trace Elements. Input / Output Basics – Streams – Byte streams and
Character streams – Reading and Writing Console – Reading and Writing Files
UNIT IV MULTITHREADING AND GENERIC PROGRAMMING 8
Differences between multi-threading and multitasking, thread life cycle, creating threads,
synchronizing threads, Inter-thread communication, daemon threads, thread groups. Generic
Programming – Generic classes – generic methods – Bounded Types – Restrictions and
Limitations.
UNIT V EVENT DRIVEN PROGRAMMING 9
Graphics programming - Frame – Components - working with 2D shapes - Using color, fonts, and
images - Basics of event handling - event handlers - adapter classes - actions - mouse events -
AWT event hierarchy - Introduction to Swing – layout management - Swing Components – Text
Fields , Text Areas – Buttons- Check Boxes – Radio Buttons – Lists- choices- Scrollbars –
Windows –Menus – Dialog Boxes.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, students will be able to:
 Develop Java programs using OOP principles
 Develop Java programs with the concepts inheritance and interfaces
 Build Java applications using exceptions and I/O streams
 Develop Java applications with threads and generics classes
 Develop interactive Java programs using swings
TEXT BOOKS:
1. Herbert Schildt, “Java The complete reference”, 8th
Edition, McGraw Hill Education, 2011.
2. Cay S. Horstmann, Gary cornell, “Core Java Volume –I Fundamentals”, 9th
Edition,
Prentice Hall, 2013.
REFERENCES:
1. Paul Deitel, Harvey Deitel, “Java SE 8 for programmers”, 3rd
Edition, Pearson, 2015.
2. Steven Holzner, “Java 2 Black book”, Dreamtech press, 2011.
3. Timothy Budd, “Understanding Object-oriented programming with Java”, Updated Edition,
Pearson Education, 2000.
EC8395 COMMUNICATION ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
 To introduce the relevance of this course to the existing technology through demonstrations,
case studies, simulations, contributions of scientist, national/international policies with a
futuristic vision along with socio-economic impact and issues
 To study the various analog and digital modulation techniques
 To study the principles behind information theory and coding
 To study the various digital communication techniques
UNIT I ANALOG MODULATION 9
Amplitude Modulation – AM, DSBSC, SSBSC, VSB – PSD, modulators and demodulators – Angle
modulation – PM and FM – PSD, modulators and demodulators – Superheterodyne receivers
45
UNITII PULSE MODULATION 9
Low pass sampling theorem – Quantization – PAM – Line coding – PCM, DPCM, DM, and
ADPCM And ADM, Channel Vocoder - Time Division Multiplexing, Frequency Division Multiplexing
UNIT III DIGITAL MODULATION AND TRANSMISSION 9
Phase shift keying – BPSK, DPSK, QPSK – Principles of M-ary signaling M-ary PSK & QAM –
Comparison, ISI – Pulse shaping – Duo binary encoding – Cosine filters – Eye pattern, equalizers
UNIT IV INFORMATION THEORY AND CODING 9
Measure of information – Entropy – Source coding theorem – Shannon–Fano coding, Huffman
Coding, LZ Coding – Channel capacity – Shannon-Hartley law – Shannon's limit – Error control
codes – Cyclic codes, Syndrome calculation – Convolution Coding, Sequential and Viterbi
decoding
UNIT V SPREAD SPECTRUM AND MULTIPLE ACCESS 9
PN sequences – properties – m-sequence – DSSS – Processing gain, Jamming – FHSS –
Synchronisation and tracking – Multiple Access – FDMA, TDMA, CDMA,
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Ability to comprehend and appreciate the significance and role of this course in the present
contemporary world
 Apply analog and digital communication techniques.
 Use data and pulse communication techniques.
 Analyze Source and Error control coding.
TEXT BOOKS:
1. H Taub, D L Schilling, G Saha, “Principles of Communication Systems” 3/e, TMH 2007
2. S. Haykin “Digital Communications” John Wiley 2005
REFERENCES:
1. B.P.Lathi, “Modern Digital and Analog Communication Systems”, 3rd
edition, Oxford
University Press, 2007
2. H P Hsu, Schaum Outline Series – “Analog and Digital Communications” TMH 2006
3. B.Sklar, Digital Communications Fundamentals and Applications” 2/e Pearson
Education 2007.
CS8381 DATA STRUCTURES LABORATORY L T P C
0 0 4 2
OBJECTIVES
 To implement linear and non-linear data structures
 To understand the different operations of search trees
 To implement graph traversal algorithms
 To get familiarized to sorting and searching algorithms
1. Array implementation of Stack and Queue ADTs
2. Array implementation of List ADT
3. Linked list implementation of List, Stack and Queue ADTs
4. Applications of List, Stack and Queue ADTs
5. Implementation of Binary Trees and operations of Binary Trees
6. Implementation of Binary Search Trees
7. Implementation of AVL Trees
8. Implementation of Heaps using Priority Queues.
46
9. Graph representation and Traversal algorithms
10. Applications of Graphs
11. Implementation of searching and sorting algorithms
12. Hashing – any two collision techniques
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the students will be able to:
 Write functions to implement linear and non-linear data structure operations
 Suggest appropriate linear / non-linear data structure operations for solving a given
problem
 Appropriately use the linear / non-linear data structure operations for a given problem
 Apply appropriate hash functions that result in a collision free scenario for data storage and
retrieval
CS8383 OBJECT ORIENTED PROGRAMMING LABORATORY L T P C
0 0 4 2
OBJECTIVES
 To build software development skills using java programming for real-world applications.
 To understand and apply the concepts of classes, packages, interfaces, arraylist, exception
handling and file processing.
 To develop applications using generic programming and event handling.
LIST OF EXPERIMENTS
1. Develop a Java application to generate Electricity bill. Create a class with the following
members: Consumer no., consumer name, previous month reading, current month reading,
type of EB connection (i.e domestic or commercial). Compute the bill amount using the
following tariff.
If the type of the EB connection is domestic, calculate the amount to be paid as follows:
 First 100 units - Rs. 1 per unit
 101-200 units - Rs. 2.50 per unit
 201 -500 units - Rs. 4 per unit
 > 501 units - Rs. 6 per unit
If the type of the EB connection is commercial, calculate the amount to be paid as follows:
 First 100 units - Rs. 2 per unit
 101-200 units - Rs. 4.50 per unit
 201 -500 units - Rs. 6 per unit
 > 501 units - Rs. 7 per unit
2. Develop a java application to implement currency converter (Dollar to INR, EURO to INR, Yen
to INR and vice versa), distance converter (meter to KM, miles to KM and vice versa) , time
converter (hours to minutes, seconds and vice versa) using packages.
3. Develop a java application with Employee class with Emp_name, Emp_id, Address, Mail_id,
Mobile_no as members. Inherit the classes, Programmer, Assistant Professor, Associate
Professor and Professor from employee class. Add Basic Pay (BP) as the member of all the
inherited classes with 97% of BP as DA, 10 % of BP as HRA, 12% of BP as PF, 0.1% of BP for
staff club fund. Generate pay slips for the employees with their gross and net salary.
4. Design a Java interface for ADT Stack. Implement this interface using array. Provide
necessary exception handling in both the implementations.
47
5. Write a program to perform string operations using ArrayList. Write functions for the following
a. Append - add at end
b. Insert – add at particular index
c. Search
d. List all string starts with given letter
6. Write a Java Program to create an abstract class named Shape that contains two integers and
an empty method named print Area(). Provide three classes named Rectangle, Triangle and
Circle such that each one of the classes extends the class Shape. Each one of the classes
contains only the method print Area () that prints the area of the given shape.
7. Write a Java program to implement user defined exception handling.
8. Write a Java program that reads a file name from the user, displays information about whether
the file exists, whether the file is readable, or writable, the type of file and the length of the file
in bytes.
9. Write a java program that implements a multi-threaded application that has three threads. First
thread generates a random integer every 1 second and if the value is even, second thread
computes the square of the number and prints. If the value is odd, the third thread will print the
value of cube of the number.
10. Write a java program to find the maximum value from the given type of elements using a
generic function.
11. Design a calculator using event-driven programming paradigm of Java with the following
options.
a) Decimal manipulations
b) Scientific manipulations
12. Develop a mini project for any application using Java concepts.
TOTAL : 60 PERIODS
OUTCOMES
Upon completion of the course, the students will be able to
 Develop and implement Java programs for simple applications that make use of classes,
packages and interfaces.
 Develop and implement Java programs with arraylist, exception handling and
multithreading .
 Design applications using file processing, generic programming and event handling.
CS8382 DIGITAL SYSTEMS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To understand the various basic logic gates
 To design and implement the various combinational circuits
 To design and implement combinational circuits using MSI devices.
 To design and implement sequential circuits
 To understand and code with HDL programming
LIST OF EXPERIMENTS
1. Verification of Boolean Theorems using basic gates.
2. Design and implementation of combinational circuits using basic gates for arbitrary
48
functions, code converters.
3. Design and implement Half/Full Adder and Subtractor.
4. Design and implement combinational circuits using MSI devices:
 4 – bit binary adder / subtractor
 Parity generator / checker
 Magnitude Comparator
 Application using multiplexers
5. Design and implement shift-registers.
6. Design and implement synchronous counters.
7. Design and implement asynchronous counters.
8. Coding combinational circuits using HDL.
9. Coding sequential circuits using HDL.
10. Design and implementation of a simple digital system (Mini Project).
TOTAL: 60 PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able to:
 Implement simplified combinational circuits using basic logic gates
 Implement combinational circuits using MSI devices
 Implement sequential circuits like registers and counters
 Simulate combinational and sequential circuits using HDL
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS:
LABORATORY REQUIREMENT FOR BATCH OF 30 STUDENTS HARDWARE:
1. Digital trainer kits - 30
2. Digital ICs required for the experiments in sufficient numbers
SOFTWARE:
1. HDL simulator.
HS8381 INTERPERSONAL SKILLS/LISTENING&SPEAKING
L T P C
0 0 2 1
OBJECTIVES:
The Course will enable learners to:
• Equip students with the English language skills required for the successful undertaking of
academic studies with primary emphasis on academic speaking and listening skills.
• Provide guidance and practice in basic general and classroom conversation and to engage in
specific academic speaking activities.
• improve general and academic listening skills
• Make effective presentations.
UNIT I
Listening as a key skill- its importance- speaking - give personal information - ask for personal
information - express ability - enquire about ability - ask for clarification Improving pronunciation -
pronunciation basics taking lecture notes - preparing to listen to a lecture - articulate a complete
idea as opposed to producing fragmented utterances.
UNIT II
Listen to a process information- give information, as part of a simple explanation - conversation
starters: small talk - stressing syllables and speaking clearly - intonation patterns - compare and
contrast information and ideas from multiple sources- converse with reasonable accuracy over a
wide range of everyday topics.
49
UNIT III
Lexical chunking for accuracy and fluency- factors influence fluency, deliver a five-minute informal
talk - greet - respond to greetings - describe health and symptoms - invite and offer - accept -
decline - take leave - listen for and follow the gist- listen for detail
UNIT IV
Being an active listener: giving verbal and non-verbal feedback - participating in a group
discussion - summarizing academic readings and lectures conversational speech listening to and
participating in conversations - persuade.
UNIT V
Formal and informal talk - listen to follow and respond to explanations, directions and instructions
in academic and business contexts - strategies for presentations and interactive communication -
group/pair presentations - negotiate disagreement in group work.
TOTAL :30PERIODS
OUTCOMES:
At the end of the course Learners will be able to:
 Listen and respond appropriately.
 Participate in group discussions
 Make effective presentations
 Participate confidently and appropriately in conversations both formal and informal
TEXT BOOKS:
1. Brooks,Margret. Skills for Success. Listening and Speaking. Level 4 Oxford University Press,
Oxford: 2011.
2. Richards,C. Jack. & David Bholke. Speak Now Level 3. Oxford University Press, Oxford:
2010
REFERENCES:
1. Bhatnagar, Nitin and MamtaBhatnagar. Communicative English for Engineers and
Professionals. Pearson: New Delhi, 2010.
2. Hughes, Glyn and Josephine Moate. Practical English Classroom. Oxford University Press:
Oxford, 2014.
3. Vargo, Mari. Speak Now Level 4. Oxford University Press: Oxford, 2013.
4. Richards C. Jack. Person to Person (Starter). Oxford University Press: Oxford, 2006.
5. Ladousse, Gillian Porter. Role Play. Oxford University Press: Oxford, 2014
MA8402 PROBABILITY AND QUEUING THEORY L T P C
4 0 0 4
OBJECTIVES:
 To provide necessary basic concepts in probability and random processes for applications
such as random signals, linear systems in communication engineering.
 To understand the basic concepts of probability, one and two dimensional random
variables and to introduce some standard distributions applicable to engineering which can
describe real life phenomenon.
 To understand the basic concepts of random processes which are widely used in IT fields.
 To understand the concept of queueing models and apply in engineering.
 To understand the significance of advanced queueing models.
 To provide the required mathematical support in real life problems and develop
probabilistic models which can be used in several areas of science and engineering.
50
UNIT I PROBABILITY AND RANDOM VARIABLES 12
Probability – Axioms of probability – Conditional probability – Baye’s theorem - Discrete and
continuous random variables – Moments – Moment generating functions – Binomial, Poisson,
Geometric, Uniform, Exponential and Normal distributions.
UNIT II TWO - DIMENSIONAL RANDOM VARIABLES 12
Joint distributions – Marginal and conditional distributions – Covariance – Correlation and linear
regression – Transformation of random variables – Central limit theorem (for independent and
identically distributed random variables).
UNIT III RANDOM PROCESSES 12
Classification – Stationary process – Markov process - Poisson process – Discrete parameter
Markov chain – Chapman Kolmogorov equations – Limiting distributions.
UNIT IV QUEUEING MODELS 12
Markovian queues – Birth and death processes – Single and multiple server queueing models –
Little’s formula - Queues with finite waiting rooms – Queues with impatient customers : Balking
and reneging.
UNIT V ADVANCED QUEUEING MODELS 12
Finite source models - M/G/1 queue – Pollaczek Khinchin formula - M/D/1 and M/EK/1 as special
cases – Series queues – Open Jackson networks.
TOTAL : 60 PERIODS
OUTCOMES:
Upon successful completion of the course, students should be able to:
 Understand the fundamental knowledge of the concepts of probability and have knowledge
of standard distributions which can describe real life phenomenon.
 Understand the basic concepts of one and two dimensional random variables and apply in
engineering applications.
 Apply the concept of random processes in engineering disciplines.
 Acquire skills in analyzing queueing models.
 Understand and characterize phenomenon which evolve with respect to time in a
probabilistic manner
TEXTBOOKS:
1. Gross, D., Shortle, J.F, Thompson, J.M and Harris. C.M., “Fundamentals of Queueing Theory",
Wiley Student 4th
Edition, 2014.
2. Ibe, O.C., “Fundamentals of Applied Probability and Random Processes", Elsevier, 1st
Indian
Reprint, 2007.
REFERENCES :
1. Hwei Hsu, "Schaum’s Outline of Theory and Problems of Probability, Random Variables and
Random Processes", Tata McGraw Hill Edition, New Delhi, 2004.
2. Taha, H.A., "Operations Research", 9th
Edition, Pearson India Education Services, Delhi,
2016.
3. Trivedi, K.S., "Probability and Statistics with Reliability, Queueing and Computer Science
Applications", 2nd
Edition, John Wiley and Sons, 2002.
4. Yates, R.D. and Goodman. D. J., "Probability and Stochastic Processes", 2nd
Edition, Wiley
India Pvt. Ltd., Bangalore, 2012.
51
CS8491 COMPUTER ARCHITECTURE L T P C
3 0 0 3
OBJECTIVES:
• To learn the basic structure and operations of a computer.
• To learn the arithmetic and logic unit and implementation of fixed-point and floating point
arithmetic unit.
• To learn the basics of pipelined execution.
• To understand parallelism and multi-core processors.
• To understand the memory hierarchies, cache memories and virtual memories.
• To learn the different ways of communication with I/O devices.
UNIT I BASIC STRUCTURE OF A COMPUTER SYSTEM 9
Functional Units – Basic Operational Concepts – Performance – Instructions: Language of
the Computer – Operations, Operands – Instruction representation – Logical operations –
decision making – MIPS Addressing.
UNIT II ARITHMETIC FOR COMPUTERS 9
Addition and Subtraction – Multiplication – Division – Floating Point Representation –
Floating Point Operations – Subword Parallelism
UNIT III PROCESSOR AND CONTROL UNIT 9
A Basic MIPS implementation – Building a Datapath – Control Implementation Scheme –
Pipelining – Pipelined datapath and control – Handling Data Hazards & Control Hazards –
Exceptions.
UNIT IV PARALLELISIM 9
Parallel processing challenges – Flynn’s classification – SISD, MIMD, SIMD, SPMD, and
Vector Architectures - Hardware multithreading – Multi-core processors and other Shared
Memory Multiprocessors - Introduction to Graphics Processing Units, Clusters, Warehouse
Scale Computers and other Message-Passing Multiprocessors.
UNIT V MEMORY & I/O SYSTEMS 9
Memory Hierarchy - memory technologies – cache memory – measuring and improving
cache performance – virtual memory, TLB’s – Accessing I/O Devices – Interrupts – Direct
Memory Access – Bus structure – Bus operation – Arbitration – Interface circuits - USB.
TOTAL : 45 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Understand the basics structure of computers, operations and instructions.
 Design arithmetic and logic unit.
 Understand pipelined execution and design control unit.
 Understand parallel processing architectures.
 Understand the various memory systems and I/O communication.
TEXT BOOKS:
1. David A. Patterson and John L. Hennessy, Computer Organization and Design: The
Hardware/Software Interface, Fifth Edition, Morgan Kaufmann / Elsevier, 2014.
2. Carl Hamacher, Zvonko Vranesic, Safwat Zaky and Naraig Manjikian, Computer
Organization and Embedded Systems, Sixth Edition, Tata McGraw Hill, 2012.
REFERENCES:
1. William Stallings, Computer Organization and Architecture – Designing for
Performance, Eighth Edition, Pearson Education, 2010.
2. John P. Hayes, Computer Architecture and Organization, Third Edition, Tata
52
McGraw Hill, 2012.
3. John L. Hennessey and David A. Patterson, Computer Architecture – A Quantitative
Approachǁ, Morgan Kaufmann / Elsevier Publishers, Fifth Edition, 2012.
CS8492 DATABASE MANAGEMENT SYSTEMS L T P C
3 0 0 3
OBJECTIVES
 To learn the fundamentals of data models and to represent a database system using ER
diagrams.
 To study SQL and relational database design.
 To understand the internal storage structures using different file and indexing
techniques which will help in physical DB design.
 To understand the fundamental concepts of transaction processing- concurrency
control techniques and recovery procedures.
 To have an introductory knowledge about the Storage and Query processing
Techniques
UNIT I RELATIONAL DATABASES 10
Purpose of Database System – Views of data – Data Models – Database System Architecture –
Introduction to relational databases – Relational Model – Keys – Relational Algebra – SQL
fundamentals – Advanced SQL features – Embedded SQL– Dynamic SQL
UNIT II DATABASE DESIGN 8
Entity-Relationship model – E-R Diagrams – Enhanced-ER Model – ER-to-Relational Mapping –
Functional Dependencies – Non-loss Decomposition – First, Second, Third Normal Forms,
Dependency Preservation – Boyce/Codd Normal Form – Multi-valued Dependencies and Fourth
Normal Form – Join Dependencies and Fifth Normal Form
UNIT III TRANSACTIONS 9
Transaction Concepts – ACID Properties – Schedules – Serializability – Concurrency Control –
Need for Concurrency – Locking Protocols – Two Phase Locking – Deadlock – Transaction
Recovery - Save Points – Isolation Levels – SQL Facilities for Concurrency and Recovery.
UNIT IV IMPLEMENTATION TECHNIQUES 9
RAID – File Organization – Organization of Records in Files – Indexing and Hashing –Ordered
Indices – B+ tree Index Files – B tree Index Files – Static Hashing – Dynamic Hashing – Query
Processing Overview – Algorithms for SELECT and JOIN operations – Query optimization using
Heuristics and Cost Estimation.
UNIT V ADVANCED TOPICS 9
Distributed Databases: Architecture, Data Storage, Transaction Processing – Object-based
Databases: Object Database Concepts, Object-Relational features, ODMG Object Model, ODL,
OQL - XML Databases: XML Hierarchical Model, DTD, XML Schema, XQuery – Information
Retrieval: IR Concepts, Retrieval Models, Queries in IR systems.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Classify the modern and futuristic database applications based on size and complexity
 Map ER model to Relational model to perform database design effectively
 Write queries using normalization criteria and optimize queries
 Compare and contrast various indexing strategies in different database systems
 Appraise how advanced databases differ from traditional databases.
53
TEXT BOOKS:
1. Abraham Silberschatz, Henry F. Korth, S. Sudharshan, “Database System Concepts”, Sixth
Edition, Tata McGraw Hill, 2011.
2. Ramez Elmasri, Shamkant B. Navathe, “Fundamentals of Database Systems”, Sixth Edition,
Pearson Education, 2011.
REFERENCES:
1. C.J.Date, A.Kannan, S.Swamynathan, “An Introduction to Database Systems”, Eighth Edition,
Pearson Education, 2006.
2. Raghu Ramakrishnan, ―Database Management Systemsǁ, Fourth Edition, McGraw-Hill
College Publications, 2015.
3. G.K.Gupta,"Database Management Systems”, Tata McGraw Hill, 2011.
CS8451 DESIGN AND ANALYSIS OF ALGORITHMS L T P C
3 0 0 3
OBJECTIVES:
 To understand and apply the algorithm analysis techniques.
 To critically analyze the efficiency of alternative algorithmic solutions for the same problem
 To understand different algorithm design techniques.
 To understand the limitations of Algorithmic power.
UNIT I INTRODUCTION 9
Notion of an Algorithm – Fundamentals of Algorithmic Problem Solving – Important Problem Types
– Fundamentals of the Analysis of Algorithmic Efficiency –Asymptotic Notations and their
properties. Analysis Framework – Empirical analysis - Mathematical analysis for Recursive and
Non-recursive algorithms - Visualization
UNIT II BRUTE FORCE AND DIVIDE-AND-CONQUER 9
Brute Force – Computing an
– String Matching - Closest-Pair and Convex-Hull Problems -
Exhaustive Search - Travelling Salesman Problem - Knapsack Problem - Assignment problem.
Divide and Conquer Methodology – Binary Search – Merge sort – Quick sort – Heap Sort -
Multiplication of Large Integers – Closest-Pair and Convex - Hull Problems.
UNIT III DYNAMIC PROGRAMMING AND GREEDY TECHNIQUE 9
Dynamic programming – Principle of optimality - Coin changing problem, Computing a Binomial
Coefficient – Floyd’s algorithm – Multi stage graph - Optimal Binary Search Trees – Knapsack
Problem and Memory functions.
Greedy Technique – Container loading problem - Prim’s algorithm and Kruskal's Algorithm – 0/1
Knapsack problem, Optimal Merge pattern - Huffman Trees.
UNIT IV ITERATIVE IMPROVEMENT 9
The Simplex Method - The Maximum-Flow Problem – Maximum Matching in Bipartite Graphs,
Stable marriage Problem.
UNIT V COPING WITH THE LIMITATIONS OF ALGORITHM POWER 9
Lower - Bound Arguments - P, NP NP- Complete and NP Hard Problems. Backtracking – n-Queen
problem - Hamiltonian Circuit Problem – Subset Sum Problem. Branch and Bound – LIFO Search
and FIFO search - Assignment problem – Knapsack Problem – Travelling Salesman Problem -
Approximation Algorithms for NP-Hard Problems – Travelling Salesman problem – Knapsack
problem.
TOTAL: 45 PERIODS
54
OUTCOMES:
At the end of the course, the students should be able to:
 Design algorithms for various computing problems.
 Analyze the time and space complexity of algorithms.
 Critically analyze the different algorithm design techniques for a given problem.
 Modify existing algorithms to improve efficiency.
TEXT BOOKS:
1. Anany Levitin, “Introduction to the Design and Analysis of Algorithms”, Third Edition,
Pearson Education, 2012.
2. Ellis Horowitz, Sartaj Sahni and Sanguthevar Rajasekaran, Computer Algorithms/ C++, Second
Edition, Universities Press, 2007.
REFERENCES:
1. Thomas H.Cormen, Charles E.Leiserson, Ronald L. Rivest and Clifford Stein, “Introduction
to Algorithms”, Third Edition, PHI Learning Private Limited, 2012.
2. Alfred V. Aho, John E. Hopcroft and Jeffrey D. Ullman, “Data Structures and Algorithms”,
Pearson Education, Reprint 2006.
3. Harsh Bhasin, “Algorithms Design and Analysis”, Oxford university press, 2016.
4. S. Sridhar, “Design and Analysis of Algorithms”, Oxford university press, 2014.
5. http://nptel.ac.in/
CS8493 OPERATING SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
 To understand the basic concepts and functions of operating systems.
 To understand Processes and Threads
 To analyze Scheduling algorithms.
 To understand the concept of Deadlocks.
 To analyze various memory management schemes.
 To understand I/O management and File systems.
 To be familiar with the basics of Linux system and Mobile OS like iOS and Android.
UNIT I OPERATING SYSTEM OVERVIEW 7
Computer System Overview-Basic Elements, Instruction Execution, Interrupts, Memory Hierarchy,
Cache Memory, Direct Memory Access, Multiprocessor and Multicore Organization. Operating
system overview-objectives and functions, Evolution of Operating System.- Computer System
Organization Operating System Structure and Operations- System Calls, System Programs, OS
Generation and System Boot.
UNIT II PROCESS MANAGEMENT 11
Processes - Process Concept, Process Scheduling, Operations on Processes, Inter-process
Communication; CPU Scheduling - Scheduling criteria, Scheduling algorithms, Multiple-processor
scheduling, Real time scheduling; Threads- Overview, Multithreading models, Threading issues;
Process Synchronization - The critical-section problem, Synchronization hardware, Mutex locks,
Semaphores, Classic problems of synchronization, Critical regions, Monitors; Deadlock - System
model, Deadlock characterization, Methods for handling deadlocks, Deadlock prevention,
Deadlock avoidance, Deadlock detection, Recovery from deadlock.
UNIT III STORAGE MANAGEMENT 9
Main Memory – Background, Swapping, Contiguous Memory Allocation, Paging, Segmentation,
Segmentation with paging, 32 and 64 bit architecture Examples; Virtual Memory – Background,
55
Demand Paging, Page Replacement, Allocation, Thrashing; Allocating Kernel Memory, OS
Examples.
UNIT IV FILE SYSTEMS AND I/O SYSTEMS 9
Mass Storage system – Overview of Mass Storage Structure, Disk Structure, Disk Scheduling and
Management, swap space management; File-System Interface - File concept, Access methods,
Directory Structure, Directory organization, File system mounting, File Sharing and Protection; File
System Implementation- File System Structure, Directory implementation, Allocation Methods,
Free Space Management, Efficiency and Performance, Recovery; I/O Systems – I/O Hardware,
Application I/O interface, Kernel I/O subsystem, Streams, Performance.
UNIT V CASE STUDY 9
Linux System - Design Principles, Kernel Modules, Process Management, Scheduling, Memory
Management, Input-Output Management, File System, Inter-process Communication; Mobile OS -
iOS and Android - Architecture and SDK Framework, Media Layer, Services Layer, Core OS
Layer, File System.
TOTAL : 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Analyze various scheduling algorithms.
 Understand deadlock, prevention and avoidance algorithms.
 Compare and contrast various memory management schemes.
 Understand the functionality of file systems.
 Perform administrative tasks on Linux Servers.
 Compare iOS and Android Operating Systems.
TEXT BOOK :
1. Abraham Silberschatz, Peter Baer Galvin and Greg Gagne, “Operating System Concepts”,
9th
Edition, John Wiley and Sons Inc., 2012.
REFERENCES :
1. Ramaz Elmasri, A. Gil Carrick, David Levine, “Operating Systems – A Spiral Approach”,
Tata McGraw Hill Edition, 2010.
2. Achyut S.Godbole, Atul Kahate, “Operating Systems”, McGraw Hill Education, 2016.
3. Andrew S. Tanenbaum, “Modern Operating Systems”, Second Edition, Pearson
Education, 2004.
4. Gary Nutt, “Operating Systems”, Third Edition, Pearson Education, 2004.
5. Harvey M. Deitel, “Operating Systems”, Third Edition, Pearson Education, 2004.
6. Daniel P Bovet and Marco Cesati, “Understanding the Linux kernel”, 3rd edition, O’Reilly,
2005.
7. Neil Smyth, “iPhone iOS 4 Development Essentials – Xcode”, Fourth Edition, Payload media,
2011.
CS8494 SOFTWARE ENGINEERING L T P C
3 0 0 3
OBJECTIVES:
 To understand the phases in a software project
 To understand fundamental concepts of requirements engineering and Analysis Modeling.
 To understand the various software design methodologies
 To learn various testing and maintenance measures
UNIT I SOFTWARE PROCESS AND AGILE DEVELOPMENT 9
Introduction to Software Engineering, Software Process, Perspective and Specialized Process
Models –Introduction to Agility-Agile process-Extreme programming-XP Process.
56
UNIT II REQUIREMENTS ANALYSIS AND SPECIFICATION 9
Software Requirements: Functional and Non-Functional, User requirements, System requirements,
Software Requirements Document – Requirement Engineering Process: Feasibility Studies,
Requirements elicitation and analysis, requirements validation, requirements management-
Classical analysis: Structured system Analysis, Petri Nets- Data Dictionary.
UNIT III SOFTWARE DESIGN 9
Design process – Design Concepts-Design Model– Design Heuristic – Architectural Design -
Architectural styles, Architectural Design, Architectural Mapping using Data Flow- User Interface
Design: Interface analysis, Interface Design –Component level Design: Designing Class based
components, traditional Components.
UNIT IV TESTING AND MAINTENANCE 9
Software testing fundamentals-Internal and external views of Testing-white box testing - basis
path testing-control structure testing-black box testing- Regression Testing – Unit Testing –
Integration Testing – Validation Testing – System Testing And Debugging –Software
Implementation Techniques: Coding practices-Refactoring-Maintenance and Reengineering-BPR
model-Reengineering process model-Reverse and Forward Engineering.
UNIT V PROJECT MANAGEMENT
9
Software Project Management: Estimation – LOC, FP Based Estimation, Make/Buy Decision
COCOMO I & II Model – Project Scheduling – Scheduling, Earned Value Analysis Planning –
Project Plan, Planning Process, RFP Risk Management – Identification, Projection - Risk
Management-Risk Identification-RMMM Plan-CASE TOOLS
TOTAL :45 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Identify the key activities in managing a software project.
 Compare different process models.
 Concepts of requirements engineering and Analysis Modeling.
 Apply systematic procedure for software design and deployment.
 Compare and contrast the various testing and maintenance.
 Manage project schedule, estimate project cost and effort required.
TEXT BOOKS:
1. Roger S. Pressman, “Software Engineering – A Practitioner‟s Approach”, Seventh Edition, Mc
Graw-Hill International Edition, 2010.
2. Ian Sommerville, “Software Engineering”, 9th Edition, Pearson Education Asia, 2011.
REFERENCES:
1. Rajib Mall, “Fundamentals of Software Engineering”, Third Edition, PHI Learning
PrivateLimited, 2009.
2. Pankaj Jalote, “Software Engineering, A Precise Approach”, Wiley India, 2010.
3. Kelkar S.A., “Software Engineering”, Prentice Hall of India Pvt Ltd, 2007.
4. Stephen R.Schach, “Software Engineering”, Tata McGraw-Hill Publishing Company
Limited,2007.
5. http://nptel.ac.in/.
CS8481 DATABASE MANAGEMENT SYSTEMS LABORATORY L T P C
0 0 4 2
AIM:
The aim of this laboratory is to inculcate the abilities of applying the principles of the database
management systems. This course aims to prepare the students for projects where a proper
implementation of databases will be required.
57
OBJECTIVES:
 To understand data definitions and data manipulation commands
 To learn the use of nested and join queries
 To understand functions, procedures and procedural extensions of data bases
 To be familiar with the use of a front end tool
 To understand design and implementation of typical database applications
1. Data Definition Commands, Data Manipulation Commands for inserting, deleting, updating
and retrieving Tables and Transaction Control statements
2. Database Querying – Simple queries, Nested queries, Sub queries and Joins
3. Views, Sequences, Synonyms
4. Database Programming: Implicit and Explicit Cursors
5. Procedures and Functions
6. Triggers
7. Exception Handling
8. Database Design using ER modeling, normalization and Implementation for any application
9. Database Connectivity with Front End Tools
10. Case Study using real life database applications
TOTAL: 60 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Use typical data definitions and manipulation commands.
 Design applications to test Nested and Join Queries
 Implement simple applications that use Views
 Implement applications that require a Front-end Tool
 Critically analyze the use of Tables, Views, Functions and Procedures
CS8461 OPERATING SYSTEMS LABORATORY L T P C
0 0 4 2
OBJECTIVES
 To learn Unix commands and shell programming
 To implement various CPU Scheduling Algorithms
 To implement Process Creation and Inter Process Communication.
 To implement Deadlock Avoidance and Deadlock Detection Algorithms
 To implement Page Replacement Algorithms
 To implement File Organization and File Allocation Strategies
LIST OF EXPERIMENTS
1. Basics of UNIX commands
2. Write programs using the following system calls of UNIX operating system
fork, exec, getpid, exit, wait, close, stat, opendir, readdir
3. Write C programs to simulate UNIX commands like cp, ls, grep, etc.
4. Shell Programming
5. Write C programs to implement the various CPU Scheduling Algorithms
6. Implementation of Semaphores
7. Implementation of Shared memory and IPC
8. Bankers Algorithm for Deadlock Avoidance
9. Implementation of Deadlock Detection Algorithm
10. Write C program to implement Threading & Synchronization Applications
11. Implementation of the following Memory Allocation Methods for fixed partition
a) First Fit b) Worst Fit c) Best Fit
12. Implementation of Paging Technique of Memory Management
13. Implementation of the following Page Replacement Algorithms
a) FIFO b) LRU c) LFU
58
14. Implementation of the various File Organization Techniques
15. Implementation of the following File Allocation Strategies
a) Sequential b) Indexed c) Linked
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to
 Compare the performance of various CPU Scheduling Algorithms
 Implement Deadlock avoidance and Detection Algorithms
 Implement Semaphores
 Create processes and implement IPC
 Analyze the performance of the various Page Replacement Algorithms
 Implement File Organization and File Allocation Strategies
HS8461 ADVANCED READING AND WRITING
L T P C
0 0 2 1
OBJECTIVES:
• Strengthen the reading skills of students of engineering.
• Enhance their writing skills with specific reference to technical writing.
• Develop students’ critical thinking skills.
• Provide more opportunities to develop their project and proposal writing skills.
UNIT I
Reading - Strategies for effective reading-Use glosses and footnotes to aid reading
comprehension- Read and recognize different text types-Predicting content using photos and title
Writing-Plan before writing- Develop a paragraph: topic sentence, supporting sentences,
concluding sentence –Write a descriptive paragraph
UNIT II
Reading-Read for details-Use of graphic organizers to review and aid comprehension Writing-
State reasons and examples to support ideas in writing- Write a paragraph with reasons and
examples- Write an opinion paragraph
UNIT III
Reading- Understanding pronoun reference and use of connectors in a passage- speed reading
techniques-Writing- Elements of a good essay-Types of essays- descriptive-narrative- issue-
based-argumentative-analytical.
UNIT IV
Reading- Genre and Organization of Ideas- Writing- Email writing- visumes – Job application-
project writing-writing convincing proposals.
UNIT V
Reading- Critical reading and thinking- understanding how the text positions the reader- identify
Writing- Statement of Purpose- letter of recommendation- Vision statement
TOTAL: 30 PERIODS
OUTCOMES:
At the end of the course Learners will be able to:
 Write different types of essays.
 Write winning job applications.
59
 Read and evaluate texts critically.
 Display critical thinking in various professional contexts.
TEXT BOOKS:
1. Gramer F. Margot and Colin S. Ward Reading and Writing (Level 3) Oxford University
Press: Oxford, 2011
2. Debra Daise, CharlNorloff, and Paul Carne Reading and Writing (Level 4) Oxford
University Press: Oxford, 2011
REFERENCES:
1. Davis, Jason and Rhonda LIss.Effective Academic Writing (Level 3) Oxford University
Press: Oxford, 2006
2. E. Suresh Kumar and et al. Enriching Speaking and Writing Skills. Second Edition.
Orient Black swan: Hyderabad, 2012
3. Withrow, Jeans and et al. Inspired to Write. Readings and Tasks to develop writing
skills. Cambridge University Press: Cambridge, 2004
4. Goatly, Andrew. Critical Reading and Writing. Routledge: United States of America,
2000
5. Petelin, Roslyn and Marsh Durham. The Professional Writing Guide: Knowing Well
and Knowing Why. Business & Professional Publishing: Australia, 2004
MA8551 ALGEBRA AND NUMBER THEORY L T P C
4 0 0 4
OBJECTIVES:
 To introduce the basic notions of groups, rings, fields which will then be used to solve
related problems.
 To introduce and apply the concepts of rings, finite fields and polynomials.
 To understand the basic concepts in number theory
 To examine the key questions in the Theory of Numbers.
 To give an integrated approach to number theory and abstract algebra, and provide a firm
basis for further reading and study in the subject.
UNIT I GROUPS AND RINGS 12
Groups : Definition - Properties - Homomorphism - Isomorphism - Cyclic groups - Cosets -
Lagrange's theorem. Rings: Definition - Sub rings - Integral domain - Field - Integer modulo n -
Ring homomorphism.
UNIT II FINITE FIELDS AND POLYNOMIALS 12
Rings - Polynomial rings - Irreducible polynomials over finite fields - Factorization of polynomials
over finite fields.
UNIT III DIVISIBILITY THEORY AND CANONICAL DECOMPOSITIONS 12
Division algorithm – Base - b representations – Number patterns – Prime and composite numbers
– GCD – Euclidean algorithm – Fundamental theorem of arithmetic – LCM.
UNIT IV DIOPHANTINE EQUATIONS AND CONGRUENCES 12
Linear Diophantine equations – Congruence’s – Linear Congruence’s - Applications: Divisibility
tests - Modular exponentiation-Chinese remainder theorem – 2 x 2 linear systems.
UNIT V CLASSICAL THEOREMS AND MULTIPLICATIVE FUNCTIONS 12
Wilson’s theorem – Fermat’s little theorem – Euler’s theorem – Euler’s Phi functions – Tau and
Sigma functions.
TOTAL: 60 PERIODS
60
OUTCOMES:
Upon successful completion of the course, students should be able to:
 Apply the basic notions of groups, rings, fields which will then be used to solve related
problems.
 Explain the fundamental concepts of advanced algebra and their role in modern
mathematics and applied contexts.
 Demonstrate accurate and efficient use of advanced algebraic techniques.
 Demonstrate their mastery by solving non - trivial problems related to the concepts, and by
proving simple theorems about the, statements proven by the text.
 Apply integrated approach to number theory and abstract algebra, and provide a firm
basis for further reading and study in the subject.
TEXTBOOKS:
1. Grimaldi, R.P and Ramana, B.V., "Discrete and Combinatorial Mathematics", Pearson
Education, 5th
Edition, New Delhi, 2007.
2. Koshy, T., “Elementary Number Theory with Applications”, Elsevier Publications,
New Delhi, 2002.
REFERENCES:
1. Lidl, R. and Pitz, G, "Applied Abstract Algebra", Springer Verlag, New Delhi, 2nd
Edition, 2006.
2. Niven, I., Zuckerman.H.S., and Montgomery, H.L., “An Introduction to Theory of Numbers”,
John Wiley and Sons , Singapore, 2004.
3. San Ling and Chaoping Xing, “Coding Theory – A first Course”, Cambridge Publications,
Cambridge, 2004.
CS8591 COMPUTER NETWORKS L T P C
3 0 0 3
OBJECTIVES:
• To understand the protocol layering and physical level communication.
• To analyze the performance of a network.
• To understand the various components required to build different networks.
• To learn the functions of network layer and the various routing protocols.
• To familiarize the functions and protocols of the Transport layer.
UNIT I INTRODUCTION AND PHYSICAL LAYER 9
Networks – Network Types – Protocol Layering – TCP/IP Protocol suite – OSI Model –
Physical Layer: Performance – Transmission media – Switching – Circuit-switched
Networks – Packet Switching.
UNIT II DATA-LINK LAYER & MEDIA ACCESS 9
Introduction – Link-Layer Addressing – DLC Services – Data-Link Layer Protocols – HDLC
– PPP - Media Access Control - Wired LANs: Ethernet - Wireless LANs – Introduction –
IEEE 802.11, Bluetooth – Connecting Devices.
UNIT III NETWORK LAYER
9
Network Layer Services – Packet switching – Performance – IPV4 Addresses – Forwarding
of IP Packets - Network Layer Protocols: IP, ICMP v4 – Unicast Routing Algorithms –
Protocols – Multicasting Basics – IPV6 Addressing – IPV6 Protocol.
UNIT IV TRANSPORT LAYER 9
Introduction – Transport Layer Protocols – Services – Port Numbers – User Datagram
Protocol – Transmission Control Protocol – SCTP.
UNIT V APPLICATION LAYER 9
WWW and HTTP – FTP – Email –Telnet –SSH – DNS – SNMP.
61
TOTAL : 45 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Understand the basic layers and its functions in computer networks.
 Evaluate the performance of a network.
 Understand the basics of how data flows from one node to another.
 Analyze and design routing algorithms.
 Design protocols for various functions in the network.
 Understand the working of various application layer protocols.
TEXT BOOK:
1. Behrouz A. Forouzan, Data Communications and Networking, Fifth Edition TMH,
2013.
REFERENCES
1. Larry L. Peterson, Bruce S. Davie, Computer Networks: A Systems Approach, Fifth
Edition, Morgan Kaufmann Publishers Inc., 2012.
2. William Stallings, Data and Computer Communications, Tenth Edition, Pearson
Education, 2013.
3. Nader F. Mir, Computer and Communication Networks, Second Edition, Prentice
Hall, 2014.
4. Ying-Dar Lin, Ren-Hung Hwang and Fred Baker, Computer Networks: An Open
Source Approach, McGraw Hill Publisher, 2011.
5. James F. Kurose, Keith W. Ross, Computer Networking, A Top-Down Approach
Featuring the Internet, Sixth Edition, Pearson Education, 2013.
EC8691 MICROPROCESSORS AND MICROCONTROLLERS L T P C
3 0 0 3
OBJECTIVES:
 To understand the Architecture of 8086 microprocessor.
 To learn the design aspects of I/O and Memory Interfacing circuits.
 To interface microprocessors with supporting chips.
 To study the Architecture of 8051 microcontroller.
 To design a microcontroller based system
UNIT I THE 8086 MICROPROCESSOR 9
Introduction to 8086 – Microprocessor architecture – Addressing modes - Instruction set and
assembler directives – Assembly language programming – Modular Programming - Linking and
Relocation - Stacks - Procedures – Macros – Interrupts and interrupt service routines – Byte and
String Manipulation.
UNIT II 8086 SYSTEM BUS STRUCTURE 9
8086 signals – Basic configurations – System bus timing –System design using 8086 – I/O
programming – Introduction to Multiprogramming – System Bus Structure – Multiprocessor
configurations – Coprocessor, Closely coupled and loosely Coupled configurations – Introduction
to advanced processors.
UNIT III I/O INTERFACING 9
Memory Interfacing and I/O interfacing - Parallel communication interface – Serial communication
interface – D/A and A/D Interface - Timer – Keyboard /display controller – Interrupt controller –
DMA controller – Programming and applications Case studies: Traffic Light control, LED display ,
LCD display, Keyboard display interface and Alarm Controller.
UNIT IV MICROCONTROLLER 9
Architecture of 8051 – Special Function Registers(SFRs) - I/O Pins Ports and Circuits - Instruction
set - Addressing modes - Assembly language programming.
62
UNIT V INTERFACING MICROCONTROLLER 9
Programming 8051 Timers - Serial Port Programming - Interrupts Programming – LCD &
Keyboard Interfacing - ADC, DAC & Sensor Interfacing - External Memory Interface- Stepper
Motor and Waveform generation - Comparison of Microprocessor, Microcontroller, PIC and ARM
processors
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Understand and execute programs based on 8086 microprocessor.
 Design Memory Interfacing circuits.
 Design and interface I/O circuits.
 Design and implement 8051 microcontroller based systems.
TEXT BOOKS:
1. Yu-Cheng Liu, Glenn A.Gibson, “Microcomputer Systems: The 8086 / 8088 Family -
Architecture, Programming and Design”, Second Edition, Prentice Hall of India, 2007.
(UNIT I- III)
2. Mohamed Ali Mazidi, Janice Gillispie Mazidi, Rolin McKinlay, “The 8051 Microcontroller and
Embedded Systems: Using Assembly and C”, Second Edition, Pearson education, 2011.
(UNIT IV-V)
REFERENCES:
1. Doughlas V.Hall, “Microprocessors and Interfacing, Programming and
Hardware”,TMH,2012
2. A.K.Ray,K.M.Bhurchandi,”Advanced Microprocessors and Peripherals “3rd
edition, Tata
McGrawHill,2012
CS8501 THEORY OF COMPUTATION L T P C
3 0 0 3
OBJECTIVES:
 To understand the language hierarchy
 To construct automata for any given pattern and find its equivalent regular
expressions
 To design a context free grammar for any given language
 To understand Turing machines and their capability
 To understand undecidable problems and NP class problems
UNIT I AUTOMATA FUNDAMENTALS 9
Introduction to formal proof – Additional forms of Proof – Inductive Proofs –Finite Automata –
Deterministic Finite Automata – Non-deterministic Finite Automata – Finite Automata with Epsilon
Transitions
UNIT II REGULAR EXPRESSIONS AND LANGUAGES 9
Regular Expressions – FA and Regular Expressions – Proving Languages not to be regular –
Closure Properties of Regular Languages – Equivalence and Minimization of Automata.
UNIT III CONTEXT FREE GRAMMAR AND LANGUAGES 9
CFG – Parse Trees – Ambiguity in Grammars and Languages – Definition of the Pushdown
Automata – Languages of a Pushdown Automata – Equivalence of Pushdown Automata and CFG,
Deterministic Pushdown Automata.
63
UNIT IV PROPERTIES OF CONTEXT FREE LANGUAGES 9
Normal Forms for CFG – Pumping Lemma for CFL – Closure Properties of CFL – Turing Machines
– Programming Techniques for TM.
UNIT V UNDECIDABILITY 9
Non Recursive Enumerable (RE) Language – Undecidable Problem with RE – Undecidable
Problems about TM – Post’s Correspondence Problem, The Class P and NP.
TOTAL :45PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Construct automata, regular expression for any pattern.
 Write Context free grammar for any construct.
 Design Turing machines for any language.
 Propose computation solutions using Turing machines.
 Derive whether a problem is decidable or not.
TEXT BOOK:
1. J.E.Hopcroft, R.Motwani and J.D Ullman, “Introduction to Automata Theory, Languages and
Computations”, Second Edition, Pearson Education, 2003.
REFERENCES:
1. H.R.Lewis and C.H.Papadimitriou, “Elements of the theory of Computation”, Second Edition,
PHI, 2003.
2. J.Martin, “Introduction to Languages and the Theory of Computation”, Third Edition, TMH, 2003.
3. Micheal Sipser, “Introduction of the Theory and Computation”, Thomson Brokecole, 1997.
CS8592 OBJECT ORIENTED ANALYSIS AND DESIGN L T P C
3 0 0 3
OBJECTIVES:
 To understand the fundamentals of object modeling
 To understand and differentiate Unified Process from other approaches.
 To design with static UML diagrams.
 To design with the UML dynamic and implementation diagrams.
 To improve the software design with design patterns.
 To test the software against its requirements specification
UNIT I UNIFIED PROCESS AND USE CASE DIAGRAMS 9
Introduction to OOAD with OO Basics - Unified Process – UML diagrams – Use Case –Case study
– the Next Gen POS system, Inception -Use case Modelling – Relating Use cases –
include, extend and generalization – When to use Use-cases
UNIT II STATIC UML DIAGRAMS 9
Class Diagram–– Elaboration – Domain Model – Finding conceptual classes and description
classes – Associations – Attributes – Domain model refinement – Finding conceptual class
Hierarchies – Aggregation and Composition - Relationship between sequence diagrams and use
cases – When to use Class Diagrams
UNIT III DYNAMIC AND IMPLEMENTATION UML DIAGRAMS 9
Dynamic Diagrams – UML interaction diagrams - System sequence diagram – Collaboration
diagram – When to use Communication Diagrams - State machine diagram and Modelling –When
to use State Diagrams - Activity diagram – When to use activity diagrams
64
Implementation Diagrams - UML package diagram - When to use package diagrams -
Component and Deployment Diagrams – When to use Component and Deployment diagrams
UNIT IV DESIGN PATTERNS 9
GRASP: Designing objects with responsibilities – Creator – Information expert – Low Coupling –
High Cohesion – Controller
Design Patterns – creational – factory method – structural – Bridge – Adapter – behavioural –
Strategy – observer –Applying GoF design patterns – Mapping design to code
UNIT V TESTING 9
Object Oriented Methodologies – Software Quality Assurance – Impact of object orientation on
Testing – Develop Test Cases and Test Plans
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students will be able to:
 Express software design with UML diagrams
 Design software applications using OO concepts.
 Identify various scenarios based on software requirements
 Transform UML based software design into pattern based design using design patterns
 Understand the various testing methodologies for OO software
TEXT BOOKS:
1. Craig Larman, “Applying UML and Patterns: An Introduction to Object-Oriented Analysis and
Design and Iterative Development”, Third Edition, Pearson Education, 2005.
2. Ali Bahrami - Object Oriented Systems Development - McGraw Hill International Edition - 1999
REFERENCES:
1. Erich Gamma, a n d Richard Helm, Ralph Johnson, John Vlissides, “Design patterns: Elements
of Reusable Object-Oriented Software”, Addison-Wesley, 1995.
2. Martin Fowler, “UML Distilled: A Brief Guide to the Standard Object Modeling Language”,
Third edition, Addison Wesley, 2003.
EC8681 MICROPROCESSORS AND MICROCONTROLLERS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To Introduce ALP concepts, features and Coding methods
 Write ALP for arithmetic and logical operations in 8086 and 8051
 Differentiate Serial and Parallel Interface
 Interface different I/Os with Microprocessors
 Be familiar with MASM
LIST OF EXPERIMENTS:
8086 Programs using kits and MASM
1. Basic arithmetic and Logical operations
2. Move a data block without overlap
3. Code conversion, decimal arithmetic and Matrix operations.
4. Floating point operations, string manipulations, sorting and searching
5. Password checking, Print RAM size and system date
6. Counters and Time Delay
Peripherals and Interfacing Experiments
7. Traffic light controller
8. Stepper motor control
65
9. Digital clock
10. Key board and Display
11. Printer status
12. Serial interface and Parallel interface
13. A/D and D/A interface and Waveform Generation
8051 Experiments using kits and MASM
14. Basic arithmetic and Logical operations
15. Square and Cube program, Find 2’s complement of a number
16. Unpacked BCD to ASCII
TOTAL: 60 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Write ALP Programmes for fixed and Floating Point and Arithmetic operations
 Interface different I/Os with processor
 Generate waveforms using Microprocessors
 Execute Programs in 8051
 Explain the difference between simulator and Emulator
LAB EQUIPMENT FOR A BATCH OF 30 STUDENTS:
HARDWARE:
8086 development kits - 30 nos
Interfacing Units - Each 10 nos
Microcontroller - 30 nos
SOFTWARE:
Intel Desktop Systems with MASM - 30 nos
8086 Assembler
8051 Cross Assembler
CS8582 OBJECT ORIENTED ANALYSIS AND DESIGN LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To capture the requirements specification for an intended software system
 To draw the UML diagrams for the given specification
 To map the design properly to code
 To test the software system thoroughly for all scenarios
 To improve the design by applying appropriate design patterns.
Draw standard UML diagrams using an UML modeling tool for a given case study and map design
to code and implement a 3 layered architecture. Test the developed code and validate whether the
SRS is satisfied.
1. Identify a software system that needs to be developed.
2. Document the Software Requirements Specification (SRS) for the identified system.
3. Identify use cases and develop the Use Case model.
4. Identify the conceptual classes and develop a Domain Model and also derive a Class
Diagram from that.
5. Using the identified scenarios, find the interaction between objects and represent them
using
UML Sequence and Collaboration Diagrams
6. Draw relevant State Chart and Activity Diagrams for the same system.
7. Implement the system as per the detailed design
8. Test the software system for all the scenarios identified as per the usecase diagram
9. Improve the reusability and maintainability of the software system by applying appropriate
66
design patterns.
10. Implement the modified system and test it for various scenarios
SUGGESTED DOMAINS FOR MINI-PROJECT:
1. Passport automation system.
2. Book bank
3. Exam registration
4. Stock maintenance system.
5. Online course reservation system
6. Airline/Railway reservation system
7. Software personnel management system
8. Credit card processing
9. e-book management system
10. Recruitment system
11. Foreign trading system
12. Conference management system
13. BPO management system
14. Library management system
15. Student information system
TOTAL: 60 PERIODS
OUTCOMES:
Upon completion of this course, the students will be able to:
 Perform OO analysis and design for a given problem specification.
 Identify and map basic software requirements in UML mapping.
 Improve the software quality using design patterns and to explain the rationale behind
applying specific design patterns
 Test the compliance of the software with the SRS.
HARDWARE REQUIREMENTS
Standard PC
SOFTWARE REQUIREMENTS
1. Windows 7 or higher
2. ArgoUML that supports UML 1.4 and higher
3. Selenium, JUnit or Apache JMeter
CS8581 NETWORKS LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To learn and use network commands.
 To learn socket programming.
 To implement and analyze various network protocols.
 To learn and use simulation tools.
 To use simulation tools to analyze the performance of various network protocols.
LIST OF EXPERIMENTS
1. Learn to use commands like tcpdump, netstat, ifconfig, nslookup and traceroute. Capture
ping and traceroute PDUs using a network protocol analyzer and examine.
2. Write a HTTP web client program to download a web page using TCP sockets.
3. Applications using TCP sockets like:
 Echo client and echo server
 Chat
 File Transfer
67
4. Simulation of DNS using UDP sockets.
5. Write a code simulating ARP /RARP protocols.
6. Study of Network simulator (NS) and Simulation of Congestion Control Algorithms using
NS.
7. Study of TCP/UDP performance using Simulation tool.
8. Simulation of Distance Vector/ Link State Routing algorithm.
9. Performance evaluation of Routing protocols using Simulation tool.
10. Simulation of error correction code (like CRC).
TOTAL: 60 PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able to:
 Implement various protocols using TCP and UDP.
 Compare the performance of different transport layer protocols.
 Use simulation tools to analyze the performance of various network protocols.
 Analyze various routing algorithms.
 Implement error correction codes.
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS:
LABORATORY REQUIREMENT FOR BATCH OF 30 STUDENTS:
HARDWARE:
1. Standalone desktops 30 Nos
SOFTWARE:
1. C / C++ / Java / Python / Equivalent Compiler 30
2. Network simulator like NS2/Glomosim/OPNET/ Packet Tracer / Equivalent
CS8651 INTERNET PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To understand different Internet Technologies.
 To learn java-specific web services architecture
UNIT I WEBSITE BASICS, HTML 5, CSS 3, WEB 2.0 9
Web Essentials: Clients, Servers and Communication – The Internet – Basic Internet
protocols – World wide web – HTTP Request Message – HTTP Response Message – Web
Clients – Web Servers – HTML5 – Tables – Lists – Image – HTML5 control elements –
Semantic elements – Drag and Drop – Audio – Video controls - CSS3 – Inline, embedded
and external style sheets – Rule cascading – Inheritance – Backgrounds – Border Images –
Colors – Shadows – Text – Transformations – Transitions – Animations.
UNIT II CLIENT SIDE PROGRAMMING 9
Java Script: An introduction to JavaScript–JavaScript DOM Model-Date and Objects,-
Regular Expressions- Exception Handling-Validation-Built-in objects-Event Handling-
DHTML with JavaScript- JSON introduction – Syntax – Function Files – Http Request –
SQL.
UNIT III SERVER SIDE PROGRAMMING 9
Servlets: Java Servlet Architecture- Servlet Life Cycle- Form GET and POST actions-
Session Handling- Understanding Cookies- Installing and Configuring Apache Tomcat Web
Server- DATABASE CONNECTIVITY: JDBC perspectives, JDBC program example - JSP:
Understanding Java Server Pages-JSP Standard Tag Library (JSTL)-Creating HTML forms
by embedding JSP code.
68
UNIT IV PHP and XML 9
An introduction to PHP: PHP- Using PHP- Variables- Program control- Built-in functions-
Form Validation- Regular Expressions - File handling – Cookies - Connecting to Database.
XML: Basic XML- Document Type Definition- XML Schema DOM and Presenting XML, XML
Parsers and Validation, XSL and XSLT Transformation, News Feed (RSS and ATOM).
UNIT V INTRODUCTION TO AJAX and WEB SERVICES 9
AJAX: Ajax Client Server Architecture-XML Http Request Object-Call Back Methods; Web
Services: Introduction- Java web services Basics – Creating, Publishing, Testing and
Describing a Web services (WSDL)-Consuming a web service, Database Driven web
service from an application –SOAP.
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Construct a basic website using HTML and Cascading Style Sheets.
 Build dynamic web page with validation using Java Script objects and by applying
different event handling mechanisms.
 Develop server side programs using Servlets and JSP.
 Construct simple web pages in PHP and to represent data in XML format.
 Use AJAX and web services to develop interactive web applications
TEXT BOOK:
1. Deitel and Deitel and Nieto, “Internet and World Wide Web - How to Program”,
Prentice Hall, 5th Edition, 2011.
REFERENCES:
1. Stephen Wynkoop and John Burke “Running a Perfect Website”, QUE, 2nd
Edition,1999.
2. Chris Bates, Web Programming – Building Intranet Applications, 3rd Edition, Wiley
Publications, 2009.
3. Jeffrey C and Jackson, “Web Technologies A Computer Science Perspective”,
Pearson Education, 2011.
4. Gopalan N.P. and Akilandeswari J., “Web Technology”, Prentice Hall of India, 2011.
5. UttamK.Roy, “Web Technologies”, Oxford University Press, 2011.
CS8691 ARTIFICIAL INTELLIGENCE L T P C
3 0 0 3
OBJECTIVES:
 To understand the various characteristics of Intelligent agents
 To learn the different search strategies in AI
 To learn to represent knowledge in solving AI problems
 To understand the different ways of designing software agents
 To know about the various applications of AI.
UNIT I INTRODUCTION 9
Introduction–Definition - Future of Artificial Intelligence – Characteristics of Intelligent Agents–
Typical Intelligent Agents – Problem Solving Approach to Typical AI problems.
69
UNIT II PROBLEM SOLVING METHODS 9
Problem solving Methods - Search Strategies- Uninformed - Informed - Heuristics - Local Search
Algorithms and Optimization Problems - Searching with Partial Observations - Constraint
Satisfaction Problems – Constraint Propagation - Backtracking Search - Game Playing - Optimal
Decisions in Games – Alpha - Beta Pruning - Stochastic Games
UNIT III KNOWLEDGE REPRESENTATION 9
First Order Predicate Logic – Prolog Programming – Unification – Forward Chaining-Backward
Chaining – Resolution – Knowledge Representation - Ontological Engineering-Categories and
Objects – Events - Mental Events and Mental Objects - Reasoning Systems for Categories -
Reasoning with Default Information
UNIT IV SOFTWARE AGENTS 9
Architecture for Intelligent Agents – Agent communication – Negotiation and Bargaining –
Argumentation among Agents – Trust and Reputation in Multi-agent systems.
UNIT V APPLICATIONS 9
AI applications – Language Models – Information Retrieval- Information Extraction – Natural
Language Processing - Machine Translation – Speech Recognition – Robot – Hardware –
Perception – Planning – Moving
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Use appropriate search algorithms for any AI problem
 Represent a problem using first order and predicate logic
 Provide the apt agent strategy to solve a given problem
 Design software agents to solve a problem
 Design applications for NLP that use Artificial Intelligence.
TEXT BOOKS:
1 S. Russell and P. Norvig, "Artificial Intelligence: A Modern Approach”, Prentice Hall, Third
Edition, 2009.
2 I. Bratko, “Prolog: Programming for Artificial Intelligence”, Fourth edition, Addison-Wesley
Educational Publishers Inc., 2011.
REFERENCES:
1. M. Tim Jones, “Artificial Intelligence: A Systems Approach(Computer Science)”, Jones
and Bartlett Publishers, Inc.; First Edition, 2008
2. Nils J. Nilsson, “The Quest for Artificial Intelligence”, Cambridge University Press,
2009.
3. William F. Clocksin and Christopher S. Mellish,” Programming in Prolog: Using the ISO
Standard”, Fifth Edition, Springer, 2003.
4. Gerhard Weiss, “Multi Agent Systems”, Second Edition, MIT Press, 2013.
5. David L. Poole and Alan K. Mackworth, “Artificial Intelligence: Foundations of
Computational Agents”, Cambridge University Press, 2010.
70
CS8601 MOBILE COMPUTING L T P C
3 0 0 3
OBJECTIVES:
 To understand the basic concepts of mobile computing.
 To learn the basics of mobile telecommunication system .
 To be familiar with the network layer protocols and Ad-Hoc networks.
 To know the basis of transport and application layer protocols.
 To gain knowledge about different mobile platforms and application development.
UNIT I INTRODUCTION 9
Introduction to Mobile Computing – Applications of Mobile Computing- Generations of
Mobile Communication Technologies- Multiplexing – Spread spectrum -MAC Protocols –
SDMA- TDMA- FDMA- CDMA
UNIT II MOBILE TELECOMMUNICATION SYSTEM 9
Introduction to Cellular Systems - GSM – Services & Architecture – Protocols – Connection
Establishment – Frequency Allocation – Routing – Mobility Management – Security – GPRS-
UMTS – Architecture – Handover - Security
UNIT III MOBILE NETWORK LAYER 9
Mobile IP – DHCP – AdHoc– Proactive protocol-DSDV, Reactive Routing Protocols – DSR,
AODV , Hybrid routing –ZRP, Multicast Routing- ODMRP, Vehicular Ad Hoc networks
( VANET) –MANET Vs VANET – Security.
UNIT IV MOBILE TRANSPORT AND APPLICATION LAYER 9
Mobile TCP– WAP – Architecture – WDP – WTLS – WTP –WSP – WAE – WTA Architecture
– WML
UNIT V MOBILE PLATFORMS AND APPLICATIONS 9
Mobile Device Operating Systems – Special Constraints & Requirements – Commercial
Mobile Operating Systems – Software Development Kit: iOS, Android, BlackBerry, Windows
Phone – MCommerce – Structure – Pros & Cons – Mobile Payment System – Security
Issues
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Explain the basics of mobile telecommunication systems
 Illustrate the generations of telecommunication systems in wireless networks
 Determine the functionality of MAC, network layer and Identify a routing protocol for a
given Ad hoc network
 Explain the functionality of Transport and Application layers
 Develop a mobile application using android/blackberry/ios/Windows SDK
TEXT BOOKS:
1. Jochen Schiller, “Mobile Communications”, PHI, Second Edition, 2003.
2. Prasant Kumar Pattnaik, Rajib Mall, “Fundamentals of Mobile Computing”, PHI
Learning Pvt.Ltd, New Delhi – 2012
REFERENCES
1. Dharma Prakash Agarval, Qing and An Zeng, "Introduction to Wireless and Mobile
systems",Thomson Asia Pvt Ltd, 2005.
2. Uwe Hansmann, Lothar Merk, Martin S. Nicklons and Thomas Stober, “Principles of
Mobile Computing”, Springer, 2003.
3. William.C.Y.Lee,“Mobile Cellular Telecommunications-Analog and Digital Systems”,
Second Edition,TataMcGraw Hill Edition ,2006.
4. C.K.Toh, “AdHoc Mobile Wireless Networks”, First Edition, Pearson Education, 2002.
71
5. Android Developers : http://developer.android.com/index.html
6. Apple Developer : https://developer.apple.com/
7. Windows Phone DevCenter : http://developer.windowsphone.com
8. BlackBerry Developer : http://developer.blackberry.com
CS8602 COMPILER DESIGN L T P C
3 0 2 4
OBJECTIVES:
 To learn the various phases of compiler.
 To learn the various parsing techniques.
 To understand intermediate code generation and run-time environment.
 To learn to implement front-end of the compiler.
 To learn to implement code generator.
UNIT I INTRODUCTION TO COMPILERS 9
Structure of a compiler – Lexical Analysis – Role of Lexical Analyzer – Input Buffering –
Specification of Tokens – Recognition of Tokens – Lex – Finite Automata – Regular Expressions
to Automata – Minimizing DFA.
UNIT II SYNTAX ANALYSIS 12
Role of Parser – Grammars – Error Handling – Context-free grammars – Writing a grammar –
Top Down Parsing - General Strategies Recursive Descent Parser Predictive Parser-LL(1)
Parser-Shift Reduce Parser-LR Parser-LR (0)Item Construction of SLR Parsing Table -
Introduction to LALR Parser - Error Handling and Recovery in Syntax Analyzer-YACC.
UNIT III INTERMEDIATE CODE GENERATION 8
Syntax Directed Definitions, Evaluation Orders for Syntax Directed Definitions, Intermediate
Languages: Syntax Tree, Three Address Code, Types and Declarations, Translation of
Expressions, Type Checking.
UNIT IV RUN-TIME ENVIRONMENT AND CODE GENERATION 8
Storage Organization, Stack Allocation Space, Access to Non-local Data on the Stack, Heap
Management - Issues in Code Generation - Design of a simple Code Generator.
UNIT V CODE OPTIMIZATION 8
Principal Sources of Optimization – Peep-hole optimization - DAG- Optimization of Basic Blocks-
Global Data Flow Analysis - Efficient Data Flow Algorithm.
LIST OF EXPERIMENTS:
1. Develop a lexical analyzer to recognize a few patterns in C. (Ex. identifiers, constants,
comments, operators etc.). Create a symbol table, while recognizing identifiers.
2. Implement a Lexical Analyzer using Lex Tool
3. Implement an Arithmetic Calculator using LEX and YACC
4. Generate three address code for a simple program using LEX and YACC.
5. Implement simple code optimization techniques (Constant folding, Strength reduction and
Algebraic transformation)
6. Implement back-end of the compiler for which the three address code is given as input and
the 8086 assembly language code is produced as output.
PRACTICALS 30 PERIODS
THEORY 45 PERIODS
TOTAL : 75 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Understand the different phases of compiler.
 Design a lexical analyzer for a sample language.
72
 Apply different parsing algorithms to develop the parsers for a given grammar.
 Understand syntax-directed translation and run-time environment.
 Learn to implement code optimization techniques and a simple code generator.
 Design and implement a scanner and a parser using LEX and YACC tools.
TEXT BOOK:
1. Alfred V. Aho, Monica S. Lam, Ravi Sethi, Jeffrey D. Ullman, Compilers: Principles,
Techniques and Toolsǁ, Second Edition, Pearson Education, 2009.
REFERENCES
1. Randy Allen, Ken Kennedy, Optimizing Compilers for Modern Architectures: A
Dependence based Approach, Morgan Kaufmann Publishers, 2002.
2. Steven S. Muchnick, Advanced Compiler Design and Implementationǁ, Morgan Kaufmann
Publishers - Elsevier Science, India, Indian Reprint 2003.
3. Keith D Cooper and Linda Torczon, Engineering a Compilerǁ, Morgan Kaufmann
Publishers Elsevier Science, 2004.
4. V. Raghavan, Principles of Compiler Designǁ, Tata McGraw Hill Education Publishers,
2010.
5. Allen I. Holub, Compiler Design in Cǁ, Prentice-Hall Software Series, 1993.
CS8603 DISTRIBUTED SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
 To understand the foundations of distributed systems.
 To learn issues related to clock Synchronization and the need for global state in distributed
systems.
 To learn distributed mutual exclusion and deadlock detection algorithms.
 To understand the significance of agreement, fault tolerance and recovery protocols in
Distributed Systems.
 To learn the characteristics of peer-to-peer and distributed shared memory systems.
UNIT I INTRODUCTION 9
Introduction: Definition –Relation to computer system components –Motivation –Relation to
parallel systems – Message-passing systems versus shared memory systems –Primitives for
distributed communication –Synchronous versus asynchronous executions –Design issues and
challenges. A model of distributed computations: A distributed program –A model of distributed
executions –Models of communication networks –Global state – Cuts –Past and future cones of
an event –Models of process communications. Logical Time: A framework for a system of logical
clocks –Scalar time –Vector time – Physical clock synchronization: NTP.
UNIT II MESSAGE ORDERING & SNAPSHOTS 9
Message ordering and group communication: Message ordering paradigms –Asynchronous
execution with synchronous communication –Synchronous program order on an asynchronous
system –Group communication – Causal order (CO) - Total order. Global state and snapshot
recording algorithms: Introduction –System model and definitions –Snapshot algorithms for
FIFO channels
UNIT III DISTRIBUTED MUTEX & DEADLOCK 9
Distributed mutual exclusion algorithms: Introduction – Preliminaries – Lamport’s algorithm –
Ricart-Agrawala algorithm – Maekawa’s algorithm – Suzuki–Kasami’s broadcast algorithm.
Deadlock detection in distributed systems: Introduction – System model – Preliminaries –
Models of deadlocks – Knapp’s classification – Algorithms for the single resource model, the
AND model and the OR model.
73
UNIT IV RECOVERY & CONSENSUS 9
Checkpointing and rollback recovery: Introduction – Background and definitions – Issues in
failure recovery – Checkpoint-based recovery – Log-based rollback recovery – Coordinated
checkpointing algorithm – Algorithm for asynchronous checkpointing and recovery. Consensus
and agreement algorithms: Problem definition – Overview of results – Agreement in a failure –
free system – Agreement in synchronous systems with failures.
UNIT V P2P & DISTRIBUTED SHARED MEMORY 9
Peer-to-peer computing and overlay graphs: Introduction – Data indexing and overlays – Chord
– Content addressable networks – Tapestry. Distributed shared memory: Abstraction and
advantages – Memory consistency models –Shared memory Mutual Exclusion.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of this course, the students will be able to:
 Elucidate the foundations and issues of distributed systems
 Understand the various synchronization issues and global state for distributed systems.
 Understand the Mutual Exclusion and Deadlock detection algorithms in distributed systems
 Describe the agreement protocols and fault tolerance mechanisms in distributed systems.
 Describe the features of peer-to-peer and distributed shared memory systems
TEXT BOOKS:
1. Kshemkalyani, Ajay D., and Mukesh Singhal. Distributed computing: principles, algorithms,
and systems. Cambridge University Press, 2011.
2. George Coulouris, Jean Dollimore and Tim Kindberg, “Distributed Systems Concepts and
Design”, Fifth Edition, Pearson Education, 2012.
REFERENCES:
1. Pradeep K Sinha, "Distributed Operating Systems: Concepts and Design", Prentice Hall of
India, 2007.
2. Mukesh Singhal and Niranjan G. Shivaratri. Advanced concepts in operating systems.
McGraw-Hill, Inc., 1994.
3. Tanenbaum A.S., Van Steen M., “Distributed Systems: Principles and Paradigms”,
Pearson Education, 2007.
4. Liu M.L., “Distributed Computing, Principles and Applications”, Pearson Education, 2004.
5. Nancy A Lynch, “Distributed Algorithms”, Morgan Kaufman Publishers, USA, 2003.
CS8661 INTERNET PROGRAMMING LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To be familiar with Web page design using HTML/XML and style sheets
 To be exposed to creation of user interfaces using Java frames and applets.
 To learn to create dynamic web pages using server side scripting.
 To learn to write Client Server applications.
 To be familiar with the PHP programming.
 To be exposed to creating applications with AJAX
LIST OF EXPERIMENTS
1. Create a web page with the following using HTML
a. To embed a map in a web page
b. To fix the hot spots in that map
c. Show all the related information when the hot spots are clicked.
74
2. Create a web page with the following.
a. Cascading style sheets.
b. Embedded style sheets.
c. Inline style sheets. Use our college information for the web pages.
3. Validate the Registration, user login, user profile and payment by credit card pages using
JavaScript.
4. Write programs in Java using Servlets:
i. To invoke servlets from HTML forms
ii. Session tracking using hidden form fields and Session tracking for a hit count
5. Write programs in Java to create three-tier applications using servlets for conducting on-
line examination for displaying student mark list. Assume that student information is
available in a database which has been stored in a database server.
6. Install TOMCAT web server. Convert the static web pages of programs into dynamic web
pages using servlets (or JSP) and cookies. Hint: Users information (user id, password,
credit card number) would be stored in web.xml. Each user should have a separate
Shopping Cart.
7. Redo the previous task using JSP by converting the static web pages into dynamic web
pages. Create a database with user information and books information. The books
catalogue should be dynamically loaded from the database.
8. Create and save an XML document at the server, which contains 10 users Information.
Write a Program, which takes user Id as an input and returns the User details by taking
the user information from the XML document
9. i. Validate the form using PHP regular expression.
ii. PHP stores a form data into database.
10. Write a web service for finding what people think by asking 500 people’s opinion for any
consumer product.
TOTAL: 60PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able to:
 Construct Web pages using HTML/XML and style sheets.
 Build dynamic web pages with validation using Java Script objects and by applying
different event handling mechanisms.
 Develop dynamic web pages using server side scripting.
 Use PHP programming to develop web applications.
 Construct web applications using AJAX and web services.
SOFTWARE REQUIRED:
 Dream Weaver or Equivalent, MySQL or Equivalent, Apache Server, WAMP/XAMPP
CS8662 MOBILE APPLICATION DEVELOPMENT LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To understand the components and structure of mobile application development frameworks
for Android and windows OS based mobiles.
 To understand how to work with various mobile application development frameworks.
 To learn the basic and important design concepts and issues of development of mobile
applications.
 To understand the capabilities and limitations of mobile devices.
75
LIST OF EXPERIMENTS
1. Develop an application that uses GUI components, Font and Colours
2. Develop an application that uses Layout Managers and event listeners.
3. Write an application that draws basic graphical primitives on the screen.
4. Develop an application that makes use of databases.
5. Develop an application that makes use of Notification Manager
6. Implement an application that uses Multi-threading
7. Develop a native application that uses GPS location information
8. Implement an application that writes data to the SD card.
9. Implement an application that creates an alert upon receiving a message
10. Write a mobile application that makes use of RSS feed
11. Develop a mobile application to send an email.
12. Develop a Mobile application for simple needs (Mini Project)
TOTAL: 60 PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able to:
 Develop mobile applications using GUI and Layouts.
 Develop mobile applications using Event Listener.
 Develop mobile applications using Databases.
 Develop mobile applications using RSS Feed, Internal/External Storage, SMS, Multi-
threading and GPS.
 Analyze and discover own mobile app for simple needs.
REFERENCES:
1. Build Your Own Security Lab, Michael Gregg, Wiley India
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS
Standalone desktops with Windows or Android or
iOS or Equivalent Mobile Application Development
Tools with appropriate emulators and debuggers - 30 Nos.
HS8581 PROFESSIONAL COMMUNICATION L T P C
0 0 2 1
OBJECTIVES:
The course aims to:
 Enhance the Employability and Career Skills of students
 Orient the students towards grooming as a professional
 Make them Employable Graduates
 Develop their confidence and help them attend interviews successfully.
UNIT I
Introduction to Soft Skills-- Hard skills & soft skills - employability and career Skills—Grooming as a
professional with values—Time Management—General awareness of Current Affairs
UNIT II
Self-Introduction-organizing the material - Introducing oneself to the audience – introducing the topic –
answering questions – individual presentation practice–– presenting the visuals effectively – 5 minute
presentations
76
UNIT III
Introduction to Group Discussion— Participating in group discussions – understanding group dynamics
- brainstorming the topic -– questioning and clarifying –GD strategies- activities to improve GD skills
UNIT IV
Interview etiquette – dress code – body language – attending job interviews– telephone/skype
interview -one to one interview &panel interview – FAQs related to job interviews
UNIT V
Recognizing differences between groups and teams- managing time-managing stress- networking
professionally- respecting social protocols-understanding career management-developing a long-term
career plan-making career changes
TOTAL : 30 PERIODS
OUTCOMES:
At the end of the course Learners will be able to:
• Make effective presentations
• Participate confidently in Group Discussions.
• Attend job interviews and be successful in them.
• Develop adequate Soft Skills required for the workplace
Recommended Software
1. Open Source Software
2. Win English
REFERENCES:
1. Butterfield, Jeff Soft Skills for Everyone. Cengage Learning: New Delhi, 2015
2. E. Suresh Kumar et al. Communication for Professional Success. Orient Blackswan:
Hyderabad, 2015
3. Interact English Lab Manual for Undergraduate Students,. OrientBalckSwan: Hyderabad, 2016.
4. Raman, Meenakshi and Sangeeta Sharma. Professional Communication. Oxford University
Press: Oxford, 2014
5. S. Hariharanetal. Soft Skills. MJP Publishers: Chennai, 2010.
MG8591 PRINCIPLES OF MANAGEMENT L T P C
3 0 0 3
OBJECTIVES:
 To enable the students to study the evolution of Management, to study the functions and
principles of management and to learn the application of the principles in an organization .
UNIT I INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS 9
Definition of Management – Science or Art – Manager Vs Entrepreneur - types of managers -
managerial roles and skills – Evolution of Management – Scientific, human relations , system and
contingency approaches – Types of Business organization - Sole proprietorship, partnership,
company-public and private sector enterprises - Organization culture and Environment – Current
trends and issues in Management.
UNIT II PLANNING 9
Nature and purpose of planning – planning process – types of planning – objectives – setting
objectives – policies – Planning premises – Strategic Management – Planning Tools and
Techniques – Decision making steps and process.
UNIT III ORGANISING 9
Nature and purpose – Formal and informal organization – organization chart – organization
structure – types – Line and staff authority – departmentalization – delegation of authority –
77
centralization and decentralization – Job Design - Human Resource Management – HR Planning,
Recruitment, selection, Training and Development, Performance Management , Career planning
and management
UNIT IV DIRECTING 9
Foundations of individual and group behaviour – motivation – motivation theories – motivational
techniques – job satisfaction – job enrichment – leadership – types and theories of leadership –
communication – process of communication – barrier in communication – effective communication
–communication and IT.
UNIT V CONTROLLING 9
System and process of controlling – budgetary and non-budgetary control techniques – use of
computers and IT in Management control – Productivity problems and management – control and
performance – direct and preventive control – reporting.
TOTAL: 45 PERIODS
OUTCOMES:
 Upon completion of the course, students will be able to have clear understanding of
managerial functions like planning, organizing, staffing, leading & controlling and have same
basic knowledge on international aspect of management
TEXTBOOKS:
1. Stephen P. Robbins & Mary Coulter, “Management”, Prentice Hall (India) Pvt. Ltd., 10th
Edition,
2009.
2. JAF Stoner, Freeman R.E and Daniel R Gilbert “Management”, Pearson Education, 6th
Edition, 2004.
REFERENCES:
1. Stephen A. Robbins & David A. Decenzo & Mary Coulter, “Fundamentals of Management”
Pearson Education, 7th Edition, 2011.
2. Robert Kreitner & Mamata Mohapatra, “ Management”, Biztantra, 2008.
3. Harold Koontz & Heinz Weihrich “Essentials of management” Tata McGraw Hill,1998.
4. Tripathy PC & Reddy PN, “Principles of Management”, Tata McGraw Hill, 1999
CS8792 CRYPTOGRAPHY AND NETWORK SECURITY L T P C
3 0 0 3
OBJECTIVES:
 To understand Cryptography Theories, Algorithms and Systems.
 To understand necessary Approaches and Techniques to build protection
mechanisms in order to secure computer networks.
UNIT I INTRODUCTION 9
Security trends - Legal, Ethical and Professional Aspects of Security, Need for Security at
Multiple levels, Security Policies - Model of network security – Security attacks, services and
mechanisms – OSI security architecture – Classical encryption techniques: substitution
techniques, transposition techniques, steganography- Foundations of modern cryptography:
perfect security – information theory – product cryptosystem – cryptanalysis.
UNIT II SYMMETRIC KEY CRYPTOGRAPHY 9
MATHEMATICS OF SYMMETRIC KEY CRYPTOGRAPHY: Algebraic structures - Modular
arithmetic-Euclid‟s algorithm- Congruence and matrices - Groups, Rings, Fields- Finite
fields- SYMMETRIC KEY CIPHERS: SDES – Block cipher Principles of DES – Strength of
DES – Differential and linear cryptanalysis - Block cipher design principles – Block cipher
mode of operation – Evaluation criteria for AES – Advanced Encryption Standard - RC4 –
78
Key distribution.
UNIT III PUBLIC KEY CRYPTOGRAPHY 9
MATHEMATICS OF ASYMMETRIC KEY CRYPTOGRAPHY: Primes – Primality Testing –
Factorization – Euler’s totient function, Fermat’s and Euler’s Theorem - Chinese Remainder
Theorem – Exponentiation and logarithm - ASYMMETRIC KEY CIPHERS: RSA
cryptosystem – Key distribution – Key management – Diffie Hellman key exchange -
ElGamal cryptosystem – Elliptic curve arithmetic-Elliptic curve cryptography.
UNIT IV MESSAGE AUTHENTICATION AND INTEGRITY 9
Authentication requirement – Authentication function – MAC – Hash function – Security of
hash function and MAC – SHA –Digital signature and authentication protocols – DSS- Entity
Authentication: Biometrics, Passwords, Challenge Response protocols- Authentication
applications - Kerberos, X.509
UNIT V SECURITY PRACTICE AND SYSTEM SECURITY 9
Electronic Mail security – PGP, S/MIME – IP security – Web Security - SYSTEM
SECURITY: Intruders – Malicious software – viruses – Firewalls.
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Understand the fundamentals of networks security, security architecture, threats and
vulnerabilities
 Apply the different cryptographic operations of symmetric cryptographic algorithms
 Apply the different cryptographic operations of public key cryptography
 Apply the various Authentication schemes to simulate different applications.
 Understand various Security practices and System security standards
TEXT BOOK:
1. William Stallings, Cryptography and Network Security: Principles and Practice, PHI
3rd Edition, 2006.
REFERENCES:
1. C K Shyamala, N Harini and Dr. T R Padmanabhan: Cryptography and Network
Security, Wiley India Pvt.Ltd
2. BehrouzA.Foruzan, Cryptography and Network Security, Tata McGraw Hill 2007.
3. Charlie Kaufman, Radia Perlman, and Mike Speciner, Network Security: PRIVATE
Communication in a PUBLIC World, Prentice Hall, ISBN 0-13-046019-2
CS8791 CLOUD COMPUTING L T P C
3 0 0 3
OBJECTIVES:
 To understand the concept of cloud computing.
 To appreciate the evolution of cloud from the existing technologies.
 To have knowledge on the various issues in cloud computing.
 To be familiar with the lead players in cloud.
 To appreciate the emergence of cloud as the next generation computing paradigm.
UNIT I INTRODUCTION 9
Introduction to Cloud Computing – Definition of Cloud – Evolution of Cloud Computing –
Underlying Principles of Parallel and Distributed Computing – Cloud Characteristics – Elasticity in
Cloud – On-demand Provisioning.
79
UNIT II CLOUD ENABLING TECHNOLOGIES 10
Service Oriented Architecture – REST and Systems of Systems – Web Services – Publish-
Subscribe Model – Basics of Virtualization – Types of Virtualization – Implementation Levels of
Virtualization – Virtualization Structures – Tools and Mechanisms – Virtualization of CPU –
Memory – I/O Devices –Virtualization Support and Disaster Recovery.
UNIT III CLOUD ARCHITECTURE, SERVICES AND STORAGE 8
Layered Cloud Architecture Design – NIST Cloud Computing Reference Architecture – Public,
Private and Hybrid Clouds - laaS – PaaS – SaaS – Architectural Design Challenges – Cloud
Storage – Storage-as-a-Service – Advantages of Cloud Storage – Cloud Storage Providers – S3.
UNIT IV RESOURCE MANAGEMENT AND SECURITY IN CLOUD 10
Inter Cloud Resource Management – Resource Provisioning and Resource Provisioning Methods
– Global Exchange of Cloud Resources – Security Overview – Cloud Security Challenges –
Software-as-a-Service Security – Security Governance – Virtual Machine Security – IAM –
Security Standards.
UNIT V CLOUD TECHNOLOGIES AND ADVANCEMENTS 8
Hadoop – MapReduce – Virtual Box -- Google App Engine – Programming Environment for
Google App Engine –– Open Stack – Federation in the Cloud – Four Levels of Federation –
Federated Services and Applications – Future of Federation.
TOTAL: 45 PERIODS
OUTCOMES:
On Completion of the course, the students should be able to:
 Articulate the main concepts, key technologies, strengths and limitations of cloud
computing.
 Learn the key and enabling technologies that help in the development of cloud.
 Develop the ability to understand and use the architecture of compute and storage cloud,
service and delivery models.
 Explain the core issues of cloud computing such as resource management and security.
 Be able to install and use current cloud technologies.
 Evaluate and choose the appropriate technologies, algorithms and approaches for
implementation and use of cloud.
TEXT BOOKS:
1. Kai Hwang, Geoffrey C. Fox, Jack G. Dongarra, "Distributed and Cloud Computing, From
Parallel Processing to the Internet of Things", Morgan Kaufmann Publishers, 2012.
2. Rittinghouse, John W., and James F. Ransome, “Cloud Computing: Implementation,
Management and Security”, CRC Press, 2017.
REFERENCES:
1. Rajkumar Buyya, Christian Vecchiola, S. ThamaraiSelvi, “Mastering Cloud Computing”, Tata
Mcgraw Hill, 2013.
2. Toby Velte, Anthony Velte, Robert Elsenpeter, "Cloud Computing - A Practical Approach”, Tata
Mcgraw Hill, 2009.
3. George Reese, "Cloud Application Architectures: Building Applications and Infrastructure in the
Cloud: Transactional Systems for EC2 and Beyond (Theory in Practice)”, O'Reilly, 2009.
80
CS8711 CLOUD COMPUTING LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To develop web applications in cloud
 To learn the design and development process involved in creating a cloud based
application
 To learn to implement and use parallel programming using Hadoop
1. Install Virtualbox/VMware Workstation with different flavours of linux or windows OS on top
of windows7 or 8.
2. Install a C compiler in the virtual machine created using virtual box and execute Simple
Programs
3. Install Google App Engine. Create hello world app and other simple web applications using
python/java.
4. Use GAE launcher to launch the web applications.
5. Simulate a cloud scenario using CloudSim and run a scheduling algorithm that is not
present in CloudSim.
6. Find a procedure to transfer the files from one virtual machine to another virtual machine.
7. Find a procedure to launch virtual machine using trystack (Online Openstack Demo
Version)
8. Install Hadoop single node cluster and run simple applications like wordcount.
TOTAL : 60 PERIODS
OUTCOMES:
On completion of this course, the students will be able to:
 Configure various virtualization tools such as Virtual Box, VMware workstation.
 Design and deploy a web application in a PaaS environment.
 Learn how to simulate a cloud environment to implement new schedulers.
 Install and use a generic cloud environment that can be used as a private cloud.
 Manipulate large data sets in a parallel environment.
IT8761 SECURITY LABORATORY L T P C
0 0 4 2
OBJECTIVES:
 To learn different cipher techniques
 To implement the algorithms DES, RSA,MD5,SHA-1
 To use network security tools and vulnerability assessment tools
LIST OF EXPERIMENTS
1. Perform encryption, decryption using the following substitution techniques
(i) Ceaser cipher, (ii) playfair cipher iii) Hill Cipher iv) Vigenere cipher
2. Perform encryption and decryption using following transposition techniques
i) Rail fence ii) row & Column Transformation
3. Apply DES algorithm for practical applications.
4. Apply AES algorithm for practical applications.
5. Implement RSA Algorithm using HTML and JavaScript
6. Implement the Diffie-Hellman Key Exchange algorithm for a given problem.
7. Calculate the message digest of a text using the SHA-1 algorithm.
8. Implement the SIGNATURE SCHEME - Digital Signature Standard.
9. Demonstrate intrusion detection system (ids) using any tool eg. Snort or any other s/w.
81
10. Automated Attack and Penetration Tools
Exploring N-Stalker, a Vulnerability Assessment Tool
11. Defeating Malware
i) Building Trojans ii) Rootkit Hunter
TOTAL: 60 PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able to:
 Develop code for classical Encryption Techniques to solve the problems.
 Build cryptosystems by applying symmetric and public key encryption algorithms.
 Construct code for authentication algorithms.
 Develop a signature scheme using Digital signature standard.
 Demonstrate the network security system using open source tools
REFERENCES:
1. Build Your Own Security Lab, Michael Gregg, Wiley India
LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: SOFTWARE: C / C++ / Java or
equivalent compiler GnuPG, Snort, N-Stalker or Equivalent HARDWARE: Standalone desktops -
30 Nos. (or) Server supporting 30 terminals or more.
CS8811 PROJECT WORK L T P C
0 0 20 10
OBJECTIVES:
 To develop the ability to solve a specific problem right from its identification and
literature review till the successful solution of the same. To train the students in preparing
project reports and to face reviews and viva voce examination.
The students in a group of 3 to 4 works on a topic approved by the head of the department under
the guidance of a faculty member and prepares a comprehensive project report after completing
the work to the satisfaction of the supervisor. The progress of the project is evaluated based on a
minimum of three reviews. The review committee may be constituted by the Head of the
Department. A project report is required at the end of the semester. The project work is
evaluated based on oral presentation and the project report jointly by external and internal
examiners constituted by the Head of the Department.
TOTAL: 300 PERIODS
OUTCOME:
 On Completion of the project work students will be in a position to take up any
challenging practical problems and find solution by formulating proper methodology.
CS8075 DATA WAREHOUSING AND DATA MINING L T P C
3 0 0 3
OBJECTIVES:
 To understand data warehouse concepts, architecture, business analysis and tools
 To understand data pre-processing and data visualization techniques
 To study algorithms for finding hidden and interesting patterns in data
 To understand and apply various classification and clustering techniques using tools.
82
UNIT I DATA WAREHOUSING, BUSINESS ANALYSIS AND ON-LINE ANALYTICAL
PROCESSING (OLAP) 9
Basic Concepts - Data Warehousing Components – Building a Data Warehouse – Database
Architectures for Parallel Processing – Parallel DBMS Vendors - Multidimensional Data Model –
Data Warehouse Schemas for Decision Support, Concept Hierarchies -Characteristics of OLAP
Systems – Typical OLAP Operations, OLAP and OLTP.
UNIT II DATA MINING – INTRODUCTION 9
Introduction to Data Mining Systems – Knowledge Discovery Process – Data Mining Techniques
– Issues – applications- Data Objects and attribute types, Statistical description of data, Data
Preprocessing – Cleaning, Integration, Reduction, Transformation and discretization, Data
Visualization, Data similarity and dissimilarity measures.
UNIT III DATA MINING - FREQUENT PATTERN ANALYSIS 9
Mining Frequent Patterns, Associations and Correlations – Mining Methods- Pattern Evaluation
Method – Pattern Mining in Multilevel, Multi Dimensional Space – Constraint Based Frequent
Pattern Mining, Classification using Frequent Patterns
UNIT IV CLASSIFICATION AND CLUSTERING 9
Decision Tree Induction - Bayesian Classification – Rule Based Classification – Classification by
Back Propagation – Support Vector Machines –– Lazy Learners – Model Evaluation and
Selection-Techniques to improve Classification Accuracy.
Clustering Techniques – Cluster analysis-Partitioning Methods - Hierarchical Methods – Density
Based Methods - Grid Based Methods – Evaluation of clustering – Clustering high dimensional
data- Clustering with constraints, Outlier analysis-outlier detection methods.
UNIT V WEKA TOOL 9
Datasets – Introduction, Iris plants database, Breast cancer database, Auto imports database -
Introduction to WEKA, The Explorer – Getting started, Exploring the explorer, Learning algorithms,
Clustering algorithms, Association–rule learners.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students should be able to:
 Design a Data warehouse system and perform business analysis with OLAP tools.
 Apply suitable pre-processing and visualization techniques for data analysis
 Apply frequent pattern and association rule mining techniques for data analysis
 Apply appropriate classification and clustering techniques for data analysis
TEXT BOOK:
1. Jiawei Han and Micheline Kamber, “Data Mining Concepts and Techniques”, Third Edition,
Elsevier, 2012.
REFERENCES:
1. Alex Berson and Stephen J.Smith, “Data Warehousing, Data Mining & OLAP”, Tata
McGraw – Hill Edition, 35th
Reprint 2016.
2. K.P. Soman, Shyam Diwakar and V. Ajay, “Insight into Data Mining Theory and Practice”,
Eastern Economy Edition, Prentice Hall of India, 2006.
3. Ian H.Witten and Eibe Frank, “Data Mining: Practical Machine Learning Tools and
Techniques”, Elsevier, Second Edition.
83
IT8076 SOFTWARE TESTING L T P C
3 0 0 3
OBJECTIVES:
 To learn the criteria for test cases.
 To learn the design of test cases.
 To understand test management and test automation techniques.
 To apply test metrics and measurements.
UNIT I INTRODUCTION 9
Testing as an Engineering Activity – Testing as a Process – Testing Maturity Model- Testing
axioms – Basic definitions – Software Testing Principles – The Tester’s Role in a Software
Development Organization – Origins of Defects – Cost of defects – Defect Classes – The Defect
Repository and Test Design –Defect Examples- Developer/Tester Support of Developing a Defect
Repository.
UNIT II TEST CASE DESIGN STRATEGIES 9
Test case Design Strategies – Using Black Box Approach to Test Case Design – Boundary Value
Analysis – Equivalence Class Partitioning – State based testing – Cause-effect graphing –
Compatibility testing – user documentation testing – domain testing - Random Testing –
Requirements based testing – Using White Box Approach to Test design – Test Adequacy Criteria
– static testing vs. structural testing – code functional testing – Coverage and Control Flow Graphs
– Covering Code Logic – Paths – code complexity testing – Additional White box testing
approaches- Evaluating Test Adequacy Criteria.
UNIT III LEVELS OF TESTING 9
The need for Levels of Testing – Unit Test – Unit Test Planning – Designing the Unit Tests – The
Test Harness – Running the Unit tests and Recording results – Integration tests – Designing
Integration Tests – Integration Test Planning – Scenario testing – Defect bash elimination System
Testing – Acceptance testing – Performance testing – Regression Testing – Internationalization
testing – Ad-hoc testing – Alpha, Beta Tests – Testing OO systems – Usability and Accessibility
testing – Configuration testing –Compatibility testing – Testing the documentation –
Website testing.
UNIT IV TEST MANAGEMENT 9
People and organizational issues in testing – Organization structures for testing teams –
testing services – Test Planning – Test Plan Components – Test Plan Attachments – Locating
Test Items – test management – test process – Reporting Test Results – Introducing the test
specialist – Skills needed by a test specialist – Building a Testing Group- The Structure of Testing
Group- .The Technical Training Program.
UNIT V TEST AUTOMATION 9
Software test automation – skills needed for automation – scope of automation – design and
architecture for automation – requirements for a test tool – challenges in automation – Test
metrics and measurements – project, progress and productivity metrics.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course the students will be able to:
 Design test cases suitable for a software development for different domains.
 Identify suitable tests to be carried out.
 Prepare test planning based on the document.
 Document test plans and test cases designed.
 Use automatic testing tools.
 Develop and validate a test plan.
84
TEXT BOOKS:
1. Srinivasan Desikan and Gopalaswamy Ramesh, “Software Testing – Principles and Practices”,
Pearson Education, 2006.
2. Ron Patton, “Software Testing”, Second Edition, Sams Publishing, Pearson Education, 2007.
AU Library.com
REFERENCES:
1. Ilene Burnstein, “Practical Software Testing”, Springer International Edition, 2003.
2. Edward Kit,” Software Testing in the Real World – Improving the Process”, Pearson
Education, 1995.
3. Boris Beizer,” Software Testing Techniques” – 2nd Edition, Van Nostrand Reinhold, New
York, 1990.
4. Aditya P. Mathur, “Foundations of Software Testing _ Fundamental Algorithms
and Techniques”, Dorling Kindersley (India) Pvt. Ltd., Pearson Education, 2008.
IT8072 EMBEDDED SYSTEMS L T P C
3 0 0 3
OBJECTIVES:
 To learn the architecture and programming of ARM processor.
 To become familiar with the embedded computing platform design and analysis.
 To get thorough knowledge in interfacing concepts
 To design an embedded system and to develop programs
UNIT I INTRODUCTION TO EMBEDDED COMPUTING AND ARM PROCESSORS 9
Complex systems and micro processors– Embedded system design process –Design example:
Model train controller- Instruction sets preliminaries - ARM Processor – CPU: programming input
and output- supervisor mode, exceptions and traps – Co-processors- Memory system
mechanisms – CPU performance- CPU power consumption.
UNIT II EMBEDDED COMPUTING PLATFORM DESIGN 9
The CPU Bus-Memory devices and systems–Designing with computing platforms – consumer
electronics architecture – platform-level performance analysis - Components for embedded
programs- Models of programs- Assembly, linking and loading – compilation techniques- Program
level performance analysis – Software performance optimization – Program level energy and
power analysis and optimization – Analysis and optimization of program size- Program validation
and testing.
UNIT III SENSOR INTERFACING WITH ARDUINO 9
Basics of hardware design and functions of basic passive components-sensors and actuators-
Arduino code - library file for sensor interfacing-construction of basic applications
UNIT IV EMBEDDED FIRMWARE 9
Reset Circuit, Brown-out Protection Circuit-Oscillator Unit - Real Time Clock-Watchdog Timer -
Embedded Firmware Design Approaches and Development Languages.
UNIT V EMBEDDED C PROGRAMMING 9
Introduction-Creating ‘hardware delays’ using Timer 0 and Timer 1-Reading switches-Adding
Structure to the code-Generating a minimum and maximum delay-Example: Creating a portable
hardware delay- Timeout mechanisms-Creating loop timeouts-Testing loop timeouts- hardware
timeouts-Testing a hardware timeout
TOTAL : 45 PERIODS
85
OUTCOMES:
Upon completion of the course, students will be able to:
 Describe the architecture and programming of ARM processor.
 Explain the concepts of embedded systems
 Understand the Concepts of peripherals and interfacing of sensors.
 Capable of using the system design techniques to develop firmware
 Illustrate the code for constructing a system
TEXT BOOKS:
1.Marilyn Wolf, “Computers as Components - Principles of Embedded Computing System
Design”, Third Edition “Morgan Kaufmann Publisher (An imprint from Elsevier), 2012. (unit I & II)
2 https://www.coursera.org/learn/interface-with-arduino#syllabus (Unit III)
3 .Michael J. Pont, “Embedded C”, 2 nd Edition, Pearson Education, 2008.(Unit IV & V)
REFERENCES:
1.Shibu K.V, “Introduction to Embedded Systems”, McGraw Hill.2014
2.Jonathan W.Valvano, “Embedded Microcomputer Systems Real Time Interfacing”, Third Edition
Cengage Learning, 2012
3 Raj Kamal, “Embedded Systems-Architecture,programming and design”, 3 edition,TMH.2015
4. Lyla, “Embedded Systems”, Pearson , 2013
6. David E. Simon, “An Embedded Software Primer”, Pearson Education,2000.
CS8072 AGILE METHODOLOGIES L T P C
3 0 0 3
OBJECTIVES:
 To provide students with a theoretical as well as practical understanding of agile software
development practices and how small teams can apply them to create high-quality software.
 To provide a good understanding of software design and a set of software technologies and
APIs.
 To do a detailed examination and demonstration of Agile development and testing techniques.
 To understand the benefits and pitfalls of working in an Agile team.
 To understand Agile development and testing.
UNIT I AGILE METHODOLOGY 9
Theories for Agile Management – Agile Software Development – Traditional Model vs. Agile Model
- Classification of Agile Methods – Agile Manifesto and Principles – Agile Project Management –
Agile Team Interactions – Ethics in Agile Teams - Agility in Design, Testing – Agile
Documentations – Agile Drivers, Capabilities and Values
UNIT II AGILE PROCESSES 9
Lean Production - SCRUM, Crystal, Feature Driven Development- Adaptive Software
Development - Extreme Programming: Method Overview – Lifecycle – Work Products, Roles and
Practices.
UNIT III AGILITY AND KNOWLEDGE MANAGEMENT 9
Agile Information Systems – Agile Decision Making - Earl‘S Schools of KM – Institutional
Knowledge Evolution Cycle – Development, Acquisition, Refinement, Distribution, Deployment ,
Leveraging – KM in Software Engineering – Managing Software Knowledge – Challenges of
Migrating to Agile Methodologies – Agile Knowledge Sharing – Role of Story-Cards – Story-Card
Maturity Model (SMM).
86
UNIT IV AGILITY AND REQUIREMENTS ENGINEERING 9
Impact of Agile Processes in RE–Current Agile Practices – Variance – Overview of RE Using Agile
– Managing Unstable Requirements – Requirements Elicitation – Agile Requirements Abstraction
Model – Requirements Management in Agile Environment, Agile Requirements Prioritization –
Agile Requirements Modeling and Generation – Concurrency in Agile Requirements Generation.
UNIT V AGILITY AND QUALITY ASSURANCE 9
Agile Product Development – Agile Metrics – Feature Driven Development (FDD) – Financial and
Production Metrics in FDD – Agile Approach to Quality Assurance - Test Driven Development –
Agile Approach in Global Software Development.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Realize the importance of interacting with business stakeholders in determining the
requirements for a software system
 Perform iterative software development processes: how to plan them, how to execute
them.
 Point out the impact of social aspects on software development success.
 Develop techniques and tools for improving team collaboration and software quality.
 Perform Software process improvement as an ongoing task for development teams.
 Show how agile approaches can be scaled up to the enterprise level.
TEXT BOOKS:
1. David J. Anderson and Eli Schragenheim, “Agile Management for Software Engineering:
Applying the Theory of Constraints for Business Results”, Prentice Hall, 2003.
2. Hazza and Dubinsky, “Agile Software Engineering, Series: Undergraduate Topics in
Computer Science”, Springer, 2009.
REFERENCES:
1. Craig Larman, “Agile and Iterative Development: A Manager‘s Guide”, Addison-Wesley,
2004.
2. Kevin C. Desouza, “Agile Information Systems: Conceptualization, Construction, and
Management”, Butterworth-Heinemann, 2007.
CS8077 GRAPH THEORY AND APPLICATIONS L T P C
3 0 0 3
OBJECTIVES:
 To understand fundamentals of graph theory.
 To study proof techniques related to various concepts in graphs.
 To explore modern applications of graph theory.
UNIT I 9
Introduction - Graph Terminologies - Types of Graphs - Sub Graph- Multi Graph - Regular
Graph - Isomorphism - Isomorphic Graphs - Sub-graph - Euler graph - Hamiltonian Graph -
Related Theorems.
UNIT II 9
Trees -Properties- Distance and Centres - Types - Rooted Tree-- Tree Enumeration-
Labeled Tree - Unlabeled Tree - Spanning Tree - Fundamental Circuits- Cut Sets -
Properties - Fundamental Circuit and Cut-set- Connectivity- Separability -Related
Theorems.
87
UNIT III 9
Network Flows - Planar Graph - Representation - Detection - Dual Graph - Geometric and
Combinatorial Dual - Related Theorems - Digraph - Properties - Euler Digraph.
UNIT IV 9
Matrix Representation - Adjacency matrix- Incidence matrix- Circuit matrix - Cut-set matrix -
Path Matrix- Properties - Related Theorems - Correlations. Graph Coloring - Chromatic
Polynomial - Chromatic Partitioning - Matching - Covering - Related Theorems.
UNIT V 9
Graph Algorithms- Connectedness and Components- Spanning Tree- Fundamental
Circuits- Cut Vertices- Directed Circuits- Shortest Path - Applications overview.
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of this course, the students should be able to
 Understand the basic concepts of graphs, and different types of graphs
 Understand the properties, theorems and be able to prove theorems.
 Apply suitable graph model and algorithm for solving applications.
TEXT BOOKS:
1. Narsingh Deo, "Graph Theory with Application to Engineering and Computer
Science", Prentice-Hall of India Pvt.Ltd, 2003.
2. L.R.Foulds , "Graph Theory Applications", Springer ,2016.
REFERENCES:
1. Bondy, J. A. and Murty, U.S.R., "Graph Theory with Applications", North Holland
Publication,2008.
2. West, D. B., “Introduction to Graph Theory”, Pearson Education, 2011.
3. John Clark, Derek Allan Holton, “A First Look at Graph Theory”, World Scientific
Publishing Company, 1991.
4. Diestel, R, "Graph Theory", Springer,3rd Edition,2006.
5. Kenneth H.Rosen, "Discrete Mathematics and Its Applications", Mc Graw Hill ,
2007.
IT8071 DIGITAL SIGNAL PROCESSING
L T P C
3 0 0 3
OBJECTIVES:
 To understand the basics of discrete time signals, systems and their classifications.
 To analyze the discrete time signals in both time and frequency domain.
 To design lowpass digital IIR filters according to predefined specifications based on analog
filter theory and analog-to-digital filter transformation.
 To design Linear phase digital FIR filters using fourier method, window technique
 To realize the concept and usage of DSP in various engineering fields.
UNIT I DISCRETE TIME SIGNALS AND SYSTEMS 9
Introduction to DSP – Basic elements of DSP– Sampling of Continuous time signals–Representation,
Operation and Classification of Discrete Time Signal–Classification of Discrete Time Systems–
Discrete Convolution: Linear and Circular–Correlation.
UNIT II ANALYSIS OF LTI DISCRETE TIME SIGNALS AND SYSTEMS 9
Analysis of LTI Discrete Time Systems using DFT–Properties of DFT–Inverse DFT– Analysis of LTI
Discrete Time Systems using FFT Algorithms– Inverse DFT using FFT Algorithm.
88
UNIT III INFINITE IMPULSE RESPONSE FILTERS 9
Frequency response of Analog and Digital IIR filters–Realization of IIR filter–Design of analog low
pass filter–Analog to Digital filter Transformation using Bilinear Transformation and Impulse Invariant
method–Design of digital IIR filters (LPF, HPF, BPF, and BRF) using various transformation
techniques.
UNIT IV FINITE IMPULSE RESPONSE FILTERS 9
Linear Phase FIR filter–Phase delay–Group delay–Realization of FIR filter–Design of Causal and
Non-causal FIR filters (LPF, HPF, BPF and BRF) using Window method (Rectangular, Hamming
window, Hanning window) –Frequency Sampling Technique.
UNIT V APPLICATIONS OF DSP 9
Multirate Signal Processing: Decimation, Interpolation, Spectrum of the sampled signal –Processing
of Audio and Radar signal.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Perform mathematical operations on signals.
 Understand the sampling theorem and perform sampling on continuous-time signals to get
discrete time signal by applying advanced knowledge of the sampling theory.
 Transform the time domain signal into frequency domain signal and vice-versa.
 Apply the relevant theoretical knowledge to design the digital IIR/FIR filters for the given
analog specifications.
TEXT BOOK:
1. John G. Proakis & Dimitris G.Manolakis, “Digital Signal Processing – Principles, Algorithms &
Applications”, Fourth Edition, Pearson Education / Prentice Hall, 2007.
REFERENCES
1. Richard G. Lyons, “Understanding Digital Signal Processing”. Second Edition, Pearson
Education.
2. A.V.Oppenheim, R.W. Schafer and J.R. Buck, “Discrete-Time Signal Processing”, 8th Indian
Reprint, Pearson, 2004.
3. Emmanuel C.Ifeachor, & Barrie.W.Jervis, “Digital Signal Processing”, Second Edition,
Pearson Education / Prentice Hall, 2002.
4. William D. Stanley, “Digital Signal Processing”, Second Edition, Reston Publications.
GE8075 INTELLECTUAL PROPERTY RIGHTS L T P C
3 0 0 3
OBJECTIVE:
 To give an idea about IPR, registration and its enforcement.
UNIT I INTRODUCTION 9
Introduction to IPRs, Basic concepts and need for Intellectual Property - Patents, Copyrights,
Geographical Indications, IPR in India and Abroad – Genesis and Development – the way from
WTO to WIPO –TRIPS, Nature of Intellectual Property, Industrial Property, technological
Research, Inventions and Innovations – Important examples of IPR.
UNIT II REGISTRATION OF IPRs 10
Meaning and practical aspects of registration of Copy Rights, Trademarks, Patents, Geographical
Indications, Trade Secrets and Industrial Design registration in India and Abroad
89
UNIT III AGREEMENTS AND LEGISLATIONS 10
International Treaties and Conventions on IPRs, TRIPS Agreement, PCT Agreement, Patent Act
of India, Patent Amendment Act, Design Act, Trademark Act, Geographical Indication Act.
UNIT IV DIGITAL PRODUCTS AND LAW 9
Digital Innovations and Developments as Knowledge Assets – IP Laws, Cyber Law and Digital
Content Protection – Unfair Competition – Meaning and Relationship between Unfair Competition
and IP Laws – Case Studies.
UNIT V ENFORCEMENT OF IPRs 7
Infringement of IPRs, Enforcement Measures, Emerging issues – Case Studies.
TOTAL : 45 PERIODS
OUTCOME:
 Ability to manage Intellectual Property portfolio to enhance the value of the firm.
TEXT BOOKS:
1. V. Scople Vinod, Managing Intellectual Property, Prentice Hall of India pvt Ltd, 2012
2. S. V. Satakar, “Intellectual Property Rights and Copy Rights, Ess Ess Publications, New Delhi,
2002
REFERENCES:
1. Deborah E. Bouchoux, “Intellectual Property: The Law of Trademarks, Copyrights, Patents and
Trade Secrets”, Cengage Learning, Third Edition, 2012.
2. Prabuddha Ganguli,”Intellectual Property Rights: Unleashing the Knowledge Economy”,
McGraw Hill Education, 2011.
3. Edited by Derek Bosworth and Elizabeth Webster, The Management of Intellectual Property,
Edward Elgar Publishing Ltd., 2013.
CS8091 BIG DATA ANALYTICS L T P C
3 0 0 3
OBJECTIVES:
 To know the fundamental concepts of big data and analytics.
 To explore tools and practices for working with big data
 To learn about stream computing.
 To know about the research that requires the integration of large amounts of data.
UNIT I INTRODUCTION TO BIG DATA 9
Evolution of Big data - Best Practices for Big data Analytics - Big data characteristics - Validating
- The Promotion of the Value of Big Data - Big Data Use Cases- Characteristics of Big Data
Applications - Perception and Quantification of Value -Understanding Big Data Storage - A
General Overview of High-Performance Architecture - HDFS - MapReduce and YARN - Map
Reduce Programming Model
UNIT II CLUSTERING AND CLASSIFICATION 9
Advanced Analytical Theory and Methods: Overview of Clustering - K-means - Use Cases -
Overview of the Method - Determining the Number of Clusters - Diagnostics - Reasons to
Choose and Cautions .- Classification: Decision Trees - Overview of a Decision Tree - The
General Algorithm - Decision Tree Algorithms - Evaluating a Decision Tree - Decision Trees in
R - Naïve Bayes - Bayes’ Theorem - Naïve Bayes Classifier.
90
UNIT III ASSOCIATION AND RECOMMENDATION SYSTEM 9
Advanced Analytical Theory and Methods: Association Rules - Overview - Apriori Algorithm -
Evaluation of Candidate Rules - Applications of Association Rules - Finding Association& finding
similarity - Recommendation System: Collaborative Recommendation- Content Based
Recommendation - Knowledge Based Recommendation- Hybrid Recommendation Approaches.
UNIT IV STREAM MEMORY 9
Introduction to Streams Concepts – Stream Data Model and Architecture - Stream Computing,
Sampling Data in a Stream – Filtering Streams – Counting Distinct Elements in a Stream –
Estimating moments – Counting oneness in a Window – Decaying Window – Real time Analytics
Platform(RTAP) applications - Case Studies - Real Time Sentiment Analysis, Stock Market
Predictions. Using Graph Analytics for Big Data: Graph Analytics
UNIT V NOSQL DATA MANAGEMENT FOR BIG DATA AND VISUALIZATION 9
NoSQL Databases : Schema-less Models”: Increasing Flexibility for Data Manipulation-Key Value
Stores- Document Stores - Tabular Stores - Object Data Stores - Graph Databases Hive -
Sharding –- Hbase – Analyzing big data with twitter - Big data for E-Commerce Big data for blogs
- Review of Basic Data Analytic Methods using R.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Work with big data tools and its analysis techniques
 Analyze data by utilizing clustering and classification algorithms
 Learn and apply different mining algorithms and recommendation systems for large
volumes of data
 Perform analytics on data streams
 Learn NoSQL databases and management.
TEXT BOOKS:
1. Anand Rajaraman and Jeffrey David Ullman, "Mining of Massive Datasets", Cambridge
University Press, 2012.
2. David Loshin, "Big Data Analytics: From Strategic Planning to Enterprise Integration with
Tools, Techniques, NoSQL, and Graph", Morgan Kaufmann/El sevier Publishers, 2013.
REFERENCES:
1. EMC Education Services, "Data Science and Big Data Analytics: Discovering, Analyzing,
Visualizing and Presenting Data", Wiley publishers, 2015.
2. Bart Baesens, "Analytics in a Big Data World: The Essential Guide to Data Science and its
Applications", Wiley Publishers, 2015.
3. Dietmar Jannach and Markus Zanker, "Recommender Systems: An Introduction",
Cambridge University Press, 2010.
4. Kim H. Pries and Robert Dunnigan, "Big Data Analytics: A Practical Guide for Managers "
CRC Press, 2015.
5. Jimmy Lin and Chris Dyer, "Data-Intensive Text Processing with MapReduce", Synthesis
Lectures on Human Language Technologies, Vol. 3, No. 1, Pages 1-177, Morgan Claypool
publishers, 2010.
91
CS8082 MACHINE LEARNING TECHNIQUES L T P C
3 0 0 3
OBJECTIVES:
 To understand the need for machine learning for various problem solving
 To study the various supervised, semi-supervised and unsupervised learning algorithms in
machine learning
 To understand the latest trends in machine learning
 To design appropriate machine learning algorithms for problem solving
UNIT I INTRODUCTION 9
Learning Problems – Perspectives and Issues – Concept Learning – Version Spaces and
Candidate Eliminations – Inductive bias – Decision Tree learning – Representation – Algorithm –
Heuristic Space Search.
UNIT II NEURAL NETWORKS AND GENETIC ALGORITHMS 9
Neural Network Representation – Problems – Perceptrons – Multilayer Networks and Back
Propagation Algorithms – Advanced Topics – Genetic Algorithms – Hypothesis Space Search –
Genetic Programming – Models of Evaluation and Learning.
UNIT III BAYESIAN AND COMPUTATIONAL LEARNING 9
Bayes Theorem – Concept Learning – Maximum Likelihood – Minimum Description Length
Principle – Bayes Optimal Classifier – Gibbs Algorithm – Naïve Bayes Classifier – Bayesian
Belief Network – EM Algorithm – Probability Learning – Sample Complexity – Finite and Infinite
Hypothesis Spaces – Mistake Bound Model.
UNIT IV INSTANT BASED LEARNING 9
K- Nearest Neighbour Learning – Locally weighted Regression – Radial Basis
Functions – Case Based Learning.
UNIT V ADVANCED LEARNING 9
Learning Sets of Rules – Sequential Covering Algorithm – Learning Rule Set – First Order
Rules – Sets of First Order Rules – Induction on Inverted Deduction – Inverting Resolution –
Analytical Learning – Perfect Domain Theories – Explanation Base Learning – FOCL
Algorithm – Reinforcement Learning – Task – Q-Learning – Temporal Difference Learning
TOTAL :45 PERIODS
OUTCOMES:
At the end of the course, the students will be able to
 Differentiate between supervised, unsupervised, semi-supervised machine learning
approaches
 Discuss the decision tree algorithm and indentity and overcome the problem of
overfitting
 Discuss and apply the back propagation algorithm and genetic algorithms to various
problems
 Apply the Bayesian concepts to machine learning
 Analyse and suggest appropriate machine learning approaches for various types of
problems
TEXT BOOK:
1. Tom M. Mitchell, “Machine Learning”, McGraw-Hill Education (India) Private
Limited, 2013.
REFERENCES:
1. Ethem Alpaydin, “Introduction to Machine Learning (Adaptive Computation and
Machine Learning)”, The MIT Press 2004.
2. Stephen Marsland, “Machine Learning: An Algorithmic Perspective”, CRC Press, 2009.
92
CS8092 COMPUTER GRAPHICS AND MULTIMEDIA L T P C
3 0 0 3
OBJECTIVES:
 To develop an understanding and awareness how issues such as content, information
architecture, motion, sound, design, and technology merge to form effective and
compelling interactive experiences for a wide range of audiences and end users.
 To become familiar with various software programs used in the creation and
implementation of multi- media
 To appreciate the importance of technical ability and creativity within design practice.
 To gain knowledge about graphics hardware devices and software used.
 To understand the two-dimensional graphics and their transformations.
 To understand the three-dimensional graphics and their transformations.
 To appreciate illumination and color models
 To become familiar with understand clipping techniques
 To become familiar with Blender Graphics
UNIT I ILLUMINATION AND COLOR MODELS 9
Light sources - basic illumination models – halftone patterns and dithering techniques; Properties
of light - Standard primaries and chromaticity diagram; Intuitive colour concepts - RGB colour
model - YIQ colour model - CMY colour model - HSV colour model - HLS colour model; Colour
selection. Output primitives – points and lines, line drawing algorithms, loading the frame buffer,
line function; circle and ellipse generating algorithms; Pixel addressing and object geometry, filled
area primitives.
UNIT II TWO-DIMENSIONAL GRAPHICS 9
Two dimensional geometric transformations – Matrix representations and homogeneous
coordinates, composite transformations; Two dimensional viewing – viewing pipeline, viewing
coordinate reference frame; window-to-viewport coordinate transformation, Two dimensional
viewing functions; clipping operations – point, line, and polygon clipping algorithms.
UNIT III THREE-DIMENSIONAL GRAPHICS 9
Three dimensional concepts; Three dimensional object representations – Polygon surfaces-
Polygon tables- Plane equations - Polygon meshes; Curved Lines and surfaces, Quadratic
surfaces; Blobby objects; Spline representations – Bezier curves and surfaces -B-Spline curves
and surfaces. TRANSFORMATION AND VIEWING: Three dimensional geometric and modeling
transformations – Translation, Rotation, Scaling, composite transformations; Three dimensional
viewing – viewing pipeline, viewing coordinates, Projections, Clipping; Visible surface detection
methods.
UNIT IV MULTIMEDIA SYSTEM DESIGN & MULTIMEDIA FILE HANDLING 9
Multimedia basics − Multimedia applications − Multimedia system architecture − Evolving
technologies for multimedia − Defining objects for multimedia systems − Multimedia data interface
standards − Multimedia databases. Compression and decompression − Data and file format
standards − Multimedia I/O technologies − Digital voice and audio − Video image and animation −
Full motion video − Storage and retrieval technologies.
UNIT V HYPERMEDIA 9
Multimedia authoring and user interface - Hypermedia messaging -Mobile messaging −
Hypermedia message component − Creating hypermedia message − Integrated multimedia
message standards − Integrated document management − Distributed multimedia systems.CASE
STUDY: BLENDER GRAPHICS Blender Fundamentals – Drawing Basic Shapes – Modelling –
Shading & Textures
TOTAL: 45 PERIODS
93
OUTCOMES:
At the end of the course, the students should be able to:
 Design two dimensional graphics.
 Apply two dimensional transformations.
 Design three dimensional graphics.
 Apply three dimensional transformations.
 Apply Illumination and color models.
 Apply clipping techniques to graphics.
 Understood Different types of Multimedia File Format
 Design Basic 3d Scenes using Blender
TEXT BOOKS:
1. Donald Hearn and Pauline Baker M, “Computer Graphics", Prentice Hall, New Delhi, 2007 [
UNIT I – III ]
2. Andleigh, P. K and Kiran Thakrar, “Multimedia Systems and Design”, PHI, 2003. [ UNIT
IV,V ]
REFERENCES:
1. Judith Jeffcoate, “Multimedia in practice: Technology and Applications”, PHI, 1998.
2. Foley, Vandam, Feiner and Hughes, “Computer Graphics: Principles and
Practice”, 2nd
Edition, Pearson Education, 2003.
3. Jeffrey McConnell, “Computer Graphics: Theory into Practice”, Jones and Bartlett
Publishers,2006.
4. Hill F S Jr., "Computer Graphics", Maxwell Macmillan , 1990.
5. Peter Shirley, Michael Ashikhmin, Michael Gleicher, Stephen R Marschner, Erik Reinhard,
KelvinSung, and AK Peters, “Fundamentals of Computer Graphics”, CRC Press, 2010.
6. William M. Newman and Robert F.Sproull, “Principles of Interactive Computer Graphics”,
Mc Graw Hill 1978.
https://www.blender.org/support/tutorials/
IT8075 SOFTWARE PROJECT MANAGEMENT L T P C
3 0 0 3
OBJECTIVES:
 To understand the Software Project Planning and Evaluation techniques.
 To plan and manage projects at each stage of the software development life cycle (SDLC).
 To learn about the activity planning and risk management principles.
 To manage software projects and control software deliverables.
 To develop skills to manage the various phases involved in project management and people
management.
 To deliver successful software projects that support organization’s strategic goals.
UNIT I PROJECT EVALUATION AND PROJECT PLANNING 9
Importance of Software Project Management – Activities - Methodologies – Categorization of
Software Projects – Setting objectives – Management Principles – Management Control – Project
portfolio Management – Cost-benefit evaluation technology – Risk evaluation – Strategic program
Management – Stepwise Project Planning.
94
UNIT II PROJECT LIFE CYCLE AND EFFORT ESTIMATION 9
Software process and Process Models – Choice of Process models - Rapid Application development
– Agile methods – Dynamic System Development Method – Extreme Programming– Managing
interactive processes – Basics of Software estimation – Effort and Cost estimation techniques –
COSMIC Full function points - COCOMO II - a Parametric Productivity Model.
UNIT III ACTIVITY PLANNING AND RISK MANAGEMENT 9
Objectives of Activity planning – Project schedules – Activities – Sequencing and scheduling –
Network Planning models – Formulating Network Model – Forward Pass & Backward Pass
techniques – Critical path (CRM) method – Risk identification – Assessment – Risk Planning –Risk
Management – – PERT technique – Monte Carlo simulation – Resource Allocation – Creation of
critical paths – Cost schedules.
UNIT IV PROJECT MANAGEMENT AND CONTROL 9
Framework for Management and control – Collection of data – Visualizing progress – Cost monitoring
– Earned Value Analysis – Prioritizing Monitoring – Project tracking – Change control – Software
Configuration Management – Managing contracts – Contract Management.
UNIT V STAFFING IN SOFTWARE PROJECTS 9
Managing people – Organizational behavior – Best methods of staff selection – Motivation – The
Oldham – Hackman job characteristic model – Stress – Health and Safety – Ethical and Professional
concerns – Working in teams – Decision making – Organizational structures – Dispersed and Virtual
teams – Communications genres – Communication plans – Leadership.
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Understand Project Management principles while developing software.
 Gain extensive knowledge about the basic project management concepts, framework and the
process models.
 Obtain adequate knowledge about software process models and software effort estimation
techniques.
 Estimate the risks involved in various project activities.
 Define the checkpoints, project reporting structure, project progress and tracking mechanisms
using project management principles.
 Learn staff selection process and the issues related to people management
TEXT BOOK:
1. Bob Hughes, Mike Cotterell and Rajib Mall: Software Project Management – Fifth Edition,
Tata McGraw Hill, New Delhi, 2012.
REFERENCES:
1. Robert K. Wysocki “Effective Software Project Management” – Wiley Publication, 2011.
2. Walker Royce: “Software Project Management”- Addison-Wesley, 1998.
3. Gopalaswamy Ramesh, “Managing Global Software Projects” – McGraw Hill Education
(India), Fourteenth Reprint 2013.
95
CS8081 INTERNET OF THINGS L T P C
3 0 0 3
OBJECTIVES:
 To understand Smart Objects and IoT Architectures
 To learn about various IOT-related protocols
 To build simple IoT Systems using Arduino and Raspberry Pi.
 To understand data analytics and cloud in the context of IoT
 To develop IoT infrastructure for popular applications
UNIT I FUNDAMENTALS OF IoT 9
Evolution of Internet of Things - Enabling Technologies – IoT Architectures: oneM2M, IoT World
Forum (IoTWF) and Alternative IoT models – Simplified IoT Architecture and Core IoT Functional
Stack -– Fog, Edge and Cloud in IoT – Functional blocks of an IoT ecosystem – Sensors,
Actuators, Smart Objects and Connecting Smart Objects
UNIT II IoT PROTOCOLS 9
IoT Access Technologies: Physical and MAC layers, topology and Security of IEEE 802.15.4,
802.15.4g, 802.15.4e, 1901.2a, 802.11ah and LoRaWAN – Network Layer: IP versions,
Constrained Nodes and Constrained Networks – Optimizing IP for IoT: From 6LoWPAN to 6Lo,
Routing over Low Power and Lossy Networks – Application Transport Methods: Supervisory
Control and Data Acquisition – Application Layer Protocols: CoAP and MQTT
UNIT III DESIGN AND DEVELOPMENT 9
Design Methodology - Embedded computing logic - Microcontroller, System on Chips - IoT system
building blocks - Arduino - Board details, IDE programming - Raspberry Pi - Interfaces and
Raspberry Pi with Python Programming.
UNIT IV DATA ANALYTICS AND SUPPORTING SERVICES 9
Structured Vs Unstructured Data and Data in Motion Vs Data in Rest – Role of Machine Learning
– No SQL Databases – Hadoop Ecosystem – Apache Kafka, Apache Spark – Edge Streaming
Analytics and Network Analytics – Xively Cloud for IoT, Python Web Application Framework –
Django – AWS for IoT – System Management with NETCONF-YANG
UNIT V CASE STUDIES/INDUSTRIAL APPLICATIONS 9
Cisco IoT system - IBM Watson IoT platform – Manufacturing - Converged Plantwide Ethernet
Model (CPwE) – Power Utility Industry – GridBlocks Reference Model - Smart and Connected
Cities: Layered architecture, Smart Lighting, Smart Parking Architecture and Smart Traffic Control
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of the course, the student should be able to:
 Explain the concept of IoT.
 Analyze various protocols for IoT.
 Design a PoC of an IoT system using Rasperry Pi/Arduino
 Apply data analytics and use cloud offerings related to IoT.
 Analyze applications of IoT in real time scenario
TEXTBOOK:
1. David Hanes, Gonzalo Salgueiro, Patrick Grossetete, Rob Barton and Jerome Henry, “IoT
Fundamentals: Networking Technologies, Protocols and Use Cases for Internet of Things,
Cisco Press, 2017
96
REFERENCES:
1. Arshdeep Bahga, Vijay Madisetti, “Internet of Things – A hands-on approach”, Universities
Press, 2015
2. Olivier Hersent, David Boswarthick, Omar Elloumi , “The Internet of Things – Key applications
and Protocols”, Wiley, 2012 (for Unit 2).
3. Jan Ho¨ ller, Vlasios Tsiatsis , Catherine Mulligan, Stamatis , Karnouskos, Stefan Avesand.
David Boyle, "From Machine-to-Machine to the Internet of Things - Introduction to a New Age of
Intelligence", Elsevier, 2014.
4. Dieter Uckelmann, Mark Harrison, Michahelles, Florian (Eds), “Architecting the Internet of
Things”, Springer, 2011.
5. Michael Margolis, Arduino Cookbook, Recipes to Begin, Expand, and Enhance Your Projects,
2nd
Edition, O'Reilly Media, 2011.
https://www.arduino.cc/
https://www.ibm.com/smarterplanet/us/en/?ca=v_smarterplanet
IT8074 SERVICE ORIENTED ARCHITECTURE L T P C
3 0 0 3
OBJECTIVES:
 To learn fundamentals of XML
 To provide an overview of Service Oriented Architecture and Web services and their
importance
 To learn web services standards and technologies
 To learn service oriented analysis and design for developing SOA based applications
UNIT I XML 9
XML document structure – Well-formed and valid documents – DTD – XML Schema – Parsing
XML using DOM, SAX – XPath - XML Transformation and XSL – Xquery
UNIT II SERVICE ORIENTED ARCHITECTURE (SOA) BASICS 9
Characteristics of SOA, Benefits of SOA , Comparing SOA with Client-Server and Distributed
architectures –-- Principles of Service Orientation – Service layers
UNIT III WEB SERVICES (WS) AND STANDARDS 8
Web Services Platform – Service descriptions – WSDL – Messaging with SOAP – Service
discovery – UDDI – Service-Level Interaction Patterns – Orchestration and Choreography
UNIT IV WEB SERVICES EXTENSIONS 8
WS-Addressing - WS-ReliableMessaging - WS-Policy – WS-Coordination – WS -Transactions -
WS-Security - Examples
UNIT V SERVICE ORIENTED ANALYSIS AND DESIGN 11
SOA delivery strategies – Service oriented analysis – Service Modelling – Service oriented design
– Standards and composition guidelines -- Service design – Business process design – Case
Study
TOTAL : 45 PERIODS
OUTCOMES:
Upon successful completion of this course, the students will be able to:
 Understand XML technologies
 Understand service orientation, benefits of SOA
 Understand web services and WS standards
 Use web services extensions to develop solutions
 Understand and apply service modeling, service oriented analysis and design for
application development
97
TEXTBOOKS:
1. Thomas Erl, “ Service Oriented Architecture: Concepts, Technology, and Design”, Pearson
Education, 2005
2. Sandeep Chatterjee and James Webber, “Developing Enterprise Web Services: An
Architect's Guide”, Prentice Hall, 2004
REFERENCES:
1. James McGovern, Sameer Tyagi, Michael E Stevens, Sunil Mathew, “Java Web Services
Architecture”, Elsevier, 2003.
2. Ron Schmelzer et al. “ XML and Web Services”, Pearson Education, 2002.
3. Frank P.Coyle, “XML, Web Services and the Data Revolution”, Pearson Education,
2002
GE8077 TOTAL QUALITY MANAGEMENT L T P C
3 0 0 3
OBJECTIVE:
 To facilitate the understanding of Quality Management principles and process.
UNIT I INTRODUCTION 9
Introduction - Need for quality - Evolution of quality - Definitions of quality - Dimensions of product
and service quality - Basic concepts of TQM - TQM Framework - Contributions of Deming, Juran
and Crosby - Barriers to TQM - Customer focus - Customer orientation, Customer satisfaction,
Customer complaints, Customer retention.
UNIT II TQM PRINCIPLES 9
Leadership - Quality Statements, Strategic quality planning, Quality Councils - Employee
involvement - Motivation, Empowerment, Team and Teamwork, Recognition and Reward,
Performance appraisal - Continuous process improvement - PDCA cycle, 5S, Kaizen - Supplier
partnership - Partnering, Supplier selection, Supplier Rating.
UNIT III TQM TOOLS AND TECHNIQUES I 9
The seven traditional tools of quality - New management tools - Six sigma: Concepts,
Methodology, applications to manufacturing, service sector including IT - Bench marking - Reason
to bench mark, Bench marking process - FMEA - Stages, Types.
UNIT IV TQM TOOLS AND TECHNIQUES II 9
Quality Circles - Cost of Quality - Quality Function Deployment (QFD) - Taguchi quality loss
function - TPM - Concepts, improvement needs - Performance measures.
UNIT V QUALITY MANAGEMENT SYSTEM 9
Introduction—Benefits of ISO Registration—ISO 9000 Series of Standards—Sector-Specific
Standards—AS 9100, TS16949 and TL 9000-- ISO 9001 Requirements—Implementation—
Documentation—Internal Audits—Registration- ENVIRONMENTAL MANAGEMENT SYSTEM:
Introduction—ISO 14000 Series Standards—Concepts of ISO 14001—Requirements of ISO
14001—Benefits of EMS.
TOTAL: 45 PERIODS
OUTCOME:
 The student would be able to apply the tools and techniques of quality management to
manufacturing and services processes.
98
TEXT BOOK:
1. Dale H.Besterfiled, Carol B.Michna,Glen H. Besterfield,Mary B.Sacre,Hemant Urdhwareshe
and Rashmi Urdhwareshe, “Total Quality Management”, Pearson Education Asia, Revised
Third Edition, Indian Reprint, Sixth Impression, 2013.
REFERENCES:
1. James R. Evans and William M. Lindsay, "The Management and Control of Quality",
8th
Edition, First Indian Edition, Cengage Learning, 2012.
2. Janakiraman. B and Gopal .R.K., "Total Quality Management - Text and Cases", Prentice Hall
(India) Pvt. Ltd., 2006.
3. Suganthi.L and Anand Samuel, "Total Quality Management", Prentice Hall (India) Pvt. Ltd.,
2006.
4. ISO9001-2015 standards
CS8083 MULTI-CORE ARCHITECTURES AND PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To understand the need for multi-core processors, and their architecture.
 To understand the challenges in parallel and multi-threaded programming.
 To learn about the various parallel programming paradigms,
 To develop multicore programs and design parallel solutions.
UNIT I MULTI-CORE PROCESSORS 9
Single core to Multi-core architectures – SIMD and MIMD systems – Interconnection networks -
Symmetric and Distributed Shared Memory Architectures – Cache coherence - Performance
Issues – Parallel program design.
UNIT II PARALLEL PROGRAM CHALLENGES 9
Performance – Scalability – Synchronization and data sharing – Data races – Synchronization
primitives (mutexes, locks, semaphores, barriers) – deadlocks and livelocks – communication
between threads (condition variables, signals, message queues and pipes).
UNIT III SHARED MEMORY PROGRAMMING WITH OpenMP 9
OpenMP Execution Model – Memory Model – OpenMP Directives – Work-sharing Constructs -
Library functions – Handling Data and Functional Parallelism – Handling Loops - Performance
Considerations.
UNIT IV DISTRIBUTED MEMORY PROGRAMMING WITH MPI 9
MPI program execution – MPI constructs – libraries – MPI send and receive – Point-to-point and
Collective communication – MPI derived datatypes – Performance evaluation
UNIT V PARALLEL PROGRAM DEVELOPMENT 9
Case studies - n-Body solvers – Tree Search – OpenMP and MPI implementations and
comparison.
TOTAL: 45 PERIODS
OUTCOMES:
At the end of the course, the students should be able to:
 Describe multicore architectures and identify their characteristics and challenges.
 Identify the issues in programming Parallel Processors.
 Write programs using OpenMP and MPI.
 Design parallel programming solutions to common problems.
 Compare and contrast programming for serial processors and programming for parallel
processors.
99
TEXT BOOKS:
1. Peter S. Pacheco, “An Introduction to Parallel Programming”, Morgan-Kauffman/Elsevier, 2011.
2. Darryl Gove, “Multicore Application Programming for Windows, Linux, and Oracle Solaris”,
Pearson, 2011 (unit 2)
REFERENCES:
1. Michael J Quinn, “Parallel programming in C with MPI and OpenMP”, Tata McGraw Hill,2003.
2. Victor Alessandrini, Shared Memory Application Programming, 1st Edition, Concepts and
Strategies in Multicore Application Programming, Morgan Kaufmann, 2015.
3. Yan Solihin, Fundamentals of Parallel Multicore Architecture, CRC Press, 2015.
CS8079 HUMAN COMPUTER INTERACTION L T P C
3 0 0 3
OBJECTIVES:
 To learn the foundations of Human Computer Interaction.
 To become familiar with the design technologies for individuals and persons with
disabilities.
 To be aware of mobile HCI.
 To learn the guidelines for user interface.
UNIT I FOUNDATIONS OF HCI 9
The Human: I/O channels – Memory – Reasoning and problem solving; The Computer: Devices
– Memory – processing and networks; Interaction: Models – frameworks – Ergonomics – styles –
elements – interactivity- Paradigms. - Case Studies
UNIT II DESIGN & SOFTWARE PROCESS 9
Interactive Design: Basics – process – scenarios – navigation – screen design – Iteration and
prototyping. HCI in software process: Software life cycle – usability engineering – Prototyping in
practice – design rationale. Design rules: principles, standards, guidelines, rules. Evaluation
Techniques – Universal Design
UNIT III MODELS AND THEORIES 9
HCI Models: Cognitive models: Socio-Organizational issues and stakeholder requirements –
Communication and collaboration models-Hypertext, Multimedia and WWW.
UNIT IV MOBILE HCI 9
Mobile Ecosystem: Platforms, Application frameworks- Types of Mobile Applications: Widgets,
Applications, Games- Mobile Information Architecture, Mobile 2.0, Mobile Design: Elements of
Mobile Design, Tools. - Case Studies
UNIT V WEB INTERFACE DESIGN 9
Designing Web Interfaces – Drag & Drop, Direct Selection, Contextual Tools, Overlays, Inlays
and Virtual Pages, Process Flow - Case Studies
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of the course, the students should be able to:
 Design effective dialog for HCI
 Design effective HCI for individuals and persons with disabilities.
 Assess the importance of user feedback.
 Explain the HCI implications for designing multimedia/ ecommerce/ e-learning Web sites.
 Develop meaningful user interface.
100
TEXT BOOKS:
1. Alan Dix, Janet Finlay, Gregory Abowd, Russell Beale, “Human Computer Interaction”, 3rd
Edition, Pearson Education, 2004 (UNIT I, II & III)
2. Brian Fling, “Mobile Design and Development”, First Edition, O’Reilly Media Inc., 2009 (UNIT –
IV)
3. Bill Scott and Theresa Neil, “Designing Web Interfaces”, First Edition, O’Reilly, 2009. (UNIT-V)
CS8073 C# AND .NET PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To learn basic programming in C# and the object oriented programming concepts.
 To update and enhance skills in writing Windows applications, ADO.NET and ASP
.NET.
 To study the advanced concepts in data connectivity, WPF, WCF and WWF with
C# and .NET 4.5.
 To implement mobile applications using .Net compact framework
 To understand the working of base class libraries, their operations and
manipulation of data using XML.
UNIT I C# LANGUAGE BASICS 9
.Net Architecture - Core C# - Variables - Data Types - Flow control - Objects and
Types- Classes and Structs - Inheritance- Generics – Arrays and Tuples - Operators
and Casts - Indexers
UNIT II C# ADVANCED FEATURES 9
Delegates - Lambdas - Lambda Expressions - Events - Event Publisher - Event
Listener - Strings and Regular Expressions - Generics - Collections - Memory
Management and Pointers - Errors and Exceptions - Reflection
UNIT III BASE CLASS LIBRARIES AND DATA MANIPULATION 9
Diagnostics -Tasks, Threads and Synchronization - .Net Security - Localization -
Manipulating XML- SAX and DOM - Manipulating files and the Registry- Transactions -
ADO.NET- Peer-to-Peer Networking - PNRP - Building P2P Applications - Windows
Presentation Foundation (WPF).
UNIT IV WINDOW BASED APPLICATIONS, WCF AND WWF 9
Window based applications - Core ASP.NET- ASP.NET Web forms -Windows
Communication Foundation (WCF)- Introduction to Web Services - .Net Remoting -
Windows Service - Windows Workflow Foundation (WWF) - Activities – Workflows
UNIT V .NET FRAMEWORK AND COMPACT FRAMEWORK 9
Assemblies - Shared assemblies - Custom Hosting with CLR Objects - Appdomains -
Core XAML - Bubbling and Tunneling Events- Reading and Writing XAML - .Net
Compact Framework - Compact Edition Data Stores – Errors, Testing and Debugging –
Optimizing performance – Packaging and Deployment – Networking and Mobile
Devices
TOTAL :45 PERIODS
101
OUTCOMES:
Upon completion of the course, the students will be able to:
 Write various applications using C# Language in the .NET Framework.
 Develop distributed applications using .NET Framework.
 Create mobile applications using .NET compact Framework.
TEXT BOOKS:
1. Christian Nagel, Bill Evjen, Jay Glynn, Karli Watson, Morgan Skinner . ―Professional
C# 2012 and .NET 4.5ǁ, Wiley, 2012
2. Harsh Bhasin, ―Programming in C#ǁ, Oxford University Press, 2014.
REFERENCES
1. Ian Gariffiths, Mathew Adams, Jesse Liberty, ―Programming C# 4.0ǁ, O‘Reilly,
Fourth Edition, 2010.
2. Andrew Troelsen, Pro C# 5.0 and the .NET 4.5 Framework, Apress publication,
2012.
3. Andy Wigley, Daniel Moth, Peter Foot, ―Mobile Development Handbookǁ, Microsoft
Press, 2011.
CS8088 WIRELESS ADHOC AND SENSOR NETWORKS L T P C
3 0 0 3
OBJECTIVES:
 To learn about the issues and challenges in the design of wireless ad hoc networks.
 To understand the working of MAC and Routing Protocols for ad hoc and sensor networks
 To learn about the Transport Layer protocols and their QoS for ad hoc and sensor
networks.
 To understand various security issues in ad hoc and sensor networks and the
corresponding solutions.
UNIT I MAC & ROUTING IN AD HOC NETWORKS 9
Introduction – Issues and challenges in ad hoc networks – MAC Layer Protocols for wireless
ad hoc networks – Contention-Based MAC protocols – MAC Protocols Using Directional
Antennas – Multiple-Channel MAC Protocols – Power-Aware MAC Protocols – Routing in Ad
hoc Networks – Design Issues – Proactive, Reactive and Hybrid Routing Protocols
UNIT II TRANSPORT & QOS IN AD HOC NETWORKS 9
TCP‟s challenges and Design Issues in Ad Hoc Networks – Transport protocols for ad hoc
networks – Issues and Challenges in providing QoS – MAC Layer QoS solutions – Network
Layer QoS solutions – QoS Model
UNIT III MAC & ROUTING IN WIRELESS SENSOR NETWORKS 9
Introduction – Applications – Challenges – Sensor network architecture – MAC Protocols for
wireless sensor networks – Low duty cycle protocols and wakeup concepts – Contention-
Based protocols – Schedule-Based protocols – IEEE 802.15.4 Zigbee – Topology Control –
Routing Protocols
UNIT IV TRANSPORT & QOS IN WIRELESS SENSOR NETWORKS 9
Data-Centric and Contention-Based Networking – Transport Layer and QoS in Wireless
Sensor Networks – Congestion Control in network processing – Operating systems for
wireless sensor networks – Examples
102
UNIT V SECURITY IN AD HOC AND SENSOR NETWORKS 9
Security Attacks – Key Distribution and Management – Intrusion Detection – Software based
Anti-tamper techniques – Water marking techniques – Defense against routing attacks -
Secure Ad hoc routing protocols – Broadcast authentication WSN protocols – TESLA – Biba –
Sensor Network Security Protocols – SPINS
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Identify different issues in wireless ad hoc and sensor networks .
 To analyze protocols developed for ad hoc and sensor networks .
 To identify and understand security issues in ad hoc and sensor
networks.
TEXT BOOKS:
1. C.Siva Ram Murthy and B.S.Manoj, “Ad Hoc Wireless Networks – Architectures and
Protocols”, Pearson Education, 2006.
2.
2. Holger Karl, Andreas Willing, “Protocols and Architectures for Wireless Sensor Networks”,
John Wiley & Sons, Inc., 2005.
REFERENCES
1. Subir Kumar Sarkar, T G Basavaraju, C Puttamadappa, “Ad Hoc Mobile Wireless Networks”,
Auerbach Publications, 2008.
2. Carlos De Morais Cordeiro, Dharma Prakash Agrawal, “Ad Hoc and Sensor Networks: Theory
and Applications (2nd
Edition)”, World Scientific Publishing, 2011.
3. Waltenegus Dargie, Christian Poellabauer, “Fundamentals of Wireless Sensor Networks
Theory and Practice”, John Wiley and Sons, 2010
4. Xiang-Yang Li , “Wireless Ad Hoc and Sensor Networks: Theory and Applications”, 1227
th edition, Cambridge university Press,2008.
CS8071 ADVANCED TOPICS ON DATABASES L T P C
3 0 0 3
OBJECTIVES:
 To learn the modeling and design of databases.
 To acquire knowledge on parallel and distributed databases and their applications.
 To study the usage and applications of Object Oriented and Intelligent databases.
 To understand the usage of advanced data models.
 To learn emerging databases such as XML, Cloud and Big Data.
 To acquire inquisitive attitude towards research topics in databases.
UNIT I PARALLEL AND DISTRIBUTED DATABASES 9
Database System Architectures: Centralized and Client-Server Architectures – Server System
Architectures – Parallel Systems- Distributed Systems – Parallel Databases: I/O Parallelism – Inter
and Intra Query Parallelism – Inter and Intra operation Parallelism – Design of Parallel Systems-
Distributed Database Concepts - Distributed Data Storage – Distributed Transactions – Commit
Protocols – Concurrency Control – Distributed Query Processing – Case Studies
UNIT II OBJECT AND OBJECT RELATIONAL DATABASES 9
Concepts for Object Databases: Object Identity – Object structure – Type Constructors –
Encapsulation of Operations – Methods – Persistence – Type and Class Hierarchies – Inheritance
– Complex Objects – Object Database Standards, Languages and Design: ODMG Model – ODL –
103
OQL – Object Relational and Extended – Relational Systems: Object Relational features in
SQL/Oracle – Case Studies.
UNIT III INTELLIGENT DATABASES 9
Active Databases: Syntax and Semantics (Starburst, Oracle, DB2)- Taxonomy- Applications-
Design Principles for Active Rules- Temporal Databases: Overview of Temporal Databases-
TSQL2- Deductive Databases: Logic of Query Languages – Datalog- Recursive Rules-Syntax and
Semantics of Datalog Languages- Implementation of Rules and Recursion- Recursive Queries in
SQL- Spatial Databases- Spatial Data Types- Spatial Relationships- Spatial Data Structures-
Spatial Access Methods- Spatial DB Implementation.
UNIT IV ADVANCED DATA MODELS 9
Mobile Databases: Location and Handoff Management - Effect of Mobility on Data Management -
Location Dependent Data Distribution - Mobile Transaction Models -Concurrency Control -
Transaction Commit Protocols- Multimedia Databases- Information Retrieval- Data Warehousing-
Data Mining- Text Mining.
UNIT V EMERGING TECHNOLOGIES 9
XML Databases: XML-Related Technologies-XML Schema- XML Query Languages- Storing XML
in Databases-XML and SQL- Native XML Databases- Web Databases- Geographic Information
Systems- Biological Data Management- Cloud Based Databases: Data Storage Systems on the
Cloud- Cloud Storage Architectures-Cloud Data Models- Query Languages- Introduction to Big
Data-Storage-Analysis.
TOTAL: 45 PERIODS
OUTCOMES:
Upon Completion of the course, the students will be able,
 To develop in-depth understanding of relational databases and skills to optimize database
performance in practice.
 To understand and critique on each type of databases.
 To design faster algorithms in solving practical database problems.
 To implement intelligent databases and various data models.
TEXT BOOKS:
1. Ramez Elmasri, Shamkant B. Navathe, “Fundamentals of Database Systems”, Sixth Edition ,
Pearson, 2011.
2. Thomas Cannolly and Carolyn Begg, “Database Systems, A Practical Approach to Design,
Implementation and Management”, Fourth Edition, Pearson Education, 2008.
REFERENCES:
1. Henry F Korth, Abraham Silberschatz, S. Sudharshan, “Database System Concepts”, Sixth
Edition, McGraw Hill, 2011.
2. C.J.Date, A.Kannan, S.Swamynathan, “An Introduction to Database Systems”, Eighth
Edition, Pearson Education, 2006.
3. Carlo Zaniolo, Stefano Ceri, Christos Faloutsos, Richard T.Snodgrass, V.S.Subrahmanian,
Roberto Zicari, “Advanced Database Systems”, Morgan Kaufmann publishers,2006.
GE8072 FOUNDATION SKILLS IN INTEGRATED PRODUCT
DEVELOPMENT
L T P C
3 0 0 3
OBJECTIVES:
 To understand the global trends and development methodologies of various types of
104
products and services
 To conceptualize, prototype and develop product management plan for a new product
based on the type of the new product and development methodology integrating the
hardware, software, controls, electronics and mechanical systems
 To understand requirement engineering and know how to collect, analyze and arrive
at requirements for new product development and convert them in to design
specification
 To understand system modeling for system, sub-system and their interfaces and
arrive at the optimum system specification and characteristics
 To develop documentation, test specifications and coordinate with various teams to
validate and sustain up to the EoL (End of Life) support activities for engineering
customer
UNIT I FUNDAMENTALS OF PRODUCT DEVELOPMENT 9
Global Trends Analysis and Product decision - Social Trends - Technical Trends-
Economical Trends - Environmental Trends - Political/Policy Trends - Introduction to
Product Development Methodologies and Management - Overview of Products and
Services - Types of Product Development - Overview of Product Development methodologies
- Product Life Cycle – Product Development Planning and Management.
UNIT II REQUIREMENTS AND SYSTEM DESIGN 9
Requirement Engineering - Types of Requirements - Requirement Engineering -
traceability Matrix and Analysis - Requirement Management - System Design & Modeling -
Introduction to System Modeling - System Optimization - System Specification - Sub-System
Design - Interface Design.
UNIT III DESIGN AND TESTING 9
Conceptualization - Industrial Design and User Interface Design - Introduction to Concept
generation Techniques – Challenges in Integration of Engineering Disciplines - Concept
Screening & Evaluation - Detailed Design - Component Design and Verification –
Mechanical, Electronics and Software Subsystems - High Level Design/Low Level Design
of S/W Program - Types of Prototypes, S/W Testing- Hardware Schematic, Component
design, Layout and Hardware Testing – Prototyping - Introduction to Rapid Prototyping and
Rapid Manufacturing - System Integration, Testing, Certification and Documentation
UNIT IV SUSTENANCE ENGINEERING AND END-OF-LIFE (EOL) SUPPORT 9
Introduction to Product verification processes and stages - Introduction to Product Validation
processes and stages - Product Testing Standards and Certification - Product Documentation
- Sustenance -Maintenance and Repair – Enhancements - Product EoL - Obsolescence
Management – Configuration Management - EoL Disposal
UNIT V BUSINESS DYNAMICS – ENGINEERING SERVICES INDUSTRY 9
The Industry - Engineering Services Industry - Product Development in Industry versus
Academia –The IPD Essentials - Introduction to Vertical Specific Product Development
processes -Manufacturing/Purchase and Assembly of Systems - Integration of Mechanical,
Embedded and Software Systems – Product Development Trade-offs - Intellectual Property
Rights and Confidentiality – Security and Configuration Management.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Define, formulate and analyze a problem
 Solve specific problems independently or as part of a team
 Gain knowledge of the Innovation & Product Development process in the Business
Context
 Work independently as well as in teams
105
 Manage a project from start to finish
TEXTBOOKS:
1. Book specially prepared by NASSCOM as per the MoU.
2. Karl T Ulrich and Stephen D Eppinger, "Product Design and Development", Tata McGraw
Hill, Fifth Edition, 2011.
3. John W Newstorm and Keith Davis, "Organizational Behavior", Tata McGraw Hill,
Eleventh Edition, 2005.
REFERENCES:
1. Hiriyappa B, “Corporate Strategy – Managing the Business”, Author House, 2013.
2. Peter F Drucker, “People and Performance”, Butterworth – Heinemann [Elsevier], Oxford,
2004.
3. Vinod Kumar Garg and Venkita Krishnan N K, “Enterprise Resource Planning –
Concepts”, Second Edition, Prentice Hall, 2003.
4. Mark S Sanders and Ernest J McCormick, "Human Factors in Engineering and Design",
McGraw Hill Education, Seventh Edition, 2013
GE8074 HUMAN RIGHTS L T P C
3 0 0 3
OBJECTIVE :
 To sensitize the Engineering students to various aspects of Human Rights.
UNIT I 9
Human Rights – Meaning, origin and Development. Notion and classification of Rights – Natural,
Moral and Legal Rights. Civil and Political Rights, Economic, Social and Cultural Rights;
collective / Solidarity Rights.
UNIT II 9
Evolution of the concept of Human Rights Magana carta – Geneva convention of 1864. Universal
Declaration of Human Rights, 1948. Theories of Human Rights.
UNIT III 9
Theories and perspectives of UN Laws – UN Agencies to monitor and compliance.
UNIT IV 9
Human Rights in India – Constitutional Provisions / Guarantees.
UNIT V 9
Human Rights of Disadvantaged People – Women, Children, Displaced persons and Disabled
persons, including Aged and HIV Infected People. Implementation of Human Rights – National
and State Human Rights Commission – Judiciary – Role of NGO’s, Media, Educational
Institutions, Social Movements.
TOTAL: 45 PERIODS
OUTCOME:
 Engineering students will acquire the basic knowledge of human rights.
REFERENCES:
1. Kapoor S.K., “Human Rights under International law and Indian Laws”, Central Law Agency,
Allahabad, 2014.
2. Chandra U., “Human Rights”, Allahabad Law Agency, Allahabad, 2014.
3. Upendra Baxi, The Future of Human Rights, Oxford University Press, New Delhi.
106
GE8071 DISASTER MANAGEMENT L T P C
3 0 0 3
OBJECTIVES:
 To provide students an exposure to disasters, their significance and types.
 To ensure that students begin to understand the relationship between vulnerability,
 disasters, disaster prevention and risk reduction
 To gain a preliminary understanding of approaches of Disaster Risk Reduction (DRR)
 To enhance awareness of institutional processes in the country and
 To develop rudimentary ability to respond to their surroundings with potential
 disaster response in areas where they live, with due sensitivity
UNIT I INTRODUCTION TO DISASTERS 9
Definition: Disaster, Hazard, Vulnerability, Resilience, Risks – Disasters: Types of disasters –
Earthquake, Landslide, Flood, Drought, Fire etc - Classification, Causes, Impacts including social,
economic, political, environmental, health, psychosocial, etc.- Differential impacts- in terms of
caste, class, gender, age, location, disability - Global trends in disasters: urban disasters,
pandemics, complex emergencies, Climate change- Dos and Don’ts during various types of
Disasters.
UNIT II APPROACHES TO DISASTER RISK REDUCTION (DRR) 9
Disaster cycle - Phases, Culture of safety, prevention, mitigation and preparedness community
based DRR, Structural- nonstructural measures, Roles and responsibilities of- community,
Panchayati Raj
Institutions/Urban Local Bodies (PRIs/ULBs), States, Centre, and other stake-holders- Institutional
Processess and Framework at State and Central Level- State Disaster Management
Authority(SDMA) – Early Warning System – Advisories from Appropriate Agencies.
UNIT III INTER-RELATIONSHIP BETWEEN DISASTERS AND DEVELOPMENT 9
Factors affecting Vulnerabilities, differential impacts, impact of Development projects such as
dams, embankments, changes in Land-use etc.- Climate Change Adaptation- IPCC Scenario and
Scenarios in the context of India - Relevance of indigenous knowledge, appropriate technology
and local resources.
UNIT IV DISASTER RISK MANAGEMENT IN INDIA 9
Hazard and Vulnerability profile of India, Components of Disaster Relief: Water, Food, Sanitation,
Shelter, Health, Waste Management, Institutional arrangements (Mitigation, Response and
Preparedness, Disaster Management Act and Policy - Other related policies, plans, programmes
and legislation – Role of GIS and Information Technology Components in Preparedness, Risk
Assessment, Response and Recovery Phases of Disaster – Disaster Damage Assessment.
UNIT V DISASTER MANAGEMENT: APPLICATIONS AND CASE STUDIES AND FIELD
WORKS 9
Landslide Hazard Zonation: Case Studies, Earthquake Vulnerability Assessment of Buildings and
Infrastructure: Case Studies, Drought Assessment: Case Studies, Coastal Flooding: Storm Surge
Assessment, Floods: Fluvial and Pluvial Flooding: Case Studies; Forest Fire: Case Studies, Man
Made disasters: Case Studies, Space Based Inputs for Disaster Mitigation and Management and
field works related to disaster management.
TOTAL: 45 PERIODS
OUTCOMES:
The students will be able to
 Differentiate the types of disasters, causes and their impact on environment and society
 Assess vulnerability and various methods of risk reduction measures as well as mitigation.
 Draw the hazard and vulnerability profile of India, Scenarious in the Indian context, Disaster
damage assessment and management.
107
TEXTBOOKS:
1. Singhal J.P. “Disaster Management”, Laxmi Publications, 2010. ISBN-10: 9380386427 ISBN-
13: 978-9380386423
2. Tushar Bhattacharya, “Disaster Science and Management”, McGraw Hill India Education Pvt.
Ltd., 2012. ISBN-10: 1259007367, ISBN-13: 978-1259007361]
3. Gupta Anil K, Sreeja S. Nair. Environmental Knowledge for Disaster Risk Management, NIDM,
New Delhi, 2011
4. Kapur Anu Vulnerable India: A Geographical Study of Disasters, IIAS and Sage Publishers,
New Delhi, 2010.
REFERENCES
1. Govt. of India: Disaster Management Act , Government of India, New Delhi, 2005
2. Government of India, National Disaster Management Policy,2009.
EC8093 DIGITAL IMAGE PROCESSING L T P C
3 0 0 3
OBJECTIVES:
 To become familiar with digital image fundamentals
 To get exposed to simple image enhancement techniques in Spatial and Frequency domain.
 To learn concepts of degradation function and restoration techniques.
 To study the image segmentation and representation techniques.
 To become familiar with image compression and recognition methods
UNIT I DIGITAL IMAGE FUNDAMENTALS 9
Steps in Digital Image Processing – Components – Elements of Visual Perception – Image
Sensing and Acquisition – Image Sampling and Quantization – Relationships between pixels -
Color image fundamentals - RGB, HSI models, Two-dimensional mathematical preliminaries, 2D
transforms - DFT, DCT.
UNIT II IMAGE ENHANCEMENT 9
Spatial Domain: Gray level transformations – Histogram processing – Basics of Spatial Filtering–
Smoothing and Sharpening Spatial Filtering, Frequency Domain: Introduction to Fourier
Transform– Smoothing and Sharpening frequency domain filters – Ideal, Butterworth and
Gaussian filters, Homomorphic filtering, Color image enhancement.
UNIT III IMAGE RESTORATION 9
Image Restoration - degradation model, Properties, Noise models – Mean Filters – Order
Statistics – Adaptive filters – Band reject Filters – Band pass Filters – Notch Filters – Optimum
Notch Filtering – Inverse Filtering – Wiener filtering
UNIT IV IMAGE SEGMENTATION 9
Edge detection, Edge linking via Hough transform – Thresholding - Region based segmentation –
Region growing – Region splitting and merging – Morphological processing- erosion and dilation,
Segmentation by morphological watersheds – basic concepts – Dam construction – Watershed
segmentation algorithm.
UNIT V IMAGE COMPRESSION AND RECOGNITION 9
Need for data compression, Huffman, Run Length Encoding, Shift codes, Arithmetic coding, JPEG
standard, MPEG. Boundary representation, Boundary description, Fourier Descriptor, Regional
Descriptors – Topological feature, Texture - Patterns and Pattern classes - Recognition based on
matching.
TOTAL 45 PERIODS
108
OUTCOMES:
At the end of the course, the students should be able to:
 Know and understand the basics and fundamentals of digital image processing, such as
digitization, sampling, quantization, and 2D-transforms.
 Operate on images using the techniques of smoothing, sharpening and enhancement.
 Understand the restoration concepts and filtering techniques.
 Learn the basics of segmentation, features extraction, compression and recognition
methods for color models.
TEXT BOOKS:
1. Rafael C. Gonzalez, Richard E. Woods, ‘Digital Image Processing’, Pearson, Third Edition,
2010.
2. Anil K. Jain, ‘Fundamentals of Digital Image Processing’, Pearson, 2002.
REFERENCES:
1. Kenneth R. Castleman, ‘Digital Image Processing’, Pearson, 2006.
2. Rafael C. Gonzalez, Richard E. Woods, Steven Eddins, ‘Digital Image Processing using
MATLAB’, Pearson Education, Inc., 2011.
3. D,E. Dudgeon and RM. Mersereau, ‘Multidimensional Digital Signal Processing’, Prentice
Hall Professional Technical Reference, 1990.
4. William K. Pratt, ‘Digital Image Processing’, John Wiley, New York, 2002
5. Milan Sonka et al ‘Image processing, analysis and machine vision’, Brookes/Cole, Vikas
Publishing House, 2nd edition, 1999
CS8085 SOCIAL NETWORK ANALYSIS L T P C
3 0 0 3
OBJECTIVES:
 To understand the concept of semantic web and related applications.
 To learn knowledge representation using ontology.
 To understand human behaviour in social web and related communities.
 To learn visualization of social networks.
UNIT I INTRODUCTION 9
Introduction to Semantic Web: Limitations of current Web - Development of Semantic Web -
Emergence of the Social Web - Social Network analysis: Development of Social Network Analysis
- Key concepts and measures in network analysis - Electronic sources for network analysis:
Electronic discussion networks, Blogs and online communities - Web-based networks -
Applications of Social Network Analysis.
UNIT II MODELLING, AGGREGATING AND KNOWLEDGE
REPRESENTATION 9
Ontology and their role in the Semantic Web: Ontology-based knowledge Representation -
Ontology languages for the Semantic Web: Resource Description Framework - Web Ontology
Language - Modelling and aggregating social network data: State-of-the-art in network data
representation - Ontological representation of social individuals - Ontological representation of
social relationships - Aggregating and reasoning with social network data - Advanced
representations.
UNIT III EXTRACTION AND MINING COMMUNITIES IN WEB SOCIAL
NETWORKS 9
Extracting evolution of Web Community from a Series of Web Archive - Detecting communities in
social networks - Definition of community - Evaluating communities - Methods for community
detection and mining - Applications of community mining algorithms - Tools for detecting
109
communities social network infrastructures and communities - Decentralized online social
networks - Multi-Relational characterization of dynamic social network communities.
UNIT IV PREDICTING HUMAN BEHAVIOUR AND PRIVACY ISSUES 9
Understanding and predicting human behaviour for social communities - User data management -
Inference and Distribution - Enabling new human experiences - Reality mining - Context -
Awareness - Privacy in online social networks - Trust in online environment - Trust models based
on subjective logic - Trust network analysis - Trust transitivity analysis - Combining trust and
reputation - Trust derivation based on trust comparisons - Attack spectrum and countermeasures.
UNIT V VISUALIZATION AND APPLICATIONS OF SOCIAL NETWORKS 9
Graph theory - Centrality - Clustering - Node-Edge Diagrams - Matrix representation - Visualizing
online social networks, Visualizing social networks with matrix-based representations - Matrix and
Node-Link Diagrams - Hybrid representations - Applications - Cover networks - Community
welfare - Collaboration networks - Co-Citation networks.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students should be able to:
 Develop semantic web related applications.
 Represent knowledge using ontology.
 Predict human behaviour in social web and related communities.
 Visualize social networks.
TEXT BOOKS:
1. Peter Mika, “Social Networks and the Semantic Web”, First Edition, Springer 2007.
2. Borko Furht, “Handbook of Social Network Technologies and Applications”, 1st
Edition,
Springer, 2010.
REFERENCES:
1. Guandong Xu ,Yanchun Zhang and Lin Li, “Web Mining and Social Networking – Techniques
and applications”, First Edition, Springer, 2011.
2. Dion Goh and Schubert Foo, “Social information Retrieval Systems: Emerging Technologies
and Applications for Searching the Web Effectively”, IGI Global Snippet, 2008.
3. Max Chevalier, Christine Julien and Chantal Soulé-Dupuy, “Collaborative and Social
Information Retrieval and Access: Techniques for Improved user Modelling”, IGI Global
Snippet, 2009.
4. John G. Breslin, Alexander Passant and Stefan Decker, “The Social Semantic Web”, Springer,
2009.
IT8073 INFORMATION SECURITY L T P C
3 0 0 3
OBJECTIVES:
 To understand the basics of Information Security
 To know the legal, ethical and professional issues in Information Security
 To know the aspects of risk management
 To become aware of various standards in this area
 To know the technological aspects of Information Security
UNIT I INTRODUCTION 9
History, What is Information Security?, Critical Characteristics of Information, NSTISSC
Security Model, Components of an Information System, Securing the Components, Balancing
Security and Access, The SDLC, The Security SDLC
110
UNIT II SECURITY INVESTIGATION 9
Need for Security, Business Needs, Threats, Attacks, Legal, Ethical and Professional Issues -
An Overview of Computer Security - Access Control Matrix, Policy-Security policies,
Confidentiality policies, Integrity policies and Hybrid policies
UNIT III SECURITY ANALYSIS 9
Risk Management: Identifying and Assessing Risk, Assessing and Controlling Risk -
Systems: Access Control Mechanisms, Information Flow and Confinement Problem
UNIT IV LOGICAL DESIGN 9
Blueprint for Security, Information Security Policy, Standards and Practices, ISO 17799/BS
7799, NIST Models, VISA International Security Model, Design of Security Architecture,
Planning for Continuity
UNIT V PHYSICAL DESIGN 9
Security Technology, IDS, Scanning and Analysis Tools, Cryptography, Access Control
Devices, Physical Security, Security and Personnel
TOTAL 45 PERIODS
OUTCOMES:
At the end of this course, the students should be able to:
 Discuss the basics of information security
 Illustrate the legal, ethical and professional issues in information security
 Demonstrate the aspects of risk management.
 Become aware of various standards in the Information Security System
 Design and implementation of Security Techniques.
TEXT BOOK:
1. Michael E Whitman and Herbert J Mattord, “Principles of Information Security”, Vikas
Publishing House, New Delhi, 2003
REFERENCES
1. Micki Krause, Harold F. Tipton, “ Handbook of Information Security Management”,
Vol 1-3 CRCPress LLC, 2004.
2. Stuart McClure, Joel Scrambray, George Kurtz, “Hacking Exposed”, Tata McGraw-
Hill, 2003
3. Matt Bishop, “ Computer Security Art and Science”, Pearson/PHI, 2002.
CS8087 SOFTWARE DEFINED NETWORKS L T P C
3 0 0 3
OBJECTIVES:
 To learn the fundamentals of software defined networks.
 To understand the separation of the data plane and the control plane.
 To study about the SDN Programming.
 To study about the various applications of SDN
UNIT I INTRODUCTION 9
History of Software Defined Networking (SDN) – Modern Data Center – Traditional Switch
Architecture – Why SDN – Evolution of SDN – How SDN Works – Centralized and
Distributed Control and Date Planes
UNIT II OPEN FLOW & SDN CONTROLLERS 9
Open Flow Specification – Drawbacks of Open SDN, SDN via APIs, SDN via Hypervisor-
111
Based Overlays – SDN via Opening up the Device – SDN Controllers – General Concepts
UNIT III DATA CENTERS 9
Multitenant and Virtualized Multitenant Data Center – SDN Solutions for the Data Center
Network – VLANs – EVPN – VxLAN – NVGRE
UNIT IV SDN PROGRAMMING 9
Programming SDNs: Northbound Application Programming Interface, Current Languages
and Tools, Composition of SDNs – Network Functions Virtualization (NFV) and Software
Defined Networks: Concepts, Implementation and Applications
UNIT V SDN 9
Juniper SDN Framework – IETF SDN Framework – Open Daylight Controller – Floodlight
Controller – Bandwidth Calendaring – Data Center Orchestration
TOTAL :45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Analyze the evolution of software defined networks
 Express the various components of SDN and their uses
 Explain the use of SDN in the current networking scenario
 Design and develop various applications of SDN
TEXT BOOKS:
1. Paul Goransson and Chuck Black, ―Software Defined Networks: A Comprehensive
Approach, First Edition, Morgan Kaufmann, 2014.
2. Thomas D. Nadeau, Ken Gray, ―SDN: Software Defined Networks, O'Reilly
Media, 2013.
REFERENCES:
1. Siamak Azodolmolky, ―Software Defined Networking with Open Flow, Packet
Publishing, 2013.
2. Vivek Tiwari, ―SDN and Open Flow for Beginnersǁ, Amazon Digital Services, Inc.,
2013.
3. Fei Hu, Editor, ―Network Innovation through Open Flow and SDN: Principles and
Design, CRC Press, 2014.
CS8074 CYBER FORENSICS L T P C
3 0 0 3
OBJECTIVES:
 To learn computer forensics
 To become familiar with forensics tools
 To learn to analyze and validate forensics data
UNIT I INTRODUCTION TO COMPUTER FORENSICS 9
Introduction to Traditional Computer Crime, Traditional problems associated with Computer
Crime. Introduction to Identity Theft & Identity Fraud. Types of CF techniques - Incident and
incident response methodology - Forensic duplication and investigation. Preparation for IR:
Creating response tool kit and IR team. - Forensics Technology and Systems -
Understanding Computer Investigation – Data Acquisition.
UNIT II EVIDENCE COLLECTION AND FORENSICS TOOLS 9
Processing Crime and Incident Scenes – Working with Windows and DOS Systems.
Current Computer Forensics Tools: Software/ Hardware Tools.
112
UNIT III ANALYSIS AND VALIDATION 9
Validating Forensics Data – Data Hiding Techniques – Performing Remote Acquisition –
Network Forensics – Email Investigations – Cell Phone and Mobile Devices Forensics
UNIT IV ETHICAL HACKING 9
Introduction to Ethical Hacking - Footprinting and Reconnaissance - Scanning Networks -
Enumeration - System Hacking - Malware Threats - Sniffing
UNIT V ETHICAL HACKING IN WEB 9
Social Engineering - Denial of Service - Session Hijacking - Hacking Web servers - Hacking
Web Applications – SQL Injection - Hacking Wireless Networks - Hacking Mobile Platforms.
TOTAL 45 PERIODS
OUTCOMES:
At the end of the course, the student should be able to:
 Understand the basics of computer forensics
 Apply a number of different computer forensic tools to a given scenario
 Analyze and validate forensics data
 Identify the vulnerabilities in a given network infrastructure
 Implement real-world hacking techniques to test system security
TEXT BOOKS:
1. Bill Nelson, Amelia Phillips, Frank Enfinger, Christopher Steuart, “Computer
Forensics and Investigations”, Cengage Learning, India Edition, 2016.
2. CEH official Certfied Ethical Hacking Review Guide, Wiley India Edition, 2015.
REFERENCES
1. John R.Vacca, “Computer Forensics”, Cengage Learning, 2005
2. MarjieT.Britz, “Computer Forensics and Cyber Crime”: An Introduction”, 3rd
Edition,
Prentice Hall, 2013.
3. AnkitFadia “ Ethical Hacking” Second Edition, Macmillan India Ltd, 2006
4. Kenneth C.Brancik “Insider Computer Fraud” Auerbach Publications Taylor &amp;
Francis Group–2008.
CS8086 SOFT COMPUTING L T P C
3 0 0 3
OBJECTIVES:
 To learn the basic concepts of Soft Computing
 To become familiar with various techniques like neural networks, genetic algorithms
and fuzzy systems.
 To apply soft computing techniques to solve problems.
UNIT I INTRODUCTION TO SOFT COMPUTING 9
Introduction-Artificial Intelligence-Artificial Neural Networks-Fuzzy Systems-Genetic
Algorithm and Evolutionary Programming-Swarm Intelligent Systems-Classification of
ANNs-McCulloch and Pitts Neuron Model-Learning Rules: Hebbian and Delta- Perceptron
Network-Adaline Network-Madaline Network.
UNIT II ARTIFICIAL NEURAL NETWORKS 9
Back propagation Neural Networks - Kohonen Neural Network -Learning Vector
Quantization -Hamming Neural Network - Hopfield Neural Network- Bi-directional
113
Associative Memory -Adaptive Resonance Theory Neural Networks- Support Vector
Machines - Spike Neuron Models.
UNIT III FUZZY SYSTEMS 9
Introduction to Fuzzy Logic, Classical Sets and Fuzzy Sets - Classical Relations and Fuzzy
Relations -Membership Functions -Defuzzification - Fuzzy Arithmetic and Fuzzy Measures -
Fuzzy Rule Base and Approximate Reasoning - Introduction to Fuzzy Decision Making.
UNIT IV GENETIC ALGORITHMS 9
Basic Concepts- Working Principles -Encoding- Fitness Function - Reproduction -
Inheritance Operators - Cross Over - Inversion and Deletion -Mutation Operator - Bit-wise
Operators -Convergence of Genetic Algorithm.
UNIT V HYBRID SYSTEMS 9
Hybrid Systems -Neural Networks, Fuzzy Logic and Genetic -GA Based Weight
Determination - LR-Type Fuzzy Numbers - Fuzzy Neuron - Fuzzy BP Architecture -
Learning in Fuzzy BP- Inference by Fuzzy BP - Fuzzy ArtMap: A Brief Introduction - Soft
Computing Tools - GA in Fuzzy Logic Controller Design - Fuzzy Logic Controller
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of this course, the students should be able to
 Apply suitable soft computing techniques for various applications.
 Integrate various soft computing techniques for complex problems.
TEXT BOOKS:
1. N.P.Padhy, S.P.Simon, "Soft Computing with MATLAB Programming", Oxford
University Press, 2015.
2. S.N.Sivanandam , S.N.Deepa, "Principles of Soft Computing", Wiley India Pvt. Ltd.,
2nd Edition, 2011.
3. S.Rajasekaran, G.A.Vijayalakshmi Pai, "Neural Networks, Fuzzy Logic and Genetic
Algorithm, Synthesis and Applications ", PHI Learning Pvt. Ltd., 2017.
REFERENCES:
1. Jyh-Shing Roger Jang, Chuen-Tsai Sun, Eiji Mizutani, “Neuro-Fuzzy and Soft
Computing”, Prentice-Hall of India, 2002.
2. Kwang H.Lee, “First course on Fuzzy Theory and Applications”, Springer, 2005.
3. George J. Klir and Bo Yuan, “Fuzzy Sets and Fuzzy Logic-Theory and Applications”,
Prentice Hall, 1996.
4. James A. Freeman and David M. Skapura, “Neural Networks Algorithms,
Applications, and Programming Techniques”, Addison Wesley, 2003.
GE8076 PROFESSIONAL ETHICS IN ENGINEERING LT P C
3 0 0 3
OBJECTIVES:
 To enable the students to create an awareness on Engineering Ethics and Human Values,
to instill Moral and Social Values and Loyalty and to appreciate the rights of others.
UNIT I HUMAN VALUES 10
Morals, values and Ethics – Integrity – Work ethic – Service learning – Civic virtue – Respect for
others – Living peacefully – Caring – Sharing – Honesty – Courage – Valuing time – Cooperation –
Commitment – Empathy – Self confidence – Character – Spirituality – Introduction to Yoga and
meditation for professional excellence and stress management.
114
UNIT II ENGINEERING ETHICS 9
Senses of ‘Engineering Ethics’ – Variety of moral issues – Types of inquiry – Moral dilemmas –
Moral Autonomy – Kohlberg’s theory – Gilligan’s theory – Consensus and Controversy – Models of
professional roles - Theories about right action – Self-interest – Customs and Religion – Uses of
Ethical Theories.
UNIT III ENGINEERING AS SOCIAL EXPERIMENTATION 9
Engineering as Experimentation – Engineers as responsible Experimenters – Codes of Ethics –
A Balanced Outlook on Law.
UNIT IV SAFETY, RESPONSIBILITIES AND RIGHTS 9
Safety and Risk – Assessment of Safety and Risk – Risk Benefit Analysis and Reducing Risk -
Respect for Authority – Collective Bargaining – Confidentiality – Conflicts of Interest –
Occupational Crime – Professional Rights – Employee Rights – Intellectual Property Rights (IPR)
– Discrimination.
UNIT V GLOBAL ISSUES 8
Multinational Corporations – Environmental Ethics – Computer Ethics – Weapons Development –
Engineers as Managers – Consulting Engineers – Engineers as Expert Witnesses and Advisors –
Moral Leadership –Code of Conduct – Corporate Social Responsibility.
TOTAL: 45 PERIODS
OUTCOMES:
 Upon completion of the course, the student should be able to apply ethics in society, discuss
the ethical issues related to engineering and realize the responsibilities and rights in the
society.
TEXT BOOKS:
1. Mike W. Martin and Roland Schinzinger, “Ethics in Engineering”, Tata McGraw Hill, New Delhi,
2003.
2. Govindarajan M, Natarajan S, Senthil Kumar V. S, “Engineering Ethics”, Prentice Hall of India,
New Delhi, 2004.
REFERENCES:
1. Charles B. Fleddermann, “Engineering Ethics”, Pearson Prentice Hall, New Jersey, 2004.
2. Charles E. Harris, Michael S. Pritchard and Michael J. Rabins, “Engineering Ethics –
Concepts and Cases”, Cengage Learning, 2009.
3. John R Boatright, “Ethics and the Conduct of Business”, Pearson Education, New Delhi, 2003
4. Edmund G Seebauer and Robert L Barry, “Fundamentals of Ethics for Scientists and
Engineers”, Oxford University Press, Oxford, 2001.
5. Laura P. Hartman and Joe Desjardins, “Business Ethics: Decision Making for Personal
Integrity and Social Responsibility” Mc Graw Hill education, India Pvt. Ltd.,New Delhi, 2013.
6. World Community Service Centre, ‘ Value Education’, Vethathiri publications, Erode, 2011.
Web sources:
1. www.onlineethics.org
2. www.nspe.org
3. www.globalethics.org
4. www.ethics.org
115
CS8080 INFORMATION RETRIEVAL TECHNIQUES L T P C
3 0 0 3
OBJECTIVES:
 To understand the basics of Information Retrieval.
 To understand machine learning techniques for text classification and clustering.
 To understand various search engine system operations.
 To learn different techniques of recommender system.
UNIT I INTRODUCTION 9
Information Retrieval – Early Developments – The IR Problem – The User‘s Task – Information
versus Data Retrieval - The IR System – The Software Architecture of the IR System – The
Retrieval and Ranking Processes - The Web – The e-Publishing Era – How the web changed
Search – Practical Issues on the Web – How People Search – Search Interfaces Today –
Visualization in Search Interfaces.
UNIT II MODELING AND RETRIEVAL EVALUATION 9
Basic IR Models - Boolean Model - TF-IDF (Term Frequency/Inverse Document Frequency)
Weighting - Vector Model – Probabilistic Model – Latent Semantic Indexing Model – Neural
Network Model – Retrieval Evaluation – Retrieval Metrics – Precision and Recall – Reference
Collection – User-based Evaluation – Relevance Feedback and Query Expansion – Explicit
Relevance Feedback.
UNIT III TEXT CLASSIFICATION AND CLUSTERING 9
A Characterization of Text Classification – Unsupervised Algorithms: Clustering – Naïve Text
Classification – Supervised Algorithms – Decision Tree – k-NN Classifier – SVM Classifier –
Feature Selection or Dimensionality Reduction – Evaluation metrics – Accuracy and Error –
Organizing the classes – Indexing and Searching – Inverted Indexes – Sequential Searching –
Multi-dimensional Indexing.
UNIT IV WEB RETRIEVAL AND WEB CRAWLING 9
The Web – Search Engine Architectures – Cluster based Architecture – Distributed Architectures
– Search Engine Ranking – Link based Ranking – Simple Ranking Functions – Learning to Rank –
Evaluations -- Search Engine Ranking – Search Engine User Interaction – Browsing – Applications
of a Web Crawler – Taxonomy – Architecture and Implementation – Scheduling Algorithms –
Evaluation.
UNIT V RECOMMENDER SYSTEM 9
Recommender Systems Functions – Data and Knowledge Sources – Recommendation
Techniques – Basics of Content-based Recommender Systems – High Level Architecture –
Advantages and Drawbacks of Content-based Filtering – Collaborative Filtering – Matrix
factorization models – Neighborhood models.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Use an open source search engine framework and explore its capabilities
 Apply appropriate method of classification or clustering.
 Design and implement innovative features in a search engine.
 Design and implement a recommender system.
TEXT BOOKS:
1. Ricardo Baeza-Yates and Berthier Ribeiro-Neto, ―Modern Information Retrieval: The Concepts
and Technology behind Search, Second Edition, ACM Press Books, 2011.
2. Ricci, F, Rokach, L. Shapira, B.Kantor, “Recommender Systems Handbook”, First Edition, 2011.
116
REFERENCES:
1. C. Manning, P. Raghavan, and H. Schütze, ―Introduction to Information Retrieval, Cambridge
University Press, 2008.
2. Stefan Buettcher, Charles L. A. Clarke and Gordon V. Cormack, ―Information Retrieval:
Implementing and Evaluating Search Engines, The MIT Press, 2010.
CS8078 GREEN COMPUTING L T P C
3 0 0 3
OBJECTIVES:
 To learn the fundamentals of Green Computing.
 To analyze the Green computing Grid Framework.
 To understand the issues related with Green compliance.
 To study and develop various case studies.
UNIT I FUNDAMENTALS 9
Green IT Fundamentals: Business, IT, and the Environment – Green computing: carbon
foot print, scoop on power – Green IT Strategies: Drivers, Dimensions, and Goals –
Environmentally Responsible Business: Policies, Practices, and Metrics.
UNIT II GREEN ASSETS AND MODELING 9
Green Assets: Buildings, Data Centers, Networks, and Devices – Green Business
Process Management: Modeling, Optimization, and Collaboration – Green Enterprise
Architecture – Environmental Intelligence – Green Supply Chains – Green Information
Systems: Design and Development Models.
UNIT III GRID FRAMEWORK 9
Virtualization of IT systems – Role of electric utilities, Telecommuting, teleconferencing
and teleporting – Materials recycling – Best ways for Green PC – Green Data center –
Green Grid framework.
UNIT IV GREEN COMPLIANCE 9
Socio-cultural aspects of Green IT – Green Enterprise Transformation Roadmap –
Green Compliance: Protocols, Standards, and Audits – Emergent Carbon Issues:
Technologies and Future.
UNIT V CASE STUDIES 9
The Environmentally Responsible Business Strategies (ERBS) – Case Study Scenarios
for Trial Runs – Case Studies – Applying Green IT Strategies and Applications to a
Home, Hospital, Packaging Industry and Telecom Sector.
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to:
 Acquire knowledge to adopt green computing practices to minimize negative
impacts on the environment.
 Enhance the skill in energy saving practices in their use of hardware.
 Evaluate technology tools that can reduce paper waste and carbon footprint by the
stakeholders.
 Understand the ways to minimize equipment disposal requirements .
117
TEXT BOOKS:
1. Bhuvan Unhelkar, “Green IT Strategies and Applications-Using Environmental
Intelligence”, CRC Press, June 2014.
2. Woody Leonhard, Katherine Murray, “Green Home computing for dummies”,
August 2012.
REFERENCES:
1. Alin Gales, Michael Schaefer, Mike Ebbers, “Green Data Center: steps for the
Journey”, Shroff/IBM rebook, 2011.
2. John Lamb, “The Greening of IT”, Pearson Education, 2009.
3. Jason Harris, “Green Computing and Green IT- Best Practices on regulations &
industry”, Lulu.com, 2008
4. Carl speshocky, “Empowering Green Initiatives with IT”, John Wiley & Sons, 2010.
5. Wu Chun Feng (editor), “Green computing: Large Scale energy efficiency”, CRC
Press
CS8076 GPU ARCHITECTURE AND PROGRAMMING L T P C
3 0 0 3
OBJECTIVES:
 To understand the basics of GPU architectures
 To write programs for massively parallel processors
 To understand the issues in mapping algorithms for GPUs
 To introduce different GPU programming models
UNIT I GPU ARCHITECTURE 12
Evolution of GPU architectures - Understanding Parallelism with GPU –Typical GPU Architecture -
CUDA Hardware Overview - Threads, Blocks, Grids, Warps, Scheduling - Memory Handling with
CUDA: Shared Memory, Global Memory, Constant Memory and Texture Memory.
UNIT II CUDA PROGRAMMING 8
Using CUDA - Multi GPU - Multi GPU Solutions - Optimizing CUDA Applications: Problem
Decomposition, Memory Considerations, Transfers, Thread Usage, Resource Contentions.
UNIT III PROGRAMMING ISSUES 8
Common Problems: CUDA Error Handling, Parallel Programming Issues, Synchronization,
Algorithmic Issues, Finding and Avoiding Errors.
UNIT IV OPENCL BASICS 8
OpenCL Standard – Kernels – Host Device Interaction – Execution Environment – Memory
Model – Basic OpenCL Examples.
UNIT V ALGORITHMS ON GPU 9
Parallel Patterns: Convolution, Prefix Sum, Sparse Matrix - Matrix Multiplication - Programming
Heterogeneous Cluster.
TOTAL: 45 PERIODS
OUTCOMES:
Upon completion of the course, the students will be able to
 Describe GPU Architecture
 Write programs using CUDA, identify issues and debug them
 Implement efficient algorithms in GPUs for common application kernels, such as matrix
multiplication
 Write simple programs using OpenCL
 Identify efficient parallel programming patterns to solve problems
118
TEXT BOOKS:
1. Shane Cook, CUDA Programming: ―A Developer's Guide to Parallel Computing with GPUs
(Applications of GPU Computing), First Edition, Morgan Kaufmann, 2012.
2. David R. Kaeli, Perhaad Mistry, Dana Schaa, Dong Ping Zhang, “Heterogeneous computing
with OpenCL”, 3rd
Edition, Morgan Kauffman, 2015.
REFERENCES:
1. Nicholas Wilt, ―CUDA Handbook: A Comprehensive Guide to GPU Programming, Addison -
Wesley, 2013.
2. Jason Sanders, Edward Kandrot, ―CUDA by Example: An Introduction to General Purpose
GPU Programmingǁ, Addison - Wesley, 2010.
3. David B. Kirk, Wen-mei W. Hwu, Programming Massively Parallel Processors - A Hands-on
Approach, Third Edition, Morgan Kaufmann, 2016.
4. http://www.nvidia.com/object/cuda_home_new.html
5. http://www.openCL.org
CS8084 NATURAL LANGUAGE PROCESSING L T P C
3 0 0 3
OBJECTIVES:
 To learn the fundamentals of natural language processing
 To understand the use of CFG and PCFG in NLP
 To understand the role of semantics of sentences and pragmatics
 To apply the NLP techniques to IR applications
UNIT I INTRODUCTION 9
Origins and challenges of NLP – Language Modeling: Grammar-based LM, Statistical LM -
Regular Expressions, Finite-State Automata – English Morphology, Transducers for lexicon
and rules, Tokenization, Detecting and Correcting Spelling Errors, Minimum Edit Distance
UNIT II WORD LEVEL ANALYSIS 9
Unsmoothed N-grams, Evaluating N-grams, Smoothing, Interpolation and Backoff – Word
Classes, Part-of-Speech Tagging, Rule-based, Stochastic and Transformation-based
tagging, Issues in PoS tagging – Hidden Markov and Maximum Entropy models.
UNIT III SYNTACTIC ANALYSIS 9
Context-Free Grammars, Grammar rules for English, Treebanks, Normal Forms for
grammar – Dependency Grammar – Syntactic Parsing, Ambiguity, Dynamic Programming
parsing – Shallow parsing – Probabilistic CFG, Probabilistic CYK, Probabilistic Lexicalized
CFGs - Feature structures, Unification of feature structures.
UNIT IV SEMANTICS AND PRAGMATICS 10
Requirements for representation, First-Order Logic, Description Logics – Syntax-Driven
Semantic analysis, Semantic attachments – Word Senses, Relations between Senses,
Thematic Roles, selectional restrictions – Word Sense Disambiguation, WSD using
Supervised, Dictionary & Thesaurus, Bootstrapping methods – Word Similarity using
Thesaurus and Distributional methods.
UNIT V DISCOURSE ANALYSIS AND LEXICAL RESOURCES 8
Discourse segmentation, Coherence – Reference Phenomena, Anaphora Resolution using
Hobbs and Centering Algorithm – Coreference Resolution – Resources: Porter Stemmer,
Lemmatizer, Penn Treebank, Brill's Tagger, WordNet, PropBank, FrameNet, Brown Corpus,
British National Corpus (BNC).
TOTAL :45 PERIODS
119
OUTCOMES:
Upon completion of the course, the students will be able to:
 To tag a given text with basic Language features
 To design an innovative application using NLP components
 To implement a rule based system to tackle morphology/syntax of a language
 To design a tag set to be used for statistical processing for real-time applications
 To compare and contrast the use of different statistical approaches for different
types of NLP applications.
TEXT BOOKS:
1. Daniel Jurafsky, James H. Martin―Speech and Language Processing: An
Introduction to Natural Language Processing, Computational Linguistics and
Speech, Pearson Publication, 2014.
2. Steven Bird, Ewan Klein and Edward Loper, ―Natural Language Processing with
Pythonǁ, First Edition, O‘Reilly Media, 2009.
REFERENCES:
1. Breck Baldwin, ―Language Processing with Java and LingPipe Cookbook, Atlantic
Publisher, 2015.
2. Richard M Reese, ―Natural Language Processing with Javaǁ, O‘Reilly Media, 2015.
3. Nitin Indurkhya and Fred J. Damerau, ―Handbook of Natural Language Processing,
Second Edition, Chapman and Hall/CRC Press, 2010.
4. Tanveer Siddiqui, U.S. Tiwary, “Natural Language Processing and Information
Retrieval”, Oxford University Press, 2008.
CS8001 PARALLEL ALGORITHMS L T P C
3 0 0 3
OBJECTIVES:
To understand different parallel architectures and models of computation.
To introduce the various classes of parallel algorithms.
To study parallel algorithms for basic problems.
UNIT I INTRODUCTION 9
Need for Parallel Processing - Data and Temporal Parallelism - Models of Computation -
RAM and PRAM Model – Shared Memory and Message Passing Models- Processor
Organisations - PRAM Algorithm – Analysis of PRAM Algorithms- Parallel Programming
Languages.
UNIT II PRAM ALGORITHMS 9
Parallel Algorithms for Reduction – Prefix Sum – List Ranking –Preorder Tree Traversal –
Searching -Sorting - Merging Two Sorted Lists – Matrix Multiplication - Graph Coloring -
Graph Searching.
UNIT III SIMD ALGORITHMS -I 9
2D Mesh SIMD Model - Parallel Algorithms for Reduction - Prefix Computation - Selection -
Odd-Even Merge Sorting - Matrix Multiplication
120
UNIT IV SIMD ALGORITHMS -II 9
Hypercube SIMD Model - Parallel Algorithms for Selection- Odd-Even Merge Sort- Bitonic
Sort- Matrix Multiplication Shuffle Exchange SIMD Model - Parallel Algorithms for Reduction
-Bitonic Merge Sort - Matrix Multiplication - Minimum Cost Spanning Tree
UNIT V MIMD ALGORITHMS 9
UMA Multiprocessor Model -Parallel Summing on Multiprocessor- Matrix Multiplication on
Multiprocessors and Multicomputer - Parallel Quick Sort - Mapping Data to Processors.
TOTAL : 45 PERIODS
OUTCOMES:
Upon completion of this course, the students should be able to
 Develop parallel algorithms for standard problems and applications.
 Analyse efficiency of different parallel algorithms.
TEXT BOOKS:
1. Michael J. Quinn, "Parallel Computing : Theory & Practice", Tata McGraw Hill
Edition, Second edition, 2017.
2. Ellis Horowitz, Sartaj Sahni and Sanguthevar Rajasekaran, "Fundamentals of
Computer Algorithms", University press, Second edition , 2011.
3. V Rajaraman, C Siva Ram Murthy, " Parallel computers- Architecture and
Programming ", PHI learning, 2016.
REFERENCES:
1. Ananth Grame, George Karpis, Vipin Kumar and Anshul Gupta, "Introduction to
Parallel Computing", 2nd Edition, Addison Wesley, 2003.
2. M Sasikumar, Dinesh Shikhare and P Ravi Prakash , " Introduction to Parallel
Processing", PHI learning , 2013.
3. S.G.Akl, "The Design and Analysis of Parallel Algorithms", PHI, 1989.
IT8077 SPEECH PROCESSING
L T P C
3 0 0 3
OBJECTIVES:
 To understand the fundamentals of the speech processing
 Explore the various speech models
 Gather knowledge about the phonetics and pronunciation processing
 Perform wavelet analysis of speech
 To understand the concepts of speech recognition
UNIT I INTRODUCTION 9
Introduction - knowledge in speech and language processing - ambiguity - models and algorithms
- language - thought - understanding - regular expression and automata - words & transducers –
N grams
UNIT II SPEECH MODELLING 9
Word classes and part of speech tagging – hidden markov model – computing likelihood: the
forward algorithm – training hidden markov model – maximum entropy model – transformation-
based tagging – evaluation and error analysis – issues in part of speech tagging – noisy channel
model for spelling
UNIT III SPEECH PRONUNCIATION AND SIGNAL PROCESSING 9
Phonetics - speech sounds and phonetic transcription - articulatory phonetics - phonological
categories and pronunciation variation - acoustic phonetics and signals - phonetic resources -
articulatory and gestural phonology
121
UNIT IV SPEECH IDENTIFICATION 9
Speech synthesis - text normalization - phonetic analysis - prosodic analysis – diphone waveform
synthesis - unit selection waveform synthesis - evaluation
UNIT V SPEECH RECOGNITION 9
Automatic speech recognition - architecture - applying hidden markov model - feature extraction:
mfcc vectors - computing acoustic likelihoods - search and decoding - embedded training -
multipass decoding: n-best lists and lattices- a* (‘stack’) decoding - context-dependent acoustic
models: triphones - discriminative training - speech recognition by humans
TOTAL : 45 PERIODS
OUTCOMES:
On Successful completion of the course ,Students will be able to
 Create new algorithms with speech processing
 Derive new speech models
 Perform various language phonetic analysis
 Create a new speech identification system
 Generate a new speech recognition system
TEXT BOOK:
1. Daniel Jurafsky and James H. Martin, “ Speech and Language Processing: An Introduction to
Natural Language Processing, Computational Linguistics and Speech Recognition”, Person
education,2013.
REFERENCES
1. Kai-Fu Lee, “Automatic Speech Recognition”, The Springer International Series in Engineering
and Computer Science, 1999.
2. Himanshu Chaurasiya, “Soft Computing Implementation of Automatic Speech Recognition”,
LAP Lambert Academic Publishing, 2010.
3. Claudio Becchetti, Klucio Prina Ricotti, “Speech Recognition: Theory and C++
implementation”,Wiley publications 2008.
4. Ikrami Eldirawy , Wesam Ashour, “Visual Speech Recognition”, Wiley publications , 2011
GE8073 FUNDAMENTALS OF NANOSCIENCE L T P C
3 0 0 3
OBJECTIVES:
To learn about basis of nanomaterial science, preparation method, types and application
UNIT I INTRODUCTION 8
Nanoscale Science and Technology- Implications for Physics, Chemistry, Biology and
Engineering-Classifications of nanostructured materials- nano particles- quantum dots, nanowires-
ultra-thinfilms-multilayered materials. Length Scales involved and effect on properties:
Mechanical, Electronic, Optical, Magnetic and Thermal properties. Introduction to
properties and motivation for study (qualitative only).
UNIT II GENERAL METHODS OF PREPARATION 9
Bottom-up Synthesis-Top-down Approach: Co-Precipitation, Ultrasonication, Mechanical Milling,
Colloidal routes, Self-assembly, Vapour phase deposition, MOCVD, Sputtering, Evaporation,
Molecular Beam Epitaxy, Atomic Layer Epitaxy, MOMBE.
122
UNIT III NANOMATERIALS 12
Nanoforms of Carbon - Buckminster fullerene- graphene and carbon nanotube, Single wall carbon
Nanotubes (SWCNT) and Multi wall carbon nanotubes (MWCNT)- methods of synthesis(arc-
growth, laser ablation, CVD routes, Plasma CVD), structure-property Relationships applications-
Nanometal oxides-ZnO, TiO2,MgO, ZrO2, NiO, nanoalumina, CaO, AgTiO2, Ferrites, Nanoclays-
functionalization and applications-Quantum wires, Quantum dots-preparation, properties and
applications.
UNIT IV CHARACTERIZATION TECHNIQUES 9
X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques,
Transmission Electron Microscopy including high-resolution imaging, Surface Analysis techniques-
AFM, SPM, STM, SNOM, ESCA, SIMS-Nanoindentation.
UNIT V APPLICATIONS 7
NanoInfoTech: Information storage- nanocomputer, molecular switch, super chip, nanocrystal,
Nanobiotechlogy: nanoprobes in medical diagnostics and biotechnology, Nano medicines,
Targetted drug delivery, Bioimaging - Micro Electro Mechanical Systems (MEMS), Nano Electro
Mechanical Systems (NEMS)- Nanosensors, nano crystalline silver for bacterial inhibition,
Nanoparticles for sunbarrier products - In Photostat, printing, solar cell, battery.
TOTAL: 45 PERIODS
OUTCOMES:
 Will familiarize about the science of nanomaterials
 Will demonstrate the preparation of nanomaterials
 Will develop knowledge in characteristic nanomaterial
TEXT BOOKS :
1. A.S. Edelstein and R.C. Cammearata, eds., “Nanomaterials: Synthesis, Properties
and Applications”, Institute of Physics Publishing, Bristol and Philadelphia, 1996.
2. N John Dinardo, “Nanoscale Charecterisation of surfaces & Interfaces”, 2nd edition,
Weinheim Cambridge, Wiley-VCH, 2000.
REFERENCES:
1. G Timp, “Nanotechnology”, AIP press/Springer, 1999.
2. Akhlesh Lakhtakia,“The Hand Book of Nano Technology, Nanometer Structure,
Theory, Modeling and Simulations”. Prentice-Hall of India (P) Ltd, New Delhi, 2007.

01.b.e. cse final

  • 1.
    1 ANNA UNIVERSITY, CHENNAI AFFILIATEDINSTITUTIONS B.E. COMPUTER SCIENCE AND ENGINEERING REGULATIONS – 2017 CHOICE BASED CREDIT SYSTEM PROGRAM EDUCATIONAL OBJECTIVES (PEOs): 1. To enable graduates to pursue higher education and research, or have a successful career in industries associated with Computer Science and Engineering, or as entrepreneurs. To ensure that graduates will have the ability and attitude to adapt to emerging technological changes. PROGRAM OUTCOMES POs: Engineering Graduates will be able to: 1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering fundamentals and an engineering specialization to the solution of complex engineering problems. 2. Problem analysis: Identify, formulate, review research literature, and analyze complex engineering problems reaching substantiated conclusions using first principles of mathematics, natural sciences, and engineering sciences. 3. Design/development of solutions: Design solutions for complex engineering problems and design system components or processes that meet the specified needs with appropriate consideration for the public health and safety, and the cultural, societal, and environmental considerations. 4. Conduct investigations of complex problems: Use research-based knowledge and research methods including design of experiments, analysis and interpretation of data, and synthesis of the information to provide valid conclusions. 5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and modern engineering and IT tools including prediction and modeling to complex engineering activities with an understanding of the limitations. 6. The engineer and society: Apply reasoning informed by the contextual knowledge to assess societal, health, safety, legal and cultural issues and the consequent responsibilities relevant to the professional engineering practice. 7. Environment and sustainability: Understand the impact of the professional engineering solutions in societal and environmental contexts, and demonstrate the knowledge of, and need for sustainable development. 8. Ethics: Apply ethical principles and commit to professional ethics and responsibilities and norms of the engineering practice. 9. Individual and team work: Function effectively as an individual, and as a member or leader in diverse teams, and in multidisciplinary settings. 10. Communication: Communicate effectively on complex engineering activities with the engineering community and with society at large, such as, being able to comprehend and write effective reports and design documentation, make effective presentations, and give and receive clear instructions.
  • 2.
    2 11. Project managementand finance: Demonstrate knowledge and understanding of the engineering and management principles and apply these to one’s own work, as a member and leader in a team, to manage projects and in multidisciplinary environments. 12. Life-long learning: Recognize the need for, and have the preparation and ability to engage in independent and life-long learning in the broadest context of technological change. PROGRAM SPECIFIC OBJECTIVES (PSOs) To analyze, design and develop computing solutions by applying foundational concepts of Computer Science and Engineering. To apply software engineering principles and practices for developing quality software for scientific and business applications. To adapt to emerging Information and Communication Technologies (ICT) to innovate ideas and solutions to existing/novel problems. Mapping of POs/PSOs to PEOs Contribution 1: Reasonable 2:Significant 3:Strong
  • 3.
    3 PEOs POs 1. Graduateswill pursue higher education and research, or have a successful career in industries associated with Computer Science and Engineering, or as entrepreneurs. 2. Graduates will have the ability and attitude to adapt to emerging technological changes. 1. Engineering knowledge: Apply the knowledge of mathematics, science, engineering fundamentals, and an engineering specialization to the solution of complex engineering problems. 3 1 2. Problem analysis: Identify, formulate, review research literature, and analyze complex engineering problems reaching substantiated conclusions using first principles of mathematics, natural sciences, and engineering sciences. 3 1 3. Design/development of solutions: Design solutions for complex engineering problems and design system components or processes that meet the specified needs with appropriate consideration for the public health and safety, and the cultural, societal, and environmental considerations. 3 2 4. Conduct investigations of complex problems: Use research-based knowledge and research methods including design of experiments, analysis and interpretation of data, and synthesis of the information to provide valid conclusions. 3 2 5. Modern tool usage: Create, select, and apply appropriate techniques, resources, and modern engineering and IT tools including prediction and modeling to complex engineering activities with an understanding of the limitations. 2 3 6. The engineer and society: Apply reasoning informed by the contextual knowledge to assess societal, health, safety, legal and cultural issues and the consequent responsibilities relevant to the professional engineering practice. 2 2
  • 4.
    4 7. Environment andsustainability: Understand the impact of the professional engineering solutions in societal and environmental contexts, and demonstrate the knowledge of, and need for sustainable development. 2 1 8. Ethics: Apply ethical principles and commit to professional ethics and responsibilities and norms of the engineering practice. 3 1 9. Individual and team work: Function effectively as an individual, and as a member or leader in diverse teams, and in multidisciplinary settings. 3 2 10. Communication: Communicate effectively on complex engineering activities with the engineering community and with society at large, such as, being able to comprehend and write effective reports and design documentation, make effective presentations, and give and receive clear instructions. 3 2 11. Project management and finance: Demonstrate knowledge and understanding of the engineering and management principles and apply these to one’s own work, as a member and leader in a team, to manage projects and in multidisciplinary environments. 2 2 12. Life-long learning: Recognize the need for, and have the preparation and ability to engage in independent and life-long learning in the broadest context of technological change. 1 3 PSOs 1. Analyze, design and develop computing solutions by applying foundational concepts of computer science and engineering. 3 1 2. Apply software engineering principles and practices for developing quality software for scientific and business applications. 3 1 3. Adapt to emerging information and communication technologies (ICT) to innovate ideas and solutions to existing/novel problems. 1 3
  • 5.
    5 MAPPING OF COURSEOUTCOMES WITH PROGRAMME OUTCOMES A broad relation between the Course Outcomes and Programme Outcomes is given in the following table Course Title Programme Outcome (PO) 1 2 3 4 5 6 7 8 9 10 11 12 SEMESTER I Communicative English √ √ √ √ Engineering Mathematics - I √ √ √ √ Engineering Physics √ √ √ Engineering Chemistry √ √ √ Problem Solving and Python Programming √ √ √ Engineering Graphics √ √ √ √ √ √ √ √ Problem Solving and Python Programming Laboratory √ √ √ √ √ √ √ √ Physics and Chemistry Laboratory √ √ √ √ √ √ SEMESTER II Technical English √ √ √ √ Engineering Mathematics II √ √ √ √ Physics for Information Science √ √ √ Basic Electrical, Electronics and Measurement Engineering √ √ √ Environmental Science and Engineering √ √ √ √ √ √ √ √ Programming in C √ √ √ √ √ √ √ Engineering Practices Laboratory √ √ √ √ √ √ √ √ √ √ C Programming Laboratory √ √ √ √ √ √ √
  • 6.
    6 PROGRAMME OUTCOME (PO) YEAR II SEMESTER III COURSE TITLE 12 3 4 5 6 7 8 9 10 11 12 Discrete Mathematics √ √ √ √ Digital Principles and Design √ √ √ Data Structures √ √ √ Object Oriented Programming √ √ √ Communication Engineering √ √ √ Data Structures Laboratory √ √ √ √ √ √ √ Object Oriented Programming Laboratory √ √ √ √ √ √ √ Digital Systems Laboratory √ √ √ √ √ √ √ √ Interpersonal Skills/Listening &Speaking √ √ √ √ SEMESTER IV Probability and Queueing Theory √ √ √ √ √ √ Computer Architecture √ √ √ Database Management Systems √ √ √ Design and Analysis of Algorithms √ √ √ √ √ √ Operating Systems √ √ √ Software Engineering √ √ √ √ √ √ √ √ √ Database Management Systems Laboratory √ √ √ √ √ √ √ Operating Systems Laboratory √ √ √ √ √ √ √ Advanced Reading and Writing √ √ √ √
  • 7.
    7 YEAR III SEMESTER V Algebra and Number Theory √√ √ √ Computer Networks √ √ √ Microprocessors and Microcontrollers √ √ √ Theory of Computation √ √ √ Object Oriented Analysis and Design √ √ √ √ Open Elective I Microprocessors and Microcontrollers Laboratory √ √ √ √ √ √ √ Object Oriented Analysis and Design Laboratory √ √ √ √ √ √ √ √ √ Networks Laboratory √ √ √ √ √ √ √ SEMESTER VI Internet Programming √ √ √ √ √ √ √ Artificial Intelligence √ √ √ Mobile Computing √ √ √ Compiler Design √ √ √ √ √ √ √ Distributed Systems √ √ √ Professional Elective I Internet Programming Laboratory √ √ √ √ √ √ √ √ Mobile Application Development Laboratory √ √ √ √ √ √ √ √ √ Mini Project √ √ √ √ √ √ √ √ √ √ √ √ Professional Communication    YEAR IV SEMESTER VII Principles of Management √ √ √ √ Cryptography and Network Security √ √ √ Cloud Computing √ √ √ Open Elective II
  • 8.
    8 Professional Elective II Professional Elective III CloudComputing Laboratory √ √ √ √ √ √ √ √ Security Laboratory √ √ √ √ √ √ √ √ SEMESTER VIII Professional Elective IV Professional Elective V Project Work √ √ √ √ √ √ √ √ √ √ √ √
  • 9.
    9 PROFESSIONAL ELECTIVES SEM COURSETITLE PROGRAMME OUTCOME (PO) 1 2 3 4 5 6 7 8 9 10 11 12 VI Data Warehousing and Data Mining √ √ √ Software Testing √ √ √ √ √ √ Embedded Systems √ √ √ Agile Methodologies √ √ √ Graph Theory and Applications- √ √ √ Intellectual Property Rights √ √ √ √ √ √ √ Digital Signal Processing √ √ √ VII Big Data Analytics √ √ √ √ √ √ Machine Learning Techniques √ √ √ √ √ √ Computer Graphics and Multimedia √ √ √ Software Project Management √ √ √ √ √ √ √ √ √ Internet of Things √ √ √ Service Oriented Architecture √ √ √ Total Quality Management √ √ √ √ Multi-core Architectures and Programming √ √ √ Human Computer Interaction √ √ √ C# and .Net Programming √ √ √ √ √ √ Wireless Adhoc and Sensor Networks √ √ √ Advanced Topics on Databases √ √ √ Foundation Skills in Integrated Product Development √ √ √ Human Rights √ √ √ Disaster Management √ √ √ √ VIII Digital Image Processing √ √ √ Social Network Analysis √ √ √ Information Security √ √ √ √ Software Defined Networks √ √ √ Cyber Forensics √ √ √ √ Soft Computing √ √ √ Professional Ethics in Engineering √ √ √ √ √ √ Information Retrieval Techniques √ √ √ Green Computing √ √ √ GPU Architecture and Programming √ √ √ Natural Language Processing √ √ √ Parallel Algorithms √ √ √ Speech Processing √ √ √ Fundamentals of Nanoscience √ √ √
  • 10.
    10 ANNA UNIVERSITY, CHENNAI AFFILIATEDINSTITUTIONS B.E. COMPUTER SCIENCE AND ENGINEERING REGULATIONS – 2017 CHOICE BASED CREDIT SYSTEM I - VIII SEMESTERS CURRICULA AND SYLLABI SEMESTER I SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. HS8151 Communicative English HS 4 4 0 0 4 2. MA8151 Engineering Mathematics - I BS 4 4 0 0 4 3. PH8151 Engineering Physics BS 3 3 0 0 3 4. CY8151 Engineering Chemistry BS 3 3 0 0 3 5. GE8151 Problem Solving and Python Programming ES 3 3 0 0 3 6. GE8152 Engineering Graphics ES 6 2 0 4 4 PRACTICALS 7. GE8161 Problem Solving and Python Programming Laboratory ES 4 0 0 4 2 8. BS8161 Physics and Chemistry Laboratory BS 4 0 0 4 2 TOTAL 31 19 0 12 25 SEMESTER II SI.No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. HS8251 Technical English HS 4 4 0 0 4 2. MA8251 Engineering Mathematics - II BS 4 4 0 0 4 3. PH8252 Physics for Information Science BS 3 3 0 0 3 4. BE8255 Basic Electrical, Electronics and Measurement Engineering ES 3 3 0 0 3 5. GE8291 Environmental Science and Engineering HS 3 3 0 0 3 6. CS8251 Programming in C PC 3 3 0 0 3 PRACTICALS 7. GE8261 Engineering Practices Laboratory ES 4 0 0 4 2 8. CS8261 C Programming Laboratory PC 4 0 0 4 2 TOTAL 28 20 0 8 24
  • 11.
    11 SEMESTER III Sl.No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. MA8351 Discrete Mathematics BS 4 4 0 0 4 2. CS8351 Digital Principles and System Design ES 4 4 0 0 4 3. CS8391 Data Structures PC 3 3 0 0 3 4. CS8392 Object Oriented Programming PC 3 3 0 0 3 5. EC8395 Communication Engineering ES 3 3 0 0 3 PRACTICALS 6. CS8381 Data Structures Laboratory PC 4 0 0 4 2 7. CS8383 Object Oriented Programming Laboratory PC 4 0 0 4 2 8. CS8382 Digital Systems Laboratory ES 4 0 0 4 2 9. HS8381 Interpersonal Skills/Listening &Speaking EEC 2 0 0 2 1 TOTAL 31 17 0 14 24 SEMESTER IV Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. MA8402 Probability and Queueing Theory BS 4 4 0 0 4 2. CS8491 Computer Architecture PC 3 3 0 0 3 3. CS8492 Database Management Systems PC 3 3 0 0 3 4. CS8451 Design and Analysis of Algorithms PC 3 3 0 0 3 5. CS8493 Operating Systems PC 3 3 0 0 3 6. CS8494 Software Engineering PC 3 3 0 0 3 PRACTICALS 7. CS8481 Database Management Systems Laboratory PC 4 0 0 4 2 8. CS8461 Operating Systems Laboratory PC 4 0 0 4 2 9. HS8461 Advanced Reading and Writing EEC 2 0 0 2 1 TOTAL 29 19 0 10 24
  • 12.
    12 SEMESTER V Sl. No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. MA8551 Algebra and Number Theory BS 4 4 0 0 4 2. CS8591 Computer Networks PC 3 3 0 0 3 3. EC8691 Microprocessors and Microcontrollers PC 3 3 0 0 3 4. CS8501 Theory of Computation PC 3 3 0 0 3 5. CS8592 Object Oriented Analysis and Design PC 3 3 0 0 3 6. Open Elective I OE 3 3 0 0 3 PRACTICALS 7. EC8681 Microprocessors and Microcontrollers Laboratory PC 4 0 0 4 2 8. CS8582 Object Oriented Analysis and Design Laboratory PC 4 0 0 4 2 9. CS8581 Networks Laboratory PC 4 0 0 4 2 TOTAL 31 19 0 12 25 SEMESTER VI Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. CS8651 Internet Programming PC 3 3 0 0 3 2. CS8691 Artificial Intelligence PC 3 3 0 0 3 3. CS8601 Mobile Computing PC 3 3 0 0 3 4. CS8602 Compiler Design PC 5 3 0 2 4 5. CS8603 Distributed Systems PC 3 3 0 0 3 6. Professional Elective I PE 3 3 0 0 3 PRACTICALS 7. CS8661 Internet Programming Laboratory PC 4 0 0 4 2 8. CS8662 Mobile Application Development Laboratory PC 4 0 0 4 2 9. CS8611 Mini Project EEC 2 0 0 2 1 10. HS8581 Professional Communication EEC 2 0 0 2 1 TOTAL 32 18 0 14 25
  • 13.
    13 SEMESTER VII SI. No COURSE CODE COURSE TITLECATEGORY CONTACT PERIODS L T P C THEORY 1. MG8591 Principles of Management HS 3 3 0 0 3 2. CS8792 Cryptography and Network Security PC 3 3 0 0 3 3. CS8791 Cloud Computing PC 3 3 0 0 3 4. Open Elective II OE 3 3 0 0 3 5. Professional Elective II PE 3 3 0 0 3 6. Professional Elective III PE 3 3 0 0 3 PRACTICALS 7. CS8711 Cloud Computing Laboratory PC 4 0 0 4 2 8. IT8761 Security Laboratory PC 4 0 0 4 2 TOTAL 26 18 0 8 22 SEMESTER VIII Sl. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C THEORY 1. Professional Elective IV PE 3 3 0 0 3 2. Professional Elective V PE 3 3 0 0 3 PRACTICALS 3. CS8811 Project Work EEC 20 0 0 20 10 TOTAL 26 6 0 20 16 TOTAL NO. OF CREDITS: 185
  • 14.
    14 HUMANITIES AND SOCIALSCIENCES (HS) Sl. NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. HS8151 Communicative English HS 4 4 0 0 4 2. HS8251 Technical English HS 4 4 0 0 4 3. GE8291 Environmental Science and Engineering HS 3 3 0 0 3 4. MG8591 Principles of Management HS 3 3 0 0 3 BASIC SCIENCES (BS) Sl. NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. MA8151 Engineering Mathematics I BS 4 4 0 0 4 2. PH8151 Engineering Physics BS 3 3 0 0 3 3. CY8151 Engineering Chemistry BS 3 3 0 0 3 4. BS8161 Physics and Chemistry Laboratory BS 4 0 0 4 2 5. MA8251 Engineering Mathematics II BS 4 4 0 0 4 6. PH8252 Physics for Information Science BS 3 3 0 0 3 7. MA8351 Discrete Mathematics BS 4 4 0 0 4 8. MA8402 Probability and Queueing Theory BS 4 4 0 0 4 9. MA8551 Algebra and Number Theory BS 4 4 0 0 4 ENGINEERING SCIENCES (ES) Sl. NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. GE8151 Problem Solving and Python Programming ES 3 3 0 0 3 2. GE8152 Engineering Graphics ES 6 2 0 4 4 3. GE8161 Problem Solving and Python Programming Laboratory ES 4 0 0 4 2 4. BE8255 Basic Electrical, Electronics and Measurement Engineering ES 3 3 0 0 3 5. GE8261 Engineering Practices Laboratory ES 4 0 0 4 2 6. CS8351 Digital Principles and System Design ES 4 4 0 0 4 7. EC8395 Communication Engineering ES 3 3 0 0 3 8. CS8382 Digital Systems Laboratory ES 4 0 0 4 2
  • 15.
    15 PROFESSIONAL CORE (PC) Sl. NO COURSE CODE COURSETITLE CATEGORY CONTACT PERIODS L T P C 1. CS8251 Programming in C PC 3 3 0 0 3 2. CS8261 C Programming Laboratory PC 4 0 0 4 2 3. CS8391 Data Structures PC 3 3 0 0 3 4. CS8392 Object Oriented Programming PC 3 3 0 0 3 5. CS8381 Data Structures Laboratory PC 4 0 0 4 2 6. CS8383 Object Oriented Programming Laboratory PC 4 0 0 4 2 7. CS8491 Computer Architecture PC 3 3 0 0 3 8. CS8492 Database Management Systems PC 3 3 0 0 3 9. CS8451 Design and Analysis of Algorithms PC 3 3 0 0 3 10. CS8493 Operating Systems PC 3 3 0 0 3 11. CS8494 Software Engineering PC 3 3 0 0 3 12. CS8481 Database Management Systems Laboratory PC 4 0 0 4 2 13. CS8461 Operating Systems Laboratory PC 4 0 0 4 2 14. CS8591 Computer Networks PC 3 3 0 0 3 15. EC8691 Microprocessors and Microcontrollers PC 3 3 0 0 3 16. CS8501 Theory of Computation PC 3 3 0 0 3 17. CS8592 Object Oriented Analysis and Design PC 3 3 0 0 3 18. EC8681 Microprocessors and Microcontrollers Laboratory PC 4 0 0 4 2 19. CS8582 Object Oriented Analysis and Design Laboratory PC 4 0 0 4 2 20. CS8581 Networks Laboratory PC 4 0 0 4 2 21. CS8651 Internet Programming PC 3 3 0 0 3 22. CS8691 Artificial Intelligence PC 3 3 0 0 3 23. CS8601 Mobile Computing PC 3 3 0 0 3 24. CS8602 Compiler Design PC 5 3 0 2 4 25. CS8603 Distributed Systems PC 3 3 0 0 3 26. CS8661 Internet Programming Laboratory PC 4 0 0 4 2 27. CS8662 Mobile Application Development Laboratory PC 4 0 0 4 2 28. CS8792 Cryptography and Network Security PC 3 3 0 0 3 29. CS8791 Cloud Computing PC 3 3 0 0 3 30. CS8711 Cloud Computing Laboratory PC 4 0 0 4 2 31. IT8761 Security Laboratory PC 4 0 0 4 2
  • 16.
    16 PROFESSIONAL ELECTIVES (PE) SEMESTERVI ELECTIVE - I SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8075 Data Warehousing and Data Mining PE 3 3 0 0 3 2. IT8076 Software Testing PE 3 3 0 0 3 3. IT8072 Embedded Systems PE 3 3 0 0 3 4. CS8072 Agile Methodologies PE 3 3 0 0 3 5. CS8077 Graph Theory and Applications- PE 3 3 0 0 3 6. IT8071 Digital Signal Processing PE 3 3 0 0 3 7. GE8075 Intellectual Property Rights PE 3 3 0 0 3 SEMESTER VII ELECTIVE - II SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8091 Big Data Analytics PE 3 3 0 0 3 2. CS8082 Machine Learning Techniques PE 3 3 0 0 3 3. CS8092 Computer Graphics and Multimedia PE 3 3 0 0 3 4. IT8075 Software Project Management PE 3 3 0 0 3 5. CS8081 Internet of Things PE 3 3 0 0 3 6. IT8074 Service Oriented Architecture PE 3 3 0 0 3 7. GE8077 Total Quality Management PE 3 3 0 0 3 SEMESTER VII ELECTIVE - III SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8083 Multi-core Architectures and Programming PE 3 3 0 0 3 2. CS8079 Human Computer Interaction PE 3 3 0 0 3 3. CS8073 C# and .Net Programming PE 3 3 0 0 3 4. CS8088 Wireless Adhoc and Sensor Networks PE 3 3 0 0 3 5. CS8071 Advanced Topics on Databases PE 3 3 0 0 3 6. GE8072 Foundation Skills in Integrated Product Development PE 3 3 0 0 3 7. GE8074 Human Rights PE 3 3 0 0 3 8. GE8071 Disaster Management PE 3 3 0 0 3
  • 17.
    17 SEMESTER VIII ELECTIVE -IV SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. EC8093 Digital Image Processing PE 3 3 0 0 3 2. CS8085 Social Network Analysis PE 3 3 0 0 3 3. IT8073 Information Security PE 3 3 0 0 3 4. CS8087 Software Defined Networks PE 3 3 0 0 3 5. CS8074 Cyber Forensics PE 3 3 0 0 3 6. CS8086 Soft Computing PE 3 3 0 0 3 7. GE8076 Professional Ethics in Engineering PE 3 3 0 0 3 SEMESTER VIII ELECTIVE - V SI. No COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. CS8080 Information Retrieval Techniques PE 3 3 0 0 3 2. CS8078 Green Computing PE 3 3 0 0 3 3. CS8076 GPU Architecture and Programming PE 3 3 0 0 3 4. CS8084 Natural Language Processing PE 3 3 0 0 3 5. CS8001 Parallel Algorithms PE 3 3 0 0 3 6. IT8077 Speech Processing PE 3 3 0 0 3 7. GE8073 Fundamentals of Nanoscience PE 3 3 0 0 3 EMPLOYABILITY ENHANCEMENT COURSES (EEC) Sl. NO COURSE CODE COURSE TITLE CATEGORY CONTACT PERIODS L T P C 1. HS8381 Interpersonal Skills/Listening & Speaking EEC 2 0 0 2 1 2. HS8461 Advanced Reading and Writing EEC 2 0 0 2 1 3. CS8611 Mini Project EEC 2 0 0 2 1 4. HS8581 Professional Communication EEC 2 0 0 2 1 5. CS8811 Project Work EEC 20 0 0 20 10
  • 18.
    18 SUMMARY S.NO. SUBJECT AREA CREDITS ASPER SEMESTER CREDITS TOTAL Percentage I II III IV V VI VII VIII 1. HS 4 7 3 14 7.60% 2. BS 12 7 4 4 4 31 16.8% 3. ES 9 5 9 23 12.5% 4. PC 5 10 19 18 20 10 82 44.5% 5. PE 3 6 6 15 8.15% 6. OE 3 3 6 3.3% 7. EEC 1 1 2 10 14 7.65% Total 25 24 24 24 25 25 22 16 185 8. Non Credit / Mandatory
  • 19.
    19 HS8151 COMMUNICATIVE ENGLISH LT P C 4 0 0 4 OBJECTIVES:  To develop the basic reading and writing skills of first year engineering and technology students.  To help learners develop their listening skills, which will, enable them listen to lectures and comprehend them by asking questions; seeking clarifications.  To help learners develop their speaking skills and speak fluently in real contexts.  To help learners develop vocabulary of a general kind by developing their reading skills UNIT I SHARING INFORMATION RELATED TO ONESELF/FAMILY& FRIENDS 12 Reading- short comprehension passages, practice in skimming-scanning and predicting- Writing- completing sentences- - developing hints. Listening- short texts- short formal and informal conversations. Speaking- introducing oneself - exchanging personal information- Language development- Wh- Questions- asking and answering-yes or no questions- parts of speech. Vocabulary development-- prefixes- suffixes- articles.- count/ uncount nouns. UNIT II GENERAL READING AND FREE WRITING 12 Reading - comprehension-pre-reading-post reading- comprehension questions (multiple choice questions and /or short questions/ open-ended questions)-inductive reading- short narratives and descriptions from newspapers including dialogues and conversations (also used as short Listening texts)- register- Writing – paragraph writing- topic sentence- main ideas- free writing, short narrative descriptions using some suggested vocabulary and structures –Listening- telephonic conversations. Speaking – sharing information of a personal kind—greeting – taking leave- Language development – prepositions, conjunctions Vocabulary development- guessing meanings of words in context. UNIT III GRAMMAR AND LANGUAGE DEVELOPMENT 12 Reading- short texts and longer passages (close reading) Writing- understanding text structure- use of reference words and discourse markers-coherence-jumbled sentences Listening – listening to longer texts and filling up the table- product description- narratives from different sources. Speaking- asking about routine actions and expressing opinions. Language development- degrees of comparison- pronouns- direct vs indirect questions- Vocabulary development – single word substitutes- adverbs. UNIT IV READING AND LANGUAGE DEVELOPMENT 12 Reading- comprehension-reading longer texts- reading different types of texts- magazines Writing- letter writing, informal or personal letters-e-mails-conventions of personal email- Listening- listening to dialogues or conversations and completing exercises based on them. Speaking- speaking about oneself- speaking about one’s friend- Language development- Tenses- simple present-simple past- present continuous and past continuous- Vocabulary development- synonyms-antonyms- phrasal verbs
  • 20.
    20 MA8151 ENGINEERING MATHEMATICS– I L T P C 4 0 0 4 OBJECTIVES : The goal of this course is to achieve conceptual understanding and to retain the best traditions of traditional calculus. The syllabus is designed to provide the basic tools of calculus mainly for the purpose of modelling the engineering problems mathematically and obtaining solutions. This is a foundation course which mainly deals with topics such as single variable and multivariable calculus and plays an important role in the understanding of science, engineering, economics and computer science, among other disciplines. UNIT I DIFFERENTIAL CALCULUS 12 Representation of functions - Limit of a function - Continuity - Derivatives - Differentiation rules - Maxima and Minima of functions of one variable. UNIT V EXTENDED WRITING 12 Reading- longer texts- close reading –Writing- brainstorming -writing short essays – developing an outline- identifying main and subordinate ideas- dialogue writing-Listening – listening to talks- conversations- Speaking – participating in conversations- short group conversations-Language development-modal verbs- present/ past perfect tense - Vocabulary development-collocations- fixed and semi-fixed expressions. TOTAL: 60 PERIODS OUTCOMES: AT THE END OF THE COURSE, LEARNERS WILL BE ABLE TO: • Read articles of a general kind in magazines and newspapers. • Participate effectively in informal conversations; introduce themselves and their friends and express opinions in English. • Comprehend conversations and short talks delivered in English • Write short essays of a general kind and personal letters and emails in English. TEXT BOOKS: 1. Board of Editors. Using English A Coursebook for Undergarduate Engineers and Technologists. Orient BlackSwan Limited, Hyderabad: 2015 2. Richards, C. Jack. Interchange Students’ Book-2 New Delhi: CUP, 2015. REFERENCES: 1. Bailey, Stephen. Academic Writing: A practical guide for students. New York: Rutledge,2011. 2. Means,L. Thomas and Elaine Langlois. English & Communication For Colleges. CengageLearning ,USA: 2007 3. Redston, Chris &Gillies Cunningham Face2Face (Pre-intermediate Student’s Book& Workbook) Cambridge University Press, New Delhi: 2005 4. Comfort, Jeremy, et al. Speaking Effectively: Developing Speaking Skills for Business English. Cambridge University Press, Cambridge: Reprint 2011 5. Dutt P. Kiranmai and Rajeevan Geeta. Basic Communication Skills, Foundation Books: 2013.
  • 21.
    21 UNIT II FUNCTIONSOF SEVERAL VARIABLES 12 Partial differentiation – Homogeneous functions and Euler’s theorem – Total derivative – Change of variables – Jacobians – Partial differentiation of implicit functions – Taylor’s series for functions of two variables – Maxima and minima of functions of two variables – Lagrange’s method of undetermined multipliers. UNIT III INTEGRAL CALCULUS 12 Definite and Indefinite integrals - Substitution rule - Techniques of Integration - Integration by parts, Trigonometric integrals, Trigonometric substitutions, Integration of rational functions by partial fraction, Integration of irrational functions - Improper integrals. UNIT IV MULTIPLE INTEGRALS 12 Double integrals – Change of order of integration – Double integrals in polar coordinates – Area enclosed by plane curves – Triple integrals – Volume of solids – Change of variables in double and triple integrals. UNIT V DIFFERENTIAL EQUATIONS 12 Higher order linear differential equations with constant coefficients - Method of variation of parameters – Homogenous equation of Euler’s and Legendre’s type – System of simultaneous linear differential equations with constant coefficients - Method of undetermined coefficients. TOTAL: 60 PERIODS OUTCOMES: After completing this course, students should demonstrate competency in the following skills:  Use both the limit definition and rules of differentiation to differentiate functions.  Apply differentiation to solve maxima and minima problems.  Evaluate integrals both by using Riemann sums and by using the Fundamental Theorem of Calculus.  Apply integration to compute multiple integrals, area, volume, integrals in polar coordinates, in addition to change of order and change of variables.  Evaluate integrals using techniques of integration, such as substitution, partial fractions and integration by parts.  Determine convergence/divergence of improper integrals and evaluate convergent improper integrals.  Apply various techniques in solving differential equations. TEXT BOOKS : 1. Grewal B.S., “Higher Engineering Mathematics”, Khanna Publishers, New Delhi, 43rd Edition, 2014. 2. James Stewart, "Calculus: Early Transcendentals", Cengage Learning, 7th Edition, New Delhi, 2015. [For Units I & III - Sections 1.1, 2.2, 2.3, 2.5, 2.7(Tangents problems only), 2.8, 3.1 to 3.6, 3.11, 4.1, 4.3, 5.1(Area problems only), 5.2, 5.3, 5.4 (excluding net change theorem), 5.5, 7.1 - 7.4 and 7.8]. REFERENCES: 1. Anton, H, Bivens, I and Davis, S, "Calculus", Wiley, 10th Edition, 2016. 2. Jain R.K. and Iyengar S.R.K., “Advanced Engineering Mathematics”, Narosa Publications, New Delhi, 3rd Edition, 2007. 3. Narayanan, S. and Manicavachagom Pillai, T. K., “Calculus" Volume I and II, S. Viswanathan Publishers Pvt. Ltd., Chennai, 2007. 4. Srimantha Pal and Bhunia, S.C, "Engineering Mathematics" Oxford University Press, 2015. 5. Weir, M.D and Joel Hass, "Thomas Calculus", 12th Edition, Pearson India, 2016.
  • 22.
    22 PH8151 ENGINEERING PHYSICS LT P C 3 0 0 3 OBJECTIVES:  To enhance the fundamental knowledge in Physics and its applications relevant to various streams of Engineering and Technology. UNIT I PROPERTIES OF MATTER 9 Elasticity – Stress-strain diagram and its uses - factors affecting elastic modulus and tensile strength – torsional stress and deformations – twisting couple - torsion pendulum: theory and experiment - bending of beams - bending moment – cantilever: theory and experiment – uniform and non-uniform bending: theory and experiment - I-shaped girders - stress due to bending in beams. UNIT II WAVES AND FIBER OPTICS 9 Oscillatory motion – forced and damped oscillations: differential equation and its solution – plane progressive waves – wave equation. Lasers : population of energy levels, Einstein’s A and B coefficients derivation – resonant cavity, optical amplification (qualitative) – Semiconductor lasers: homojunction and heterojunction – Fiber optics: principle, numerical aperture and acceptance angle - types of optical fibres (material, refractive index, mode) – losses associated with optical fibers - fibre optic sensors: pressure and displacement. UNIT III THERMAL PHYSICS 9 Transfer of heat energy – thermal expansion of solids and liquids – expansion joints - bimetallic strips - thermal conduction, convection and radiation – heat conductions in solids – thermal conductivity - Forbe’s and Lee’s disc method: theory and experiment - conduction through compound media (series and parallel) – thermal insulation – applications: heat exchangers, refrigerators, ovens and solar water heaters. UNIT IV QUANTUM PHYSICS 9 Black body radiation – Planck’s theory (derivation) – Compton effect: theory and experimental verification – wave particle duality – electron diffraction – concept of wave function and its physical significance – Schrödinger’s wave equation – time independent and time dependent equations – particle in a one-dimensional rigid box – tunnelling (qualitative) - scanning tunnelling microscope. UNIT V CRYSTAL PHYSICS 9 Single crystalline, polycrystalline and amorphous materials – single crystals: unit cell, crystal systems, Bravais lattices, directions and planes in a crystal, Miller indices – inter-planar distances - coordination number and packing factor for SC, BCC, FCC, HCP and diamond structures - crystal imperfections: point defects, line defects – Burger vectors, stacking faults – role of imperfections in plastic deformation - growth of single crystals: solution and melt growth techniques. TOTAL :45 PERIODS OUTCOMES: Upon completion of this course,  The students will gain knowledge on the basics of properties of matter and its applications,  The students will acquire knowledge on the concepts of waves and optical devices and their applications in fibre optics,  The students will have adequate knowledge on the concepts of thermal properties of materials and their applications in expansion joints and heat exchangers,  The students will get knowledge on advanced physics concepts of quantum theory and its applications in tunneling microscopes, and  The students will understand the basics of crystals, their structures and different crystal growth techniques.
  • 23.
    23 TEXT BOOKS: 1. Bhattacharya,D.K. & Poonam, T. “Engineering Physics”. Oxford University Press, 2015. 2. Gaur, R.K. & Gupta, S.L. “Engineering Physics”. Dhanpat Rai Publishers, 2012. 3. Pandey, B.K. & Chaturvedi, S. “Engineering Physics”. Cengage Learning India, 2012. REFERENCES: 1. Halliday, D., Resnick, R. & Walker, J. “Principles of Physics”. Wiley, 2015. 2. Serway, R.A. & Jewett, J.W. “Physics for Scientists and Engineers”. Cengage Learning, 2010. 3. Tipler, P.A. & Mosca, G. “Physics for Scientists and Engineers with Modern Physics’. W.H.Freeman, 2007. CY8151 ENGINEERING CHEMISTRY L T P C 3 0 0 3 OBJECTIVES:  To make the students conversant with boiler feed water requirements, related problems and water treatment techniques.  To develop an understanding of the basic concepts of phase rule and its applications to single and two component systems and appreciate the purpose and significance of alloys.  Preparation, properties and applications of engineering materials.  Types of fuels, calorific value calculations, manufacture of solid, liquid and gaseous fuels.  Principles and generation of energy in batteries, nuclear reactors, solar cells, wind mills and fuel cells. UNIT I WATER AND ITS TREATMENT 9 Hardness of water – types – expression of hardness – units – estimation of hardness of water by EDTA – numerical problems – boiler troubles (scale and sludge) – treatment of boiler feed water – Internal treatment (phosphate, colloidal, sodium aluminate and calgon conditioning) external treatment – Ion exchange process, zeolite process – desalination of brackish water - Reverse Osmosis. UNIT II SURFACE CHEMISTRY AND CATALYSIS 9 Adsorption: Types of adsorption – adsorption of gases on solids – adsorption of solute from solutions – adsorption isotherms – Freundlich’s adsorption isotherm – Langmuir’s adsorption isotherm – contact theory – kinetics of surface reactions, unimolecular reactions, Langmuir - applications of adsorption on pollution abatement. Catalysis: Catalyst – types of catalysis – criteria – autocatalysis – catalytic poisoning and catalytic promoters - acid base catalysis – applications (catalytic convertor) – enzyme catalysis– Michaelis – Menten equation. UNIT III ALLOYS AND PHASE RULE 9 Alloys: Introduction- Definition- properties of alloys- significance of alloying, functions and effect of alloying elements- Nichrome and stainless steel (18/8) – heat treatment of steel. Phase rule: Introduction, definition of terms with examples, one component system -water system - reduced phase rule - thermal analysis and cooling curves - two component systems - lead-silver system - Pattinson process. UNIT IV FUELS AND COMBUSTION 9 Fuels: Introduction - classification of fuels - coal - analysis of coal (proximate and ultimate) - carbonization - manufacture of metallurgical coke (Otto Hoffmann method) - petroleum - manufacture of synthetic petrol (Bergius process) - knocking - octane number - diesel oil - cetane number - natural gas - compressed natural gas (CNG) - liquefied petroleum gases (LPG) - power alcohol and biodiesel. Combustion of fuels: Introduction - calorific value - higher and lower calorific values- theoretical calculation of calorific value - ignition temperature - spontaneous ignition temperature - explosive range - flue gas analysis (ORSAT Method).
  • 24.
    24 UNIT V ENERGYSOURCES AND STORAGE DEVICES 9 Nuclear fission - controlled nuclear fission - nuclear fusion - differences between nuclear fission and fusion - nuclear chain reactions - nuclear energy - light water nuclear power plant - breeder reactor - solar energy conversion - solar cells - wind energy. Batteries, fuel cells and supercapacitors: Types of batteries – primary battery (dry cell) secondary battery (lead acid battery, lithium-ion-battery) fuel cells – H2-O2 fuel cell. TOTAL: 45 PERIODS OUTCOMES:  The knowledge gained on engineering materials, fuels, energy sources and water treatment techniques will facilitate better understanding of engineering processes and applications for further learning. TEXT BOOKS: 1. S. S. Dara and S. S. Umare, “A Textbook of Engineering Chemistry”, S. Chand & Company LTD, New Delhi, 2015 2. P. C. Jain and Monika Jain, “Engineering Chemistry” Dhanpat Rai Publishing Company (P) LTD, New Delhi, 2015 3. S. Vairam, P. Kalyani and Suba Ramesh, “Engineering Chemistry”, Wiley India PVT, LTD, New Delhi, 2013. REFERENCES: 1. Friedrich Emich, “Engineering Chemistry”, Scientific International PVT, LTD, New Delhi, 2014. 2. Prasanta Rath, “Engineering Chemistry”, Cengage Learning India PVT, LTD, Delhi, 2015. 3. Shikha Agarwal, “Engineering Chemistry-Fundamentals and Applications”, Cambridge University Press, Delhi, 2015. GE8151 PROBLEM SOLVING AND PYTHON PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To know the basics of algorithmic problem solving  To read and write simple Python programs.  To develop Python programs with conditionals and loops.  To define Python functions and call them.  To use Python data structures –- lists, tuples, dictionaries.  To do input/output with files in Python. UNIT I ALGORITHMIC PROBLEM SOLVING 9 Algorithms, building blocks of algorithms (statements, state, control flow, functions), notation (pseudo code, flow chart, programming language), algorithmic problem solving, simple strategies for developing algorithms (iteration, recursion). Illustrative problems: find minimum in a list, insert a card in a list of sorted cards, guess an integer number in a range, Towers of Hanoi. UNIT II DATA, EXPRESSIONS, STATEMENTS 9 Python interpreter and interactive mode; values and types: int, float, boolean, string, and list; variables, expressions, statements, tuple assignment, precedence of operators, comments; modules and functions, function definition and use, flow of execution, parameters and arguments; Illustrative programs: exchange the values of two variables, circulate the values of n variables, distance between two points. UNIT III CONTROL FLOW, FUNCTIONS 9 Conditionals: Boolean values and operators, conditional (if), alternative (if-else), chained conditional (if-elif-else); Iteration: state, while, for, break, continue, pass; Fruitful functions: return values, parameters, local and global scope, function composition, recursion; Strings: string slices,
  • 25.
    25 immutability, string functionsand methods, string module; Lists as arrays. Illustrative programs: square root, gcd, exponentiation, sum an array of numbers, linear search, binary search. UNIT IV LISTS, TUPLES, DICTIONARIES 9 Lists: list operations, list slices, list methods, list loop, mutability, aliasing, cloning lists, list parameters; Tuples: tuple assignment, tuple as return value; Dictionaries: operations and methods; advanced list processing - list comprehension; Illustrative programs: selection sort, insertion sort, mergesort, histogram. UNIT V FILES, MODULES, PACKAGES 9 Files and exception: text files, reading and writing files, format operator; command line arguments, errors and exceptions, handling exceptions, modules, packages; Illustrative programs: word count, copy file. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, students will be able to  Develop algorithmic solutions to simple computational problems  Read, write, execute by hand simple Python programs.  Structure simple Python programs for solving problems.  Decompose a Python program into functions.  Represent compound data using Python lists, tuples, dictionaries.  Read and write data from/to files in Python Programs. TEXT BOOKS: 1. Allen B. Downey, ``Think Python: How to Think Like a Computer Scientist’’, 2nd edition, Updated for Python 3, Shroff/O’Reilly Publishers, 2016 (http://greenteapress.com/wp/think- python/) 2. Guido van Rossum and Fred L. Drake Jr, “An Introduction to Python – Revised and updated for Python 3.2, Network Theory Ltd., 2011. REFERENCES: 1. John V Guttag, “Introduction to Computation and Programming Using Python’’, Revised and expanded Edition, MIT Press , 2013 2. Robert Sedgewick, Kevin Wayne, Robert Dondero, “Introduction to Programming in Python: An Inter-disciplinary Approach, Pearson India Education Services Pvt. Ltd., 2016. 3. Timothy A. Budd, “Exploring Python”, Mc-Graw Hill Education (India) Private Ltd.,, 2015. 4. Kenneth A. Lambert, “Fundamentals of Python: First Programs”, CENGAGE Learning, 2012. 5. Charles Dierbach, “Introduction to Computer Science using Python: A Computational Problem-Solving Focus, Wiley India Edition, 2013. 6. Paul Gries, Jennifer Campbell and Jason Montojo, “Practical Programming: An Introduction to Computer Science using Python 3”, Second edition, Pragmatic Programmers, LLC, 2013. GE8152 ENGINEERING GRAPHICS L T P C 2 0 4 4 OBJECTIVES:  To develop in students, graphic skills for communication of concepts, ideas and design of Engineering products.  To expose them to existing national standards related to technical drawings. CONCEPTS AND CONVENTIONS (Not for Examination) 1 Importance of graphics in engineering applications – Use of drafting instruments – BIS conventions and specifications – Size, layout and folding of drawing sheets – Lettering and
  • 26.
    26 dimensioning. UNIT I PLANECURVES AND FREEHAND SKETCHING 7+12 Basic Geometrical constructions, Curves used in engineering practices: Conics – Construction of ellipse, parabola and hyperbola by eccentricity method – Construction of cycloid – construction of involutes of square and circle – Drawing of tangents and normal to the above curves. Visualization concepts and Free Hand sketching: Visualization principles –Representation of Three Dimensional objects – Layout of views- Freehand sketching of multiple views from pictorial views of objects UNIT II PROJECTION OF POINTS, LINES AND PLANE SURFACE 6+12 Orthographic projection- principles-Principal planes-First angle projection-projection of points. Projection of straight lines (only First angle projections) inclined to both the principal planes - Determination of true lengths and true inclinations by rotating line method and traces Projection of planes (polygonal and circular surfaces) inclined to both the principal planes by rotating object method. UNIT III PROJECTION OF SOLIDS 5+12 Projection of simple solids like prisms, pyramids, cylinder, cone and truncated solids when the axis is inclined to one of the principal planes by rotating object method. UNIT IV PROJECTION OF SECTIONED SOLIDS AND DEVELOPMENT OF SURFACES 5+12 Sectioning of above solids in simple vertical position when the cutting plane is inclined to the one of the principal planes and perpendicular to the other – obtaining true shape of section. Development of lateral surfaces of simple and sectioned solids – Prisms, pyramids cylinders and cones. UNIT V ISOMETRIC AND PERSPECTIVE PROJECTIONS 6 +12 Principles of isometric projection – isometric scale –Isometric projections of simple solids and truncated solids - Prisms, pyramids, cylinders, cones- combination of two solid objects in simple vertical positions - Perspective projection of simple solids-Prisms, pyramids and cylinders by visual ray method . TOTAL: 90 PERIODS OUTCOMES: On successful completion of this course, the student will be able to:  Familiarize with the fundamentals and standards of Engineering graphics  Perform freehand sketching of basic geometrical constructions and multiple views of objects.  Project orthographic projections of lines and plane surfaces.  Draw projections and solids and development of surfaces.  Visualize and to project isometric and perspective sections of simple solids. TEXT BOOKS: 1. Natrajan K.V., “A text book of Engineering Graphics”, Dhanalakshmi Publishers, Chennai, 2009. 2. Venugopal K. and Prabhu Raja V., “Engineering Graphics”, New Age International (P) Limited, 2008. REFERENCES: 1. Bhatt N.D. and Panchal V.M., “Engineering Drawing”, Charotar Publishing House, 50th Edition, 2010. 2. Basant Agarwal and Agarwal C.M., “Engineering Drawing”, Tata McGraw Hill Publishing Company Limited, New Delhi, 2008. 3. Gopalakrishna K.R., “Engineering Drawing” (Vol. I&II combined), Subhas Stores, Bangalore, 2007.
  • 27.
    27 4. Luzzader, Warren.J.and Duff,John M., “Fundamentals of Engineering Drawing with an introduction to Interactive Computer Graphics for Design and Production, Eastern Economy Edition, Prentice Hall of India Pvt. Ltd, New Delhi, 2005. 5. N. S. Parthasarathy and Vela Murali, “Engineering Graphics”, Oxford University, Press, New Delhi, 2015. 6. Shah M.B., and Rana B.C., “Engineering Drawing”, Pearson, 2nd Edition, 2009. Publication of Bureau of Indian Standards: 1. IS 10711 – 2001: Technical products Documentation – Size and lay out of drawing sheets. 2. IS 9609 (Parts 0 & 1) – 2001: Technical products Documentation – Lettering. 3. IS 10714 (Part 20) – 2001 & SP 46 – 2003: Lines for technical drawings. 4. IS 11669 – 1986 & SP 46 – 2003: Dimensioning of Technical Drawings. 5. IS 15021 (Parts 1 to 4) – 2001: Technical drawings – Projection Methods. Special points applicable to University Examinations on Engineering Graphics: 1. There will be five questions, each of either or type covering all units of the syllabus. 2. All questions will carry equal marks of 20 each making a total of 100. 3. The answer paper shall consist of drawing sheets of A3 size only. The students will be permitted to use appropriate scale to fit solution within A3 size. 4. The examination will be conducted in appropriate sessions on the same day GE8161 PROBLEM SOLVING AND PYTHON PROGRAMMING LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To write, test, and debug simple Python programs.  To implement Python programs with conditionals and loops.  Use functions for structuring Python programs.  Represent compound data using Python lists, tuples, dictionaries.  Read and write data from/to files in Python. LIST OF PROGRAMS: 1. Compute the GCD of two numbers. 2. Find the square root of a number (Newton’s method) 3. Exponentiation (power of a number) 4. Find the maximum of a list of numbers 5. Linear search and Binary search 6. Selection sort, Insertion sort 7. Merge sort 8. First n prime numbers 9. Multiply matrices 10. Programs that take command line arguments (word count) 11. Find the most frequent words in a text read from a file 12. Simulate elliptical orbits in Pygame 13. Simulate bouncing ball using Pygame PLATFORM NEEDED Python 3 interpreter for Windows/Linux TOTAL: 60 PERIODS OUTCOMES: Upon completion of the course, students will be able to:  Write, test, and debug simple Python programs.  Implement Python programs with conditionals and loops.  Develop Python programs step-wise by defining functions and calling them.
  • 28.
    28  Use Pythonlists, tuples, dictionaries for representing compound data.  Read and write data from/to files in Python. BS8161 PHYSICS AND CHEMISTRY LABORATORY (Common to all branches of B.E. / B.Tech Programmes) L T P C 0 0 4 2 OBJECTIVES:  To introduce different experiments to test basic understanding of physics concepts applied in optics, thermal physics, properties of matter and liquids. LIST OF EXPERIMENTS: PHYSICS LABORATORY (Any 5 Experiments) 1. Determination of rigidity modulus – Torsion pendulum 2. Determination of Young’s modulus by non-uniform bending method 3. (a) Determination of wavelength, and particle size using Laser (b) Determination of acceptance angle in an optical fiber. 4. Determination of thermal conductivity of a bad conductor – Lee’s Disc method. 5. Determination of velocity of sound and compressibility of liquid – Ultrasonic interferometer 6. Determination of wavelength of mercury spectrum – spectrometer grating 7. Determination of band gap of a semiconductor 8. Determination of thickness of a thin wire – Air wedge method TOTAL: 30 PERIODS OUTCOMES: Upon completion of the course, the students will be able to  Apply principles of elasticity, optics and thermal properties for engineering applications. CHEMISTRY LABORATORY: (Any seven experiments to be conducted) OBJECTIVES:  To make the student to acquire practical skills in the determination of water quality parameters through volumetric and instrumental analysis.  To acquaint the students with the determination of molecular weight of a polymer by viscometery. 1. Estimation of HCl using Na2CO3 as primary standard and Determination of alkalinity in water sample. 2. Determination of total, temporary & permanent hardness of water by EDTA method. 3. Determination of DO content of water sample by Winkler’s method. 4. Determination of chloride content of water sample by argentometric method. 5. Estimation of copper content of the given solution by Iodometry. 6. Determination of strength of given hydrochloric acid using pH meter. 7. Determination of strength of acids in a mixture of acids using conductivity meter. 8. Estimation of iron content of the given solution using potentiometer. 9. Estimation of iron content of the water sample using spectrophotometer (1, 10- Phenanthroline / thiocyanate method). 10. Estimation of sodium and potassium present in water using flame photometer. 11. Determination of molecular weight of polyvinyl alcohol using Ostwald viscometer. 12. Pseudo first order kinetics-ester hydrolysis. 13. Corrosion experiment-weight loss method. 14. Determination of CMC. 15. Phase change in a solid.
  • 29.
    29 16. Conductometric titrationof strong acid vs strong base. OUTCOMES:  The students will be outfitted with hands-on knowledge in the quantitative chemical analysis of water quality related parameters. TOTAL: 30 PERIODS TEXTBOOK: 1. Vogel’s Textbook of Quantitative Chemical Analysis (8TH edition, 2014). HS8251 TECHNICAL ENGLISH L T P C 4 0 0 4 OBJECTIVES: The Course prepares second semester engineering and Technology students to: • Develop strategies and skills to enhance their ability to read and comprehend engineering and technology texts. • Foster their ability to write convincing job applications and effective reports. • Develop their speaking skills to make technical presentations, participate in group discussions. • Strengthen their listening skill which will help them comprehend lectures and talks in their areas of specialization. UNIT I INTRODUCTION TECHNICAL ENGLISH 12 Listening- Listening to talks mostly of a scientific/technical nature and completing information-gap exercises- Speaking –Asking for and giving directions- Reading – reading short technical texts from journals- newsapapers- Writing- purpose statements – extended definitions – issue- writing instructions – checklists-recommendations-Vocabulary Development- technical vocabulary Language Development –subject verb agreement - compound words. UNIT II READING AND STUDY SKILLS 12 Listening- Listening to longer technical talks and completing exercises based on them-Speaking – describing a process-Reading – reading longer technical texts- identifying the various transitions in a text- paragraphing- Writing- interpreting cgarts, graphs- Vocabulary Development- vocabulary used in formal letters/emails and reports Language Development- impersonal passive voice, numerical adjectives. UNIT III TECHNICAL WRITING AND GRAMMAR 12 Listening- Listening to classroom lectures/ talkls on engineering/technology -Speaking – introduction to technical presentations- Reading – longer texts both general and technical, practice in speed reading; Writing-Describing a process, use of sequence words- Vocabulary Development- sequence words- Misspelled words. Language Development- embedded sentences UNIT IV REPORT WRITING 12 Listening- Listening to documentaries and making notes. Speaking – mechanics of presentations- Reading – reading for detailed comprehension- Writing- email etiquette- job application – cover letter –Résumé preparation( via email and hard copy)- analytical essays and issue based essays--Vocabulary Development- finding suitable synonyms-paraphrasing-. Language Development- clauses- if conditionals.
  • 30.
    30 UNIT V GROUPDISCUSSION AND JOB APPLICATIONS 12 Listening- TED/Ink talks; Speaking –participating in a group discussion -Reading– reading and understanding technical articles Writing– Writing reports- minutes of a meeting- accident and survey-Vocabulary Development- verbal analogies Language Development- reported speech. TOTAL :60 PERIODS OUTCOMES: At the end of the course learners will be able to:  Read technical texts and write area- specific texts effortlessly.  Listen and comprehend lectures and talks in their area of specialisation successfully.  Speak appropriately and effectively in varied formal and informal contexts.  Write reports and winning job applications. TEXT BOOKS: 1. Board of editors. Fluency in English A Course book for Engineering and Technology. Orient Blackswan, Hyderabad: 2016 2. Sudharshana.N.P and Saveetha. C. English for Technical Communication. Cambridge University Press: New Delhi, 2016. REFERENCES: 1. Raman, Meenakshi and Sharma, Sangeetha- Technical Communication Principles and Practice.Oxford University Press: New Delhi,2014. 2. Kumar, Suresh. E. Engineering English. Orient Blackswan: Hyderabad,2015 3. Booth-L. Diana, Project Work, Oxford University Press, Oxford: 2014. 4. Grussendorf, Marion, English for Presentations, Oxford University Press, Oxford: 2007 5. Means, L. Thomas and Elaine Langlois, English & Communication For Colleges. Cengage Learning, USA: 2007 Students can be asked to read Tagore, Chetan Bhagat and for supplementary reading. MA8251 ENGINEERING MATHEMATICS – II L T P C 4 0 0 4 OBJECTIVES: This course is designed to cover topics such as Matrix Algebra, Vector Calculus, Complex Analysis and Laplace Transform. Matrix Algebra is one of the powerful tools to handle practical problems arising in the field of engineering. Vector calculus can be widely used for modelling the various laws of physics. The various methods of complex analysis and Laplace transforms can be used for efficiently solving the problems that occur in various branches of engineering disciplines. UNIT I MATRICES 12 Eigenvalues and Eigenvectors of a real matrix – Characteristic equation – Properties of Eigenvalues and Eigenvectors – Cayley-Hamilton theorem – Diagonalization of matrices – Reduction of a quadratic form to canonical form by orthogonal transformation – Nature of quadratic forms. UNIT II VECTOR CALCULUS 12 Gradient and directional derivative – Divergence and curl - Vector identities – Irrotational and Solenoidal vector fields – Line integral over a plane curve – Surface integral - Area of a curved surface - Volume integral - Green’s, Gauss divergence and Stoke’s theorems – Verification and application in evaluating line, surface and volume integrals.
  • 31.
    31 UNIT III ANALYTICFUNCTIONS 12 Analytic functions – Necessary and sufficient conditions for analyticity in Cartesian and polar coordinates - Properties – Harmonic conjugates – Construction of analytic function - Conformal mapping – Mapping by functions 2 1 z z cz c z w , , ,   - Bilinear transformation. UNIT IV COMPLEX INTEGRATION 12 Line integral - Cauchy’s integral theorem – Cauchy’s integral formula – Taylor’s and Laurent’s series – Singularities – Residues – Residue theorem – Application of residue theorem for evaluation of real integrals – Use of circular contour and semicircular contour. UNIT V LAPLACE TRANSFORMS 12 Existence conditions – Transforms of elementary functions – Transform of unit step function and unit impulse function – Basic properties – Shifting theorems -Transforms of derivatives and integrals – Initial and final value theorems – Inverse transforms – Convolution theorem – Transform of periodic functions – Application to solution of linear second order ordinary differential equations with constant coefficients. TOTAL: 60 PERIODS OUTCOMES : After successfully completing the course, the student will have a good understanding of the following topics and their applications:  Eigen values and eigenvectors, diagonalization of a matrix, Symmetric matrices, Positive definite matrices and similar matrices.  Gradient, divergence and curl of a vector point function and related identities.  Evaluation of line, surface and volume integrals using Gauss, Stokes and Green’s theorems and their verification.  Analytic functions, conformal mapping and complex integration.  Laplace transform and inverse transform of simple functions, properties, various related theorems and application to differential equations with constant coefficients. TEXT BOOKS: 1. Grewal B.S., “Higher Engineering Mathematics”, Khanna Publishers, New Delhi, 43rd Edition, 2014. 2. Kreyszig Erwin, "Advanced Engineering Mathematics ", John Wiley and Sons, 10th Edition, New Delhi, 2016. REFERENCES : 1. Bali N., Goyal M. and Watkins C., “Advanced Engineering Mathematics”, Firewall Media (An imprint of Lakshmi Publications Pvt., Ltd.,), New Delhi, 7th Edition, 2009. 2. Jain R.K. and Iyengar S.R.K., “ Advanced Engineering Mathematics ”, Narosa Publications, New Delhi , 3rd Edition, 2007. 3. O’Neil, P.V. “Advanced Engineering Mathematics”, Cengage Learning India Pvt., Ltd, New Delhi, 2007. 4. Sastry, S.S, “Engineering Mathematics", Vol. I & II, PHI Learning Pvt. Ltd, 4th Edition, New Delhi, 2014. 5. Wylie, R.C. and Barrett, L.C., “Advanced Engineering Mathematics “Tata McGraw Hill Education Pvt. Ltd, 6th Edition, New Delhi, 2012. PH8252 PHYSICS FOR INFORMATION SCIENCE (Common to CSE & IT) L T P C 3 0 0 3 OBJECTIVES:  To understand the essential principles of Physics of semiconductor device and Electron transport properties. Become proficient in magnetic and optical properties of materials and Nano-electronic devices.
  • 32.
    32 UNIT I ELECTRICALPROPERTIES OF MATERIALS 9 Classical free electron theory - Expression for electrical conductivity – Thermal conductivity, expression - Wiedemann-Franz law – Success and failures - electrons in metals – Particle in a three dimensional box – degenerate states – Fermi- Dirac statistics – Density of energy states – Electron in periodic potential – Energy bands in solids – tight binding approximation - Electron effective mass – concept of hole. UNIT II SEMICONDUCTOR PHYSICS 9 Intrinsic Semiconductors – Energy band diagram – direct and indirect band gap semiconductors – Carrier concentration in intrinsic semiconductors – extrinsic semiconductors - Carrier concentration in N-type & P-type semiconductors – Variation of carrier concentration with temperature – variation of Fermi level with temperature and impurity concentration – Carrier transport in Semiconductor: random motion, drift, mobility and diffusion – Hall effect and devices – Ohmic contacts – Schottky diode. UNIT III MAGNETIC PROPERTIES OF MATERIALS 9 Magnetic dipole moment – atomic magnetic moments- magnetic permeability and susceptibility - Magnetic material classification: diamagnetism – paramagnetism – ferromagnetism – antiferromagnetism – ferrimagnetism – Ferromagnetism: origin and exchange interaction- saturation magnetization and Curie temperature – Domain Theory- M versus H behaviour – Hard and soft magnetic materials – examples and uses-– Magnetic principle in computer data storage – Magnetic hard disc (GMR sensor). UNIT IV OPTICAL PROPERTIES OF MATERIALS 9 Classification of optical materials – carrier generation and recombination processes - Absorption emission and scattering of light in metals, insulators and semiconductors (concepts only) - photo current in a P-N diode – solar cell - LED – Organic LED – Laser diodes – Optical data storage techniques. UNIT V NANO DEVICES 9 Electron density in bulk material – Size dependence of Fermi energy – Quantum confinement – Quantum structures – Density of states in quantum well, quantum wire and quantum dot structure - Band gap of nanomaterials – Tunneling: single electron phenomena and single electron transistor – Quantum dot laser. Conductivity of metallic nanowires – Ballistic transport – Quantum resistance and conductance – Carbon nanotubes: Properties and applications . TOTAL :45 PERIODS OUTCOMES: At the end of the course, the students will able to  Gain knowledge on classical and quantum electron theories, and energy band structuues,  Acquire knowledge on basics of semiconductor physics and its applications in various devices,  Get knowledge on magnetic properties of materials and their applications in data storage,  Have the necessary understanding on the functioning of optical materials for optoelectronics,  Understand the basics of quantum structures and their applications in carbon electronics.. TEXT BOOKS: 1. Jasprit Singh, “Semiconductor Devices: Basic Principles”, Wiley 2012. 2. Kasap, S.O. “Principles of Electronic Materials and Devices”, McGraw-Hill Education, 2007. 3. Kittel, C. “Introduction to Solid State Physics”. Wiley, 2005.
  • 33.
    33 REFERENCES: 1. Garcia, N.& Damask, A. “Physics for Computer Science Students”. Springer-Verlag, 2012. 2. Hanson, G.W. “Fundamentals of Nanoelectronics”. Pearson Education, 2009. 3. Rogers, B., Adams, J. & Pennathur, S. “Nanotechnology: Understanding Small Systems”. CRC Press, 2014. BE8255 BASIC ELECTRICAL, ELECTRONICS AND MEASUREMENT L T P C ENGINEERING 3 0 0 3 OBJECTIVES:  To understand the fundamentals of electronic circuit constructions.  To learn the fundamental laws, theorems of electrical circuits and also to analyze them  To study the basic principles of electrical machines and their performance  To study the different energy sources, protective devices and their field applications  To understand the principles and operation of measuring instruments and transducers UNIT I ELECTRICAL CIRCUITS ANALYSIS 9 Ohms Law, Kirchhoff’s Law-Instantaneous power- series and parallel circuit analysis with resistive, capacitive and inductive network - nodal analysis, mesh analysis- network theorems - Thevenins theorem, Norton theorem, maximum power transfer theorem and superposition theorem, three phase supply-Instantaneous, Reactive and apparent power-star delta conversion. UNIT II ELECTRICAL MACHINES 9 DC and AC ROTATING MACHINES:Types, Construction, principle, Emf and torque equation, application Speed Control- Basics of Stepper Motor – Brushless DC motors- Transformers- Introduction- types and construction, working principle of Ideal transformer-Emf equation- All day efficiency calculation. UNIT III UTILIZATION OF ELECTRICAL POWER 9 Renewable energy sources-wind and solar panels. Illumination by lamps- Sodium Vapour, Mercury vapour, Fluorescent tube. Domestic refrigerator and air conditioner-Electric circuit, construction and working principle. Batteries-NiCd, Pb Acid and Li ion–Charge and Discharge Characteristics. Protection-need for earthing, fuses and circuit breakers.Energy Tariff calculation for domestic loads. UNIT IV ELECTRONIC CIRCUITS 9 PN Junction-VI Characteristics of Diode, zener diode, Transistors configurations - amplifiers. Op amps- Amplifiers, oscillator,rectifiers, differentiator, integrator, ADC, DAC. Multi vibrator using 555 Timer IC . Voltage regulator IC using LM 723,LM 317. UNIT V ELECTRICAL MEASUREMENT 9 Characteristic of measurement-errors in measurement, torque in indicating instruments- moving coil and moving iron meters, Energy meter and watt meter. Transducers- classification-thermo electric, RTD, Strain gauge, LVDT, LDR and piezoelectric. Oscilloscope-CRO. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Discuss the essentials of electric circuits and analysis.  Discuss the basic operation of electric machines and transformers  Introduction of renewable sources and common domestic loads.  Introduction to measurement and metering for electric circuits.
  • 34.
    34 TEXT BOOKS: 1. D.P.Kotharti and I.J Nagarath, Basic Electrical and Electronics Engineering, Mc Graw Hill, 2016,Third Edition. 2. M.S. Sukhija and T.K. Nagsarkar, Basic Electrical and Electronic Engineering, Oxford, 2016. REFERENCES: 1. S.B. Lal Seksena and Kaustuv Dasgupta, Fundaments of Electrical Engineering, Cambridge, 2016 2. B.L Theraja, Fundamentals of Electrical Engineering and Electronics. Chand & Co, 2008. 3. S.K.Sahdev, Basic of Electrical Engineering, Pearson, 2015 4. John Bird, ―Electrical and Electronic Principles and Technologyǁ, Fourth Edition, Elsevier, 2010. 5. Mittle,Mittal, Basic Electrical Engineeringǁ, 2nd Edition, Tata McGraw-Hill Edition, 2016. 6. C.L.Wadhwa, “Generation, Distribution and Utilisation of Electrical Energy”, New Age international pvt.ltd.,2003. GE8291 ENVIRONMENTAL SCIENCE AND ENGINEERING L T P C 3 0 0 3 OBJECTIVES:  To study the nature and facts about environment.  To finding and implementing scientific, technological, economic and political solutions to environmental problems.  To study the interrelationship between living organism and environment.  To appreciate the importance of environment by assessing its impact on the human world; envision the surrounding environment, its functions and its value.  To study the dynamic processes and understand the features of the earth‟s interior and surface.  To study the integrated themes and biodiversity, natural resources, pollution control and waste management. UNIT I ENVIRONMENT, ECOSYSTEMS AND BIODIVERSITY 14 Definition, scope and importance of environment – need for public awareness - concept of an ecosystem – structure and function of an ecosystem – producers, consumers and decomposers – energy flow in the ecosystem – ecological succession – food chains, food webs and ecological pyramids – Introduction, types, characteristic features, structure and function of the (a) forest ecosystem (b) grassland ecosystem (c) desert ecosystem (d) aquatic ecosystems (ponds, streams, lakes, rivers, oceans, estuaries) – Introduction to biodiversity definition: genetic, species and ecosystem diversity – biogeographical classification of India – value of biodiversity: consumptive use, productive use, social, ethical, aesthetic and option values – Biodiversity at global, national and local levels – India as a mega-diversity nation – hot-spots of biodiversity – threats to biodiversity: habitat loss, poaching of wildlife, man-wildlife conflicts – endangered and endemic species of India – conservation of biodiversity: In-situ and ex-situ conservation of biodiversity. Field study of common plants, insects, birds; Field study of simple ecosystems – pond, river, hill slopes, etc. UNIT II ENVIRONMENTAL POLLUTION 8 Definition – causes, effects and control measures of: (a) Air pollution (b) Water pollution (c) Soil pollution (d) Marine pollution (e) Noise pollution (f) Thermal pollution (g) Nuclear hazards – solid waste management: causes, effects and control measures of municipal solid wastes – role of an individual in prevention of pollution – pollution case studies – disaster management: floods, earthquake, cyclone and landslides. Field study of local polluted site – Urban / Rural / Industrial / Agricultural.
  • 35.
    35 UNIT III NATURALRESOURCES 10 Forest resources: Use and over-exploitation, deforestation, case studies- timber extraction, mining, dams and their effects on forests and tribal people – Water resources: Use and over- utilization of surface and ground water, floods, drought, conflicts over water, dams-benefits and problems – Mineral resources: Use and exploitation, environmental effects of extracting and using mineral resources, case studies – Food resources: World food problems, changes caused by agriculture and overgrazing, effects of modern agriculture, fertilizer-pesticide problems, water logging, salinity, case studies – Energy resources: Growing energy needs, renewable and non renewable energy sources, use of alternate energy sources. case studies – Land resources: Land as a resource, land degradation, man induced landslides, soil erosion and desertification – role of an individual in conservation of natural resources – Equitable use of resources for sustainable lifestyles. Field study of local area to document environmental assets – river / forest / grassland / hill / mountain. UNIT IV SOCIAL ISSUES AND THE ENVIRONMENT 7 From unsustainable to sustainable development – urban problems related to energy – water conservation, rain water harvesting, watershed management – resettlement and rehabilitation of people; its problems and concerns, case studies – role of non-governmental organization- environmental ethics: Issues and possible solutions – climate change, global warming, acid rain, ozone layer depletion, nuclear accidents and holocaust, case studies. – wasteland reclamation – consumerism and waste products – environment production act – Air (Prevention and Control of Pollution) act – Water (Prevention and control of Pollution) act – Wildlife protection act – Forest conservation act – enforcement machinery involved in environmental legislation- central and state pollution control boards- Public awareness. UNIT V HUMAN POPULATION AND THE ENVIRONMENT 6 Population growth, variation among nations – population explosion – family welfare programme – environment and human health – human rights – value education – HIV / AIDS – women and child welfare – role of information technology in environment and human health – Case studies. TOTAL: 45 PERIODS OUTCOMES:  Environmental Pollution or problems cannot be solved by mere laws. Public participation is an important aspect which serves the environmental Protection. One will obtain knowledge on the following after completing the course.  Public awareness of environmental is at infant stage.  Ignorance and incomplete knowledge has lead to misconceptions  Development and improvement in std. of living has lead to serious environmental disasters TEXTBOOKS: 1. Benny Joseph, ‘Environmental Science and Engineering’, Tata McGraw-Hill, New Delhi, 2006. 2. Gilbert M.Masters, ‘Introduction to Environmental Engineering and Science’, 2nd edition, Pearson Education, 2004. REFERENCES : 1. Dharmendra S. Sengar, ‘Environmental law’, Prentice hall of India PVT LTD,New Delhi, 2007. 2. Erach Bharucha, “Textbook of Environmental Studies”, Universities Press(I) PVT, LTD, Hydrabad, 2015. 3. Rajagopalan, R, ‘Environmental Studies-From Crisis to Cure’, Oxford University Press, 2005. 4. G. Tyler Miller and Scott E. Spoolman, “Environmental Science”, Cengage Learning India PVT, LTD, Delhi, 2014.
  • 36.
    36 CS8251 PROGRAMMING INC L T P C 3 0 0 3 OBJECTIVES:  To develop C Programs using basic programming constructs  To develop C programs using arrays and strings  To develop applications in C using functions , pointers and structures  To do input/output and file handling in C UNIT I BASICS OF C PROGRAMMING 9 Introduction to programming paradigms - Structure of C program - C programming: Data Types – Storage classes - Constants – Enumeration Constants - Keywords – Operators: Precedence and Associativity - Expressions - Input/Output statements, Assignment statements – Decision making statements - Switch statement - Looping statements – Pre-processor directives - Compilation process UNIT II ARRAYS AND STRINGS 9 Introduction to Arrays: Declaration, Initialization – One dimensional array – Example Program: Computing Mean, Median and Mode - Two dimensional arrays – Example Program: Matrix Operations (Addition, Scaling, Determinant and Transpose) - String operations: length, compare, concatenate, copy – Selection sort, linear and binary search UNIT III FUNCTIONS AND POINTERS 9 Introduction to functions: Function prototype, function definition, function call, Built-in functions (string functions, math functions) – Recursion – Example Program: Computation of Sine series, Scientific calculator using built-in functions, Binary Search using recursive functions – Pointers – Pointer operators – Pointer arithmetic – Arrays and pointers – Array of pointers – Example Program: Sorting of names – Parameter passing: Pass by value, Pass by reference – Example Program: Swapping of two numbers and changing the value of a variable using pass by reference UNIT IV STRUCTURES 9 Structure - Nested structures – Pointer and Structures – Array of structures – Example Program using structures and pointers – Self referential structures – Dynamic memory allocation - Singly linked list - typedef UNIT V FILE PROCESSING 9 Files – Types of file processing: Sequential access, Random access – Sequential access file - Example Program: Finding average of numbers stored in sequential access file - Random access file - Example Program: Transaction processing using random access files – Command line arguments OUTCOMES: Upon completion of the course, the students will be able to  Develop simple applications in C using basic constructs  Design and implement applications using arrays and strings  Develop and implement applications in C using functions and pointers.  Develop applications in C using structures.  Design applications using sequential and random access file processing. TEXT BOOKS: 1. Reema Thareja, “Programming in C”, Oxford University Press, Second Edition, 2016. 2. Kernighan, B.W and Ritchie,D.M, “The C Programming language”, Second Edition, Pearson Education, 2006 REFERENCES: 1. Paul Deitel and Harvey Deitel, “C How to Program”, Seventh edition, Pearson Publication 2. Juneja, B. L and Anita Seth, “Programming in C”, CENGAGE Learning India pvt. Ltd., 2011
  • 37.
    37 3. Pradip Dey,Manas Ghosh, “Fundamentals of Computing and Programming in C”, First Edition, Oxford University Press, 2009. 4. Anita Goel and Ajay Mittal, “Computer Fundamentals and Programming in C”, Dorling Kindersley (India) Pvt. Ltd., Pearson Education in South Asia, 2011. 5. Byron S. Gottfried, "Schaum's Outline of Theory and Problems of Programming with C",McGraw-Hill Education, 1996. GE8261 ENGINEERING PRACTICES LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To provide exposure to the students with hands on experience on various basic engineering practices in Civil, Mechanical, Electrical and Electronics Engineering. GROUP A (CIVIL & MECHANICAL) I CIVIL ENGINEERING PRACTICE 13 BUILDINGS: (a) Study of plumbing and carpentry components of residential and industrial buildings. Safety aspects. PLUMBING WORKS: (a) Study of pipeline joints, its location and functions: valves, taps, couplings, unions, reducers, elbows in household fittings. (b) Study of pipe connections requirements for pumps and turbines. (c) Preparation of plumbing line sketches for water supply and sewage works. (d) Hands-on-exercise: Basic pipe connections – Mixed pipe material connection – Pipe connections with different joining components. (e) Demonstration of plumbing requirements of high-rise buildings. CARPENTRY USING POWER TOOLS ONLY: (a) Study of the joints in roofs, doors, windows and furniture. (b) Hands-on-exercise: Wood work, joints by sawing, planing and cutting. II MECHANICAL ENGINEERING PRACTICE 18 WELDING: (a) Preparation of butt joints, lap joints and T- joints by Shielded metal arc welding. (b) Gas welding practice BASIC MACHINING: (a) Simple Turning and Taper turning (b) Drilling Practice SHEET METAL WORK: (a) Forming & Bending: (b) Model making – Trays and funnels. (c) Different type of joints. MACHINE ASSEMBLY PRACTICE: (a) Study of centrifugal pump
  • 38.
    38 (b) Study ofair conditioner DEMONSTRATION ON: (a) Smithy operations, upsetting, swaging, setting down and bending. Example – Exercise – Production of hexagonal headed bolt. (b) Foundry operations like mould preparation for gear and step cone pulley. (c) Fitting – Exercises – Preparation of square fitting and V – fitting models. GROUP B (ELECTRICAL & ELECTRONICS) III ELECTRICAL ENGINEERING PRACTICE 13 1. Residential house wiring using switches, fuse, indicator, lamp and energy meter. 2. Fluorescent lamp wiring. 3. Stair case wiring 4. Measurement of electrical quantities – voltage, current, power & power factor in RLC circuit. 5. Measurement of energy using single phase energy meter. 6. Measurement of resistance to earth of an electrical equipment. IV ELECTRONICS ENGINEERING PRACTICE 16 1. Study of Electronic components and equipments – Resistor, colour coding measurement of AC signal parameter (peak-peak, rms period, frequency) using CR. 2. Study of logic gates AND, OR, EX-OR and NOT. 3. Generation of Clock Signal. 4. Soldering practice – Components Devices and Circuits – Using general purpose PCB. 5. Measurement of ripple factor of HWR and FWR. TOTAL: 60 PERIODS OUTCOMES: On successful completion of this course, the student will be able to Fabricate carpentry components and pipe connections including plumbing works. Use welding equipments to join the structures. Carry out the basic machining operations Make the models using sheet metal works Illustrate on centrifugal pump, Air conditioner, operations of smithy, foundary and fittings Carry out basic home electrical works and appliances Measure the electrical quantities Elaborate on the components, gates, soldering practices. LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: CIVIL 1. Assorted components for plumbing consisting of metallic pipes, plastic pipes, flexible pipes, couplings, unions, elbows, plugs and other fittings. 15 Sets. 2. Carpentry vice (fitted to work bench) 15 Nos. 3. Standard woodworking tools 15 Sets. 4. Models of industrial trusses, door joints, furniture joints 5 each 5. Power Tools: (a) Rotary Hammer 2 Nos (b) Demolition Hammer 2 Nos (c) Circular Saw 2 Nos (d) Planer 2 Nos (e) Hand Drilling Machine 2 Nos (f) Jigsaw 2 Nos MECHANICAL 1. Arc welding transformer with cables and holders 5 Nos.
  • 39.
    39 2. Welding boothwith exhaust facility 5 Nos. 3. Welding accessories like welding shield, chipping hammer, wire brush, etc. 5 Sets. 4. Oxygen and acetylene gas cylinders, blow pipe and other welding outfit. 2 Nos. 5. Centre lathe 2 Nos. 6. Hearth furnace, anvil and smithy tools 2 Sets. 7. Moulding table, foundry tools 2 Sets. 8. Power Tool: Angle Grinder 2 Nos 9. Study-purpose items: centrifugal pump, air-conditioner One each. ELECTRICAL 1. Assorted electrical components for house wiring 15 Sets 2. Electrical measuring instruments 10 Sets 3. Study purpose items: Iron box, fan and regulator, emergency lamp 1 each 4. Megger (250V/500V) 1 No. 5. Power Tools: (a) Range Finder 2 Nos (b) Digital Live-wire detector 2 Nos ELECTRONICS 1. Soldering guns 10 Nos. 2. Assorted electronic components for making circuits 50 Nos. 3. Small PCBs 10 Nos. 4. Multimeters 10 Nos. 5. Study purpose items: Telephone, FM radio, low-voltage power supply CS8261 C PROGRAMMING LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To develop programs in C using basic constructs.  To develop applications in C using strings, pointers, functions, structures.  To develop applications in C using file processing. LIST OF EXPERIMENTS: 1. Programs using I/O statements and expressions. 2. Programs using decision-making constructs. 3. Write a program to find whether the given year is leap year or Not? (Hint: not every centurion year is a leap. For example 1700, 1800 and 1900 is not a leap year) 4. Design a calculator to perform the operations, namely, addition, subtraction, multiplication, division and square of a number. 5. Check whether a given number is Armstrong number or not? 6. Given a set of numbers like <10, 36, 54, 89, 12, 27>, find sum of weights based on the following conditions.  5 if it is a perfect cube.  4 if it is a multiple of 4 and divisible by 6.  3 if it is a prime number. Sort the numbers based on the weight in the increasing order as shown below <10,its weight>,<36,its weight><89,its weight> 7. Populate an array with height of persons and find how many persons are above the average height. 8. Populate a two dimensional array with height and weight of persons and compute the Body Mass Index of the individuals. 9. Given a string “a$bcd./fg” find its reverse without changing the position of special characters. (Example input:a@gh%;j and output:j@hg%;a)
  • 40.
    40 10. Convert thegiven decimal number into binary, octal and hexadecimal numbers using user defined functions. 11. From a given paragraph perform the following using built-in functions: a. Find the total number of words. b. Capitalize the first word of each sentence. c. Replace a given word with another word. 12. Solve towers of Hanoi using recursion. 13. Sort the list of numbers using pass by reference. 14. Generate salary slip of employees using structures and pointers. 15. Compute internal marks of students for five different subjects using structures and functions. 16. Insert, update, delete and append telephone details of an individual or a company into a telephone directory using random access file. 17. Count the number of account holders whose balance is less than the minimum balance using sequential access file. Mini project 18. Create a “Railway reservation system” with the following modules  Booking  Availability checking  Cancellation  Prepare chart TOTAL: 60 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Develop C programs for simple applications making use of basic constructs, arrays and strings.  Develop C programs involving functions, recursion, pointers, and structures.  Design applications using sequential and random access file processing. MA8351 DISCRETE MATHEMATICS L T P C 4 0 0 4 OBJECTIVES:  To extend student’s logical and mathematical maturity and ability to deal with abstraction.  To introduce most of the basic terminologies used in computer science courses and application of ideas to solve practical problems.  To understand the basic concepts of combinatorics and graph theory.  To familiarize the applications of algebraic structures.  To understand the concepts and significance of lattices and boolean algebra which are widely used in computer science and engineering. UNIT I LOGIC AND PROOFS 12 Propositional logic – Propositional equivalences - Predicates and quantifiers – Nested quantifiers – Rules of inference - Introduction to proofs – Proof methods and strategy. UNIT II COMBINATORICS 12 Mathematical induction – Strong induction and well ordering – The basics of counting – The pigeonhole principle – Permutations and combinations – Recurrence relations – Solving linear recurrence relations – Generating functions – Inclusion and exclusion principle and its applications UNIT III GRAPHS 12 Graphs and graph models – Graph terminology and special types of graphs – Matrix representation of graphs and graph isomorphism – Connectivity – Euler and Hamilton paths.
  • 41.
    41 UNIT IV ALGEBRAICSTRUCTURES 12 Algebraic systems – Semi groups and monoids - Groups – Subgroups – Homomorphism’s – Normal subgroup and cosets – Lagrange’s theorem – Definitions and examples of Rings and Fields. UNIT V LATTICES AND BOOLEAN ALGEBRA 12 Partial ordering – Posets – Lattices as posets – Properties of lattices - Lattices as algebraic systems – Sub lattices – Direct product and homomorphism – Some special lattices – Boolean algebra. TOTAL: 60 PERIODS OUTCOMES: At the end of the course, students would:  Have knowledge of the concepts needed to test the logic of a program.  Have an understanding in identifying structures on many levels.  Be aware of a class of functions which transform a finite set into another finite set which relates to input and output functions in computer science.  Be aware of the counting principles.  Be exposed to concepts and properties of algebraic structures such as groups, rings and fields. TEXTBOOKS: 1. Rosen, K.H., "Discrete Mathematics and its Applications", 7th Edition, Tata McGraw Hill Pub. Co. Ltd., New Delhi, Special Indian Edition, 2011. 2. Tremblay, J.P. and Manohar.R, " Discrete Mathematical Structures with Applications to Computer Science", Tata McGraw Hill Pub. Co. Ltd, New Delhi, 30th Reprint, 2011. REFERENCES: 1. Grimaldi, R.P. "Discrete and Combinatorial Mathematics: An Applied Introduction", 4th Edition, Pearson Education Asia, Delhi, 2007. 2. Lipschutz, S. and Mark Lipson., "Discrete Mathematics", Schaum’s Outlines, Tata McGraw Hill Pub. Co. Ltd., New Delhi, 3rd Edition, 2010. 3. Koshy, T. "Discrete Mathematics with Applications", Elsevier Publications, 2006. CS8351 DIGITAL PRINCIPLES AND SYSTEM DESIGN L T P C 4 0 0 4 OBJECTIVES: • To design digital circuits using simplified Boolean functions • To analyze and design combinational circuits • To analyze and design synchronous and asynchronous sequential circuits • To understand Programmable Logic Devices • To write HDL code for combinational and sequential circuits UNIT I BOOLEAN ALGEBRA AND LOGIC GATES 12 Number Systems - Arithmetic Operations - Binary Codes- Boolean Algebra and Logic Gates - Theorems and Properties of Boolean Algebra - Boolean Functions - Canonical and Standard Forms - Simplification of Boolean Functions using Karnaugh Map - Logic Gates – NAND and NOR Implementations. UNIT II COMBINATIONAL LOGIC 12 Combinational Circuits – Analysis and Design Procedures - Binary Adder-Subtractor - Decimal Adder - Binary Multiplier - Magnitude Comparator - Decoders – Encoders – Multiplexers - Introduction to HDL – HDL Models of Combinational circuits.
  • 42.
    42 UNIT III SYNCHRONOUSSEQUENTIAL LOGIC 12 Sequential Circuits - Storage Elements: Latches , Flip-Flops - Analysis of Clocked Sequential Circuits - State Reduction and Assignment - Design Procedure - Registers and Counters - HDL Models of Sequential Circuits. UNIT IV ASYNCHRONOUS SEQUENTIAL LOGIC 12 Analysis and Design of Asynchronous Sequential Circuits – Reduction of State and Flow Tables – Race-free State Assignment – Hazards. UNIT V MEMORY AND PROGRAMMABLE LOGIC 12 RAM – Memory Decoding – Error Detection and Correction - ROM - Programmable Logic Array – Programmable Array Logic – Sequential Programmable Devices. TOTAL : 60 PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Simplify Boolean functions using KMap  Design and Analyze Combinational and Sequential Circuits  Implement designs using Programmable Logic Devices  Write HDL code for combinational and Sequential Circuits TEXT BOOK: 1. M. Morris R. Mano, Michael D. Ciletti, “Digital Design: With an Introduction to the Verilog HDL, VHDL, and SystemVerilog”, 6th Edition, Pearson Education, 2017. REFERENCES: 1. G. K. Kharate, Digital Electronics, Oxford University Press, 2010 2. John F. Wakerly, Digital Design Principles and Practices, Fifth Edition, Pearson Education, 2017. 3. Charles H. Roth Jr, Larry L. Kinney, Fundamentals of Logic Design, Sixth Edition, CENGAGE Learning, 2013 4. Donald D. Givone, Digital Principles and Designǁ, Tata Mc Graw Hill, 2003. CS8391 DATA STRUCTURES L T P C 3 0 0 3 OBJECTIVES:  To understand the concepts of ADTs  To Learn linear data structures – lists, stacks, and queues  To understand sorting, searching and hashing algorithms  To apply Tree and Graph structures UNIT I LINEAR DATA STRUCTURES – LIST 9 Abstract Data Types (ADTs) – List ADT – array-based implementation – linked list implementation ––singly linked lists- circularly linked lists- doubly-linked lists – applications of lists –Polynomial Manipulation – All operations (Insertion, Deletion, Merge, Traversal). UNIT II LINEAR DATA STRUCTURES – STACKS, QUEUES 9 Stack ADT – Operations - Applications - Evaluating arithmetic expressions- Conversion of Infix to postfix expression - Queue ADT – Operations - Circular Queue – Priority Queue - deQueue – applications of queues.
  • 43.
    43 UNIT III NONLINEAR DATA STRUCTURES – TREES 9 Tree ADT – tree traversals - Binary Tree ADT – expression trees – applications of trees – binary search tree ADT –Threaded Binary Trees- AVL Trees – B-Tree - B+ Tree - Heap – Applications of heap. UNIT IV NON LINEAR DATA STRUCTURES - GRAPHS 9 Definition – Representation of Graph – Types of graph - Breadth-first traversal - Depth-first traversal – Topological Sort – Bi-connectivity – Cut vertex – Euler circuits – Applications of graphs. UNIT V SEARCHING, SORTING AND HASHING TECHNIQUES 9 Searching- Linear Search - Binary Search. Sorting - Bubble sort - Selection sort - Insertion sort - Shell sort – Radix sort. Hashing- Hash Functions – Separate Chaining – Open Addressing – Rehashing – Extendible Hashing. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Implement abstract data types for linear data structures.  Apply the different linear and non-linear data structures to problem solutions.  Critically analyze the various sorting algorithms. TEXT BOOKS: 1. Mark Allen Weiss, “Data Structures and Algorithm Analysis in C”, 2nd Edition, Pearson Education,1997. 2. Reema Thareja, “Data Structures Using C”, Second Edition , Oxford University Press, 2011 REFERENCES: 1. Thomas H. Cormen, Charles E. Leiserson, Ronald L.Rivest, Clifford Stein, “Introduction to Algorithms", Second Edition, Mcgraw Hill, 2002. 2. Aho, Hopcroft and Ullman, “Data Structures and Algorithms”, Pearson Education,1983. 3. Stephen G. Kochan, “Programming in C”, 3rd edition, Pearson Education. 4. Ellis Horowitz, Sartaj Sahni, Susan Anderson-Freed, “Fundamentals of Data Structures in C”, Second Edition, University Press, 2008 CS8392 OBJECT ORIENTED PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To understand Object Oriented Programming concepts and basic characteristics of Java  To know the principles of packages, inheritance and interfaces  To define exceptions and use I/O streams  To develop a java application with threads and generics classes  To design and build simple Graphical User Interfaces UNIT I INTRODUCTION TO OOP AND JAVA FUNDAMENTALS 10 Object Oriented Programming - Abstraction – objects and classes - Encapsulation- Inheritance - Polymorphism- OOP in Java – Characteristics of Java – The Java Environment - Java Source File -Structure – Compilation. Fundamental Programming Structures in Java – Defining classes in Java – constructors, methods -access specifiers - static members -Comments, Data Types, Variables, Operators, Control Flow, Arrays , Packages - JavaDoc comments. UNIT II INHERITANCE AND INTERFACES 9 Inheritance – Super classes- sub classes –Protected members – constructors in sub classes- the Object class – abstract classes and methods- final methods and classes – Interfaces – defining an interface, implementing interface, differences between classes and interfaces and extending
  • 44.
    44 interfaces - Objectcloning -inner classes, Array Lists - Strings UNIT III EXCEPTION HANDLING AND I/O 9 Exceptions - exception hierarchy - throwing and catching exceptions – built-in exceptions, creating own exceptions, Stack Trace Elements. Input / Output Basics – Streams – Byte streams and Character streams – Reading and Writing Console – Reading and Writing Files UNIT IV MULTITHREADING AND GENERIC PROGRAMMING 8 Differences between multi-threading and multitasking, thread life cycle, creating threads, synchronizing threads, Inter-thread communication, daemon threads, thread groups. Generic Programming – Generic classes – generic methods – Bounded Types – Restrictions and Limitations. UNIT V EVENT DRIVEN PROGRAMMING 9 Graphics programming - Frame – Components - working with 2D shapes - Using color, fonts, and images - Basics of event handling - event handlers - adapter classes - actions - mouse events - AWT event hierarchy - Introduction to Swing – layout management - Swing Components – Text Fields , Text Areas – Buttons- Check Boxes – Radio Buttons – Lists- choices- Scrollbars – Windows –Menus – Dialog Boxes. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, students will be able to:  Develop Java programs using OOP principles  Develop Java programs with the concepts inheritance and interfaces  Build Java applications using exceptions and I/O streams  Develop Java applications with threads and generics classes  Develop interactive Java programs using swings TEXT BOOKS: 1. Herbert Schildt, “Java The complete reference”, 8th Edition, McGraw Hill Education, 2011. 2. Cay S. Horstmann, Gary cornell, “Core Java Volume –I Fundamentals”, 9th Edition, Prentice Hall, 2013. REFERENCES: 1. Paul Deitel, Harvey Deitel, “Java SE 8 for programmers”, 3rd Edition, Pearson, 2015. 2. Steven Holzner, “Java 2 Black book”, Dreamtech press, 2011. 3. Timothy Budd, “Understanding Object-oriented programming with Java”, Updated Edition, Pearson Education, 2000. EC8395 COMMUNICATION ENGINEERING L T P C 3 0 0 3 OBJECTIVES:  To introduce the relevance of this course to the existing technology through demonstrations, case studies, simulations, contributions of scientist, national/international policies with a futuristic vision along with socio-economic impact and issues  To study the various analog and digital modulation techniques  To study the principles behind information theory and coding  To study the various digital communication techniques UNIT I ANALOG MODULATION 9 Amplitude Modulation – AM, DSBSC, SSBSC, VSB – PSD, modulators and demodulators – Angle modulation – PM and FM – PSD, modulators and demodulators – Superheterodyne receivers
  • 45.
    45 UNITII PULSE MODULATION9 Low pass sampling theorem – Quantization – PAM – Line coding – PCM, DPCM, DM, and ADPCM And ADM, Channel Vocoder - Time Division Multiplexing, Frequency Division Multiplexing UNIT III DIGITAL MODULATION AND TRANSMISSION 9 Phase shift keying – BPSK, DPSK, QPSK – Principles of M-ary signaling M-ary PSK & QAM – Comparison, ISI – Pulse shaping – Duo binary encoding – Cosine filters – Eye pattern, equalizers UNIT IV INFORMATION THEORY AND CODING 9 Measure of information – Entropy – Source coding theorem – Shannon–Fano coding, Huffman Coding, LZ Coding – Channel capacity – Shannon-Hartley law – Shannon's limit – Error control codes – Cyclic codes, Syndrome calculation – Convolution Coding, Sequential and Viterbi decoding UNIT V SPREAD SPECTRUM AND MULTIPLE ACCESS 9 PN sequences – properties – m-sequence – DSSS – Processing gain, Jamming – FHSS – Synchronisation and tracking – Multiple Access – FDMA, TDMA, CDMA, TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Ability to comprehend and appreciate the significance and role of this course in the present contemporary world  Apply analog and digital communication techniques.  Use data and pulse communication techniques.  Analyze Source and Error control coding. TEXT BOOKS: 1. H Taub, D L Schilling, G Saha, “Principles of Communication Systems” 3/e, TMH 2007 2. S. Haykin “Digital Communications” John Wiley 2005 REFERENCES: 1. B.P.Lathi, “Modern Digital and Analog Communication Systems”, 3rd edition, Oxford University Press, 2007 2. H P Hsu, Schaum Outline Series – “Analog and Digital Communications” TMH 2006 3. B.Sklar, Digital Communications Fundamentals and Applications” 2/e Pearson Education 2007. CS8381 DATA STRUCTURES LABORATORY L T P C 0 0 4 2 OBJECTIVES  To implement linear and non-linear data structures  To understand the different operations of search trees  To implement graph traversal algorithms  To get familiarized to sorting and searching algorithms 1. Array implementation of Stack and Queue ADTs 2. Array implementation of List ADT 3. Linked list implementation of List, Stack and Queue ADTs 4. Applications of List, Stack and Queue ADTs 5. Implementation of Binary Trees and operations of Binary Trees 6. Implementation of Binary Search Trees 7. Implementation of AVL Trees 8. Implementation of Heaps using Priority Queues.
  • 46.
    46 9. Graph representationand Traversal algorithms 10. Applications of Graphs 11. Implementation of searching and sorting algorithms 12. Hashing – any two collision techniques TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the students will be able to:  Write functions to implement linear and non-linear data structure operations  Suggest appropriate linear / non-linear data structure operations for solving a given problem  Appropriately use the linear / non-linear data structure operations for a given problem  Apply appropriate hash functions that result in a collision free scenario for data storage and retrieval CS8383 OBJECT ORIENTED PROGRAMMING LABORATORY L T P C 0 0 4 2 OBJECTIVES  To build software development skills using java programming for real-world applications.  To understand and apply the concepts of classes, packages, interfaces, arraylist, exception handling and file processing.  To develop applications using generic programming and event handling. LIST OF EXPERIMENTS 1. Develop a Java application to generate Electricity bill. Create a class with the following members: Consumer no., consumer name, previous month reading, current month reading, type of EB connection (i.e domestic or commercial). Compute the bill amount using the following tariff. If the type of the EB connection is domestic, calculate the amount to be paid as follows:  First 100 units - Rs. 1 per unit  101-200 units - Rs. 2.50 per unit  201 -500 units - Rs. 4 per unit  > 501 units - Rs. 6 per unit If the type of the EB connection is commercial, calculate the amount to be paid as follows:  First 100 units - Rs. 2 per unit  101-200 units - Rs. 4.50 per unit  201 -500 units - Rs. 6 per unit  > 501 units - Rs. 7 per unit 2. Develop a java application to implement currency converter (Dollar to INR, EURO to INR, Yen to INR and vice versa), distance converter (meter to KM, miles to KM and vice versa) , time converter (hours to minutes, seconds and vice versa) using packages. 3. Develop a java application with Employee class with Emp_name, Emp_id, Address, Mail_id, Mobile_no as members. Inherit the classes, Programmer, Assistant Professor, Associate Professor and Professor from employee class. Add Basic Pay (BP) as the member of all the inherited classes with 97% of BP as DA, 10 % of BP as HRA, 12% of BP as PF, 0.1% of BP for staff club fund. Generate pay slips for the employees with their gross and net salary. 4. Design a Java interface for ADT Stack. Implement this interface using array. Provide necessary exception handling in both the implementations.
  • 47.
    47 5. Write aprogram to perform string operations using ArrayList. Write functions for the following a. Append - add at end b. Insert – add at particular index c. Search d. List all string starts with given letter 6. Write a Java Program to create an abstract class named Shape that contains two integers and an empty method named print Area(). Provide three classes named Rectangle, Triangle and Circle such that each one of the classes extends the class Shape. Each one of the classes contains only the method print Area () that prints the area of the given shape. 7. Write a Java program to implement user defined exception handling. 8. Write a Java program that reads a file name from the user, displays information about whether the file exists, whether the file is readable, or writable, the type of file and the length of the file in bytes. 9. Write a java program that implements a multi-threaded application that has three threads. First thread generates a random integer every 1 second and if the value is even, second thread computes the square of the number and prints. If the value is odd, the third thread will print the value of cube of the number. 10. Write a java program to find the maximum value from the given type of elements using a generic function. 11. Design a calculator using event-driven programming paradigm of Java with the following options. a) Decimal manipulations b) Scientific manipulations 12. Develop a mini project for any application using Java concepts. TOTAL : 60 PERIODS OUTCOMES Upon completion of the course, the students will be able to  Develop and implement Java programs for simple applications that make use of classes, packages and interfaces.  Develop and implement Java programs with arraylist, exception handling and multithreading .  Design applications using file processing, generic programming and event handling. CS8382 DIGITAL SYSTEMS LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To understand the various basic logic gates  To design and implement the various combinational circuits  To design and implement combinational circuits using MSI devices.  To design and implement sequential circuits  To understand and code with HDL programming LIST OF EXPERIMENTS 1. Verification of Boolean Theorems using basic gates. 2. Design and implementation of combinational circuits using basic gates for arbitrary
  • 48.
    48 functions, code converters. 3.Design and implement Half/Full Adder and Subtractor. 4. Design and implement combinational circuits using MSI devices:  4 – bit binary adder / subtractor  Parity generator / checker  Magnitude Comparator  Application using multiplexers 5. Design and implement shift-registers. 6. Design and implement synchronous counters. 7. Design and implement asynchronous counters. 8. Coding combinational circuits using HDL. 9. Coding sequential circuits using HDL. 10. Design and implementation of a simple digital system (Mini Project). TOTAL: 60 PERIODS OUTCOMES: Upon Completion of the course, the students will be able to:  Implement simplified combinational circuits using basic logic gates  Implement combinational circuits using MSI devices  Implement sequential circuits like registers and counters  Simulate combinational and sequential circuits using HDL LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: LABORATORY REQUIREMENT FOR BATCH OF 30 STUDENTS HARDWARE: 1. Digital trainer kits - 30 2. Digital ICs required for the experiments in sufficient numbers SOFTWARE: 1. HDL simulator. HS8381 INTERPERSONAL SKILLS/LISTENING&SPEAKING L T P C 0 0 2 1 OBJECTIVES: The Course will enable learners to: • Equip students with the English language skills required for the successful undertaking of academic studies with primary emphasis on academic speaking and listening skills. • Provide guidance and practice in basic general and classroom conversation and to engage in specific academic speaking activities. • improve general and academic listening skills • Make effective presentations. UNIT I Listening as a key skill- its importance- speaking - give personal information - ask for personal information - express ability - enquire about ability - ask for clarification Improving pronunciation - pronunciation basics taking lecture notes - preparing to listen to a lecture - articulate a complete idea as opposed to producing fragmented utterances. UNIT II Listen to a process information- give information, as part of a simple explanation - conversation starters: small talk - stressing syllables and speaking clearly - intonation patterns - compare and contrast information and ideas from multiple sources- converse with reasonable accuracy over a wide range of everyday topics.
  • 49.
    49 UNIT III Lexical chunkingfor accuracy and fluency- factors influence fluency, deliver a five-minute informal talk - greet - respond to greetings - describe health and symptoms - invite and offer - accept - decline - take leave - listen for and follow the gist- listen for detail UNIT IV Being an active listener: giving verbal and non-verbal feedback - participating in a group discussion - summarizing academic readings and lectures conversational speech listening to and participating in conversations - persuade. UNIT V Formal and informal talk - listen to follow and respond to explanations, directions and instructions in academic and business contexts - strategies for presentations and interactive communication - group/pair presentations - negotiate disagreement in group work. TOTAL :30PERIODS OUTCOMES: At the end of the course Learners will be able to:  Listen and respond appropriately.  Participate in group discussions  Make effective presentations  Participate confidently and appropriately in conversations both formal and informal TEXT BOOKS: 1. Brooks,Margret. Skills for Success. Listening and Speaking. Level 4 Oxford University Press, Oxford: 2011. 2. Richards,C. Jack. & David Bholke. Speak Now Level 3. Oxford University Press, Oxford: 2010 REFERENCES: 1. Bhatnagar, Nitin and MamtaBhatnagar. Communicative English for Engineers and Professionals. Pearson: New Delhi, 2010. 2. Hughes, Glyn and Josephine Moate. Practical English Classroom. Oxford University Press: Oxford, 2014. 3. Vargo, Mari. Speak Now Level 4. Oxford University Press: Oxford, 2013. 4. Richards C. Jack. Person to Person (Starter). Oxford University Press: Oxford, 2006. 5. Ladousse, Gillian Porter. Role Play. Oxford University Press: Oxford, 2014 MA8402 PROBABILITY AND QUEUING THEORY L T P C 4 0 0 4 OBJECTIVES:  To provide necessary basic concepts in probability and random processes for applications such as random signals, linear systems in communication engineering.  To understand the basic concepts of probability, one and two dimensional random variables and to introduce some standard distributions applicable to engineering which can describe real life phenomenon.  To understand the basic concepts of random processes which are widely used in IT fields.  To understand the concept of queueing models and apply in engineering.  To understand the significance of advanced queueing models.  To provide the required mathematical support in real life problems and develop probabilistic models which can be used in several areas of science and engineering.
  • 50.
    50 UNIT I PROBABILITYAND RANDOM VARIABLES 12 Probability – Axioms of probability – Conditional probability – Baye’s theorem - Discrete and continuous random variables – Moments – Moment generating functions – Binomial, Poisson, Geometric, Uniform, Exponential and Normal distributions. UNIT II TWO - DIMENSIONAL RANDOM VARIABLES 12 Joint distributions – Marginal and conditional distributions – Covariance – Correlation and linear regression – Transformation of random variables – Central limit theorem (for independent and identically distributed random variables). UNIT III RANDOM PROCESSES 12 Classification – Stationary process – Markov process - Poisson process – Discrete parameter Markov chain – Chapman Kolmogorov equations – Limiting distributions. UNIT IV QUEUEING MODELS 12 Markovian queues – Birth and death processes – Single and multiple server queueing models – Little’s formula - Queues with finite waiting rooms – Queues with impatient customers : Balking and reneging. UNIT V ADVANCED QUEUEING MODELS 12 Finite source models - M/G/1 queue – Pollaczek Khinchin formula - M/D/1 and M/EK/1 as special cases – Series queues – Open Jackson networks. TOTAL : 60 PERIODS OUTCOMES: Upon successful completion of the course, students should be able to:  Understand the fundamental knowledge of the concepts of probability and have knowledge of standard distributions which can describe real life phenomenon.  Understand the basic concepts of one and two dimensional random variables and apply in engineering applications.  Apply the concept of random processes in engineering disciplines.  Acquire skills in analyzing queueing models.  Understand and characterize phenomenon which evolve with respect to time in a probabilistic manner TEXTBOOKS: 1. Gross, D., Shortle, J.F, Thompson, J.M and Harris. C.M., “Fundamentals of Queueing Theory", Wiley Student 4th Edition, 2014. 2. Ibe, O.C., “Fundamentals of Applied Probability and Random Processes", Elsevier, 1st Indian Reprint, 2007. REFERENCES : 1. Hwei Hsu, "Schaum’s Outline of Theory and Problems of Probability, Random Variables and Random Processes", Tata McGraw Hill Edition, New Delhi, 2004. 2. Taha, H.A., "Operations Research", 9th Edition, Pearson India Education Services, Delhi, 2016. 3. Trivedi, K.S., "Probability and Statistics with Reliability, Queueing and Computer Science Applications", 2nd Edition, John Wiley and Sons, 2002. 4. Yates, R.D. and Goodman. D. J., "Probability and Stochastic Processes", 2nd Edition, Wiley India Pvt. Ltd., Bangalore, 2012.
  • 51.
    51 CS8491 COMPUTER ARCHITECTUREL T P C 3 0 0 3 OBJECTIVES: • To learn the basic structure and operations of a computer. • To learn the arithmetic and logic unit and implementation of fixed-point and floating point arithmetic unit. • To learn the basics of pipelined execution. • To understand parallelism and multi-core processors. • To understand the memory hierarchies, cache memories and virtual memories. • To learn the different ways of communication with I/O devices. UNIT I BASIC STRUCTURE OF A COMPUTER SYSTEM 9 Functional Units – Basic Operational Concepts – Performance – Instructions: Language of the Computer – Operations, Operands – Instruction representation – Logical operations – decision making – MIPS Addressing. UNIT II ARITHMETIC FOR COMPUTERS 9 Addition and Subtraction – Multiplication – Division – Floating Point Representation – Floating Point Operations – Subword Parallelism UNIT III PROCESSOR AND CONTROL UNIT 9 A Basic MIPS implementation – Building a Datapath – Control Implementation Scheme – Pipelining – Pipelined datapath and control – Handling Data Hazards & Control Hazards – Exceptions. UNIT IV PARALLELISIM 9 Parallel processing challenges – Flynn’s classification – SISD, MIMD, SIMD, SPMD, and Vector Architectures - Hardware multithreading – Multi-core processors and other Shared Memory Multiprocessors - Introduction to Graphics Processing Units, Clusters, Warehouse Scale Computers and other Message-Passing Multiprocessors. UNIT V MEMORY & I/O SYSTEMS 9 Memory Hierarchy - memory technologies – cache memory – measuring and improving cache performance – virtual memory, TLB’s – Accessing I/O Devices – Interrupts – Direct Memory Access – Bus structure – Bus operation – Arbitration – Interface circuits - USB. TOTAL : 45 PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Understand the basics structure of computers, operations and instructions.  Design arithmetic and logic unit.  Understand pipelined execution and design control unit.  Understand parallel processing architectures.  Understand the various memory systems and I/O communication. TEXT BOOKS: 1. David A. Patterson and John L. Hennessy, Computer Organization and Design: The Hardware/Software Interface, Fifth Edition, Morgan Kaufmann / Elsevier, 2014. 2. Carl Hamacher, Zvonko Vranesic, Safwat Zaky and Naraig Manjikian, Computer Organization and Embedded Systems, Sixth Edition, Tata McGraw Hill, 2012. REFERENCES: 1. William Stallings, Computer Organization and Architecture – Designing for Performance, Eighth Edition, Pearson Education, 2010. 2. John P. Hayes, Computer Architecture and Organization, Third Edition, Tata
  • 52.
    52 McGraw Hill, 2012. 3.John L. Hennessey and David A. Patterson, Computer Architecture – A Quantitative Approachǁ, Morgan Kaufmann / Elsevier Publishers, Fifth Edition, 2012. CS8492 DATABASE MANAGEMENT SYSTEMS L T P C 3 0 0 3 OBJECTIVES  To learn the fundamentals of data models and to represent a database system using ER diagrams.  To study SQL and relational database design.  To understand the internal storage structures using different file and indexing techniques which will help in physical DB design.  To understand the fundamental concepts of transaction processing- concurrency control techniques and recovery procedures.  To have an introductory knowledge about the Storage and Query processing Techniques UNIT I RELATIONAL DATABASES 10 Purpose of Database System – Views of data – Data Models – Database System Architecture – Introduction to relational databases – Relational Model – Keys – Relational Algebra – SQL fundamentals – Advanced SQL features – Embedded SQL– Dynamic SQL UNIT II DATABASE DESIGN 8 Entity-Relationship model – E-R Diagrams – Enhanced-ER Model – ER-to-Relational Mapping – Functional Dependencies – Non-loss Decomposition – First, Second, Third Normal Forms, Dependency Preservation – Boyce/Codd Normal Form – Multi-valued Dependencies and Fourth Normal Form – Join Dependencies and Fifth Normal Form UNIT III TRANSACTIONS 9 Transaction Concepts – ACID Properties – Schedules – Serializability – Concurrency Control – Need for Concurrency – Locking Protocols – Two Phase Locking – Deadlock – Transaction Recovery - Save Points – Isolation Levels – SQL Facilities for Concurrency and Recovery. UNIT IV IMPLEMENTATION TECHNIQUES 9 RAID – File Organization – Organization of Records in Files – Indexing and Hashing –Ordered Indices – B+ tree Index Files – B tree Index Files – Static Hashing – Dynamic Hashing – Query Processing Overview – Algorithms for SELECT and JOIN operations – Query optimization using Heuristics and Cost Estimation. UNIT V ADVANCED TOPICS 9 Distributed Databases: Architecture, Data Storage, Transaction Processing – Object-based Databases: Object Database Concepts, Object-Relational features, ODMG Object Model, ODL, OQL - XML Databases: XML Hierarchical Model, DTD, XML Schema, XQuery – Information Retrieval: IR Concepts, Retrieval Models, Queries in IR systems. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Classify the modern and futuristic database applications based on size and complexity  Map ER model to Relational model to perform database design effectively  Write queries using normalization criteria and optimize queries  Compare and contrast various indexing strategies in different database systems  Appraise how advanced databases differ from traditional databases.
  • 53.
    53 TEXT BOOKS: 1. AbrahamSilberschatz, Henry F. Korth, S. Sudharshan, “Database System Concepts”, Sixth Edition, Tata McGraw Hill, 2011. 2. Ramez Elmasri, Shamkant B. Navathe, “Fundamentals of Database Systems”, Sixth Edition, Pearson Education, 2011. REFERENCES: 1. C.J.Date, A.Kannan, S.Swamynathan, “An Introduction to Database Systems”, Eighth Edition, Pearson Education, 2006. 2. Raghu Ramakrishnan, ―Database Management Systemsǁ, Fourth Edition, McGraw-Hill College Publications, 2015. 3. G.K.Gupta,"Database Management Systems”, Tata McGraw Hill, 2011. CS8451 DESIGN AND ANALYSIS OF ALGORITHMS L T P C 3 0 0 3 OBJECTIVES:  To understand and apply the algorithm analysis techniques.  To critically analyze the efficiency of alternative algorithmic solutions for the same problem  To understand different algorithm design techniques.  To understand the limitations of Algorithmic power. UNIT I INTRODUCTION 9 Notion of an Algorithm – Fundamentals of Algorithmic Problem Solving – Important Problem Types – Fundamentals of the Analysis of Algorithmic Efficiency –Asymptotic Notations and their properties. Analysis Framework – Empirical analysis - Mathematical analysis for Recursive and Non-recursive algorithms - Visualization UNIT II BRUTE FORCE AND DIVIDE-AND-CONQUER 9 Brute Force – Computing an – String Matching - Closest-Pair and Convex-Hull Problems - Exhaustive Search - Travelling Salesman Problem - Knapsack Problem - Assignment problem. Divide and Conquer Methodology – Binary Search – Merge sort – Quick sort – Heap Sort - Multiplication of Large Integers – Closest-Pair and Convex - Hull Problems. UNIT III DYNAMIC PROGRAMMING AND GREEDY TECHNIQUE 9 Dynamic programming – Principle of optimality - Coin changing problem, Computing a Binomial Coefficient – Floyd’s algorithm – Multi stage graph - Optimal Binary Search Trees – Knapsack Problem and Memory functions. Greedy Technique – Container loading problem - Prim’s algorithm and Kruskal's Algorithm – 0/1 Knapsack problem, Optimal Merge pattern - Huffman Trees. UNIT IV ITERATIVE IMPROVEMENT 9 The Simplex Method - The Maximum-Flow Problem – Maximum Matching in Bipartite Graphs, Stable marriage Problem. UNIT V COPING WITH THE LIMITATIONS OF ALGORITHM POWER 9 Lower - Bound Arguments - P, NP NP- Complete and NP Hard Problems. Backtracking – n-Queen problem - Hamiltonian Circuit Problem – Subset Sum Problem. Branch and Bound – LIFO Search and FIFO search - Assignment problem – Knapsack Problem – Travelling Salesman Problem - Approximation Algorithms for NP-Hard Problems – Travelling Salesman problem – Knapsack problem. TOTAL: 45 PERIODS
  • 54.
    54 OUTCOMES: At the endof the course, the students should be able to:  Design algorithms for various computing problems.  Analyze the time and space complexity of algorithms.  Critically analyze the different algorithm design techniques for a given problem.  Modify existing algorithms to improve efficiency. TEXT BOOKS: 1. Anany Levitin, “Introduction to the Design and Analysis of Algorithms”, Third Edition, Pearson Education, 2012. 2. Ellis Horowitz, Sartaj Sahni and Sanguthevar Rajasekaran, Computer Algorithms/ C++, Second Edition, Universities Press, 2007. REFERENCES: 1. Thomas H.Cormen, Charles E.Leiserson, Ronald L. Rivest and Clifford Stein, “Introduction to Algorithms”, Third Edition, PHI Learning Private Limited, 2012. 2. Alfred V. Aho, John E. Hopcroft and Jeffrey D. Ullman, “Data Structures and Algorithms”, Pearson Education, Reprint 2006. 3. Harsh Bhasin, “Algorithms Design and Analysis”, Oxford university press, 2016. 4. S. Sridhar, “Design and Analysis of Algorithms”, Oxford university press, 2014. 5. http://nptel.ac.in/ CS8493 OPERATING SYSTEMS L T P C 3 0 0 3 OBJECTIVES:  To understand the basic concepts and functions of operating systems.  To understand Processes and Threads  To analyze Scheduling algorithms.  To understand the concept of Deadlocks.  To analyze various memory management schemes.  To understand I/O management and File systems.  To be familiar with the basics of Linux system and Mobile OS like iOS and Android. UNIT I OPERATING SYSTEM OVERVIEW 7 Computer System Overview-Basic Elements, Instruction Execution, Interrupts, Memory Hierarchy, Cache Memory, Direct Memory Access, Multiprocessor and Multicore Organization. Operating system overview-objectives and functions, Evolution of Operating System.- Computer System Organization Operating System Structure and Operations- System Calls, System Programs, OS Generation and System Boot. UNIT II PROCESS MANAGEMENT 11 Processes - Process Concept, Process Scheduling, Operations on Processes, Inter-process Communication; CPU Scheduling - Scheduling criteria, Scheduling algorithms, Multiple-processor scheduling, Real time scheduling; Threads- Overview, Multithreading models, Threading issues; Process Synchronization - The critical-section problem, Synchronization hardware, Mutex locks, Semaphores, Classic problems of synchronization, Critical regions, Monitors; Deadlock - System model, Deadlock characterization, Methods for handling deadlocks, Deadlock prevention, Deadlock avoidance, Deadlock detection, Recovery from deadlock. UNIT III STORAGE MANAGEMENT 9 Main Memory – Background, Swapping, Contiguous Memory Allocation, Paging, Segmentation, Segmentation with paging, 32 and 64 bit architecture Examples; Virtual Memory – Background,
  • 55.
    55 Demand Paging, PageReplacement, Allocation, Thrashing; Allocating Kernel Memory, OS Examples. UNIT IV FILE SYSTEMS AND I/O SYSTEMS 9 Mass Storage system – Overview of Mass Storage Structure, Disk Structure, Disk Scheduling and Management, swap space management; File-System Interface - File concept, Access methods, Directory Structure, Directory organization, File system mounting, File Sharing and Protection; File System Implementation- File System Structure, Directory implementation, Allocation Methods, Free Space Management, Efficiency and Performance, Recovery; I/O Systems – I/O Hardware, Application I/O interface, Kernel I/O subsystem, Streams, Performance. UNIT V CASE STUDY 9 Linux System - Design Principles, Kernel Modules, Process Management, Scheduling, Memory Management, Input-Output Management, File System, Inter-process Communication; Mobile OS - iOS and Android - Architecture and SDK Framework, Media Layer, Services Layer, Core OS Layer, File System. TOTAL : 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Analyze various scheduling algorithms.  Understand deadlock, prevention and avoidance algorithms.  Compare and contrast various memory management schemes.  Understand the functionality of file systems.  Perform administrative tasks on Linux Servers.  Compare iOS and Android Operating Systems. TEXT BOOK : 1. Abraham Silberschatz, Peter Baer Galvin and Greg Gagne, “Operating System Concepts”, 9th Edition, John Wiley and Sons Inc., 2012. REFERENCES : 1. Ramaz Elmasri, A. Gil Carrick, David Levine, “Operating Systems – A Spiral Approach”, Tata McGraw Hill Edition, 2010. 2. Achyut S.Godbole, Atul Kahate, “Operating Systems”, McGraw Hill Education, 2016. 3. Andrew S. Tanenbaum, “Modern Operating Systems”, Second Edition, Pearson Education, 2004. 4. Gary Nutt, “Operating Systems”, Third Edition, Pearson Education, 2004. 5. Harvey M. Deitel, “Operating Systems”, Third Edition, Pearson Education, 2004. 6. Daniel P Bovet and Marco Cesati, “Understanding the Linux kernel”, 3rd edition, O’Reilly, 2005. 7. Neil Smyth, “iPhone iOS 4 Development Essentials – Xcode”, Fourth Edition, Payload media, 2011. CS8494 SOFTWARE ENGINEERING L T P C 3 0 0 3 OBJECTIVES:  To understand the phases in a software project  To understand fundamental concepts of requirements engineering and Analysis Modeling.  To understand the various software design methodologies  To learn various testing and maintenance measures UNIT I SOFTWARE PROCESS AND AGILE DEVELOPMENT 9 Introduction to Software Engineering, Software Process, Perspective and Specialized Process Models –Introduction to Agility-Agile process-Extreme programming-XP Process.
  • 56.
    56 UNIT II REQUIREMENTSANALYSIS AND SPECIFICATION 9 Software Requirements: Functional and Non-Functional, User requirements, System requirements, Software Requirements Document – Requirement Engineering Process: Feasibility Studies, Requirements elicitation and analysis, requirements validation, requirements management- Classical analysis: Structured system Analysis, Petri Nets- Data Dictionary. UNIT III SOFTWARE DESIGN 9 Design process – Design Concepts-Design Model– Design Heuristic – Architectural Design - Architectural styles, Architectural Design, Architectural Mapping using Data Flow- User Interface Design: Interface analysis, Interface Design –Component level Design: Designing Class based components, traditional Components. UNIT IV TESTING AND MAINTENANCE 9 Software testing fundamentals-Internal and external views of Testing-white box testing - basis path testing-control structure testing-black box testing- Regression Testing – Unit Testing – Integration Testing – Validation Testing – System Testing And Debugging –Software Implementation Techniques: Coding practices-Refactoring-Maintenance and Reengineering-BPR model-Reengineering process model-Reverse and Forward Engineering. UNIT V PROJECT MANAGEMENT 9 Software Project Management: Estimation – LOC, FP Based Estimation, Make/Buy Decision COCOMO I & II Model – Project Scheduling – Scheduling, Earned Value Analysis Planning – Project Plan, Planning Process, RFP Risk Management – Identification, Projection - Risk Management-Risk Identification-RMMM Plan-CASE TOOLS TOTAL :45 PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Identify the key activities in managing a software project.  Compare different process models.  Concepts of requirements engineering and Analysis Modeling.  Apply systematic procedure for software design and deployment.  Compare and contrast the various testing and maintenance.  Manage project schedule, estimate project cost and effort required. TEXT BOOKS: 1. Roger S. Pressman, “Software Engineering – A Practitioner‟s Approach”, Seventh Edition, Mc Graw-Hill International Edition, 2010. 2. Ian Sommerville, “Software Engineering”, 9th Edition, Pearson Education Asia, 2011. REFERENCES: 1. Rajib Mall, “Fundamentals of Software Engineering”, Third Edition, PHI Learning PrivateLimited, 2009. 2. Pankaj Jalote, “Software Engineering, A Precise Approach”, Wiley India, 2010. 3. Kelkar S.A., “Software Engineering”, Prentice Hall of India Pvt Ltd, 2007. 4. Stephen R.Schach, “Software Engineering”, Tata McGraw-Hill Publishing Company Limited,2007. 5. http://nptel.ac.in/. CS8481 DATABASE MANAGEMENT SYSTEMS LABORATORY L T P C 0 0 4 2 AIM: The aim of this laboratory is to inculcate the abilities of applying the principles of the database management systems. This course aims to prepare the students for projects where a proper implementation of databases will be required.
  • 57.
    57 OBJECTIVES:  To understanddata definitions and data manipulation commands  To learn the use of nested and join queries  To understand functions, procedures and procedural extensions of data bases  To be familiar with the use of a front end tool  To understand design and implementation of typical database applications 1. Data Definition Commands, Data Manipulation Commands for inserting, deleting, updating and retrieving Tables and Transaction Control statements 2. Database Querying – Simple queries, Nested queries, Sub queries and Joins 3. Views, Sequences, Synonyms 4. Database Programming: Implicit and Explicit Cursors 5. Procedures and Functions 6. Triggers 7. Exception Handling 8. Database Design using ER modeling, normalization and Implementation for any application 9. Database Connectivity with Front End Tools 10. Case Study using real life database applications TOTAL: 60 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Use typical data definitions and manipulation commands.  Design applications to test Nested and Join Queries  Implement simple applications that use Views  Implement applications that require a Front-end Tool  Critically analyze the use of Tables, Views, Functions and Procedures CS8461 OPERATING SYSTEMS LABORATORY L T P C 0 0 4 2 OBJECTIVES  To learn Unix commands and shell programming  To implement various CPU Scheduling Algorithms  To implement Process Creation and Inter Process Communication.  To implement Deadlock Avoidance and Deadlock Detection Algorithms  To implement Page Replacement Algorithms  To implement File Organization and File Allocation Strategies LIST OF EXPERIMENTS 1. Basics of UNIX commands 2. Write programs using the following system calls of UNIX operating system fork, exec, getpid, exit, wait, close, stat, opendir, readdir 3. Write C programs to simulate UNIX commands like cp, ls, grep, etc. 4. Shell Programming 5. Write C programs to implement the various CPU Scheduling Algorithms 6. Implementation of Semaphores 7. Implementation of Shared memory and IPC 8. Bankers Algorithm for Deadlock Avoidance 9. Implementation of Deadlock Detection Algorithm 10. Write C program to implement Threading & Synchronization Applications 11. Implementation of the following Memory Allocation Methods for fixed partition a) First Fit b) Worst Fit c) Best Fit 12. Implementation of Paging Technique of Memory Management 13. Implementation of the following Page Replacement Algorithms a) FIFO b) LRU c) LFU
  • 58.
    58 14. Implementation ofthe various File Organization Techniques 15. Implementation of the following File Allocation Strategies a) Sequential b) Indexed c) Linked TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to  Compare the performance of various CPU Scheduling Algorithms  Implement Deadlock avoidance and Detection Algorithms  Implement Semaphores  Create processes and implement IPC  Analyze the performance of the various Page Replacement Algorithms  Implement File Organization and File Allocation Strategies HS8461 ADVANCED READING AND WRITING L T P C 0 0 2 1 OBJECTIVES: • Strengthen the reading skills of students of engineering. • Enhance their writing skills with specific reference to technical writing. • Develop students’ critical thinking skills. • Provide more opportunities to develop their project and proposal writing skills. UNIT I Reading - Strategies for effective reading-Use glosses and footnotes to aid reading comprehension- Read and recognize different text types-Predicting content using photos and title Writing-Plan before writing- Develop a paragraph: topic sentence, supporting sentences, concluding sentence –Write a descriptive paragraph UNIT II Reading-Read for details-Use of graphic organizers to review and aid comprehension Writing- State reasons and examples to support ideas in writing- Write a paragraph with reasons and examples- Write an opinion paragraph UNIT III Reading- Understanding pronoun reference and use of connectors in a passage- speed reading techniques-Writing- Elements of a good essay-Types of essays- descriptive-narrative- issue- based-argumentative-analytical. UNIT IV Reading- Genre and Organization of Ideas- Writing- Email writing- visumes – Job application- project writing-writing convincing proposals. UNIT V Reading- Critical reading and thinking- understanding how the text positions the reader- identify Writing- Statement of Purpose- letter of recommendation- Vision statement TOTAL: 30 PERIODS OUTCOMES: At the end of the course Learners will be able to:  Write different types of essays.  Write winning job applications.
  • 59.
    59  Read andevaluate texts critically.  Display critical thinking in various professional contexts. TEXT BOOKS: 1. Gramer F. Margot and Colin S. Ward Reading and Writing (Level 3) Oxford University Press: Oxford, 2011 2. Debra Daise, CharlNorloff, and Paul Carne Reading and Writing (Level 4) Oxford University Press: Oxford, 2011 REFERENCES: 1. Davis, Jason and Rhonda LIss.Effective Academic Writing (Level 3) Oxford University Press: Oxford, 2006 2. E. Suresh Kumar and et al. Enriching Speaking and Writing Skills. Second Edition. Orient Black swan: Hyderabad, 2012 3. Withrow, Jeans and et al. Inspired to Write. Readings and Tasks to develop writing skills. Cambridge University Press: Cambridge, 2004 4. Goatly, Andrew. Critical Reading and Writing. Routledge: United States of America, 2000 5. Petelin, Roslyn and Marsh Durham. The Professional Writing Guide: Knowing Well and Knowing Why. Business & Professional Publishing: Australia, 2004 MA8551 ALGEBRA AND NUMBER THEORY L T P C 4 0 0 4 OBJECTIVES:  To introduce the basic notions of groups, rings, fields which will then be used to solve related problems.  To introduce and apply the concepts of rings, finite fields and polynomials.  To understand the basic concepts in number theory  To examine the key questions in the Theory of Numbers.  To give an integrated approach to number theory and abstract algebra, and provide a firm basis for further reading and study in the subject. UNIT I GROUPS AND RINGS 12 Groups : Definition - Properties - Homomorphism - Isomorphism - Cyclic groups - Cosets - Lagrange's theorem. Rings: Definition - Sub rings - Integral domain - Field - Integer modulo n - Ring homomorphism. UNIT II FINITE FIELDS AND POLYNOMIALS 12 Rings - Polynomial rings - Irreducible polynomials over finite fields - Factorization of polynomials over finite fields. UNIT III DIVISIBILITY THEORY AND CANONICAL DECOMPOSITIONS 12 Division algorithm – Base - b representations – Number patterns – Prime and composite numbers – GCD – Euclidean algorithm – Fundamental theorem of arithmetic – LCM. UNIT IV DIOPHANTINE EQUATIONS AND CONGRUENCES 12 Linear Diophantine equations – Congruence’s – Linear Congruence’s - Applications: Divisibility tests - Modular exponentiation-Chinese remainder theorem – 2 x 2 linear systems. UNIT V CLASSICAL THEOREMS AND MULTIPLICATIVE FUNCTIONS 12 Wilson’s theorem – Fermat’s little theorem – Euler’s theorem – Euler’s Phi functions – Tau and Sigma functions. TOTAL: 60 PERIODS
  • 60.
    60 OUTCOMES: Upon successful completionof the course, students should be able to:  Apply the basic notions of groups, rings, fields which will then be used to solve related problems.  Explain the fundamental concepts of advanced algebra and their role in modern mathematics and applied contexts.  Demonstrate accurate and efficient use of advanced algebraic techniques.  Demonstrate their mastery by solving non - trivial problems related to the concepts, and by proving simple theorems about the, statements proven by the text.  Apply integrated approach to number theory and abstract algebra, and provide a firm basis for further reading and study in the subject. TEXTBOOKS: 1. Grimaldi, R.P and Ramana, B.V., "Discrete and Combinatorial Mathematics", Pearson Education, 5th Edition, New Delhi, 2007. 2. Koshy, T., “Elementary Number Theory with Applications”, Elsevier Publications, New Delhi, 2002. REFERENCES: 1. Lidl, R. and Pitz, G, "Applied Abstract Algebra", Springer Verlag, New Delhi, 2nd Edition, 2006. 2. Niven, I., Zuckerman.H.S., and Montgomery, H.L., “An Introduction to Theory of Numbers”, John Wiley and Sons , Singapore, 2004. 3. San Ling and Chaoping Xing, “Coding Theory – A first Course”, Cambridge Publications, Cambridge, 2004. CS8591 COMPUTER NETWORKS L T P C 3 0 0 3 OBJECTIVES: • To understand the protocol layering and physical level communication. • To analyze the performance of a network. • To understand the various components required to build different networks. • To learn the functions of network layer and the various routing protocols. • To familiarize the functions and protocols of the Transport layer. UNIT I INTRODUCTION AND PHYSICAL LAYER 9 Networks – Network Types – Protocol Layering – TCP/IP Protocol suite – OSI Model – Physical Layer: Performance – Transmission media – Switching – Circuit-switched Networks – Packet Switching. UNIT II DATA-LINK LAYER & MEDIA ACCESS 9 Introduction – Link-Layer Addressing – DLC Services – Data-Link Layer Protocols – HDLC – PPP - Media Access Control - Wired LANs: Ethernet - Wireless LANs – Introduction – IEEE 802.11, Bluetooth – Connecting Devices. UNIT III NETWORK LAYER 9 Network Layer Services – Packet switching – Performance – IPV4 Addresses – Forwarding of IP Packets - Network Layer Protocols: IP, ICMP v4 – Unicast Routing Algorithms – Protocols – Multicasting Basics – IPV6 Addressing – IPV6 Protocol. UNIT IV TRANSPORT LAYER 9 Introduction – Transport Layer Protocols – Services – Port Numbers – User Datagram Protocol – Transmission Control Protocol – SCTP. UNIT V APPLICATION LAYER 9 WWW and HTTP – FTP – Email –Telnet –SSH – DNS – SNMP.
  • 61.
    61 TOTAL : 45PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Understand the basic layers and its functions in computer networks.  Evaluate the performance of a network.  Understand the basics of how data flows from one node to another.  Analyze and design routing algorithms.  Design protocols for various functions in the network.  Understand the working of various application layer protocols. TEXT BOOK: 1. Behrouz A. Forouzan, Data Communications and Networking, Fifth Edition TMH, 2013. REFERENCES 1. Larry L. Peterson, Bruce S. Davie, Computer Networks: A Systems Approach, Fifth Edition, Morgan Kaufmann Publishers Inc., 2012. 2. William Stallings, Data and Computer Communications, Tenth Edition, Pearson Education, 2013. 3. Nader F. Mir, Computer and Communication Networks, Second Edition, Prentice Hall, 2014. 4. Ying-Dar Lin, Ren-Hung Hwang and Fred Baker, Computer Networks: An Open Source Approach, McGraw Hill Publisher, 2011. 5. James F. Kurose, Keith W. Ross, Computer Networking, A Top-Down Approach Featuring the Internet, Sixth Edition, Pearson Education, 2013. EC8691 MICROPROCESSORS AND MICROCONTROLLERS L T P C 3 0 0 3 OBJECTIVES:  To understand the Architecture of 8086 microprocessor.  To learn the design aspects of I/O and Memory Interfacing circuits.  To interface microprocessors with supporting chips.  To study the Architecture of 8051 microcontroller.  To design a microcontroller based system UNIT I THE 8086 MICROPROCESSOR 9 Introduction to 8086 – Microprocessor architecture – Addressing modes - Instruction set and assembler directives – Assembly language programming – Modular Programming - Linking and Relocation - Stacks - Procedures – Macros – Interrupts and interrupt service routines – Byte and String Manipulation. UNIT II 8086 SYSTEM BUS STRUCTURE 9 8086 signals – Basic configurations – System bus timing –System design using 8086 – I/O programming – Introduction to Multiprogramming – System Bus Structure – Multiprocessor configurations – Coprocessor, Closely coupled and loosely Coupled configurations – Introduction to advanced processors. UNIT III I/O INTERFACING 9 Memory Interfacing and I/O interfacing - Parallel communication interface – Serial communication interface – D/A and A/D Interface - Timer – Keyboard /display controller – Interrupt controller – DMA controller – Programming and applications Case studies: Traffic Light control, LED display , LCD display, Keyboard display interface and Alarm Controller. UNIT IV MICROCONTROLLER 9 Architecture of 8051 – Special Function Registers(SFRs) - I/O Pins Ports and Circuits - Instruction set - Addressing modes - Assembly language programming.
  • 62.
    62 UNIT V INTERFACINGMICROCONTROLLER 9 Programming 8051 Timers - Serial Port Programming - Interrupts Programming – LCD & Keyboard Interfacing - ADC, DAC & Sensor Interfacing - External Memory Interface- Stepper Motor and Waveform generation - Comparison of Microprocessor, Microcontroller, PIC and ARM processors TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Understand and execute programs based on 8086 microprocessor.  Design Memory Interfacing circuits.  Design and interface I/O circuits.  Design and implement 8051 microcontroller based systems. TEXT BOOKS: 1. Yu-Cheng Liu, Glenn A.Gibson, “Microcomputer Systems: The 8086 / 8088 Family - Architecture, Programming and Design”, Second Edition, Prentice Hall of India, 2007. (UNIT I- III) 2. Mohamed Ali Mazidi, Janice Gillispie Mazidi, Rolin McKinlay, “The 8051 Microcontroller and Embedded Systems: Using Assembly and C”, Second Edition, Pearson education, 2011. (UNIT IV-V) REFERENCES: 1. Doughlas V.Hall, “Microprocessors and Interfacing, Programming and Hardware”,TMH,2012 2. A.K.Ray,K.M.Bhurchandi,”Advanced Microprocessors and Peripherals “3rd edition, Tata McGrawHill,2012 CS8501 THEORY OF COMPUTATION L T P C 3 0 0 3 OBJECTIVES:  To understand the language hierarchy  To construct automata for any given pattern and find its equivalent regular expressions  To design a context free grammar for any given language  To understand Turing machines and their capability  To understand undecidable problems and NP class problems UNIT I AUTOMATA FUNDAMENTALS 9 Introduction to formal proof – Additional forms of Proof – Inductive Proofs –Finite Automata – Deterministic Finite Automata – Non-deterministic Finite Automata – Finite Automata with Epsilon Transitions UNIT II REGULAR EXPRESSIONS AND LANGUAGES 9 Regular Expressions – FA and Regular Expressions – Proving Languages not to be regular – Closure Properties of Regular Languages – Equivalence and Minimization of Automata. UNIT III CONTEXT FREE GRAMMAR AND LANGUAGES 9 CFG – Parse Trees – Ambiguity in Grammars and Languages – Definition of the Pushdown Automata – Languages of a Pushdown Automata – Equivalence of Pushdown Automata and CFG, Deterministic Pushdown Automata.
  • 63.
    63 UNIT IV PROPERTIESOF CONTEXT FREE LANGUAGES 9 Normal Forms for CFG – Pumping Lemma for CFL – Closure Properties of CFL – Turing Machines – Programming Techniques for TM. UNIT V UNDECIDABILITY 9 Non Recursive Enumerable (RE) Language – Undecidable Problem with RE – Undecidable Problems about TM – Post’s Correspondence Problem, The Class P and NP. TOTAL :45PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Construct automata, regular expression for any pattern.  Write Context free grammar for any construct.  Design Turing machines for any language.  Propose computation solutions using Turing machines.  Derive whether a problem is decidable or not. TEXT BOOK: 1. J.E.Hopcroft, R.Motwani and J.D Ullman, “Introduction to Automata Theory, Languages and Computations”, Second Edition, Pearson Education, 2003. REFERENCES: 1. H.R.Lewis and C.H.Papadimitriou, “Elements of the theory of Computation”, Second Edition, PHI, 2003. 2. J.Martin, “Introduction to Languages and the Theory of Computation”, Third Edition, TMH, 2003. 3. Micheal Sipser, “Introduction of the Theory and Computation”, Thomson Brokecole, 1997. CS8592 OBJECT ORIENTED ANALYSIS AND DESIGN L T P C 3 0 0 3 OBJECTIVES:  To understand the fundamentals of object modeling  To understand and differentiate Unified Process from other approaches.  To design with static UML diagrams.  To design with the UML dynamic and implementation diagrams.  To improve the software design with design patterns.  To test the software against its requirements specification UNIT I UNIFIED PROCESS AND USE CASE DIAGRAMS 9 Introduction to OOAD with OO Basics - Unified Process – UML diagrams – Use Case –Case study – the Next Gen POS system, Inception -Use case Modelling – Relating Use cases – include, extend and generalization – When to use Use-cases UNIT II STATIC UML DIAGRAMS 9 Class Diagram–– Elaboration – Domain Model – Finding conceptual classes and description classes – Associations – Attributes – Domain model refinement – Finding conceptual class Hierarchies – Aggregation and Composition - Relationship between sequence diagrams and use cases – When to use Class Diagrams UNIT III DYNAMIC AND IMPLEMENTATION UML DIAGRAMS 9 Dynamic Diagrams – UML interaction diagrams - System sequence diagram – Collaboration diagram – When to use Communication Diagrams - State machine diagram and Modelling –When to use State Diagrams - Activity diagram – When to use activity diagrams
  • 64.
    64 Implementation Diagrams -UML package diagram - When to use package diagrams - Component and Deployment Diagrams – When to use Component and Deployment diagrams UNIT IV DESIGN PATTERNS 9 GRASP: Designing objects with responsibilities – Creator – Information expert – Low Coupling – High Cohesion – Controller Design Patterns – creational – factory method – structural – Bridge – Adapter – behavioural – Strategy – observer –Applying GoF design patterns – Mapping design to code UNIT V TESTING 9 Object Oriented Methodologies – Software Quality Assurance – Impact of object orientation on Testing – Develop Test Cases and Test Plans TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students will be able to:  Express software design with UML diagrams  Design software applications using OO concepts.  Identify various scenarios based on software requirements  Transform UML based software design into pattern based design using design patterns  Understand the various testing methodologies for OO software TEXT BOOKS: 1. Craig Larman, “Applying UML and Patterns: An Introduction to Object-Oriented Analysis and Design and Iterative Development”, Third Edition, Pearson Education, 2005. 2. Ali Bahrami - Object Oriented Systems Development - McGraw Hill International Edition - 1999 REFERENCES: 1. Erich Gamma, a n d Richard Helm, Ralph Johnson, John Vlissides, “Design patterns: Elements of Reusable Object-Oriented Software”, Addison-Wesley, 1995. 2. Martin Fowler, “UML Distilled: A Brief Guide to the Standard Object Modeling Language”, Third edition, Addison Wesley, 2003. EC8681 MICROPROCESSORS AND MICROCONTROLLERS LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To Introduce ALP concepts, features and Coding methods  Write ALP for arithmetic and logical operations in 8086 and 8051  Differentiate Serial and Parallel Interface  Interface different I/Os with Microprocessors  Be familiar with MASM LIST OF EXPERIMENTS: 8086 Programs using kits and MASM 1. Basic arithmetic and Logical operations 2. Move a data block without overlap 3. Code conversion, decimal arithmetic and Matrix operations. 4. Floating point operations, string manipulations, sorting and searching 5. Password checking, Print RAM size and system date 6. Counters and Time Delay Peripherals and Interfacing Experiments 7. Traffic light controller 8. Stepper motor control
  • 65.
    65 9. Digital clock 10.Key board and Display 11. Printer status 12. Serial interface and Parallel interface 13. A/D and D/A interface and Waveform Generation 8051 Experiments using kits and MASM 14. Basic arithmetic and Logical operations 15. Square and Cube program, Find 2’s complement of a number 16. Unpacked BCD to ASCII TOTAL: 60 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Write ALP Programmes for fixed and Floating Point and Arithmetic operations  Interface different I/Os with processor  Generate waveforms using Microprocessors  Execute Programs in 8051  Explain the difference between simulator and Emulator LAB EQUIPMENT FOR A BATCH OF 30 STUDENTS: HARDWARE: 8086 development kits - 30 nos Interfacing Units - Each 10 nos Microcontroller - 30 nos SOFTWARE: Intel Desktop Systems with MASM - 30 nos 8086 Assembler 8051 Cross Assembler CS8582 OBJECT ORIENTED ANALYSIS AND DESIGN LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To capture the requirements specification for an intended software system  To draw the UML diagrams for the given specification  To map the design properly to code  To test the software system thoroughly for all scenarios  To improve the design by applying appropriate design patterns. Draw standard UML diagrams using an UML modeling tool for a given case study and map design to code and implement a 3 layered architecture. Test the developed code and validate whether the SRS is satisfied. 1. Identify a software system that needs to be developed. 2. Document the Software Requirements Specification (SRS) for the identified system. 3. Identify use cases and develop the Use Case model. 4. Identify the conceptual classes and develop a Domain Model and also derive a Class Diagram from that. 5. Using the identified scenarios, find the interaction between objects and represent them using UML Sequence and Collaboration Diagrams 6. Draw relevant State Chart and Activity Diagrams for the same system. 7. Implement the system as per the detailed design 8. Test the software system for all the scenarios identified as per the usecase diagram 9. Improve the reusability and maintainability of the software system by applying appropriate
  • 66.
    66 design patterns. 10. Implementthe modified system and test it for various scenarios SUGGESTED DOMAINS FOR MINI-PROJECT: 1. Passport automation system. 2. Book bank 3. Exam registration 4. Stock maintenance system. 5. Online course reservation system 6. Airline/Railway reservation system 7. Software personnel management system 8. Credit card processing 9. e-book management system 10. Recruitment system 11. Foreign trading system 12. Conference management system 13. BPO management system 14. Library management system 15. Student information system TOTAL: 60 PERIODS OUTCOMES: Upon completion of this course, the students will be able to:  Perform OO analysis and design for a given problem specification.  Identify and map basic software requirements in UML mapping.  Improve the software quality using design patterns and to explain the rationale behind applying specific design patterns  Test the compliance of the software with the SRS. HARDWARE REQUIREMENTS Standard PC SOFTWARE REQUIREMENTS 1. Windows 7 or higher 2. ArgoUML that supports UML 1.4 and higher 3. Selenium, JUnit or Apache JMeter CS8581 NETWORKS LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To learn and use network commands.  To learn socket programming.  To implement and analyze various network protocols.  To learn and use simulation tools.  To use simulation tools to analyze the performance of various network protocols. LIST OF EXPERIMENTS 1. Learn to use commands like tcpdump, netstat, ifconfig, nslookup and traceroute. Capture ping and traceroute PDUs using a network protocol analyzer and examine. 2. Write a HTTP web client program to download a web page using TCP sockets. 3. Applications using TCP sockets like:  Echo client and echo server  Chat  File Transfer
  • 67.
    67 4. Simulation ofDNS using UDP sockets. 5. Write a code simulating ARP /RARP protocols. 6. Study of Network simulator (NS) and Simulation of Congestion Control Algorithms using NS. 7. Study of TCP/UDP performance using Simulation tool. 8. Simulation of Distance Vector/ Link State Routing algorithm. 9. Performance evaluation of Routing protocols using Simulation tool. 10. Simulation of error correction code (like CRC). TOTAL: 60 PERIODS OUTCOMES: Upon Completion of the course, the students will be able to:  Implement various protocols using TCP and UDP.  Compare the performance of different transport layer protocols.  Use simulation tools to analyze the performance of various network protocols.  Analyze various routing algorithms.  Implement error correction codes. LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: LABORATORY REQUIREMENT FOR BATCH OF 30 STUDENTS: HARDWARE: 1. Standalone desktops 30 Nos SOFTWARE: 1. C / C++ / Java / Python / Equivalent Compiler 30 2. Network simulator like NS2/Glomosim/OPNET/ Packet Tracer / Equivalent CS8651 INTERNET PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To understand different Internet Technologies.  To learn java-specific web services architecture UNIT I WEBSITE BASICS, HTML 5, CSS 3, WEB 2.0 9 Web Essentials: Clients, Servers and Communication – The Internet – Basic Internet protocols – World wide web – HTTP Request Message – HTTP Response Message – Web Clients – Web Servers – HTML5 – Tables – Lists – Image – HTML5 control elements – Semantic elements – Drag and Drop – Audio – Video controls - CSS3 – Inline, embedded and external style sheets – Rule cascading – Inheritance – Backgrounds – Border Images – Colors – Shadows – Text – Transformations – Transitions – Animations. UNIT II CLIENT SIDE PROGRAMMING 9 Java Script: An introduction to JavaScript–JavaScript DOM Model-Date and Objects,- Regular Expressions- Exception Handling-Validation-Built-in objects-Event Handling- DHTML with JavaScript- JSON introduction – Syntax – Function Files – Http Request – SQL. UNIT III SERVER SIDE PROGRAMMING 9 Servlets: Java Servlet Architecture- Servlet Life Cycle- Form GET and POST actions- Session Handling- Understanding Cookies- Installing and Configuring Apache Tomcat Web Server- DATABASE CONNECTIVITY: JDBC perspectives, JDBC program example - JSP: Understanding Java Server Pages-JSP Standard Tag Library (JSTL)-Creating HTML forms by embedding JSP code.
  • 68.
    68 UNIT IV PHPand XML 9 An introduction to PHP: PHP- Using PHP- Variables- Program control- Built-in functions- Form Validation- Regular Expressions - File handling – Cookies - Connecting to Database. XML: Basic XML- Document Type Definition- XML Schema DOM and Presenting XML, XML Parsers and Validation, XSL and XSLT Transformation, News Feed (RSS and ATOM). UNIT V INTRODUCTION TO AJAX and WEB SERVICES 9 AJAX: Ajax Client Server Architecture-XML Http Request Object-Call Back Methods; Web Services: Introduction- Java web services Basics – Creating, Publishing, Testing and Describing a Web services (WSDL)-Consuming a web service, Database Driven web service from an application –SOAP. TOTAL 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Construct a basic website using HTML and Cascading Style Sheets.  Build dynamic web page with validation using Java Script objects and by applying different event handling mechanisms.  Develop server side programs using Servlets and JSP.  Construct simple web pages in PHP and to represent data in XML format.  Use AJAX and web services to develop interactive web applications TEXT BOOK: 1. Deitel and Deitel and Nieto, “Internet and World Wide Web - How to Program”, Prentice Hall, 5th Edition, 2011. REFERENCES: 1. Stephen Wynkoop and John Burke “Running a Perfect Website”, QUE, 2nd Edition,1999. 2. Chris Bates, Web Programming – Building Intranet Applications, 3rd Edition, Wiley Publications, 2009. 3. Jeffrey C and Jackson, “Web Technologies A Computer Science Perspective”, Pearson Education, 2011. 4. Gopalan N.P. and Akilandeswari J., “Web Technology”, Prentice Hall of India, 2011. 5. UttamK.Roy, “Web Technologies”, Oxford University Press, 2011. CS8691 ARTIFICIAL INTELLIGENCE L T P C 3 0 0 3 OBJECTIVES:  To understand the various characteristics of Intelligent agents  To learn the different search strategies in AI  To learn to represent knowledge in solving AI problems  To understand the different ways of designing software agents  To know about the various applications of AI. UNIT I INTRODUCTION 9 Introduction–Definition - Future of Artificial Intelligence – Characteristics of Intelligent Agents– Typical Intelligent Agents – Problem Solving Approach to Typical AI problems.
  • 69.
    69 UNIT II PROBLEMSOLVING METHODS 9 Problem solving Methods - Search Strategies- Uninformed - Informed - Heuristics - Local Search Algorithms and Optimization Problems - Searching with Partial Observations - Constraint Satisfaction Problems – Constraint Propagation - Backtracking Search - Game Playing - Optimal Decisions in Games – Alpha - Beta Pruning - Stochastic Games UNIT III KNOWLEDGE REPRESENTATION 9 First Order Predicate Logic – Prolog Programming – Unification – Forward Chaining-Backward Chaining – Resolution – Knowledge Representation - Ontological Engineering-Categories and Objects – Events - Mental Events and Mental Objects - Reasoning Systems for Categories - Reasoning with Default Information UNIT IV SOFTWARE AGENTS 9 Architecture for Intelligent Agents – Agent communication – Negotiation and Bargaining – Argumentation among Agents – Trust and Reputation in Multi-agent systems. UNIT V APPLICATIONS 9 AI applications – Language Models – Information Retrieval- Information Extraction – Natural Language Processing - Machine Translation – Speech Recognition – Robot – Hardware – Perception – Planning – Moving TOTAL :45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Use appropriate search algorithms for any AI problem  Represent a problem using first order and predicate logic  Provide the apt agent strategy to solve a given problem  Design software agents to solve a problem  Design applications for NLP that use Artificial Intelligence. TEXT BOOKS: 1 S. Russell and P. Norvig, "Artificial Intelligence: A Modern Approach”, Prentice Hall, Third Edition, 2009. 2 I. Bratko, “Prolog: Programming for Artificial Intelligence”, Fourth edition, Addison-Wesley Educational Publishers Inc., 2011. REFERENCES: 1. M. Tim Jones, “Artificial Intelligence: A Systems Approach(Computer Science)”, Jones and Bartlett Publishers, Inc.; First Edition, 2008 2. Nils J. Nilsson, “The Quest for Artificial Intelligence”, Cambridge University Press, 2009. 3. William F. Clocksin and Christopher S. Mellish,” Programming in Prolog: Using the ISO Standard”, Fifth Edition, Springer, 2003. 4. Gerhard Weiss, “Multi Agent Systems”, Second Edition, MIT Press, 2013. 5. David L. Poole and Alan K. Mackworth, “Artificial Intelligence: Foundations of Computational Agents”, Cambridge University Press, 2010.
  • 70.
    70 CS8601 MOBILE COMPUTINGL T P C 3 0 0 3 OBJECTIVES:  To understand the basic concepts of mobile computing.  To learn the basics of mobile telecommunication system .  To be familiar with the network layer protocols and Ad-Hoc networks.  To know the basis of transport and application layer protocols.  To gain knowledge about different mobile platforms and application development. UNIT I INTRODUCTION 9 Introduction to Mobile Computing – Applications of Mobile Computing- Generations of Mobile Communication Technologies- Multiplexing – Spread spectrum -MAC Protocols – SDMA- TDMA- FDMA- CDMA UNIT II MOBILE TELECOMMUNICATION SYSTEM 9 Introduction to Cellular Systems - GSM – Services & Architecture – Protocols – Connection Establishment – Frequency Allocation – Routing – Mobility Management – Security – GPRS- UMTS – Architecture – Handover - Security UNIT III MOBILE NETWORK LAYER 9 Mobile IP – DHCP – AdHoc– Proactive protocol-DSDV, Reactive Routing Protocols – DSR, AODV , Hybrid routing –ZRP, Multicast Routing- ODMRP, Vehicular Ad Hoc networks ( VANET) –MANET Vs VANET – Security. UNIT IV MOBILE TRANSPORT AND APPLICATION LAYER 9 Mobile TCP– WAP – Architecture – WDP – WTLS – WTP –WSP – WAE – WTA Architecture – WML UNIT V MOBILE PLATFORMS AND APPLICATIONS 9 Mobile Device Operating Systems – Special Constraints & Requirements – Commercial Mobile Operating Systems – Software Development Kit: iOS, Android, BlackBerry, Windows Phone – MCommerce – Structure – Pros & Cons – Mobile Payment System – Security Issues TOTAL 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Explain the basics of mobile telecommunication systems  Illustrate the generations of telecommunication systems in wireless networks  Determine the functionality of MAC, network layer and Identify a routing protocol for a given Ad hoc network  Explain the functionality of Transport and Application layers  Develop a mobile application using android/blackberry/ios/Windows SDK TEXT BOOKS: 1. Jochen Schiller, “Mobile Communications”, PHI, Second Edition, 2003. 2. Prasant Kumar Pattnaik, Rajib Mall, “Fundamentals of Mobile Computing”, PHI Learning Pvt.Ltd, New Delhi – 2012 REFERENCES 1. Dharma Prakash Agarval, Qing and An Zeng, "Introduction to Wireless and Mobile systems",Thomson Asia Pvt Ltd, 2005. 2. Uwe Hansmann, Lothar Merk, Martin S. Nicklons and Thomas Stober, “Principles of Mobile Computing”, Springer, 2003. 3. William.C.Y.Lee,“Mobile Cellular Telecommunications-Analog and Digital Systems”, Second Edition,TataMcGraw Hill Edition ,2006. 4. C.K.Toh, “AdHoc Mobile Wireless Networks”, First Edition, Pearson Education, 2002.
  • 71.
    71 5. Android Developers: http://developer.android.com/index.html 6. Apple Developer : https://developer.apple.com/ 7. Windows Phone DevCenter : http://developer.windowsphone.com 8. BlackBerry Developer : http://developer.blackberry.com CS8602 COMPILER DESIGN L T P C 3 0 2 4 OBJECTIVES:  To learn the various phases of compiler.  To learn the various parsing techniques.  To understand intermediate code generation and run-time environment.  To learn to implement front-end of the compiler.  To learn to implement code generator. UNIT I INTRODUCTION TO COMPILERS 9 Structure of a compiler – Lexical Analysis – Role of Lexical Analyzer – Input Buffering – Specification of Tokens – Recognition of Tokens – Lex – Finite Automata – Regular Expressions to Automata – Minimizing DFA. UNIT II SYNTAX ANALYSIS 12 Role of Parser – Grammars – Error Handling – Context-free grammars – Writing a grammar – Top Down Parsing - General Strategies Recursive Descent Parser Predictive Parser-LL(1) Parser-Shift Reduce Parser-LR Parser-LR (0)Item Construction of SLR Parsing Table - Introduction to LALR Parser - Error Handling and Recovery in Syntax Analyzer-YACC. UNIT III INTERMEDIATE CODE GENERATION 8 Syntax Directed Definitions, Evaluation Orders for Syntax Directed Definitions, Intermediate Languages: Syntax Tree, Three Address Code, Types and Declarations, Translation of Expressions, Type Checking. UNIT IV RUN-TIME ENVIRONMENT AND CODE GENERATION 8 Storage Organization, Stack Allocation Space, Access to Non-local Data on the Stack, Heap Management - Issues in Code Generation - Design of a simple Code Generator. UNIT V CODE OPTIMIZATION 8 Principal Sources of Optimization – Peep-hole optimization - DAG- Optimization of Basic Blocks- Global Data Flow Analysis - Efficient Data Flow Algorithm. LIST OF EXPERIMENTS: 1. Develop a lexical analyzer to recognize a few patterns in C. (Ex. identifiers, constants, comments, operators etc.). Create a symbol table, while recognizing identifiers. 2. Implement a Lexical Analyzer using Lex Tool 3. Implement an Arithmetic Calculator using LEX and YACC 4. Generate three address code for a simple program using LEX and YACC. 5. Implement simple code optimization techniques (Constant folding, Strength reduction and Algebraic transformation) 6. Implement back-end of the compiler for which the three address code is given as input and the 8086 assembly language code is produced as output. PRACTICALS 30 PERIODS THEORY 45 PERIODS TOTAL : 75 PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Understand the different phases of compiler.  Design a lexical analyzer for a sample language.
  • 72.
    72  Apply differentparsing algorithms to develop the parsers for a given grammar.  Understand syntax-directed translation and run-time environment.  Learn to implement code optimization techniques and a simple code generator.  Design and implement a scanner and a parser using LEX and YACC tools. TEXT BOOK: 1. Alfred V. Aho, Monica S. Lam, Ravi Sethi, Jeffrey D. Ullman, Compilers: Principles, Techniques and Toolsǁ, Second Edition, Pearson Education, 2009. REFERENCES 1. Randy Allen, Ken Kennedy, Optimizing Compilers for Modern Architectures: A Dependence based Approach, Morgan Kaufmann Publishers, 2002. 2. Steven S. Muchnick, Advanced Compiler Design and Implementationǁ, Morgan Kaufmann Publishers - Elsevier Science, India, Indian Reprint 2003. 3. Keith D Cooper and Linda Torczon, Engineering a Compilerǁ, Morgan Kaufmann Publishers Elsevier Science, 2004. 4. V. Raghavan, Principles of Compiler Designǁ, Tata McGraw Hill Education Publishers, 2010. 5. Allen I. Holub, Compiler Design in Cǁ, Prentice-Hall Software Series, 1993. CS8603 DISTRIBUTED SYSTEMS L T P C 3 0 0 3 OBJECTIVES:  To understand the foundations of distributed systems.  To learn issues related to clock Synchronization and the need for global state in distributed systems.  To learn distributed mutual exclusion and deadlock detection algorithms.  To understand the significance of agreement, fault tolerance and recovery protocols in Distributed Systems.  To learn the characteristics of peer-to-peer and distributed shared memory systems. UNIT I INTRODUCTION 9 Introduction: Definition –Relation to computer system components –Motivation –Relation to parallel systems – Message-passing systems versus shared memory systems –Primitives for distributed communication –Synchronous versus asynchronous executions –Design issues and challenges. A model of distributed computations: A distributed program –A model of distributed executions –Models of communication networks –Global state – Cuts –Past and future cones of an event –Models of process communications. Logical Time: A framework for a system of logical clocks –Scalar time –Vector time – Physical clock synchronization: NTP. UNIT II MESSAGE ORDERING & SNAPSHOTS 9 Message ordering and group communication: Message ordering paradigms –Asynchronous execution with synchronous communication –Synchronous program order on an asynchronous system –Group communication – Causal order (CO) - Total order. Global state and snapshot recording algorithms: Introduction –System model and definitions –Snapshot algorithms for FIFO channels UNIT III DISTRIBUTED MUTEX & DEADLOCK 9 Distributed mutual exclusion algorithms: Introduction – Preliminaries – Lamport’s algorithm – Ricart-Agrawala algorithm – Maekawa’s algorithm – Suzuki–Kasami’s broadcast algorithm. Deadlock detection in distributed systems: Introduction – System model – Preliminaries – Models of deadlocks – Knapp’s classification – Algorithms for the single resource model, the AND model and the OR model.
  • 73.
    73 UNIT IV RECOVERY& CONSENSUS 9 Checkpointing and rollback recovery: Introduction – Background and definitions – Issues in failure recovery – Checkpoint-based recovery – Log-based rollback recovery – Coordinated checkpointing algorithm – Algorithm for asynchronous checkpointing and recovery. Consensus and agreement algorithms: Problem definition – Overview of results – Agreement in a failure – free system – Agreement in synchronous systems with failures. UNIT V P2P & DISTRIBUTED SHARED MEMORY 9 Peer-to-peer computing and overlay graphs: Introduction – Data indexing and overlays – Chord – Content addressable networks – Tapestry. Distributed shared memory: Abstraction and advantages – Memory consistency models –Shared memory Mutual Exclusion. TOTAL: 45 PERIODS OUTCOMES: At the end of this course, the students will be able to:  Elucidate the foundations and issues of distributed systems  Understand the various synchronization issues and global state for distributed systems.  Understand the Mutual Exclusion and Deadlock detection algorithms in distributed systems  Describe the agreement protocols and fault tolerance mechanisms in distributed systems.  Describe the features of peer-to-peer and distributed shared memory systems TEXT BOOKS: 1. Kshemkalyani, Ajay D., and Mukesh Singhal. Distributed computing: principles, algorithms, and systems. Cambridge University Press, 2011. 2. George Coulouris, Jean Dollimore and Tim Kindberg, “Distributed Systems Concepts and Design”, Fifth Edition, Pearson Education, 2012. REFERENCES: 1. Pradeep K Sinha, "Distributed Operating Systems: Concepts and Design", Prentice Hall of India, 2007. 2. Mukesh Singhal and Niranjan G. Shivaratri. Advanced concepts in operating systems. McGraw-Hill, Inc., 1994. 3. Tanenbaum A.S., Van Steen M., “Distributed Systems: Principles and Paradigms”, Pearson Education, 2007. 4. Liu M.L., “Distributed Computing, Principles and Applications”, Pearson Education, 2004. 5. Nancy A Lynch, “Distributed Algorithms”, Morgan Kaufman Publishers, USA, 2003. CS8661 INTERNET PROGRAMMING LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To be familiar with Web page design using HTML/XML and style sheets  To be exposed to creation of user interfaces using Java frames and applets.  To learn to create dynamic web pages using server side scripting.  To learn to write Client Server applications.  To be familiar with the PHP programming.  To be exposed to creating applications with AJAX LIST OF EXPERIMENTS 1. Create a web page with the following using HTML a. To embed a map in a web page b. To fix the hot spots in that map c. Show all the related information when the hot spots are clicked.
  • 74.
    74 2. Create aweb page with the following. a. Cascading style sheets. b. Embedded style sheets. c. Inline style sheets. Use our college information for the web pages. 3. Validate the Registration, user login, user profile and payment by credit card pages using JavaScript. 4. Write programs in Java using Servlets: i. To invoke servlets from HTML forms ii. Session tracking using hidden form fields and Session tracking for a hit count 5. Write programs in Java to create three-tier applications using servlets for conducting on- line examination for displaying student mark list. Assume that student information is available in a database which has been stored in a database server. 6. Install TOMCAT web server. Convert the static web pages of programs into dynamic web pages using servlets (or JSP) and cookies. Hint: Users information (user id, password, credit card number) would be stored in web.xml. Each user should have a separate Shopping Cart. 7. Redo the previous task using JSP by converting the static web pages into dynamic web pages. Create a database with user information and books information. The books catalogue should be dynamically loaded from the database. 8. Create and save an XML document at the server, which contains 10 users Information. Write a Program, which takes user Id as an input and returns the User details by taking the user information from the XML document 9. i. Validate the form using PHP regular expression. ii. PHP stores a form data into database. 10. Write a web service for finding what people think by asking 500 people’s opinion for any consumer product. TOTAL: 60PERIODS OUTCOMES: Upon Completion of the course, the students will be able to:  Construct Web pages using HTML/XML and style sheets.  Build dynamic web pages with validation using Java Script objects and by applying different event handling mechanisms.  Develop dynamic web pages using server side scripting.  Use PHP programming to develop web applications.  Construct web applications using AJAX and web services. SOFTWARE REQUIRED:  Dream Weaver or Equivalent, MySQL or Equivalent, Apache Server, WAMP/XAMPP CS8662 MOBILE APPLICATION DEVELOPMENT LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To understand the components and structure of mobile application development frameworks for Android and windows OS based mobiles.  To understand how to work with various mobile application development frameworks.  To learn the basic and important design concepts and issues of development of mobile applications.  To understand the capabilities and limitations of mobile devices.
  • 75.
    75 LIST OF EXPERIMENTS 1.Develop an application that uses GUI components, Font and Colours 2. Develop an application that uses Layout Managers and event listeners. 3. Write an application that draws basic graphical primitives on the screen. 4. Develop an application that makes use of databases. 5. Develop an application that makes use of Notification Manager 6. Implement an application that uses Multi-threading 7. Develop a native application that uses GPS location information 8. Implement an application that writes data to the SD card. 9. Implement an application that creates an alert upon receiving a message 10. Write a mobile application that makes use of RSS feed 11. Develop a mobile application to send an email. 12. Develop a Mobile application for simple needs (Mini Project) TOTAL: 60 PERIODS OUTCOMES: Upon Completion of the course, the students will be able to:  Develop mobile applications using GUI and Layouts.  Develop mobile applications using Event Listener.  Develop mobile applications using Databases.  Develop mobile applications using RSS Feed, Internal/External Storage, SMS, Multi- threading and GPS.  Analyze and discover own mobile app for simple needs. REFERENCES: 1. Build Your Own Security Lab, Michael Gregg, Wiley India LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS Standalone desktops with Windows or Android or iOS or Equivalent Mobile Application Development Tools with appropriate emulators and debuggers - 30 Nos. HS8581 PROFESSIONAL COMMUNICATION L T P C 0 0 2 1 OBJECTIVES: The course aims to:  Enhance the Employability and Career Skills of students  Orient the students towards grooming as a professional  Make them Employable Graduates  Develop their confidence and help them attend interviews successfully. UNIT I Introduction to Soft Skills-- Hard skills & soft skills - employability and career Skills—Grooming as a professional with values—Time Management—General awareness of Current Affairs UNIT II Self-Introduction-organizing the material - Introducing oneself to the audience – introducing the topic – answering questions – individual presentation practice–– presenting the visuals effectively – 5 minute presentations
  • 76.
    76 UNIT III Introduction toGroup Discussion— Participating in group discussions – understanding group dynamics - brainstorming the topic -– questioning and clarifying –GD strategies- activities to improve GD skills UNIT IV Interview etiquette – dress code – body language – attending job interviews– telephone/skype interview -one to one interview &panel interview – FAQs related to job interviews UNIT V Recognizing differences between groups and teams- managing time-managing stress- networking professionally- respecting social protocols-understanding career management-developing a long-term career plan-making career changes TOTAL : 30 PERIODS OUTCOMES: At the end of the course Learners will be able to: • Make effective presentations • Participate confidently in Group Discussions. • Attend job interviews and be successful in them. • Develop adequate Soft Skills required for the workplace Recommended Software 1. Open Source Software 2. Win English REFERENCES: 1. Butterfield, Jeff Soft Skills for Everyone. Cengage Learning: New Delhi, 2015 2. E. Suresh Kumar et al. Communication for Professional Success. Orient Blackswan: Hyderabad, 2015 3. Interact English Lab Manual for Undergraduate Students,. OrientBalckSwan: Hyderabad, 2016. 4. Raman, Meenakshi and Sangeeta Sharma. Professional Communication. Oxford University Press: Oxford, 2014 5. S. Hariharanetal. Soft Skills. MJP Publishers: Chennai, 2010. MG8591 PRINCIPLES OF MANAGEMENT L T P C 3 0 0 3 OBJECTIVES:  To enable the students to study the evolution of Management, to study the functions and principles of management and to learn the application of the principles in an organization . UNIT I INTRODUCTION TO MANAGEMENT AND ORGANIZATIONS 9 Definition of Management – Science or Art – Manager Vs Entrepreneur - types of managers - managerial roles and skills – Evolution of Management – Scientific, human relations , system and contingency approaches – Types of Business organization - Sole proprietorship, partnership, company-public and private sector enterprises - Organization culture and Environment – Current trends and issues in Management. UNIT II PLANNING 9 Nature and purpose of planning – planning process – types of planning – objectives – setting objectives – policies – Planning premises – Strategic Management – Planning Tools and Techniques – Decision making steps and process. UNIT III ORGANISING 9 Nature and purpose – Formal and informal organization – organization chart – organization structure – types – Line and staff authority – departmentalization – delegation of authority –
  • 77.
    77 centralization and decentralization– Job Design - Human Resource Management – HR Planning, Recruitment, selection, Training and Development, Performance Management , Career planning and management UNIT IV DIRECTING 9 Foundations of individual and group behaviour – motivation – motivation theories – motivational techniques – job satisfaction – job enrichment – leadership – types and theories of leadership – communication – process of communication – barrier in communication – effective communication –communication and IT. UNIT V CONTROLLING 9 System and process of controlling – budgetary and non-budgetary control techniques – use of computers and IT in Management control – Productivity problems and management – control and performance – direct and preventive control – reporting. TOTAL: 45 PERIODS OUTCOMES:  Upon completion of the course, students will be able to have clear understanding of managerial functions like planning, organizing, staffing, leading & controlling and have same basic knowledge on international aspect of management TEXTBOOKS: 1. Stephen P. Robbins & Mary Coulter, “Management”, Prentice Hall (India) Pvt. Ltd., 10th Edition, 2009. 2. JAF Stoner, Freeman R.E and Daniel R Gilbert “Management”, Pearson Education, 6th Edition, 2004. REFERENCES: 1. Stephen A. Robbins & David A. Decenzo & Mary Coulter, “Fundamentals of Management” Pearson Education, 7th Edition, 2011. 2. Robert Kreitner & Mamata Mohapatra, “ Management”, Biztantra, 2008. 3. Harold Koontz & Heinz Weihrich “Essentials of management” Tata McGraw Hill,1998. 4. Tripathy PC & Reddy PN, “Principles of Management”, Tata McGraw Hill, 1999 CS8792 CRYPTOGRAPHY AND NETWORK SECURITY L T P C 3 0 0 3 OBJECTIVES:  To understand Cryptography Theories, Algorithms and Systems.  To understand necessary Approaches and Techniques to build protection mechanisms in order to secure computer networks. UNIT I INTRODUCTION 9 Security trends - Legal, Ethical and Professional Aspects of Security, Need for Security at Multiple levels, Security Policies - Model of network security – Security attacks, services and mechanisms – OSI security architecture – Classical encryption techniques: substitution techniques, transposition techniques, steganography- Foundations of modern cryptography: perfect security – information theory – product cryptosystem – cryptanalysis. UNIT II SYMMETRIC KEY CRYPTOGRAPHY 9 MATHEMATICS OF SYMMETRIC KEY CRYPTOGRAPHY: Algebraic structures - Modular arithmetic-Euclid‟s algorithm- Congruence and matrices - Groups, Rings, Fields- Finite fields- SYMMETRIC KEY CIPHERS: SDES – Block cipher Principles of DES – Strength of DES – Differential and linear cryptanalysis - Block cipher design principles – Block cipher mode of operation – Evaluation criteria for AES – Advanced Encryption Standard - RC4 –
  • 78.
    78 Key distribution. UNIT IIIPUBLIC KEY CRYPTOGRAPHY 9 MATHEMATICS OF ASYMMETRIC KEY CRYPTOGRAPHY: Primes – Primality Testing – Factorization – Euler’s totient function, Fermat’s and Euler’s Theorem - Chinese Remainder Theorem – Exponentiation and logarithm - ASYMMETRIC KEY CIPHERS: RSA cryptosystem – Key distribution – Key management – Diffie Hellman key exchange - ElGamal cryptosystem – Elliptic curve arithmetic-Elliptic curve cryptography. UNIT IV MESSAGE AUTHENTICATION AND INTEGRITY 9 Authentication requirement – Authentication function – MAC – Hash function – Security of hash function and MAC – SHA –Digital signature and authentication protocols – DSS- Entity Authentication: Biometrics, Passwords, Challenge Response protocols- Authentication applications - Kerberos, X.509 UNIT V SECURITY PRACTICE AND SYSTEM SECURITY 9 Electronic Mail security – PGP, S/MIME – IP security – Web Security - SYSTEM SECURITY: Intruders – Malicious software – viruses – Firewalls. TOTAL 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Understand the fundamentals of networks security, security architecture, threats and vulnerabilities  Apply the different cryptographic operations of symmetric cryptographic algorithms  Apply the different cryptographic operations of public key cryptography  Apply the various Authentication schemes to simulate different applications.  Understand various Security practices and System security standards TEXT BOOK: 1. William Stallings, Cryptography and Network Security: Principles and Practice, PHI 3rd Edition, 2006. REFERENCES: 1. C K Shyamala, N Harini and Dr. T R Padmanabhan: Cryptography and Network Security, Wiley India Pvt.Ltd 2. BehrouzA.Foruzan, Cryptography and Network Security, Tata McGraw Hill 2007. 3. Charlie Kaufman, Radia Perlman, and Mike Speciner, Network Security: PRIVATE Communication in a PUBLIC World, Prentice Hall, ISBN 0-13-046019-2 CS8791 CLOUD COMPUTING L T P C 3 0 0 3 OBJECTIVES:  To understand the concept of cloud computing.  To appreciate the evolution of cloud from the existing technologies.  To have knowledge on the various issues in cloud computing.  To be familiar with the lead players in cloud.  To appreciate the emergence of cloud as the next generation computing paradigm. UNIT I INTRODUCTION 9 Introduction to Cloud Computing – Definition of Cloud – Evolution of Cloud Computing – Underlying Principles of Parallel and Distributed Computing – Cloud Characteristics – Elasticity in Cloud – On-demand Provisioning.
  • 79.
    79 UNIT II CLOUDENABLING TECHNOLOGIES 10 Service Oriented Architecture – REST and Systems of Systems – Web Services – Publish- Subscribe Model – Basics of Virtualization – Types of Virtualization – Implementation Levels of Virtualization – Virtualization Structures – Tools and Mechanisms – Virtualization of CPU – Memory – I/O Devices –Virtualization Support and Disaster Recovery. UNIT III CLOUD ARCHITECTURE, SERVICES AND STORAGE 8 Layered Cloud Architecture Design – NIST Cloud Computing Reference Architecture – Public, Private and Hybrid Clouds - laaS – PaaS – SaaS – Architectural Design Challenges – Cloud Storage – Storage-as-a-Service – Advantages of Cloud Storage – Cloud Storage Providers – S3. UNIT IV RESOURCE MANAGEMENT AND SECURITY IN CLOUD 10 Inter Cloud Resource Management – Resource Provisioning and Resource Provisioning Methods – Global Exchange of Cloud Resources – Security Overview – Cloud Security Challenges – Software-as-a-Service Security – Security Governance – Virtual Machine Security – IAM – Security Standards. UNIT V CLOUD TECHNOLOGIES AND ADVANCEMENTS 8 Hadoop – MapReduce – Virtual Box -- Google App Engine – Programming Environment for Google App Engine –– Open Stack – Federation in the Cloud – Four Levels of Federation – Federated Services and Applications – Future of Federation. TOTAL: 45 PERIODS OUTCOMES: On Completion of the course, the students should be able to:  Articulate the main concepts, key technologies, strengths and limitations of cloud computing.  Learn the key and enabling technologies that help in the development of cloud.  Develop the ability to understand and use the architecture of compute and storage cloud, service and delivery models.  Explain the core issues of cloud computing such as resource management and security.  Be able to install and use current cloud technologies.  Evaluate and choose the appropriate technologies, algorithms and approaches for implementation and use of cloud. TEXT BOOKS: 1. Kai Hwang, Geoffrey C. Fox, Jack G. Dongarra, "Distributed and Cloud Computing, From Parallel Processing to the Internet of Things", Morgan Kaufmann Publishers, 2012. 2. Rittinghouse, John W., and James F. Ransome, “Cloud Computing: Implementation, Management and Security”, CRC Press, 2017. REFERENCES: 1. Rajkumar Buyya, Christian Vecchiola, S. ThamaraiSelvi, “Mastering Cloud Computing”, Tata Mcgraw Hill, 2013. 2. Toby Velte, Anthony Velte, Robert Elsenpeter, "Cloud Computing - A Practical Approach”, Tata Mcgraw Hill, 2009. 3. George Reese, "Cloud Application Architectures: Building Applications and Infrastructure in the Cloud: Transactional Systems for EC2 and Beyond (Theory in Practice)”, O'Reilly, 2009.
  • 80.
    80 CS8711 CLOUD COMPUTINGLABORATORY L T P C 0 0 4 2 OBJECTIVES:  To develop web applications in cloud  To learn the design and development process involved in creating a cloud based application  To learn to implement and use parallel programming using Hadoop 1. Install Virtualbox/VMware Workstation with different flavours of linux or windows OS on top of windows7 or 8. 2. Install a C compiler in the virtual machine created using virtual box and execute Simple Programs 3. Install Google App Engine. Create hello world app and other simple web applications using python/java. 4. Use GAE launcher to launch the web applications. 5. Simulate a cloud scenario using CloudSim and run a scheduling algorithm that is not present in CloudSim. 6. Find a procedure to transfer the files from one virtual machine to another virtual machine. 7. Find a procedure to launch virtual machine using trystack (Online Openstack Demo Version) 8. Install Hadoop single node cluster and run simple applications like wordcount. TOTAL : 60 PERIODS OUTCOMES: On completion of this course, the students will be able to:  Configure various virtualization tools such as Virtual Box, VMware workstation.  Design and deploy a web application in a PaaS environment.  Learn how to simulate a cloud environment to implement new schedulers.  Install and use a generic cloud environment that can be used as a private cloud.  Manipulate large data sets in a parallel environment. IT8761 SECURITY LABORATORY L T P C 0 0 4 2 OBJECTIVES:  To learn different cipher techniques  To implement the algorithms DES, RSA,MD5,SHA-1  To use network security tools and vulnerability assessment tools LIST OF EXPERIMENTS 1. Perform encryption, decryption using the following substitution techniques (i) Ceaser cipher, (ii) playfair cipher iii) Hill Cipher iv) Vigenere cipher 2. Perform encryption and decryption using following transposition techniques i) Rail fence ii) row & Column Transformation 3. Apply DES algorithm for practical applications. 4. Apply AES algorithm for practical applications. 5. Implement RSA Algorithm using HTML and JavaScript 6. Implement the Diffie-Hellman Key Exchange algorithm for a given problem. 7. Calculate the message digest of a text using the SHA-1 algorithm. 8. Implement the SIGNATURE SCHEME - Digital Signature Standard. 9. Demonstrate intrusion detection system (ids) using any tool eg. Snort or any other s/w.
  • 81.
    81 10. Automated Attackand Penetration Tools Exploring N-Stalker, a Vulnerability Assessment Tool 11. Defeating Malware i) Building Trojans ii) Rootkit Hunter TOTAL: 60 PERIODS OUTCOMES: Upon Completion of the course, the students will be able to:  Develop code for classical Encryption Techniques to solve the problems.  Build cryptosystems by applying symmetric and public key encryption algorithms.  Construct code for authentication algorithms.  Develop a signature scheme using Digital signature standard.  Demonstrate the network security system using open source tools REFERENCES: 1. Build Your Own Security Lab, Michael Gregg, Wiley India LIST OF EQUIPMENT FOR A BATCH OF 30 STUDENTS: SOFTWARE: C / C++ / Java or equivalent compiler GnuPG, Snort, N-Stalker or Equivalent HARDWARE: Standalone desktops - 30 Nos. (or) Server supporting 30 terminals or more. CS8811 PROJECT WORK L T P C 0 0 20 10 OBJECTIVES:  To develop the ability to solve a specific problem right from its identification and literature review till the successful solution of the same. To train the students in preparing project reports and to face reviews and viva voce examination. The students in a group of 3 to 4 works on a topic approved by the head of the department under the guidance of a faculty member and prepares a comprehensive project report after completing the work to the satisfaction of the supervisor. The progress of the project is evaluated based on a minimum of three reviews. The review committee may be constituted by the Head of the Department. A project report is required at the end of the semester. The project work is evaluated based on oral presentation and the project report jointly by external and internal examiners constituted by the Head of the Department. TOTAL: 300 PERIODS OUTCOME:  On Completion of the project work students will be in a position to take up any challenging practical problems and find solution by formulating proper methodology. CS8075 DATA WAREHOUSING AND DATA MINING L T P C 3 0 0 3 OBJECTIVES:  To understand data warehouse concepts, architecture, business analysis and tools  To understand data pre-processing and data visualization techniques  To study algorithms for finding hidden and interesting patterns in data  To understand and apply various classification and clustering techniques using tools.
  • 82.
    82 UNIT I DATAWAREHOUSING, BUSINESS ANALYSIS AND ON-LINE ANALYTICAL PROCESSING (OLAP) 9 Basic Concepts - Data Warehousing Components – Building a Data Warehouse – Database Architectures for Parallel Processing – Parallel DBMS Vendors - Multidimensional Data Model – Data Warehouse Schemas for Decision Support, Concept Hierarchies -Characteristics of OLAP Systems – Typical OLAP Operations, OLAP and OLTP. UNIT II DATA MINING – INTRODUCTION 9 Introduction to Data Mining Systems – Knowledge Discovery Process – Data Mining Techniques – Issues – applications- Data Objects and attribute types, Statistical description of data, Data Preprocessing – Cleaning, Integration, Reduction, Transformation and discretization, Data Visualization, Data similarity and dissimilarity measures. UNIT III DATA MINING - FREQUENT PATTERN ANALYSIS 9 Mining Frequent Patterns, Associations and Correlations – Mining Methods- Pattern Evaluation Method – Pattern Mining in Multilevel, Multi Dimensional Space – Constraint Based Frequent Pattern Mining, Classification using Frequent Patterns UNIT IV CLASSIFICATION AND CLUSTERING 9 Decision Tree Induction - Bayesian Classification – Rule Based Classification – Classification by Back Propagation – Support Vector Machines –– Lazy Learners – Model Evaluation and Selection-Techniques to improve Classification Accuracy. Clustering Techniques – Cluster analysis-Partitioning Methods - Hierarchical Methods – Density Based Methods - Grid Based Methods – Evaluation of clustering – Clustering high dimensional data- Clustering with constraints, Outlier analysis-outlier detection methods. UNIT V WEKA TOOL 9 Datasets – Introduction, Iris plants database, Breast cancer database, Auto imports database - Introduction to WEKA, The Explorer – Getting started, Exploring the explorer, Learning algorithms, Clustering algorithms, Association–rule learners. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students should be able to:  Design a Data warehouse system and perform business analysis with OLAP tools.  Apply suitable pre-processing and visualization techniques for data analysis  Apply frequent pattern and association rule mining techniques for data analysis  Apply appropriate classification and clustering techniques for data analysis TEXT BOOK: 1. Jiawei Han and Micheline Kamber, “Data Mining Concepts and Techniques”, Third Edition, Elsevier, 2012. REFERENCES: 1. Alex Berson and Stephen J.Smith, “Data Warehousing, Data Mining & OLAP”, Tata McGraw – Hill Edition, 35th Reprint 2016. 2. K.P. Soman, Shyam Diwakar and V. Ajay, “Insight into Data Mining Theory and Practice”, Eastern Economy Edition, Prentice Hall of India, 2006. 3. Ian H.Witten and Eibe Frank, “Data Mining: Practical Machine Learning Tools and Techniques”, Elsevier, Second Edition.
  • 83.
    83 IT8076 SOFTWARE TESTINGL T P C 3 0 0 3 OBJECTIVES:  To learn the criteria for test cases.  To learn the design of test cases.  To understand test management and test automation techniques.  To apply test metrics and measurements. UNIT I INTRODUCTION 9 Testing as an Engineering Activity – Testing as a Process – Testing Maturity Model- Testing axioms – Basic definitions – Software Testing Principles – The Tester’s Role in a Software Development Organization – Origins of Defects – Cost of defects – Defect Classes – The Defect Repository and Test Design –Defect Examples- Developer/Tester Support of Developing a Defect Repository. UNIT II TEST CASE DESIGN STRATEGIES 9 Test case Design Strategies – Using Black Box Approach to Test Case Design – Boundary Value Analysis – Equivalence Class Partitioning – State based testing – Cause-effect graphing – Compatibility testing – user documentation testing – domain testing - Random Testing – Requirements based testing – Using White Box Approach to Test design – Test Adequacy Criteria – static testing vs. structural testing – code functional testing – Coverage and Control Flow Graphs – Covering Code Logic – Paths – code complexity testing – Additional White box testing approaches- Evaluating Test Adequacy Criteria. UNIT III LEVELS OF TESTING 9 The need for Levels of Testing – Unit Test – Unit Test Planning – Designing the Unit Tests – The Test Harness – Running the Unit tests and Recording results – Integration tests – Designing Integration Tests – Integration Test Planning – Scenario testing – Defect bash elimination System Testing – Acceptance testing – Performance testing – Regression Testing – Internationalization testing – Ad-hoc testing – Alpha, Beta Tests – Testing OO systems – Usability and Accessibility testing – Configuration testing –Compatibility testing – Testing the documentation – Website testing. UNIT IV TEST MANAGEMENT 9 People and organizational issues in testing – Organization structures for testing teams – testing services – Test Planning – Test Plan Components – Test Plan Attachments – Locating Test Items – test management – test process – Reporting Test Results – Introducing the test specialist – Skills needed by a test specialist – Building a Testing Group- The Structure of Testing Group- .The Technical Training Program. UNIT V TEST AUTOMATION 9 Software test automation – skills needed for automation – scope of automation – design and architecture for automation – requirements for a test tool – challenges in automation – Test metrics and measurements – project, progress and productivity metrics. TOTAL: 45 PERIODS OUTCOMES: At the end of the course the students will be able to:  Design test cases suitable for a software development for different domains.  Identify suitable tests to be carried out.  Prepare test planning based on the document.  Document test plans and test cases designed.  Use automatic testing tools.  Develop and validate a test plan.
  • 84.
    84 TEXT BOOKS: 1. SrinivasanDesikan and Gopalaswamy Ramesh, “Software Testing – Principles and Practices”, Pearson Education, 2006. 2. Ron Patton, “Software Testing”, Second Edition, Sams Publishing, Pearson Education, 2007. AU Library.com REFERENCES: 1. Ilene Burnstein, “Practical Software Testing”, Springer International Edition, 2003. 2. Edward Kit,” Software Testing in the Real World – Improving the Process”, Pearson Education, 1995. 3. Boris Beizer,” Software Testing Techniques” – 2nd Edition, Van Nostrand Reinhold, New York, 1990. 4. Aditya P. Mathur, “Foundations of Software Testing _ Fundamental Algorithms and Techniques”, Dorling Kindersley (India) Pvt. Ltd., Pearson Education, 2008. IT8072 EMBEDDED SYSTEMS L T P C 3 0 0 3 OBJECTIVES:  To learn the architecture and programming of ARM processor.  To become familiar with the embedded computing platform design and analysis.  To get thorough knowledge in interfacing concepts  To design an embedded system and to develop programs UNIT I INTRODUCTION TO EMBEDDED COMPUTING AND ARM PROCESSORS 9 Complex systems and micro processors– Embedded system design process –Design example: Model train controller- Instruction sets preliminaries - ARM Processor – CPU: programming input and output- supervisor mode, exceptions and traps – Co-processors- Memory system mechanisms – CPU performance- CPU power consumption. UNIT II EMBEDDED COMPUTING PLATFORM DESIGN 9 The CPU Bus-Memory devices and systems–Designing with computing platforms – consumer electronics architecture – platform-level performance analysis - Components for embedded programs- Models of programs- Assembly, linking and loading – compilation techniques- Program level performance analysis – Software performance optimization – Program level energy and power analysis and optimization – Analysis and optimization of program size- Program validation and testing. UNIT III SENSOR INTERFACING WITH ARDUINO 9 Basics of hardware design and functions of basic passive components-sensors and actuators- Arduino code - library file for sensor interfacing-construction of basic applications UNIT IV EMBEDDED FIRMWARE 9 Reset Circuit, Brown-out Protection Circuit-Oscillator Unit - Real Time Clock-Watchdog Timer - Embedded Firmware Design Approaches and Development Languages. UNIT V EMBEDDED C PROGRAMMING 9 Introduction-Creating ‘hardware delays’ using Timer 0 and Timer 1-Reading switches-Adding Structure to the code-Generating a minimum and maximum delay-Example: Creating a portable hardware delay- Timeout mechanisms-Creating loop timeouts-Testing loop timeouts- hardware timeouts-Testing a hardware timeout TOTAL : 45 PERIODS
  • 85.
    85 OUTCOMES: Upon completion ofthe course, students will be able to:  Describe the architecture and programming of ARM processor.  Explain the concepts of embedded systems  Understand the Concepts of peripherals and interfacing of sensors.  Capable of using the system design techniques to develop firmware  Illustrate the code for constructing a system TEXT BOOKS: 1.Marilyn Wolf, “Computers as Components - Principles of Embedded Computing System Design”, Third Edition “Morgan Kaufmann Publisher (An imprint from Elsevier), 2012. (unit I & II) 2 https://www.coursera.org/learn/interface-with-arduino#syllabus (Unit III) 3 .Michael J. Pont, “Embedded C”, 2 nd Edition, Pearson Education, 2008.(Unit IV & V) REFERENCES: 1.Shibu K.V, “Introduction to Embedded Systems”, McGraw Hill.2014 2.Jonathan W.Valvano, “Embedded Microcomputer Systems Real Time Interfacing”, Third Edition Cengage Learning, 2012 3 Raj Kamal, “Embedded Systems-Architecture,programming and design”, 3 edition,TMH.2015 4. Lyla, “Embedded Systems”, Pearson , 2013 6. David E. Simon, “An Embedded Software Primer”, Pearson Education,2000. CS8072 AGILE METHODOLOGIES L T P C 3 0 0 3 OBJECTIVES:  To provide students with a theoretical as well as practical understanding of agile software development practices and how small teams can apply them to create high-quality software.  To provide a good understanding of software design and a set of software technologies and APIs.  To do a detailed examination and demonstration of Agile development and testing techniques.  To understand the benefits and pitfalls of working in an Agile team.  To understand Agile development and testing. UNIT I AGILE METHODOLOGY 9 Theories for Agile Management – Agile Software Development – Traditional Model vs. Agile Model - Classification of Agile Methods – Agile Manifesto and Principles – Agile Project Management – Agile Team Interactions – Ethics in Agile Teams - Agility in Design, Testing – Agile Documentations – Agile Drivers, Capabilities and Values UNIT II AGILE PROCESSES 9 Lean Production - SCRUM, Crystal, Feature Driven Development- Adaptive Software Development - Extreme Programming: Method Overview – Lifecycle – Work Products, Roles and Practices. UNIT III AGILITY AND KNOWLEDGE MANAGEMENT 9 Agile Information Systems – Agile Decision Making - Earl‘S Schools of KM – Institutional Knowledge Evolution Cycle – Development, Acquisition, Refinement, Distribution, Deployment , Leveraging – KM in Software Engineering – Managing Software Knowledge – Challenges of Migrating to Agile Methodologies – Agile Knowledge Sharing – Role of Story-Cards – Story-Card Maturity Model (SMM).
  • 86.
    86 UNIT IV AGILITYAND REQUIREMENTS ENGINEERING 9 Impact of Agile Processes in RE–Current Agile Practices – Variance – Overview of RE Using Agile – Managing Unstable Requirements – Requirements Elicitation – Agile Requirements Abstraction Model – Requirements Management in Agile Environment, Agile Requirements Prioritization – Agile Requirements Modeling and Generation – Concurrency in Agile Requirements Generation. UNIT V AGILITY AND QUALITY ASSURANCE 9 Agile Product Development – Agile Metrics – Feature Driven Development (FDD) – Financial and Production Metrics in FDD – Agile Approach to Quality Assurance - Test Driven Development – Agile Approach in Global Software Development. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Realize the importance of interacting with business stakeholders in determining the requirements for a software system  Perform iterative software development processes: how to plan them, how to execute them.  Point out the impact of social aspects on software development success.  Develop techniques and tools for improving team collaboration and software quality.  Perform Software process improvement as an ongoing task for development teams.  Show how agile approaches can be scaled up to the enterprise level. TEXT BOOKS: 1. David J. Anderson and Eli Schragenheim, “Agile Management for Software Engineering: Applying the Theory of Constraints for Business Results”, Prentice Hall, 2003. 2. Hazza and Dubinsky, “Agile Software Engineering, Series: Undergraduate Topics in Computer Science”, Springer, 2009. REFERENCES: 1. Craig Larman, “Agile and Iterative Development: A Manager‘s Guide”, Addison-Wesley, 2004. 2. Kevin C. Desouza, “Agile Information Systems: Conceptualization, Construction, and Management”, Butterworth-Heinemann, 2007. CS8077 GRAPH THEORY AND APPLICATIONS L T P C 3 0 0 3 OBJECTIVES:  To understand fundamentals of graph theory.  To study proof techniques related to various concepts in graphs.  To explore modern applications of graph theory. UNIT I 9 Introduction - Graph Terminologies - Types of Graphs - Sub Graph- Multi Graph - Regular Graph - Isomorphism - Isomorphic Graphs - Sub-graph - Euler graph - Hamiltonian Graph - Related Theorems. UNIT II 9 Trees -Properties- Distance and Centres - Types - Rooted Tree-- Tree Enumeration- Labeled Tree - Unlabeled Tree - Spanning Tree - Fundamental Circuits- Cut Sets - Properties - Fundamental Circuit and Cut-set- Connectivity- Separability -Related Theorems.
  • 87.
    87 UNIT III 9 NetworkFlows - Planar Graph - Representation - Detection - Dual Graph - Geometric and Combinatorial Dual - Related Theorems - Digraph - Properties - Euler Digraph. UNIT IV 9 Matrix Representation - Adjacency matrix- Incidence matrix- Circuit matrix - Cut-set matrix - Path Matrix- Properties - Related Theorems - Correlations. Graph Coloring - Chromatic Polynomial - Chromatic Partitioning - Matching - Covering - Related Theorems. UNIT V 9 Graph Algorithms- Connectedness and Components- Spanning Tree- Fundamental Circuits- Cut Vertices- Directed Circuits- Shortest Path - Applications overview. TOTAL : 45 PERIODS OUTCOMES: Upon completion of this course, the students should be able to  Understand the basic concepts of graphs, and different types of graphs  Understand the properties, theorems and be able to prove theorems.  Apply suitable graph model and algorithm for solving applications. TEXT BOOKS: 1. Narsingh Deo, "Graph Theory with Application to Engineering and Computer Science", Prentice-Hall of India Pvt.Ltd, 2003. 2. L.R.Foulds , "Graph Theory Applications", Springer ,2016. REFERENCES: 1. Bondy, J. A. and Murty, U.S.R., "Graph Theory with Applications", North Holland Publication,2008. 2. West, D. B., “Introduction to Graph Theory”, Pearson Education, 2011. 3. John Clark, Derek Allan Holton, “A First Look at Graph Theory”, World Scientific Publishing Company, 1991. 4. Diestel, R, "Graph Theory", Springer,3rd Edition,2006. 5. Kenneth H.Rosen, "Discrete Mathematics and Its Applications", Mc Graw Hill , 2007. IT8071 DIGITAL SIGNAL PROCESSING L T P C 3 0 0 3 OBJECTIVES:  To understand the basics of discrete time signals, systems and their classifications.  To analyze the discrete time signals in both time and frequency domain.  To design lowpass digital IIR filters according to predefined specifications based on analog filter theory and analog-to-digital filter transformation.  To design Linear phase digital FIR filters using fourier method, window technique  To realize the concept and usage of DSP in various engineering fields. UNIT I DISCRETE TIME SIGNALS AND SYSTEMS 9 Introduction to DSP – Basic elements of DSP– Sampling of Continuous time signals–Representation, Operation and Classification of Discrete Time Signal–Classification of Discrete Time Systems– Discrete Convolution: Linear and Circular–Correlation. UNIT II ANALYSIS OF LTI DISCRETE TIME SIGNALS AND SYSTEMS 9 Analysis of LTI Discrete Time Systems using DFT–Properties of DFT–Inverse DFT– Analysis of LTI Discrete Time Systems using FFT Algorithms– Inverse DFT using FFT Algorithm.
  • 88.
    88 UNIT III INFINITEIMPULSE RESPONSE FILTERS 9 Frequency response of Analog and Digital IIR filters–Realization of IIR filter–Design of analog low pass filter–Analog to Digital filter Transformation using Bilinear Transformation and Impulse Invariant method–Design of digital IIR filters (LPF, HPF, BPF, and BRF) using various transformation techniques. UNIT IV FINITE IMPULSE RESPONSE FILTERS 9 Linear Phase FIR filter–Phase delay–Group delay–Realization of FIR filter–Design of Causal and Non-causal FIR filters (LPF, HPF, BPF and BRF) using Window method (Rectangular, Hamming window, Hanning window) –Frequency Sampling Technique. UNIT V APPLICATIONS OF DSP 9 Multirate Signal Processing: Decimation, Interpolation, Spectrum of the sampled signal –Processing of Audio and Radar signal. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Perform mathematical operations on signals.  Understand the sampling theorem and perform sampling on continuous-time signals to get discrete time signal by applying advanced knowledge of the sampling theory.  Transform the time domain signal into frequency domain signal and vice-versa.  Apply the relevant theoretical knowledge to design the digital IIR/FIR filters for the given analog specifications. TEXT BOOK: 1. John G. Proakis & Dimitris G.Manolakis, “Digital Signal Processing – Principles, Algorithms & Applications”, Fourth Edition, Pearson Education / Prentice Hall, 2007. REFERENCES 1. Richard G. Lyons, “Understanding Digital Signal Processing”. Second Edition, Pearson Education. 2. A.V.Oppenheim, R.W. Schafer and J.R. Buck, “Discrete-Time Signal Processing”, 8th Indian Reprint, Pearson, 2004. 3. Emmanuel C.Ifeachor, & Barrie.W.Jervis, “Digital Signal Processing”, Second Edition, Pearson Education / Prentice Hall, 2002. 4. William D. Stanley, “Digital Signal Processing”, Second Edition, Reston Publications. GE8075 INTELLECTUAL PROPERTY RIGHTS L T P C 3 0 0 3 OBJECTIVE:  To give an idea about IPR, registration and its enforcement. UNIT I INTRODUCTION 9 Introduction to IPRs, Basic concepts and need for Intellectual Property - Patents, Copyrights, Geographical Indications, IPR in India and Abroad – Genesis and Development – the way from WTO to WIPO –TRIPS, Nature of Intellectual Property, Industrial Property, technological Research, Inventions and Innovations – Important examples of IPR. UNIT II REGISTRATION OF IPRs 10 Meaning and practical aspects of registration of Copy Rights, Trademarks, Patents, Geographical Indications, Trade Secrets and Industrial Design registration in India and Abroad
  • 89.
    89 UNIT III AGREEMENTSAND LEGISLATIONS 10 International Treaties and Conventions on IPRs, TRIPS Agreement, PCT Agreement, Patent Act of India, Patent Amendment Act, Design Act, Trademark Act, Geographical Indication Act. UNIT IV DIGITAL PRODUCTS AND LAW 9 Digital Innovations and Developments as Knowledge Assets – IP Laws, Cyber Law and Digital Content Protection – Unfair Competition – Meaning and Relationship between Unfair Competition and IP Laws – Case Studies. UNIT V ENFORCEMENT OF IPRs 7 Infringement of IPRs, Enforcement Measures, Emerging issues – Case Studies. TOTAL : 45 PERIODS OUTCOME:  Ability to manage Intellectual Property portfolio to enhance the value of the firm. TEXT BOOKS: 1. V. Scople Vinod, Managing Intellectual Property, Prentice Hall of India pvt Ltd, 2012 2. S. V. Satakar, “Intellectual Property Rights and Copy Rights, Ess Ess Publications, New Delhi, 2002 REFERENCES: 1. Deborah E. Bouchoux, “Intellectual Property: The Law of Trademarks, Copyrights, Patents and Trade Secrets”, Cengage Learning, Third Edition, 2012. 2. Prabuddha Ganguli,”Intellectual Property Rights: Unleashing the Knowledge Economy”, McGraw Hill Education, 2011. 3. Edited by Derek Bosworth and Elizabeth Webster, The Management of Intellectual Property, Edward Elgar Publishing Ltd., 2013. CS8091 BIG DATA ANALYTICS L T P C 3 0 0 3 OBJECTIVES:  To know the fundamental concepts of big data and analytics.  To explore tools and practices for working with big data  To learn about stream computing.  To know about the research that requires the integration of large amounts of data. UNIT I INTRODUCTION TO BIG DATA 9 Evolution of Big data - Best Practices for Big data Analytics - Big data characteristics - Validating - The Promotion of the Value of Big Data - Big Data Use Cases- Characteristics of Big Data Applications - Perception and Quantification of Value -Understanding Big Data Storage - A General Overview of High-Performance Architecture - HDFS - MapReduce and YARN - Map Reduce Programming Model UNIT II CLUSTERING AND CLASSIFICATION 9 Advanced Analytical Theory and Methods: Overview of Clustering - K-means - Use Cases - Overview of the Method - Determining the Number of Clusters - Diagnostics - Reasons to Choose and Cautions .- Classification: Decision Trees - Overview of a Decision Tree - The General Algorithm - Decision Tree Algorithms - Evaluating a Decision Tree - Decision Trees in R - Naïve Bayes - Bayes’ Theorem - Naïve Bayes Classifier.
  • 90.
    90 UNIT III ASSOCIATIONAND RECOMMENDATION SYSTEM 9 Advanced Analytical Theory and Methods: Association Rules - Overview - Apriori Algorithm - Evaluation of Candidate Rules - Applications of Association Rules - Finding Association& finding similarity - Recommendation System: Collaborative Recommendation- Content Based Recommendation - Knowledge Based Recommendation- Hybrid Recommendation Approaches. UNIT IV STREAM MEMORY 9 Introduction to Streams Concepts – Stream Data Model and Architecture - Stream Computing, Sampling Data in a Stream – Filtering Streams – Counting Distinct Elements in a Stream – Estimating moments – Counting oneness in a Window – Decaying Window – Real time Analytics Platform(RTAP) applications - Case Studies - Real Time Sentiment Analysis, Stock Market Predictions. Using Graph Analytics for Big Data: Graph Analytics UNIT V NOSQL DATA MANAGEMENT FOR BIG DATA AND VISUALIZATION 9 NoSQL Databases : Schema-less Models”: Increasing Flexibility for Data Manipulation-Key Value Stores- Document Stores - Tabular Stores - Object Data Stores - Graph Databases Hive - Sharding –- Hbase – Analyzing big data with twitter - Big data for E-Commerce Big data for blogs - Review of Basic Data Analytic Methods using R. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Work with big data tools and its analysis techniques  Analyze data by utilizing clustering and classification algorithms  Learn and apply different mining algorithms and recommendation systems for large volumes of data  Perform analytics on data streams  Learn NoSQL databases and management. TEXT BOOKS: 1. Anand Rajaraman and Jeffrey David Ullman, "Mining of Massive Datasets", Cambridge University Press, 2012. 2. David Loshin, "Big Data Analytics: From Strategic Planning to Enterprise Integration with Tools, Techniques, NoSQL, and Graph", Morgan Kaufmann/El sevier Publishers, 2013. REFERENCES: 1. EMC Education Services, "Data Science and Big Data Analytics: Discovering, Analyzing, Visualizing and Presenting Data", Wiley publishers, 2015. 2. Bart Baesens, "Analytics in a Big Data World: The Essential Guide to Data Science and its Applications", Wiley Publishers, 2015. 3. Dietmar Jannach and Markus Zanker, "Recommender Systems: An Introduction", Cambridge University Press, 2010. 4. Kim H. Pries and Robert Dunnigan, "Big Data Analytics: A Practical Guide for Managers " CRC Press, 2015. 5. Jimmy Lin and Chris Dyer, "Data-Intensive Text Processing with MapReduce", Synthesis Lectures on Human Language Technologies, Vol. 3, No. 1, Pages 1-177, Morgan Claypool publishers, 2010.
  • 91.
    91 CS8082 MACHINE LEARNINGTECHNIQUES L T P C 3 0 0 3 OBJECTIVES:  To understand the need for machine learning for various problem solving  To study the various supervised, semi-supervised and unsupervised learning algorithms in machine learning  To understand the latest trends in machine learning  To design appropriate machine learning algorithms for problem solving UNIT I INTRODUCTION 9 Learning Problems – Perspectives and Issues – Concept Learning – Version Spaces and Candidate Eliminations – Inductive bias – Decision Tree learning – Representation – Algorithm – Heuristic Space Search. UNIT II NEURAL NETWORKS AND GENETIC ALGORITHMS 9 Neural Network Representation – Problems – Perceptrons – Multilayer Networks and Back Propagation Algorithms – Advanced Topics – Genetic Algorithms – Hypothesis Space Search – Genetic Programming – Models of Evaluation and Learning. UNIT III BAYESIAN AND COMPUTATIONAL LEARNING 9 Bayes Theorem – Concept Learning – Maximum Likelihood – Minimum Description Length Principle – Bayes Optimal Classifier – Gibbs Algorithm – Naïve Bayes Classifier – Bayesian Belief Network – EM Algorithm – Probability Learning – Sample Complexity – Finite and Infinite Hypothesis Spaces – Mistake Bound Model. UNIT IV INSTANT BASED LEARNING 9 K- Nearest Neighbour Learning – Locally weighted Regression – Radial Basis Functions – Case Based Learning. UNIT V ADVANCED LEARNING 9 Learning Sets of Rules – Sequential Covering Algorithm – Learning Rule Set – First Order Rules – Sets of First Order Rules – Induction on Inverted Deduction – Inverting Resolution – Analytical Learning – Perfect Domain Theories – Explanation Base Learning – FOCL Algorithm – Reinforcement Learning – Task – Q-Learning – Temporal Difference Learning TOTAL :45 PERIODS OUTCOMES: At the end of the course, the students will be able to  Differentiate between supervised, unsupervised, semi-supervised machine learning approaches  Discuss the decision tree algorithm and indentity and overcome the problem of overfitting  Discuss and apply the back propagation algorithm and genetic algorithms to various problems  Apply the Bayesian concepts to machine learning  Analyse and suggest appropriate machine learning approaches for various types of problems TEXT BOOK: 1. Tom M. Mitchell, “Machine Learning”, McGraw-Hill Education (India) Private Limited, 2013. REFERENCES: 1. Ethem Alpaydin, “Introduction to Machine Learning (Adaptive Computation and Machine Learning)”, The MIT Press 2004. 2. Stephen Marsland, “Machine Learning: An Algorithmic Perspective”, CRC Press, 2009.
  • 92.
    92 CS8092 COMPUTER GRAPHICSAND MULTIMEDIA L T P C 3 0 0 3 OBJECTIVES:  To develop an understanding and awareness how issues such as content, information architecture, motion, sound, design, and technology merge to form effective and compelling interactive experiences for a wide range of audiences and end users.  To become familiar with various software programs used in the creation and implementation of multi- media  To appreciate the importance of technical ability and creativity within design practice.  To gain knowledge about graphics hardware devices and software used.  To understand the two-dimensional graphics and their transformations.  To understand the three-dimensional graphics and their transformations.  To appreciate illumination and color models  To become familiar with understand clipping techniques  To become familiar with Blender Graphics UNIT I ILLUMINATION AND COLOR MODELS 9 Light sources - basic illumination models – halftone patterns and dithering techniques; Properties of light - Standard primaries and chromaticity diagram; Intuitive colour concepts - RGB colour model - YIQ colour model - CMY colour model - HSV colour model - HLS colour model; Colour selection. Output primitives – points and lines, line drawing algorithms, loading the frame buffer, line function; circle and ellipse generating algorithms; Pixel addressing and object geometry, filled area primitives. UNIT II TWO-DIMENSIONAL GRAPHICS 9 Two dimensional geometric transformations – Matrix representations and homogeneous coordinates, composite transformations; Two dimensional viewing – viewing pipeline, viewing coordinate reference frame; window-to-viewport coordinate transformation, Two dimensional viewing functions; clipping operations – point, line, and polygon clipping algorithms. UNIT III THREE-DIMENSIONAL GRAPHICS 9 Three dimensional concepts; Three dimensional object representations – Polygon surfaces- Polygon tables- Plane equations - Polygon meshes; Curved Lines and surfaces, Quadratic surfaces; Blobby objects; Spline representations – Bezier curves and surfaces -B-Spline curves and surfaces. TRANSFORMATION AND VIEWING: Three dimensional geometric and modeling transformations – Translation, Rotation, Scaling, composite transformations; Three dimensional viewing – viewing pipeline, viewing coordinates, Projections, Clipping; Visible surface detection methods. UNIT IV MULTIMEDIA SYSTEM DESIGN & MULTIMEDIA FILE HANDLING 9 Multimedia basics − Multimedia applications − Multimedia system architecture − Evolving technologies for multimedia − Defining objects for multimedia systems − Multimedia data interface standards − Multimedia databases. Compression and decompression − Data and file format standards − Multimedia I/O technologies − Digital voice and audio − Video image and animation − Full motion video − Storage and retrieval technologies. UNIT V HYPERMEDIA 9 Multimedia authoring and user interface - Hypermedia messaging -Mobile messaging − Hypermedia message component − Creating hypermedia message − Integrated multimedia message standards − Integrated document management − Distributed multimedia systems.CASE STUDY: BLENDER GRAPHICS Blender Fundamentals – Drawing Basic Shapes – Modelling – Shading & Textures TOTAL: 45 PERIODS
  • 93.
    93 OUTCOMES: At the endof the course, the students should be able to:  Design two dimensional graphics.  Apply two dimensional transformations.  Design three dimensional graphics.  Apply three dimensional transformations.  Apply Illumination and color models.  Apply clipping techniques to graphics.  Understood Different types of Multimedia File Format  Design Basic 3d Scenes using Blender TEXT BOOKS: 1. Donald Hearn and Pauline Baker M, “Computer Graphics", Prentice Hall, New Delhi, 2007 [ UNIT I – III ] 2. Andleigh, P. K and Kiran Thakrar, “Multimedia Systems and Design”, PHI, 2003. [ UNIT IV,V ] REFERENCES: 1. Judith Jeffcoate, “Multimedia in practice: Technology and Applications”, PHI, 1998. 2. Foley, Vandam, Feiner and Hughes, “Computer Graphics: Principles and Practice”, 2nd Edition, Pearson Education, 2003. 3. Jeffrey McConnell, “Computer Graphics: Theory into Practice”, Jones and Bartlett Publishers,2006. 4. Hill F S Jr., "Computer Graphics", Maxwell Macmillan , 1990. 5. Peter Shirley, Michael Ashikhmin, Michael Gleicher, Stephen R Marschner, Erik Reinhard, KelvinSung, and AK Peters, “Fundamentals of Computer Graphics”, CRC Press, 2010. 6. William M. Newman and Robert F.Sproull, “Principles of Interactive Computer Graphics”, Mc Graw Hill 1978. https://www.blender.org/support/tutorials/ IT8075 SOFTWARE PROJECT MANAGEMENT L T P C 3 0 0 3 OBJECTIVES:  To understand the Software Project Planning and Evaluation techniques.  To plan and manage projects at each stage of the software development life cycle (SDLC).  To learn about the activity planning and risk management principles.  To manage software projects and control software deliverables.  To develop skills to manage the various phases involved in project management and people management.  To deliver successful software projects that support organization’s strategic goals. UNIT I PROJECT EVALUATION AND PROJECT PLANNING 9 Importance of Software Project Management – Activities - Methodologies – Categorization of Software Projects – Setting objectives – Management Principles – Management Control – Project portfolio Management – Cost-benefit evaluation technology – Risk evaluation – Strategic program Management – Stepwise Project Planning.
  • 94.
    94 UNIT II PROJECTLIFE CYCLE AND EFFORT ESTIMATION 9 Software process and Process Models – Choice of Process models - Rapid Application development – Agile methods – Dynamic System Development Method – Extreme Programming– Managing interactive processes – Basics of Software estimation – Effort and Cost estimation techniques – COSMIC Full function points - COCOMO II - a Parametric Productivity Model. UNIT III ACTIVITY PLANNING AND RISK MANAGEMENT 9 Objectives of Activity planning – Project schedules – Activities – Sequencing and scheduling – Network Planning models – Formulating Network Model – Forward Pass & Backward Pass techniques – Critical path (CRM) method – Risk identification – Assessment – Risk Planning –Risk Management – – PERT technique – Monte Carlo simulation – Resource Allocation – Creation of critical paths – Cost schedules. UNIT IV PROJECT MANAGEMENT AND CONTROL 9 Framework for Management and control – Collection of data – Visualizing progress – Cost monitoring – Earned Value Analysis – Prioritizing Monitoring – Project tracking – Change control – Software Configuration Management – Managing contracts – Contract Management. UNIT V STAFFING IN SOFTWARE PROJECTS 9 Managing people – Organizational behavior – Best methods of staff selection – Motivation – The Oldham – Hackman job characteristic model – Stress – Health and Safety – Ethical and Professional concerns – Working in teams – Decision making – Organizational structures – Dispersed and Virtual teams – Communications genres – Communication plans – Leadership. TOTAL 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Understand Project Management principles while developing software.  Gain extensive knowledge about the basic project management concepts, framework and the process models.  Obtain adequate knowledge about software process models and software effort estimation techniques.  Estimate the risks involved in various project activities.  Define the checkpoints, project reporting structure, project progress and tracking mechanisms using project management principles.  Learn staff selection process and the issues related to people management TEXT BOOK: 1. Bob Hughes, Mike Cotterell and Rajib Mall: Software Project Management – Fifth Edition, Tata McGraw Hill, New Delhi, 2012. REFERENCES: 1. Robert K. Wysocki “Effective Software Project Management” – Wiley Publication, 2011. 2. Walker Royce: “Software Project Management”- Addison-Wesley, 1998. 3. Gopalaswamy Ramesh, “Managing Global Software Projects” – McGraw Hill Education (India), Fourteenth Reprint 2013.
  • 95.
    95 CS8081 INTERNET OFTHINGS L T P C 3 0 0 3 OBJECTIVES:  To understand Smart Objects and IoT Architectures  To learn about various IOT-related protocols  To build simple IoT Systems using Arduino and Raspberry Pi.  To understand data analytics and cloud in the context of IoT  To develop IoT infrastructure for popular applications UNIT I FUNDAMENTALS OF IoT 9 Evolution of Internet of Things - Enabling Technologies – IoT Architectures: oneM2M, IoT World Forum (IoTWF) and Alternative IoT models – Simplified IoT Architecture and Core IoT Functional Stack -– Fog, Edge and Cloud in IoT – Functional blocks of an IoT ecosystem – Sensors, Actuators, Smart Objects and Connecting Smart Objects UNIT II IoT PROTOCOLS 9 IoT Access Technologies: Physical and MAC layers, topology and Security of IEEE 802.15.4, 802.15.4g, 802.15.4e, 1901.2a, 802.11ah and LoRaWAN – Network Layer: IP versions, Constrained Nodes and Constrained Networks – Optimizing IP for IoT: From 6LoWPAN to 6Lo, Routing over Low Power and Lossy Networks – Application Transport Methods: Supervisory Control and Data Acquisition – Application Layer Protocols: CoAP and MQTT UNIT III DESIGN AND DEVELOPMENT 9 Design Methodology - Embedded computing logic - Microcontroller, System on Chips - IoT system building blocks - Arduino - Board details, IDE programming - Raspberry Pi - Interfaces and Raspberry Pi with Python Programming. UNIT IV DATA ANALYTICS AND SUPPORTING SERVICES 9 Structured Vs Unstructured Data and Data in Motion Vs Data in Rest – Role of Machine Learning – No SQL Databases – Hadoop Ecosystem – Apache Kafka, Apache Spark – Edge Streaming Analytics and Network Analytics – Xively Cloud for IoT, Python Web Application Framework – Django – AWS for IoT – System Management with NETCONF-YANG UNIT V CASE STUDIES/INDUSTRIAL APPLICATIONS 9 Cisco IoT system - IBM Watson IoT platform – Manufacturing - Converged Plantwide Ethernet Model (CPwE) – Power Utility Industry – GridBlocks Reference Model - Smart and Connected Cities: Layered architecture, Smart Lighting, Smart Parking Architecture and Smart Traffic Control TOTAL : 45 PERIODS OUTCOMES: Upon completion of the course, the student should be able to:  Explain the concept of IoT.  Analyze various protocols for IoT.  Design a PoC of an IoT system using Rasperry Pi/Arduino  Apply data analytics and use cloud offerings related to IoT.  Analyze applications of IoT in real time scenario TEXTBOOK: 1. David Hanes, Gonzalo Salgueiro, Patrick Grossetete, Rob Barton and Jerome Henry, “IoT Fundamentals: Networking Technologies, Protocols and Use Cases for Internet of Things, Cisco Press, 2017
  • 96.
    96 REFERENCES: 1. Arshdeep Bahga,Vijay Madisetti, “Internet of Things – A hands-on approach”, Universities Press, 2015 2. Olivier Hersent, David Boswarthick, Omar Elloumi , “The Internet of Things – Key applications and Protocols”, Wiley, 2012 (for Unit 2). 3. Jan Ho¨ ller, Vlasios Tsiatsis , Catherine Mulligan, Stamatis , Karnouskos, Stefan Avesand. David Boyle, "From Machine-to-Machine to the Internet of Things - Introduction to a New Age of Intelligence", Elsevier, 2014. 4. Dieter Uckelmann, Mark Harrison, Michahelles, Florian (Eds), “Architecting the Internet of Things”, Springer, 2011. 5. Michael Margolis, Arduino Cookbook, Recipes to Begin, Expand, and Enhance Your Projects, 2nd Edition, O'Reilly Media, 2011. https://www.arduino.cc/ https://www.ibm.com/smarterplanet/us/en/?ca=v_smarterplanet IT8074 SERVICE ORIENTED ARCHITECTURE L T P C 3 0 0 3 OBJECTIVES:  To learn fundamentals of XML  To provide an overview of Service Oriented Architecture and Web services and their importance  To learn web services standards and technologies  To learn service oriented analysis and design for developing SOA based applications UNIT I XML 9 XML document structure – Well-formed and valid documents – DTD – XML Schema – Parsing XML using DOM, SAX – XPath - XML Transformation and XSL – Xquery UNIT II SERVICE ORIENTED ARCHITECTURE (SOA) BASICS 9 Characteristics of SOA, Benefits of SOA , Comparing SOA with Client-Server and Distributed architectures –-- Principles of Service Orientation – Service layers UNIT III WEB SERVICES (WS) AND STANDARDS 8 Web Services Platform – Service descriptions – WSDL – Messaging with SOAP – Service discovery – UDDI – Service-Level Interaction Patterns – Orchestration and Choreography UNIT IV WEB SERVICES EXTENSIONS 8 WS-Addressing - WS-ReliableMessaging - WS-Policy – WS-Coordination – WS -Transactions - WS-Security - Examples UNIT V SERVICE ORIENTED ANALYSIS AND DESIGN 11 SOA delivery strategies – Service oriented analysis – Service Modelling – Service oriented design – Standards and composition guidelines -- Service design – Business process design – Case Study TOTAL : 45 PERIODS OUTCOMES: Upon successful completion of this course, the students will be able to:  Understand XML technologies  Understand service orientation, benefits of SOA  Understand web services and WS standards  Use web services extensions to develop solutions  Understand and apply service modeling, service oriented analysis and design for application development
  • 97.
    97 TEXTBOOKS: 1. Thomas Erl,“ Service Oriented Architecture: Concepts, Technology, and Design”, Pearson Education, 2005 2. Sandeep Chatterjee and James Webber, “Developing Enterprise Web Services: An Architect's Guide”, Prentice Hall, 2004 REFERENCES: 1. James McGovern, Sameer Tyagi, Michael E Stevens, Sunil Mathew, “Java Web Services Architecture”, Elsevier, 2003. 2. Ron Schmelzer et al. “ XML and Web Services”, Pearson Education, 2002. 3. Frank P.Coyle, “XML, Web Services and the Data Revolution”, Pearson Education, 2002 GE8077 TOTAL QUALITY MANAGEMENT L T P C 3 0 0 3 OBJECTIVE:  To facilitate the understanding of Quality Management principles and process. UNIT I INTRODUCTION 9 Introduction - Need for quality - Evolution of quality - Definitions of quality - Dimensions of product and service quality - Basic concepts of TQM - TQM Framework - Contributions of Deming, Juran and Crosby - Barriers to TQM - Customer focus - Customer orientation, Customer satisfaction, Customer complaints, Customer retention. UNIT II TQM PRINCIPLES 9 Leadership - Quality Statements, Strategic quality planning, Quality Councils - Employee involvement - Motivation, Empowerment, Team and Teamwork, Recognition and Reward, Performance appraisal - Continuous process improvement - PDCA cycle, 5S, Kaizen - Supplier partnership - Partnering, Supplier selection, Supplier Rating. UNIT III TQM TOOLS AND TECHNIQUES I 9 The seven traditional tools of quality - New management tools - Six sigma: Concepts, Methodology, applications to manufacturing, service sector including IT - Bench marking - Reason to bench mark, Bench marking process - FMEA - Stages, Types. UNIT IV TQM TOOLS AND TECHNIQUES II 9 Quality Circles - Cost of Quality - Quality Function Deployment (QFD) - Taguchi quality loss function - TPM - Concepts, improvement needs - Performance measures. UNIT V QUALITY MANAGEMENT SYSTEM 9 Introduction—Benefits of ISO Registration—ISO 9000 Series of Standards—Sector-Specific Standards—AS 9100, TS16949 and TL 9000-- ISO 9001 Requirements—Implementation— Documentation—Internal Audits—Registration- ENVIRONMENTAL MANAGEMENT SYSTEM: Introduction—ISO 14000 Series Standards—Concepts of ISO 14001—Requirements of ISO 14001—Benefits of EMS. TOTAL: 45 PERIODS OUTCOME:  The student would be able to apply the tools and techniques of quality management to manufacturing and services processes.
  • 98.
    98 TEXT BOOK: 1. DaleH.Besterfiled, Carol B.Michna,Glen H. Besterfield,Mary B.Sacre,Hemant Urdhwareshe and Rashmi Urdhwareshe, “Total Quality Management”, Pearson Education Asia, Revised Third Edition, Indian Reprint, Sixth Impression, 2013. REFERENCES: 1. James R. Evans and William M. Lindsay, "The Management and Control of Quality", 8th Edition, First Indian Edition, Cengage Learning, 2012. 2. Janakiraman. B and Gopal .R.K., "Total Quality Management - Text and Cases", Prentice Hall (India) Pvt. Ltd., 2006. 3. Suganthi.L and Anand Samuel, "Total Quality Management", Prentice Hall (India) Pvt. Ltd., 2006. 4. ISO9001-2015 standards CS8083 MULTI-CORE ARCHITECTURES AND PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To understand the need for multi-core processors, and their architecture.  To understand the challenges in parallel and multi-threaded programming.  To learn about the various parallel programming paradigms,  To develop multicore programs and design parallel solutions. UNIT I MULTI-CORE PROCESSORS 9 Single core to Multi-core architectures – SIMD and MIMD systems – Interconnection networks - Symmetric and Distributed Shared Memory Architectures – Cache coherence - Performance Issues – Parallel program design. UNIT II PARALLEL PROGRAM CHALLENGES 9 Performance – Scalability – Synchronization and data sharing – Data races – Synchronization primitives (mutexes, locks, semaphores, barriers) – deadlocks and livelocks – communication between threads (condition variables, signals, message queues and pipes). UNIT III SHARED MEMORY PROGRAMMING WITH OpenMP 9 OpenMP Execution Model – Memory Model – OpenMP Directives – Work-sharing Constructs - Library functions – Handling Data and Functional Parallelism – Handling Loops - Performance Considerations. UNIT IV DISTRIBUTED MEMORY PROGRAMMING WITH MPI 9 MPI program execution – MPI constructs – libraries – MPI send and receive – Point-to-point and Collective communication – MPI derived datatypes – Performance evaluation UNIT V PARALLEL PROGRAM DEVELOPMENT 9 Case studies - n-Body solvers – Tree Search – OpenMP and MPI implementations and comparison. TOTAL: 45 PERIODS OUTCOMES: At the end of the course, the students should be able to:  Describe multicore architectures and identify their characteristics and challenges.  Identify the issues in programming Parallel Processors.  Write programs using OpenMP and MPI.  Design parallel programming solutions to common problems.  Compare and contrast programming for serial processors and programming for parallel processors.
  • 99.
    99 TEXT BOOKS: 1. PeterS. Pacheco, “An Introduction to Parallel Programming”, Morgan-Kauffman/Elsevier, 2011. 2. Darryl Gove, “Multicore Application Programming for Windows, Linux, and Oracle Solaris”, Pearson, 2011 (unit 2) REFERENCES: 1. Michael J Quinn, “Parallel programming in C with MPI and OpenMP”, Tata McGraw Hill,2003. 2. Victor Alessandrini, Shared Memory Application Programming, 1st Edition, Concepts and Strategies in Multicore Application Programming, Morgan Kaufmann, 2015. 3. Yan Solihin, Fundamentals of Parallel Multicore Architecture, CRC Press, 2015. CS8079 HUMAN COMPUTER INTERACTION L T P C 3 0 0 3 OBJECTIVES:  To learn the foundations of Human Computer Interaction.  To become familiar with the design technologies for individuals and persons with disabilities.  To be aware of mobile HCI.  To learn the guidelines for user interface. UNIT I FOUNDATIONS OF HCI 9 The Human: I/O channels – Memory – Reasoning and problem solving; The Computer: Devices – Memory – processing and networks; Interaction: Models – frameworks – Ergonomics – styles – elements – interactivity- Paradigms. - Case Studies UNIT II DESIGN & SOFTWARE PROCESS 9 Interactive Design: Basics – process – scenarios – navigation – screen design – Iteration and prototyping. HCI in software process: Software life cycle – usability engineering – Prototyping in practice – design rationale. Design rules: principles, standards, guidelines, rules. Evaluation Techniques – Universal Design UNIT III MODELS AND THEORIES 9 HCI Models: Cognitive models: Socio-Organizational issues and stakeholder requirements – Communication and collaboration models-Hypertext, Multimedia and WWW. UNIT IV MOBILE HCI 9 Mobile Ecosystem: Platforms, Application frameworks- Types of Mobile Applications: Widgets, Applications, Games- Mobile Information Architecture, Mobile 2.0, Mobile Design: Elements of Mobile Design, Tools. - Case Studies UNIT V WEB INTERFACE DESIGN 9 Designing Web Interfaces – Drag & Drop, Direct Selection, Contextual Tools, Overlays, Inlays and Virtual Pages, Process Flow - Case Studies TOTAL :45 PERIODS OUTCOMES: Upon completion of the course, the students should be able to:  Design effective dialog for HCI  Design effective HCI for individuals and persons with disabilities.  Assess the importance of user feedback.  Explain the HCI implications for designing multimedia/ ecommerce/ e-learning Web sites.  Develop meaningful user interface.
  • 100.
    100 TEXT BOOKS: 1. AlanDix, Janet Finlay, Gregory Abowd, Russell Beale, “Human Computer Interaction”, 3rd Edition, Pearson Education, 2004 (UNIT I, II & III) 2. Brian Fling, “Mobile Design and Development”, First Edition, O’Reilly Media Inc., 2009 (UNIT – IV) 3. Bill Scott and Theresa Neil, “Designing Web Interfaces”, First Edition, O’Reilly, 2009. (UNIT-V) CS8073 C# AND .NET PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To learn basic programming in C# and the object oriented programming concepts.  To update and enhance skills in writing Windows applications, ADO.NET and ASP .NET.  To study the advanced concepts in data connectivity, WPF, WCF and WWF with C# and .NET 4.5.  To implement mobile applications using .Net compact framework  To understand the working of base class libraries, their operations and manipulation of data using XML. UNIT I C# LANGUAGE BASICS 9 .Net Architecture - Core C# - Variables - Data Types - Flow control - Objects and Types- Classes and Structs - Inheritance- Generics – Arrays and Tuples - Operators and Casts - Indexers UNIT II C# ADVANCED FEATURES 9 Delegates - Lambdas - Lambda Expressions - Events - Event Publisher - Event Listener - Strings and Regular Expressions - Generics - Collections - Memory Management and Pointers - Errors and Exceptions - Reflection UNIT III BASE CLASS LIBRARIES AND DATA MANIPULATION 9 Diagnostics -Tasks, Threads and Synchronization - .Net Security - Localization - Manipulating XML- SAX and DOM - Manipulating files and the Registry- Transactions - ADO.NET- Peer-to-Peer Networking - PNRP - Building P2P Applications - Windows Presentation Foundation (WPF). UNIT IV WINDOW BASED APPLICATIONS, WCF AND WWF 9 Window based applications - Core ASP.NET- ASP.NET Web forms -Windows Communication Foundation (WCF)- Introduction to Web Services - .Net Remoting - Windows Service - Windows Workflow Foundation (WWF) - Activities – Workflows UNIT V .NET FRAMEWORK AND COMPACT FRAMEWORK 9 Assemblies - Shared assemblies - Custom Hosting with CLR Objects - Appdomains - Core XAML - Bubbling and Tunneling Events- Reading and Writing XAML - .Net Compact Framework - Compact Edition Data Stores – Errors, Testing and Debugging – Optimizing performance – Packaging and Deployment – Networking and Mobile Devices TOTAL :45 PERIODS
  • 101.
    101 OUTCOMES: Upon completion ofthe course, the students will be able to:  Write various applications using C# Language in the .NET Framework.  Develop distributed applications using .NET Framework.  Create mobile applications using .NET compact Framework. TEXT BOOKS: 1. Christian Nagel, Bill Evjen, Jay Glynn, Karli Watson, Morgan Skinner . ―Professional C# 2012 and .NET 4.5ǁ, Wiley, 2012 2. Harsh Bhasin, ―Programming in C#ǁ, Oxford University Press, 2014. REFERENCES 1. Ian Gariffiths, Mathew Adams, Jesse Liberty, ―Programming C# 4.0ǁ, O‘Reilly, Fourth Edition, 2010. 2. Andrew Troelsen, Pro C# 5.0 and the .NET 4.5 Framework, Apress publication, 2012. 3. Andy Wigley, Daniel Moth, Peter Foot, ―Mobile Development Handbookǁ, Microsoft Press, 2011. CS8088 WIRELESS ADHOC AND SENSOR NETWORKS L T P C 3 0 0 3 OBJECTIVES:  To learn about the issues and challenges in the design of wireless ad hoc networks.  To understand the working of MAC and Routing Protocols for ad hoc and sensor networks  To learn about the Transport Layer protocols and their QoS for ad hoc and sensor networks.  To understand various security issues in ad hoc and sensor networks and the corresponding solutions. UNIT I MAC & ROUTING IN AD HOC NETWORKS 9 Introduction – Issues and challenges in ad hoc networks – MAC Layer Protocols for wireless ad hoc networks – Contention-Based MAC protocols – MAC Protocols Using Directional Antennas – Multiple-Channel MAC Protocols – Power-Aware MAC Protocols – Routing in Ad hoc Networks – Design Issues – Proactive, Reactive and Hybrid Routing Protocols UNIT II TRANSPORT & QOS IN AD HOC NETWORKS 9 TCP‟s challenges and Design Issues in Ad Hoc Networks – Transport protocols for ad hoc networks – Issues and Challenges in providing QoS – MAC Layer QoS solutions – Network Layer QoS solutions – QoS Model UNIT III MAC & ROUTING IN WIRELESS SENSOR NETWORKS 9 Introduction – Applications – Challenges – Sensor network architecture – MAC Protocols for wireless sensor networks – Low duty cycle protocols and wakeup concepts – Contention- Based protocols – Schedule-Based protocols – IEEE 802.15.4 Zigbee – Topology Control – Routing Protocols UNIT IV TRANSPORT & QOS IN WIRELESS SENSOR NETWORKS 9 Data-Centric and Contention-Based Networking – Transport Layer and QoS in Wireless Sensor Networks – Congestion Control in network processing – Operating systems for wireless sensor networks – Examples
  • 102.
    102 UNIT V SECURITYIN AD HOC AND SENSOR NETWORKS 9 Security Attacks – Key Distribution and Management – Intrusion Detection – Software based Anti-tamper techniques – Water marking techniques – Defense against routing attacks - Secure Ad hoc routing protocols – Broadcast authentication WSN protocols – TESLA – Biba – Sensor Network Security Protocols – SPINS TOTAL :45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Identify different issues in wireless ad hoc and sensor networks .  To analyze protocols developed for ad hoc and sensor networks .  To identify and understand security issues in ad hoc and sensor networks. TEXT BOOKS: 1. C.Siva Ram Murthy and B.S.Manoj, “Ad Hoc Wireless Networks – Architectures and Protocols”, Pearson Education, 2006. 2. 2. Holger Karl, Andreas Willing, “Protocols and Architectures for Wireless Sensor Networks”, John Wiley & Sons, Inc., 2005. REFERENCES 1. Subir Kumar Sarkar, T G Basavaraju, C Puttamadappa, “Ad Hoc Mobile Wireless Networks”, Auerbach Publications, 2008. 2. Carlos De Morais Cordeiro, Dharma Prakash Agrawal, “Ad Hoc and Sensor Networks: Theory and Applications (2nd Edition)”, World Scientific Publishing, 2011. 3. Waltenegus Dargie, Christian Poellabauer, “Fundamentals of Wireless Sensor Networks Theory and Practice”, John Wiley and Sons, 2010 4. Xiang-Yang Li , “Wireless Ad Hoc and Sensor Networks: Theory and Applications”, 1227 th edition, Cambridge university Press,2008. CS8071 ADVANCED TOPICS ON DATABASES L T P C 3 0 0 3 OBJECTIVES:  To learn the modeling and design of databases.  To acquire knowledge on parallel and distributed databases and their applications.  To study the usage and applications of Object Oriented and Intelligent databases.  To understand the usage of advanced data models.  To learn emerging databases such as XML, Cloud and Big Data.  To acquire inquisitive attitude towards research topics in databases. UNIT I PARALLEL AND DISTRIBUTED DATABASES 9 Database System Architectures: Centralized and Client-Server Architectures – Server System Architectures – Parallel Systems- Distributed Systems – Parallel Databases: I/O Parallelism – Inter and Intra Query Parallelism – Inter and Intra operation Parallelism – Design of Parallel Systems- Distributed Database Concepts - Distributed Data Storage – Distributed Transactions – Commit Protocols – Concurrency Control – Distributed Query Processing – Case Studies UNIT II OBJECT AND OBJECT RELATIONAL DATABASES 9 Concepts for Object Databases: Object Identity – Object structure – Type Constructors – Encapsulation of Operations – Methods – Persistence – Type and Class Hierarchies – Inheritance – Complex Objects – Object Database Standards, Languages and Design: ODMG Model – ODL –
  • 103.
    103 OQL – ObjectRelational and Extended – Relational Systems: Object Relational features in SQL/Oracle – Case Studies. UNIT III INTELLIGENT DATABASES 9 Active Databases: Syntax and Semantics (Starburst, Oracle, DB2)- Taxonomy- Applications- Design Principles for Active Rules- Temporal Databases: Overview of Temporal Databases- TSQL2- Deductive Databases: Logic of Query Languages – Datalog- Recursive Rules-Syntax and Semantics of Datalog Languages- Implementation of Rules and Recursion- Recursive Queries in SQL- Spatial Databases- Spatial Data Types- Spatial Relationships- Spatial Data Structures- Spatial Access Methods- Spatial DB Implementation. UNIT IV ADVANCED DATA MODELS 9 Mobile Databases: Location and Handoff Management - Effect of Mobility on Data Management - Location Dependent Data Distribution - Mobile Transaction Models -Concurrency Control - Transaction Commit Protocols- Multimedia Databases- Information Retrieval- Data Warehousing- Data Mining- Text Mining. UNIT V EMERGING TECHNOLOGIES 9 XML Databases: XML-Related Technologies-XML Schema- XML Query Languages- Storing XML in Databases-XML and SQL- Native XML Databases- Web Databases- Geographic Information Systems- Biological Data Management- Cloud Based Databases: Data Storage Systems on the Cloud- Cloud Storage Architectures-Cloud Data Models- Query Languages- Introduction to Big Data-Storage-Analysis. TOTAL: 45 PERIODS OUTCOMES: Upon Completion of the course, the students will be able,  To develop in-depth understanding of relational databases and skills to optimize database performance in practice.  To understand and critique on each type of databases.  To design faster algorithms in solving practical database problems.  To implement intelligent databases and various data models. TEXT BOOKS: 1. Ramez Elmasri, Shamkant B. Navathe, “Fundamentals of Database Systems”, Sixth Edition , Pearson, 2011. 2. Thomas Cannolly and Carolyn Begg, “Database Systems, A Practical Approach to Design, Implementation and Management”, Fourth Edition, Pearson Education, 2008. REFERENCES: 1. Henry F Korth, Abraham Silberschatz, S. Sudharshan, “Database System Concepts”, Sixth Edition, McGraw Hill, 2011. 2. C.J.Date, A.Kannan, S.Swamynathan, “An Introduction to Database Systems”, Eighth Edition, Pearson Education, 2006. 3. Carlo Zaniolo, Stefano Ceri, Christos Faloutsos, Richard T.Snodgrass, V.S.Subrahmanian, Roberto Zicari, “Advanced Database Systems”, Morgan Kaufmann publishers,2006. GE8072 FOUNDATION SKILLS IN INTEGRATED PRODUCT DEVELOPMENT L T P C 3 0 0 3 OBJECTIVES:  To understand the global trends and development methodologies of various types of
  • 104.
    104 products and services To conceptualize, prototype and develop product management plan for a new product based on the type of the new product and development methodology integrating the hardware, software, controls, electronics and mechanical systems  To understand requirement engineering and know how to collect, analyze and arrive at requirements for new product development and convert them in to design specification  To understand system modeling for system, sub-system and their interfaces and arrive at the optimum system specification and characteristics  To develop documentation, test specifications and coordinate with various teams to validate and sustain up to the EoL (End of Life) support activities for engineering customer UNIT I FUNDAMENTALS OF PRODUCT DEVELOPMENT 9 Global Trends Analysis and Product decision - Social Trends - Technical Trends- Economical Trends - Environmental Trends - Political/Policy Trends - Introduction to Product Development Methodologies and Management - Overview of Products and Services - Types of Product Development - Overview of Product Development methodologies - Product Life Cycle – Product Development Planning and Management. UNIT II REQUIREMENTS AND SYSTEM DESIGN 9 Requirement Engineering - Types of Requirements - Requirement Engineering - traceability Matrix and Analysis - Requirement Management - System Design & Modeling - Introduction to System Modeling - System Optimization - System Specification - Sub-System Design - Interface Design. UNIT III DESIGN AND TESTING 9 Conceptualization - Industrial Design and User Interface Design - Introduction to Concept generation Techniques – Challenges in Integration of Engineering Disciplines - Concept Screening & Evaluation - Detailed Design - Component Design and Verification – Mechanical, Electronics and Software Subsystems - High Level Design/Low Level Design of S/W Program - Types of Prototypes, S/W Testing- Hardware Schematic, Component design, Layout and Hardware Testing – Prototyping - Introduction to Rapid Prototyping and Rapid Manufacturing - System Integration, Testing, Certification and Documentation UNIT IV SUSTENANCE ENGINEERING AND END-OF-LIFE (EOL) SUPPORT 9 Introduction to Product verification processes and stages - Introduction to Product Validation processes and stages - Product Testing Standards and Certification - Product Documentation - Sustenance -Maintenance and Repair – Enhancements - Product EoL - Obsolescence Management – Configuration Management - EoL Disposal UNIT V BUSINESS DYNAMICS – ENGINEERING SERVICES INDUSTRY 9 The Industry - Engineering Services Industry - Product Development in Industry versus Academia –The IPD Essentials - Introduction to Vertical Specific Product Development processes -Manufacturing/Purchase and Assembly of Systems - Integration of Mechanical, Embedded and Software Systems – Product Development Trade-offs - Intellectual Property Rights and Confidentiality – Security and Configuration Management. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Define, formulate and analyze a problem  Solve specific problems independently or as part of a team  Gain knowledge of the Innovation & Product Development process in the Business Context  Work independently as well as in teams
  • 105.
    105  Manage aproject from start to finish TEXTBOOKS: 1. Book specially prepared by NASSCOM as per the MoU. 2. Karl T Ulrich and Stephen D Eppinger, "Product Design and Development", Tata McGraw Hill, Fifth Edition, 2011. 3. John W Newstorm and Keith Davis, "Organizational Behavior", Tata McGraw Hill, Eleventh Edition, 2005. REFERENCES: 1. Hiriyappa B, “Corporate Strategy – Managing the Business”, Author House, 2013. 2. Peter F Drucker, “People and Performance”, Butterworth – Heinemann [Elsevier], Oxford, 2004. 3. Vinod Kumar Garg and Venkita Krishnan N K, “Enterprise Resource Planning – Concepts”, Second Edition, Prentice Hall, 2003. 4. Mark S Sanders and Ernest J McCormick, "Human Factors in Engineering and Design", McGraw Hill Education, Seventh Edition, 2013 GE8074 HUMAN RIGHTS L T P C 3 0 0 3 OBJECTIVE :  To sensitize the Engineering students to various aspects of Human Rights. UNIT I 9 Human Rights – Meaning, origin and Development. Notion and classification of Rights – Natural, Moral and Legal Rights. Civil and Political Rights, Economic, Social and Cultural Rights; collective / Solidarity Rights. UNIT II 9 Evolution of the concept of Human Rights Magana carta – Geneva convention of 1864. Universal Declaration of Human Rights, 1948. Theories of Human Rights. UNIT III 9 Theories and perspectives of UN Laws – UN Agencies to monitor and compliance. UNIT IV 9 Human Rights in India – Constitutional Provisions / Guarantees. UNIT V 9 Human Rights of Disadvantaged People – Women, Children, Displaced persons and Disabled persons, including Aged and HIV Infected People. Implementation of Human Rights – National and State Human Rights Commission – Judiciary – Role of NGO’s, Media, Educational Institutions, Social Movements. TOTAL: 45 PERIODS OUTCOME:  Engineering students will acquire the basic knowledge of human rights. REFERENCES: 1. Kapoor S.K., “Human Rights under International law and Indian Laws”, Central Law Agency, Allahabad, 2014. 2. Chandra U., “Human Rights”, Allahabad Law Agency, Allahabad, 2014. 3. Upendra Baxi, The Future of Human Rights, Oxford University Press, New Delhi.
  • 106.
    106 GE8071 DISASTER MANAGEMENTL T P C 3 0 0 3 OBJECTIVES:  To provide students an exposure to disasters, their significance and types.  To ensure that students begin to understand the relationship between vulnerability,  disasters, disaster prevention and risk reduction  To gain a preliminary understanding of approaches of Disaster Risk Reduction (DRR)  To enhance awareness of institutional processes in the country and  To develop rudimentary ability to respond to their surroundings with potential  disaster response in areas where they live, with due sensitivity UNIT I INTRODUCTION TO DISASTERS 9 Definition: Disaster, Hazard, Vulnerability, Resilience, Risks – Disasters: Types of disasters – Earthquake, Landslide, Flood, Drought, Fire etc - Classification, Causes, Impacts including social, economic, political, environmental, health, psychosocial, etc.- Differential impacts- in terms of caste, class, gender, age, location, disability - Global trends in disasters: urban disasters, pandemics, complex emergencies, Climate change- Dos and Don’ts during various types of Disasters. UNIT II APPROACHES TO DISASTER RISK REDUCTION (DRR) 9 Disaster cycle - Phases, Culture of safety, prevention, mitigation and preparedness community based DRR, Structural- nonstructural measures, Roles and responsibilities of- community, Panchayati Raj Institutions/Urban Local Bodies (PRIs/ULBs), States, Centre, and other stake-holders- Institutional Processess and Framework at State and Central Level- State Disaster Management Authority(SDMA) – Early Warning System – Advisories from Appropriate Agencies. UNIT III INTER-RELATIONSHIP BETWEEN DISASTERS AND DEVELOPMENT 9 Factors affecting Vulnerabilities, differential impacts, impact of Development projects such as dams, embankments, changes in Land-use etc.- Climate Change Adaptation- IPCC Scenario and Scenarios in the context of India - Relevance of indigenous knowledge, appropriate technology and local resources. UNIT IV DISASTER RISK MANAGEMENT IN INDIA 9 Hazard and Vulnerability profile of India, Components of Disaster Relief: Water, Food, Sanitation, Shelter, Health, Waste Management, Institutional arrangements (Mitigation, Response and Preparedness, Disaster Management Act and Policy - Other related policies, plans, programmes and legislation – Role of GIS and Information Technology Components in Preparedness, Risk Assessment, Response and Recovery Phases of Disaster – Disaster Damage Assessment. UNIT V DISASTER MANAGEMENT: APPLICATIONS AND CASE STUDIES AND FIELD WORKS 9 Landslide Hazard Zonation: Case Studies, Earthquake Vulnerability Assessment of Buildings and Infrastructure: Case Studies, Drought Assessment: Case Studies, Coastal Flooding: Storm Surge Assessment, Floods: Fluvial and Pluvial Flooding: Case Studies; Forest Fire: Case Studies, Man Made disasters: Case Studies, Space Based Inputs for Disaster Mitigation and Management and field works related to disaster management. TOTAL: 45 PERIODS OUTCOMES: The students will be able to  Differentiate the types of disasters, causes and their impact on environment and society  Assess vulnerability and various methods of risk reduction measures as well as mitigation.  Draw the hazard and vulnerability profile of India, Scenarious in the Indian context, Disaster damage assessment and management.
  • 107.
    107 TEXTBOOKS: 1. Singhal J.P.“Disaster Management”, Laxmi Publications, 2010. ISBN-10: 9380386427 ISBN- 13: 978-9380386423 2. Tushar Bhattacharya, “Disaster Science and Management”, McGraw Hill India Education Pvt. Ltd., 2012. ISBN-10: 1259007367, ISBN-13: 978-1259007361] 3. Gupta Anil K, Sreeja S. Nair. Environmental Knowledge for Disaster Risk Management, NIDM, New Delhi, 2011 4. Kapur Anu Vulnerable India: A Geographical Study of Disasters, IIAS and Sage Publishers, New Delhi, 2010. REFERENCES 1. Govt. of India: Disaster Management Act , Government of India, New Delhi, 2005 2. Government of India, National Disaster Management Policy,2009. EC8093 DIGITAL IMAGE PROCESSING L T P C 3 0 0 3 OBJECTIVES:  To become familiar with digital image fundamentals  To get exposed to simple image enhancement techniques in Spatial and Frequency domain.  To learn concepts of degradation function and restoration techniques.  To study the image segmentation and representation techniques.  To become familiar with image compression and recognition methods UNIT I DIGITAL IMAGE FUNDAMENTALS 9 Steps in Digital Image Processing – Components – Elements of Visual Perception – Image Sensing and Acquisition – Image Sampling and Quantization – Relationships between pixels - Color image fundamentals - RGB, HSI models, Two-dimensional mathematical preliminaries, 2D transforms - DFT, DCT. UNIT II IMAGE ENHANCEMENT 9 Spatial Domain: Gray level transformations – Histogram processing – Basics of Spatial Filtering– Smoothing and Sharpening Spatial Filtering, Frequency Domain: Introduction to Fourier Transform– Smoothing and Sharpening frequency domain filters – Ideal, Butterworth and Gaussian filters, Homomorphic filtering, Color image enhancement. UNIT III IMAGE RESTORATION 9 Image Restoration - degradation model, Properties, Noise models – Mean Filters – Order Statistics – Adaptive filters – Band reject Filters – Band pass Filters – Notch Filters – Optimum Notch Filtering – Inverse Filtering – Wiener filtering UNIT IV IMAGE SEGMENTATION 9 Edge detection, Edge linking via Hough transform – Thresholding - Region based segmentation – Region growing – Region splitting and merging – Morphological processing- erosion and dilation, Segmentation by morphological watersheds – basic concepts – Dam construction – Watershed segmentation algorithm. UNIT V IMAGE COMPRESSION AND RECOGNITION 9 Need for data compression, Huffman, Run Length Encoding, Shift codes, Arithmetic coding, JPEG standard, MPEG. Boundary representation, Boundary description, Fourier Descriptor, Regional Descriptors – Topological feature, Texture - Patterns and Pattern classes - Recognition based on matching. TOTAL 45 PERIODS
  • 108.
    108 OUTCOMES: At the endof the course, the students should be able to:  Know and understand the basics and fundamentals of digital image processing, such as digitization, sampling, quantization, and 2D-transforms.  Operate on images using the techniques of smoothing, sharpening and enhancement.  Understand the restoration concepts and filtering techniques.  Learn the basics of segmentation, features extraction, compression and recognition methods for color models. TEXT BOOKS: 1. Rafael C. Gonzalez, Richard E. Woods, ‘Digital Image Processing’, Pearson, Third Edition, 2010. 2. Anil K. Jain, ‘Fundamentals of Digital Image Processing’, Pearson, 2002. REFERENCES: 1. Kenneth R. Castleman, ‘Digital Image Processing’, Pearson, 2006. 2. Rafael C. Gonzalez, Richard E. Woods, Steven Eddins, ‘Digital Image Processing using MATLAB’, Pearson Education, Inc., 2011. 3. D,E. Dudgeon and RM. Mersereau, ‘Multidimensional Digital Signal Processing’, Prentice Hall Professional Technical Reference, 1990. 4. William K. Pratt, ‘Digital Image Processing’, John Wiley, New York, 2002 5. Milan Sonka et al ‘Image processing, analysis and machine vision’, Brookes/Cole, Vikas Publishing House, 2nd edition, 1999 CS8085 SOCIAL NETWORK ANALYSIS L T P C 3 0 0 3 OBJECTIVES:  To understand the concept of semantic web and related applications.  To learn knowledge representation using ontology.  To understand human behaviour in social web and related communities.  To learn visualization of social networks. UNIT I INTRODUCTION 9 Introduction to Semantic Web: Limitations of current Web - Development of Semantic Web - Emergence of the Social Web - Social Network analysis: Development of Social Network Analysis - Key concepts and measures in network analysis - Electronic sources for network analysis: Electronic discussion networks, Blogs and online communities - Web-based networks - Applications of Social Network Analysis. UNIT II MODELLING, AGGREGATING AND KNOWLEDGE REPRESENTATION 9 Ontology and their role in the Semantic Web: Ontology-based knowledge Representation - Ontology languages for the Semantic Web: Resource Description Framework - Web Ontology Language - Modelling and aggregating social network data: State-of-the-art in network data representation - Ontological representation of social individuals - Ontological representation of social relationships - Aggregating and reasoning with social network data - Advanced representations. UNIT III EXTRACTION AND MINING COMMUNITIES IN WEB SOCIAL NETWORKS 9 Extracting evolution of Web Community from a Series of Web Archive - Detecting communities in social networks - Definition of community - Evaluating communities - Methods for community detection and mining - Applications of community mining algorithms - Tools for detecting
  • 109.
    109 communities social networkinfrastructures and communities - Decentralized online social networks - Multi-Relational characterization of dynamic social network communities. UNIT IV PREDICTING HUMAN BEHAVIOUR AND PRIVACY ISSUES 9 Understanding and predicting human behaviour for social communities - User data management - Inference and Distribution - Enabling new human experiences - Reality mining - Context - Awareness - Privacy in online social networks - Trust in online environment - Trust models based on subjective logic - Trust network analysis - Trust transitivity analysis - Combining trust and reputation - Trust derivation based on trust comparisons - Attack spectrum and countermeasures. UNIT V VISUALIZATION AND APPLICATIONS OF SOCIAL NETWORKS 9 Graph theory - Centrality - Clustering - Node-Edge Diagrams - Matrix representation - Visualizing online social networks, Visualizing social networks with matrix-based representations - Matrix and Node-Link Diagrams - Hybrid representations - Applications - Cover networks - Community welfare - Collaboration networks - Co-Citation networks. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students should be able to:  Develop semantic web related applications.  Represent knowledge using ontology.  Predict human behaviour in social web and related communities.  Visualize social networks. TEXT BOOKS: 1. Peter Mika, “Social Networks and the Semantic Web”, First Edition, Springer 2007. 2. Borko Furht, “Handbook of Social Network Technologies and Applications”, 1st Edition, Springer, 2010. REFERENCES: 1. Guandong Xu ,Yanchun Zhang and Lin Li, “Web Mining and Social Networking – Techniques and applications”, First Edition, Springer, 2011. 2. Dion Goh and Schubert Foo, “Social information Retrieval Systems: Emerging Technologies and Applications for Searching the Web Effectively”, IGI Global Snippet, 2008. 3. Max Chevalier, Christine Julien and Chantal Soulé-Dupuy, “Collaborative and Social Information Retrieval and Access: Techniques for Improved user Modelling”, IGI Global Snippet, 2009. 4. John G. Breslin, Alexander Passant and Stefan Decker, “The Social Semantic Web”, Springer, 2009. IT8073 INFORMATION SECURITY L T P C 3 0 0 3 OBJECTIVES:  To understand the basics of Information Security  To know the legal, ethical and professional issues in Information Security  To know the aspects of risk management  To become aware of various standards in this area  To know the technological aspects of Information Security UNIT I INTRODUCTION 9 History, What is Information Security?, Critical Characteristics of Information, NSTISSC Security Model, Components of an Information System, Securing the Components, Balancing Security and Access, The SDLC, The Security SDLC
  • 110.
    110 UNIT II SECURITYINVESTIGATION 9 Need for Security, Business Needs, Threats, Attacks, Legal, Ethical and Professional Issues - An Overview of Computer Security - Access Control Matrix, Policy-Security policies, Confidentiality policies, Integrity policies and Hybrid policies UNIT III SECURITY ANALYSIS 9 Risk Management: Identifying and Assessing Risk, Assessing and Controlling Risk - Systems: Access Control Mechanisms, Information Flow and Confinement Problem UNIT IV LOGICAL DESIGN 9 Blueprint for Security, Information Security Policy, Standards and Practices, ISO 17799/BS 7799, NIST Models, VISA International Security Model, Design of Security Architecture, Planning for Continuity UNIT V PHYSICAL DESIGN 9 Security Technology, IDS, Scanning and Analysis Tools, Cryptography, Access Control Devices, Physical Security, Security and Personnel TOTAL 45 PERIODS OUTCOMES: At the end of this course, the students should be able to:  Discuss the basics of information security  Illustrate the legal, ethical and professional issues in information security  Demonstrate the aspects of risk management.  Become aware of various standards in the Information Security System  Design and implementation of Security Techniques. TEXT BOOK: 1. Michael E Whitman and Herbert J Mattord, “Principles of Information Security”, Vikas Publishing House, New Delhi, 2003 REFERENCES 1. Micki Krause, Harold F. Tipton, “ Handbook of Information Security Management”, Vol 1-3 CRCPress LLC, 2004. 2. Stuart McClure, Joel Scrambray, George Kurtz, “Hacking Exposed”, Tata McGraw- Hill, 2003 3. Matt Bishop, “ Computer Security Art and Science”, Pearson/PHI, 2002. CS8087 SOFTWARE DEFINED NETWORKS L T P C 3 0 0 3 OBJECTIVES:  To learn the fundamentals of software defined networks.  To understand the separation of the data plane and the control plane.  To study about the SDN Programming.  To study about the various applications of SDN UNIT I INTRODUCTION 9 History of Software Defined Networking (SDN) – Modern Data Center – Traditional Switch Architecture – Why SDN – Evolution of SDN – How SDN Works – Centralized and Distributed Control and Date Planes UNIT II OPEN FLOW & SDN CONTROLLERS 9 Open Flow Specification – Drawbacks of Open SDN, SDN via APIs, SDN via Hypervisor-
  • 111.
    111 Based Overlays –SDN via Opening up the Device – SDN Controllers – General Concepts UNIT III DATA CENTERS 9 Multitenant and Virtualized Multitenant Data Center – SDN Solutions for the Data Center Network – VLANs – EVPN – VxLAN – NVGRE UNIT IV SDN PROGRAMMING 9 Programming SDNs: Northbound Application Programming Interface, Current Languages and Tools, Composition of SDNs – Network Functions Virtualization (NFV) and Software Defined Networks: Concepts, Implementation and Applications UNIT V SDN 9 Juniper SDN Framework – IETF SDN Framework – Open Daylight Controller – Floodlight Controller – Bandwidth Calendaring – Data Center Orchestration TOTAL :45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Analyze the evolution of software defined networks  Express the various components of SDN and their uses  Explain the use of SDN in the current networking scenario  Design and develop various applications of SDN TEXT BOOKS: 1. Paul Goransson and Chuck Black, ―Software Defined Networks: A Comprehensive Approach, First Edition, Morgan Kaufmann, 2014. 2. Thomas D. Nadeau, Ken Gray, ―SDN: Software Defined Networks, O'Reilly Media, 2013. REFERENCES: 1. Siamak Azodolmolky, ―Software Defined Networking with Open Flow, Packet Publishing, 2013. 2. Vivek Tiwari, ―SDN and Open Flow for Beginnersǁ, Amazon Digital Services, Inc., 2013. 3. Fei Hu, Editor, ―Network Innovation through Open Flow and SDN: Principles and Design, CRC Press, 2014. CS8074 CYBER FORENSICS L T P C 3 0 0 3 OBJECTIVES:  To learn computer forensics  To become familiar with forensics tools  To learn to analyze and validate forensics data UNIT I INTRODUCTION TO COMPUTER FORENSICS 9 Introduction to Traditional Computer Crime, Traditional problems associated with Computer Crime. Introduction to Identity Theft & Identity Fraud. Types of CF techniques - Incident and incident response methodology - Forensic duplication and investigation. Preparation for IR: Creating response tool kit and IR team. - Forensics Technology and Systems - Understanding Computer Investigation – Data Acquisition. UNIT II EVIDENCE COLLECTION AND FORENSICS TOOLS 9 Processing Crime and Incident Scenes – Working with Windows and DOS Systems. Current Computer Forensics Tools: Software/ Hardware Tools.
  • 112.
    112 UNIT III ANALYSISAND VALIDATION 9 Validating Forensics Data – Data Hiding Techniques – Performing Remote Acquisition – Network Forensics – Email Investigations – Cell Phone and Mobile Devices Forensics UNIT IV ETHICAL HACKING 9 Introduction to Ethical Hacking - Footprinting and Reconnaissance - Scanning Networks - Enumeration - System Hacking - Malware Threats - Sniffing UNIT V ETHICAL HACKING IN WEB 9 Social Engineering - Denial of Service - Session Hijacking - Hacking Web servers - Hacking Web Applications – SQL Injection - Hacking Wireless Networks - Hacking Mobile Platforms. TOTAL 45 PERIODS OUTCOMES: At the end of the course, the student should be able to:  Understand the basics of computer forensics  Apply a number of different computer forensic tools to a given scenario  Analyze and validate forensics data  Identify the vulnerabilities in a given network infrastructure  Implement real-world hacking techniques to test system security TEXT BOOKS: 1. Bill Nelson, Amelia Phillips, Frank Enfinger, Christopher Steuart, “Computer Forensics and Investigations”, Cengage Learning, India Edition, 2016. 2. CEH official Certfied Ethical Hacking Review Guide, Wiley India Edition, 2015. REFERENCES 1. John R.Vacca, “Computer Forensics”, Cengage Learning, 2005 2. MarjieT.Britz, “Computer Forensics and Cyber Crime”: An Introduction”, 3rd Edition, Prentice Hall, 2013. 3. AnkitFadia “ Ethical Hacking” Second Edition, Macmillan India Ltd, 2006 4. Kenneth C.Brancik “Insider Computer Fraud” Auerbach Publications Taylor &amp; Francis Group–2008. CS8086 SOFT COMPUTING L T P C 3 0 0 3 OBJECTIVES:  To learn the basic concepts of Soft Computing  To become familiar with various techniques like neural networks, genetic algorithms and fuzzy systems.  To apply soft computing techniques to solve problems. UNIT I INTRODUCTION TO SOFT COMPUTING 9 Introduction-Artificial Intelligence-Artificial Neural Networks-Fuzzy Systems-Genetic Algorithm and Evolutionary Programming-Swarm Intelligent Systems-Classification of ANNs-McCulloch and Pitts Neuron Model-Learning Rules: Hebbian and Delta- Perceptron Network-Adaline Network-Madaline Network. UNIT II ARTIFICIAL NEURAL NETWORKS 9 Back propagation Neural Networks - Kohonen Neural Network -Learning Vector Quantization -Hamming Neural Network - Hopfield Neural Network- Bi-directional
  • 113.
    113 Associative Memory -AdaptiveResonance Theory Neural Networks- Support Vector Machines - Spike Neuron Models. UNIT III FUZZY SYSTEMS 9 Introduction to Fuzzy Logic, Classical Sets and Fuzzy Sets - Classical Relations and Fuzzy Relations -Membership Functions -Defuzzification - Fuzzy Arithmetic and Fuzzy Measures - Fuzzy Rule Base and Approximate Reasoning - Introduction to Fuzzy Decision Making. UNIT IV GENETIC ALGORITHMS 9 Basic Concepts- Working Principles -Encoding- Fitness Function - Reproduction - Inheritance Operators - Cross Over - Inversion and Deletion -Mutation Operator - Bit-wise Operators -Convergence of Genetic Algorithm. UNIT V HYBRID SYSTEMS 9 Hybrid Systems -Neural Networks, Fuzzy Logic and Genetic -GA Based Weight Determination - LR-Type Fuzzy Numbers - Fuzzy Neuron - Fuzzy BP Architecture - Learning in Fuzzy BP- Inference by Fuzzy BP - Fuzzy ArtMap: A Brief Introduction - Soft Computing Tools - GA in Fuzzy Logic Controller Design - Fuzzy Logic Controller TOTAL : 45 PERIODS OUTCOMES: Upon completion of this course, the students should be able to  Apply suitable soft computing techniques for various applications.  Integrate various soft computing techniques for complex problems. TEXT BOOKS: 1. N.P.Padhy, S.P.Simon, "Soft Computing with MATLAB Programming", Oxford University Press, 2015. 2. S.N.Sivanandam , S.N.Deepa, "Principles of Soft Computing", Wiley India Pvt. Ltd., 2nd Edition, 2011. 3. S.Rajasekaran, G.A.Vijayalakshmi Pai, "Neural Networks, Fuzzy Logic and Genetic Algorithm, Synthesis and Applications ", PHI Learning Pvt. Ltd., 2017. REFERENCES: 1. Jyh-Shing Roger Jang, Chuen-Tsai Sun, Eiji Mizutani, “Neuro-Fuzzy and Soft Computing”, Prentice-Hall of India, 2002. 2. Kwang H.Lee, “First course on Fuzzy Theory and Applications”, Springer, 2005. 3. George J. Klir and Bo Yuan, “Fuzzy Sets and Fuzzy Logic-Theory and Applications”, Prentice Hall, 1996. 4. James A. Freeman and David M. Skapura, “Neural Networks Algorithms, Applications, and Programming Techniques”, Addison Wesley, 2003. GE8076 PROFESSIONAL ETHICS IN ENGINEERING LT P C 3 0 0 3 OBJECTIVES:  To enable the students to create an awareness on Engineering Ethics and Human Values, to instill Moral and Social Values and Loyalty and to appreciate the rights of others. UNIT I HUMAN VALUES 10 Morals, values and Ethics – Integrity – Work ethic – Service learning – Civic virtue – Respect for others – Living peacefully – Caring – Sharing – Honesty – Courage – Valuing time – Cooperation – Commitment – Empathy – Self confidence – Character – Spirituality – Introduction to Yoga and meditation for professional excellence and stress management.
  • 114.
    114 UNIT II ENGINEERINGETHICS 9 Senses of ‘Engineering Ethics’ – Variety of moral issues – Types of inquiry – Moral dilemmas – Moral Autonomy – Kohlberg’s theory – Gilligan’s theory – Consensus and Controversy – Models of professional roles - Theories about right action – Self-interest – Customs and Religion – Uses of Ethical Theories. UNIT III ENGINEERING AS SOCIAL EXPERIMENTATION 9 Engineering as Experimentation – Engineers as responsible Experimenters – Codes of Ethics – A Balanced Outlook on Law. UNIT IV SAFETY, RESPONSIBILITIES AND RIGHTS 9 Safety and Risk – Assessment of Safety and Risk – Risk Benefit Analysis and Reducing Risk - Respect for Authority – Collective Bargaining – Confidentiality – Conflicts of Interest – Occupational Crime – Professional Rights – Employee Rights – Intellectual Property Rights (IPR) – Discrimination. UNIT V GLOBAL ISSUES 8 Multinational Corporations – Environmental Ethics – Computer Ethics – Weapons Development – Engineers as Managers – Consulting Engineers – Engineers as Expert Witnesses and Advisors – Moral Leadership –Code of Conduct – Corporate Social Responsibility. TOTAL: 45 PERIODS OUTCOMES:  Upon completion of the course, the student should be able to apply ethics in society, discuss the ethical issues related to engineering and realize the responsibilities and rights in the society. TEXT BOOKS: 1. Mike W. Martin and Roland Schinzinger, “Ethics in Engineering”, Tata McGraw Hill, New Delhi, 2003. 2. Govindarajan M, Natarajan S, Senthil Kumar V. S, “Engineering Ethics”, Prentice Hall of India, New Delhi, 2004. REFERENCES: 1. Charles B. Fleddermann, “Engineering Ethics”, Pearson Prentice Hall, New Jersey, 2004. 2. Charles E. Harris, Michael S. Pritchard and Michael J. Rabins, “Engineering Ethics – Concepts and Cases”, Cengage Learning, 2009. 3. John R Boatright, “Ethics and the Conduct of Business”, Pearson Education, New Delhi, 2003 4. Edmund G Seebauer and Robert L Barry, “Fundamentals of Ethics for Scientists and Engineers”, Oxford University Press, Oxford, 2001. 5. Laura P. Hartman and Joe Desjardins, “Business Ethics: Decision Making for Personal Integrity and Social Responsibility” Mc Graw Hill education, India Pvt. Ltd.,New Delhi, 2013. 6. World Community Service Centre, ‘ Value Education’, Vethathiri publications, Erode, 2011. Web sources: 1. www.onlineethics.org 2. www.nspe.org 3. www.globalethics.org 4. www.ethics.org
  • 115.
    115 CS8080 INFORMATION RETRIEVALTECHNIQUES L T P C 3 0 0 3 OBJECTIVES:  To understand the basics of Information Retrieval.  To understand machine learning techniques for text classification and clustering.  To understand various search engine system operations.  To learn different techniques of recommender system. UNIT I INTRODUCTION 9 Information Retrieval – Early Developments – The IR Problem – The User‘s Task – Information versus Data Retrieval - The IR System – The Software Architecture of the IR System – The Retrieval and Ranking Processes - The Web – The e-Publishing Era – How the web changed Search – Practical Issues on the Web – How People Search – Search Interfaces Today – Visualization in Search Interfaces. UNIT II MODELING AND RETRIEVAL EVALUATION 9 Basic IR Models - Boolean Model - TF-IDF (Term Frequency/Inverse Document Frequency) Weighting - Vector Model – Probabilistic Model – Latent Semantic Indexing Model – Neural Network Model – Retrieval Evaluation – Retrieval Metrics – Precision and Recall – Reference Collection – User-based Evaluation – Relevance Feedback and Query Expansion – Explicit Relevance Feedback. UNIT III TEXT CLASSIFICATION AND CLUSTERING 9 A Characterization of Text Classification – Unsupervised Algorithms: Clustering – Naïve Text Classification – Supervised Algorithms – Decision Tree – k-NN Classifier – SVM Classifier – Feature Selection or Dimensionality Reduction – Evaluation metrics – Accuracy and Error – Organizing the classes – Indexing and Searching – Inverted Indexes – Sequential Searching – Multi-dimensional Indexing. UNIT IV WEB RETRIEVAL AND WEB CRAWLING 9 The Web – Search Engine Architectures – Cluster based Architecture – Distributed Architectures – Search Engine Ranking – Link based Ranking – Simple Ranking Functions – Learning to Rank – Evaluations -- Search Engine Ranking – Search Engine User Interaction – Browsing – Applications of a Web Crawler – Taxonomy – Architecture and Implementation – Scheduling Algorithms – Evaluation. UNIT V RECOMMENDER SYSTEM 9 Recommender Systems Functions – Data and Knowledge Sources – Recommendation Techniques – Basics of Content-based Recommender Systems – High Level Architecture – Advantages and Drawbacks of Content-based Filtering – Collaborative Filtering – Matrix factorization models – Neighborhood models. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Use an open source search engine framework and explore its capabilities  Apply appropriate method of classification or clustering.  Design and implement innovative features in a search engine.  Design and implement a recommender system. TEXT BOOKS: 1. Ricardo Baeza-Yates and Berthier Ribeiro-Neto, ―Modern Information Retrieval: The Concepts and Technology behind Search, Second Edition, ACM Press Books, 2011. 2. Ricci, F, Rokach, L. Shapira, B.Kantor, “Recommender Systems Handbook”, First Edition, 2011.
  • 116.
    116 REFERENCES: 1. C. Manning,P. Raghavan, and H. Schütze, ―Introduction to Information Retrieval, Cambridge University Press, 2008. 2. Stefan Buettcher, Charles L. A. Clarke and Gordon V. Cormack, ―Information Retrieval: Implementing and Evaluating Search Engines, The MIT Press, 2010. CS8078 GREEN COMPUTING L T P C 3 0 0 3 OBJECTIVES:  To learn the fundamentals of Green Computing.  To analyze the Green computing Grid Framework.  To understand the issues related with Green compliance.  To study and develop various case studies. UNIT I FUNDAMENTALS 9 Green IT Fundamentals: Business, IT, and the Environment – Green computing: carbon foot print, scoop on power – Green IT Strategies: Drivers, Dimensions, and Goals – Environmentally Responsible Business: Policies, Practices, and Metrics. UNIT II GREEN ASSETS AND MODELING 9 Green Assets: Buildings, Data Centers, Networks, and Devices – Green Business Process Management: Modeling, Optimization, and Collaboration – Green Enterprise Architecture – Environmental Intelligence – Green Supply Chains – Green Information Systems: Design and Development Models. UNIT III GRID FRAMEWORK 9 Virtualization of IT systems – Role of electric utilities, Telecommuting, teleconferencing and teleporting – Materials recycling – Best ways for Green PC – Green Data center – Green Grid framework. UNIT IV GREEN COMPLIANCE 9 Socio-cultural aspects of Green IT – Green Enterprise Transformation Roadmap – Green Compliance: Protocols, Standards, and Audits – Emergent Carbon Issues: Technologies and Future. UNIT V CASE STUDIES 9 The Environmentally Responsible Business Strategies (ERBS) – Case Study Scenarios for Trial Runs – Case Studies – Applying Green IT Strategies and Applications to a Home, Hospital, Packaging Industry and Telecom Sector. TOTAL : 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to:  Acquire knowledge to adopt green computing practices to minimize negative impacts on the environment.  Enhance the skill in energy saving practices in their use of hardware.  Evaluate technology tools that can reduce paper waste and carbon footprint by the stakeholders.  Understand the ways to minimize equipment disposal requirements .
  • 117.
    117 TEXT BOOKS: 1. BhuvanUnhelkar, “Green IT Strategies and Applications-Using Environmental Intelligence”, CRC Press, June 2014. 2. Woody Leonhard, Katherine Murray, “Green Home computing for dummies”, August 2012. REFERENCES: 1. Alin Gales, Michael Schaefer, Mike Ebbers, “Green Data Center: steps for the Journey”, Shroff/IBM rebook, 2011. 2. John Lamb, “The Greening of IT”, Pearson Education, 2009. 3. Jason Harris, “Green Computing and Green IT- Best Practices on regulations & industry”, Lulu.com, 2008 4. Carl speshocky, “Empowering Green Initiatives with IT”, John Wiley & Sons, 2010. 5. Wu Chun Feng (editor), “Green computing: Large Scale energy efficiency”, CRC Press CS8076 GPU ARCHITECTURE AND PROGRAMMING L T P C 3 0 0 3 OBJECTIVES:  To understand the basics of GPU architectures  To write programs for massively parallel processors  To understand the issues in mapping algorithms for GPUs  To introduce different GPU programming models UNIT I GPU ARCHITECTURE 12 Evolution of GPU architectures - Understanding Parallelism with GPU –Typical GPU Architecture - CUDA Hardware Overview - Threads, Blocks, Grids, Warps, Scheduling - Memory Handling with CUDA: Shared Memory, Global Memory, Constant Memory and Texture Memory. UNIT II CUDA PROGRAMMING 8 Using CUDA - Multi GPU - Multi GPU Solutions - Optimizing CUDA Applications: Problem Decomposition, Memory Considerations, Transfers, Thread Usage, Resource Contentions. UNIT III PROGRAMMING ISSUES 8 Common Problems: CUDA Error Handling, Parallel Programming Issues, Synchronization, Algorithmic Issues, Finding and Avoiding Errors. UNIT IV OPENCL BASICS 8 OpenCL Standard – Kernels – Host Device Interaction – Execution Environment – Memory Model – Basic OpenCL Examples. UNIT V ALGORITHMS ON GPU 9 Parallel Patterns: Convolution, Prefix Sum, Sparse Matrix - Matrix Multiplication - Programming Heterogeneous Cluster. TOTAL: 45 PERIODS OUTCOMES: Upon completion of the course, the students will be able to  Describe GPU Architecture  Write programs using CUDA, identify issues and debug them  Implement efficient algorithms in GPUs for common application kernels, such as matrix multiplication  Write simple programs using OpenCL  Identify efficient parallel programming patterns to solve problems
  • 118.
    118 TEXT BOOKS: 1. ShaneCook, CUDA Programming: ―A Developer's Guide to Parallel Computing with GPUs (Applications of GPU Computing), First Edition, Morgan Kaufmann, 2012. 2. David R. Kaeli, Perhaad Mistry, Dana Schaa, Dong Ping Zhang, “Heterogeneous computing with OpenCL”, 3rd Edition, Morgan Kauffman, 2015. REFERENCES: 1. Nicholas Wilt, ―CUDA Handbook: A Comprehensive Guide to GPU Programming, Addison - Wesley, 2013. 2. Jason Sanders, Edward Kandrot, ―CUDA by Example: An Introduction to General Purpose GPU Programmingǁ, Addison - Wesley, 2010. 3. David B. Kirk, Wen-mei W. Hwu, Programming Massively Parallel Processors - A Hands-on Approach, Third Edition, Morgan Kaufmann, 2016. 4. http://www.nvidia.com/object/cuda_home_new.html 5. http://www.openCL.org CS8084 NATURAL LANGUAGE PROCESSING L T P C 3 0 0 3 OBJECTIVES:  To learn the fundamentals of natural language processing  To understand the use of CFG and PCFG in NLP  To understand the role of semantics of sentences and pragmatics  To apply the NLP techniques to IR applications UNIT I INTRODUCTION 9 Origins and challenges of NLP – Language Modeling: Grammar-based LM, Statistical LM - Regular Expressions, Finite-State Automata – English Morphology, Transducers for lexicon and rules, Tokenization, Detecting and Correcting Spelling Errors, Minimum Edit Distance UNIT II WORD LEVEL ANALYSIS 9 Unsmoothed N-grams, Evaluating N-grams, Smoothing, Interpolation and Backoff – Word Classes, Part-of-Speech Tagging, Rule-based, Stochastic and Transformation-based tagging, Issues in PoS tagging – Hidden Markov and Maximum Entropy models. UNIT III SYNTACTIC ANALYSIS 9 Context-Free Grammars, Grammar rules for English, Treebanks, Normal Forms for grammar – Dependency Grammar – Syntactic Parsing, Ambiguity, Dynamic Programming parsing – Shallow parsing – Probabilistic CFG, Probabilistic CYK, Probabilistic Lexicalized CFGs - Feature structures, Unification of feature structures. UNIT IV SEMANTICS AND PRAGMATICS 10 Requirements for representation, First-Order Logic, Description Logics – Syntax-Driven Semantic analysis, Semantic attachments – Word Senses, Relations between Senses, Thematic Roles, selectional restrictions – Word Sense Disambiguation, WSD using Supervised, Dictionary & Thesaurus, Bootstrapping methods – Word Similarity using Thesaurus and Distributional methods. UNIT V DISCOURSE ANALYSIS AND LEXICAL RESOURCES 8 Discourse segmentation, Coherence – Reference Phenomena, Anaphora Resolution using Hobbs and Centering Algorithm – Coreference Resolution – Resources: Porter Stemmer, Lemmatizer, Penn Treebank, Brill's Tagger, WordNet, PropBank, FrameNet, Brown Corpus, British National Corpus (BNC). TOTAL :45 PERIODS
  • 119.
    119 OUTCOMES: Upon completion ofthe course, the students will be able to:  To tag a given text with basic Language features  To design an innovative application using NLP components  To implement a rule based system to tackle morphology/syntax of a language  To design a tag set to be used for statistical processing for real-time applications  To compare and contrast the use of different statistical approaches for different types of NLP applications. TEXT BOOKS: 1. Daniel Jurafsky, James H. Martin―Speech and Language Processing: An Introduction to Natural Language Processing, Computational Linguistics and Speech, Pearson Publication, 2014. 2. Steven Bird, Ewan Klein and Edward Loper, ―Natural Language Processing with Pythonǁ, First Edition, O‘Reilly Media, 2009. REFERENCES: 1. Breck Baldwin, ―Language Processing with Java and LingPipe Cookbook, Atlantic Publisher, 2015. 2. Richard M Reese, ―Natural Language Processing with Javaǁ, O‘Reilly Media, 2015. 3. Nitin Indurkhya and Fred J. Damerau, ―Handbook of Natural Language Processing, Second Edition, Chapman and Hall/CRC Press, 2010. 4. Tanveer Siddiqui, U.S. Tiwary, “Natural Language Processing and Information Retrieval”, Oxford University Press, 2008. CS8001 PARALLEL ALGORITHMS L T P C 3 0 0 3 OBJECTIVES: To understand different parallel architectures and models of computation. To introduce the various classes of parallel algorithms. To study parallel algorithms for basic problems. UNIT I INTRODUCTION 9 Need for Parallel Processing - Data and Temporal Parallelism - Models of Computation - RAM and PRAM Model – Shared Memory and Message Passing Models- Processor Organisations - PRAM Algorithm – Analysis of PRAM Algorithms- Parallel Programming Languages. UNIT II PRAM ALGORITHMS 9 Parallel Algorithms for Reduction – Prefix Sum – List Ranking –Preorder Tree Traversal – Searching -Sorting - Merging Two Sorted Lists – Matrix Multiplication - Graph Coloring - Graph Searching. UNIT III SIMD ALGORITHMS -I 9 2D Mesh SIMD Model - Parallel Algorithms for Reduction - Prefix Computation - Selection - Odd-Even Merge Sorting - Matrix Multiplication
  • 120.
    120 UNIT IV SIMDALGORITHMS -II 9 Hypercube SIMD Model - Parallel Algorithms for Selection- Odd-Even Merge Sort- Bitonic Sort- Matrix Multiplication Shuffle Exchange SIMD Model - Parallel Algorithms for Reduction -Bitonic Merge Sort - Matrix Multiplication - Minimum Cost Spanning Tree UNIT V MIMD ALGORITHMS 9 UMA Multiprocessor Model -Parallel Summing on Multiprocessor- Matrix Multiplication on Multiprocessors and Multicomputer - Parallel Quick Sort - Mapping Data to Processors. TOTAL : 45 PERIODS OUTCOMES: Upon completion of this course, the students should be able to  Develop parallel algorithms for standard problems and applications.  Analyse efficiency of different parallel algorithms. TEXT BOOKS: 1. Michael J. Quinn, "Parallel Computing : Theory & Practice", Tata McGraw Hill Edition, Second edition, 2017. 2. Ellis Horowitz, Sartaj Sahni and Sanguthevar Rajasekaran, "Fundamentals of Computer Algorithms", University press, Second edition , 2011. 3. V Rajaraman, C Siva Ram Murthy, " Parallel computers- Architecture and Programming ", PHI learning, 2016. REFERENCES: 1. Ananth Grame, George Karpis, Vipin Kumar and Anshul Gupta, "Introduction to Parallel Computing", 2nd Edition, Addison Wesley, 2003. 2. M Sasikumar, Dinesh Shikhare and P Ravi Prakash , " Introduction to Parallel Processing", PHI learning , 2013. 3. S.G.Akl, "The Design and Analysis of Parallel Algorithms", PHI, 1989. IT8077 SPEECH PROCESSING L T P C 3 0 0 3 OBJECTIVES:  To understand the fundamentals of the speech processing  Explore the various speech models  Gather knowledge about the phonetics and pronunciation processing  Perform wavelet analysis of speech  To understand the concepts of speech recognition UNIT I INTRODUCTION 9 Introduction - knowledge in speech and language processing - ambiguity - models and algorithms - language - thought - understanding - regular expression and automata - words & transducers – N grams UNIT II SPEECH MODELLING 9 Word classes and part of speech tagging – hidden markov model – computing likelihood: the forward algorithm – training hidden markov model – maximum entropy model – transformation- based tagging – evaluation and error analysis – issues in part of speech tagging – noisy channel model for spelling UNIT III SPEECH PRONUNCIATION AND SIGNAL PROCESSING 9 Phonetics - speech sounds and phonetic transcription - articulatory phonetics - phonological categories and pronunciation variation - acoustic phonetics and signals - phonetic resources - articulatory and gestural phonology
  • 121.
    121 UNIT IV SPEECHIDENTIFICATION 9 Speech synthesis - text normalization - phonetic analysis - prosodic analysis – diphone waveform synthesis - unit selection waveform synthesis - evaluation UNIT V SPEECH RECOGNITION 9 Automatic speech recognition - architecture - applying hidden markov model - feature extraction: mfcc vectors - computing acoustic likelihoods - search and decoding - embedded training - multipass decoding: n-best lists and lattices- a* (‘stack’) decoding - context-dependent acoustic models: triphones - discriminative training - speech recognition by humans TOTAL : 45 PERIODS OUTCOMES: On Successful completion of the course ,Students will be able to  Create new algorithms with speech processing  Derive new speech models  Perform various language phonetic analysis  Create a new speech identification system  Generate a new speech recognition system TEXT BOOK: 1. Daniel Jurafsky and James H. Martin, “ Speech and Language Processing: An Introduction to Natural Language Processing, Computational Linguistics and Speech Recognition”, Person education,2013. REFERENCES 1. Kai-Fu Lee, “Automatic Speech Recognition”, The Springer International Series in Engineering and Computer Science, 1999. 2. Himanshu Chaurasiya, “Soft Computing Implementation of Automatic Speech Recognition”, LAP Lambert Academic Publishing, 2010. 3. Claudio Becchetti, Klucio Prina Ricotti, “Speech Recognition: Theory and C++ implementation”,Wiley publications 2008. 4. Ikrami Eldirawy , Wesam Ashour, “Visual Speech Recognition”, Wiley publications , 2011 GE8073 FUNDAMENTALS OF NANOSCIENCE L T P C 3 0 0 3 OBJECTIVES: To learn about basis of nanomaterial science, preparation method, types and application UNIT I INTRODUCTION 8 Nanoscale Science and Technology- Implications for Physics, Chemistry, Biology and Engineering-Classifications of nanostructured materials- nano particles- quantum dots, nanowires- ultra-thinfilms-multilayered materials. Length Scales involved and effect on properties: Mechanical, Electronic, Optical, Magnetic and Thermal properties. Introduction to properties and motivation for study (qualitative only). UNIT II GENERAL METHODS OF PREPARATION 9 Bottom-up Synthesis-Top-down Approach: Co-Precipitation, Ultrasonication, Mechanical Milling, Colloidal routes, Self-assembly, Vapour phase deposition, MOCVD, Sputtering, Evaporation, Molecular Beam Epitaxy, Atomic Layer Epitaxy, MOMBE.
  • 122.
    122 UNIT III NANOMATERIALS12 Nanoforms of Carbon - Buckminster fullerene- graphene and carbon nanotube, Single wall carbon Nanotubes (SWCNT) and Multi wall carbon nanotubes (MWCNT)- methods of synthesis(arc- growth, laser ablation, CVD routes, Plasma CVD), structure-property Relationships applications- Nanometal oxides-ZnO, TiO2,MgO, ZrO2, NiO, nanoalumina, CaO, AgTiO2, Ferrites, Nanoclays- functionalization and applications-Quantum wires, Quantum dots-preparation, properties and applications. UNIT IV CHARACTERIZATION TECHNIQUES 9 X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques, Transmission Electron Microscopy including high-resolution imaging, Surface Analysis techniques- AFM, SPM, STM, SNOM, ESCA, SIMS-Nanoindentation. UNIT V APPLICATIONS 7 NanoInfoTech: Information storage- nanocomputer, molecular switch, super chip, nanocrystal, Nanobiotechlogy: nanoprobes in medical diagnostics and biotechnology, Nano medicines, Targetted drug delivery, Bioimaging - Micro Electro Mechanical Systems (MEMS), Nano Electro Mechanical Systems (NEMS)- Nanosensors, nano crystalline silver for bacterial inhibition, Nanoparticles for sunbarrier products - In Photostat, printing, solar cell, battery. TOTAL: 45 PERIODS OUTCOMES:  Will familiarize about the science of nanomaterials  Will demonstrate the preparation of nanomaterials  Will develop knowledge in characteristic nanomaterial TEXT BOOKS : 1. A.S. Edelstein and R.C. Cammearata, eds., “Nanomaterials: Synthesis, Properties and Applications”, Institute of Physics Publishing, Bristol and Philadelphia, 1996. 2. N John Dinardo, “Nanoscale Charecterisation of surfaces & Interfaces”, 2nd edition, Weinheim Cambridge, Wiley-VCH, 2000. REFERENCES: 1. G Timp, “Nanotechnology”, AIP press/Springer, 1999. 2. Akhlesh Lakhtakia,“The Hand Book of Nano Technology, Nanometer Structure, Theory, Modeling and Simulations”. Prentice-Hall of India (P) Ltd, New Delhi, 2007.