Writing
That
Works
Works
A Teacher’s Guide to
Technical Writing
by

Dr. Steven M. Gerson
Johnson County Community College

Developed and Published by:
Kansas Curriculum Center
Washburn University
Topeka, KS
Writing
That
Works
Works
A Teacher’s Guide to
Technical Writing
by

Dr. Steven M. Gerson
Johnson County Community College
Project Advisor:

Dr. Craig Haugsness
Program Consultant: Technology Initiative
KS State Dept. of Education

Designed and Edited by:

Ben Clay
Kansas Curriculum Center
Text Processing by:

Esperanza Root
PREFACE

Welcome to
Technical Writing
by Dr. Steven Gerson
I hope this Teacher’s Guide will help you find new and interesting
ways to incorporate technical writing in your classroom. The
Teacher’s Guide seeks to accomplish the following:
Chapter One not only provides a rationale for teaching technical
writing, but also defines technical writing and compares/contrasts it to
other types of written communication. This puts technical writing into
context, for you and your students. In addition, the chapter gives you
several teaching tools. These include tables, which you can make into
overheads, and a wide range of end-of-chapter activities. These
teaching tools lend themselves to classroom discussions, assignments,
and tests.
Chapter Two provides exact criteria for teaching technical writing.
The technical writing criteria is expressed in 5 Traits, comparable to
the 6 Traits rubric with which you may be familiar. These 5 Traits
include clarity, conciseness, accessibility, audience, and accuracy.
This chapter gives you a 5 Traits grading rubric and many end-ofchapter activities.
Chapter Three discusses the different types of technical writing. These
include letters, memos, e-mail, reports, instructions, resumés, brochures, newsletters, fliers, web pages, PowerPoint presentations, and
graphics. This chapter provides numerous samples for each type of
technical writing, as well as peer evaluation checklists, ready for
duplication and use in your classes.
Chapter Four focuses on technical writing assignments. Whether you
teach elementary school, English, Spanish, math, physical education,
business, history, psychology, or art, you will find assignments geared
toward your classes . . . and they all work. They are interesting,
diverse, and proven effective in classroom settings.
(Continued on next page…)

i
This revised teachers’ guide to technical writing includes the following
New and Updated information:
!

!

!

!

!
!

!

!

Updated information and New samples (screen captures) for
websites. This includes revised criteria and explanations of the
importance of websites, as well as the ways in which on-line text
differs from hard copy.
Updated information and New samples (screen captures) for e-mail.
This includes revised criteria and explanations of the increased
importance of electronic communication in the workplace.
Updated information and New samples of instructions, appropriate
for elementary as well as middle/high school students.
Updated information and New samples of brochures and
newsletters.
New information and samples of fliers.
New information on the use of online wizards and templates for
memos, letters, resumes, brochures, newsletters, and fliers. This
includes not only the benefits of wizards/templates but also
problems encountered.
New information on the importance of graphics in technical writing.
This includes samples, criteria, and the reasons why graphics (tables
and figures) are important in technical writing.
New and revised assignments for technical writing, including
—Assignments for elementary school students as well as middle/high
schools.
—Focus on different subject matters/disciplines, including
agricultural education, family and consumer sciences, industrial
technology, business/computer classes, etc.

I am available for on-line assistance via e-mail. I am always happy to
talk about technical writing. If you have questions regarding assignments or curriculum, just contact me at:
sgerson@jccc.net
or you could use the two, old-fashioned approaches: phone
(913-469-8500, ext. 3625) or mail (12345 College Blvd., Johnson
County Community College, Overland Park, KS 66210).
I want to thank several people for helping me prepare this Teacher’s
Guide. Carol Hailey, Shawnee Mission North High School, gave me
many ideas for assignments and curriculum options; Carmen Shelly,
DeSoto High School, created the 5 Traits rubric that I have adapted.
My office mate, Professor James McWard, reviewed early copies of this
text and offered valuable suggestions for revision. Finally, my wife,
Professor Sharon Gerson (DeVry Institute of Technology, Kansas City),
was a constant source of assistance, helping me develop ideas, draft
text, revise, and proofread.

ii
Table of
Contents

Preface ...................................................................................... i-ii
Chapter One: Why Teach Technical Writing ........................... 1-9
Definition ............................................................................ 1
Rationale .......................................................................... 2-3
Communication Continuum ............................................. 4-5
Technical Writing vs. Essays ............................................... 6
Five Components of Technical Writing ............................. 7-8
End of Chapter Activities ..................................................... 9
Chapter Two: Five Traits of Technical Writing ..................... 10-25
Clarity .......................................................................... 10-12
Conciseness ................................................................. 13-16
Accessibility ................................................................. 16-17
Audience Recognition .................................................. 18-19
Accuracy ........................................................................... 20
Five Trait Rubric .................................................................21
End of Chapter Activities .............................................. 22-25
Chapter Three: Applications of Technical Writing ............... 26-80
Letters .......................................................................... 26-33
Memos ......................................................................... 34-38
E-Mail ........................................................................... 39-42
Reports ......................................................................... 43-45
The Job Search ............................................................. 46-54
Instructions ................................................................... 54-57
Web Pages ................................................................... 58-62
PowerPoint Presentations ............................................. 63-65
Brochures ..................................................................... 66-69
Newsletters .................................................................. 70-74
Fliers ............................................................................ 75-78
Graphics ....................................................................... 79-80
Chapter Four: Technical Writing Assignments ..................... 81-96
Sales Letters ....................................................................... 81
Letters of Inquiry ............................................................... 82
Memos ......................................................................... 82-83
E-Mail ........................................................................... 83-84
Reports ......................................................................... 84-85
The Job Search .................................................................. 85
Instructions ........................................................................ 86
Web Pages and PowerPoint .......................................... 86-87
Brochures/Newsletters .................................................. 87-88
Fliers ................................................................................. 88
Grouped Assignments .................................................. 89-90
Conclusion ........................................................................ 91
Sample Technical Writing I ................................................ 91
Sample Course Scope and Sequence ............................ 92-96
Chapter One

Technical Writing:
A Definition
Technical writing is communication written for and
about business and industry,
focusing on products and
services: how to manufacture them, market them,
manage them, deliver them,
and use them.

Why Teach
Technical Writing?

Technical writing is written:
! in the work environment
(in the office, from 8:00
to 5:00, not counting
overtime)
! for supervisors, colleagues, subordinates,
vendors, and customers
Technical writing, which
must be understood easily
and quickly, includes:
! memos and e-mail
! letters
! reports
! instructions
! brochures and newsletters
! the job search
! web pages
! fliers
! PowerPoint presentations
! graphics

Why is technical writing so important?
Why would I want to teach technical writing?
Don’t I have enough to teach now without adding one more
assignment or series of assignments to my curriculum?
What’s the point?
!

Technical writing is the
resumé that helps get a
job and the web page
that promotes a
company.
In each case, the
technical document
must be quantifiable,
precise, and easily
understood.

!

!
!

Technical writing is not literature; it’s neither prose which recounts the
fictional tales of characters nor poetry which expresses deeply felt,
universal emotions through similes and metaphors.
Technical writing is neither an expressive essay narrating an
occurrence nor an expository essay analyzing a topic.
Technical writing is not journalism, written to report the news.
Technical writing does not focus on poetic images, describe personal
experiences, or report who won the basketball game.

Instead, technical writing is:
—an instructional manual for repairing machinery
—a memo listing meeting agendas
—a letter from a vendor to a client
—a recommendation report proposing a new computer system

1
Once students are employed,
will they have to write on the
job? The answer is a
resounding YES!
One reason for teaching technical
writing is so students will know
the types of documents they
will write on the job.

When our students are employed and have to write
on the job, will they write essays?

Students often do
not believe they
will have to write
at work; they
assume that once
their education is
completed,
writing will be a
distant memory.
They are wrong.

The answer is no. Our students, when employed, will not write essays at
work. They will write essays while working on their college degrees;
they might even be asked to write an essay on their job application when
applying for work. However, once the job begins, essays end.

What takes the place of the essay?
The answer is technical writing—memos, letters, reports, e-mail,
proposals, instructions, even web pages. That’s why technical writing is
important. Technical writing is the type of written communication that
our students will be responsible for on the job.

Is technical writing a necessary component of
every employee’s professional skill?
Daily, newspapers tell us that employers want to hire people who can
communicate effectively, both in writing and orally. Career counselors
reiterate this.
!

!
!
!

In fact, we are told that on the job, an employee will spend at least 20
percent of his or her time writing.
This number increases as an employee’s responsibilities increase.
Managers spend up to 50 percent of their time writing.
CEOs spend between 80 and 100 percent of their work week
communicating.

2
How does technical writing compare/contrast to
traditional essays?
Technical writing is different from other types of written
communication. Does that mean, therefore, that you must relearn all
your teaching skills to accommodate this new communication beast?
Absolutely not. Many of the writing skills you already teach are
applicable to technical writing. Others are less valid.

“Technical writing would come in handy
for some students, such as our vo-tech
kids. When they enter the job market,
they could benefit by knowing
how to write at work.
But what about our college-bound
students? Why would they need
technical writing?”

Here is a reminder…
College lasts only four to six years. In K-12, we should continue
to prepare our students for college by teaching essays. In addition,
we should prepare them for what comes next—their jobs. After
they graduate with their AA or BA or BS, they go to work where
they will write memos, letters, and reports.
The career and technical education students—the students who
will work as mechanics, welders, office help, or daycare center
assistants—can benefit by learning how to write technical
documents.
However, our students who acquire associate degrees and bachelor
degrees—the students who go on to become computer
programmers, CAD/CAM operators, dental hygienists, fashion
merchandising specialists, graphic artists, engineers, architects,
accountants, doctors, and lawyers—also will need to write memos,
letters, and reports.

3

On the next
page is a
Communication
Continuum
including traits
and examples
of five types of
writing, ranging
from the
connotative
to the
denotative.
Communication Continuum
Connotative/Expressive

Type of
Writing

Examples

Traits

Poems, plays, stories

Connotative and expressive
words, fictional characters,
imagery, and plots

Expressive
Writing

Narratives, descriptions

Subjective, based on
personal experience,
connotative and expressive
words

Expository
Writing

Comparison/contrast,
analysis, cause/effect,
argument/persuasion

Creative
Writing

Journalism

Technical
Writing
Denotative/Objective

Objective, connotative and
denotative words
Objective, written from
factual observation, short
sentences and paragraphs,
some connotative but more
denotative words

News stories, features,
editorials

Memos, letters, reports,
instructions, resumés,
web pages

Legend:

Connotative

Of course, there are exceptions…
Newsletters, sales letters, websites, and fliers might
include promotional information. Such sales details
could depend on expressive words—maybe even
fictional characters. However, generally speaking,
most technical writing is denotative
versus connotative.

4

Objective, written about
products or services, short
sentences and paragraphs,
denotative words
Denotative
On the next page is a
poem about a tennis
shoe as well as
technical specifications
for manufacturing
the same shoe.
These two writing
samples further illustrate
the difference between
technical writing and
other types of writing.
Ode to a Shoe

Technical Specifications for
Manufacturing Tennis Shoes

My son’s tennis shoes rest temporarily in a
heap against the kitchen door,
their laces soiled, their tongues hanging out
like exhausted terriers.
The soles, worn down on the insides from
sliding into second,
are green, the shades of summer.
Canvas exteriors, once pristine white, are the
colors of the rainbow—
sun bleached, mud splattered, rained on,
ketchup and mustard adorned,
each shoe shouting a child’s joyous
exuberance: “I’m alive!”

The D40 Slammer Tennis Shoe will be
manufactured to the following specifications:
Sole:

Uppers:
Tongue:

Laces:
Aglets:
Weight:

Neoprene rubber #345
white enameled paint
1.589" high
Slammer waffle-textured©
Blue canvas
White canvas
Oval Slammer© logo heatpressure sealed, centered .50"
from all sides
15" long
100% cotton
Clear polyacetate plastic #290
1 lb. 6 oz.

“Unclear writing costs
American businesses real
money—over one billion
dollars a year, according to one
estimate…Did you know the
Three Mile Island nuclear
power plant meltdown was
partly attributed to poorly
written procedures?”
(“Why Dick and Jane Can’t Write on the Job…and How to Help Them,” Janet Van Wicklen,
American Society of Training and Development, 2000).

“The ability to communicate
effectively is the most important skill
you can have, whether you’re giving
speeches, pitching ideas to your boss,
or simply sending off an e-mail or
leaving a voice message.”
(“What You Need to Know About Career Planning,”
<http://careerplanning.about.com/cs/importantskills/>2002.)

5

The graphic
appearing on
the next page
examines how
technical writing
compares and
contrasts
to essays.
Comparison/Contrast: Technical Writing vs. Essays
Components
Development

Grammar

Technical Writing
!

!

!

!

Organization
!

!

Style

!

Document
Design

Uses examples, anecdotes,
testimony, data, research

It is important!

Essays
!

!

Provides an introduction,
body, and conclusion
Uses a subject line vs. a thesis
and itemization of points vs.
transitional words
Uses topic sentences only
when needed, dependent
upon the type and length of
correspondence
Uses short, denotative words;
short sentences; and short
paragraphs

Uses highlighting techniques,
such as graphics, headings,
subheadings, various fonts,
white space, bullets, etc.

!

!

!

Uses examples,
anecdotes,
testimony, data,
research

Same for both

It is important!

Same for both

Provides an
introduction,
thesis statement,
body paragraphs,
transitional words,
and topic
sentences

Uses longer,
connotative words;
longer sentences;
and longer
paragraphs
Not usually a
factor

People read literature for pleasure, essays for
enlightenment, and journalism for news. People
read technical writing to accomplish a job.

6

Summary

Similar in some
ways, different in
others

Different

Different

The five components
listed above are
discussed in greater
detail on the
following pages.
Five Components of Writing
Development
If you have been teaching your students to develop their essays using
such traditional means as examples, anecdotes, testimony, data, and
research, then teaching technical writing will not be a strain. The same
development techniques are applicable when the students write memos,
letters, and reports.

Grammar
Grammar is important in essays. It might be more important in technical
writing. Whereas errors often can hide in longer essays, those same
errors loom large in one page memos or letters.
In a survey (Gerson) of over 700 technical writers (coast to coast) asked
to list important aspects of correspondence, 98% ranked correct grammar as an essential component of successful writing.
Grammar is not merely the concern of English teachers. Professional
writers and business people perceive it as essential.

Organization
Essays employ topic sentences, transition between and within
paragraphs, and a thesis statement. Technical writing usually does not.
In a memo, letter, or report, the thesis would be replaced by a subject
line. The different aspects of organization help distinguish technical
writing from essays.
Since paragraphs are shorter in technical writing (often between one to
three sentences) than in many essays, topic sentences are less important.
Transitional words and phrases in an essay can be replaced by an
enumerated list, by a list of bullets (!#$%, etc.), and/or by headings
and subheadings.

Style
Of greater importance is the different style (word usage, sentence
structure, and paragraph length) used in essays versus technical writing.
Essays rely on longer, more connotative words; longer, more complex
syntax; longer, more detailed paragraphs. Technical writing, in contrast,
demands short, denotative words; short, simple sentences; short
(Continued on next page…)

7
Style (continued)
paragraphs with information clarified through graphics (pie charts, line
graphs, etc.). It has everything to do with audience and purpose.
The reader of technical writing does not have time, nor necessarily an
interest in the subject matter. Envision this scenario. It is the night
before Christmas, your children are asleep, and you are trying to put
together a Christmas present—a doll house, a train set, etc.
To assemble this present, you are sitting on the floor (you have been
sitting there for two hours, as your aching back attests). You are trying to
read the complicated instructions which accompanied the toy (those
instructions are a type of technical writing). You do not enjoy the
activity. In fact, you just want to end the task and go to sleep. That is a
typical technical writing situation.
The same holds true when you read an instruction to install software,
build a cabinet, lay tile, or any other task. People do not read technical
writing, such as instructions, for pleasure. The writing is a means to an
end. Thus, to help people accomplish the task as quickly and as
efficiently as possible, the writing style should be concise—short words,
short sentences, and short paragraphs.

Document Design
Document design refers to the physical layout of the correspondence.
Essays consist of words, words, and more words, separated by
indentations to create paragraphs. Technical writing, in contrast, uses
highlighting techniques and graphics for visual appeal to help the reader
access and understand the data.

Technical writing is written to a
different audience for a different
purpose than essays.
The reader of technical writing does
not have time, nor necessarily the
interest in the subject matter.

8
Conclusion:
If we want students to write technical documents,
we need to define what technical writing is and
provide a context for writing such documentation.
This first chapter may be used to
accomplish those goals.

End-of-Chapter Activities
Read, Lecture, Invite, and Test
Read this chapter for your own knowledge. Use this information to acquire a better understanding
of technical writing or as a reminder of what you’ve always known. Lecture from the chapter.
Teach from this information to clarify for your students why technical writing is important, what
technical writing entails, and how it differs from the type of writing they are used to. Invite people
from business and industry to your classroom to discuss how technical writing is important to
them. Test students on the information in this chapter. A short test could include the following:
! What percentage of time does a manager spend writing? Or a new employee, or a CEO?
! How does technical writing differ from essays? List at least three ways.
! Define technical writing. List five types of technical writing.
! Explain the writing continuum, giving examples to prove your points.

Have students create their own definition of technical writing
!

!
!

!

!
!

Students could gather examples of technical writing (such as memos, letters, reports, brochures,
or instructions), or you could bring in examples (this Teachers’ Guide provides you several
examples). The students can get examples from their parents, from businesses, or in your
school’s office.
Once they have examples, break the students into groups and have them review the examples.
Ask them to brainstorm the examples’ unique characteristics (page layout, length, tone, content,
word usage).
Next, give them essays—or poetry, or drama, or a short story, or a newspaper. Ask them to
compare the technical writing to the other types of correspondence.
Based on these discussions, ask the students to create their own list of technical writing criteria.
Finally, ask the students to create a technical writing rubric, perhaps comparing it to Six Traits.

Write and Rewrite
Have the students write a poem (or an expressive essay or an expository essay) about a classroom
object (a stapler, an eraser, etc.). Then have the students take the same subject and write a
technical memo, complaint letter, recommendation report, instructions for using the object, or a
manufacturing specification. Compare and contrast the results.

9
Chapter Two

In this
Chapter...

Five Traits of
Technical Writing

Students are not familiar with
technical writing. Unless we
teach them what this different
type of communication entails, they will continue to
write essays (the writing skill
they have practiced since
grade school).

1. Clarity

This chapter provides specific
criteria to give students before
asking them to write technical documents. The five traits
of technical writing are:
! clarity
! conciseness
! accessible document
design
! audience recognition
! accuracy

Clarity in technical writing is mandatory
If a student fails to
clearly understand a
poem, a short story,
a play, or a novel,
that is unfortunate;
however,
equipment is not
damaged, no one
is physically
hurt, and no one
is sued.

The most important criteria for effective technical writing is clarity. If the
audience responds to a memo, letter, report, or manual with, “Huh?”
what has the writer accomplished? If the correspondence is not clearly
understood, the reader will either call the writer for further clarification,
or just ignore the information. In either case, the writer’s time is wasted;
the reader’s time is wasted; the message is lost.
Clarity, however, is not just a time concern. Think of it from this
perspective: your company has written an installation manual for a
product. The manual, unfortunately, is not clear. When the reader fails
to understand the content, three negatives can occur:
! BAD—The equipment is damaged. This requires the owner to ship the
equipment back. The company will replace the equipment, costs
accrue, and public relations have been frayed.
! WORSE—The owner is hurt, leading to pain, anxiety, doctor’s bills, and
bad public relations.
! EVEN WORSE—The company is sued. The company loses money, the
writer of the manual loses a job, and public relations are severed.

10
Clarity achieved through reporter’s questions
This flawed memo, written by a manager to a newly hired employee,
highlights the importance of clarity.

Ask your students:
!

!

Nothing is
clear in this
memo, and
the reasons are
obvious. The
manager has
failed to
answer
Reporter’s
Questions:
who, what,
when, where,
why, how.

Date:
To:
From:
Subject:

March 5, 2004
Michelle Fields
Earl Eddings
Meeting

Please plan to prepare a
presentation on sales.
Make sure the information
is very detailed.
Thanks.

Obvious responses:
!
!
!
!

!

!

!

Reporter’s Questions Checklist
Who

is the audience? Who will know what? Will the
audience know a great deal (High Tech)? Will the audience
know a little about the topic (Low Tech)? Will the audience
know nothing about the topic (Lay)?

What

do you plan to do? What do you want the audience to
do? What do you want to know?

When

should the job be completed? What’s the turnaround
time? What’s the timetable? What’s the desired schedule?
When do you need an answer?

Where will the work take place?
Why

is the task being undertaken (the rationale, motivation,
goal)? Why is the desired date important?

How

should the task be performed? What’s the preferred
procedure?

11

What don’t you know in
this memo?
What additional
information should the
writer have included for
clarity?

When’s the meeting?
Where’s the meeting?
Who’s the meeting for?
How much information is
“very detailed”?
How will the presentation
be made?
Why is this meeting being
held?
What does the manager
want to be conveyed
about sales?
Using the Reporter’s
Questions Checklist
as a prewriting tool,
the previous memo
could be revised to
achieve greater
clarity. Here is an
example of a revised
memo.

Date:
To:
From:
Subject:

March 5, 2004
Michelle Fields
Earl Eddings
Sales Staff Meeting

Please make a presentation on improved sales
techniques for our sales staff. This meeting is
planned for March 18, 2004, in Conference
Room C, from 8:00 a.m. - 5:00 p.m.
Our quarterly sales are down 27%. Thus, we
need to help our staff accomplish the following:
1. Make new contacts.
2. Close deals more effectively.
3. Earn a 40% profit margin on all sales.
Use our new multimedia presentation system to
make your presentation. With your help, I know
our company can get back on track.
Thanks.

Clarity achieved through specificity
In contrast to
mystery stories
which seek to create
suspense, technical
writing must be
clear.
The ultimate goal of
effective technical
writing is to say the
same thing to
multiple readers!

When a student answers reporter’s questions, he or she has filled a page
with words. But all words are not equal. Words like some, several,
many, few, frequently, often, substantial, or recently will take up space
on the page and convey an impression. These connotative words will
not mean the same thing to everyone.
If a memo sent to six employees states that the company has lost a
substantial amount of business, will all employees acquire the same
knowledge? One might assume that a substantial loss equals $1,000;
another might assume that a substantial loss equals twelve clients. In
each case, the employees are guessing, and that is not the goal of
successful technical writing.
(The previous memo using the phrase very detailed would be more clear
if the writer had said he needed an eight hour presentation. Everyone
receiving the memo then would know exactly how much time they
needed to set aside to attend the meeting.)

12
Read the following paragraph,
taken from an actual business
correspondence:

2. Conciseness

“In order to facilitate an efficient meeting and
fuel thought processes prior to June 25, I want
to provide you with a brief overview of
discussions recently carried out at the director
and manager level within the process. These
discussions involved personnel from Accounts
Payable, Information Services, Procurement/
Materials Management, Financial Systems,
and Property Accounting, centering on a
proposed framework for managing process
improvement moving forward.”

Do you understand this letter?
Do you remember what you read?
Did you even finish reading it?
Successful technical writing should help the reader
understand the text, not present challenges to
understanding

No one curls
up in bed at
night and for
pleasure reads
manuals about
installing
computer
printers.

The above paragraph is not successful writing. It fails to communicate
clearly because it is too long-winded. In this case, conciseness actually
would aid clarity.
Isn’t it the responsibility of the reader to figure it out? No. The responsibility is with the writer. Here is why.
If an individual reads literature, it is his or her responsibility to understand the writing. Creative writers seek to challenge us. However,
technical writing, as noted in Chapter 1, is not literature. We read
technical writing because it is a job requirement.
Good technical writing is concise. It is a tool for the readers to use to
accomplish whatever job they are doing. In contrast to traditional
essays, effective technical writing uses short words and short sentences.

13
Conciseness has unique importance in
technical writing

Technical
Writing
Must
Fit in
the Box

Where’s the user manual for your car? It’s inside the glove
compartment. In other words, that piece of very complex
technical writing had to be written concisely enough to fit
inside a specific-sized box. The content took a backseat, so
to speak, to the user manual’s predetermined location
within the car.
Here’s another example: what’s the perfect length of a
resumé? One page, of course! Guess what? That’s a box.
We have decided that a great resumé should fit inside a
typical, 8” X 11” piece of paper.
Now, think about the size of an e-mail screen. Yes, the
“box” is shrinking. A typical e-mail screen measures about
3” X 6”. A Palm Pilot monitor is about 2” X 2”. Your cell
phone monitor is about 1” X 1”, and a pager’s monitor is
closer to ¼” X 1½”. In each instance, the writer has less
and less room to write.

Successful technical writing
tries to avoid multisyllabic
words such as “mul-ti-syl-lab-ic.”
Conciseness achieved through short words
Teach students to use one and two syllable words. Of course, some
multisyllabic words can not be changed. We can not replace engineer,
telecommunications, or Internet. Other words, however, can be
avoided. Look at these, for example.

Changing Long Words to Short Words
Long Words

Short Words

cognizant

know

endeavor

try

domicile

home

morbidity

death

terminate

end

14
Conciseness achieved through short sentences
You can shorten
a sentence by
avoiding:
! redundancy
! prepositional
phrases
! passive voice

Here is an unsuccessful example of technical writing:

“In order to successfully accomplish their job
functions, the team has been needing more work
space for some time now.”
An improved sentence would read,

“The team needs more work space to do its jobs.”
The first sentence contains 20 words and 28 syllables; the second sentence contains ten words and ten syllables.

Avoiding redundancy
Why say, “The used car will cost the sum of $1,000.00”? It is more
concise to say, “The used car will cost $1,000.00.” In this instance,
“the sum of” is redundant. The following examples replace redundancy with concise revisions:

Wordy Sentence

Less Wordy Sentence

We collaborated together on the projects.

We collaborated on
the project.

This is a brand new
innovation.

This is an innovation.

The other alternative is
to eat soup.

The alternative is to
eat soup.

Avoiding prepositional phrases
Prepositional phrases create wordy sentences. Consider the following
examples (note that the prepositional phrase is in bold type):

Wordy Sentence

Concise Sentence

He drove at a rapid
rate.

He drove rapidly.

I will see you in the
near future.

I will see you soon.

I am in receipt of your
e-mail message requesting an increase
in pay.

I received your e-mail
message requesting a
pay raise.

15
Avoiding passive voice
Passive voice constructions are weak for at least two reasons. They
are wordy, and they replace strong verbs with weak verbs. Example:

“The window was broken by the boys.”
versus

“The boys broke the window.”
The first sentence contains seven words and the weak verb was. In
contrast, the second sentence contains five words and the strong verb
broke. The emphasis is placed on the individuals (boys) rather than
on an inanimate object (window). Other examples follow:

Passive Voice

Active Voice

It is my decision to run
for office.

I decided to run for
office.

There are sixteen
people who tried out
for the basketball team.

Sixteen people tried out
for the basketball team.

The computer was
purchased by Tom.

Tom purchased the
computer.

3. Accessible Document
Design

In addition to clarity and conciseness, a third trait of effective technical writing is accessibility (page layout—
the way the text looks on the page). Look at the following
paragraph:
Regarding part number 315564-000, we
received 541 units of wafer #3206-2. These
were rejected. For the same part number, we
received 643 units of wafer #3206-4. These
were accepted. Three hundred and twentynine units of wafer #3206-5 from the same
part number. These were accepted. Next,
344 of part number 315564-000’s wafer
#3206-6 were accepted. However, the 143
units of wafer #3206-7 (same part number)
were rejected. Finally, all 906 units of wafer
#3206-8 were rejected. These also were from
part number 315564-00.

16
Wall-to-wall words turn off readers.
Highlighting techniques make the text open,
airy, and inviting!

Students can make
information leap off the
page by making content
accessible through the
following highlighting
techniques:
!

The paragraph on the bottom of page 16 consists of 84 words and ten
sentences. The average number of words per sentence is only 8.4.
Because the sentences are not too long, the writing is concise. Next,
the text is clear, due to specificity of detail. However, despite the
clarity and conciseness, this writing fails. Why? Essentially, this
paragraph is unintelligible. The page layout makes it nearly impossible for the reader to understand the text.

Graphics (table
and figures)

!

White space

!

Boldface text

!

Headings and
subheadings

Wafer #

Quantity
Received

3206-2

541

3206-4

643

a
"

3206-5

329

a
"

3206-6

344

a
"

3206-7

143

X

3206-8

906

X

Accepted

Rejected

X

17

!

Underlining

!

Varied Font sizes
Bullets (!&'())

!

Part Number 315564-00

Italics

!

Using highlighting techniques (tables, headings and subheadings,
different font sizes, column lines, and white space), below is a revised
copy of the information presented on page 16.

!

Numbered lists

!

Varied Font types
(computers offer
many options)
4. Audience Recognition

Who is writing to whom?
What does the audience
know, need to know,
and want to know?
When your audience fails
to understand the text,
you have failed
to communicate!

Recognizing your audiences
Successful technical writers know that they can only achieve clarity by
recognizing their audiences. Basically, our students will write to either
High Tech Peers, Low Tech Peers, or Lay Readers. These three audience levels have the following traits.
High Tech Peers know as much about a subject matter as you. They
have the same job title, same education, same years of experience, and
the same level of expertise. For example, a medical doctor writing to
another medical doctor would be writing High Tech to High Tech.
Low Tech Peers who work in your company know something about
the subject matter. They may not have the same job title, education,
years of experience, or level of expertise. For example, a medical
doctor writing to a staff nurse would be writing High Tech to Low Tech.
Lay Readers are your customers. They are completely out of the loop.
For example, a medical doctor communicating with a patient.

High Tech Peers
Communicating

High Tech and Low
Tech Peer
18

Writing
successfully to
these three
types of
audiences
requires
different
techniques.

High Tech and
Lay Reader
Writing to High Tech Peers
When writing to a high tech peer, one can use acronyms and abbreviations, usually without any definition. Educators are familiar with QPA,
NEA, and KPERS. But individuals in other fields would assume that
NEA meant National Endowment for the Arts, not National
Education Association.

Writing to Low Tech Peers
Accountants do not need their high tech peers to define FIFO or CPR.
If these accountants write to one of their fellow employees in sales,
computer technology, or human resources (low tech peers), however,
these high-tech terms must be explained. FIFO could be parenthetically defined as First In, First Out. CPR, which everyone assumes
means Cardiopulmonary Resuscitation, in fact means Continuing
Property Records, something accountants understand.

Writing to the Lay Reader
Whereas high tech readers do not need acronyms or abbreviations
defined, and low tech readers need a parenthetical definition, lay
readers want to avoid the confusion completely. All they want is the
definition—no abbreviations or acronyms. In fact, they might also
need follow-up explanations. Why would a homeowner in a residential area want to be told by local health authorities, “You are in danger
of DBPs”? What’s a DBP? These lay readers do not even want to be
told, “You are in danger of DBPs (disinfection by-products).” What’s a
disinfection by-product? Instead, the lay reader wants to be told that
their nearby streams contain high-acid, chlorine, and ammonia levels.

Use pronouns in
technical writing.
After all,
companies do
not write to
companies.
People write to
people!
Readers want to be
spoken to, not spoken at.
Pronouns are effective in
technical writing. You,
your, us, we, our, I, me,
and my create a
personalized tone.

Achieving Audience Recognition
Audience

Style

Example

High Tech
Peers

Abbreviations/
Acronyms OK

Please review the enclosed
OP and EN.

Low Tech
Peers

Abbreviations/
Acronyms need
parenthetical
definitions.

Please review the enclosed
OP (Operating Procedure)
and EN (Engineering
Notice).

No abbreviations/
acronyms.
Explanations
instead.

By following the enclosed
operating procedure, you
can ensure that your printer
will run to our engineers’
desired performance levels.

Lay
Readers

19
5. Accuracy
Effective technical writing must be
correct, whether grammatically,
mathematically, electronically, etc.
Errors in technical writing make the
company and the employee look bad.
More importantly, errors can lead to
damages, injuries, lawsuits, or just
embarrassment and misunderstandings.

Students must understand the importance of
proofeading
Ask your students to try these proofreading techniques:

Ode to
Spell Check...
I have a spelling checker.
It came with my PC.
It plainly marks four my revue
Mistakes I cannot sea.
I’ve run this poem threw it.
I’m sure your pleased to no,
Its letter perfect in it’s weigh
My checker tolled me sew.
—Unknown

!

!

Use the computer’s spell check—remember, however, that a spell
check will not catch form if you mean from, to if you mean too, or
except if you mean accept.
Let it sit—for a day or a weekend. When the document is cold,
students are more objective about their own writing.

!

Use peer evaluations—others will see the errors we miss.

!

Read it aloud—sometimes we can hear errors.

!

Read it backwards—then you read words out of context. You
cannot anticipate the next word.

Conclusion:
Until we tell students what we want in a technical document,
they will not give it to us. Once they know the criteria for
successful technical writing, then you can hold them accountable for these skills.

20
5-Trait Rubric

This five-trait rubric can help
in assessing student work.
Trait

0
!

CLARITY
Organization

!

!

!

CONCISENESS
Sentence fluency/
word choice

ACCESSIBLE
DOCUMENT
DESIGN
Ideas and
Content

!

!

!
!
!

!

AUDIENCE
RECOGNITION
Voice

ACCURACY
Writing
Conventions

!

!

!
!
!

1
Important points are delayed
or absent
Some Reporter's Questions
never answered
Many vague, connotative
words used
Longer words are
commonplace
Sentences average over
20 words
Paragraphs often exceed six
typed lines
Highlighting is not used
Information is not accessible
Highlighting is overused

Writer does not define
high-tech terms
Writer does not consider
audience needs
Writer never uses pronouns
to involve audience

Punctuation often incorrect
Spelling often incorrect
Excessive grammar & usage
errors distort the message

3

2
!

!

!

!

!

!

!

!

!

!

!

!

!
!

Some important points are
delayed
Some Reporter's Questions assumed understood
Some vague, connotative

Longer words used when
shorter words exist
Sentences average
15-20 words
Some paragraphs exceed
six typed lines
Some main points are
highlighted
Information is usually
accessible

Writer usually defines
high-tech terms
Writer usually considers
audience needs
Writer often involves
audience through
pronouns
Punctuation is usually
correct
Spelling is usually correct
Grammar & usage
somewhat flawed

5

4
!
!

!

!

!

!

!

!

!

!

!

!
!
!

Important points come first
Reporter's Questions
answered
Specific, denotative words
used

Words are generally one
or two syllables
Sentences average
10-12 words
Paragraphs do not exceed
six typed lines
Highlighting techniques
emphasize main points to
help access
Highlighting techniques
not overused
Writer defines all high-tech
terms
Writer considers audience
needs
Writer uses pronouns to
involve audience

Correct punctuation
Correct spelling
Correct grammar & usage

Original source: Carmen Shelly at DeSoto High School, DeSoto, KS

21
End-of-Chapter Activities
Clarity and Conciseness
Revise the italicized vague words and phrases, specifying exact
information. (Students are allowed to invent numbers.)

Specificity
Vague Word(s)

Specified

I have a low GPA.
The b-ball player was
really tall.
I’ll be home as soon as
possible.
The team has a losing
record.
The computer has lots
of memory.

Change the following long words to shorter words.

Changing Long Words to
Short Words
Long Word

Short Word

utilize

More student
activities for
clarity and
conciseness
continued on
next page...

anticipate
cooperate
indicate
initially
presently
prohibit
inconvenience

22
Clarity and Conciseness

(continued)

Change the following long phrases to one word.

Changing Long Phrases to
One Word
Long Phrase

One Word

In the event that
At this point in time
With regard to
In the first place
Is of the opinion that
Due to the fact that
Make revisions
Take into
consideration
With the exception of
Make an adjustment of

Revise the following long sentences, making them shorter.
1. I will be calling you on May 31 to see if you have any questions
at that time.
2. If I can be of any assistance to you in the evaluation of this
proposal, please feel free to give me a call.
3. The company is in the process of trying to cut the cost of expenditures relating to the waste of unused office supplies.
4. I am of the opinion that Acme employees have too much work
to do.
5. In the month of July, my family will make a visit to the state
of Arkansas.
6. It is the company’s plan to take action to avoid problems with
hazardous waste.
7. On two different occasions, the manager of personnel met with
at least several different employees to ascertain whether or not
they were in agreement with the company’s policies regarding
overtime.

23
Accessible Document Design
Ask your students to reformat the following text by using highlighting
techniques. Consider using bullets or numbers, headings, boldface or
underlining, and white space.

To make a pie chart using your word processing
package’s graphic components, turn on the machine.
Once it has booted up, double click on the word
processing icon. After the system is open, click on
“graphic,” scroll down to “chart,” and double click.
Next, click on “data chart types” and select “pie.”
Once you have done this, input your new data in the
“data sheet.” After this has been completed, click
anywhere on the page to import your new pie chart.
If you want to make changes, just double click again
inside the pie chart; then you can revise according to
your desires.

Student Activity
!

!

!

Bring a document to class.
(This could be a textbook,
technical manuals, popular
magazines, brochures, etc.)
In a small group, determine
which documents are
successfully accessible and
which documents are not.
Reformat any of the flawed
documents to improve the
document design.

Audience Recognition
Acronyms &
Abbreviations
!

!

!

Make a list of 4-6 acronyms
or abbreviations from an
area of interest. (Students
interested in computers
could list computer terms,
students in art could list art
terms, etc.)
Read these terms to see how
many of your peers
understand the high tech
language.
Define the terms for a low
tech reader and/or explain
the terms for a lay reader.

!

!

!

Bring a document to class. (This could
be a textbook from your class or other
classes, manuals found at home, popular magazines, brochures, etc.)
In a small group, determine whether
high tech terminology, abbreviations,
and/or acronyms are used successfully
and defined when necessary?
Define the terminology and/or
explain the terminology to improve
the document’s clarity.

(On the next page is an answer key for student activities
on pages 22 and 23.)

24
Answer Key
!

!

!

!

Specificity: 1.6; six foot seven; by
midnight; 3 and 12; and
16 megs.
Changing Long Words to Short
Words: use; await; help; show;
first; now; stop; problem.
Changing Long Phrases to One
Word: if; now; regarding or
about; first; thinks; because;
revise; consider; except; adjust
or fix.
Revising Long Sentences:
1. I will call on May 31, 1998,
to answer questions.
2. If I can help you assess this
proposal, please call.
3. The company is trying to cut
costs of unused office supplies.
4. I think Acme employees are
overworked.
5. In July, my family will visit
Arkansas.
6. The company plans to avoid
hazardous waste problems.
7. Twice, the personnel manager
met with six employees to learn
if they agreed with the company’s overtime policies.

25
Chapter Three

In This
Chapter...

Applications in
Technical Writing

No one type of correspondence defines technical
writing. Instead, technical
writing consists of many different types of documentation. As teachers, we can
help our students by familiarizing them with these
various types of technical
writing. This chapter includes criteria, samples,
and peer evaluation checklists for the following:

Letters

Letters
Memos
Reports
The Job Search
Brochures
Newsletters
Fliers
Graphics
PowerPoint
Presentations

Letters, which rarely should exceed one page,
are a basic form of technical writing

A successful letter will
abide by all the criteria
discussed in Chapter 2.
An effective letter will be:
clear
concise
accessible
accurate and
recognize audience*
*By defining high-tech terms and
by achieving a personalized tone.

A corporate environment will send letters (external correspondence) to
and receive letters from potential employees, vendors, clients, lawyers,
colleagues in other companies, and city, state, national, and international governments.
No matter who the reader is or why the letter has been written, a letter
should have the following eight Essential Components:
Writer’s address
Date
Reader’s address
Salutation
Text
Complimentary close
Signature
Typed name

26

On the next page is
a sample letter with
each of the essential
components noted.
Writer’s Address

ACME NutZ & BoltZ

1800 West Hardware, Wheelbarrow, KS 66244

Date
Reader’s Address
Salutation

January 15, 2004
Julie Boyle
5982 Elm
Hastings, KS 62331
Dear Ms. Boyle:
Thank you for your letter requesting information about our Acme
Nutz & Boltz service contract. The following clarifies what we
cover and the duration of that coverage.
Machinery maintenance: Free for 60 days after purchase. After
the first two months, we will provide complete maintenance
(parts and labor) for $24.00 a year up to five years. This maintenance contract requires you to bring the machinery to our shop.

Text

On-site maintenance: Free for 60 days after purchase. After the
first two months, we will service your machinery at your site for
an additional $12.00 a year up to five years.
Exclusions: We will maintain your machinery parts free for 60
days or for five years at $24.00 a year. This does not include
lubricants. You should lubricate your machinery quarterly with
2 oz. of silicon gel. You can purchase this at our parts counter.
With our expert maintenance, your machinery can last a lifetime. If
you purchase our five-year plan by the end of this month, Ms.
Boyle, we will offer you a 10% discount. Please contact our service
representative at 441-9026, ext. 1313.

Complimentary Close
Signature

Sincerely,

Becky Sandhaus
Becky Sandhaus

Typed Name

27
All-Purpose Template
In addition to the eight essential letter components, an effective letter will
also contain an Introduction, a Body, and a Conclusion (the text of the
letter). To help students understand what these three parts of a letter should
include, use the following all-purpose template:

Conclusion

Body

Introduction
Tell the reader why you are
writing and

Itemize what exactly you want
the reader to do or

What you are writing about

What exactly you plan to do

Tell the reader what’s next
Include when you plan a
follow-up action and
Why that date or time is
important

This is called the All-Purpose Template because students can use this organizational approach for every type of letter
they might write. Whether writing a cover letter for a resumé, a sales letter, or a letter of inquiry, the student will respond
to the same questions.

Type of Letter

Body

Introduction

Conclusion

Question:

Why are you writing?
Answer:

Cover
Letter

In response to a job advertisement.
Question:

Question:

What exactly do you want to
say?
Answer:

What are you writing about?
Answer:

Name the specific job opening.
(Many companies list numerous job
openings.)

The reasons why you are qualified for the job.

Question:

What is next?
Answer:

When can you meet with
the personnel director to
discuss this job opening?

Question:

Why are you writing?

Question:

Answer:

Sales
Letter

Question:

To solve a reader’s problem or fulfill a reader’s need.
Question:

What are you writing about?
Answer:

The product or service you are attempting to sell.

What exactly do you want to
say?
Answer:

The reasons why your product
or service will benefit the
reader.

What is next?
Answer:

When the reader should purchase this product or service
and why that date is important (a discount, an extended
warranty, or a discontinued
item date).

Question:

Why are you writing?
Answer:

Letter of
Inquiry

Question:

To ask your reader a question.

What exactly do you want to
say?

Question:

Answer:

List your specific questions.

What are you writing about?
Answer:

The specific topic of your inquiry.

28

Question:

What is next?
Answer:

When do you want an answer
and why is that date
important.
Letter Wizards/Templates
Microsoft Word’s Wizards/Templates might help your students more
easily write letters (and memos, fliers, resumés, etc.). Students can
access Wizards/Templates by clicking on File, scrolling to New, and
then clicking on the Letters & Faxes tab. Inside this file, they will find
templates for contemporary, professional, and elegant letters.
Wizards/Templates are good and bad. On the good side, these
templates help students format letters and provide the standard letter
components. On the bad side, however, templates can be restrictive,
limiting the students’ options.
For example, I would NEVER teach students to begin a letter with
Dear Sir or Madam. It is too impersonal and old-fashioned. Yet, the
letter wizard provides this salutation in their template. Students
should be informed of both the pluses and minuses of wizards.

Screen shot reprinted courtesy of Microsoft Corporation.

Wizards provide your
students optional layouts
for letters. On the next
page is an example of what
the Contemporary Letter
template looks like.

29
Here is what the Contemporary Letter template looks like.

Company Name Here
August 20, 2004
[Click here and type recipient’s address]
Dear Sir or Madam
Type your letter here. For more details on modifying this letter template, double. To return to this letter, use the Window menu.
click
Sincerely,

[Click here and type your name]
[Click here and type job title]

Student Activity…
After the criteria on the all-purpose template have been shared
and discussed with the students,
have them write rough drafts of
a Cover Letter, Sales Letter, or
Letter of Inquiry.
(Samples of a Sales Letter and
Letter of Inquiry follow the Peer
Evaluation Checklist.)

30

On the following
page is a
Peer Evaluation
Checklist for
a LETTER.
This checklist may be
customized,
depending on the
type of letter the
student is writing.
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

LETTER

_________________________________________
Reader’s Name

YES

QUESTIONS
1

Has the student provided the eight letter essentials?

2

Does the student’s Introduction explain why he or she is writing and what he or
she is writing about?

3

Does the student’s Body explain what exactly he or she wants or plans to do?

4

Does the student’s Conclusion explain what’s next, specifying when there should
be a follow-up action and why that date/time is important?

5

Is the letter Clear, answering reporter’s questions and specifying?

6

Is the letter Concise, limiting word length, sentence length, and paragraph
length?

7

Does the letter provide an Accessible Document Design, using highlighting
techniques effectively?

8

Does the letter achieve Audience Recognition by defining high-tech terms?

9

Does the letter achieve Audience Involvement by personalizing through pronoun usage?

10

Is the letter Accurate, abiding by all grammatical conventions?

*If the answer is no, specify what is missing and suggest a solution.

31

NO*
Sample Sales Letter

Teaching Tools
1423 Excel
Collegetown, KS 65551

July 12, 2004
Flint Lake Hills USD
6590 Lakeside Dr.
Flint Lake, KS 68621
Subject: INTERACTIVE TEACHING EQUIPMENT
Do your teachers want more hands-on activities in class? Could your
students profit from more personal involvement in their education? Now,
you can use our proven Interactive Teaching Tools (ITT) to achieve
these goals. Here is how we can help:
ITT computer-generated presentations encourage creative teaching.
The animated graphics packages (complete with 1200 images) help
teachers enliven their lectures.
ITT palm-top computers encourage student involvement. When each
student has his or her own palm-top, that student can move from
lecture to hands-on application instantaneously! Quick turnaround
equals quick understanding.
ITT software encourages shared learning. Our team-tested software
helps students learn together. When students work in teams, they
increase their knowledge, a fact proven by 2003 MIT studies in interpersonal effectiveness. This software then lets the teacher become a
facilitator rather than a lecturer.
Ask for a free demonstration and free software package today! If you
act before the next semester, we will offer you a USD 10% discount.
ITT can help your teachers to help your students.
Sincerely,
Wilkes Barry, Ed.D.

32
Sample Letter of Inquiry

Flint Lake Hills USD

July 15, 2004
6590 Lakeside Dr.
Flint Lake, KS 68621

Teaching Tools
1423 Excel
Collegetown, KS 65551
Dear Dr. Barry:

Your Interactive Teaching Tools (ITT) might be what we are looking
for to increase student involvement and encourage hands-on instruction. Before we place an order, however, we need more information.
Please answer the following questions:
1. Do your ITT computer-generated presentation packages come
with user manuals, and will you provide free training at our USD
site?
2. Do you offer quantity discounts on your ITT palm-top computers? We would like to purchase 500 palm-tops. However, we
can only do this if you give us a cost break. This is required by
our USD Purchasing Office.
3. What 1997 MIT study are you referring to? We would like a
copy of that study for our USD board. This would substantiate
your claims and help us recommend purchase.
Our Fall semester begins August 13, 2004. If you respond to our questions by July 30, 2004, we will have time to meet with our board and
consider a purchase.
Sincerely,

Walt D. McDonald, Ed.D.
Superintendent, Flint Lake USD

33
Memos

Memos differ from letters in two
significant ways
First, memos are internal correspondence, written by
employees in a company to employees in the same company. Letters, in contrast, are external correspondence,
written from within a company to outside vendors, clients,
or colleagues. Secondly, memos have a different format
than the letter essential components.

Memo components
Memos replace the eight letter essential components with
the following memo identification lines:

Teaching
Suggestion
When teaching about
writing letters, the focus is
usually on types (such as
cover letters, sales letters,
and letters of inquiry).
It is suggested that the
instructor use modes to
teach memos.
Students could write a
problem/solution, comparison/contrast, argument/persuasion, a cause/
effect, a classification or
analysis memo, etc.
This, of course, is not
mandatory. Using modes
is an easy tool since both
teachers and students are
familiar with this organizational technique.

Date is the month, day, and year in which
you are writing
To names your reader
From is your name
Subject (typed in all capitals) provides
your audience two things: a topic and a
focus. For example, a successful subject line would read as follows:
Date:
To:
From:
Subject:

Subject: VACATION SCHEDULE FOR ACCOUNTANTS
Accountants is the topic of the memo; vacation schedule is the focus.
The focus aids communication more than the topic. The topic of a
memo, for instance, can stay the same, while the focus changes. Look at
the following examples:
Subject: SALARY INCREASE FOR ACCOUNTANTS
Subject: TERMINATION OF ACCOUNTANTS
In each of these instances, the topic stays the same: Accountants.
Notice, then, how important the focus comments are. We see a huge
difference between salary increases, vacation schedules, and
termination.
In addition to the identification lines, memos differ from letters in one
other subtle way. Whereas letters are signed (essential component #7),
memos are initialed next to the From line.
Though memos and letters differ as noted, they are similar in all other
ways. Successful memos, like letters, have an introduction, body, and
conclusion. Like letters, successful memos are clear, concise, accessible,
accurate, and achieve audience recognition.

The next two pages contain sample
memos focusing on problem/solution
and comparison/contrast modes.
34
Sample Problem/Solution Memo

Date:
To:
From:
Subject:

March 15, 2004
Candice Millard
Larry Massin LMM
SOLVING PROBLEM WITH E-MAIL

Candice, as you noted in your March 13 memo, we are having problems with our e-mail. Intranet correspondence has evinced the wrong
tone, contained unnecessary spacing, and forced readers to scroll endlessly. Here are suggestions to correct these problems.
1. Improving Tone—Studies tell us that typing in all caps creates a
negative tone, called flaming. For example, when one writes,
TELL YOUR SUBORDINATES TO IMPROVE THEIR TONE IN
E-MAIL, readers feel they are being shouted at. Please ask your
colleagues to avoid typing in all capitals.
2. Omitting Unneeded Spaces—E-mail arrives looking as follows:
“Can you help
us solve
problems with odd spacing.
We can not seem
to figure out why this is happening.”
This odd spacing is caused by the different sizes of monitors.
We commonly use word wrap when writing memos and letters
because all text will exist on an 8½ X 11 inch page. Such is not
the case with e-mail. E-mail on a 12” monitor will look differently than e-mail on a 16” monitor. To avoid the problem of
odd spacing caused by different monitor sizes, do not use word
wrap. Instead, use a hard return at the end of each line, and
limit your line length to approximately 60 characters.
3. Avoiding Endless Scrolling—A memo or letter follows the
WYSIWYG factor. When we get an 8½ X 11 inch memo or
letter, What We See Is What We Get. In contrast, e-mail screens
are smaller. Readers are often forced to scroll for several screens.
This is disconcerting. To avoid this problem, limit your e-mail
to approximately 14 lines (one screen).
By using these techniques, Candice, your department’s e-mail will
improve. Please e-mail my suggestions to your colleagues by today’s
end-of-business. If I can answer other questions, just call ext. 3625.

35
Sample Comparison/Contrast Memo

Date:
To:
From:
Subject:

December 2, 2004
Lupe Salinas
Larry Massin LMM
INCREASING PRINTER CAPABILITIES

Lupe, currently our printers are backing up. This is due to increased
demands placed on the printers. Now that we have 20 new employees and 15 new accounts, our printers cannot keep up with the
demand. To solve this problem, you might want to consider the
following two options presented in Table 1:

Table 1: Printer Options
5 B/W, Dot Matrix
Printers

1 Color Laser
Printer

5 x $350=$1,750

$2,500

Printing text

Print text/graphics in color

Capacity

Printing 1 page per 2 min.

Printing 5 pages per 2 min.

Control

Only 5 users can be linked

All 35 users can be linked

Options
Cost
Capability

Both these options will meet our demands, Lupe. However, the
color laser printer, though more expensive, will save us time and
provide more quality. Let me know which option you prefer. If we
place an order before month end, we can buy this year’s model
(next year’s models will cost more).

Memo Wizards/Templates
Microsoft Word’s Wizards/Templates might help your students more easily write memos (and letters,
fliers, resumés, etc.). Students can access Wizards/Templates by clicking on File, scrolling to New, and
then clicking on the Memos tab. Inside this file, they’ll find templates for contemporary, professional,
and elegant memos.
Wizards/Templates are good and bad. On the good side, these templates help students format memos
and provide the standard memo components. On the bad side, however, templates are restrictive,
limiting the students’ options.
(See example screen shots of Memo Wizards on next page.)

36
Wizards provide your students optional layouts for memos.

Below is an
example of what the
Contemporary Memo
template looks like.

Screen shot reprinted courtesy of Microsoft Corporation.

interoffice memo
Date: 11/05/02
To:

[Click here and type names]

cc:

[Click here and type names]

From: Network Services
RE:

Following
is a Peer
Evaluation
Checklist
for MEMOS.

[Click here and type subject]

[Click here and type your memo text]

37
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

MEMO

_________________________________________
Reader’s Name

QUESTIONS

YES

1

Does the student provide the memo identification lines (Date, To, From,
Subject)?

2

Does the student’s Subject line provide a topic and a focus; is the memo Initialed
by “From”?

3

Does the student’s Introduction explain why he or she is writing and what he or
she is writing about?

4

Does the student’s Body explain what exactly he or she wants or plans to do,
using appropriate modes (problem/solution, comparison/contrast, argument/
persuasion, cause/effect, classification, analysis, etc.)?

5

Does the student’s Conclusion explain what’s next, specifying when there should
be a follow-up action and why that date/time is important?

6

Is the memo Clear, answering reporter’s questions and specifying?

7

Is the memo Concise, limiting word length, sentence length, and paragraph
length?

8

Does the memo provide an Accessible Document Design, using highlighting
techniques effectively?

9

Does the memo achieve Audience Recognition by defining high-tech terms and
Audience Involvement by personalizing through pronouns?

10

Is the memo Accurate, abiding by all grammatical conventions?
*If the answer is no, specify what is missing and suggest a solution.

38

NO*
E-mail

E-mail is rapidly
becoming one of the
world’s most
important means of
communicating in the
business place.
To succeed on their
jobs, our students
need to learn how to
write successful
e-mail.

E-mail
Benefits

Why is E-mail important?
Just look at these numbers:
140 million people will use e-mail in 2003.
E-mail messages outnumber first-class letters 30-1.
80 percent of business employees say that e-mail has replaced most
of their written business communication.
45 percent of business employees say that e-mail has replaced most
of their business-related phone calls.
66 percent of business employees say that they are e-mail only
communicators.

E-mail is similar to and different from memos
and letters
Letters are external correspondence; memos are internal
correspondence. E-mail (electronic mail), in contrast, can be both
internal and/or external. Employees can e-mail each other within
a company and/or e-mail vendors, clients, and colleagues outside
a company.
E-mail is similar to memos in that both use identification lines
(Date, To, From, and Subject), in contrast to a letter’s eight essential
components. Like letters and memos, e-mail must be clear, concise,
accessible, accurate, and achieve audience recognition.
A successful e-mail contains a subject line with a topic and a focus,
an introduction, a body, and a conclusion.

39

E-mail allows a writer to
instantly communicate
with a reader.
E-mail can be sent to
numerous readers at the
same time.
E-mail allows the writer
and reader(s) to chat with
each other online. A
real-time dialogue is
possible, whereas memos
and letters may require
days or weeks for dialogue to occur.
E-mail means no
telephone tag.

However...
A wonderful value to
the slowness of memos
and letters is that time
lets us correct errors.
While the benefits of e-mail help
companies save time and money,
things can and do go wrong.
E-mail problems
Specifically, e-mail causes the following problems:
Instantaneous communication hinders the writer’s
ability to double-check facts, effectively proofread text,
and achieve the correct tone.
—If we write something that has grammatical or mathematical errors, we can check these for correctness.

Highlighting
techniques,
such as boldface,
underlining,
italics, color,
and fonts, are not
possible for all
e-mail packages.

—If we write something that might be offensive, we can set the memo
or letter aside for awhile. Then, at a later date, we could review the
original and revise accordingly.
—E-mail, in contrast, can be sent at the push of a button. This speed
may hinder our revision.
People don’t like scrolling endlessly. Instead, e-mail should abide by
the WYSIWYG factor (What You See Is What You Get). One, viewable screen of text is better than text that only can be read when you
scroll . . . and scroll and scroll.

E-mail and computer viruses
Some can use highlighting
techniques; other e-mail
packages cannot. If a
system can use highlighting
but another system cannot,
the codes used to highlight
will garble the e-mail
message. E-mail writers
should limit themselves to:
numbering,
asterisks
indenting (by using the
tab key or the space
bar)

Computer viruses, easily spread via e-mail, make readers cautious about
opening e-mail from unknown sources. To avoid this problem, you
should use Sig. Lines in your e-mail.
These signature lines tell readers who
you are (since e-mail addresses like
BigDaddy@aol.com or
SweetBaby@hotmail.com don’t
communicate clearly).
Ideal signature lines include your name,
your organization/company, contact
information (phone and fax numbers),
and your URL and e-mail address.

40
The biggest problem in e-mail is lack of
professionalism
Students are used to writing IMs—Instant Messages—to
their friends. That’s not what we’re talking about in this
chapter. We’re discussing e-mail written in the workplace, to bosses, co-workers, vendors, and clients. In
instant messages, our students can get away with poor
punctuation and spelling.
As Diane Stafford, editoralist for the Kansas City Star,
says, “One could argue that the casual nature of instant
messaging has created a different mind-set among young e-mail users.
Perhaps the medium dictates the style, and [students] don’t think it
requires the same attention as, say, a school essay.”
But for business e-mail, those errors create the wrong image, making
employees and companies look unprofessional. Stafford continues by
stating, “job readiness education is a good thing in middle schools and
high schools…Teach [students] that what’s acceptable in instant messaging isn’t appropriate for job hunting” (C1: May 2, 2002).

Sample Business E-Mail
From: spcsupport@nuvocom.net
Date: December 30, 2003
To: Christy McWard
Subject: CREATING A NEW PROFILE
Thank you for contacting our 800-hotline. Recent online nuvocom.net updates
have modified existing customer profiles. These changes can affect your e-mail.
To solve the problems you encountered, create a new customer profile as follows:
1.
2.
3.
4.
5.
6.
7.

Click on the nuvocom.net icon to open your account.
Double click “Configure.”
Right click on “Manage Profiles.”
Scroll down to “New Profile.”
Type in your password and 6-digit PIN.
Click “Next.”
Click “Finish.”

This will allow you to access your e-mail. If you have any more questions,
you can contact us either by e-mail, at our 800-hotline, or online at
http://www.nuvocom.net/support.

On the next page is a
Peer Evaluation Checklist for E-mail.
41
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

E-MAIL

_________________________________________
Reader’s Name

YES

QUESTIONS
1

Does the student provide the e-mail identification lines (Date, To, From,
Subject)?

2

Does the student’s Subject line provide a topic and a focus; is the Address to the
e-mail’s reader correct?

3

Does the student’s Introduction explain why he or she is writing and what he or
she is writing about?

4

Does the student’s Body explain what exactly he or she wants or plans to do?

5

Does the student’s Conclusion explain what’s next, specifying when there should
be a follow-up action and why that date/time is important?

6

Is the e-mail Clear, answering reporter’s questions and specifying?

7

Is the e-mail Concise, limiting word length, sentence length, paragraph length,
line length (to no more than 60 characters), and screen length (no more than
22 lines)?

8

Does the e-mail provide an Accessible Document Design, using only such highlighting techniques as numbers or asterisks?

9

Does the e-mail achieve Audience Recognition by defining high-tech terms
and Audience Involvement by creating a positive tone (versus “Flaming”- a
negative tone)?

10

Is the e-mail Accurate, abiding by all grammatical conventions?

*If the answer is no, specify what is missing and suggest a solution.

42

NO*
Reports

Reports come in all types and sizes
Students could write long reports (over three pages) or short
reports (under three pages). They could write:
proposals to recommend the solution to a problem or to
assess the feasibility of a project
trip reports about an off-site visit
laboratory reports about the results of a procedure
status reports about their progress on a project

Whichever type of report a student writes,
whether it is long or short, it should have
the following components:
Identification lines
Date, To, From, Subject (just as with memos and e-mail). The subject
line would be typed in all caps and contain a topic and a focus.

Introduction
The introduction tells the readers what you are writing about and why
you are reporting on this topic. This and the following comments
about body and conclusion abide by the same all-purpose template
discussed earlier in the chapter.

Body
The body of the report explains what exactly you accomplished and
what problems you encountered (status report); what you saw and did
(trip report); what procedure you followed and what you learned from
the task (laboratory report); what options exist as feasible solutions to a
problem (proposal).

Conclusion
The conclusion informs the reader what’s next. This could include
what you plan to do during the next reporting period (status report),
your suggestions for the next site visit (trip report), follow-up
procedures and/or lessons learned (laboratory report), and your
recommendations to solve the problem (proposal).

43

Remember the Five
Traits of Technical
Writing When
Preparing Reports
Clarity--answering reporter’s
questions.
Conciseness--using short
words, short sentences, and
short paragraphs.
Document Design-employing highlighting
techniques to make
information accessible.
Audience Recognitiondefining high tech terms.
Throughout this chapter,
it has been suggested that
letters, memos, and e-mail
use pronouns to achieve a
personalized tone. Most
reports, in contrast, are
more objective, less
personal.
Accuracy--abiding by
grammatical conventions.
Sample Report

Reports, unlike memos and e-mail, contain first, second,
and third level headings, as you can see in this sample
report. The headings help the reader navigate text.
(A first level heading would be more emphatic than a second level,
a second level more emphatic than a third, etc.)

A first level heading
might be 11 POINT,
ALL CAPS, ARIAL,
BOLDFACE.

Date:
To:
From:
Subject:

October 3, 2004
Mr. Perry Michelson
Steve Janasz
LAB REPORT ON BACTERIA GROWTH

INTRODUCTION
Purpose
To determine the effects of antiseptics on the growth of bacteria. My
hypothesis is that Sodium Hyperchlorite (Clorox) will reduce bacteria
growth.

Materials/Equipment

A second level, to be
less emphatic, could
be 10 POINT,
INITIAL CAPS,
OMEGA, BOLDFACE.

A third level heading
might be 9 point, no
caps, Omega, Italics.

2 petri dishes
5% Clorox
soap
magnifying lens

pencil
water
paper
agar

DISCUSSION
Procedure
1. Obtain the petri dishes, then label one “control” and the other
“5% Clorox.”
2. Touch my unwashed hands to the petri dish labeled “control.”
Close the lid after touching the dish.
3. Wash my fingers in the 5% Clorox solution for 15 seconds.
4. Air dry my fingers for about 2 minutes.
5. Touch my washed fingers to the petri dish labeled “5% Clorox.”
Close the lid after touching the dish.
6. Wash my hands with soap to remove the Clorox.
7. Incubate the dishes at room temperature.
8. Record the day, date, number of colonies, and their color
for days 0 through 4.

Results
colony count
Day
Control
0
0
1
8
2
285
3
570
4
411

5%
0
0
0
0
1

color of colonies
Control
5%
off-white
none
off-white
none
off-white
none
off-white
none
off-white
off-white

CONCLUSION
From the information gathered, I conclude that antiseptics kill most bacteria.
My hypothesis is true, even though the 5% dish had one colony on day 4.

Note how the differences create a
hierarchy, much like an outline, to
lead the reader from point to point.

44

On the next page is a
Peer Evaluation Checklist
for REPORTS.
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

REPORT

_________________________________________
Reader’s Name

QUESTIONS
1

YES

Does the student provide Identification lines (Date, To, From, Subject), and does
the Subject line provide a topic and a focus?

2

Does the student’s Introduction explain why he or she is writing and what he or
she is writing about?

3

Does the student’s Body explain exactly what options he or she has considered
(proposal), what has been accomplished (status report), what procedures have
been followed (laboratory report), or what has been seen and done on the site
visit (trip report)?

4

Does the student’s Conclusion explain what’s next, specifying when there should
be a follow-up action and why that date/time is important?

5

Does the report include First level, Second level, and/or Third level Headings to
help the reader navigate the text?

6

Is the report Clear, answering reporter’s questions and specifying?

7

Is the report Concise, limiting word length, sentence length, and
paragraph length?

8

Does the report have an Accessible Document Design, including bulleted lists
and graphics, such as a table and/or chart?

9

Does the report achieve Audience Recognition by defining high-tech terms?

10

Is the report Accurate, abiding by all grammatical conventions?

*If the answer is no, specify what is missing and suggest a solution.

45

NO*
The Job Search

The Job Search Includes. . .
Finding job opportunities
Creating a resumé
Writing a cover letter/e-mail
Interviewing
Writing a follow-up letter/e-mail

Not many things are more important than getting a job.
After all, income is paramount. Our students will need to
find employment once they graduate from high school, the
community college, a college, or a university. You know
who might be best suited to help them find employment?
That’s right—their teachers, in all disciplines. We spend
more time with our students than anyone else, and we know the
students better than most people.

Online
Job Search Sites
CareerLab.com
Career City Jobs

Whether you teach physical education, industrial technology, family
and consumer sciences, agricultural education, business/computer
classes, English, or any other discipline, you are the person who can
help prepare students for their job search.

Finding job opportunities

Job Options Job Search

Where should students look for jobs? They should try the following:

NetTemps

Networking. That can start with you, your school’s counselors, and, of
course, their families and friends.

Internet Job Locator
Career Shop Job Search
Career Builder Search
HelpWanted USA
Career Magazine Jobline
Database
What other possibilities
exist? Ask your students for
their suggestions.

Career placement centers. Does your school’s counseling area list job
opportunities? Many do, and that’s a great place for students to look.
Area community colleges or local universities offer other possibilities.
Online searches. Our students are very computer/Internet savvy.
Today, a wonderful site for job opportunities is the Internet. Some
career placement experts suggest that within a few years, 95% of all jobs
will be found online (L. A. Lorek, “Searching On-line.” The Kansas City
Star. August 23, 1998: D1).
Monster.com, Headhunter.net, and Google.com, for example, let you
search for jobs by title and location. Google.com provides a link to
their cool jobs. All of these sites, and more, offer help with resumés,
interview tips, job search tips, and samples of cover and
thank-you letters.

46
Don’t forget newspapers for
your job search. Times have
changed, and jobs can be found
online, but local newspapers are
still a solid standby.
Creating a resumé
Microsoft Word’s Wizards/Templates might help your
students more easily write resumés (and letters, fliers,
memos, etc.). Students can access Wizards/Templates
by clicking on File, scrolling to New, and then clicking
on the Other Documents tab. Inside this file, they’ll
find templates for contemporary, professional, and
elegant resumés.
Wizards/Templates are good and bad. On the good side, these
templates help students format resumés and provide the standard
resumé components. On the bad side, however, templates are
restrictive, limiting the students’ options.

Screen shot reprinted courtesy of Microsoft Corporation.

47
Different types of resumés

ME!

Not that long ago, if one talked about different
types of resumés, that would have just meant
reverse chronological vs. functional. A reverse
chronological resumé would work for most of
our students, since these types of resumés are
geared toward the traditional job applicant
(recent high school or college graduates) hoping
to enter a profession for the first time.
Functional resumés are more common for older
individuals who are changing jobs or career
fields.

resu

However, nowadays, different types of resumés
refers to the format of the text versus the
content. Today, you can send three types of
resumés to prospective employers:
Traditional mail versions. This is when you
mail an 8 ½” X 11" piece of paper to an
employer. In such a resumé, the student can use boldface headings,
colored paper, italicized subheadings, bullets, etc.

Many people
consider a resumé
the perfect form of
technical writing.
Whether you write
a traditional resumé,
e-mail version, or
Internet resumé,
they will all have
many of the same
components.

An e-mail resumé. E-mail programs are different (AOL, Microsoft
Outlook, Hotmail, and Juno, for example). They use different ASCII
coding. So, what you see on your e-mail might not be what your
reader sees. Thus, e-mail resumés cannot use boldface headings,
color, italicization, or bullets.
The coding required for these highlighting techniques might create
garbled text. An e-mail resumé, on the other hand, must limit
highlighting techniques to simple tools like the use of asterisks, all
caps, and double spacing.
An Internet resumé. This resumé will be delivered online, using
HTML coding. Internet resumés are very unique, rarely following any
set pattern.
A resumé requires the writer to use each of the technical writing
techniques already discussed. A resumé must be clear, concise (since
most resumés are limited to one page), accessible, and correct.
In addition to the above concerns, a resumé would include identification
information of the writer, employment objectives, the writer’s education,
work experience, and references. (These components are further discussed on the next page.)

48
Component
Identification

Description
The writer’s name, address, phone number, and e-mail address.

Objectives

This is optional: telling what kind of employment the applicant is
seeking.

Education

List in reverse chronological order the writer’s degree (possibly at the
anticipated graduation), school, city, state, and date of graduation (or
anticipated date of graduation). The writer also could list achievements, such as GPA, honors, and/or special classes taken. (Education
does not have to come before Work Experience.)

Work
Experience

List in reverse chronological order the writer’s job title, company, city,
state, and dates of employment. The writer also could list achievements, such as special tasks accomplished (open and shut store, train
new employees, etc.), rapid promotions, number of hours worked
while in school, and special skills acquired (use ten key calculator,
computerized cash register, customer service, problem/solving skills).

References

Often noting References Supplied Upon Request is sufficient.

Incorrect information on a resumé is tantamount to lying,
which would destroy an applicant’s chances
at getting or keeping a job.
Activities
Direct your students to go online (Internet Explorer or Netscape) and
type in individual resumés in the search box. Then, look at the
different ways in which Internet resumés can appear.
—Which are good? Which are bad?
—Ask your students to make value judgments and then explain their
reasoning.
—Compare these online resumés to traditional, hard copy resumés.
What are the differences?
Ask your students to find online sites giving tips for resumé writing.
Then, in small groups, report their findings.
—What sites have they found?
—What tips are provided?

49

On the next
page is an
example
document
exemplifying the
five components
necessary for
an effective
resumé.
Sample Resumé

Leonard J. Liss
55122 Chico
Mighty Oak, KS 66312
913-455-5555

OBJECTIVE
Seeking sales employment in the computer field, using my
technical knowledge, problem solving skills, and
interpersonal communication talents

WORK EXPERIENCE
Computer Salesperson, OmniTec Computers,
1997 to present
108 South Rd., Clayton, KS
Provided computer training for new customers
Exceeded my 15% sales quota each month
Installed and repaired customer computers
Computer Technician, U-Bet-Your-Byte, 1996-1997
2111 Elm St., Mighty Oak, KS
Repaired all computer makes and models
Received a letter of commendation from my boss
Stocker/Checker, USack Groceries, 1994-1996
786 Summer Rd., Mighty Oak, KS
Worked second shift (4:00p.m.-11:00p.m.) while
going to high school full time
Earned enough money to pay for my own car and
insurance
Promoted to Head Stocker within three months

EDUCATION
GED, Mighty Oak Alternative Education High School, 1997
Completed my degree while working 30 hours a week
Clayton High School, Clayton, KS, 1994-1996
Member of the Computer Club
Built own computer
Maintained a 3.0 GPA while working over 20 hrs./wk.
References supplied upon request

50

On the following
page is a Peer
Evaluation
Checklist for the
RESUMÉ.
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

RESUMÉ

_________________________________________
Reader’s Name

YES

QUESTIONS
1

Does the student provide Identification lines (Name, Address—Street, City, State,
ZIP Code—and Phone Number)?

2

Does the student’s Objective section explain what kind of job he or she hopes
to find?

3

Does the student’s Education section explain in reverse chronological order
exactly what degree he or she has, which school has been attended, where that
school is located, and when the student graduated (or plans to graduate)? This
section also can list educational achievements.

4

Does the student’s Work Experience section explain in reverse chronological
order exactly what his or her job title is, which company the student worked at,
where this company was located, and the dates of employment? This section also
can list achievements on the job.

5

Does the resumé include a References section?

6

Does the resumé include First level, Second level, and/or Third level Headings to
help the reader navigate the text? For example, the student’s name would be a
first level heading, and “Objectives,” “Work Experience,” and “References”
would be a second level heading.

7

Is the resumé Clear, answering reporter’s questions and specifying?

8

Is the resumé Concise, limiting word length and omitting sentences?

9

Does the resumé have an Accessible Document Design, including bulleted lists
and white space?

10

Is the resumé Accurate, abiding by all grammatical conventions and making sure
that all dates, degrees, job titles, addresses, and phone numbers are correct?

*If the answer is no, specify what is missing and suggest a solution.

51

NO*
Writing a cover letter/e-mail

The Cover
Letter
Customizes
the Job
Search

Every resumé, whether traditional, e-mail, or
Internet, should be prefaced by a cover letter.
This is important for two reasons: the cover letter
or cover e-mail customizes the job search, and the
cover letter highlights the student’s value.
Students will use the same resumé regardless of
which job they are applying for.
The cover letter, in contrast, should be written for
a specific job opportunity. Thus, whereas the
resumé is generic, the cover letter or e-mail will
highlight how the student is truly the best hire for
that specific job.
To accomplish this goal, the student will use the
cover letter to focus on how he or she can fulfill
the requirements of the job as it has specifically
been advertised.

What a cover letter should accomplish
Activity
—Ask your students to find
online sites giving tips for
cover letters.

The cover letter should accomplish the following (see pages 26-33 for
more information on letters):

—Then, in small groups,
report their findings.

1. Essential components of a letter (writer’s address, date, reader’s
address, salutation, text, complimentary close, signature, and typed
name.) If the student is sending the resumé via e-mail, then these
components will change—no address, salutation, or signature
will be required.

—What sites have they
found? What tips are
provided?

2. Introduction. Tell why you are writing and what you are writing
about. This will tell the reader that you are applying for a job (that’s
the “why”) and which job you are applying for (that’s the “what”).
3. Body. Tell what exactly makes you the best candidate for the job.
List the ways in which you specifically meet the advertised criteria.
4. Conclusion. Tell what’s next. When would you like to set up an
interview to discuss your credentials?

On the next page is
the text of a Sample
Cover Letter
52
Sample Cover Letter Text

Dr. John Smith, my physical education teacher at Bluff High School, informed
me of an opening for an umpire in the Bluff City Parks and Recreation Summer
3-2 Baseball League. Please consider me for this position.
Though I have attached a resumé, let me highlight my skills:
1. I played varsity baseball for Bluff High School, lettering for three years.
2. I was all-city second team catcher.
3. I have two years experience as a referee for youth soccer.
4. I was the assistant coach for my brother’s little league baseball team for
two years.
Eventually, I hope to get my teacher’s certification and coach high school
baseball. I am positive that my background and motivation will be an asset to
your Summer League. Could we meet to discuss my credentials and interest?

Interviewing

Activities
—Ask your students to find
online sites giving tips for
interviewing. In small
groups report: what sites
have they found? What
tips are provided?
—Ask your students what
questions they might be
asked on a job interview.

With luck, your student will write a cover letter/e-mail and
resumé effective enough to get an interview. Then the next
challenge occurs—landing the job. You can help by
working with your students on interview/oral presentation
skills. Basically, interviewing requires common sense:
Arriving on time
Dressing appropriately
Looking people in the eye when speaking
Sitting and standing straight
Not smoking or chewing gum during an interview

Be Prepared. . .
Be prepared to answer questions (“Why do you want
this job?” “What skills can you provide us?” “Why
did you leave your last employment?” “What makes
you right for this job?”)
Be prepared to ask the right questions (salary range,
hours, tasks, chains of authority, etc.)

—Try mock interviews in
the classroom.

53
Activity
Ask your students to find
online sites giving tips for
follow-up letters.
In small groups report:
what sites have they
found? What tips are
provided?

Writing a follow-up letter/e-mail
A follow-up letter serves several purposes:
Reminds the reader of your continued interest
Politely thanks the reader for his or her time
Allows you to highlight additional reasons why you are the best
person for the job
These letters or e-mail do not have to be long. In fact, just a few
sentences will suffice.

Instructions

The only people who read instructions are
those who need help performing the task
In a recent survey (Gerson & Gerson), 454 professional
technical writers nationwide were asked which type of
documentation they most often wrote. The writing of
instructions was named by 90.1% of them.
Instructions (or procedures) tell the reader how to do something. This could include programming a VCR, repairing a
broken bicycle, installing speakers in a car, making a clock in
industrial technology, performing a science experiment, or
throwing a pot in a ceramics class.

To write effective instructions, students again must create
clear, concise, accessible, and accurate text which achieves
audience recognition. The latter point, audience recognition, is especially important in instructions. If we knew how to do it, we would not
need to read the text.
Successful instructions often are much more detailed than the ones presented here.
1. Obtain the petri dishes, then label one control and the other 5% Clorox.
2. Touch my unwashed hands to the petri dish labeled control. Close the
lid after touching the dish.
3. Wash my fingers in the 5% Clorox solution for 15 seconds.
4. Air dry my fingers for about 2 minutes.
5. Touch my washed fingers to the petri dish labeled 5% Clorox. Close the
lid after touching the dish.
6. Wash my hands with soap to remove the Clorox.
7. Incubate the dishes at room temperature.
8. Record the day, date, number of colonies, and their color for days 0-4.

54

The following
pages illustrate
the components
and attributes
generally found
in successful
instructions.
Components of Instructions
Title

Graphic to
Represent Topic

Introduction

Plant Cuttings
Instructions
With a cutting from a favorite plant, you
will be able to grow that plant forever!

Required Tools
Tools & Equipment

Propagation Pot
Potting Soil
Cloning Gel
Razor Blade
Water

Instructions
1. Cover the bottom of your propagation pot with at least
3" of potting soil.
2. Select your plant for the cutting. NOTE: Pick the
healthiest plant you can find.
3. Choose a branch or stem with 2 or 3 sets of leaves.

Numbered Steps
Begin with a Verb

4. Using your razor blade, make a 45-degree angle cut
next to a leaf node (that’s where the branches leave
the stem).
5. Immediately dip the cutting in your cloning gel to
prevent an air bubble from entering the stem.
6. Place the cutting in the propagation pot, inserting the
cutting at least 2" into the potting soil.

Cautions

7. Moisten the soil. Do Not over water.

Enjoy your plants for years
to come
Conclusion

55
The steps of
procedure
are the most
important aspect
of any
instructions.
Each step should be
numbered.
An action verb should be
used to begin each step.
Each step should have
specificity of detail for
clarity.
Short words and
sentences help achieve
conciseness.

Sample Instructions

How to Yo-Yo
Yoo-Y

Yo-yoing is FUN! But it takes
practice. Learn how to yo-yo by
following these steps.
What Do You Need?

Any yo-yo will do. Be sure to buy one that will sleep (stay
down) when you try to “walk the dog.” So the string can’t be
tied or glued at the bottom. It must be loose enough to spin.

Steps for Yo-yoing Successfully
1. Make about a ½ inch loop with the
string, and then tie a knot. Pull about
2 inches of the string through the loop.
2. Put your middle finger through the loop
(between your first and second knuckle) and
pull the string tight.

The use of graphics helps
the reader understand
each step.
Previously discussed
attributes of accessibility,
audience recognition, and
accuracy are important in
writing successful
instructions.

Accurate and
correct information
when writing
instructions can
mean the difference
between life and
death. Just ask any
health practitioner.

3. Holding the yo-yo in your palm (with the
palm facing up), throw your hand down,
letting the yo-yo drop from your hand.

4. When the yo-yo reaches the bottom, twist
your hand counterclockwise so the palm is
now facing down.

5. To return the yo-yo to your hand,
jerk your palm up.

On the next page is the Peer Evaluation
Checklist for INSTRUCTIONS.

56
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

INSTRUCTIONS

_________________________________________
Reader’s Name

Questions

YES

1

Does the instruction include a Title, mentioning the topic to be discussed?

2

Does the Title Page include a Graphic representing the topic?

3

Has an Introduction been included, explaining why the instruction will be
performed?

4

Have required Tools and/or Equipment been listed?

5

Has the writer provided Numbered Steps?

6

Do steps begin with Action Verbs?

7

Is each step clearly developed with Specific Details?

8

Are Hazards (warnings, dangers, cautions, notes) provided?

9

Are Graphics used to help the readers understand the steps?

10

Is a Conclusion provided to sum up the instruction?

*If the answer is no, specify what is missing and suggest a solution.

57

NO*
Web Pages

Technical writing is no longer
bound to hard copy
More and more, technical writing is online.
One component of this growth is the Internet,
which has generated a variety of occupations
related to design, development, and
maintenance of websites.
How rapidly are such jobs growing? Computer
and data processing services are projected to be
the fastest growing industry in the U.S.
economy. In fact, web design, responsible for
the creation of websites, is among the 10 fastest
growing occupations. (Occupational Outlook
Handbook, 2002.)

“I have been teaching
composition and technical
writing for about twenty-five
years. In that time, I rarely
have heard students gasp with
joy upon writing an essay,
memo, or letter. Students
actually gasp when they see
their hypertext go online.”

There is another reason to teach web pages, in
addition to good job training: IT’S FUN!
With Wizards, teaching web design has never
been easier
If your students are using Microsoft Word, they can access a web pages
template. The students just open Microsoft Word, click on File, scroll to
New, select the Web Pages tab, and they’re there. Wizards will allow
students to create various types of websites and easily save their work as
an HTML document.

Screen shot reprinted courtesy of Microsoft Corporation.

58
On-line vs. hard copy
The Internet is very different from traditional means of communication, such as books, magazines, and journals. Books, for example,
require that we read chronologically and linearly. That is, we must
read a book from beginning to end (chronologically) and line by line
(linearly). That’s the way it is; that’s the way it’s always been.
The Internet, however, allows us to read differently: randomly. With
hypertext links, you can jump to any page within a website, in any
order you prefer.
There is no page 1 or page 2, nor is there a beginning or an end.
Then, once within a web page, you should be able to scan the text
(reading it at a glance) rather than read it line by line. The Internet is a
paradigm shift in communication.

Think of it this way: the
Internet is like your hand
with individual pages (at
each fingertip) hanging
randomly. You can access
the pages in any order.

Criteria for web pages
All web pages are not equal. Some websites on the Internet are awful,
while others are very successful. To create an effective website,
students should abide by the following criteria.
Home Page. When you arrive at a website, by typing in its URL
(Uniform Resource Locator, the website address), you should see:
A title of the product or service
Contact information: street address, e-mail address, phone number,
and/or fax
A graphic representing the topic
An introductory lead-in telling readers who the company is and/or
what the product or service entails
Hypertext links (leading to the linked screens, the major text and
development for the website)

59

Start at the top left and end
at the bottom right.
Criteria for web pages

(continued)

Page Layout. A successful web page should only use about 2/3 of the
screen for text. It’s hard for anyone to read an online page from margin
to margin due to a number of challenges. These include monitor
resolution, scrolling, glare, pixel distortion, animation, etc. To solve
these problems, limit line length, using about 1/3 of the screen for your
navigation bar and 2/3 for the text.
Navigation. Online, readers can’t turn pages, so they need some way to
get from screen to screen. You help them by providing:
A “Home” button on each web page
A navigational bar or separate hypertext linked words or icons to all
web pages within the website
Highlighting Techniques. You want to tastefully and judiciously use any
of the following techniques to design your website. But remember, a
little goes a long way:
Colored or patterned backgrounds. Be sure the text is clearly legible
by striving for “optimum contrast”—black text on a white background
or yellow text on a blue background, for example.
Horizontal divider lines
Iconic bullets
Colored text
Different font sizes (first level headings, second level headings, etc.)
Tables and figures
Conciseness, using short words, short sentences, and short paragraphs.
Again, this is important because people have trouble reading text online
and readers want to skim.
Clarity, answering reporter’s questions and providing specific
information.
Tone, through positive word usage and personalized pronouns. The
Internet is a very friendly communication medium.
Audience Needs, by defining terms, using the appropriate tone, and
developing ideas at the appropriate level. You can accomplish this by
deciding if your readers are high tech, low tech, or lay.
Grammar. The Internet is the World Wide Web. Remember that when
you communicate online, you are communicating to the WORLD. Do
you want everyone to see your grammatical errors?

On the next page is a
Sample Web Page
60
Sample Web Pages

Technical
ProfCOM Technical
Services
Writing Services
HOME
PRICES
OPTIONS

We’re “Write” For You!

REFERENCES

1818 Elm
City,
Kansas City, KS
816-555-2121

Creating a web page
allows the students to
practice good technical
writing skills (clarity,
conciseness, document
design, etc.).
More importantly, by
teaching students how to
create a website, you can
help prepare them for a
growing and profitable
career.

The home page has four, hypertext links: Home, Prices, Options, and
References. Plus, it has:
a left-margin navigational border
a title for the company
a logo representing the company’s services
a clever introductory lead-in
contact information
An example of one of the linked pages looks as follows:

Note the design of
this web page:

Technical
Services
ProfCOM Technical Writing Services

PRICES
HOME
PRICES
OPTIONS
REFERENCES

Projects

Costs

Technical Writing
Technical writing
Editing, proofreading
Software documentation
Online Help

Web Design
Website and page design
Web-writing
Web-writing training

$25 per hour

$45 per hour

61

On 1/3 of the screen is
the navigation bar,
including the hypertext
links
On the remaining 2/3 of
the screen, you have the
name of the company, the
company logo, a title for
the web page (prices),
and then the text
The text is provided in an
easy-to-access manner,
using a table and lots of
white space
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________

WEB SITES

Reader’s Name

YES

QUESTIONS

1

Does the Home Page contain:
A title of the product or service?
Contact information—street address, e-mail address, phone number, and/or fax?
A graphic representing the topic?
An introductory lead-in telling readers who the company is and/or what the product or
service entails?
Three or more hypertext links (leading to the linked screens—the major text and
development for the web site)?

2

Does the web site contain 3 or more linked pages identified on the home page?

3

Do the Linked Pages contain the following:
A title for each page, allowing the reader to know where he or she is
Text, developing this page’s points

4

Does the web site provide successful Navigation, including:
A Home button on each web page?
Navigational links (a navigational bar or separate hypertext linked words or icons) to all
web pages within the web site.

5

Does the web site tastefully and judiciously use:
Colored or patterened backgrounds (be sure the text is clearly legible)
Horizontal divider lines
Iconic bullets
Colored text
Different font sizes (first, second, and third level headings, etc.)
Tables and/or figures

6

Is the web site Concise (short words, short sentences, and short paragraphs; limiting the
text to no more than two-thirds of the screen)?

7

Is the web site Clear (answering reporter’s questions and providing specific information)?

8

Does the web site achieve an effective Tone (through positive word usage and personalized pronouns)?

9

Does the web site address its specific Audience Needs by:
Defining terms?
Using the appropriate tone?
Developing ideas at the appropriate level?

10

Has the web site avoided Grammatical Errors?

*If the answer is no, specify what is missing and suggest a solution.

62

NO*
PowerPoint
Presentations

PowerPoint is an amazingly valuable
and versatile tool
You can do so much with PowerPoint including oral
presentations for reports, user manuals, and websites.
Teaching students how to create PowerPoint
presentations helps them become more familiar with
technology (more and more important every day on the
job) and helps them practice good technical writing
skills: clarity, conciseness, document design, audience,
and accuracy.
Plus, every computer has PowerPoint, so it’s easy for
students to access and use. In fact, PowerPoint
presentations are a wonderful option to websites
(which can be very difficult due to computer
challenges).

Criteria for PowerPoint
More About Fonts…
Weird but interesting fonts,
like Gallery, Old
English, or Yearbook
Outline, are not only hard
to read but also will not
always be compatible with
whatever computer you
might use to show your
presentation.
Script fonts, like NevisonCasD,
Lucida Handwriting,
or Challenge, are almost
totally unreadable in
PowerPoint.

Fonts. Use common fonts, such as Times New Roman, Courier, or
Arial. In fact, Arial is considered the best to use, since sans serif fonts
(those without feet) show up best in PowerPoint. Use no more than
three font sizes per slide.
To make your slides legible, use at least between 18-point font size and
24-point. Bigger is better, however. Titles can be in font sizes 48-54;
main text titles in 32 point; smaller text lines in 24 point.
Color. Never use red or green text (individuals who are color blind
can’t see these colors). Use color for emphasis only. Strive for optimum
contrast between your text and your background colors. In fact, a dark
background with light text gives the best contrast in PowerPoint. For
example, white and yellow letters look great on a blue background.
Text. As with all good technical writing, the fewer the words, the better.
Strive for open white space. Limit the text to six or seven lines per slide
and six or seven words per line (think “6 X 6”). Two or more short and
simple slides of text are better than one slide with many words. Use no
more than 40 characters per line (a character is any letter, punctuation
mark, and/or space). Use headings for each slide.
Graphics. Use graphics instead of tables. Keep your graphics simple.
A graph that is too complicated, containing too much information, will
not be easy to read or understand.

63
Whatever
techniques you use
to create your
PowerPoint
presentation, be
sure to test it on
two or three
different projection
systems or
computers. Rather
than be surprised,
be prepared.

Criteria for PowerPoint (continued)
Emphasis techniques. To call attention to a word or phrase or idea, use
color (sparingly), boldface, all caps, and/or arrows. But don’t overdo it.
A little goes a long way. Animation can be effective, but do not use
every special effect (sounds and fade-ins). Pick one effect and use it
consistently.

Sample PowerPoint Slides

Heading

Simple Graphic

On the next page is
the Peer Evaluation
Checklist for
POWERPOINT
PRESENTATIONS.

Source of Information

5 lines of text
32-point Arial

Note: All numbers given in this
report are from the March 6, 2001
Distance Learning Enrollment
Report, prepared by the JCCC
Office of Institutional Research.

64
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________

POWERPOINT

Reader’s Name

PRESENTATIONS

_________________________________________
Reader’s Name

YES

QUESTIONS
1

Does the presentation include headings for each slide?

2

Is an appropriate font size used for easy readability?

3

Is the appropriate font type used for easy readability (Arial, for example, vs.
a script font)?

4

Are no more than 3 different font sizes used?

5

Has color been used effectively for readability and emphasis, including font
color and slide background?

6

Have special effects been used effectively (vs. being overused)?

7

Has text been limited on each screen (remembering the 6 x 6 rule)?

8

Are graphics sized correctly for readability, avoiding ones that are too small
and/or too complex?

9

Have highlighting techniques (arrows, color) been used to emphasize key points?

10

Have you avoided grammatical errors?

*If the answer is no, specify what is missing and suggest a solution.

65

NO*
Brochures

Brochures are omnipresent!
When you go to a hotel, an amusement park, a historical landmark (like the Eisenhower Library in Abilene,
the capitol in Topeka, or Boot Hill in Dodge City), a
zoo, a museum, or a college campus, do you pick up a
research paper at the door, explaining the site’s unique
traits?
When you receive news from KNEA, TIAA, CREF, or
any of your stock companies, do you get this information in a research paper? No, you do not. You either
pick up a brochure at the door or receive a newsletter
in the mail.

Many computer programs
allow students to format
brochures automatically. If
you do not have this capability, it is no less demanding than setting up columns
on a computer and printing
as landscape versus portrait.
If this cannot be done, then
the students will need to
type and fold the pages
accordingly.
Brochures can be any size,
from a back and front
8½” X 3" card to four-panel
or six-panel layout.
Back

Front

Criteria for brochures
Title Page (Font Panel). Include these three things:
Topic: In the top one-third of the panel, name the topic about
which you’re writing (product name, service, etc.).
Graphic: In the middle third of the panel, include a graphic to
appeal to your reader’s need for a visual representation of your
topic. The graphic will sell the value of your subject (its beauty, its
usefulness, its location, its significance, etc.) or visually represent the
focus of your brochure.
Contact Information: place contact information on the bottom third
of this panel. You could include your name, your company’s name,
street address, city, state, zip code, telephone number, fax number,
and/or e-mail address.
Back Panel. The back panel may include any of the following:
Conclusion: Use this panel to summarize your brochure’s content,
highlighting your topic’s benefits or suggesting a next step for your
readers to pursue.
Mailing: This panel could be used like the face of an envelope. On
this panel, when left blank, you could provide your address, a place
for a stamp or paid postage, and your reader’s address.

Inside
Fold-In Back Front

Coupons: As a tear-out, this panel could be an incentive for your
readers to visit your site or use your service. Here you could
provide discounts or complimentary tickets.
Location: Provide your address, hours of operation, phone
numbers, e-mail, and a map to help them locate you.

Inside

66
Criteria for brochures (continued)
Body Panels (Fold-in and Inside)
Provide headings and subheadings.
Use graphics (photos, maps, line drawings, tables, figures, etc.).
Develop your ideas. Consider including the following information, dependent upon your topic:
—Locations, maps, directions
—Technical Specifications and warranties
—Prices and payment plans
—Credentials and company history
—Unique Characteristics of the product or service
—Personnel biographies and employment opportunities
—Options
—Delivery (Dates/Methods)
Document Design. Try using only three or so different highlighting
techniques for your document design. These options could include:
Color and graphics/tables
Font changes
Though you want to make your brochure
Horizontal rules
interesting to look at, you don’t want to
Bullets
overdo the use of highlighting techniques—
too much of anything is always a problem.
Borders
Italics and boldface
Clarity. Remember to be specific and answer reporter’s questions
(who, what, when, where, why, how).
Conciseness. Due to the limited size of each of your panels, you must
limit your words (1-2 syllables), paragraphing (4 types lines), and
sentence length (10-12 words).
Audience Recognition. Who are you writing to? Is your audience
high tech, low tech, lay, or combinations of the three? To avoid
problems, define any terminology, abbreviations, and/or acronyms
which could cause confusion.
Audience Involvement. Brochures are very friendly methods of
communication. You want to personalize your text through pronoun
usage and contractions.
Accuracy. Your brochure might be the only thing a potential
customer ever sees about your company. You want to make a good
first impression. Poor grammar, in contrast, will make your company
look very bad. Proofread to avoid any grammatical errors.

67

Teaching Tip
Teaching research papers is
important because research
is a valuable skill for
students. However, that
research can be packaged
in a different form, one
more commonplace in
society.
How about teaching your
students research, not by
assigning a traditional
essay, but by having the
students write a researched
brochure or newsletter?
Doing so is more fun and
lets the students create a
type of communication that
they see in the mail and at
local points of interest.
Doing so also lets the
students practice technical
writing skills, including
document design, clarity,
conciseness, audience
recognition, and grammatical correctness.
Sample Brochure Cover

The Kansas State Department
of Education presents

○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○

A premier staff development
opportunity focusing on developing
appropriate and effective test items,
including multiple choice, true/false,
matching, completion, and essay. Each
participant will receive a copy of. . .

Is This a
Trick
Question?

Students can
create
brochures
for a number
of topics.
They could write brochures about businesses
in their community,
historic landmarks, parks,
museums, zoos, day care
centers, geriatric homes,
or hospitals.
They could create brochures about their school
organizations, such
National Honor Society,
Art Club, Drama Club.

A Short Guide
to Writing Effective
Test Questions

The students could make
brochures based on
fiction they are reading,
focusing on the characters, settings, and/or
themes.
They could create a
brochure about an author
they are studying. The
list is endless.

Interested?
Want More Information?
Contact:

Dr. Mary Ann Smith
Workshops Coordinator
Washburn University
785-231-1010 x1895
e-mail: zzmasmith@washburn.edu

More details inside. . .

68

Following
is a Peer
Evaluation
Checklist for
BROCHURE.
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

BROCHURES

_________________________________________
Reader’s Name

QUESTIONS

YES

1

Does the brochure’s Title Page (front panel) include the following:
Topic—in the top one-third of the panel, the topic about which you’re writing
Graphic—in the middle third of the panel, a visual representation of your topic
Contact Information—on the bottom third of this panel, including your company’s
name, street address, city, state, zip code, telephone number, fax number, and/or
email address

2

Does the brochure’s Back Panel include at least one of the following options:
Conclusion—summarizing your brochure’s content, highlighting your topic’s benefits,
or suggesting a next step for your readers to pursue
Mailing—providing your address, a place for a stamp or paid postage, and your
reader’s address
Coupons—as a tear-out, acting as an incentive for your readers to visit your site or use
your service
Location—providing your reader with your address, hours of operation, phone numbers, email, and a map to help them locate you

3

Does the brochure’s Body Panels (fold-in and inside) accomplish the following:
provide headings and subheadings
use graphics (photos, maps, line drawings, tables, figures, etc.)
develop your ideas

4

Does the brochure use Highlighting techniques for access and visual appeal?

5

Does the brochure have a Positive Tone:
insuring that pleasant, interpersonal communication is achieved
motivating the reader to action

6

Is the brochure Personalized using pronouns and contractions?

7

Does the brochure Recognize Audience by defining high-tech terms?

8

Is the brochure Concise, fitting in each panel by using:
short words
short sentences
short paragraphs

9

Is the brochure Clear:
achieving specificity of detail
answering reporter’s questions

10

Does the brochure avoid Grammatical Errors?

*If the answer is no, specify what is missing and suggest a solution.

69

NO*
Newsletters

Newsletters can be
one page or more.
As with brochures,
newsletters can
help students
practice technical
writing skills:
clarity
conciseness
accessible
document design
audience
recognition
accuracy.

Why have students write
newsletters? Because we get
many more newsletters in the
mail than we get research
papers. Newsletters are
everywhere; someone writes
them and gets paid to do so.

Criteria for newsletters
1. The Flag
Include the following:
title of your newsletter
the date of its publication
perhaps the publication volume and issue number
The Flag will be placed at the top of your newsletter in a bold, large
font.
2. Columns
Divide your newsletter into two to three columns. Strive for variety;
the top half of the page could have two columns while the bottom
half would use three, for example.
3. Headlines and Subheadings
Help your readers navigate the text by providing the following:
a headline for the major article on page one
first-level headings for all other articles
second-level subheadings
In your headings and subheadings, use present tense, avoid
excessive punctuation, omit titles (such as Dr., Mr., Mrs., Ms.),
avoid abbreviations and acronyms, use strong verbs, and use short
words and phrases.

70
Criteria for newsletters (continued)
4. Pop-Up Quotes
Gain your reader’s interest through pop-up quotes. These “talkbubbles” or “pull-out quotes” are usually:
! printed in larger front than the articles
! centered on a page or within a column
! printed inside a border
! printed in a different color

Teaching Tip
!

5. Sidebars
Add variety to your page layout through sidebars. These are often
shaded or gradient-colored textboxes which present late-breaking,
additional, and/or contrasting short news items.
6. Table of Contents
Include a table of contents to help your readers find information
within the newsletter.
7. Initial Caps

M

any newsletters begin each article with an initial cap for
visual appeal. Use these larger, capital letters to preface the first
word of the first sentence of an article—as shown in this paragraph.

!

Newsletters can be written
about a host of topics.
Rather than assigning
another staid research
paper, why not ask
students to research a
topic and turn it into a
newsletter.
They could research
historical figures, literary
figures, national parks,
vacation spots, businesses
in their community, or
school-related
organizations.

8. Newsletter Style
As in all effective technical writing:
! limit your word length (one-two syllables)
! limit sentence length (10-15 words)
! limit paragraph length.
(The length of paragraphs is especially important when writing a
newsletter, since columns make your writing more cramped. You
want to limit your paragraphs to four to six lines.)
9. Highlighting
Add interest to your newsletter by including typical highlighting
techniques, such as:
! tables and figures
! font changes
! bullets
! numbering
! boldface and italics.
10. Accuracy
Proofread to avoid grammatical errors.

71

On the next page is
a Sample Front Page
of a Newsletter.
This is followed by a
Peer Evaluation
Checklist for
Newsletters.
Sample Newsletter Front Page

Parrot Beach National Park
Newsletter
October 25, 2003

Sand, Surf, and Shells!
Inside. . .
Parrot Beach offers you many benefits.
Meet Our Staff ......................................... 2

These include 27 miles of sand, gently
rolling surf (with waves that rarely top 5
feet), and one of the state’s best collections
of seashells. The beach’s shells include
“collector items like starfish, conch,
murex, mussels, and nautilus shells”
(Shoults 25). Parrot Beach also offers
many activities such as “bike riding,
swimming, skating, sailing, and sand
volleyball” (Weese 9).

Calendar of Events ................................... 3
Visitors Reactions ..................................... 3
Current & Future Projects ......................... 4

History of Parrot Beach

R

ecognized as a national park by Theodore
Roosevelt in 1908, Parrot
Beach had been a hunting
ground for the Seminole
Indians and then a favorite
haunt for pirates and
buccaneers (Herrman 16). The president saw
its natural grandeur and sought to save its beauty
for generations to come.

How to Get There
We’re in the center
of it all, just ten miles
from Tampa.

The island is 27 miles long by 3 miles wide.
The highest point in the island is only 10 feet
above sea level (Shoults 12). This has caused
problems during hurricane weather, when the
island is in the most danger from flooding.

"

The Parrot Habitat
One unique feature of Parrot Beach is its
bird sanctuary. Here, injured and
orphaned parrots are rehabilitated. Parrots
can be hurt by hunters, by “ingesting nylon
fishing lines” or by pollution (Shoults 34).
The habitat uses donations to educate
tourists and to provide care for the birds.
The habitat is open year round and
provides guided tours.

To solve this problem, a seawall was built in
1927. The wall is “12 feet high, 10 feet wide at
its base, and 5 feet wide at the top. The concave
design allows waves to roll back into the Gulf
of Mexico” (Weese 2).

Works Cited
Herrman, Jess. Teddy. Boston: Polar House Pub., 2000.

The sunsets are
spectacular!

Shoults, Whit. Parrot Beach. New York: Ornxy, 1998.
Weese, Sarah. Seawall Design. Waco: Baylor Univ. Press, 1999.

72
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________

NEWSLETTERS

Reader’s Name

QUESTIONS

1

YES

NO*

First Page
Does the first page provide a Flag that names the newsletter and gives the date, volume,
and issue number?
Does the first page provide a table of contents to help the reader find information
throughout the newsletter?
Is the headline story the most important article in the newsletter?
Text
Are headings used effectively to clarify the article’s content as well as to arouse the
reader’s interest?
Do the headings:
! use present tense instead of past?
! avoid excessive puncutation?
! omit titles, such as Dr., Mr., Mrs., and Ms.?
! avoid abbreviations and acronyms?
! use strong verbs, short words, and phrases?

2

Are sidebars used to introduce short additional, contrasting, and/or late-breaking
information?
Is the text clear, answering reporter’s questions (who, what, when, where, why, how)?
Does the newsletter meet the writer’s goals?
! create awareness of the company, product, or service
! increase understanding
! advertise new aspects
! change negative attitudes
! show ways in which the topic surpasses the competition
! inform the reader of new information
Access
Are subheadings used to break up blocks of paragraphing and to help the readers
navigate the text?

3

Do the headings and subheadings vary font sizes and type for emphasis and visual
appeal?
Are bullets and numbers used to itemize ideas for better access?
Has ample white space been used to help the reader access information and to make
reading easier?
Has color been used effectively for visual appeal?

*If the answer is no, specify what is missing and suggest a solution.
Continued on next page…

73
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________

NEWSLETTERS

Reader’s Name

QUESTIONS

YES

Access (continued)
Have photographs, figures, and tables been used to add interest as well as to make
information more clear?

3

Have pop-up quotes been used for interest and clarity?
Has the newsletter varied its use of two and three columns?
Have color, shading, and/or gradients been used for interest?
Have initial caps been used at the beginning of an article or new paragraph for interest,
visual appeal, and to call attention to a new idea?

4

Style
Is the text concise, using:
! short words (one to two syllables)?
! short sentences (10-15 words long)?
! short paragraphs (preferably no longer than six lines)?
Audience
Are all unfamiliar terms defined?

5

Is the level of writing appropriate for the audience (high tech, low tech, lay, multiple
readers)?
Has the appropriate tone been achieved through positive words and personalized
pronouns?

6

Accuracy
Is the technical content correct, verified by peer review?
Is the newsletter grammatically correct?

*If the answer is no, specify what is missing and suggest a solution.

74

NO*
Fliers

Fliers get the word out!
Fliers, as small as a postcard or as large as one, 8½ x 11
page, are external correspondence sent to prospective
or existing customers. Fliers, usually limited to one,
very specific topic, highlight a way in which you or
your company can meet a customer’s unique needs.

How could your students use fliers?

Fliers were the dominant
form of advertising in the
nineteenth and early
twentieth centuries.

Fliers are effective for inviting parents to orchestral
concerts, dramatic plays or musicals, or dance team
recitals. Agricultural Education students could create
fliers about hydroponic plants; Family and Consumer
Science students could create fliers about food products, nutritional
ideas, or clothing construction; Industrial Technology students could
create fliers about robotics, aviation, or computer-aided drawing.

Fliers come with easy-to-use Microsoft Wizards
As always, the students would open Microsoft Word or Microsoft
Publisher. In Word, the students would click on File, scroll to New,
click on the Direct Mail Manager tab, and then click on Flyer Wizard.
(It seems that flier can be spelled several different ways!)

Screen shot reprinted courtesy of Microsoft Corporation.

(If using Microsoft Publisher, choose the Flyers link and then one of
several optional templates provided.)

75
Criteria for fliers
1. Limit the Length of your Flier to one page (8½ x 11).
2. Focus on one Specific Idea. This could be a feature, a benefit, a
component, a use, a person, a place, an object, an activity, etc.
Consider a technical description/specification. Then, your Flier
could focus on dimension, colors, material, etc. This, of course,
would only apply if you were writing about a product. For a service,
a person, or a place, your Flier would focus on some other user
benefit.
3. Include a Title at the top of your Flier. A word, a phrase, a
question—but give it impact to attract your reader’s interest!
4. Limit your Text. As with all good technical writing, text should be
short. Strive for no more than 100 words, or fewer. Remember, a
graphic should be the key to your Flier (more on this in point
number 6 below).
5. Increase your Font size. You want your reader to see the key points
at a glance. Increased font size, with limited text, will help
accomplish this goal. Think 20 point and up for titles, 16 point and
up for subtitles, and 12 point and up for text.
6. Use Graphics. This is important. Let a picture emphasize your key
point and draw the reader’s attention. This could either be a
technical specification, as shown in the sample, or a host of other
possibilities.
7. Use Color. Attract your reader’s attention, but be careful. Don’t
overuse color. A little bit goes a long way.
8. Use Highlighting techniques. As with color, a little bit goes a long
way. Be careful. Limit yourself to no more than three or so
highlighting techniques.
9. Find the “Phrase.” Be clever. Come up with 3-5 words that draw
your reader in and/or that highlight your topic’s worth or reader
benefit.
10. Avoid Grammatical errors.

76

On the next page
is a Sample Flier.
This is followed by a
Peer Evaluation Checklist
for Fliers.
Sample Flier

“Pop” Goes the Rivet!
Ajax

can manufacture
cold-headed, solid, tubular, and
semi-tubular pop rivets
to your specifications.

Weight

2 oz

1. Body Diameter

.118"

2. Head Diameter

.213"

3. Head Height

.029"

4. Hole Depth

.077"

Let us add “pop” to your
fastening system needs.
Call 1-800-PopRivet

77
PEER EVALUATION CHECKLIST
_________________________________________
Writer’s Name

_________________________________________
Reader’s Name

FLIERS

_________________________________________
Reader’s Name

QUESTIONS

YES

1

Did the student limit the length of the flier to one page (8½x11)?

2

Did the student focus on one specific idea, such as a feature, a benefit, a component, a use, etc.?

3

Did the student include a title at the top of the flier—a word, a phrase, a question—to make it interesting and to give it impact?

4

Did the student limit the text, striving for no more than 100 words, or fewer?

5

Did the student increase font size, helping the reader see the key points at a
glance? Did the student use 20 point and up for titles, 16 point and up for subtitles, and 12 point and up for text?

6

Did the student use graphics to visually depict the key idea being highlighted?

7

Did the student use color to attract the reader’s attention? Has the student
avoided overusing color?

8

Did the student effectively use highlighting techniques? As with color, a little bit
goes a long way.

9

Did the student find the phrase, a clever, 3-5 word phrase to highlight the topic’s
worth or reader benefit?

10

Is the flier grammatically correct?

*If the answer is no, specify what is missing and suggest a solution.

78

NO*
Graphics

Ironically, technical writing often has
more to do with graphics than writing
Graphics can be a major part of communication in the
workplace. Just look throughout this book to see the
importance of graphics. You’ll notice that the
instruction and flier samples include line art, a memo
sample includes a table, a sample PowerPoint slide
include a bar chart, and the discussion of Wizards/
Templates includes screen captures.

Graphics can be divided into two categories: tables
and figures. Tables are obvious. Figures include pie
charts, bar charts, photographs, line drawings, icons,
maps, schematics—in fact, a figure is anything that’s not
a table. Tables, composed of rows and columns, allow
readers to grasp details at a glance. Notice how the following memo
uses a table to clarify its conclusions.
It’s important to teach your
students the importance of
graphical interpretations of
text. Graphics aid
communication for several
reasons:
!

!

!

!

Entertainment. Graphics
add interest to the
writing.
Clarity. Often,
information is more
obvious when shown
visually than when
discussed verbally.
Variety. Words, words,
and more words might
turn the reader off.
Graphics break up the
monotony of wall-to-wall
words.
Conciseness. Sometimes,
“one picture really is
worth a 1,000 words.”

MEMO
Date:
To:
Cc:
From:
RE:

August 20, 2003
Ms. Kanakis
Dr. Jim McWard, Dr. Tom Lisk, Ms. Ellen Mohr
Greg Mundy
Stock Purchases

Last April, I purchased 20 shares of Empire District Electric stock at
$24 per unit. Empire serves Missouri, Kansas, Oklahoma, and
Arkansas. I purchased this stock because everyone uses electricity.
Also, I assumed that the stock prices would go up during the summer
months, as people used their air conditioners to cool their homes.
As shown in the following table, the stock price generally has gone
up, increasing 75%, ending at $32 a share.

Month
April

Change in Stock Value
Stock Value
Gain/Loss
$24
———

May

$22

-$2 per share

June

$28

+$4 per share

July

$24

August

$32

———
+$8 per share

Based on the overall growth of this stock, I plan to purchase 10
additional shares.

79
Beyond columns and rows
Whereas tables provide information in columns and rows, figures can
present information in many different ways. A line drawing presents a
photographic view of a topic. These are especially valuable in instructions,
which help an end user perform a task. Bar charts and/or line graphs help
readers make comparisons. Schematics visualize circuitry. Maps show
contour or direction.
(Note how the same memo now uses a combination graph to depict the
growth and decline of stock prices.)

MEMO
Date:
To:
Cc:
From:
RE:

August 20, 2003
Ms. Kanakis
Dr. Jim McWard, Dr. Tom Lisk, Ms. Ellen Mohr
Greg Mundy
Stock Purchases

Last April, I purchased 20 shares of Empire District Electric stock at
$24 per unit. Empire serves Missouri, Kansas, Oklahoma, and
Arkansas. I purchased this stock because everyone uses electricity.
Also, I assumed that the stock prices would go up during the summer
months, as people used their air conditioners to cool their homes.
As shown in the following table, the stock price generally has gone
up, increasing 75%, ending at $32 a share.
35

Price of Stock vs. Stock Value

30
25
20
15
10
5
0
April

May

June

July

August

Price of Stock
Stock Value

Based on the overall growth of this stock, I plan to purchase 10
additional shares.

80
Chapter Four

Technical Writing
Assignments

In This
Chapter...
Technical writing can be incorporated into your classroom in a host of ways. Perhaps you only want to incorporate one technical writing
assignment (a letter, memo,
or report).
Maybe you would like the
students to write several,
grouped documents in a
technical writing module.
Then again, you might teach
an entire term or a year-long
course in technical writing.
This chapter will present
ways to meet each of these
goals.
Here are ideas for individual
letters, memos, e-mail, reports, resumés, instructions,
web pages, brochures,
newsletters, fliers, and
PowerPoint presentations.

Sales Letters
!

!

!

!

!

!

!

!

Write a letter selling a product, such as a
VCR, CD player, computer, printer, car,
motorcycle, roller blades, tennis racket,
golf clubs, vintage records, jewelry, etc.

Write a letter selling a service, such as car detailing, lawn mowing,
babysitting, dog walking, house painting, deck building, basement
refinishing, computer installation, computer repair, tennis or golf
lessons, tutoring (math, languages, science), etc.
Foreign Languages: write a sales letter detailing the unique aspects
of foreign countries studied in class.
Industrial Technology: write a sales letter about class projects,
including car maintenance, welding, CAD/CAM operations, woodworking, robotics, etc.
Art: write a sales letter focusing on the unique traits of class projects,
including ceramics, jewelry, painting, mixed media, etc.
Literature: write a sales letter marketing sites in a novel, such as East
or West Egg in The Great Gatsby, Tom’s Island in The Adventures of
Tom Sawyer, or Holden Caulfield’s military school in The Catcher in
the Rye.
Family and Consumer Sciences: write a sales letter about a food or
clothing project you have been working on, highlighting the unique
benefits offered.
Elementary: your students have just returned from a class trip to the
fire station, museum, science city, zoo, or theatre. Write a sales
letter about that locale, highlighting its unique values.

81
Letters of Inquiry
!

!

!

!

!

!

!

!

Write a letter of inquiry to a company about its products, services,
warranties, guarantees, costs, maintenance, etc.
Write a letter of inquiry to a company about job openings, job requirements, hiring trends, salary ranges, etc.
Write a letter of inquiry to a community college, vo-tech school, college, or university about its degree requirements, programs, tuition,
housing fees, extracurricular activities.
Foreign Languages: write a letter of inquiry to a travel agency for
information about a country, to a country’s local ambassador, or to the
country’s ambassadors at the United Nations, etc.
Industrial Technology: write a letter of inquiry to a company about its
CAD/Cam equipment, welding equipment, woodworking equipment,
automotive equipment, etc.
Art: write a letter of inquiry to an art supply company about its clay,
precious and semi-precious stones, paint, mixed media, etc.
Government: Write a letter of inquiry to a city, county, or state elected
official, asking questions about governmental procedures.
Elementary: your class will have a visitor—a dentist, firefighter, police
officer, local government official, etc. Prior to the visit, have students
write a letter asking the kinds of questions they would like to have
answered.

Memos
!

!

Write an explanatory memo to your boss, teacher, parent, friend,
etc., explaining the causes for your absence, tardiness, inability to
do the work, inability to meet deadlines, failure to return a borrowed item, etc. Then explain the effects of these actions.

Write an evaluative memo to your boss, teacher, parent, friend, etc.
comparing and contrasting a topic such as two movies, two CDs, two
novels (which to see or purchase or read); two cars, trucks, bikes, roller
blades (which to purchase); two restaurants (which to frequent); two
colleges (which to attend); or two jobs (where to seek employment).
(Continued on next page…)

82
Memos (continued)
!

!

!

!

!

!

!

!

Write an argument/persuasion memo to your teacher, boss, parent,
friend, explaining why he or she should allow students to rewrite
essays for a new grade or extend due dates; implement a new work
schedule, pay scale, or method of promoting employees; allow a
later curfew or allow you and friends to go to Padre Island for spring
break; seek a career option or attend a specific college.
Write a problem/solution memo to your teacher, boss, parent,
friend, etc. documenting a problem and suggesting solutions.
Business & Computer Technology: write a cause/effect memo from
Stephen Jobs to Bill Gates explaining why Apple should join ranks
with Microsoft (or vice versa).
Art: write a problem/solution memo from Michelangelo to Pablo
Picasso explaining how to draw more realistic portraits.
Literature: write a memo from Mark Twain comparing/contrasting
Tom Sawyer to Huck Finn.
Social Studies: write an argument/persuasion memo from President
Truman to General MacArthur explaining why the general was
removed from his command; or from President Roosevelt to General
Eisenhower explaining why Normandy was the best site for D-Day.
Physical Education/Health: write a memo explaining what causes
certain health problems and what effects these problems have.
Elementary: your class has been involved in an “Around the
World” discovery. Write an explanatory memo about one country’s
culture, foods, religion, and/or history.

E-mail
!

!

!

E-mail your teachers, bosses, parents, friends, to argue a point,
compare and contrast two topics, solve a problem, etc.
E-mail your fellow students with peer evaluations about their creative
or expository writing, about their artistic achievements, about math or
science tutoring, etc.

Business & Computer Technology: write an e-mail explaining the
steps for performing a computer operation, such as opening a file,
saving a file, downloading graphics, copying and pasting, etc. Or,
write an e-mail explaining computer ethics.

(Continued on next page…)

83
E-mail (continued)
!

!

!

!

!

Industrial Technology: write an e-mail providing instructions for
editing a video production, producing an animated cartoon, constructing circuit boards, or building a bridge.
Family and Consumer Science: write an e-mail explaining the key
concepts of parenting skills.
Marketing & Management: write an e-mail explaining key concepts
of personal finance or how to become a successful entrepreneur.
English: write an e-mail from one character in a novel, play, or short
story to another character. The topic will depend on the story’s
context. Or, you could write an e-mail from one character in a story
to another character in a totally different story—from Romeo to Hamlet, from Huckleberry Finn to Holden Caulfield, for example. These email messages could focus on the character’s respective era or personal challenges with family members, etc.
Elementary: write an e-mail explaining safety procedures on the
playground or about other safety issues, such as fire safety, bike safety,
water safety, life saving techniques, etc.

Reports
!

!

!

Industrial Technology: write a recommendation report about improving safety in the classroom or a progress report about your project
(clock making, race car construction, welding, automotive work).
English: write a progress report on your work this semester (where
have you succeeded; where can you improve).

Write a recommendation report to the school principal or school district
proposing:
—a new, expanded parking lot
—new swimming pool
—new competitive sports
—new art courses in jewelry
—a new computer lab
—a school television or radio station
—improved tennis courts
—better cafeteria options (name brand food services)
—on-campus day care centers
—earlier dismissal for college-now courses

(Continued on next page…)

84
Reports (continued)
!

!

!

!

!

Science: write a laboratory report about one of your projects (including
the purpose of the project, equipment used, activities accomplished,
and lessons learned).
Social Studies: write a status report and/or recommendation report
about stocks and bonds you’ve purchased (a mock purchase works
well). How are you doing, should you sell, should you buy?
Art: write a trip report about a museum visit.
Physical Education/Health: write a feasibility report studying a healthrelated problem (smoking, obesity, anorexia, etc.). Then suggest
solutions to the problem.

Elementary: your class has been studying biodegradable
substances. After burying an item and then digging it up, write a
report on the findings.

The Job Search (Resumés/Cover Letters)
!

!

!

!

!

!

Write your resumé and a cover letter (letter of application). Direct the
letter to an actual job listing found in your city’s newspaper, your school’s
job placement center or counseling center.

Foreign Languages: write a resumé and cover letter about an author
(Cervantes, Kafka, or Dumas) or about a literary figure (Don Quixote, Gregor
Samsa, or Jean Valjean).
Business & Computer Technology: write a resumé and cover letter for
Stephen Jobs or Bill Gates.
Literature: write a resumé and cover letter about an author (Mark Twain, F.
Scott Fitzgerald, or Shakespeare ) or about a literary character (Tom Sawyer,
Gatsby, or Macbeth).
Social Studies: write a resumé and cover letter for George Washington,
Sojourner Truth, Martin Luther, or Sigmund Freud.
Art: write a resumé and cover letter for Pablo Picasso, Andy Warhol, or
Andrew Wyeth.

85
Instructions
Studies tell us that students learn best when they have to teach
someone else how to do something. Have your students write any
of the following instructions, geared toward another student.
!

!

!

!

!

!

!

!

!

!

Industrial Technology: write safety instructions or instructions for
building any project.

Business & Computer Technology: write instructions for any computer
operation: printing, saving a file, opening a file, creating a folder, making
a computer-generated presentation, etc.
English: write instructions for revising an essay.
Art: write instructions for creating a sculpture, a piece of jewelry, a
photograph, a ceramic pot, etc.
Science: write an instruction for performing any lab.
Math: write an instruction for performing any geometric, algebraic, or
trigonometric equation or project.
Social Studies: write an instruction for purchasing stocks or bonds.

Careers: write an instruction on how to get a job, focusing on
interviewing techniques, job searches, or writing the different types of
correspondence needed for a job (resumé, cover letter, follow-up
thank you, etc.).
Physical Education/Health: write an instruction on how to correctly
lift weights.
Elementary: write an instructional recipe about how to make a pizza,
a taco, a peanut butter and jelly sandwich, or any food item.

Web Pages and PowerPoint Presentations
Every topic imaginable can be turned into a Web or PowerPoint
presentation. And it’s good to have your students use these
computer applications. After all, according to business and industry
representatives, a primary skill our students need to succeed on the
job is computer technology.
(Continued on next page…)

86
Web Pages and PowerPoint Presentations (continued)
!

!

!

!

!

!

!

Create web pages for your school or your school district; for your
school club or activity; or an invented company.
English: create web pages or PowerPoint presentations about an
author, a piece of literature, a genre, or a literary movement/era.
History: create web pages or PowerPoint presentations about any
historical moment (the Oklahoma City Bombing, the World Trade
Center attacks, the charge up San Juan Hill, the Chicago riots accompanying the 1968 Democratic National Convention, etc.); any
historical figure (presidents, revolutionaries, inventors, etc.); historical eras (the Renaissance, the Enlightenment, the Victorian era, etc.).
Foreign Languages: create web pages or PowerPoint presentations
about foreign countries and their culture.
Science: create web pages or PowerPoint presentations about topics
studied in chemistry, geology, biology, etc.
Family and Consumer Sciences: create web pages or PowerPoint
presentations about parenting skills, interior design, fashion merchandising, or foods.
Elementary: create web pages or PowerPoint presentations about
animal habitats, dinosaurs, minerals and rocks, etc.

Brochures and Newsletters
In Chapter Three it was suggested that students do a research
brochure or a newsletter instead of a research paper. Consider these
possibilities.
!

Write a brochure or newsletter:
—about a vacation spot (national or local park, wildlife reserve,
city, country).
—about a school organization (Key Club, Honor Society, Drama
Club, Art Club, Foreign Language Club, etc.)
—about a city organization, agency, or company (a local business,
geriatric home, community center, Rotary Club, Lions Club).
—about your city’s Hispanic culture and/or business owners;
Native American culture and/or business owners; unique ethnic
background (Swedish, German, Polish, etc.); frontier history;
railroading, agricultural, ranching, or cattle industry.
(Continued on next page…)

87
Brochures and Newsletters (continued)
!

!

!

!

!

!

!

!

Invent a topic for a newsletter or brochure (a new country, a new
planet, a new company, an invention).
English: research an author and write a brochure or newsletter about
him or her, reporting your findings. These could include biographical
data, analyses of stories, critical responses, awards and accomplishments, etc.
History: create a brochure or newsletter about a local historical figure
(President Eisenhower, Bat Masterson, Jesse Chisolm, Amelia Earhart,
General Custer, Senator Bob Dole); an occurrence of local historical
importance (trail drives, dust bowl events, cow town histories, border
war activities); a historical era (the Renaissance or the Great
Depression).
Family and Consumer Science: create a brochure or newsletter about
parenting, interior design, fashion merchandising, or foods.
Industrial Technology: create a brochure or newsletter reporting
about a bridge construction, electricity (how to measure it, how to
generate it, how to figure its cost, etc.), simple machines, and/or
graphics, animation, and video production projects.
Art: create a brochure or newsletter about an artist, type of art, or
about your class’s art project(s).
Foreign Languages: Create a brochure or newsletter based on having
researched a country and its culture. Or, create a brochure or
newsletter about a famous author, artist or historical figure from a
country relevant to the language studied.
Elementary: your class has been studying the regional parts of the
country, climate, rocks, minerals, dinosaurs, volcanoes, ocean life, the
solar system, and/or the food pyramid. Select any of these topics, and
write a brochure or newsletter to report on your studies.

Fliers
Fliers are written primarily to promote, sell, or advertise a product,
service, or event. Thus, your classes could create fliers about many
topics. These include machines (Industrial Technology), food or
clothing (Family and Consumer Sciences), an art object (Art), a
locale (from a story in English), a scientific or historical invention
(History and Science), a play performance or recital (Music and
Drama), etc. The list is endless.

88
Grouped Assignments (Instructional
Modules)
An excellent way to have students write more technical
documents is to create technical writing modules
(grouped assignments with a central focus).
For example, tell students on the first day of class that
they will be employed by a company (one they will
invent). For this company, they will write several,
related technical documents. There are different ways
to approach this assignment.

For Option #1
Students write a:
1. Report to a boss recommending a new product/
service
2. Directive memo from a boss
approving the product
3. Sales letter marketing the
product
4. Web page marketing the
product
5. Instructions manual for the
product
6. Cover letter

Option #2
1. Sales letter marketing a
product or service
2. Flier highlighting one
specific aspect of the
product or service
3. Website advertising or
explaining the product or
service
4. PowerPoint presentation
advertising or explaining
the product or service
5. Newsletter informing the
public or co-workers about
the product or service

Option #1
Company

Client

Boss

3. Sales
Letter

2. Directive
Memo

1. Recommendation
Report

4. Web 5/6. Instructions/
Cover Letter
Pages

Employee

Option #2
Company

1

Client

2

3

4

5

(Option #3 continued on next page…)

89
For Option #3
Students write a:
1. Sales letter marketing a
product or service
2. Letter of inquiry from a
prospective client requesting more information
3. Directive memo from
the boss
4. Proposal
5. Instructional manual
6. Cover letter

Option #3
Company

Client
1. Sales
Letter
2. Inquiry
Letter

Boss

4. Proposal

5. Instructions

3. Directive
Memo

6. Cover
Letter

Employee

Teaching modular
groupings is
effective because it
simulates the reality
of corporate
communication,
where one
document leads to
another.

The primary difference between Option #1, Option #2, and Option #3 is
computer access. If you teach in a computer laboratory, students can
create web pages, fliers, and powerpoint presentations. If you teach in a
regular classroom without access to computers, replace the web pages,
fliers, and powerpoint presentations with reports and memos.

Variations for modular groupings
Modular groupings let students role play (boss, client, employee), write
different types of documentation, and write for different purposes (to recommend, sell, instruct, direct, request, etc.).
Six grouped documents may be more than you would like to assign. If so,
assign fewer (the modules are flexible). Combine just two or three of the
assignments. For example, the students may write (1) a directive memo
from a boss asking for (2) a sales letter and (3) then create a web page. Or
the students may write (1) a letter of inquiry requesting (2) a proposal and
then (3) an instructional manual.

Job packages
Job packages are an excellent way to group assignments. The students
could write (1) a letter of inquiry to a local company asking for information
about job openings, salary ranges, job requirements, etc. (2) Upon receiving answers from the company’s Human Resources staff, the students could
present this information to the class or teacher by way of a report, memo,
e-mail or PowerPoint presentation. (3) Then students could write a followup thank you letter or e-mail. (4) Students could write a resumé and (5) a
cover letter/e-mail for a job of their choice within that company. (6) Finally, students could perform mock interviews based on these resumés
and cover letters. (These six assignments could be reduced to two or three.)

90
Conclusion
There is no one way to teach technical writing. Teach one
assignment or many; teach stand-alone, unrelated assignments or
groups of assignments unified by a central theme; teach technical
writing in one term or as a year-long course. Technical writing
can be incorporated successfully into any course . . . in many
different ways.
However you decide to make technical writing a part of your
class, your students will benefit. They will learn a type of writing
that will help them get jobs and succeed in the workplace. They
will learn writing that works!

Sample Technical Writing I
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
Week 7
Week 8
Week 9
Week 10
Week 11
Week 12
Week 13
Week 14
Week 15

Introduction to Technical Writing
Criteria for Effective Technical Writing discussed
Sales Letters/In-class Writing Activity
HW: Prewrite and Write Rough Draft Sales Letter
Prewriting and Rough Draft Due/Peer Evaluations
Sales Letters due/Fliers/In-class Writing Activity
HW: Prewrite and Write Rough Draft Flier
Prewriting and Rough Draft Due/Peer Evaluations
Fliers due/Letter of Inquiry/In-class Writing Activity
HW: Prewrite and Write Rough Draft Letter of Inquiry
Prewriting and Rough Drafts due/Peer Evaluations
Letter of Inquiry due/Memos/Prewriting
HW: Write Rough Draft Memo
Rough Drafts Memo due/Peer Evaluations
Memo due/E-mail
HW: Prewrite and Write Rough Draft E-mail
E-mail due
Begin Website Team Work
Team Work Continues
Team Websites due
Begin Team User Manuals/Team Work
Team Work Continues
Team User Manual due
Progress Reports/Graphics
HW: Rough Draft
Peer Evaluations/Progress Reports due
Finals begin

91

The following
is an example of a
Scope and Sequence
Outline for a year-long
technical writing
course titled Technical
Writing and Applied
Communications.
Sample Course

Scope and Sequence of YearLong Technical Writing Course
Technical Writing & Applied Communications

Course Description:

Grade Level:
Prerequisites:

Technical writing is worthy of a year-long course. If you would like to teach a year-long course
in technical writing, here is an approach currently used by Carol Hailey at Shawnee Mission
North High School (Overland Park, KS).
!

12

!

English 9, 10, 11; Introduction to Computers

Articulations:

!

Required Text:

!

Johnson County Community College (JCCC) Technical Writing I; JCCC Tech Prep Transformations--Applied Communications
Technical Writing: Process and Product (Gerson and Gerson, Prentice Hall, 1997,
second edition)

Course Overview:

Technical Writing and Applied Communications is a course for career-oriented students who
plan to attend two or four year college. Because the course is designed to introduce students to
writing required in the work environment, students will complete assignments in both classroom and community settings. Students will learn reading, listening, and speaking skills; will
explore group dynamics, interviewing and problem-solving strategies; and will write various
types of technical correspondence demonstrating accuracy in grammar.

Course Objectives:

Students will read and respond to nonfiction literature including articles on applied communications and career areas of interest, occupational handouts, biographies, autobiographies, and
social agency and business communications. Students will demonstrate comprehension through
written or oral assignments.
Students will demonstrate effective empathetic and critical listening skills at a 70% level on the
instructor's rubric.
Students will perform small group or individual speaking presentations, role-playing activities,
and interview situations at a 70% skill level on the instructor's rubric.
Students will demonstrate use of the writing process in completing written assignments for
specific audience and purpose.
Students will demonstrate ability to work effectively in small groups to complete problem solving, projects, presentations, and research.
Students will use word-processing and computer-generated graphics to complete written
assignments.
Students will produce the following written assignments scoring a minimum of 3 on each of the
5 Traits.
! Letters
! Summaries
! Paraphrases
! Short research reports
! Resumés
! Newsletters
! Brochures
Students will successfully complete a college application.
Students will complete writing assignments that contain no more than three grammar errors
per page.
After completing a Basic Business Grammar review module, students will demonstrate 80%
accuracy on a post assessment.

92
Quarter 1
Course Objectives:
Rationale:

Introduction to Technical Writing:

Exploring Group Dynamics:

Introduction to Applied Communications
Course objectives
Classroom management
Parent letter from instructor
! Rationale for class
! Community/business involvement
! Group work/attendance
! Multi-media/technology
! Assessment
a. Portfolio
b. Projects
c. Presentations
Compare/contrast essay composition to technical writing
Define criteria
Readings/analyze models
Assessment—Rewrite 6 Traits for technical writing
! Student handbook
! Student self-assessment tool
Rationale for cooperative workplace
! Guest speakers from business
! Possible visit to business environment
Responsibilities in group/cooperative production
! Group responsibilities
! Attendance
Simulated group activity
! Video tape
! Identify and analyze group roles
Group roles inventory
! Identify individual roles
! Short written report/response
Effective listening skills
! Importance in group/cooperative work
! Practice activities
Assessment—Group/Problem solving activities
! Video tape
! Analysis
! Individual written/oral response

Grammar Review:

Writing Assignments:

Pretest
Business Grammar Module
Post test
Practice proofreading exercises/technical writing context
Peer group editing practice and exercises
Summary
! Quoting/Paraphrasing/Documentation
! Objective Summary
! Subjective response
Short Reports

Assessment Portfolio for course:

Introduce concept and assignment
Assessment/selections to demonstrate technical writing
College application and resumé

93
Quarter 2
Course Objectives:
Introduction to Problem Solving:

Writing Brochures & Newsletters:

Final Assessment--Project:

Applied Communications Within the School Community
Steps in problem solving
Written proposals
Interviewing/investigation skills
Assessment--Project: Group practice in problem solving
! Student groups identify problems within the school (parking, cafeteria food, discipline,
drugs, etc.)
! Interview/investigate (principal, cafeteria administrator, counselor, etc.)
! Draft proposal/short report suggesting solutions to the problem
Criteria
Models/analyze
Computer graphics/layout
Practice activity
Student groups identify need for brochure and newsletter within the school community (Key
Club, Honor Society, band, drama department, Spanish Club, etc.)
Student groups interview organization, determine needs
Presentation of product to peers
Evaluation
! Peer evaluations
! Teacher evaluations
! Group work evaluations
Assessment of Portfolio Revision/Update

Quarter 3
Course Objectives:
Identify community problems/
issues and organizations that
address them:

Applied Communications Within the Community
Research problem/issues—Secondary sources (nonfiction readings)
! Articles
! Newspapers
! Essays
Research problems/issues—Primary sources--community guest speakers
! Follow-up thank you letters
Research problems and issues
! Research techniques
! Documentation
Assessment Projects
! Short reports--reporting on the problems/suggesting solutions
! Oral presentation

Writing for the community:

Develop student groups
Identify a community or service organization
! Writer letter of inquiry/contact/interview
! Prepare written proposal for instructor/present to class
! Spend day in community or service organization--shadowing
! Write follow-up thank you letter
Develop brochure or newsletter for organization
Class presentations
! Peer evaluations/group evaluations
! Teacher evaluations
Class develops slide presentation/narrative of projects for selected audience

94
Quarter 4
Course Objectives:
Assessment Portfolio
Revisions/Update:
Review Areas of Career
Interest—ACT Discover Program:
Readings—Career Interest:

Applied Communication and Career Exploration
Student selects career for exploration
Student researches bibliography/resources
Biography/autobiography
! Read
! Develop brochure or short report
Periodicals appropriate to career
! Read
! Writer summaries/response
Professional journals/occupational handbooks
! Read
! Writer summaries/response
Interview corporate personnel director, human resources administrator or employee in your
field:
! Write letter of inquiry
! Interview/visit/shadow at work/on-site experience
! Follow-up thank you letter
! Short report
! Update Resumé
! Cover letter of Application
! Complete Portfolio
! Assessment: Mock interview with personnel director/present portfolio/receive
feedback

Sample Five Day Technical Writing Instructional Module
Unit Objective:

Upon completion of this unit, students will be able to identify criteria for writing an effective ______________,
prewrite to gather data, write a rough draft, and revise others’ work through peer group assessments.

Day #1

Day #2

Day #3

Day #4

Day #5

Introduce Topic

Practice

Instructor Review

Individual
Assignment

Peer Review

*Provide criteria
for a __________

*Group writing
based on Day #1
criteria

*Assess group
work on overhead
projector

*Assign students to
write a __________

*Students assess
others’ writing
based on Day #1
criteria

*Review samples
of good/bad
___________

*Collect writing to
make overheads

*Compare/contrast
to Day #1 criteria

*Students prewrite

*Homework:
Revise for submission next class

*Students write
rough drafts
*Complete at
home

95
Five Day Technical Writing Instructional Module
Unit Objective:___________________________________________________________________________________________
_________________________________________________________________________________________________________
Day #1

Day #2

Day #3

Day #4

Day #5

96

Tb writing book(1)

  • 1.
    Writing That Works Works A Teacher’s Guideto Technical Writing by Dr. Steven M. Gerson Johnson County Community College Developed and Published by: Kansas Curriculum Center Washburn University Topeka, KS
  • 2.
    Writing That Works Works A Teacher’s Guideto Technical Writing by Dr. Steven M. Gerson Johnson County Community College Project Advisor: Dr. Craig Haugsness Program Consultant: Technology Initiative KS State Dept. of Education Designed and Edited by: Ben Clay Kansas Curriculum Center Text Processing by: Esperanza Root
  • 3.
    PREFACE Welcome to Technical Writing byDr. Steven Gerson I hope this Teacher’s Guide will help you find new and interesting ways to incorporate technical writing in your classroom. The Teacher’s Guide seeks to accomplish the following: Chapter One not only provides a rationale for teaching technical writing, but also defines technical writing and compares/contrasts it to other types of written communication. This puts technical writing into context, for you and your students. In addition, the chapter gives you several teaching tools. These include tables, which you can make into overheads, and a wide range of end-of-chapter activities. These teaching tools lend themselves to classroom discussions, assignments, and tests. Chapter Two provides exact criteria for teaching technical writing. The technical writing criteria is expressed in 5 Traits, comparable to the 6 Traits rubric with which you may be familiar. These 5 Traits include clarity, conciseness, accessibility, audience, and accuracy. This chapter gives you a 5 Traits grading rubric and many end-ofchapter activities. Chapter Three discusses the different types of technical writing. These include letters, memos, e-mail, reports, instructions, resumés, brochures, newsletters, fliers, web pages, PowerPoint presentations, and graphics. This chapter provides numerous samples for each type of technical writing, as well as peer evaluation checklists, ready for duplication and use in your classes. Chapter Four focuses on technical writing assignments. Whether you teach elementary school, English, Spanish, math, physical education, business, history, psychology, or art, you will find assignments geared toward your classes . . . and they all work. They are interesting, diverse, and proven effective in classroom settings. (Continued on next page…) i
  • 4.
    This revised teachers’guide to technical writing includes the following New and Updated information: ! ! ! ! ! ! ! ! Updated information and New samples (screen captures) for websites. This includes revised criteria and explanations of the importance of websites, as well as the ways in which on-line text differs from hard copy. Updated information and New samples (screen captures) for e-mail. This includes revised criteria and explanations of the increased importance of electronic communication in the workplace. Updated information and New samples of instructions, appropriate for elementary as well as middle/high school students. Updated information and New samples of brochures and newsletters. New information and samples of fliers. New information on the use of online wizards and templates for memos, letters, resumes, brochures, newsletters, and fliers. This includes not only the benefits of wizards/templates but also problems encountered. New information on the importance of graphics in technical writing. This includes samples, criteria, and the reasons why graphics (tables and figures) are important in technical writing. New and revised assignments for technical writing, including —Assignments for elementary school students as well as middle/high schools. —Focus on different subject matters/disciplines, including agricultural education, family and consumer sciences, industrial technology, business/computer classes, etc. I am available for on-line assistance via e-mail. I am always happy to talk about technical writing. If you have questions regarding assignments or curriculum, just contact me at: sgerson@jccc.net or you could use the two, old-fashioned approaches: phone (913-469-8500, ext. 3625) or mail (12345 College Blvd., Johnson County Community College, Overland Park, KS 66210). I want to thank several people for helping me prepare this Teacher’s Guide. Carol Hailey, Shawnee Mission North High School, gave me many ideas for assignments and curriculum options; Carmen Shelly, DeSoto High School, created the 5 Traits rubric that I have adapted. My office mate, Professor James McWard, reviewed early copies of this text and offered valuable suggestions for revision. Finally, my wife, Professor Sharon Gerson (DeVry Institute of Technology, Kansas City), was a constant source of assistance, helping me develop ideas, draft text, revise, and proofread. ii
  • 5.
    Table of Contents Preface ......................................................................................i-ii Chapter One: Why Teach Technical Writing ........................... 1-9 Definition ............................................................................ 1 Rationale .......................................................................... 2-3 Communication Continuum ............................................. 4-5 Technical Writing vs. Essays ............................................... 6 Five Components of Technical Writing ............................. 7-8 End of Chapter Activities ..................................................... 9 Chapter Two: Five Traits of Technical Writing ..................... 10-25 Clarity .......................................................................... 10-12 Conciseness ................................................................. 13-16 Accessibility ................................................................. 16-17 Audience Recognition .................................................. 18-19 Accuracy ........................................................................... 20 Five Trait Rubric .................................................................21 End of Chapter Activities .............................................. 22-25 Chapter Three: Applications of Technical Writing ............... 26-80 Letters .......................................................................... 26-33 Memos ......................................................................... 34-38 E-Mail ........................................................................... 39-42 Reports ......................................................................... 43-45 The Job Search ............................................................. 46-54 Instructions ................................................................... 54-57 Web Pages ................................................................... 58-62 PowerPoint Presentations ............................................. 63-65 Brochures ..................................................................... 66-69 Newsletters .................................................................. 70-74 Fliers ............................................................................ 75-78 Graphics ....................................................................... 79-80 Chapter Four: Technical Writing Assignments ..................... 81-96 Sales Letters ....................................................................... 81 Letters of Inquiry ............................................................... 82 Memos ......................................................................... 82-83 E-Mail ........................................................................... 83-84 Reports ......................................................................... 84-85 The Job Search .................................................................. 85 Instructions ........................................................................ 86 Web Pages and PowerPoint .......................................... 86-87 Brochures/Newsletters .................................................. 87-88 Fliers ................................................................................. 88 Grouped Assignments .................................................. 89-90 Conclusion ........................................................................ 91 Sample Technical Writing I ................................................ 91 Sample Course Scope and Sequence ............................ 92-96
  • 6.
    Chapter One Technical Writing: ADefinition Technical writing is communication written for and about business and industry, focusing on products and services: how to manufacture them, market them, manage them, deliver them, and use them. Why Teach Technical Writing? Technical writing is written: ! in the work environment (in the office, from 8:00 to 5:00, not counting overtime) ! for supervisors, colleagues, subordinates, vendors, and customers Technical writing, which must be understood easily and quickly, includes: ! memos and e-mail ! letters ! reports ! instructions ! brochures and newsletters ! the job search ! web pages ! fliers ! PowerPoint presentations ! graphics Why is technical writing so important? Why would I want to teach technical writing? Don’t I have enough to teach now without adding one more assignment or series of assignments to my curriculum? What’s the point? ! Technical writing is the resumé that helps get a job and the web page that promotes a company. In each case, the technical document must be quantifiable, precise, and easily understood. ! ! ! Technical writing is not literature; it’s neither prose which recounts the fictional tales of characters nor poetry which expresses deeply felt, universal emotions through similes and metaphors. Technical writing is neither an expressive essay narrating an occurrence nor an expository essay analyzing a topic. Technical writing is not journalism, written to report the news. Technical writing does not focus on poetic images, describe personal experiences, or report who won the basketball game. Instead, technical writing is: —an instructional manual for repairing machinery —a memo listing meeting agendas —a letter from a vendor to a client —a recommendation report proposing a new computer system 1
  • 7.
    Once students areemployed, will they have to write on the job? The answer is a resounding YES! One reason for teaching technical writing is so students will know the types of documents they will write on the job. When our students are employed and have to write on the job, will they write essays? Students often do not believe they will have to write at work; they assume that once their education is completed, writing will be a distant memory. They are wrong. The answer is no. Our students, when employed, will not write essays at work. They will write essays while working on their college degrees; they might even be asked to write an essay on their job application when applying for work. However, once the job begins, essays end. What takes the place of the essay? The answer is technical writing—memos, letters, reports, e-mail, proposals, instructions, even web pages. That’s why technical writing is important. Technical writing is the type of written communication that our students will be responsible for on the job. Is technical writing a necessary component of every employee’s professional skill? Daily, newspapers tell us that employers want to hire people who can communicate effectively, both in writing and orally. Career counselors reiterate this. ! ! ! ! In fact, we are told that on the job, an employee will spend at least 20 percent of his or her time writing. This number increases as an employee’s responsibilities increase. Managers spend up to 50 percent of their time writing. CEOs spend between 80 and 100 percent of their work week communicating. 2
  • 8.
    How does technicalwriting compare/contrast to traditional essays? Technical writing is different from other types of written communication. Does that mean, therefore, that you must relearn all your teaching skills to accommodate this new communication beast? Absolutely not. Many of the writing skills you already teach are applicable to technical writing. Others are less valid. “Technical writing would come in handy for some students, such as our vo-tech kids. When they enter the job market, they could benefit by knowing how to write at work. But what about our college-bound students? Why would they need technical writing?” Here is a reminder… College lasts only four to six years. In K-12, we should continue to prepare our students for college by teaching essays. In addition, we should prepare them for what comes next—their jobs. After they graduate with their AA or BA or BS, they go to work where they will write memos, letters, and reports. The career and technical education students—the students who will work as mechanics, welders, office help, or daycare center assistants—can benefit by learning how to write technical documents. However, our students who acquire associate degrees and bachelor degrees—the students who go on to become computer programmers, CAD/CAM operators, dental hygienists, fashion merchandising specialists, graphic artists, engineers, architects, accountants, doctors, and lawyers—also will need to write memos, letters, and reports. 3 On the next page is a Communication Continuum including traits and examples of five types of writing, ranging from the connotative to the denotative.
  • 9.
    Communication Continuum Connotative/Expressive Type of Writing Examples Traits Poems,plays, stories Connotative and expressive words, fictional characters, imagery, and plots Expressive Writing Narratives, descriptions Subjective, based on personal experience, connotative and expressive words Expository Writing Comparison/contrast, analysis, cause/effect, argument/persuasion Creative Writing Journalism Technical Writing Denotative/Objective Objective, connotative and denotative words Objective, written from factual observation, short sentences and paragraphs, some connotative but more denotative words News stories, features, editorials Memos, letters, reports, instructions, resumés, web pages Legend: Connotative Of course, there are exceptions… Newsletters, sales letters, websites, and fliers might include promotional information. Such sales details could depend on expressive words—maybe even fictional characters. However, generally speaking, most technical writing is denotative versus connotative. 4 Objective, written about products or services, short sentences and paragraphs, denotative words Denotative On the next page is a poem about a tennis shoe as well as technical specifications for manufacturing the same shoe. These two writing samples further illustrate the difference between technical writing and other types of writing.
  • 10.
    Ode to aShoe Technical Specifications for Manufacturing Tennis Shoes My son’s tennis shoes rest temporarily in a heap against the kitchen door, their laces soiled, their tongues hanging out like exhausted terriers. The soles, worn down on the insides from sliding into second, are green, the shades of summer. Canvas exteriors, once pristine white, are the colors of the rainbow— sun bleached, mud splattered, rained on, ketchup and mustard adorned, each shoe shouting a child’s joyous exuberance: “I’m alive!” The D40 Slammer Tennis Shoe will be manufactured to the following specifications: Sole: Uppers: Tongue: Laces: Aglets: Weight: Neoprene rubber #345 white enameled paint 1.589" high Slammer waffle-textured© Blue canvas White canvas Oval Slammer© logo heatpressure sealed, centered .50" from all sides 15" long 100% cotton Clear polyacetate plastic #290 1 lb. 6 oz. “Unclear writing costs American businesses real money—over one billion dollars a year, according to one estimate…Did you know the Three Mile Island nuclear power plant meltdown was partly attributed to poorly written procedures?” (“Why Dick and Jane Can’t Write on the Job…and How to Help Them,” Janet Van Wicklen, American Society of Training and Development, 2000). “The ability to communicate effectively is the most important skill you can have, whether you’re giving speeches, pitching ideas to your boss, or simply sending off an e-mail or leaving a voice message.” (“What You Need to Know About Career Planning,” <http://careerplanning.about.com/cs/importantskills/>2002.) 5 The graphic appearing on the next page examines how technical writing compares and contrasts to essays.
  • 11.
    Comparison/Contrast: Technical Writingvs. Essays Components Development Grammar Technical Writing ! ! ! ! Organization ! ! Style ! Document Design Uses examples, anecdotes, testimony, data, research It is important! Essays ! ! Provides an introduction, body, and conclusion Uses a subject line vs. a thesis and itemization of points vs. transitional words Uses topic sentences only when needed, dependent upon the type and length of correspondence Uses short, denotative words; short sentences; and short paragraphs Uses highlighting techniques, such as graphics, headings, subheadings, various fonts, white space, bullets, etc. ! ! ! Uses examples, anecdotes, testimony, data, research Same for both It is important! Same for both Provides an introduction, thesis statement, body paragraphs, transitional words, and topic sentences Uses longer, connotative words; longer sentences; and longer paragraphs Not usually a factor People read literature for pleasure, essays for enlightenment, and journalism for news. People read technical writing to accomplish a job. 6 Summary Similar in some ways, different in others Different Different The five components listed above are discussed in greater detail on the following pages.
  • 12.
    Five Components ofWriting Development If you have been teaching your students to develop their essays using such traditional means as examples, anecdotes, testimony, data, and research, then teaching technical writing will not be a strain. The same development techniques are applicable when the students write memos, letters, and reports. Grammar Grammar is important in essays. It might be more important in technical writing. Whereas errors often can hide in longer essays, those same errors loom large in one page memos or letters. In a survey (Gerson) of over 700 technical writers (coast to coast) asked to list important aspects of correspondence, 98% ranked correct grammar as an essential component of successful writing. Grammar is not merely the concern of English teachers. Professional writers and business people perceive it as essential. Organization Essays employ topic sentences, transition between and within paragraphs, and a thesis statement. Technical writing usually does not. In a memo, letter, or report, the thesis would be replaced by a subject line. The different aspects of organization help distinguish technical writing from essays. Since paragraphs are shorter in technical writing (often between one to three sentences) than in many essays, topic sentences are less important. Transitional words and phrases in an essay can be replaced by an enumerated list, by a list of bullets (!#$%, etc.), and/or by headings and subheadings. Style Of greater importance is the different style (word usage, sentence structure, and paragraph length) used in essays versus technical writing. Essays rely on longer, more connotative words; longer, more complex syntax; longer, more detailed paragraphs. Technical writing, in contrast, demands short, denotative words; short, simple sentences; short (Continued on next page…) 7
  • 13.
    Style (continued) paragraphs withinformation clarified through graphics (pie charts, line graphs, etc.). It has everything to do with audience and purpose. The reader of technical writing does not have time, nor necessarily an interest in the subject matter. Envision this scenario. It is the night before Christmas, your children are asleep, and you are trying to put together a Christmas present—a doll house, a train set, etc. To assemble this present, you are sitting on the floor (you have been sitting there for two hours, as your aching back attests). You are trying to read the complicated instructions which accompanied the toy (those instructions are a type of technical writing). You do not enjoy the activity. In fact, you just want to end the task and go to sleep. That is a typical technical writing situation. The same holds true when you read an instruction to install software, build a cabinet, lay tile, or any other task. People do not read technical writing, such as instructions, for pleasure. The writing is a means to an end. Thus, to help people accomplish the task as quickly and as efficiently as possible, the writing style should be concise—short words, short sentences, and short paragraphs. Document Design Document design refers to the physical layout of the correspondence. Essays consist of words, words, and more words, separated by indentations to create paragraphs. Technical writing, in contrast, uses highlighting techniques and graphics for visual appeal to help the reader access and understand the data. Technical writing is written to a different audience for a different purpose than essays. The reader of technical writing does not have time, nor necessarily the interest in the subject matter. 8
  • 14.
    Conclusion: If we wantstudents to write technical documents, we need to define what technical writing is and provide a context for writing such documentation. This first chapter may be used to accomplish those goals. End-of-Chapter Activities Read, Lecture, Invite, and Test Read this chapter for your own knowledge. Use this information to acquire a better understanding of technical writing or as a reminder of what you’ve always known. Lecture from the chapter. Teach from this information to clarify for your students why technical writing is important, what technical writing entails, and how it differs from the type of writing they are used to. Invite people from business and industry to your classroom to discuss how technical writing is important to them. Test students on the information in this chapter. A short test could include the following: ! What percentage of time does a manager spend writing? Or a new employee, or a CEO? ! How does technical writing differ from essays? List at least three ways. ! Define technical writing. List five types of technical writing. ! Explain the writing continuum, giving examples to prove your points. Have students create their own definition of technical writing ! ! ! ! ! ! Students could gather examples of technical writing (such as memos, letters, reports, brochures, or instructions), or you could bring in examples (this Teachers’ Guide provides you several examples). The students can get examples from their parents, from businesses, or in your school’s office. Once they have examples, break the students into groups and have them review the examples. Ask them to brainstorm the examples’ unique characteristics (page layout, length, tone, content, word usage). Next, give them essays—or poetry, or drama, or a short story, or a newspaper. Ask them to compare the technical writing to the other types of correspondence. Based on these discussions, ask the students to create their own list of technical writing criteria. Finally, ask the students to create a technical writing rubric, perhaps comparing it to Six Traits. Write and Rewrite Have the students write a poem (or an expressive essay or an expository essay) about a classroom object (a stapler, an eraser, etc.). Then have the students take the same subject and write a technical memo, complaint letter, recommendation report, instructions for using the object, or a manufacturing specification. Compare and contrast the results. 9
  • 15.
    Chapter Two In this Chapter... FiveTraits of Technical Writing Students are not familiar with technical writing. Unless we teach them what this different type of communication entails, they will continue to write essays (the writing skill they have practiced since grade school). 1. Clarity This chapter provides specific criteria to give students before asking them to write technical documents. The five traits of technical writing are: ! clarity ! conciseness ! accessible document design ! audience recognition ! accuracy Clarity in technical writing is mandatory If a student fails to clearly understand a poem, a short story, a play, or a novel, that is unfortunate; however, equipment is not damaged, no one is physically hurt, and no one is sued. The most important criteria for effective technical writing is clarity. If the audience responds to a memo, letter, report, or manual with, “Huh?” what has the writer accomplished? If the correspondence is not clearly understood, the reader will either call the writer for further clarification, or just ignore the information. In either case, the writer’s time is wasted; the reader’s time is wasted; the message is lost. Clarity, however, is not just a time concern. Think of it from this perspective: your company has written an installation manual for a product. The manual, unfortunately, is not clear. When the reader fails to understand the content, three negatives can occur: ! BAD—The equipment is damaged. This requires the owner to ship the equipment back. The company will replace the equipment, costs accrue, and public relations have been frayed. ! WORSE—The owner is hurt, leading to pain, anxiety, doctor’s bills, and bad public relations. ! EVEN WORSE—The company is sued. The company loses money, the writer of the manual loses a job, and public relations are severed. 10
  • 16.
    Clarity achieved throughreporter’s questions This flawed memo, written by a manager to a newly hired employee, highlights the importance of clarity. Ask your students: ! ! Nothing is clear in this memo, and the reasons are obvious. The manager has failed to answer Reporter’s Questions: who, what, when, where, why, how. Date: To: From: Subject: March 5, 2004 Michelle Fields Earl Eddings Meeting Please plan to prepare a presentation on sales. Make sure the information is very detailed. Thanks. Obvious responses: ! ! ! ! ! ! ! Reporter’s Questions Checklist Who is the audience? Who will know what? Will the audience know a great deal (High Tech)? Will the audience know a little about the topic (Low Tech)? Will the audience know nothing about the topic (Lay)? What do you plan to do? What do you want the audience to do? What do you want to know? When should the job be completed? What’s the turnaround time? What’s the timetable? What’s the desired schedule? When do you need an answer? Where will the work take place? Why is the task being undertaken (the rationale, motivation, goal)? Why is the desired date important? How should the task be performed? What’s the preferred procedure? 11 What don’t you know in this memo? What additional information should the writer have included for clarity? When’s the meeting? Where’s the meeting? Who’s the meeting for? How much information is “very detailed”? How will the presentation be made? Why is this meeting being held? What does the manager want to be conveyed about sales?
  • 17.
    Using the Reporter’s QuestionsChecklist as a prewriting tool, the previous memo could be revised to achieve greater clarity. Here is an example of a revised memo. Date: To: From: Subject: March 5, 2004 Michelle Fields Earl Eddings Sales Staff Meeting Please make a presentation on improved sales techniques for our sales staff. This meeting is planned for March 18, 2004, in Conference Room C, from 8:00 a.m. - 5:00 p.m. Our quarterly sales are down 27%. Thus, we need to help our staff accomplish the following: 1. Make new contacts. 2. Close deals more effectively. 3. Earn a 40% profit margin on all sales. Use our new multimedia presentation system to make your presentation. With your help, I know our company can get back on track. Thanks. Clarity achieved through specificity In contrast to mystery stories which seek to create suspense, technical writing must be clear. The ultimate goal of effective technical writing is to say the same thing to multiple readers! When a student answers reporter’s questions, he or she has filled a page with words. But all words are not equal. Words like some, several, many, few, frequently, often, substantial, or recently will take up space on the page and convey an impression. These connotative words will not mean the same thing to everyone. If a memo sent to six employees states that the company has lost a substantial amount of business, will all employees acquire the same knowledge? One might assume that a substantial loss equals $1,000; another might assume that a substantial loss equals twelve clients. In each case, the employees are guessing, and that is not the goal of successful technical writing. (The previous memo using the phrase very detailed would be more clear if the writer had said he needed an eight hour presentation. Everyone receiving the memo then would know exactly how much time they needed to set aside to attend the meeting.) 12
  • 18.
    Read the followingparagraph, taken from an actual business correspondence: 2. Conciseness “In order to facilitate an efficient meeting and fuel thought processes prior to June 25, I want to provide you with a brief overview of discussions recently carried out at the director and manager level within the process. These discussions involved personnel from Accounts Payable, Information Services, Procurement/ Materials Management, Financial Systems, and Property Accounting, centering on a proposed framework for managing process improvement moving forward.” Do you understand this letter? Do you remember what you read? Did you even finish reading it? Successful technical writing should help the reader understand the text, not present challenges to understanding No one curls up in bed at night and for pleasure reads manuals about installing computer printers. The above paragraph is not successful writing. It fails to communicate clearly because it is too long-winded. In this case, conciseness actually would aid clarity. Isn’t it the responsibility of the reader to figure it out? No. The responsibility is with the writer. Here is why. If an individual reads literature, it is his or her responsibility to understand the writing. Creative writers seek to challenge us. However, technical writing, as noted in Chapter 1, is not literature. We read technical writing because it is a job requirement. Good technical writing is concise. It is a tool for the readers to use to accomplish whatever job they are doing. In contrast to traditional essays, effective technical writing uses short words and short sentences. 13
  • 19.
    Conciseness has uniqueimportance in technical writing Technical Writing Must Fit in the Box Where’s the user manual for your car? It’s inside the glove compartment. In other words, that piece of very complex technical writing had to be written concisely enough to fit inside a specific-sized box. The content took a backseat, so to speak, to the user manual’s predetermined location within the car. Here’s another example: what’s the perfect length of a resumé? One page, of course! Guess what? That’s a box. We have decided that a great resumé should fit inside a typical, 8” X 11” piece of paper. Now, think about the size of an e-mail screen. Yes, the “box” is shrinking. A typical e-mail screen measures about 3” X 6”. A Palm Pilot monitor is about 2” X 2”. Your cell phone monitor is about 1” X 1”, and a pager’s monitor is closer to ¼” X 1½”. In each instance, the writer has less and less room to write. Successful technical writing tries to avoid multisyllabic words such as “mul-ti-syl-lab-ic.” Conciseness achieved through short words Teach students to use one and two syllable words. Of course, some multisyllabic words can not be changed. We can not replace engineer, telecommunications, or Internet. Other words, however, can be avoided. Look at these, for example. Changing Long Words to Short Words Long Words Short Words cognizant know endeavor try domicile home morbidity death terminate end 14
  • 20.
    Conciseness achieved throughshort sentences You can shorten a sentence by avoiding: ! redundancy ! prepositional phrases ! passive voice Here is an unsuccessful example of technical writing: “In order to successfully accomplish their job functions, the team has been needing more work space for some time now.” An improved sentence would read, “The team needs more work space to do its jobs.” The first sentence contains 20 words and 28 syllables; the second sentence contains ten words and ten syllables. Avoiding redundancy Why say, “The used car will cost the sum of $1,000.00”? It is more concise to say, “The used car will cost $1,000.00.” In this instance, “the sum of” is redundant. The following examples replace redundancy with concise revisions: Wordy Sentence Less Wordy Sentence We collaborated together on the projects. We collaborated on the project. This is a brand new innovation. This is an innovation. The other alternative is to eat soup. The alternative is to eat soup. Avoiding prepositional phrases Prepositional phrases create wordy sentences. Consider the following examples (note that the prepositional phrase is in bold type): Wordy Sentence Concise Sentence He drove at a rapid rate. He drove rapidly. I will see you in the near future. I will see you soon. I am in receipt of your e-mail message requesting an increase in pay. I received your e-mail message requesting a pay raise. 15
  • 21.
    Avoiding passive voice Passivevoice constructions are weak for at least two reasons. They are wordy, and they replace strong verbs with weak verbs. Example: “The window was broken by the boys.” versus “The boys broke the window.” The first sentence contains seven words and the weak verb was. In contrast, the second sentence contains five words and the strong verb broke. The emphasis is placed on the individuals (boys) rather than on an inanimate object (window). Other examples follow: Passive Voice Active Voice It is my decision to run for office. I decided to run for office. There are sixteen people who tried out for the basketball team. Sixteen people tried out for the basketball team. The computer was purchased by Tom. Tom purchased the computer. 3. Accessible Document Design In addition to clarity and conciseness, a third trait of effective technical writing is accessibility (page layout— the way the text looks on the page). Look at the following paragraph: Regarding part number 315564-000, we received 541 units of wafer #3206-2. These were rejected. For the same part number, we received 643 units of wafer #3206-4. These were accepted. Three hundred and twentynine units of wafer #3206-5 from the same part number. These were accepted. Next, 344 of part number 315564-000’s wafer #3206-6 were accepted. However, the 143 units of wafer #3206-7 (same part number) were rejected. Finally, all 906 units of wafer #3206-8 were rejected. These also were from part number 315564-00. 16
  • 22.
    Wall-to-wall words turnoff readers. Highlighting techniques make the text open, airy, and inviting! Students can make information leap off the page by making content accessible through the following highlighting techniques: ! The paragraph on the bottom of page 16 consists of 84 words and ten sentences. The average number of words per sentence is only 8.4. Because the sentences are not too long, the writing is concise. Next, the text is clear, due to specificity of detail. However, despite the clarity and conciseness, this writing fails. Why? Essentially, this paragraph is unintelligible. The page layout makes it nearly impossible for the reader to understand the text. Graphics (table and figures) ! White space ! Boldface text ! Headings and subheadings Wafer # Quantity Received 3206-2 541 3206-4 643 a " 3206-5 329 a " 3206-6 344 a " 3206-7 143 X 3206-8 906 X Accepted Rejected X 17 ! Underlining ! Varied Font sizes Bullets (!&'()) ! Part Number 315564-00 Italics ! Using highlighting techniques (tables, headings and subheadings, different font sizes, column lines, and white space), below is a revised copy of the information presented on page 16. ! Numbered lists ! Varied Font types (computers offer many options)
  • 23.
    4. Audience Recognition Whois writing to whom? What does the audience know, need to know, and want to know? When your audience fails to understand the text, you have failed to communicate! Recognizing your audiences Successful technical writers know that they can only achieve clarity by recognizing their audiences. Basically, our students will write to either High Tech Peers, Low Tech Peers, or Lay Readers. These three audience levels have the following traits. High Tech Peers know as much about a subject matter as you. They have the same job title, same education, same years of experience, and the same level of expertise. For example, a medical doctor writing to another medical doctor would be writing High Tech to High Tech. Low Tech Peers who work in your company know something about the subject matter. They may not have the same job title, education, years of experience, or level of expertise. For example, a medical doctor writing to a staff nurse would be writing High Tech to Low Tech. Lay Readers are your customers. They are completely out of the loop. For example, a medical doctor communicating with a patient. High Tech Peers Communicating High Tech and Low Tech Peer 18 Writing successfully to these three types of audiences requires different techniques. High Tech and Lay Reader
  • 24.
    Writing to HighTech Peers When writing to a high tech peer, one can use acronyms and abbreviations, usually without any definition. Educators are familiar with QPA, NEA, and KPERS. But individuals in other fields would assume that NEA meant National Endowment for the Arts, not National Education Association. Writing to Low Tech Peers Accountants do not need their high tech peers to define FIFO or CPR. If these accountants write to one of their fellow employees in sales, computer technology, or human resources (low tech peers), however, these high-tech terms must be explained. FIFO could be parenthetically defined as First In, First Out. CPR, which everyone assumes means Cardiopulmonary Resuscitation, in fact means Continuing Property Records, something accountants understand. Writing to the Lay Reader Whereas high tech readers do not need acronyms or abbreviations defined, and low tech readers need a parenthetical definition, lay readers want to avoid the confusion completely. All they want is the definition—no abbreviations or acronyms. In fact, they might also need follow-up explanations. Why would a homeowner in a residential area want to be told by local health authorities, “You are in danger of DBPs”? What’s a DBP? These lay readers do not even want to be told, “You are in danger of DBPs (disinfection by-products).” What’s a disinfection by-product? Instead, the lay reader wants to be told that their nearby streams contain high-acid, chlorine, and ammonia levels. Use pronouns in technical writing. After all, companies do not write to companies. People write to people! Readers want to be spoken to, not spoken at. Pronouns are effective in technical writing. You, your, us, we, our, I, me, and my create a personalized tone. Achieving Audience Recognition Audience Style Example High Tech Peers Abbreviations/ Acronyms OK Please review the enclosed OP and EN. Low Tech Peers Abbreviations/ Acronyms need parenthetical definitions. Please review the enclosed OP (Operating Procedure) and EN (Engineering Notice). No abbreviations/ acronyms. Explanations instead. By following the enclosed operating procedure, you can ensure that your printer will run to our engineers’ desired performance levels. Lay Readers 19
  • 25.
    5. Accuracy Effective technicalwriting must be correct, whether grammatically, mathematically, electronically, etc. Errors in technical writing make the company and the employee look bad. More importantly, errors can lead to damages, injuries, lawsuits, or just embarrassment and misunderstandings. Students must understand the importance of proofeading Ask your students to try these proofreading techniques: Ode to Spell Check... I have a spelling checker. It came with my PC. It plainly marks four my revue Mistakes I cannot sea. I’ve run this poem threw it. I’m sure your pleased to no, Its letter perfect in it’s weigh My checker tolled me sew. —Unknown ! ! Use the computer’s spell check—remember, however, that a spell check will not catch form if you mean from, to if you mean too, or except if you mean accept. Let it sit—for a day or a weekend. When the document is cold, students are more objective about their own writing. ! Use peer evaluations—others will see the errors we miss. ! Read it aloud—sometimes we can hear errors. ! Read it backwards—then you read words out of context. You cannot anticipate the next word. Conclusion: Until we tell students what we want in a technical document, they will not give it to us. Once they know the criteria for successful technical writing, then you can hold them accountable for these skills. 20
  • 26.
    5-Trait Rubric This five-traitrubric can help in assessing student work. Trait 0 ! CLARITY Organization ! ! ! CONCISENESS Sentence fluency/ word choice ACCESSIBLE DOCUMENT DESIGN Ideas and Content ! ! ! ! ! ! AUDIENCE RECOGNITION Voice ACCURACY Writing Conventions ! ! ! ! ! 1 Important points are delayed or absent Some Reporter's Questions never answered Many vague, connotative words used Longer words are commonplace Sentences average over 20 words Paragraphs often exceed six typed lines Highlighting is not used Information is not accessible Highlighting is overused Writer does not define high-tech terms Writer does not consider audience needs Writer never uses pronouns to involve audience Punctuation often incorrect Spelling often incorrect Excessive grammar & usage errors distort the message 3 2 ! ! ! ! ! ! ! ! ! ! ! ! ! ! Some important points are delayed Some Reporter's Questions assumed understood Some vague, connotative Longer words used when shorter words exist Sentences average 15-20 words Some paragraphs exceed six typed lines Some main points are highlighted Information is usually accessible Writer usually defines high-tech terms Writer usually considers audience needs Writer often involves audience through pronouns Punctuation is usually correct Spelling is usually correct Grammar & usage somewhat flawed 5 4 ! ! ! ! ! ! ! ! ! ! ! ! ! ! Important points come first Reporter's Questions answered Specific, denotative words used Words are generally one or two syllables Sentences average 10-12 words Paragraphs do not exceed six typed lines Highlighting techniques emphasize main points to help access Highlighting techniques not overused Writer defines all high-tech terms Writer considers audience needs Writer uses pronouns to involve audience Correct punctuation Correct spelling Correct grammar & usage Original source: Carmen Shelly at DeSoto High School, DeSoto, KS 21
  • 27.
    End-of-Chapter Activities Clarity andConciseness Revise the italicized vague words and phrases, specifying exact information. (Students are allowed to invent numbers.) Specificity Vague Word(s) Specified I have a low GPA. The b-ball player was really tall. I’ll be home as soon as possible. The team has a losing record. The computer has lots of memory. Change the following long words to shorter words. Changing Long Words to Short Words Long Word Short Word utilize More student activities for clarity and conciseness continued on next page... anticipate cooperate indicate initially presently prohibit inconvenience 22
  • 28.
    Clarity and Conciseness (continued) Changethe following long phrases to one word. Changing Long Phrases to One Word Long Phrase One Word In the event that At this point in time With regard to In the first place Is of the opinion that Due to the fact that Make revisions Take into consideration With the exception of Make an adjustment of Revise the following long sentences, making them shorter. 1. I will be calling you on May 31 to see if you have any questions at that time. 2. If I can be of any assistance to you in the evaluation of this proposal, please feel free to give me a call. 3. The company is in the process of trying to cut the cost of expenditures relating to the waste of unused office supplies. 4. I am of the opinion that Acme employees have too much work to do. 5. In the month of July, my family will make a visit to the state of Arkansas. 6. It is the company’s plan to take action to avoid problems with hazardous waste. 7. On two different occasions, the manager of personnel met with at least several different employees to ascertain whether or not they were in agreement with the company’s policies regarding overtime. 23
  • 29.
    Accessible Document Design Askyour students to reformat the following text by using highlighting techniques. Consider using bullets or numbers, headings, boldface or underlining, and white space. To make a pie chart using your word processing package’s graphic components, turn on the machine. Once it has booted up, double click on the word processing icon. After the system is open, click on “graphic,” scroll down to “chart,” and double click. Next, click on “data chart types” and select “pie.” Once you have done this, input your new data in the “data sheet.” After this has been completed, click anywhere on the page to import your new pie chart. If you want to make changes, just double click again inside the pie chart; then you can revise according to your desires. Student Activity ! ! ! Bring a document to class. (This could be a textbook, technical manuals, popular magazines, brochures, etc.) In a small group, determine which documents are successfully accessible and which documents are not. Reformat any of the flawed documents to improve the document design. Audience Recognition Acronyms & Abbreviations ! ! ! Make a list of 4-6 acronyms or abbreviations from an area of interest. (Students interested in computers could list computer terms, students in art could list art terms, etc.) Read these terms to see how many of your peers understand the high tech language. Define the terms for a low tech reader and/or explain the terms for a lay reader. ! ! ! Bring a document to class. (This could be a textbook from your class or other classes, manuals found at home, popular magazines, brochures, etc.) In a small group, determine whether high tech terminology, abbreviations, and/or acronyms are used successfully and defined when necessary? Define the terminology and/or explain the terminology to improve the document’s clarity. (On the next page is an answer key for student activities on pages 22 and 23.) 24
  • 30.
    Answer Key ! ! ! ! Specificity: 1.6;six foot seven; by midnight; 3 and 12; and 16 megs. Changing Long Words to Short Words: use; await; help; show; first; now; stop; problem. Changing Long Phrases to One Word: if; now; regarding or about; first; thinks; because; revise; consider; except; adjust or fix. Revising Long Sentences: 1. I will call on May 31, 1998, to answer questions. 2. If I can help you assess this proposal, please call. 3. The company is trying to cut costs of unused office supplies. 4. I think Acme employees are overworked. 5. In July, my family will visit Arkansas. 6. The company plans to avoid hazardous waste problems. 7. Twice, the personnel manager met with six employees to learn if they agreed with the company’s overtime policies. 25
  • 31.
    Chapter Three In This Chapter... Applicationsin Technical Writing No one type of correspondence defines technical writing. Instead, technical writing consists of many different types of documentation. As teachers, we can help our students by familiarizing them with these various types of technical writing. This chapter includes criteria, samples, and peer evaluation checklists for the following: Letters Letters Memos Reports The Job Search Brochures Newsletters Fliers Graphics PowerPoint Presentations Letters, which rarely should exceed one page, are a basic form of technical writing A successful letter will abide by all the criteria discussed in Chapter 2. An effective letter will be: clear concise accessible accurate and recognize audience* *By defining high-tech terms and by achieving a personalized tone. A corporate environment will send letters (external correspondence) to and receive letters from potential employees, vendors, clients, lawyers, colleagues in other companies, and city, state, national, and international governments. No matter who the reader is or why the letter has been written, a letter should have the following eight Essential Components: Writer’s address Date Reader’s address Salutation Text Complimentary close Signature Typed name 26 On the next page is a sample letter with each of the essential components noted.
  • 32.
    Writer’s Address ACME NutZ& BoltZ 1800 West Hardware, Wheelbarrow, KS 66244 Date Reader’s Address Salutation January 15, 2004 Julie Boyle 5982 Elm Hastings, KS 62331 Dear Ms. Boyle: Thank you for your letter requesting information about our Acme Nutz & Boltz service contract. The following clarifies what we cover and the duration of that coverage. Machinery maintenance: Free for 60 days after purchase. After the first two months, we will provide complete maintenance (parts and labor) for $24.00 a year up to five years. This maintenance contract requires you to bring the machinery to our shop. Text On-site maintenance: Free for 60 days after purchase. After the first two months, we will service your machinery at your site for an additional $12.00 a year up to five years. Exclusions: We will maintain your machinery parts free for 60 days or for five years at $24.00 a year. This does not include lubricants. You should lubricate your machinery quarterly with 2 oz. of silicon gel. You can purchase this at our parts counter. With our expert maintenance, your machinery can last a lifetime. If you purchase our five-year plan by the end of this month, Ms. Boyle, we will offer you a 10% discount. Please contact our service representative at 441-9026, ext. 1313. Complimentary Close Signature Sincerely, Becky Sandhaus Becky Sandhaus Typed Name 27
  • 33.
    All-Purpose Template In additionto the eight essential letter components, an effective letter will also contain an Introduction, a Body, and a Conclusion (the text of the letter). To help students understand what these three parts of a letter should include, use the following all-purpose template: Conclusion Body Introduction Tell the reader why you are writing and Itemize what exactly you want the reader to do or What you are writing about What exactly you plan to do Tell the reader what’s next Include when you plan a follow-up action and Why that date or time is important This is called the All-Purpose Template because students can use this organizational approach for every type of letter they might write. Whether writing a cover letter for a resumé, a sales letter, or a letter of inquiry, the student will respond to the same questions. Type of Letter Body Introduction Conclusion Question: Why are you writing? Answer: Cover Letter In response to a job advertisement. Question: Question: What exactly do you want to say? Answer: What are you writing about? Answer: Name the specific job opening. (Many companies list numerous job openings.) The reasons why you are qualified for the job. Question: What is next? Answer: When can you meet with the personnel director to discuss this job opening? Question: Why are you writing? Question: Answer: Sales Letter Question: To solve a reader’s problem or fulfill a reader’s need. Question: What are you writing about? Answer: The product or service you are attempting to sell. What exactly do you want to say? Answer: The reasons why your product or service will benefit the reader. What is next? Answer: When the reader should purchase this product or service and why that date is important (a discount, an extended warranty, or a discontinued item date). Question: Why are you writing? Answer: Letter of Inquiry Question: To ask your reader a question. What exactly do you want to say? Question: Answer: List your specific questions. What are you writing about? Answer: The specific topic of your inquiry. 28 Question: What is next? Answer: When do you want an answer and why is that date important.
  • 34.
    Letter Wizards/Templates Microsoft Word’sWizards/Templates might help your students more easily write letters (and memos, fliers, resumés, etc.). Students can access Wizards/Templates by clicking on File, scrolling to New, and then clicking on the Letters & Faxes tab. Inside this file, they will find templates for contemporary, professional, and elegant letters. Wizards/Templates are good and bad. On the good side, these templates help students format letters and provide the standard letter components. On the bad side, however, templates can be restrictive, limiting the students’ options. For example, I would NEVER teach students to begin a letter with Dear Sir or Madam. It is too impersonal and old-fashioned. Yet, the letter wizard provides this salutation in their template. Students should be informed of both the pluses and minuses of wizards. Screen shot reprinted courtesy of Microsoft Corporation. Wizards provide your students optional layouts for letters. On the next page is an example of what the Contemporary Letter template looks like. 29
  • 35.
    Here is whatthe Contemporary Letter template looks like. Company Name Here August 20, 2004 [Click here and type recipient’s address] Dear Sir or Madam Type your letter here. For more details on modifying this letter template, double. To return to this letter, use the Window menu. click Sincerely, [Click here and type your name] [Click here and type job title] Student Activity… After the criteria on the all-purpose template have been shared and discussed with the students, have them write rough drafts of a Cover Letter, Sales Letter, or Letter of Inquiry. (Samples of a Sales Letter and Letter of Inquiry follow the Peer Evaluation Checklist.) 30 On the following page is a Peer Evaluation Checklist for a LETTER. This checklist may be customized, depending on the type of letter the student is writing.
  • 36.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name LETTER _________________________________________ Reader’s Name YES QUESTIONS 1 Has the student provided the eight letter essentials? 2 Does the student’s Introduction explain why he or she is writing and what he or she is writing about? 3 Does the student’s Body explain what exactly he or she wants or plans to do? 4 Does the student’s Conclusion explain what’s next, specifying when there should be a follow-up action and why that date/time is important? 5 Is the letter Clear, answering reporter’s questions and specifying? 6 Is the letter Concise, limiting word length, sentence length, and paragraph length? 7 Does the letter provide an Accessible Document Design, using highlighting techniques effectively? 8 Does the letter achieve Audience Recognition by defining high-tech terms? 9 Does the letter achieve Audience Involvement by personalizing through pronoun usage? 10 Is the letter Accurate, abiding by all grammatical conventions? *If the answer is no, specify what is missing and suggest a solution. 31 NO*
  • 37.
    Sample Sales Letter TeachingTools 1423 Excel Collegetown, KS 65551 July 12, 2004 Flint Lake Hills USD 6590 Lakeside Dr. Flint Lake, KS 68621 Subject: INTERACTIVE TEACHING EQUIPMENT Do your teachers want more hands-on activities in class? Could your students profit from more personal involvement in their education? Now, you can use our proven Interactive Teaching Tools (ITT) to achieve these goals. Here is how we can help: ITT computer-generated presentations encourage creative teaching. The animated graphics packages (complete with 1200 images) help teachers enliven their lectures. ITT palm-top computers encourage student involvement. When each student has his or her own palm-top, that student can move from lecture to hands-on application instantaneously! Quick turnaround equals quick understanding. ITT software encourages shared learning. Our team-tested software helps students learn together. When students work in teams, they increase their knowledge, a fact proven by 2003 MIT studies in interpersonal effectiveness. This software then lets the teacher become a facilitator rather than a lecturer. Ask for a free demonstration and free software package today! If you act before the next semester, we will offer you a USD 10% discount. ITT can help your teachers to help your students. Sincerely, Wilkes Barry, Ed.D. 32
  • 38.
    Sample Letter ofInquiry Flint Lake Hills USD July 15, 2004 6590 Lakeside Dr. Flint Lake, KS 68621 Teaching Tools 1423 Excel Collegetown, KS 65551 Dear Dr. Barry: Your Interactive Teaching Tools (ITT) might be what we are looking for to increase student involvement and encourage hands-on instruction. Before we place an order, however, we need more information. Please answer the following questions: 1. Do your ITT computer-generated presentation packages come with user manuals, and will you provide free training at our USD site? 2. Do you offer quantity discounts on your ITT palm-top computers? We would like to purchase 500 palm-tops. However, we can only do this if you give us a cost break. This is required by our USD Purchasing Office. 3. What 1997 MIT study are you referring to? We would like a copy of that study for our USD board. This would substantiate your claims and help us recommend purchase. Our Fall semester begins August 13, 2004. If you respond to our questions by July 30, 2004, we will have time to meet with our board and consider a purchase. Sincerely, Walt D. McDonald, Ed.D. Superintendent, Flint Lake USD 33
  • 39.
    Memos Memos differ fromletters in two significant ways First, memos are internal correspondence, written by employees in a company to employees in the same company. Letters, in contrast, are external correspondence, written from within a company to outside vendors, clients, or colleagues. Secondly, memos have a different format than the letter essential components. Memo components Memos replace the eight letter essential components with the following memo identification lines: Teaching Suggestion When teaching about writing letters, the focus is usually on types (such as cover letters, sales letters, and letters of inquiry). It is suggested that the instructor use modes to teach memos. Students could write a problem/solution, comparison/contrast, argument/persuasion, a cause/ effect, a classification or analysis memo, etc. This, of course, is not mandatory. Using modes is an easy tool since both teachers and students are familiar with this organizational technique. Date is the month, day, and year in which you are writing To names your reader From is your name Subject (typed in all capitals) provides your audience two things: a topic and a focus. For example, a successful subject line would read as follows: Date: To: From: Subject: Subject: VACATION SCHEDULE FOR ACCOUNTANTS Accountants is the topic of the memo; vacation schedule is the focus. The focus aids communication more than the topic. The topic of a memo, for instance, can stay the same, while the focus changes. Look at the following examples: Subject: SALARY INCREASE FOR ACCOUNTANTS Subject: TERMINATION OF ACCOUNTANTS In each of these instances, the topic stays the same: Accountants. Notice, then, how important the focus comments are. We see a huge difference between salary increases, vacation schedules, and termination. In addition to the identification lines, memos differ from letters in one other subtle way. Whereas letters are signed (essential component #7), memos are initialed next to the From line. Though memos and letters differ as noted, they are similar in all other ways. Successful memos, like letters, have an introduction, body, and conclusion. Like letters, successful memos are clear, concise, accessible, accurate, and achieve audience recognition. The next two pages contain sample memos focusing on problem/solution and comparison/contrast modes. 34
  • 40.
    Sample Problem/Solution Memo Date: To: From: Subject: March15, 2004 Candice Millard Larry Massin LMM SOLVING PROBLEM WITH E-MAIL Candice, as you noted in your March 13 memo, we are having problems with our e-mail. Intranet correspondence has evinced the wrong tone, contained unnecessary spacing, and forced readers to scroll endlessly. Here are suggestions to correct these problems. 1. Improving Tone—Studies tell us that typing in all caps creates a negative tone, called flaming. For example, when one writes, TELL YOUR SUBORDINATES TO IMPROVE THEIR TONE IN E-MAIL, readers feel they are being shouted at. Please ask your colleagues to avoid typing in all capitals. 2. Omitting Unneeded Spaces—E-mail arrives looking as follows: “Can you help us solve problems with odd spacing. We can not seem to figure out why this is happening.” This odd spacing is caused by the different sizes of monitors. We commonly use word wrap when writing memos and letters because all text will exist on an 8½ X 11 inch page. Such is not the case with e-mail. E-mail on a 12” monitor will look differently than e-mail on a 16” monitor. To avoid the problem of odd spacing caused by different monitor sizes, do not use word wrap. Instead, use a hard return at the end of each line, and limit your line length to approximately 60 characters. 3. Avoiding Endless Scrolling—A memo or letter follows the WYSIWYG factor. When we get an 8½ X 11 inch memo or letter, What We See Is What We Get. In contrast, e-mail screens are smaller. Readers are often forced to scroll for several screens. This is disconcerting. To avoid this problem, limit your e-mail to approximately 14 lines (one screen). By using these techniques, Candice, your department’s e-mail will improve. Please e-mail my suggestions to your colleagues by today’s end-of-business. If I can answer other questions, just call ext. 3625. 35
  • 41.
    Sample Comparison/Contrast Memo Date: To: From: Subject: December2, 2004 Lupe Salinas Larry Massin LMM INCREASING PRINTER CAPABILITIES Lupe, currently our printers are backing up. This is due to increased demands placed on the printers. Now that we have 20 new employees and 15 new accounts, our printers cannot keep up with the demand. To solve this problem, you might want to consider the following two options presented in Table 1: Table 1: Printer Options 5 B/W, Dot Matrix Printers 1 Color Laser Printer 5 x $350=$1,750 $2,500 Printing text Print text/graphics in color Capacity Printing 1 page per 2 min. Printing 5 pages per 2 min. Control Only 5 users can be linked All 35 users can be linked Options Cost Capability Both these options will meet our demands, Lupe. However, the color laser printer, though more expensive, will save us time and provide more quality. Let me know which option you prefer. If we place an order before month end, we can buy this year’s model (next year’s models will cost more). Memo Wizards/Templates Microsoft Word’s Wizards/Templates might help your students more easily write memos (and letters, fliers, resumés, etc.). Students can access Wizards/Templates by clicking on File, scrolling to New, and then clicking on the Memos tab. Inside this file, they’ll find templates for contemporary, professional, and elegant memos. Wizards/Templates are good and bad. On the good side, these templates help students format memos and provide the standard memo components. On the bad side, however, templates are restrictive, limiting the students’ options. (See example screen shots of Memo Wizards on next page.) 36
  • 42.
    Wizards provide yourstudents optional layouts for memos. Below is an example of what the Contemporary Memo template looks like. Screen shot reprinted courtesy of Microsoft Corporation. interoffice memo Date: 11/05/02 To: [Click here and type names] cc: [Click here and type names] From: Network Services RE: Following is a Peer Evaluation Checklist for MEMOS. [Click here and type subject] [Click here and type your memo text] 37
  • 43.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name MEMO _________________________________________ Reader’s Name QUESTIONS YES 1 Does the student provide the memo identification lines (Date, To, From, Subject)? 2 Does the student’s Subject line provide a topic and a focus; is the memo Initialed by “From”? 3 Does the student’s Introduction explain why he or she is writing and what he or she is writing about? 4 Does the student’s Body explain what exactly he or she wants or plans to do, using appropriate modes (problem/solution, comparison/contrast, argument/ persuasion, cause/effect, classification, analysis, etc.)? 5 Does the student’s Conclusion explain what’s next, specifying when there should be a follow-up action and why that date/time is important? 6 Is the memo Clear, answering reporter’s questions and specifying? 7 Is the memo Concise, limiting word length, sentence length, and paragraph length? 8 Does the memo provide an Accessible Document Design, using highlighting techniques effectively? 9 Does the memo achieve Audience Recognition by defining high-tech terms and Audience Involvement by personalizing through pronouns? 10 Is the memo Accurate, abiding by all grammatical conventions? *If the answer is no, specify what is missing and suggest a solution. 38 NO*
  • 44.
    E-mail E-mail is rapidly becomingone of the world’s most important means of communicating in the business place. To succeed on their jobs, our students need to learn how to write successful e-mail. E-mail Benefits Why is E-mail important? Just look at these numbers: 140 million people will use e-mail in 2003. E-mail messages outnumber first-class letters 30-1. 80 percent of business employees say that e-mail has replaced most of their written business communication. 45 percent of business employees say that e-mail has replaced most of their business-related phone calls. 66 percent of business employees say that they are e-mail only communicators. E-mail is similar to and different from memos and letters Letters are external correspondence; memos are internal correspondence. E-mail (electronic mail), in contrast, can be both internal and/or external. Employees can e-mail each other within a company and/or e-mail vendors, clients, and colleagues outside a company. E-mail is similar to memos in that both use identification lines (Date, To, From, and Subject), in contrast to a letter’s eight essential components. Like letters and memos, e-mail must be clear, concise, accessible, accurate, and achieve audience recognition. A successful e-mail contains a subject line with a topic and a focus, an introduction, a body, and a conclusion. 39 E-mail allows a writer to instantly communicate with a reader. E-mail can be sent to numerous readers at the same time. E-mail allows the writer and reader(s) to chat with each other online. A real-time dialogue is possible, whereas memos and letters may require days or weeks for dialogue to occur. E-mail means no telephone tag. However... A wonderful value to the slowness of memos and letters is that time lets us correct errors.
  • 45.
    While the benefitsof e-mail help companies save time and money, things can and do go wrong. E-mail problems Specifically, e-mail causes the following problems: Instantaneous communication hinders the writer’s ability to double-check facts, effectively proofread text, and achieve the correct tone. —If we write something that has grammatical or mathematical errors, we can check these for correctness. Highlighting techniques, such as boldface, underlining, italics, color, and fonts, are not possible for all e-mail packages. —If we write something that might be offensive, we can set the memo or letter aside for awhile. Then, at a later date, we could review the original and revise accordingly. —E-mail, in contrast, can be sent at the push of a button. This speed may hinder our revision. People don’t like scrolling endlessly. Instead, e-mail should abide by the WYSIWYG factor (What You See Is What You Get). One, viewable screen of text is better than text that only can be read when you scroll . . . and scroll and scroll. E-mail and computer viruses Some can use highlighting techniques; other e-mail packages cannot. If a system can use highlighting but another system cannot, the codes used to highlight will garble the e-mail message. E-mail writers should limit themselves to: numbering, asterisks indenting (by using the tab key or the space bar) Computer viruses, easily spread via e-mail, make readers cautious about opening e-mail from unknown sources. To avoid this problem, you should use Sig. Lines in your e-mail. These signature lines tell readers who you are (since e-mail addresses like BigDaddy@aol.com or SweetBaby@hotmail.com don’t communicate clearly). Ideal signature lines include your name, your organization/company, contact information (phone and fax numbers), and your URL and e-mail address. 40
  • 46.
    The biggest problemin e-mail is lack of professionalism Students are used to writing IMs—Instant Messages—to their friends. That’s not what we’re talking about in this chapter. We’re discussing e-mail written in the workplace, to bosses, co-workers, vendors, and clients. In instant messages, our students can get away with poor punctuation and spelling. As Diane Stafford, editoralist for the Kansas City Star, says, “One could argue that the casual nature of instant messaging has created a different mind-set among young e-mail users. Perhaps the medium dictates the style, and [students] don’t think it requires the same attention as, say, a school essay.” But for business e-mail, those errors create the wrong image, making employees and companies look unprofessional. Stafford continues by stating, “job readiness education is a good thing in middle schools and high schools…Teach [students] that what’s acceptable in instant messaging isn’t appropriate for job hunting” (C1: May 2, 2002). Sample Business E-Mail From: spcsupport@nuvocom.net Date: December 30, 2003 To: Christy McWard Subject: CREATING A NEW PROFILE Thank you for contacting our 800-hotline. Recent online nuvocom.net updates have modified existing customer profiles. These changes can affect your e-mail. To solve the problems you encountered, create a new customer profile as follows: 1. 2. 3. 4. 5. 6. 7. Click on the nuvocom.net icon to open your account. Double click “Configure.” Right click on “Manage Profiles.” Scroll down to “New Profile.” Type in your password and 6-digit PIN. Click “Next.” Click “Finish.” This will allow you to access your e-mail. If you have any more questions, you can contact us either by e-mail, at our 800-hotline, or online at http://www.nuvocom.net/support. On the next page is a Peer Evaluation Checklist for E-mail. 41
  • 47.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name E-MAIL _________________________________________ Reader’s Name YES QUESTIONS 1 Does the student provide the e-mail identification lines (Date, To, From, Subject)? 2 Does the student’s Subject line provide a topic and a focus; is the Address to the e-mail’s reader correct? 3 Does the student’s Introduction explain why he or she is writing and what he or she is writing about? 4 Does the student’s Body explain what exactly he or she wants or plans to do? 5 Does the student’s Conclusion explain what’s next, specifying when there should be a follow-up action and why that date/time is important? 6 Is the e-mail Clear, answering reporter’s questions and specifying? 7 Is the e-mail Concise, limiting word length, sentence length, paragraph length, line length (to no more than 60 characters), and screen length (no more than 22 lines)? 8 Does the e-mail provide an Accessible Document Design, using only such highlighting techniques as numbers or asterisks? 9 Does the e-mail achieve Audience Recognition by defining high-tech terms and Audience Involvement by creating a positive tone (versus “Flaming”- a negative tone)? 10 Is the e-mail Accurate, abiding by all grammatical conventions? *If the answer is no, specify what is missing and suggest a solution. 42 NO*
  • 48.
    Reports Reports come inall types and sizes Students could write long reports (over three pages) or short reports (under three pages). They could write: proposals to recommend the solution to a problem or to assess the feasibility of a project trip reports about an off-site visit laboratory reports about the results of a procedure status reports about their progress on a project Whichever type of report a student writes, whether it is long or short, it should have the following components: Identification lines Date, To, From, Subject (just as with memos and e-mail). The subject line would be typed in all caps and contain a topic and a focus. Introduction The introduction tells the readers what you are writing about and why you are reporting on this topic. This and the following comments about body and conclusion abide by the same all-purpose template discussed earlier in the chapter. Body The body of the report explains what exactly you accomplished and what problems you encountered (status report); what you saw and did (trip report); what procedure you followed and what you learned from the task (laboratory report); what options exist as feasible solutions to a problem (proposal). Conclusion The conclusion informs the reader what’s next. This could include what you plan to do during the next reporting period (status report), your suggestions for the next site visit (trip report), follow-up procedures and/or lessons learned (laboratory report), and your recommendations to solve the problem (proposal). 43 Remember the Five Traits of Technical Writing When Preparing Reports Clarity--answering reporter’s questions. Conciseness--using short words, short sentences, and short paragraphs. Document Design-employing highlighting techniques to make information accessible. Audience Recognitiondefining high tech terms. Throughout this chapter, it has been suggested that letters, memos, and e-mail use pronouns to achieve a personalized tone. Most reports, in contrast, are more objective, less personal. Accuracy--abiding by grammatical conventions.
  • 49.
    Sample Report Reports, unlikememos and e-mail, contain first, second, and third level headings, as you can see in this sample report. The headings help the reader navigate text. (A first level heading would be more emphatic than a second level, a second level more emphatic than a third, etc.) A first level heading might be 11 POINT, ALL CAPS, ARIAL, BOLDFACE. Date: To: From: Subject: October 3, 2004 Mr. Perry Michelson Steve Janasz LAB REPORT ON BACTERIA GROWTH INTRODUCTION Purpose To determine the effects of antiseptics on the growth of bacteria. My hypothesis is that Sodium Hyperchlorite (Clorox) will reduce bacteria growth. Materials/Equipment A second level, to be less emphatic, could be 10 POINT, INITIAL CAPS, OMEGA, BOLDFACE. A third level heading might be 9 point, no caps, Omega, Italics. 2 petri dishes 5% Clorox soap magnifying lens pencil water paper agar DISCUSSION Procedure 1. Obtain the petri dishes, then label one “control” and the other “5% Clorox.” 2. Touch my unwashed hands to the petri dish labeled “control.” Close the lid after touching the dish. 3. Wash my fingers in the 5% Clorox solution for 15 seconds. 4. Air dry my fingers for about 2 minutes. 5. Touch my washed fingers to the petri dish labeled “5% Clorox.” Close the lid after touching the dish. 6. Wash my hands with soap to remove the Clorox. 7. Incubate the dishes at room temperature. 8. Record the day, date, number of colonies, and their color for days 0 through 4. Results colony count Day Control 0 0 1 8 2 285 3 570 4 411 5% 0 0 0 0 1 color of colonies Control 5% off-white none off-white none off-white none off-white none off-white off-white CONCLUSION From the information gathered, I conclude that antiseptics kill most bacteria. My hypothesis is true, even though the 5% dish had one colony on day 4. Note how the differences create a hierarchy, much like an outline, to lead the reader from point to point. 44 On the next page is a Peer Evaluation Checklist for REPORTS.
  • 50.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name REPORT _________________________________________ Reader’s Name QUESTIONS 1 YES Does the student provide Identification lines (Date, To, From, Subject), and does the Subject line provide a topic and a focus? 2 Does the student’s Introduction explain why he or she is writing and what he or she is writing about? 3 Does the student’s Body explain exactly what options he or she has considered (proposal), what has been accomplished (status report), what procedures have been followed (laboratory report), or what has been seen and done on the site visit (trip report)? 4 Does the student’s Conclusion explain what’s next, specifying when there should be a follow-up action and why that date/time is important? 5 Does the report include First level, Second level, and/or Third level Headings to help the reader navigate the text? 6 Is the report Clear, answering reporter’s questions and specifying? 7 Is the report Concise, limiting word length, sentence length, and paragraph length? 8 Does the report have an Accessible Document Design, including bulleted lists and graphics, such as a table and/or chart? 9 Does the report achieve Audience Recognition by defining high-tech terms? 10 Is the report Accurate, abiding by all grammatical conventions? *If the answer is no, specify what is missing and suggest a solution. 45 NO*
  • 51.
    The Job Search TheJob Search Includes. . . Finding job opportunities Creating a resumé Writing a cover letter/e-mail Interviewing Writing a follow-up letter/e-mail Not many things are more important than getting a job. After all, income is paramount. Our students will need to find employment once they graduate from high school, the community college, a college, or a university. You know who might be best suited to help them find employment? That’s right—their teachers, in all disciplines. We spend more time with our students than anyone else, and we know the students better than most people. Online Job Search Sites CareerLab.com Career City Jobs Whether you teach physical education, industrial technology, family and consumer sciences, agricultural education, business/computer classes, English, or any other discipline, you are the person who can help prepare students for their job search. Finding job opportunities Job Options Job Search Where should students look for jobs? They should try the following: NetTemps Networking. That can start with you, your school’s counselors, and, of course, their families and friends. Internet Job Locator Career Shop Job Search Career Builder Search HelpWanted USA Career Magazine Jobline Database What other possibilities exist? Ask your students for their suggestions. Career placement centers. Does your school’s counseling area list job opportunities? Many do, and that’s a great place for students to look. Area community colleges or local universities offer other possibilities. Online searches. Our students are very computer/Internet savvy. Today, a wonderful site for job opportunities is the Internet. Some career placement experts suggest that within a few years, 95% of all jobs will be found online (L. A. Lorek, “Searching On-line.” The Kansas City Star. August 23, 1998: D1). Monster.com, Headhunter.net, and Google.com, for example, let you search for jobs by title and location. Google.com provides a link to their cool jobs. All of these sites, and more, offer help with resumés, interview tips, job search tips, and samples of cover and thank-you letters. 46
  • 52.
    Don’t forget newspapersfor your job search. Times have changed, and jobs can be found online, but local newspapers are still a solid standby. Creating a resumé Microsoft Word’s Wizards/Templates might help your students more easily write resumés (and letters, fliers, memos, etc.). Students can access Wizards/Templates by clicking on File, scrolling to New, and then clicking on the Other Documents tab. Inside this file, they’ll find templates for contemporary, professional, and elegant resumés. Wizards/Templates are good and bad. On the good side, these templates help students format resumés and provide the standard resumé components. On the bad side, however, templates are restrictive, limiting the students’ options. Screen shot reprinted courtesy of Microsoft Corporation. 47
  • 53.
    Different types ofresumés ME! Not that long ago, if one talked about different types of resumés, that would have just meant reverse chronological vs. functional. A reverse chronological resumé would work for most of our students, since these types of resumés are geared toward the traditional job applicant (recent high school or college graduates) hoping to enter a profession for the first time. Functional resumés are more common for older individuals who are changing jobs or career fields. resu However, nowadays, different types of resumés refers to the format of the text versus the content. Today, you can send three types of resumés to prospective employers: Traditional mail versions. This is when you mail an 8 ½” X 11" piece of paper to an employer. In such a resumé, the student can use boldface headings, colored paper, italicized subheadings, bullets, etc. Many people consider a resumé the perfect form of technical writing. Whether you write a traditional resumé, e-mail version, or Internet resumé, they will all have many of the same components. An e-mail resumé. E-mail programs are different (AOL, Microsoft Outlook, Hotmail, and Juno, for example). They use different ASCII coding. So, what you see on your e-mail might not be what your reader sees. Thus, e-mail resumés cannot use boldface headings, color, italicization, or bullets. The coding required for these highlighting techniques might create garbled text. An e-mail resumé, on the other hand, must limit highlighting techniques to simple tools like the use of asterisks, all caps, and double spacing. An Internet resumé. This resumé will be delivered online, using HTML coding. Internet resumés are very unique, rarely following any set pattern. A resumé requires the writer to use each of the technical writing techniques already discussed. A resumé must be clear, concise (since most resumés are limited to one page), accessible, and correct. In addition to the above concerns, a resumé would include identification information of the writer, employment objectives, the writer’s education, work experience, and references. (These components are further discussed on the next page.) 48
  • 54.
    Component Identification Description The writer’s name,address, phone number, and e-mail address. Objectives This is optional: telling what kind of employment the applicant is seeking. Education List in reverse chronological order the writer’s degree (possibly at the anticipated graduation), school, city, state, and date of graduation (or anticipated date of graduation). The writer also could list achievements, such as GPA, honors, and/or special classes taken. (Education does not have to come before Work Experience.) Work Experience List in reverse chronological order the writer’s job title, company, city, state, and dates of employment. The writer also could list achievements, such as special tasks accomplished (open and shut store, train new employees, etc.), rapid promotions, number of hours worked while in school, and special skills acquired (use ten key calculator, computerized cash register, customer service, problem/solving skills). References Often noting References Supplied Upon Request is sufficient. Incorrect information on a resumé is tantamount to lying, which would destroy an applicant’s chances at getting or keeping a job. Activities Direct your students to go online (Internet Explorer or Netscape) and type in individual resumés in the search box. Then, look at the different ways in which Internet resumés can appear. —Which are good? Which are bad? —Ask your students to make value judgments and then explain their reasoning. —Compare these online resumés to traditional, hard copy resumés. What are the differences? Ask your students to find online sites giving tips for resumé writing. Then, in small groups, report their findings. —What sites have they found? —What tips are provided? 49 On the next page is an example document exemplifying the five components necessary for an effective resumé.
  • 55.
    Sample Resumé Leonard J.Liss 55122 Chico Mighty Oak, KS 66312 913-455-5555 OBJECTIVE Seeking sales employment in the computer field, using my technical knowledge, problem solving skills, and interpersonal communication talents WORK EXPERIENCE Computer Salesperson, OmniTec Computers, 1997 to present 108 South Rd., Clayton, KS Provided computer training for new customers Exceeded my 15% sales quota each month Installed and repaired customer computers Computer Technician, U-Bet-Your-Byte, 1996-1997 2111 Elm St., Mighty Oak, KS Repaired all computer makes and models Received a letter of commendation from my boss Stocker/Checker, USack Groceries, 1994-1996 786 Summer Rd., Mighty Oak, KS Worked second shift (4:00p.m.-11:00p.m.) while going to high school full time Earned enough money to pay for my own car and insurance Promoted to Head Stocker within three months EDUCATION GED, Mighty Oak Alternative Education High School, 1997 Completed my degree while working 30 hours a week Clayton High School, Clayton, KS, 1994-1996 Member of the Computer Club Built own computer Maintained a 3.0 GPA while working over 20 hrs./wk. References supplied upon request 50 On the following page is a Peer Evaluation Checklist for the RESUMÉ.
  • 56.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name RESUMÉ _________________________________________ Reader’s Name YES QUESTIONS 1 Does the student provide Identification lines (Name, Address—Street, City, State, ZIP Code—and Phone Number)? 2 Does the student’s Objective section explain what kind of job he or she hopes to find? 3 Does the student’s Education section explain in reverse chronological order exactly what degree he or she has, which school has been attended, where that school is located, and when the student graduated (or plans to graduate)? This section also can list educational achievements. 4 Does the student’s Work Experience section explain in reverse chronological order exactly what his or her job title is, which company the student worked at, where this company was located, and the dates of employment? This section also can list achievements on the job. 5 Does the resumé include a References section? 6 Does the resumé include First level, Second level, and/or Third level Headings to help the reader navigate the text? For example, the student’s name would be a first level heading, and “Objectives,” “Work Experience,” and “References” would be a second level heading. 7 Is the resumé Clear, answering reporter’s questions and specifying? 8 Is the resumé Concise, limiting word length and omitting sentences? 9 Does the resumé have an Accessible Document Design, including bulleted lists and white space? 10 Is the resumé Accurate, abiding by all grammatical conventions and making sure that all dates, degrees, job titles, addresses, and phone numbers are correct? *If the answer is no, specify what is missing and suggest a solution. 51 NO*
  • 57.
    Writing a coverletter/e-mail The Cover Letter Customizes the Job Search Every resumé, whether traditional, e-mail, or Internet, should be prefaced by a cover letter. This is important for two reasons: the cover letter or cover e-mail customizes the job search, and the cover letter highlights the student’s value. Students will use the same resumé regardless of which job they are applying for. The cover letter, in contrast, should be written for a specific job opportunity. Thus, whereas the resumé is generic, the cover letter or e-mail will highlight how the student is truly the best hire for that specific job. To accomplish this goal, the student will use the cover letter to focus on how he or she can fulfill the requirements of the job as it has specifically been advertised. What a cover letter should accomplish Activity —Ask your students to find online sites giving tips for cover letters. The cover letter should accomplish the following (see pages 26-33 for more information on letters): —Then, in small groups, report their findings. 1. Essential components of a letter (writer’s address, date, reader’s address, salutation, text, complimentary close, signature, and typed name.) If the student is sending the resumé via e-mail, then these components will change—no address, salutation, or signature will be required. —What sites have they found? What tips are provided? 2. Introduction. Tell why you are writing and what you are writing about. This will tell the reader that you are applying for a job (that’s the “why”) and which job you are applying for (that’s the “what”). 3. Body. Tell what exactly makes you the best candidate for the job. List the ways in which you specifically meet the advertised criteria. 4. Conclusion. Tell what’s next. When would you like to set up an interview to discuss your credentials? On the next page is the text of a Sample Cover Letter 52
  • 58.
    Sample Cover LetterText Dr. John Smith, my physical education teacher at Bluff High School, informed me of an opening for an umpire in the Bluff City Parks and Recreation Summer 3-2 Baseball League. Please consider me for this position. Though I have attached a resumé, let me highlight my skills: 1. I played varsity baseball for Bluff High School, lettering for three years. 2. I was all-city second team catcher. 3. I have two years experience as a referee for youth soccer. 4. I was the assistant coach for my brother’s little league baseball team for two years. Eventually, I hope to get my teacher’s certification and coach high school baseball. I am positive that my background and motivation will be an asset to your Summer League. Could we meet to discuss my credentials and interest? Interviewing Activities —Ask your students to find online sites giving tips for interviewing. In small groups report: what sites have they found? What tips are provided? —Ask your students what questions they might be asked on a job interview. With luck, your student will write a cover letter/e-mail and resumé effective enough to get an interview. Then the next challenge occurs—landing the job. You can help by working with your students on interview/oral presentation skills. Basically, interviewing requires common sense: Arriving on time Dressing appropriately Looking people in the eye when speaking Sitting and standing straight Not smoking or chewing gum during an interview Be Prepared. . . Be prepared to answer questions (“Why do you want this job?” “What skills can you provide us?” “Why did you leave your last employment?” “What makes you right for this job?”) Be prepared to ask the right questions (salary range, hours, tasks, chains of authority, etc.) —Try mock interviews in the classroom. 53
  • 59.
    Activity Ask your studentsto find online sites giving tips for follow-up letters. In small groups report: what sites have they found? What tips are provided? Writing a follow-up letter/e-mail A follow-up letter serves several purposes: Reminds the reader of your continued interest Politely thanks the reader for his or her time Allows you to highlight additional reasons why you are the best person for the job These letters or e-mail do not have to be long. In fact, just a few sentences will suffice. Instructions The only people who read instructions are those who need help performing the task In a recent survey (Gerson & Gerson), 454 professional technical writers nationwide were asked which type of documentation they most often wrote. The writing of instructions was named by 90.1% of them. Instructions (or procedures) tell the reader how to do something. This could include programming a VCR, repairing a broken bicycle, installing speakers in a car, making a clock in industrial technology, performing a science experiment, or throwing a pot in a ceramics class. To write effective instructions, students again must create clear, concise, accessible, and accurate text which achieves audience recognition. The latter point, audience recognition, is especially important in instructions. If we knew how to do it, we would not need to read the text. Successful instructions often are much more detailed than the ones presented here. 1. Obtain the petri dishes, then label one control and the other 5% Clorox. 2. Touch my unwashed hands to the petri dish labeled control. Close the lid after touching the dish. 3. Wash my fingers in the 5% Clorox solution for 15 seconds. 4. Air dry my fingers for about 2 minutes. 5. Touch my washed fingers to the petri dish labeled 5% Clorox. Close the lid after touching the dish. 6. Wash my hands with soap to remove the Clorox. 7. Incubate the dishes at room temperature. 8. Record the day, date, number of colonies, and their color for days 0-4. 54 The following pages illustrate the components and attributes generally found in successful instructions.
  • 60.
    Components of Instructions Title Graphicto Represent Topic Introduction Plant Cuttings Instructions With a cutting from a favorite plant, you will be able to grow that plant forever! Required Tools Tools & Equipment Propagation Pot Potting Soil Cloning Gel Razor Blade Water Instructions 1. Cover the bottom of your propagation pot with at least 3" of potting soil. 2. Select your plant for the cutting. NOTE: Pick the healthiest plant you can find. 3. Choose a branch or stem with 2 or 3 sets of leaves. Numbered Steps Begin with a Verb 4. Using your razor blade, make a 45-degree angle cut next to a leaf node (that’s where the branches leave the stem). 5. Immediately dip the cutting in your cloning gel to prevent an air bubble from entering the stem. 6. Place the cutting in the propagation pot, inserting the cutting at least 2" into the potting soil. Cautions 7. Moisten the soil. Do Not over water. Enjoy your plants for years to come Conclusion 55
  • 61.
    The steps of procedure arethe most important aspect of any instructions. Each step should be numbered. An action verb should be used to begin each step. Each step should have specificity of detail for clarity. Short words and sentences help achieve conciseness. Sample Instructions How to Yo-Yo Yoo-Y Yo-yoing is FUN! But it takes practice. Learn how to yo-yo by following these steps. What Do You Need? Any yo-yo will do. Be sure to buy one that will sleep (stay down) when you try to “walk the dog.” So the string can’t be tied or glued at the bottom. It must be loose enough to spin. Steps for Yo-yoing Successfully 1. Make about a ½ inch loop with the string, and then tie a knot. Pull about 2 inches of the string through the loop. 2. Put your middle finger through the loop (between your first and second knuckle) and pull the string tight. The use of graphics helps the reader understand each step. Previously discussed attributes of accessibility, audience recognition, and accuracy are important in writing successful instructions. Accurate and correct information when writing instructions can mean the difference between life and death. Just ask any health practitioner. 3. Holding the yo-yo in your palm (with the palm facing up), throw your hand down, letting the yo-yo drop from your hand. 4. When the yo-yo reaches the bottom, twist your hand counterclockwise so the palm is now facing down. 5. To return the yo-yo to your hand, jerk your palm up. On the next page is the Peer Evaluation Checklist for INSTRUCTIONS. 56
  • 62.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name INSTRUCTIONS _________________________________________ Reader’s Name Questions YES 1 Does the instruction include a Title, mentioning the topic to be discussed? 2 Does the Title Page include a Graphic representing the topic? 3 Has an Introduction been included, explaining why the instruction will be performed? 4 Have required Tools and/or Equipment been listed? 5 Has the writer provided Numbered Steps? 6 Do steps begin with Action Verbs? 7 Is each step clearly developed with Specific Details? 8 Are Hazards (warnings, dangers, cautions, notes) provided? 9 Are Graphics used to help the readers understand the steps? 10 Is a Conclusion provided to sum up the instruction? *If the answer is no, specify what is missing and suggest a solution. 57 NO*
  • 63.
    Web Pages Technical writingis no longer bound to hard copy More and more, technical writing is online. One component of this growth is the Internet, which has generated a variety of occupations related to design, development, and maintenance of websites. How rapidly are such jobs growing? Computer and data processing services are projected to be the fastest growing industry in the U.S. economy. In fact, web design, responsible for the creation of websites, is among the 10 fastest growing occupations. (Occupational Outlook Handbook, 2002.) “I have been teaching composition and technical writing for about twenty-five years. In that time, I rarely have heard students gasp with joy upon writing an essay, memo, or letter. Students actually gasp when they see their hypertext go online.” There is another reason to teach web pages, in addition to good job training: IT’S FUN! With Wizards, teaching web design has never been easier If your students are using Microsoft Word, they can access a web pages template. The students just open Microsoft Word, click on File, scroll to New, select the Web Pages tab, and they’re there. Wizards will allow students to create various types of websites and easily save their work as an HTML document. Screen shot reprinted courtesy of Microsoft Corporation. 58
  • 64.
    On-line vs. hardcopy The Internet is very different from traditional means of communication, such as books, magazines, and journals. Books, for example, require that we read chronologically and linearly. That is, we must read a book from beginning to end (chronologically) and line by line (linearly). That’s the way it is; that’s the way it’s always been. The Internet, however, allows us to read differently: randomly. With hypertext links, you can jump to any page within a website, in any order you prefer. There is no page 1 or page 2, nor is there a beginning or an end. Then, once within a web page, you should be able to scan the text (reading it at a glance) rather than read it line by line. The Internet is a paradigm shift in communication. Think of it this way: the Internet is like your hand with individual pages (at each fingertip) hanging randomly. You can access the pages in any order. Criteria for web pages All web pages are not equal. Some websites on the Internet are awful, while others are very successful. To create an effective website, students should abide by the following criteria. Home Page. When you arrive at a website, by typing in its URL (Uniform Resource Locator, the website address), you should see: A title of the product or service Contact information: street address, e-mail address, phone number, and/or fax A graphic representing the topic An introductory lead-in telling readers who the company is and/or what the product or service entails Hypertext links (leading to the linked screens, the major text and development for the website) 59 Start at the top left and end at the bottom right.
  • 65.
    Criteria for webpages (continued) Page Layout. A successful web page should only use about 2/3 of the screen for text. It’s hard for anyone to read an online page from margin to margin due to a number of challenges. These include monitor resolution, scrolling, glare, pixel distortion, animation, etc. To solve these problems, limit line length, using about 1/3 of the screen for your navigation bar and 2/3 for the text. Navigation. Online, readers can’t turn pages, so they need some way to get from screen to screen. You help them by providing: A “Home” button on each web page A navigational bar or separate hypertext linked words or icons to all web pages within the website Highlighting Techniques. You want to tastefully and judiciously use any of the following techniques to design your website. But remember, a little goes a long way: Colored or patterned backgrounds. Be sure the text is clearly legible by striving for “optimum contrast”—black text on a white background or yellow text on a blue background, for example. Horizontal divider lines Iconic bullets Colored text Different font sizes (first level headings, second level headings, etc.) Tables and figures Conciseness, using short words, short sentences, and short paragraphs. Again, this is important because people have trouble reading text online and readers want to skim. Clarity, answering reporter’s questions and providing specific information. Tone, through positive word usage and personalized pronouns. The Internet is a very friendly communication medium. Audience Needs, by defining terms, using the appropriate tone, and developing ideas at the appropriate level. You can accomplish this by deciding if your readers are high tech, low tech, or lay. Grammar. The Internet is the World Wide Web. Remember that when you communicate online, you are communicating to the WORLD. Do you want everyone to see your grammatical errors? On the next page is a Sample Web Page 60
  • 66.
    Sample Web Pages Technical ProfCOMTechnical Services Writing Services HOME PRICES OPTIONS We’re “Write” For You! REFERENCES 1818 Elm City, Kansas City, KS 816-555-2121 Creating a web page allows the students to practice good technical writing skills (clarity, conciseness, document design, etc.). More importantly, by teaching students how to create a website, you can help prepare them for a growing and profitable career. The home page has four, hypertext links: Home, Prices, Options, and References. Plus, it has: a left-margin navigational border a title for the company a logo representing the company’s services a clever introductory lead-in contact information An example of one of the linked pages looks as follows: Note the design of this web page: Technical Services ProfCOM Technical Writing Services PRICES HOME PRICES OPTIONS REFERENCES Projects Costs Technical Writing Technical writing Editing, proofreading Software documentation Online Help Web Design Website and page design Web-writing Web-writing training $25 per hour $45 per hour 61 On 1/3 of the screen is the navigation bar, including the hypertext links On the remaining 2/3 of the screen, you have the name of the company, the company logo, a title for the web page (prices), and then the text The text is provided in an easy-to-access manner, using a table and lots of white space
  • 67.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ WEB SITES Reader’s Name YES QUESTIONS 1 Does the Home Page contain: A title of the product or service? Contact information—street address, e-mail address, phone number, and/or fax? A graphic representing the topic? An introductory lead-in telling readers who the company is and/or what the product or service entails? Three or more hypertext links (leading to the linked screens—the major text and development for the web site)? 2 Does the web site contain 3 or more linked pages identified on the home page? 3 Do the Linked Pages contain the following: A title for each page, allowing the reader to know where he or she is Text, developing this page’s points 4 Does the web site provide successful Navigation, including: A Home button on each web page? Navigational links (a navigational bar or separate hypertext linked words or icons) to all web pages within the web site. 5 Does the web site tastefully and judiciously use: Colored or patterened backgrounds (be sure the text is clearly legible) Horizontal divider lines Iconic bullets Colored text Different font sizes (first, second, and third level headings, etc.) Tables and/or figures 6 Is the web site Concise (short words, short sentences, and short paragraphs; limiting the text to no more than two-thirds of the screen)? 7 Is the web site Clear (answering reporter’s questions and providing specific information)? 8 Does the web site achieve an effective Tone (through positive word usage and personalized pronouns)? 9 Does the web site address its specific Audience Needs by: Defining terms? Using the appropriate tone? Developing ideas at the appropriate level? 10 Has the web site avoided Grammatical Errors? *If the answer is no, specify what is missing and suggest a solution. 62 NO*
  • 68.
    PowerPoint Presentations PowerPoint is anamazingly valuable and versatile tool You can do so much with PowerPoint including oral presentations for reports, user manuals, and websites. Teaching students how to create PowerPoint presentations helps them become more familiar with technology (more and more important every day on the job) and helps them practice good technical writing skills: clarity, conciseness, document design, audience, and accuracy. Plus, every computer has PowerPoint, so it’s easy for students to access and use. In fact, PowerPoint presentations are a wonderful option to websites (which can be very difficult due to computer challenges). Criteria for PowerPoint More About Fonts… Weird but interesting fonts, like Gallery, Old English, or Yearbook Outline, are not only hard to read but also will not always be compatible with whatever computer you might use to show your presentation. Script fonts, like NevisonCasD, Lucida Handwriting, or Challenge, are almost totally unreadable in PowerPoint. Fonts. Use common fonts, such as Times New Roman, Courier, or Arial. In fact, Arial is considered the best to use, since sans serif fonts (those without feet) show up best in PowerPoint. Use no more than three font sizes per slide. To make your slides legible, use at least between 18-point font size and 24-point. Bigger is better, however. Titles can be in font sizes 48-54; main text titles in 32 point; smaller text lines in 24 point. Color. Never use red or green text (individuals who are color blind can’t see these colors). Use color for emphasis only. Strive for optimum contrast between your text and your background colors. In fact, a dark background with light text gives the best contrast in PowerPoint. For example, white and yellow letters look great on a blue background. Text. As with all good technical writing, the fewer the words, the better. Strive for open white space. Limit the text to six or seven lines per slide and six or seven words per line (think “6 X 6”). Two or more short and simple slides of text are better than one slide with many words. Use no more than 40 characters per line (a character is any letter, punctuation mark, and/or space). Use headings for each slide. Graphics. Use graphics instead of tables. Keep your graphics simple. A graph that is too complicated, containing too much information, will not be easy to read or understand. 63
  • 69.
    Whatever techniques you use tocreate your PowerPoint presentation, be sure to test it on two or three different projection systems or computers. Rather than be surprised, be prepared. Criteria for PowerPoint (continued) Emphasis techniques. To call attention to a word or phrase or idea, use color (sparingly), boldface, all caps, and/or arrows. But don’t overdo it. A little goes a long way. Animation can be effective, but do not use every special effect (sounds and fade-ins). Pick one effect and use it consistently. Sample PowerPoint Slides Heading Simple Graphic On the next page is the Peer Evaluation Checklist for POWERPOINT PRESENTATIONS. Source of Information 5 lines of text 32-point Arial Note: All numbers given in this report are from the March 6, 2001 Distance Learning Enrollment Report, prepared by the JCCC Office of Institutional Research. 64
  • 70.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ POWERPOINT Reader’s Name PRESENTATIONS _________________________________________ Reader’s Name YES QUESTIONS 1 Does the presentation include headings for each slide? 2 Is an appropriate font size used for easy readability? 3 Is the appropriate font type used for easy readability (Arial, for example, vs. a script font)? 4 Are no more than 3 different font sizes used? 5 Has color been used effectively for readability and emphasis, including font color and slide background? 6 Have special effects been used effectively (vs. being overused)? 7 Has text been limited on each screen (remembering the 6 x 6 rule)? 8 Are graphics sized correctly for readability, avoiding ones that are too small and/or too complex? 9 Have highlighting techniques (arrows, color) been used to emphasize key points? 10 Have you avoided grammatical errors? *If the answer is no, specify what is missing and suggest a solution. 65 NO*
  • 71.
    Brochures Brochures are omnipresent! Whenyou go to a hotel, an amusement park, a historical landmark (like the Eisenhower Library in Abilene, the capitol in Topeka, or Boot Hill in Dodge City), a zoo, a museum, or a college campus, do you pick up a research paper at the door, explaining the site’s unique traits? When you receive news from KNEA, TIAA, CREF, or any of your stock companies, do you get this information in a research paper? No, you do not. You either pick up a brochure at the door or receive a newsletter in the mail. Many computer programs allow students to format brochures automatically. If you do not have this capability, it is no less demanding than setting up columns on a computer and printing as landscape versus portrait. If this cannot be done, then the students will need to type and fold the pages accordingly. Brochures can be any size, from a back and front 8½” X 3" card to four-panel or six-panel layout. Back Front Criteria for brochures Title Page (Font Panel). Include these three things: Topic: In the top one-third of the panel, name the topic about which you’re writing (product name, service, etc.). Graphic: In the middle third of the panel, include a graphic to appeal to your reader’s need for a visual representation of your topic. The graphic will sell the value of your subject (its beauty, its usefulness, its location, its significance, etc.) or visually represent the focus of your brochure. Contact Information: place contact information on the bottom third of this panel. You could include your name, your company’s name, street address, city, state, zip code, telephone number, fax number, and/or e-mail address. Back Panel. The back panel may include any of the following: Conclusion: Use this panel to summarize your brochure’s content, highlighting your topic’s benefits or suggesting a next step for your readers to pursue. Mailing: This panel could be used like the face of an envelope. On this panel, when left blank, you could provide your address, a place for a stamp or paid postage, and your reader’s address. Inside Fold-In Back Front Coupons: As a tear-out, this panel could be an incentive for your readers to visit your site or use your service. Here you could provide discounts or complimentary tickets. Location: Provide your address, hours of operation, phone numbers, e-mail, and a map to help them locate you. Inside 66
  • 72.
    Criteria for brochures(continued) Body Panels (Fold-in and Inside) Provide headings and subheadings. Use graphics (photos, maps, line drawings, tables, figures, etc.). Develop your ideas. Consider including the following information, dependent upon your topic: —Locations, maps, directions —Technical Specifications and warranties —Prices and payment plans —Credentials and company history —Unique Characteristics of the product or service —Personnel biographies and employment opportunities —Options —Delivery (Dates/Methods) Document Design. Try using only three or so different highlighting techniques for your document design. These options could include: Color and graphics/tables Font changes Though you want to make your brochure Horizontal rules interesting to look at, you don’t want to Bullets overdo the use of highlighting techniques— too much of anything is always a problem. Borders Italics and boldface Clarity. Remember to be specific and answer reporter’s questions (who, what, when, where, why, how). Conciseness. Due to the limited size of each of your panels, you must limit your words (1-2 syllables), paragraphing (4 types lines), and sentence length (10-12 words). Audience Recognition. Who are you writing to? Is your audience high tech, low tech, lay, or combinations of the three? To avoid problems, define any terminology, abbreviations, and/or acronyms which could cause confusion. Audience Involvement. Brochures are very friendly methods of communication. You want to personalize your text through pronoun usage and contractions. Accuracy. Your brochure might be the only thing a potential customer ever sees about your company. You want to make a good first impression. Poor grammar, in contrast, will make your company look very bad. Proofread to avoid any grammatical errors. 67 Teaching Tip Teaching research papers is important because research is a valuable skill for students. However, that research can be packaged in a different form, one more commonplace in society. How about teaching your students research, not by assigning a traditional essay, but by having the students write a researched brochure or newsletter? Doing so is more fun and lets the students create a type of communication that they see in the mail and at local points of interest. Doing so also lets the students practice technical writing skills, including document design, clarity, conciseness, audience recognition, and grammatical correctness.
  • 73.
    Sample Brochure Cover TheKansas State Department of Education presents ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ A premier staff development opportunity focusing on developing appropriate and effective test items, including multiple choice, true/false, matching, completion, and essay. Each participant will receive a copy of. . . Is This a Trick Question? Students can create brochures for a number of topics. They could write brochures about businesses in their community, historic landmarks, parks, museums, zoos, day care centers, geriatric homes, or hospitals. They could create brochures about their school organizations, such National Honor Society, Art Club, Drama Club. A Short Guide to Writing Effective Test Questions The students could make brochures based on fiction they are reading, focusing on the characters, settings, and/or themes. They could create a brochure about an author they are studying. The list is endless. Interested? Want More Information? Contact: Dr. Mary Ann Smith Workshops Coordinator Washburn University 785-231-1010 x1895 e-mail: zzmasmith@washburn.edu More details inside. . . 68 Following is a Peer Evaluation Checklist for BROCHURE.
  • 74.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName BROCHURES _________________________________________ Reader’s Name QUESTIONS YES 1 Does the brochure’s Title Page (front panel) include the following: Topic—in the top one-third of the panel, the topic about which you’re writing Graphic—in the middle third of the panel, a visual representation of your topic Contact Information—on the bottom third of this panel, including your company’s name, street address, city, state, zip code, telephone number, fax number, and/or email address 2 Does the brochure’s Back Panel include at least one of the following options: Conclusion—summarizing your brochure’s content, highlighting your topic’s benefits, or suggesting a next step for your readers to pursue Mailing—providing your address, a place for a stamp or paid postage, and your reader’s address Coupons—as a tear-out, acting as an incentive for your readers to visit your site or use your service Location—providing your reader with your address, hours of operation, phone numbers, email, and a map to help them locate you 3 Does the brochure’s Body Panels (fold-in and inside) accomplish the following: provide headings and subheadings use graphics (photos, maps, line drawings, tables, figures, etc.) develop your ideas 4 Does the brochure use Highlighting techniques for access and visual appeal? 5 Does the brochure have a Positive Tone: insuring that pleasant, interpersonal communication is achieved motivating the reader to action 6 Is the brochure Personalized using pronouns and contractions? 7 Does the brochure Recognize Audience by defining high-tech terms? 8 Is the brochure Concise, fitting in each panel by using: short words short sentences short paragraphs 9 Is the brochure Clear: achieving specificity of detail answering reporter’s questions 10 Does the brochure avoid Grammatical Errors? *If the answer is no, specify what is missing and suggest a solution. 69 NO*
  • 75.
    Newsletters Newsletters can be onepage or more. As with brochures, newsletters can help students practice technical writing skills: clarity conciseness accessible document design audience recognition accuracy. Why have students write newsletters? Because we get many more newsletters in the mail than we get research papers. Newsletters are everywhere; someone writes them and gets paid to do so. Criteria for newsletters 1. The Flag Include the following: title of your newsletter the date of its publication perhaps the publication volume and issue number The Flag will be placed at the top of your newsletter in a bold, large font. 2. Columns Divide your newsletter into two to three columns. Strive for variety; the top half of the page could have two columns while the bottom half would use three, for example. 3. Headlines and Subheadings Help your readers navigate the text by providing the following: a headline for the major article on page one first-level headings for all other articles second-level subheadings In your headings and subheadings, use present tense, avoid excessive punctuation, omit titles (such as Dr., Mr., Mrs., Ms.), avoid abbreviations and acronyms, use strong verbs, and use short words and phrases. 70
  • 76.
    Criteria for newsletters(continued) 4. Pop-Up Quotes Gain your reader’s interest through pop-up quotes. These “talkbubbles” or “pull-out quotes” are usually: ! printed in larger front than the articles ! centered on a page or within a column ! printed inside a border ! printed in a different color Teaching Tip ! 5. Sidebars Add variety to your page layout through sidebars. These are often shaded or gradient-colored textboxes which present late-breaking, additional, and/or contrasting short news items. 6. Table of Contents Include a table of contents to help your readers find information within the newsletter. 7. Initial Caps M any newsletters begin each article with an initial cap for visual appeal. Use these larger, capital letters to preface the first word of the first sentence of an article—as shown in this paragraph. ! Newsletters can be written about a host of topics. Rather than assigning another staid research paper, why not ask students to research a topic and turn it into a newsletter. They could research historical figures, literary figures, national parks, vacation spots, businesses in their community, or school-related organizations. 8. Newsletter Style As in all effective technical writing: ! limit your word length (one-two syllables) ! limit sentence length (10-15 words) ! limit paragraph length. (The length of paragraphs is especially important when writing a newsletter, since columns make your writing more cramped. You want to limit your paragraphs to four to six lines.) 9. Highlighting Add interest to your newsletter by including typical highlighting techniques, such as: ! tables and figures ! font changes ! bullets ! numbering ! boldface and italics. 10. Accuracy Proofread to avoid grammatical errors. 71 On the next page is a Sample Front Page of a Newsletter. This is followed by a Peer Evaluation Checklist for Newsletters.
  • 77.
    Sample Newsletter FrontPage Parrot Beach National Park Newsletter October 25, 2003 Sand, Surf, and Shells! Inside. . . Parrot Beach offers you many benefits. Meet Our Staff ......................................... 2 These include 27 miles of sand, gently rolling surf (with waves that rarely top 5 feet), and one of the state’s best collections of seashells. The beach’s shells include “collector items like starfish, conch, murex, mussels, and nautilus shells” (Shoults 25). Parrot Beach also offers many activities such as “bike riding, swimming, skating, sailing, and sand volleyball” (Weese 9). Calendar of Events ................................... 3 Visitors Reactions ..................................... 3 Current & Future Projects ......................... 4 History of Parrot Beach R ecognized as a national park by Theodore Roosevelt in 1908, Parrot Beach had been a hunting ground for the Seminole Indians and then a favorite haunt for pirates and buccaneers (Herrman 16). The president saw its natural grandeur and sought to save its beauty for generations to come. How to Get There We’re in the center of it all, just ten miles from Tampa. The island is 27 miles long by 3 miles wide. The highest point in the island is only 10 feet above sea level (Shoults 12). This has caused problems during hurricane weather, when the island is in the most danger from flooding. " The Parrot Habitat One unique feature of Parrot Beach is its bird sanctuary. Here, injured and orphaned parrots are rehabilitated. Parrots can be hurt by hunters, by “ingesting nylon fishing lines” or by pollution (Shoults 34). The habitat uses donations to educate tourists and to provide care for the birds. The habitat is open year round and provides guided tours. To solve this problem, a seawall was built in 1927. The wall is “12 feet high, 10 feet wide at its base, and 5 feet wide at the top. The concave design allows waves to roll back into the Gulf of Mexico” (Weese 2). Works Cited Herrman, Jess. Teddy. Boston: Polar House Pub., 2000. The sunsets are spectacular! Shoults, Whit. Parrot Beach. New York: Ornxy, 1998. Weese, Sarah. Seawall Design. Waco: Baylor Univ. Press, 1999. 72
  • 78.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ NEWSLETTERS Reader’s Name QUESTIONS 1 YES NO* First Page Does the first page provide a Flag that names the newsletter and gives the date, volume, and issue number? Does the first page provide a table of contents to help the reader find information throughout the newsletter? Is the headline story the most important article in the newsletter? Text Are headings used effectively to clarify the article’s content as well as to arouse the reader’s interest? Do the headings: ! use present tense instead of past? ! avoid excessive puncutation? ! omit titles, such as Dr., Mr., Mrs., and Ms.? ! avoid abbreviations and acronyms? ! use strong verbs, short words, and phrases? 2 Are sidebars used to introduce short additional, contrasting, and/or late-breaking information? Is the text clear, answering reporter’s questions (who, what, when, where, why, how)? Does the newsletter meet the writer’s goals? ! create awareness of the company, product, or service ! increase understanding ! advertise new aspects ! change negative attitudes ! show ways in which the topic surpasses the competition ! inform the reader of new information Access Are subheadings used to break up blocks of paragraphing and to help the readers navigate the text? 3 Do the headings and subheadings vary font sizes and type for emphasis and visual appeal? Are bullets and numbers used to itemize ideas for better access? Has ample white space been used to help the reader access information and to make reading easier? Has color been used effectively for visual appeal? *If the answer is no, specify what is missing and suggest a solution. Continued on next page… 73
  • 79.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ NEWSLETTERS Reader’s Name QUESTIONS YES Access (continued) Have photographs, figures, and tables been used to add interest as well as to make information more clear? 3 Have pop-up quotes been used for interest and clarity? Has the newsletter varied its use of two and three columns? Have color, shading, and/or gradients been used for interest? Have initial caps been used at the beginning of an article or new paragraph for interest, visual appeal, and to call attention to a new idea? 4 Style Is the text concise, using: ! short words (one to two syllables)? ! short sentences (10-15 words long)? ! short paragraphs (preferably no longer than six lines)? Audience Are all unfamiliar terms defined? 5 Is the level of writing appropriate for the audience (high tech, low tech, lay, multiple readers)? Has the appropriate tone been achieved through positive words and personalized pronouns? 6 Accuracy Is the technical content correct, verified by peer review? Is the newsletter grammatically correct? *If the answer is no, specify what is missing and suggest a solution. 74 NO*
  • 80.
    Fliers Fliers get theword out! Fliers, as small as a postcard or as large as one, 8½ x 11 page, are external correspondence sent to prospective or existing customers. Fliers, usually limited to one, very specific topic, highlight a way in which you or your company can meet a customer’s unique needs. How could your students use fliers? Fliers were the dominant form of advertising in the nineteenth and early twentieth centuries. Fliers are effective for inviting parents to orchestral concerts, dramatic plays or musicals, or dance team recitals. Agricultural Education students could create fliers about hydroponic plants; Family and Consumer Science students could create fliers about food products, nutritional ideas, or clothing construction; Industrial Technology students could create fliers about robotics, aviation, or computer-aided drawing. Fliers come with easy-to-use Microsoft Wizards As always, the students would open Microsoft Word or Microsoft Publisher. In Word, the students would click on File, scroll to New, click on the Direct Mail Manager tab, and then click on Flyer Wizard. (It seems that flier can be spelled several different ways!) Screen shot reprinted courtesy of Microsoft Corporation. (If using Microsoft Publisher, choose the Flyers link and then one of several optional templates provided.) 75
  • 81.
    Criteria for fliers 1.Limit the Length of your Flier to one page (8½ x 11). 2. Focus on one Specific Idea. This could be a feature, a benefit, a component, a use, a person, a place, an object, an activity, etc. Consider a technical description/specification. Then, your Flier could focus on dimension, colors, material, etc. This, of course, would only apply if you were writing about a product. For a service, a person, or a place, your Flier would focus on some other user benefit. 3. Include a Title at the top of your Flier. A word, a phrase, a question—but give it impact to attract your reader’s interest! 4. Limit your Text. As with all good technical writing, text should be short. Strive for no more than 100 words, or fewer. Remember, a graphic should be the key to your Flier (more on this in point number 6 below). 5. Increase your Font size. You want your reader to see the key points at a glance. Increased font size, with limited text, will help accomplish this goal. Think 20 point and up for titles, 16 point and up for subtitles, and 12 point and up for text. 6. Use Graphics. This is important. Let a picture emphasize your key point and draw the reader’s attention. This could either be a technical specification, as shown in the sample, or a host of other possibilities. 7. Use Color. Attract your reader’s attention, but be careful. Don’t overuse color. A little bit goes a long way. 8. Use Highlighting techniques. As with color, a little bit goes a long way. Be careful. Limit yourself to no more than three or so highlighting techniques. 9. Find the “Phrase.” Be clever. Come up with 3-5 words that draw your reader in and/or that highlight your topic’s worth or reader benefit. 10. Avoid Grammatical errors. 76 On the next page is a Sample Flier. This is followed by a Peer Evaluation Checklist for Fliers.
  • 82.
    Sample Flier “Pop” Goesthe Rivet! Ajax can manufacture cold-headed, solid, tubular, and semi-tubular pop rivets to your specifications. Weight 2 oz 1. Body Diameter .118" 2. Head Diameter .213" 3. Head Height .029" 4. Hole Depth .077" Let us add “pop” to your fastening system needs. Call 1-800-PopRivet 77
  • 83.
    PEER EVALUATION CHECKLIST _________________________________________ Writer’sName _________________________________________ Reader’s Name FLIERS _________________________________________ Reader’s Name QUESTIONS YES 1 Did the student limit the length of the flier to one page (8½x11)? 2 Did the student focus on one specific idea, such as a feature, a benefit, a component, a use, etc.? 3 Did the student include a title at the top of the flier—a word, a phrase, a question—to make it interesting and to give it impact? 4 Did the student limit the text, striving for no more than 100 words, or fewer? 5 Did the student increase font size, helping the reader see the key points at a glance? Did the student use 20 point and up for titles, 16 point and up for subtitles, and 12 point and up for text? 6 Did the student use graphics to visually depict the key idea being highlighted? 7 Did the student use color to attract the reader’s attention? Has the student avoided overusing color? 8 Did the student effectively use highlighting techniques? As with color, a little bit goes a long way. 9 Did the student find the phrase, a clever, 3-5 word phrase to highlight the topic’s worth or reader benefit? 10 Is the flier grammatically correct? *If the answer is no, specify what is missing and suggest a solution. 78 NO*
  • 84.
    Graphics Ironically, technical writingoften has more to do with graphics than writing Graphics can be a major part of communication in the workplace. Just look throughout this book to see the importance of graphics. You’ll notice that the instruction and flier samples include line art, a memo sample includes a table, a sample PowerPoint slide include a bar chart, and the discussion of Wizards/ Templates includes screen captures. Graphics can be divided into two categories: tables and figures. Tables are obvious. Figures include pie charts, bar charts, photographs, line drawings, icons, maps, schematics—in fact, a figure is anything that’s not a table. Tables, composed of rows and columns, allow readers to grasp details at a glance. Notice how the following memo uses a table to clarify its conclusions. It’s important to teach your students the importance of graphical interpretations of text. Graphics aid communication for several reasons: ! ! ! ! Entertainment. Graphics add interest to the writing. Clarity. Often, information is more obvious when shown visually than when discussed verbally. Variety. Words, words, and more words might turn the reader off. Graphics break up the monotony of wall-to-wall words. Conciseness. Sometimes, “one picture really is worth a 1,000 words.” MEMO Date: To: Cc: From: RE: August 20, 2003 Ms. Kanakis Dr. Jim McWard, Dr. Tom Lisk, Ms. Ellen Mohr Greg Mundy Stock Purchases Last April, I purchased 20 shares of Empire District Electric stock at $24 per unit. Empire serves Missouri, Kansas, Oklahoma, and Arkansas. I purchased this stock because everyone uses electricity. Also, I assumed that the stock prices would go up during the summer months, as people used their air conditioners to cool their homes. As shown in the following table, the stock price generally has gone up, increasing 75%, ending at $32 a share. Month April Change in Stock Value Stock Value Gain/Loss $24 ——— May $22 -$2 per share June $28 +$4 per share July $24 August $32 ——— +$8 per share Based on the overall growth of this stock, I plan to purchase 10 additional shares. 79
  • 85.
    Beyond columns androws Whereas tables provide information in columns and rows, figures can present information in many different ways. A line drawing presents a photographic view of a topic. These are especially valuable in instructions, which help an end user perform a task. Bar charts and/or line graphs help readers make comparisons. Schematics visualize circuitry. Maps show contour or direction. (Note how the same memo now uses a combination graph to depict the growth and decline of stock prices.) MEMO Date: To: Cc: From: RE: August 20, 2003 Ms. Kanakis Dr. Jim McWard, Dr. Tom Lisk, Ms. Ellen Mohr Greg Mundy Stock Purchases Last April, I purchased 20 shares of Empire District Electric stock at $24 per unit. Empire serves Missouri, Kansas, Oklahoma, and Arkansas. I purchased this stock because everyone uses electricity. Also, I assumed that the stock prices would go up during the summer months, as people used their air conditioners to cool their homes. As shown in the following table, the stock price generally has gone up, increasing 75%, ending at $32 a share. 35 Price of Stock vs. Stock Value 30 25 20 15 10 5 0 April May June July August Price of Stock Stock Value Based on the overall growth of this stock, I plan to purchase 10 additional shares. 80
  • 86.
    Chapter Four Technical Writing Assignments InThis Chapter... Technical writing can be incorporated into your classroom in a host of ways. Perhaps you only want to incorporate one technical writing assignment (a letter, memo, or report). Maybe you would like the students to write several, grouped documents in a technical writing module. Then again, you might teach an entire term or a year-long course in technical writing. This chapter will present ways to meet each of these goals. Here are ideas for individual letters, memos, e-mail, reports, resumés, instructions, web pages, brochures, newsletters, fliers, and PowerPoint presentations. Sales Letters ! ! ! ! ! ! ! ! Write a letter selling a product, such as a VCR, CD player, computer, printer, car, motorcycle, roller blades, tennis racket, golf clubs, vintage records, jewelry, etc. Write a letter selling a service, such as car detailing, lawn mowing, babysitting, dog walking, house painting, deck building, basement refinishing, computer installation, computer repair, tennis or golf lessons, tutoring (math, languages, science), etc. Foreign Languages: write a sales letter detailing the unique aspects of foreign countries studied in class. Industrial Technology: write a sales letter about class projects, including car maintenance, welding, CAD/CAM operations, woodworking, robotics, etc. Art: write a sales letter focusing on the unique traits of class projects, including ceramics, jewelry, painting, mixed media, etc. Literature: write a sales letter marketing sites in a novel, such as East or West Egg in The Great Gatsby, Tom’s Island in The Adventures of Tom Sawyer, or Holden Caulfield’s military school in The Catcher in the Rye. Family and Consumer Sciences: write a sales letter about a food or clothing project you have been working on, highlighting the unique benefits offered. Elementary: your students have just returned from a class trip to the fire station, museum, science city, zoo, or theatre. Write a sales letter about that locale, highlighting its unique values. 81
  • 87.
    Letters of Inquiry ! ! ! ! ! ! ! ! Writea letter of inquiry to a company about its products, services, warranties, guarantees, costs, maintenance, etc. Write a letter of inquiry to a company about job openings, job requirements, hiring trends, salary ranges, etc. Write a letter of inquiry to a community college, vo-tech school, college, or university about its degree requirements, programs, tuition, housing fees, extracurricular activities. Foreign Languages: write a letter of inquiry to a travel agency for information about a country, to a country’s local ambassador, or to the country’s ambassadors at the United Nations, etc. Industrial Technology: write a letter of inquiry to a company about its CAD/Cam equipment, welding equipment, woodworking equipment, automotive equipment, etc. Art: write a letter of inquiry to an art supply company about its clay, precious and semi-precious stones, paint, mixed media, etc. Government: Write a letter of inquiry to a city, county, or state elected official, asking questions about governmental procedures. Elementary: your class will have a visitor—a dentist, firefighter, police officer, local government official, etc. Prior to the visit, have students write a letter asking the kinds of questions they would like to have answered. Memos ! ! Write an explanatory memo to your boss, teacher, parent, friend, etc., explaining the causes for your absence, tardiness, inability to do the work, inability to meet deadlines, failure to return a borrowed item, etc. Then explain the effects of these actions. Write an evaluative memo to your boss, teacher, parent, friend, etc. comparing and contrasting a topic such as two movies, two CDs, two novels (which to see or purchase or read); two cars, trucks, bikes, roller blades (which to purchase); two restaurants (which to frequent); two colleges (which to attend); or two jobs (where to seek employment). (Continued on next page…) 82
  • 88.
    Memos (continued) ! ! ! ! ! ! ! ! Write anargument/persuasion memo to your teacher, boss, parent, friend, explaining why he or she should allow students to rewrite essays for a new grade or extend due dates; implement a new work schedule, pay scale, or method of promoting employees; allow a later curfew or allow you and friends to go to Padre Island for spring break; seek a career option or attend a specific college. Write a problem/solution memo to your teacher, boss, parent, friend, etc. documenting a problem and suggesting solutions. Business & Computer Technology: write a cause/effect memo from Stephen Jobs to Bill Gates explaining why Apple should join ranks with Microsoft (or vice versa). Art: write a problem/solution memo from Michelangelo to Pablo Picasso explaining how to draw more realistic portraits. Literature: write a memo from Mark Twain comparing/contrasting Tom Sawyer to Huck Finn. Social Studies: write an argument/persuasion memo from President Truman to General MacArthur explaining why the general was removed from his command; or from President Roosevelt to General Eisenhower explaining why Normandy was the best site for D-Day. Physical Education/Health: write a memo explaining what causes certain health problems and what effects these problems have. Elementary: your class has been involved in an “Around the World” discovery. Write an explanatory memo about one country’s culture, foods, religion, and/or history. E-mail ! ! ! E-mail your teachers, bosses, parents, friends, to argue a point, compare and contrast two topics, solve a problem, etc. E-mail your fellow students with peer evaluations about their creative or expository writing, about their artistic achievements, about math or science tutoring, etc. Business & Computer Technology: write an e-mail explaining the steps for performing a computer operation, such as opening a file, saving a file, downloading graphics, copying and pasting, etc. Or, write an e-mail explaining computer ethics. (Continued on next page…) 83
  • 89.
    E-mail (continued) ! ! ! ! ! Industrial Technology:write an e-mail providing instructions for editing a video production, producing an animated cartoon, constructing circuit boards, or building a bridge. Family and Consumer Science: write an e-mail explaining the key concepts of parenting skills. Marketing & Management: write an e-mail explaining key concepts of personal finance or how to become a successful entrepreneur. English: write an e-mail from one character in a novel, play, or short story to another character. The topic will depend on the story’s context. Or, you could write an e-mail from one character in a story to another character in a totally different story—from Romeo to Hamlet, from Huckleberry Finn to Holden Caulfield, for example. These email messages could focus on the character’s respective era or personal challenges with family members, etc. Elementary: write an e-mail explaining safety procedures on the playground or about other safety issues, such as fire safety, bike safety, water safety, life saving techniques, etc. Reports ! ! ! Industrial Technology: write a recommendation report about improving safety in the classroom or a progress report about your project (clock making, race car construction, welding, automotive work). English: write a progress report on your work this semester (where have you succeeded; where can you improve). Write a recommendation report to the school principal or school district proposing: —a new, expanded parking lot —new swimming pool —new competitive sports —new art courses in jewelry —a new computer lab —a school television or radio station —improved tennis courts —better cafeteria options (name brand food services) —on-campus day care centers —earlier dismissal for college-now courses (Continued on next page…) 84
  • 90.
    Reports (continued) ! ! ! ! ! Science: writea laboratory report about one of your projects (including the purpose of the project, equipment used, activities accomplished, and lessons learned). Social Studies: write a status report and/or recommendation report about stocks and bonds you’ve purchased (a mock purchase works well). How are you doing, should you sell, should you buy? Art: write a trip report about a museum visit. Physical Education/Health: write a feasibility report studying a healthrelated problem (smoking, obesity, anorexia, etc.). Then suggest solutions to the problem. Elementary: your class has been studying biodegradable substances. After burying an item and then digging it up, write a report on the findings. The Job Search (Resumés/Cover Letters) ! ! ! ! ! ! Write your resumé and a cover letter (letter of application). Direct the letter to an actual job listing found in your city’s newspaper, your school’s job placement center or counseling center. Foreign Languages: write a resumé and cover letter about an author (Cervantes, Kafka, or Dumas) or about a literary figure (Don Quixote, Gregor Samsa, or Jean Valjean). Business & Computer Technology: write a resumé and cover letter for Stephen Jobs or Bill Gates. Literature: write a resumé and cover letter about an author (Mark Twain, F. Scott Fitzgerald, or Shakespeare ) or about a literary character (Tom Sawyer, Gatsby, or Macbeth). Social Studies: write a resumé and cover letter for George Washington, Sojourner Truth, Martin Luther, or Sigmund Freud. Art: write a resumé and cover letter for Pablo Picasso, Andy Warhol, or Andrew Wyeth. 85
  • 91.
    Instructions Studies tell usthat students learn best when they have to teach someone else how to do something. Have your students write any of the following instructions, geared toward another student. ! ! ! ! ! ! ! ! ! ! Industrial Technology: write safety instructions or instructions for building any project. Business & Computer Technology: write instructions for any computer operation: printing, saving a file, opening a file, creating a folder, making a computer-generated presentation, etc. English: write instructions for revising an essay. Art: write instructions for creating a sculpture, a piece of jewelry, a photograph, a ceramic pot, etc. Science: write an instruction for performing any lab. Math: write an instruction for performing any geometric, algebraic, or trigonometric equation or project. Social Studies: write an instruction for purchasing stocks or bonds. Careers: write an instruction on how to get a job, focusing on interviewing techniques, job searches, or writing the different types of correspondence needed for a job (resumé, cover letter, follow-up thank you, etc.). Physical Education/Health: write an instruction on how to correctly lift weights. Elementary: write an instructional recipe about how to make a pizza, a taco, a peanut butter and jelly sandwich, or any food item. Web Pages and PowerPoint Presentations Every topic imaginable can be turned into a Web or PowerPoint presentation. And it’s good to have your students use these computer applications. After all, according to business and industry representatives, a primary skill our students need to succeed on the job is computer technology. (Continued on next page…) 86
  • 92.
    Web Pages andPowerPoint Presentations (continued) ! ! ! ! ! ! ! Create web pages for your school or your school district; for your school club or activity; or an invented company. English: create web pages or PowerPoint presentations about an author, a piece of literature, a genre, or a literary movement/era. History: create web pages or PowerPoint presentations about any historical moment (the Oklahoma City Bombing, the World Trade Center attacks, the charge up San Juan Hill, the Chicago riots accompanying the 1968 Democratic National Convention, etc.); any historical figure (presidents, revolutionaries, inventors, etc.); historical eras (the Renaissance, the Enlightenment, the Victorian era, etc.). Foreign Languages: create web pages or PowerPoint presentations about foreign countries and their culture. Science: create web pages or PowerPoint presentations about topics studied in chemistry, geology, biology, etc. Family and Consumer Sciences: create web pages or PowerPoint presentations about parenting skills, interior design, fashion merchandising, or foods. Elementary: create web pages or PowerPoint presentations about animal habitats, dinosaurs, minerals and rocks, etc. Brochures and Newsletters In Chapter Three it was suggested that students do a research brochure or a newsletter instead of a research paper. Consider these possibilities. ! Write a brochure or newsletter: —about a vacation spot (national or local park, wildlife reserve, city, country). —about a school organization (Key Club, Honor Society, Drama Club, Art Club, Foreign Language Club, etc.) —about a city organization, agency, or company (a local business, geriatric home, community center, Rotary Club, Lions Club). —about your city’s Hispanic culture and/or business owners; Native American culture and/or business owners; unique ethnic background (Swedish, German, Polish, etc.); frontier history; railroading, agricultural, ranching, or cattle industry. (Continued on next page…) 87
  • 93.
    Brochures and Newsletters(continued) ! ! ! ! ! ! ! ! Invent a topic for a newsletter or brochure (a new country, a new planet, a new company, an invention). English: research an author and write a brochure or newsletter about him or her, reporting your findings. These could include biographical data, analyses of stories, critical responses, awards and accomplishments, etc. History: create a brochure or newsletter about a local historical figure (President Eisenhower, Bat Masterson, Jesse Chisolm, Amelia Earhart, General Custer, Senator Bob Dole); an occurrence of local historical importance (trail drives, dust bowl events, cow town histories, border war activities); a historical era (the Renaissance or the Great Depression). Family and Consumer Science: create a brochure or newsletter about parenting, interior design, fashion merchandising, or foods. Industrial Technology: create a brochure or newsletter reporting about a bridge construction, electricity (how to measure it, how to generate it, how to figure its cost, etc.), simple machines, and/or graphics, animation, and video production projects. Art: create a brochure or newsletter about an artist, type of art, or about your class’s art project(s). Foreign Languages: Create a brochure or newsletter based on having researched a country and its culture. Or, create a brochure or newsletter about a famous author, artist or historical figure from a country relevant to the language studied. Elementary: your class has been studying the regional parts of the country, climate, rocks, minerals, dinosaurs, volcanoes, ocean life, the solar system, and/or the food pyramid. Select any of these topics, and write a brochure or newsletter to report on your studies. Fliers Fliers are written primarily to promote, sell, or advertise a product, service, or event. Thus, your classes could create fliers about many topics. These include machines (Industrial Technology), food or clothing (Family and Consumer Sciences), an art object (Art), a locale (from a story in English), a scientific or historical invention (History and Science), a play performance or recital (Music and Drama), etc. The list is endless. 88
  • 94.
    Grouped Assignments (Instructional Modules) Anexcellent way to have students write more technical documents is to create technical writing modules (grouped assignments with a central focus). For example, tell students on the first day of class that they will be employed by a company (one they will invent). For this company, they will write several, related technical documents. There are different ways to approach this assignment. For Option #1 Students write a: 1. Report to a boss recommending a new product/ service 2. Directive memo from a boss approving the product 3. Sales letter marketing the product 4. Web page marketing the product 5. Instructions manual for the product 6. Cover letter Option #2 1. Sales letter marketing a product or service 2. Flier highlighting one specific aspect of the product or service 3. Website advertising or explaining the product or service 4. PowerPoint presentation advertising or explaining the product or service 5. Newsletter informing the public or co-workers about the product or service Option #1 Company Client Boss 3. Sales Letter 2. Directive Memo 1. Recommendation Report 4. Web 5/6. Instructions/ Cover Letter Pages Employee Option #2 Company 1 Client 2 3 4 5 (Option #3 continued on next page…) 89
  • 95.
    For Option #3 Studentswrite a: 1. Sales letter marketing a product or service 2. Letter of inquiry from a prospective client requesting more information 3. Directive memo from the boss 4. Proposal 5. Instructional manual 6. Cover letter Option #3 Company Client 1. Sales Letter 2. Inquiry Letter Boss 4. Proposal 5. Instructions 3. Directive Memo 6. Cover Letter Employee Teaching modular groupings is effective because it simulates the reality of corporate communication, where one document leads to another. The primary difference between Option #1, Option #2, and Option #3 is computer access. If you teach in a computer laboratory, students can create web pages, fliers, and powerpoint presentations. If you teach in a regular classroom without access to computers, replace the web pages, fliers, and powerpoint presentations with reports and memos. Variations for modular groupings Modular groupings let students role play (boss, client, employee), write different types of documentation, and write for different purposes (to recommend, sell, instruct, direct, request, etc.). Six grouped documents may be more than you would like to assign. If so, assign fewer (the modules are flexible). Combine just two or three of the assignments. For example, the students may write (1) a directive memo from a boss asking for (2) a sales letter and (3) then create a web page. Or the students may write (1) a letter of inquiry requesting (2) a proposal and then (3) an instructional manual. Job packages Job packages are an excellent way to group assignments. The students could write (1) a letter of inquiry to a local company asking for information about job openings, salary ranges, job requirements, etc. (2) Upon receiving answers from the company’s Human Resources staff, the students could present this information to the class or teacher by way of a report, memo, e-mail or PowerPoint presentation. (3) Then students could write a followup thank you letter or e-mail. (4) Students could write a resumé and (5) a cover letter/e-mail for a job of their choice within that company. (6) Finally, students could perform mock interviews based on these resumés and cover letters. (These six assignments could be reduced to two or three.) 90
  • 96.
    Conclusion There is noone way to teach technical writing. Teach one assignment or many; teach stand-alone, unrelated assignments or groups of assignments unified by a central theme; teach technical writing in one term or as a year-long course. Technical writing can be incorporated successfully into any course . . . in many different ways. However you decide to make technical writing a part of your class, your students will benefit. They will learn a type of writing that will help them get jobs and succeed in the workplace. They will learn writing that works! Sample Technical Writing I Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15 Introduction to Technical Writing Criteria for Effective Technical Writing discussed Sales Letters/In-class Writing Activity HW: Prewrite and Write Rough Draft Sales Letter Prewriting and Rough Draft Due/Peer Evaluations Sales Letters due/Fliers/In-class Writing Activity HW: Prewrite and Write Rough Draft Flier Prewriting and Rough Draft Due/Peer Evaluations Fliers due/Letter of Inquiry/In-class Writing Activity HW: Prewrite and Write Rough Draft Letter of Inquiry Prewriting and Rough Drafts due/Peer Evaluations Letter of Inquiry due/Memos/Prewriting HW: Write Rough Draft Memo Rough Drafts Memo due/Peer Evaluations Memo due/E-mail HW: Prewrite and Write Rough Draft E-mail E-mail due Begin Website Team Work Team Work Continues Team Websites due Begin Team User Manuals/Team Work Team Work Continues Team User Manual due Progress Reports/Graphics HW: Rough Draft Peer Evaluations/Progress Reports due Finals begin 91 The following is an example of a Scope and Sequence Outline for a year-long technical writing course titled Technical Writing and Applied Communications.
  • 97.
    Sample Course Scope andSequence of YearLong Technical Writing Course Technical Writing & Applied Communications Course Description: Grade Level: Prerequisites: Technical writing is worthy of a year-long course. If you would like to teach a year-long course in technical writing, here is an approach currently used by Carol Hailey at Shawnee Mission North High School (Overland Park, KS). ! 12 ! English 9, 10, 11; Introduction to Computers Articulations: ! Required Text: ! Johnson County Community College (JCCC) Technical Writing I; JCCC Tech Prep Transformations--Applied Communications Technical Writing: Process and Product (Gerson and Gerson, Prentice Hall, 1997, second edition) Course Overview: Technical Writing and Applied Communications is a course for career-oriented students who plan to attend two or four year college. Because the course is designed to introduce students to writing required in the work environment, students will complete assignments in both classroom and community settings. Students will learn reading, listening, and speaking skills; will explore group dynamics, interviewing and problem-solving strategies; and will write various types of technical correspondence demonstrating accuracy in grammar. Course Objectives: Students will read and respond to nonfiction literature including articles on applied communications and career areas of interest, occupational handouts, biographies, autobiographies, and social agency and business communications. Students will demonstrate comprehension through written or oral assignments. Students will demonstrate effective empathetic and critical listening skills at a 70% level on the instructor's rubric. Students will perform small group or individual speaking presentations, role-playing activities, and interview situations at a 70% skill level on the instructor's rubric. Students will demonstrate use of the writing process in completing written assignments for specific audience and purpose. Students will demonstrate ability to work effectively in small groups to complete problem solving, projects, presentations, and research. Students will use word-processing and computer-generated graphics to complete written assignments. Students will produce the following written assignments scoring a minimum of 3 on each of the 5 Traits. ! Letters ! Summaries ! Paraphrases ! Short research reports ! Resumés ! Newsletters ! Brochures Students will successfully complete a college application. Students will complete writing assignments that contain no more than three grammar errors per page. After completing a Basic Business Grammar review module, students will demonstrate 80% accuracy on a post assessment. 92
  • 98.
    Quarter 1 Course Objectives: Rationale: Introductionto Technical Writing: Exploring Group Dynamics: Introduction to Applied Communications Course objectives Classroom management Parent letter from instructor ! Rationale for class ! Community/business involvement ! Group work/attendance ! Multi-media/technology ! Assessment a. Portfolio b. Projects c. Presentations Compare/contrast essay composition to technical writing Define criteria Readings/analyze models Assessment—Rewrite 6 Traits for technical writing ! Student handbook ! Student self-assessment tool Rationale for cooperative workplace ! Guest speakers from business ! Possible visit to business environment Responsibilities in group/cooperative production ! Group responsibilities ! Attendance Simulated group activity ! Video tape ! Identify and analyze group roles Group roles inventory ! Identify individual roles ! Short written report/response Effective listening skills ! Importance in group/cooperative work ! Practice activities Assessment—Group/Problem solving activities ! Video tape ! Analysis ! Individual written/oral response Grammar Review: Writing Assignments: Pretest Business Grammar Module Post test Practice proofreading exercises/technical writing context Peer group editing practice and exercises Summary ! Quoting/Paraphrasing/Documentation ! Objective Summary ! Subjective response Short Reports Assessment Portfolio for course: Introduce concept and assignment Assessment/selections to demonstrate technical writing College application and resumé 93
  • 99.
    Quarter 2 Course Objectives: Introductionto Problem Solving: Writing Brochures & Newsletters: Final Assessment--Project: Applied Communications Within the School Community Steps in problem solving Written proposals Interviewing/investigation skills Assessment--Project: Group practice in problem solving ! Student groups identify problems within the school (parking, cafeteria food, discipline, drugs, etc.) ! Interview/investigate (principal, cafeteria administrator, counselor, etc.) ! Draft proposal/short report suggesting solutions to the problem Criteria Models/analyze Computer graphics/layout Practice activity Student groups identify need for brochure and newsletter within the school community (Key Club, Honor Society, band, drama department, Spanish Club, etc.) Student groups interview organization, determine needs Presentation of product to peers Evaluation ! Peer evaluations ! Teacher evaluations ! Group work evaluations Assessment of Portfolio Revision/Update Quarter 3 Course Objectives: Identify community problems/ issues and organizations that address them: Applied Communications Within the Community Research problem/issues—Secondary sources (nonfiction readings) ! Articles ! Newspapers ! Essays Research problems/issues—Primary sources--community guest speakers ! Follow-up thank you letters Research problems and issues ! Research techniques ! Documentation Assessment Projects ! Short reports--reporting on the problems/suggesting solutions ! Oral presentation Writing for the community: Develop student groups Identify a community or service organization ! Writer letter of inquiry/contact/interview ! Prepare written proposal for instructor/present to class ! Spend day in community or service organization--shadowing ! Write follow-up thank you letter Develop brochure or newsletter for organization Class presentations ! Peer evaluations/group evaluations ! Teacher evaluations Class develops slide presentation/narrative of projects for selected audience 94
  • 100.
    Quarter 4 Course Objectives: AssessmentPortfolio Revisions/Update: Review Areas of Career Interest—ACT Discover Program: Readings—Career Interest: Applied Communication and Career Exploration Student selects career for exploration Student researches bibliography/resources Biography/autobiography ! Read ! Develop brochure or short report Periodicals appropriate to career ! Read ! Writer summaries/response Professional journals/occupational handbooks ! Read ! Writer summaries/response Interview corporate personnel director, human resources administrator or employee in your field: ! Write letter of inquiry ! Interview/visit/shadow at work/on-site experience ! Follow-up thank you letter ! Short report ! Update Resumé ! Cover letter of Application ! Complete Portfolio ! Assessment: Mock interview with personnel director/present portfolio/receive feedback Sample Five Day Technical Writing Instructional Module Unit Objective: Upon completion of this unit, students will be able to identify criteria for writing an effective ______________, prewrite to gather data, write a rough draft, and revise others’ work through peer group assessments. Day #1 Day #2 Day #3 Day #4 Day #5 Introduce Topic Practice Instructor Review Individual Assignment Peer Review *Provide criteria for a __________ *Group writing based on Day #1 criteria *Assess group work on overhead projector *Assign students to write a __________ *Students assess others’ writing based on Day #1 criteria *Review samples of good/bad ___________ *Collect writing to make overheads *Compare/contrast to Day #1 criteria *Students prewrite *Homework: Revise for submission next class *Students write rough drafts *Complete at home 95
  • 101.
    Five Day TechnicalWriting Instructional Module Unit Objective:___________________________________________________________________________________________ _________________________________________________________________________________________________________ Day #1 Day #2 Day #3 Day #4 Day #5 96