Integrating IT Frameworks,
Methodologies and Best
Practices Into IT Delivery
and Operation


Alan McSweeney
Objectives

•   Contains notes on the integration of available frameworks
    and methodologies into a possible integrated approach to
    providing information technology services




    March 23, 2010                                              2
Information Technology and Related Frameworks
and Methodologies
•   Bewildering array of overlapping frameworks and methodologies
    across lifecycle of IT systems delivery and management
•   Frameworks and methodologies have benefits
      − Provide a short-cut to determining the optimum approach to address a
        business need
      − Contain collective learning and experience
      − Supported and enhanced
      − Useful but are a means to and end and not an end in themselves
•   But there are many (too many) competing individual frameworks
    and methodologies representing specific potential solutions to
    specific needs
      − Focussing on individual aspects of IT
•   Need for a higher view above the individual frameworks
•   A view that represents how an IT function needs to operate
    holistically

    March 23, 2010                                                             3
Suggested Integrated IT Solution and Operations
Management Approach
                             Integrated Solution and Operations
                                   Management Approach

    Architecture and                                                  Management and
       Realisation                                                       Processes

                       Vision and Strategy        Enterprise Management


                                                  Programme and Portfolio
                          Architecture
                                                        Management

                  Development, Customisation
                                                    Project Management
                       and Configuration

                       Implementation and
                                                   Service Management
                          Deployment


                    Operation and Control        Architecture Management
 March 23, 2010                                                                        4
Integrated IT Solution and Operations Management
Approach
•   Every IT function has two pillars
      − Doing
             •   Strategy
             •   Design
             •   Development
             •   Implementation
      − Managing the doing
             •   Business change
             •   Programmes
             •   Projects
             •   Operations
•   Generalised approach that can integrate specific delivery
    frameworks as required
•   Provide an overarching approach on which any function can be built

    March 23, 2010                                                       5
Direction and Focus of IT Solution and Operations
  Management Approach – Three Layers
                                          Integrated Solution and Operations
                                                Management Approach

                 Architecture and                                                  Management and
                    Realisation                                                       Processes


  General                           Vision and Strategy        Enterprise Management       Fundamental
Direction of                                                                               Processes and
  Solution                                                                                 Competencies
                                                               Programme and Portfolio
  Lifecycle                            Architecture
                                                                     Management
    From
 Design to                   Development, Customisation                                    Implementation
 Operation                                                       Project Management        of New Projects
                                  and Configuration
                                                                                             and Services
                                    Implementation and
                                                                Service Management
                                       Deployment

                                                                                             Operation of
                                     Operation and Control    Architecture Management      Existing Services


     March 23, 2010                                                                                            6
Arrangement of Integrated IT Solution and Operations
  Management Approach Within Operational Context
                                Architecture and Realisation                             Management and Processes


   Existing




                                                                 MANAGING THE DOING
Programmes,                                                                            Focus on management processes
                             Focus on architecture and design
 Projects and                                                                         associated with the operation and
                                aspects of existing services
   Services                                                                              delivery of existing services


                                                                                      Focus on management processes
                     DOING




                              Focus on architecture, design,
     New                                                                              associated with the architecture,
                               selection, development and
Programmes,                                                                            design, selection, development
                             delivery aspects of new projects
 Projects and                                                                           and delivery aspects of new
                                       and services
   Services                                                                                 projects and services


                              Focus on the prerequisites and                           Focus on the prerequisite and
Fundamental
                                foundations for strategy,                                foundation management
Organisational
Requirements                 architecture and design across IT                        processes across IT function and
                              function and solution lifecycle                                solution lifecycle

    March 23, 2010                                                                                                        7
Integrated IT Solution and Operations Management
Approach
•   An practical and integrated solution and operations
    management approach consisting of two pillars:
      − Architecture and Realisation (“Doing”)
             • Concerned with enterprise vision, strategy, architecture, implementation,
               delivery and subsequent operation
      − Management and Processes (“Managing the Doing”)
             • Addresses the management of large-scale business and information
               technology initiatives and associated programmes and projects
• Phases and processes within the two pillars can be
  integrated across a programme of work or the services can
  be delivered independently, depending on the
  requirements of the organisation
• Generalised framework that can be applied across multiple
  environments
    March 23, 2010                                                                         8
Expanded Integrated IT Solution and Operations
Management Approach - Architecture and Realisation Pillar
 Architecture and Realisation

                                                                         Vision and Strategy


                                                   Enterprise Transition and                  Information Technology
                                                       Transformation                                Strategy


                                                                               Architecture


                                                     Business Application                     Information Technology
                       System Architecture                                                                             Business Area Architecture
                                                         Architecture                              Architecture

                                                                     Development, Customisation
                                                                          and Configuration

                                                      Package Selection,
                      Accelerated Application
                                                      Customisation and                        Iterative Development   Application Re-engineering
                   Prototyping and Development
                                                       Implementation

                                                                        Implementation and
                                                                           Deployment


                      Readiness Assessment                   Pilot                            Deployment Preparation          Deployment


                                                                       Operation and Control


                                                 System Operations and Service                  System Support and
                                                         Management                               Administration
 March 23, 2010                                                                                                                                 9
Expanded Integrated IT Solution and Operations
Management Approach - Management and Processes Pillar
Management and Processes

                                                                         Enterprise Management


                                                                        Architecture and Systems          Management Support
                   Business Change               Governance                                                                              IT Management
                                                                              Management                      Framework

                                                                        Programme and Portfolio
                                                                             Management

                                                                                             Portfolio Project
                                                         Programme Management
                                                                                              Management


                                                                          Project Management


                                                           PMO Implementation
                                                                                       Management of Projects
                                                             and Operation


                                                                          Service Management


                                                                             Service Request              Service Improvement
                                               Service Delivery
                                                                              Management                       Programme

                                                                              Architecture
                                                                              Management

                              Business Architecture       Information Architecture     Technology Architecture        Application Architecture
                                  Management                   Management                   Management                     Management
  March 23, 2010                                                                                                                                         10
Integrated IT Solution and Operations Management
 Approach Within Operational Context
                            Architecture and Realisation                    Management and Processes

   Existing
                                                   Operation and
Programmes,                                           Control
 Projects and
   Services                                                               Service
                                                                        Management

                                                 Implementation and
                                                    Deployment


     New
Programmes,
 Projects and                                      Development,
                                                   Customisation
   Services                                             and
                                                   Configuration
                                  Architecture                                        Programme
                                                                       Enterprise                      Project    Architecture
                                                                                     and Portfolio                Management
                                                                      Management                     Management
                                                                                     Management
                    Vision and
Fundamental          Strategy
Organisational
Requirements


   March 23, 2010                                                                                                            11
Architecture and Realisation Pillar

•   Vision and Strategy
      −    Creates the business vision defines the direction for subsequent information technology initiatives
      −    Internal and external requirements and processes are analysed
      −    Allows prioritisation of the business and information system areas that will addressed in subsequent stages
      −    Ensures that all further work is aligned with the vision and strategy
•   Architecture
      − Designed to translate the Vision and Strategy into an implementable, operable and supportable structure
      − Architecture can encompass both enterprise and specific solution areas
      − Scope, requirements and functionality of the business processes and the associated information systems are
        specified
      − Architecture is concerned with both business and information technology in parallel
      − Constituent projects and changes to deliver the architecture are identified
•   Development, Customisation and Configuration
      − Selects, designs, builds, customises and tests the elements of the solution
      − Includes some or all of customised development, package customisation and system enhancement.
      − Development activities related to business change and technical infrastructure are addressed
•   Implementation and Deployment
      − Takes the solution components and creates a fully operable system, complete with data and business process
        changes
      − Includes integration testing, pilot, data conversion documented procedures, training, and operational readiness
        and acceptance
•   Operation and Control
      − Creates and implements practices for ensuring defined service levels for the operation, maintenance, and
        support of the new or modified systems


    March 23, 2010                                                                                                        12
Management and Processes Pillar

•   Enterprise Management
      − Involves establishing business objectives, monitoring achievement against targets and making necessary
        corrections
•   Programme and Portfolio Management
      − Directs and manages programmes and portfolios of initiatives and undertakings offerings to balance benefits,
        costs, resources and risks in a strategic context and ensuring benefits realisation
      − Establish the competency within an organisation to provide this service internally or manage its provision by
        external agents
•   Project Management
      − Concentrates on the effective and efficient processes required to identify, coordinate, and continuously focus
        people and resources on achieving project objectives and commitment within time, cost, resource and quality
        controls
      − Enables organisations to deliver both the simple and complex initiatives and to perform projects capably
•   Service Management
      − Controls and manages the operational services phases of the overall initiative life cycle
      − Service request management handles requests from users
      − Manages their fulfilment and includes logging, performing initial analysis, monitoring, prioritising, measuring,
        and closing
      − Service delivery management directs and manages services to ensure that the end-user receives the agreed
        service
•   Architecture Management
      − Concerned with the business, technical, and operational procedures and processes needed to ensure and
        maintain integrated enterprise and solution architecture during the implementation of the solution and its
        subsequent operation



    March 23, 2010                                                                                                         13
Groups of Information Technology and Related
Frameworks, Methodologies and Toolsets
•   Multiple existing IT frameworks can be divided into groups
      −    Service and Application Management, Provisioning and Sourcing
      −    Program and Project Management
      −    Enterprise Architecture
      −    Software Lifecycle Management
      −    Value and Investment Management
      −    Data Management
      −    Quality Management
      −    Governance, Security and Risk Management
      −    Business Management and Support
      −    Business Analysis
•   Not an exhaustive list of frameworks or groups
•   Each exists as a point solution to a specific requirement
•   Frameworks need to be placed in context to allow most relevant and
    appropriate be selected

    March 23, 2010                                                         14
Groups of Information Technology and Related
Frameworks, Methodologies and Toolsets
                                   Information Technology and Related
                                Frameworks, Methodologies and Toolsets


Service and Application Management,
                                                                    Quality Management
      Provisioning and Sourcing


                                                                Governance, Security and Risk
  Program and Project Management
                                                                       Management


    Software Lifecycle Management                            Business Management and Support



 Value and Investment Management                                         Business Analysis



                  Data Management                                  Enterprise Architecture

 March 23, 2010                                                                                 15
Framework Groups Within Integrated Solution and
 Operations Management Approach
                          Architecture and Realisation                              Management and Processes

   Existing
Programmes,
 Projects and
   Services

                                   Business
                                 Management
                                 and Support                   Software
                                                               Lifecycle
                                                Service and
     New                                        Application
                                                              Management     Governance,
                                                                                            Program and
                                               Management,                   Security and
Programmes,                                    Provisioning                      Risk          Project
                                                                             Management     Management
 Projects and                                  and Sourcing

   Services
                                  Business                                                                 Value and     Quality
                       Data
                                  Analysis                     Enterprise                                 Investment   Management
                    Management
                                                              Architecture                                Management

Fundamental
Organisational
Requirements


   March 23, 2010                                                                                                                   16
Organisations Need to Maintain Sets of Core
Competencies That Cross All Functions
•   Core competencies that organisations need and which cross
    functional areas
      − Performance and Quality Management
      − Resource Management
      − Funding, Financial, Investment and Budget Management and Total Cost of
        Ownership
      − Human Capital and Resource Management
      − Organisation Design, Planning and Management
      − Usability and User Experience Design
      − Sourcing and Selection Management
      − Vendor and Supplier Management
      − Business Process Management
      − Benefits Assessment and Realisation
      − Capacity Planning, Forecasting and Demand and Supply Management
•   These are common sets of skills needed for both pillars and across
    solution and service lifecycles
•   Not specific to one area within integrated approach
    March 23, 2010                                                               17
Core Competencies That Cross All Functions
                           Performance Solution and Management
                              Integrated and Quality Operations
                                      Management Approach
                                     Resource Management
    Architecture and                                        Management and
Funding, Financial, Investment and Budget Management and Total Cost of Ownership
       Realisation                                              Processes

                         Human Capital and Resource Management
                         Vision and Strategy         Enterprise Management
                      Organisation Design, Planning and Management
                                                    Programme and Portfolio
                            Architectureand User Experience Design
                            Usability
                                                          Management
                             Sourcing and Selection Management
                     Development, Customisation
                                                      Project Management
                          and Configuration Supplier Management
                               Vendor and
                        Implementation andProcess Management
                               Business             Service Management
                           Deployment
                             Benefits Assessment and Realisation
                          Operation and Control   Architecture Management
             Capacity Planning, Forecasting and Demand and Supply Management
 March 23, 2010                                                                18
Core Competencies

•   Frameworks can assist in quickly implementing some core
    competencies
    Performance and Quality Management              ISO 9000, TickIT, TQM, Six Sigma
    Resource Management
    Funding, Financial, Investment and Budget       ITIM, Val IT
    Management and Total Cost of Ownership
    Human Capital and Resource Management           People CMM
    Organisation Design, Planning and Management
    Usability and User Experience Design
    Sourcing and Selection Management               eSCM, ISPL
    Vendor and Supplier Management                  eSCM, ISPL
    Business Process Management
    Benefits Assessment and Realisation             MSP, IT Balanced Scorecard, ITIM, Val IT
    Capacity Planning, Forecasting and Demand and
    Supply Management
    March 23, 2010                                                                             19
Frameworks and Integrated Solution and Operations
Management Approach - Architecture and Realisation
High Level Function              Components of Function                     Possible Methodology/Framework
                                                                            Toolset
Vision and Strategy              Enterprise Transition and Transformation
                                 Information Technology Strategy            TOGAF, DODAF, MODAF, NASCIO EAMM
Architecture                     System Architecture                        TOGAF, DODAF, MODAF, NASCIO EAMM
                                 Business Application Architecture          TOGAF, DODAF, MODAF, NASCIO EAMM
                                 Information Technology Architecture        TOGAF, DODAF, MODAF, NASCIO EAMM
                                 Business Area Architecture                 TOGAF, DODAF, MODAF, NASCIO EAMM
Development, Customisation and   Accelerated Application Prototyping and    DSDM, RUP
Configuration                    Development
                                 Package Selection, Customisation and       ITIM, Val IT
                                 Implementation
                                 Iterative Development                      DSDM, RUP
                                 Application Re-engineering
Implementation and Deployment    Readiness Assessment
                                 Pilot
                                 Deployment Preparation
                                 Deployment
Operation and Control            System Operations and Service Management   ITIL, ISO 20000, IT Service CMM, ISPL, eSCM,
                                                                            ASL, USMBOK
                                 System Support and Administration          ITIL, ISO 20000, IT Service CMM, ISPL, eSCM,
                                                                            ASL, USMBOK
   March 23, 2010                                                                                                          20
Frameworks and Integrated Solution and Operations
Management Approach - Management and Processes
High Level Function                  Components of Function                Possible Methodology/Framework
                                                                           Toolset
Enterprise Management                Business Change
                                     Governance                            COBIT, ISO 38500, OCEG
                                     Architecture and Systems Management
                                     Management Support Framework          MOF, BISL, ITIL, ISO 20000, IT Service CMM,
                                                                           ISPL, eSCM, ASL, USMBOK
                                     IT Management
Programme and Portfolio Management   Programme Management                  PRINCE2, PMBOK, MSP
                                     Portfolio Project Management          PRINCE2, PMBOK, MSP
Project Management                   PMO Implementation and Operation      PRINCE2, PMBOK, MSP
                                     Management of Projects                PRINCE2, PMBOK, MSP
Service Management                   Service Delivery                      ITIL, ISO 20000, IT Service CMM, ISPL, eSCM,
                                                                           ASL, USMBOK
                                     Service Request Management            ITIL, ISO 20000, IT Service CMM, ISPL, eSCM,
                                                                           ASL, USMBOK
                                     Service Improvement Programme         ITIL, ISO 20000, IT Service CMM, ISPL, eSCM,
                                                                           ASL, USMBOK
Architecture Management              Business Architecture Management      TOGAF, DODAF, MODAF, NASCIO EAMM
                                     Information Architecture Management   TOGAF, DODAF, MODAF, NASCIO EAMM
                                     Technology Architecture Management    TOGAF, DODAF, MODAF, NASCIO EAMM
                                     Application Architecture Management   TOGAF, DODAF, MODAF, NASCIO EAMM
  March 23, 2010                                                                                                          21
Service and Application Management, Provisioning
and Sourcing Frameworks
Information
Technology
and Related
Frameworks




                                                      Service and
                                                      Application
                                                     Management,
                                                     Provisioning
                                                     and Sourcing




                                                                                                  USMBOK
                ITIL                    IT Service        ISPL        eSCM
                                                                                     ASL         (Universal
           (Information    ISO 20000      CMM        (Information   (eSourcing
                                                                                 (Application      Service
            Technology       (ITSM     (Capability      Services    Capability
                                                                                   Services     Management
          Infrastructure   Standard)     Maturity    Procurement     Maturity
                                                                                   Library)       Body of
              Library)                   Model)         Library)      Model)
                                                                                                Knowledge)


  March 23, 2010                                                                                              22
ITIL (Information Technology Infrastructure Library)

•   Aims to improve the overall quality of service to the business within imposed
    constraints while improving the overall effectiveness and efficiency of IT
•   Consists of a series of books giving guidance on the provision of quality IT services,
    and on the accommodation and environmental facilities needed to support IT
•   Provides a framework of best practice guidance for IT service management that
    has become the most widely used and accepted approach to IT service
    management in the world
•   Developed in recognition of organisations' growing dependency on IT
•   Core of ITIL provides best practice guidance for service delivery, service support, IT
    infrastructure management, planning to implement service management,
    application management, the business perspective, and security management
•   Whole ITIL philosophy has grown up around the guidance contained within the ITIL
    books and the supporting professional qualification scheme




    March 23, 2010                                                                           23
ISO 20000 (IT Service Management Standard)

•   Formal standard for IT service management
•   Management standard, addressing the establishment and
    maintenance of processes and the mechanism to ensure their
    relevance and improvement
•   Consists of service delivery processes, resolution processes,
    relationship processes, control processes, and the release process
•   Requires service providers to implement the PDCA( Plan-Do-Check-
    Act) cycle for service management processes
•   Achieve formal certification and thus demonstrate compliance to
    accepted best practices but ISO 20000 is primarily a measure of
    process conformance to be achieved rather than setting out a means
    of achieving this process conformance
•   Covers only core elements of the service management process and
    thus cannot describe the full set of processes for any specific service
    provider

    March 23, 2010                                                            24
IT Service CMM (Capability Maturity Model)

•   Maturity model for organisations that provide IT services
    such as management of hardware and software,
    operations, and software maintenance
•   Used to assess current IT organisation's maturity and to
    improve IT processes
•   Focus on process improvement but does not include
    specifications on how a specific maturity level should be
    reached
•   Does not distinguish between internal and external IT
    service providers

    March 23, 2010                                              25
ISPL (Information Services Procurement
Library)
•   Best practice library for the management of IT related
    acquisition processes
•   Focus on the relationship between the customer and
    supplier organisation and on the procurement of
    information services
•   Designed to professionalise customer-supplier
    relationships during an outsourcing initiative
•   Designed to help understand services to be acquired and
    delivered and structure their acquisition and delivery


    March 23, 2010                                            26
eSCM (eSourcing Capability Maturity Model)

•   Two versions:
      − Sourcing partners (eSCM-SP)
      − Client companies availing of outsourcing function (eSCM-CL)
•   Sourcing partners
      − Defines sourcing capabilities that organisations should develop
        and improve in order to be viewed by their current and
        prospective customers as capable and reliable partners
•   Client companies availing of outsourcing function
      − Defines capabilities that organisations should develop and
        improve in order to select and manage outsourcing relationship
•   Covers the lifecycle of service provision from initiation to
    completion of a relationship

    March 23, 2010                                                        27
ASL (Application Services Library)

•   Describes a standard for processes for management,
    maintenance and enhancement/renovation of (business)
    applications
•   Aimed at managers and professionals loooking to improve
    maturity of the processes for delivering application
    management services
•   Can be used to improve a broad spectrum of aspects of
    application management, varying from cost control and
    quality of service to staff motivation and strategic
    alignment
•   Based on ITIL concepts
    March 23, 2010                                            28
USMBOK (Universal Service Management Body of
Knowledge)
•   New major and comprehensive service management
    framework
•   Driven by a single individual
•   Designed as an open body of knowledge on successful
    service management




    March 23, 2010                                        29
Program and Project Management Frameworks
Information
Technology
and Related
Frameworks




                                   Program and
                                      Project
                                   Management




                              PMBOK
               PRINCE2                         MSP
                              (Project
             (Projects in                   (Managing    IT Balanced
                            Management
              Controlled                    Successful    Scorecard
                              Body of
            Environments)                  Programmes)
                            Knowledge)


  March 23, 2010                                                       30
PRINCE2 (Projects in Controlled Environments )

•   Best practice project management standard in the UK and widely
    used elsewhere
•   Process-based method for project management - sets of processes
    that provide a controlled project start, controlled project, and
    controlled close
•   Covers management, control and organisation of a project and can
    be used for any project type and size
•   Concentrates on the work of project and team managers and
    management involved in decision-making within the project
•   Covered aspects of projects are business case, organisation, plans,
    controls, management of risks, quality in a project environment,
    configuration management and change control

    March 23, 2010                                                        31
PMBOK (Project Management Body of Knowledge)

•   Very widely used process-based project management
    guide and an internationally recognised standard that
    provides the fundamentals of project management as they
    apply to a wide range of projects
•   Recognised throughout the world as a standard for
    managing projects
•   Covers project knowledge areas: integration management,
    HR management, scope management, communications
    management, time management, risk management, cost
    management, procurement management and quality
    management

    March 23, 2010                                            32
MSP (Managing Successful Programmes)

•   Best practice guide on programme management
•   Generic approach which can be used in all types of
    programmes
•   Contains a set of principles and a set of processes for use
    when managing a programme
•   Tool to manage strategic change in parts of an
    organisation
•   Can be used together with PRINCE2



    March 23, 2010                                                33
IT Balanced Scorecard

•   Planning and management tool used to align business
    activities to the vision and strategy of the organisation,
    improve internal and external communications and
    monitor organisation performance against strategic goals
•   Can be used to measure and manage IT performance and
    to enable alignment between business and IT
•   Covers four perspectives: perspective, internal business
    process, learning and growth and customer




    March 23, 2010                                               34
Software Lifecycle Management Frameworks
  Information
Technology and
    Related
 Frameworks




                                            Software
                                            Lifecycle
                                           Management




                                ISO/IEC 12207
                  CMMI           Systems And      DSDM (Dynamic
                (Capability        Software          Systems       RUP (Rational
              Maturity Model     Engineering –     Development    Unified Process)
               Integration)      Software Life       Method)
                               Cycle Processes)

  March 23, 2010                                                                     35
CMMI (Capability Maturity Model Integration

•   Process improvement approach that provides with the
    essential elements of effective processes
•   Currently addresses three areas
      − Product and service development - CMMI for Development
      − Service establishment, management, and delivery - CMMI for
        Services
      − Product and service acquisition - CMMI for Acquisition




    March 23, 2010                                                   36
ISO/IEC 12207 Systems And Software Engineering –
Software Life Cycle Processes)
•   Defines a common framework for software life cycle
    processes, with well-defined terminology that can be
    referenced by the software industry
•   Applies to the acquisition of systems and software
    products and services, to the supply, development,
    operation, maintenance, and disposal of software products
    and the software portion of a system, whether performed
    internally or externally to an organisation
•   Provides a process that can be employed for defining,
    controlling, and improving software life cycle processes


    March 23, 2010                                              37
DSDM (Dynamic Systems Development Method)

•   Software development methodology originally based on
    and extends Rapid Application Development methodology
•   Iterative and incremental approach that emphasises
    continuous user involvement
•   Aims to deliver software systems on time and on budget
    while adjusting for changing requirements along the
    development process




    March 23, 2010                                           38
RUP (Rational Unified Process)

• Iterative software development process framework
  created by the Rational Software Corporation (IBM)
• Can be tailored by the development organisations and
  software project teams who select the parts of the process
  that are appropriate
• Consists of project lifecycle phases and engineering and
  supporting disciplines
• Variants and extensions
      − Unified Process
      − Open Unified Process
      − Agile Unified Process
      − Enterprise Unified Process

    March 23, 2010                                             39
Value and Investment Management Frameworks
Information
Technology
and Related
Frameworks




                            Value and
                           Investment
                           Management




                ITIM
            (Information                Gartner Total
             Technology      Val IT        Cost of
             Investment                  Ownership
            Management)


  March 23, 2010                                        40
ITIM (Information Technology Investment
Management)
•   Produced by the United States General Accounting Office
    (GAO)
•   Identifies and organises thirteen processes that are critical
    for successful investment into a framework of increasingly
    mature stages
•   Tool for internal and external evaluations of investment
    management process




    March 23, 2010                                                  41
Val IT

•   Framework for the governance of IT investments to get
    business value from IT investments
•   Provides guidance on different types of value (tangible and
    intangible) that can be considered and how to compare
    the tangible with intangibles benefits
•   Tightly integrated with and extends and complements
    COBIT with management processes required to get good
    value from IT investments




    March 23, 2010                                                42
Gartner Total Cost of Ownership

•   Aims to be an industry standard TCO methodology
•   TCO models are available for contact centre, data network,
    distributed computing, enterprise operations centre,
    enterprise storage management, help desk, and voice
    telecom




    March 23, 2010                                               43
Data Management Frameworks
Information
Technology
and Related
Frameworks




                Data
             Management




            DMBOK (Data
            Management
               Body of
             Knowledge)


  March 23, 2010             44
DMBOK (Data Management Body of Knowledge)

•   Generalised and comprehensive framework for managing
    data across the entire lifecycle
•   rovides a detailed framework to assist development and
    implementation of data management processes and
    procedures and ensures all requirements are addressed
•   Enables effective and appropriate data management
    across the organisation
•   Provides awareness and visibility of data management
    issues and requirements


    March 23, 2010                                           45
Quality Management Frameworks
  Information
Technology and
    Related
 Frameworks




                                            Quality
                                          Management




                                                   TQM (Total
                   ISO 9000   TickIT/TickITplus     Quality     Six Sigma
                                                  Management)



  March 23, 2010                                                            46
ISO 9000

•   ISO 9000 is a family of standards for quality management
    systems
•   Developed to address the quality management systems
    within an organisation to demonstrate its capability to
    meet its customer's requirements
•   Certifies that an organisation has carried out the correct
    processes but does not provide a quality guarantee of the
    end product
•   Only standard that can be used for the certification of a
    quality management system

    March 23, 2010                                               47
TickIT/TickITplus

•   Quality management certification for software
•   Mainly UK based
•   Aims to improve the quality of software and its application
•   Includes practical guidance for software development and
    services
•   TickITplus adds industry best practice with international IT
    standards with ISO 9001 accredited certification




    March 23, 2010                                                 48
TQM (Total Quality Management)

•   TQM is a management approach that seeks to integrate all
    organisational functions to focus on meeting customer
    needs and organisational objectives
•   All personnel become involved in the continuous
    improvement of the production of goods and services
•   Concerned with continuous improvement in all work from
    high level strategic planning and decision making to
    detailed execution of work elements
•   Many methodologies and techniques to implement TQM
    approach

    March 23, 2010                                             49
Six Sigma

•   Data-driven approach and methodology for eliminating defects in
    any process
•   Originated in manufacturing but now widely used
•   Practical goal to increase profits by eliminating variability, defects,
    and waste that undermine customer loyalty
•   Two Six Sigma components
      − DMAIC - define, measure, analyse, improve and control for existing processes
      − DMADV define, measure, analyse, design and verify for new processes
•   Uses a set of quality management methods, including statistical
    methods, and creates a special infrastructure of people within the
    organisation who are experts in these methods


    March 23, 2010                                                                     50
Governance, Security and Risk Management
Frameworks
Information
Technology
and Related
Frameworks




                                             Governance,
                                             Security and
                                                 Risk
                                             Management




            COBIT (Control      ISO 38500     ISO 27000 /
                                                            OCEG (Open
            Objectives for     (Corporate    (Information                 IT Baseline
                                                            Compliance
             Information     Governance of      Security                  Protection
                                                             and Ethics
             and Related      Information    Management                    Catalogs
                                                              Group)
             Technology)      Technology)       System)


  March 23, 2010                                                                        51
COBIT (Control Objectives for Information and
Related Technology
•   Framework for IT management created by the Information
    Systems Audit and Control Association (ISACA) and the IT
    Governance Institute (ITGI)
•   Enables clear policy development and good practice for IT
    control
•   Emphasises regulatory compliance, helps organisations to
    increase the value attained from IT




    March 23, 2010                                              52
ISO 38500 (Corporate Governance of Information
Technology)
•   Framework for governance of IT to assist senior
    management to understand and fulfill their legal,
    regulatory and ethical obligations in relation to the
    organisation’s use of IT
•   Based on Austrailian standard AS 8015 for corporate
    governance of information and communication technology
•   Encompasses establish responsibilities, plan to best
    support the organisation, acquire validly, ensure
    performance when required, ensure conformance with
    rules and ensure respect for human factors


    March 23, 2010                                           53
ISO 27000 / (Information Security Management
System)
•   Family of 27000 standards for information security
•   ISO 27001 specifies a management system to bring
    information security under management control
•   Examine information security risks, taking account of the
    threats, vulnerabilities and impacts
•   Design and implement information security controls to
    address those risks that are deemed unacceptable
•   Implement management process to ensure that the
    controls continue to meet information security
    requirements

    March 23, 2010                                              54
Open Compliance and Ethics Group

•   OCEG Framework contains the GRC Capability Model –
    specified in the OCEG Red Book
•   Provides comprehensive and detailed practices for an
    integrated GRC system
      − Achieve business objectives
      − Enhance organisational culture
      − Increase stakeholder confidence
      − Prepare and protect the organisation
      − Prevent, detect and reduce adversity
      − Motivate and inspire desired conduct
      − Improve responsiveness and efficiency
      − Optimise economic and social value
    March 23, 2010                                         55
IT Baseline Protection Catalogs

•   Collection of documents from the German Federal Office
    for Security in Information Technology
•   Includes standard security measures for typical IT systems
    with normal protection needs
•   Component catalog defines overall aspects of IT,
    infrastructure, IT systems, networks and IT applications
•   Threat catalog details potential threats to IT systems
•   measures catalog define measures necessary to achieve
    baseline protection


    March 23, 2010                                               56
Business Management and Support Frameworks

  Information
Technology and
    Related
 Frameworks




                        Business
                      Management
                      and Support




            MOF (Microsoft    BISL (Business
             Operations        Information
             Framework)      Service Library)



   March 23, 2010                               57
MOF (Microsoft Operations Framework)

•   Contains practices, principles, and activities that provide guidelines
    for achieving reliability for IT solutions and services
•   Provides question-based guidance that allows you to determine
    what is needed now as well as activities that will keep the IT
    organisation running efficiently and effectively in the future
•   Creates an environment where business and IT can work together
    toward operational maturity using a proactive model that defines
    processes and standard procedures to gain efficiency and
    effectiveness
•   Covers activities and processes involved in managing IT services:
    definition, development, operation, maintenance and retirement



    March 23, 2010                                                           58
BISL (Business Information Service Library)

•   Public domain standard for functional and and information
    management
•   Describes processes within business information management at the
    strategy, management, and operations level
•   Establishes a bridge between IT and business processes and
    between business information administrators and information
    managers
•   Identifies processes at three levels: operations, management, and
    strategic
•   Covers operations management, functionality management, change
    management and transition, planning and control, financial
    management, demand management, contract management,
    develop information strategy, develop information organisation
    strategy and information coordination

    March 23, 2010                                                      59
Business Analysis Frameworks

Information
Technology
and Related
Frameworks




                     Business
                     Analysis




                            Structured
             Business        Systems
          Analysis Body    Analysis and
          of Knowledge        Design
             (BABOK)          Method
                             (SSADM)


  March 23, 2010                          60
Business Analysis Body of Knowledge (BABOK)

•   Developed by the IIBA (International Institute of Business Analysis)
•   BABOK is the collection of knowledge within the profession of
    Business Analysis and reflects generally accepted practice
•   Describes business analysis areas of knowledge, their associated
    activities and tasks and the skills necessary to be effective in their
    execution
•   Identifies currently accepted practices
•   Recognises business analysis is not the same as software
    requirements
•   Defined and enhanced by the professionals who apply it
•   Captures the knowledge required for the practice of business
    analysis as a profession
    March 23, 2010                                                           61
Structured Systems Analysis and Design Method
(SSADM)
•   Systems approach to the analysis and design of
    information systems
•   Waterfall approach incorporates document-led approach
    to system design
•   Includes
      − Logical Data Modelling
      − Data Flow Modelling
      − Entity Behaviour Modelling




    March 23, 2010                                          62
Enterprise Architecture Frameworks

Information
Technology
and Related
Frameworks




                                                       Enterprise
                                                      Architecture




                                                                                          NASCIO EAMM
                            Department of    Ministry of
             TOGAF (The                                                      Federal         (NASCIO
                               Defense         Defence
             Open Group                                                     Enterprise      Enterprise
                             Architecture   Architectural        Zachman
             Architecture                                                  Architecture    Architecture
                             Framework       Framework
             Framework)                                                       (FEA)          Maturity
                               (DoDAF)        (MODAF)
                                                                                              Model)


  March 23, 2010                                                                                          63
TOGAF (The Open Group Architecture Framework)

•   TOGAF is a framework - a detailed method and a set of supporting tools — for
    developing an enterprise architecture
      − TOGAF is not itself an architecture
•   Architecture design is a technically complex process and the design of mixed,
    multivendor architectures is particularly complex
•   TOGAF plays an important role in helping to demystify and reduce the risk in the
    architecture development process
•   TOGAF provides a platform for adding value and enables users to build genuinely
    open systems-based solutions to address their business issues and needs
•   Because TOGAF has a detailed implementation framework, the project to
    implement it and the associated time and cost can be defined more exactly
•   Framework can be customised to suit the requirements of the organisation
•   TOGAF has a broad coverage and a business focus and seeks to ensure that IT
    delivers what the business needs
•   TOGAF focuses on both the “what” and the “how”


    March 23, 2010                                                                     64
Department of Defense Architecture Framework
(DoDAF)
•   Framework for developing and representing architecture
    descriptions that ensure a common denominator for
    understanding, comparing, and integrating architectures
•   Establishes data element definitions, rules, and
    relationships and a baseline set of products for consistent
    development of systems, integrated or federated
    architectures




    March 23, 2010                                                65
Ministry of Defence Architectural Framework
(MODAF)
•   Framework defining a standardised way of creating
    enterprise architecture
•   Defines architectural views covering the strategic goals of
    the enterprise and the people, processes and systems that
    deliver those goals




    March 23, 2010                                                66
Zachman

•   Zachman Framework for Enterprise Architecture defines a
    collection of perspectives involved in enterprise
    architecture
•   Provides a logical structure for classifying and organising
    the descriptive representations of an enterprise
•   High level framework




    March 23, 2010                                                67
Federal Enterprise Architecture (FEA)

•   Methodology for information technology acquisition, use
    and disposal
•   Contains a set of reference models
      − Performance Reference Model
      − Business Reference Model
      − Service Component Reference Model
      − Data Reference Model
      − Technical Reference Model




    March 23, 2010                                            68
NASCIO EAMM (NASCIO Enterprise Architecture
Maturity Model)
•   Developed by National Association of State Chief
    Information Officers (NASCIO)
•   Provides a path for architecture and procedural
    improvements within an organisation
•   Framework combines business and environment processes
    and representations to allow planning and development of
    an architecture blueprint
•   Designed to improve information sharing across
    government boundaries, as well as to position government
    enterprises for the digital government age and the
    advantages and opportunities that technology presents
    March 23, 2010                                             69
Summary

•   Large number of potentially very useful frameworks and
    methodologies existing as point solutions
•   Need to select the most appropriate framework to suit
    your needs
•   Need to integrate frameworks into IT operations and
    delivery structure




    March 23, 2010                                           70
More Information

          Alan McSweeney
          alan@alanmcsweeney.com




 March 23, 2010                    71

Integrating It Frameworks, Methodologies And Best Practices Into It Delivery And Operation

  • 1.
    Integrating IT Frameworks, Methodologiesand Best Practices Into IT Delivery and Operation Alan McSweeney
  • 2.
    Objectives • Contains notes on the integration of available frameworks and methodologies into a possible integrated approach to providing information technology services March 23, 2010 2
  • 3.
    Information Technology andRelated Frameworks and Methodologies • Bewildering array of overlapping frameworks and methodologies across lifecycle of IT systems delivery and management • Frameworks and methodologies have benefits − Provide a short-cut to determining the optimum approach to address a business need − Contain collective learning and experience − Supported and enhanced − Useful but are a means to and end and not an end in themselves • But there are many (too many) competing individual frameworks and methodologies representing specific potential solutions to specific needs − Focussing on individual aspects of IT • Need for a higher view above the individual frameworks • A view that represents how an IT function needs to operate holistically March 23, 2010 3
  • 4.
    Suggested Integrated ITSolution and Operations Management Approach Integrated Solution and Operations Management Approach Architecture and Management and Realisation Processes Vision and Strategy Enterprise Management Programme and Portfolio Architecture Management Development, Customisation Project Management and Configuration Implementation and Service Management Deployment Operation and Control Architecture Management March 23, 2010 4
  • 5.
    Integrated IT Solutionand Operations Management Approach • Every IT function has two pillars − Doing • Strategy • Design • Development • Implementation − Managing the doing • Business change • Programmes • Projects • Operations • Generalised approach that can integrate specific delivery frameworks as required • Provide an overarching approach on which any function can be built March 23, 2010 5
  • 6.
    Direction and Focusof IT Solution and Operations Management Approach – Three Layers Integrated Solution and Operations Management Approach Architecture and Management and Realisation Processes General Vision and Strategy Enterprise Management Fundamental Direction of Processes and Solution Competencies Programme and Portfolio Lifecycle Architecture Management From Design to Development, Customisation Implementation Operation Project Management of New Projects and Configuration and Services Implementation and Service Management Deployment Operation of Operation and Control Architecture Management Existing Services March 23, 2010 6
  • 7.
    Arrangement of IntegratedIT Solution and Operations Management Approach Within Operational Context Architecture and Realisation Management and Processes Existing MANAGING THE DOING Programmes, Focus on management processes Focus on architecture and design Projects and associated with the operation and aspects of existing services Services delivery of existing services Focus on management processes DOING Focus on architecture, design, New associated with the architecture, selection, development and Programmes, design, selection, development delivery aspects of new projects Projects and and delivery aspects of new and services Services projects and services Focus on the prerequisites and Focus on the prerequisite and Fundamental foundations for strategy, foundation management Organisational Requirements architecture and design across IT processes across IT function and function and solution lifecycle solution lifecycle March 23, 2010 7
  • 8.
    Integrated IT Solutionand Operations Management Approach • An practical and integrated solution and operations management approach consisting of two pillars: − Architecture and Realisation (“Doing”) • Concerned with enterprise vision, strategy, architecture, implementation, delivery and subsequent operation − Management and Processes (“Managing the Doing”) • Addresses the management of large-scale business and information technology initiatives and associated programmes and projects • Phases and processes within the two pillars can be integrated across a programme of work or the services can be delivered independently, depending on the requirements of the organisation • Generalised framework that can be applied across multiple environments March 23, 2010 8
  • 9.
    Expanded Integrated ITSolution and Operations Management Approach - Architecture and Realisation Pillar Architecture and Realisation Vision and Strategy Enterprise Transition and Information Technology Transformation Strategy Architecture Business Application Information Technology System Architecture Business Area Architecture Architecture Architecture Development, Customisation and Configuration Package Selection, Accelerated Application Customisation and Iterative Development Application Re-engineering Prototyping and Development Implementation Implementation and Deployment Readiness Assessment Pilot Deployment Preparation Deployment Operation and Control System Operations and Service System Support and Management Administration March 23, 2010 9
  • 10.
    Expanded Integrated ITSolution and Operations Management Approach - Management and Processes Pillar Management and Processes Enterprise Management Architecture and Systems Management Support Business Change Governance IT Management Management Framework Programme and Portfolio Management Portfolio Project Programme Management Management Project Management PMO Implementation Management of Projects and Operation Service Management Service Request Service Improvement Service Delivery Management Programme Architecture Management Business Architecture Information Architecture Technology Architecture Application Architecture Management Management Management Management March 23, 2010 10
  • 11.
    Integrated IT Solutionand Operations Management Approach Within Operational Context Architecture and Realisation Management and Processes Existing Operation and Programmes, Control Projects and Services Service Management Implementation and Deployment New Programmes, Projects and Development, Customisation Services and Configuration Architecture Programme Enterprise Project Architecture and Portfolio Management Management Management Management Vision and Fundamental Strategy Organisational Requirements March 23, 2010 11
  • 12.
    Architecture and RealisationPillar • Vision and Strategy − Creates the business vision defines the direction for subsequent information technology initiatives − Internal and external requirements and processes are analysed − Allows prioritisation of the business and information system areas that will addressed in subsequent stages − Ensures that all further work is aligned with the vision and strategy • Architecture − Designed to translate the Vision and Strategy into an implementable, operable and supportable structure − Architecture can encompass both enterprise and specific solution areas − Scope, requirements and functionality of the business processes and the associated information systems are specified − Architecture is concerned with both business and information technology in parallel − Constituent projects and changes to deliver the architecture are identified • Development, Customisation and Configuration − Selects, designs, builds, customises and tests the elements of the solution − Includes some or all of customised development, package customisation and system enhancement. − Development activities related to business change and technical infrastructure are addressed • Implementation and Deployment − Takes the solution components and creates a fully operable system, complete with data and business process changes − Includes integration testing, pilot, data conversion documented procedures, training, and operational readiness and acceptance • Operation and Control − Creates and implements practices for ensuring defined service levels for the operation, maintenance, and support of the new or modified systems March 23, 2010 12
  • 13.
    Management and ProcessesPillar • Enterprise Management − Involves establishing business objectives, monitoring achievement against targets and making necessary corrections • Programme and Portfolio Management − Directs and manages programmes and portfolios of initiatives and undertakings offerings to balance benefits, costs, resources and risks in a strategic context and ensuring benefits realisation − Establish the competency within an organisation to provide this service internally or manage its provision by external agents • Project Management − Concentrates on the effective and efficient processes required to identify, coordinate, and continuously focus people and resources on achieving project objectives and commitment within time, cost, resource and quality controls − Enables organisations to deliver both the simple and complex initiatives and to perform projects capably • Service Management − Controls and manages the operational services phases of the overall initiative life cycle − Service request management handles requests from users − Manages their fulfilment and includes logging, performing initial analysis, monitoring, prioritising, measuring, and closing − Service delivery management directs and manages services to ensure that the end-user receives the agreed service • Architecture Management − Concerned with the business, technical, and operational procedures and processes needed to ensure and maintain integrated enterprise and solution architecture during the implementation of the solution and its subsequent operation March 23, 2010 13
  • 14.
    Groups of InformationTechnology and Related Frameworks, Methodologies and Toolsets • Multiple existing IT frameworks can be divided into groups − Service and Application Management, Provisioning and Sourcing − Program and Project Management − Enterprise Architecture − Software Lifecycle Management − Value and Investment Management − Data Management − Quality Management − Governance, Security and Risk Management − Business Management and Support − Business Analysis • Not an exhaustive list of frameworks or groups • Each exists as a point solution to a specific requirement • Frameworks need to be placed in context to allow most relevant and appropriate be selected March 23, 2010 14
  • 15.
    Groups of InformationTechnology and Related Frameworks, Methodologies and Toolsets Information Technology and Related Frameworks, Methodologies and Toolsets Service and Application Management, Quality Management Provisioning and Sourcing Governance, Security and Risk Program and Project Management Management Software Lifecycle Management Business Management and Support Value and Investment Management Business Analysis Data Management Enterprise Architecture March 23, 2010 15
  • 16.
    Framework Groups WithinIntegrated Solution and Operations Management Approach Architecture and Realisation Management and Processes Existing Programmes, Projects and Services Business Management and Support Software Lifecycle Service and New Application Management Governance, Program and Management, Security and Programmes, Provisioning Risk Project Management Management Projects and and Sourcing Services Business Value and Quality Data Analysis Enterprise Investment Management Management Architecture Management Fundamental Organisational Requirements March 23, 2010 16
  • 17.
    Organisations Need toMaintain Sets of Core Competencies That Cross All Functions • Core competencies that organisations need and which cross functional areas − Performance and Quality Management − Resource Management − Funding, Financial, Investment and Budget Management and Total Cost of Ownership − Human Capital and Resource Management − Organisation Design, Planning and Management − Usability and User Experience Design − Sourcing and Selection Management − Vendor and Supplier Management − Business Process Management − Benefits Assessment and Realisation − Capacity Planning, Forecasting and Demand and Supply Management • These are common sets of skills needed for both pillars and across solution and service lifecycles • Not specific to one area within integrated approach March 23, 2010 17
  • 18.
    Core Competencies ThatCross All Functions Performance Solution and Management Integrated and Quality Operations Management Approach Resource Management Architecture and Management and Funding, Financial, Investment and Budget Management and Total Cost of Ownership Realisation Processes Human Capital and Resource Management Vision and Strategy Enterprise Management Organisation Design, Planning and Management Programme and Portfolio Architectureand User Experience Design Usability Management Sourcing and Selection Management Development, Customisation Project Management and Configuration Supplier Management Vendor and Implementation andProcess Management Business Service Management Deployment Benefits Assessment and Realisation Operation and Control Architecture Management Capacity Planning, Forecasting and Demand and Supply Management March 23, 2010 18
  • 19.
    Core Competencies • Frameworks can assist in quickly implementing some core competencies Performance and Quality Management ISO 9000, TickIT, TQM, Six Sigma Resource Management Funding, Financial, Investment and Budget ITIM, Val IT Management and Total Cost of Ownership Human Capital and Resource Management People CMM Organisation Design, Planning and Management Usability and User Experience Design Sourcing and Selection Management eSCM, ISPL Vendor and Supplier Management eSCM, ISPL Business Process Management Benefits Assessment and Realisation MSP, IT Balanced Scorecard, ITIM, Val IT Capacity Planning, Forecasting and Demand and Supply Management March 23, 2010 19
  • 20.
    Frameworks and IntegratedSolution and Operations Management Approach - Architecture and Realisation High Level Function Components of Function Possible Methodology/Framework Toolset Vision and Strategy Enterprise Transition and Transformation Information Technology Strategy TOGAF, DODAF, MODAF, NASCIO EAMM Architecture System Architecture TOGAF, DODAF, MODAF, NASCIO EAMM Business Application Architecture TOGAF, DODAF, MODAF, NASCIO EAMM Information Technology Architecture TOGAF, DODAF, MODAF, NASCIO EAMM Business Area Architecture TOGAF, DODAF, MODAF, NASCIO EAMM Development, Customisation and Accelerated Application Prototyping and DSDM, RUP Configuration Development Package Selection, Customisation and ITIM, Val IT Implementation Iterative Development DSDM, RUP Application Re-engineering Implementation and Deployment Readiness Assessment Pilot Deployment Preparation Deployment Operation and Control System Operations and Service Management ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK System Support and Administration ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK March 23, 2010 20
  • 21.
    Frameworks and IntegratedSolution and Operations Management Approach - Management and Processes High Level Function Components of Function Possible Methodology/Framework Toolset Enterprise Management Business Change Governance COBIT, ISO 38500, OCEG Architecture and Systems Management Management Support Framework MOF, BISL, ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK IT Management Programme and Portfolio Management Programme Management PRINCE2, PMBOK, MSP Portfolio Project Management PRINCE2, PMBOK, MSP Project Management PMO Implementation and Operation PRINCE2, PMBOK, MSP Management of Projects PRINCE2, PMBOK, MSP Service Management Service Delivery ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK Service Request Management ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK Service Improvement Programme ITIL, ISO 20000, IT Service CMM, ISPL, eSCM, ASL, USMBOK Architecture Management Business Architecture Management TOGAF, DODAF, MODAF, NASCIO EAMM Information Architecture Management TOGAF, DODAF, MODAF, NASCIO EAMM Technology Architecture Management TOGAF, DODAF, MODAF, NASCIO EAMM Application Architecture Management TOGAF, DODAF, MODAF, NASCIO EAMM March 23, 2010 21
  • 22.
    Service and ApplicationManagement, Provisioning and Sourcing Frameworks Information Technology and Related Frameworks Service and Application Management, Provisioning and Sourcing USMBOK ITIL IT Service ISPL eSCM ASL (Universal (Information ISO 20000 CMM (Information (eSourcing (Application Service Technology (ITSM (Capability Services Capability Services Management Infrastructure Standard) Maturity Procurement Maturity Library) Body of Library) Model) Library) Model) Knowledge) March 23, 2010 22
  • 23.
    ITIL (Information TechnologyInfrastructure Library) • Aims to improve the overall quality of service to the business within imposed constraints while improving the overall effectiveness and efficiency of IT • Consists of a series of books giving guidance on the provision of quality IT services, and on the accommodation and environmental facilities needed to support IT • Provides a framework of best practice guidance for IT service management that has become the most widely used and accepted approach to IT service management in the world • Developed in recognition of organisations' growing dependency on IT • Core of ITIL provides best practice guidance for service delivery, service support, IT infrastructure management, planning to implement service management, application management, the business perspective, and security management • Whole ITIL philosophy has grown up around the guidance contained within the ITIL books and the supporting professional qualification scheme March 23, 2010 23
  • 24.
    ISO 20000 (ITService Management Standard) • Formal standard for IT service management • Management standard, addressing the establishment and maintenance of processes and the mechanism to ensure their relevance and improvement • Consists of service delivery processes, resolution processes, relationship processes, control processes, and the release process • Requires service providers to implement the PDCA( Plan-Do-Check- Act) cycle for service management processes • Achieve formal certification and thus demonstrate compliance to accepted best practices but ISO 20000 is primarily a measure of process conformance to be achieved rather than setting out a means of achieving this process conformance • Covers only core elements of the service management process and thus cannot describe the full set of processes for any specific service provider March 23, 2010 24
  • 25.
    IT Service CMM(Capability Maturity Model) • Maturity model for organisations that provide IT services such as management of hardware and software, operations, and software maintenance • Used to assess current IT organisation's maturity and to improve IT processes • Focus on process improvement but does not include specifications on how a specific maturity level should be reached • Does not distinguish between internal and external IT service providers March 23, 2010 25
  • 26.
    ISPL (Information ServicesProcurement Library) • Best practice library for the management of IT related acquisition processes • Focus on the relationship between the customer and supplier organisation and on the procurement of information services • Designed to professionalise customer-supplier relationships during an outsourcing initiative • Designed to help understand services to be acquired and delivered and structure their acquisition and delivery March 23, 2010 26
  • 27.
    eSCM (eSourcing CapabilityMaturity Model) • Two versions: − Sourcing partners (eSCM-SP) − Client companies availing of outsourcing function (eSCM-CL) • Sourcing partners − Defines sourcing capabilities that organisations should develop and improve in order to be viewed by their current and prospective customers as capable and reliable partners • Client companies availing of outsourcing function − Defines capabilities that organisations should develop and improve in order to select and manage outsourcing relationship • Covers the lifecycle of service provision from initiation to completion of a relationship March 23, 2010 27
  • 28.
    ASL (Application ServicesLibrary) • Describes a standard for processes for management, maintenance and enhancement/renovation of (business) applications • Aimed at managers and professionals loooking to improve maturity of the processes for delivering application management services • Can be used to improve a broad spectrum of aspects of application management, varying from cost control and quality of service to staff motivation and strategic alignment • Based on ITIL concepts March 23, 2010 28
  • 29.
    USMBOK (Universal ServiceManagement Body of Knowledge) • New major and comprehensive service management framework • Driven by a single individual • Designed as an open body of knowledge on successful service management March 23, 2010 29
  • 30.
    Program and ProjectManagement Frameworks Information Technology and Related Frameworks Program and Project Management PMBOK PRINCE2 MSP (Project (Projects in (Managing IT Balanced Management Controlled Successful Scorecard Body of Environments) Programmes) Knowledge) March 23, 2010 30
  • 31.
    PRINCE2 (Projects inControlled Environments ) • Best practice project management standard in the UK and widely used elsewhere • Process-based method for project management - sets of processes that provide a controlled project start, controlled project, and controlled close • Covers management, control and organisation of a project and can be used for any project type and size • Concentrates on the work of project and team managers and management involved in decision-making within the project • Covered aspects of projects are business case, organisation, plans, controls, management of risks, quality in a project environment, configuration management and change control March 23, 2010 31
  • 32.
    PMBOK (Project ManagementBody of Knowledge) • Very widely used process-based project management guide and an internationally recognised standard that provides the fundamentals of project management as they apply to a wide range of projects • Recognised throughout the world as a standard for managing projects • Covers project knowledge areas: integration management, HR management, scope management, communications management, time management, risk management, cost management, procurement management and quality management March 23, 2010 32
  • 33.
    MSP (Managing SuccessfulProgrammes) • Best practice guide on programme management • Generic approach which can be used in all types of programmes • Contains a set of principles and a set of processes for use when managing a programme • Tool to manage strategic change in parts of an organisation • Can be used together with PRINCE2 March 23, 2010 33
  • 34.
    IT Balanced Scorecard • Planning and management tool used to align business activities to the vision and strategy of the organisation, improve internal and external communications and monitor organisation performance against strategic goals • Can be used to measure and manage IT performance and to enable alignment between business and IT • Covers four perspectives: perspective, internal business process, learning and growth and customer March 23, 2010 34
  • 35.
    Software Lifecycle ManagementFrameworks Information Technology and Related Frameworks Software Lifecycle Management ISO/IEC 12207 CMMI Systems And DSDM (Dynamic (Capability Software Systems RUP (Rational Maturity Model Engineering – Development Unified Process) Integration) Software Life Method) Cycle Processes) March 23, 2010 35
  • 36.
    CMMI (Capability MaturityModel Integration • Process improvement approach that provides with the essential elements of effective processes • Currently addresses three areas − Product and service development - CMMI for Development − Service establishment, management, and delivery - CMMI for Services − Product and service acquisition - CMMI for Acquisition March 23, 2010 36
  • 37.
    ISO/IEC 12207 SystemsAnd Software Engineering – Software Life Cycle Processes) • Defines a common framework for software life cycle processes, with well-defined terminology that can be referenced by the software industry • Applies to the acquisition of systems and software products and services, to the supply, development, operation, maintenance, and disposal of software products and the software portion of a system, whether performed internally or externally to an organisation • Provides a process that can be employed for defining, controlling, and improving software life cycle processes March 23, 2010 37
  • 38.
    DSDM (Dynamic SystemsDevelopment Method) • Software development methodology originally based on and extends Rapid Application Development methodology • Iterative and incremental approach that emphasises continuous user involvement • Aims to deliver software systems on time and on budget while adjusting for changing requirements along the development process March 23, 2010 38
  • 39.
    RUP (Rational UnifiedProcess) • Iterative software development process framework created by the Rational Software Corporation (IBM) • Can be tailored by the development organisations and software project teams who select the parts of the process that are appropriate • Consists of project lifecycle phases and engineering and supporting disciplines • Variants and extensions − Unified Process − Open Unified Process − Agile Unified Process − Enterprise Unified Process March 23, 2010 39
  • 40.
    Value and InvestmentManagement Frameworks Information Technology and Related Frameworks Value and Investment Management ITIM (Information Gartner Total Technology Val IT Cost of Investment Ownership Management) March 23, 2010 40
  • 41.
    ITIM (Information TechnologyInvestment Management) • Produced by the United States General Accounting Office (GAO) • Identifies and organises thirteen processes that are critical for successful investment into a framework of increasingly mature stages • Tool for internal and external evaluations of investment management process March 23, 2010 41
  • 42.
    Val IT • Framework for the governance of IT investments to get business value from IT investments • Provides guidance on different types of value (tangible and intangible) that can be considered and how to compare the tangible with intangibles benefits • Tightly integrated with and extends and complements COBIT with management processes required to get good value from IT investments March 23, 2010 42
  • 43.
    Gartner Total Costof Ownership • Aims to be an industry standard TCO methodology • TCO models are available for contact centre, data network, distributed computing, enterprise operations centre, enterprise storage management, help desk, and voice telecom March 23, 2010 43
  • 44.
    Data Management Frameworks Information Technology andRelated Frameworks Data Management DMBOK (Data Management Body of Knowledge) March 23, 2010 44
  • 45.
    DMBOK (Data ManagementBody of Knowledge) • Generalised and comprehensive framework for managing data across the entire lifecycle • rovides a detailed framework to assist development and implementation of data management processes and procedures and ensures all requirements are addressed • Enables effective and appropriate data management across the organisation • Provides awareness and visibility of data management issues and requirements March 23, 2010 45
  • 46.
    Quality Management Frameworks Information Technology and Related Frameworks Quality Management TQM (Total ISO 9000 TickIT/TickITplus Quality Six Sigma Management) March 23, 2010 46
  • 47.
    ISO 9000 • ISO 9000 is a family of standards for quality management systems • Developed to address the quality management systems within an organisation to demonstrate its capability to meet its customer's requirements • Certifies that an organisation has carried out the correct processes but does not provide a quality guarantee of the end product • Only standard that can be used for the certification of a quality management system March 23, 2010 47
  • 48.
    TickIT/TickITplus • Quality management certification for software • Mainly UK based • Aims to improve the quality of software and its application • Includes practical guidance for software development and services • TickITplus adds industry best practice with international IT standards with ISO 9001 accredited certification March 23, 2010 48
  • 49.
    TQM (Total QualityManagement) • TQM is a management approach that seeks to integrate all organisational functions to focus on meeting customer needs and organisational objectives • All personnel become involved in the continuous improvement of the production of goods and services • Concerned with continuous improvement in all work from high level strategic planning and decision making to detailed execution of work elements • Many methodologies and techniques to implement TQM approach March 23, 2010 49
  • 50.
    Six Sigma • Data-driven approach and methodology for eliminating defects in any process • Originated in manufacturing but now widely used • Practical goal to increase profits by eliminating variability, defects, and waste that undermine customer loyalty • Two Six Sigma components − DMAIC - define, measure, analyse, improve and control for existing processes − DMADV define, measure, analyse, design and verify for new processes • Uses a set of quality management methods, including statistical methods, and creates a special infrastructure of people within the organisation who are experts in these methods March 23, 2010 50
  • 51.
    Governance, Security andRisk Management Frameworks Information Technology and Related Frameworks Governance, Security and Risk Management COBIT (Control ISO 38500 ISO 27000 / OCEG (Open Objectives for (Corporate (Information IT Baseline Compliance Information Governance of Security Protection and Ethics and Related Information Management Catalogs Group) Technology) Technology) System) March 23, 2010 51
  • 52.
    COBIT (Control Objectivesfor Information and Related Technology • Framework for IT management created by the Information Systems Audit and Control Association (ISACA) and the IT Governance Institute (ITGI) • Enables clear policy development and good practice for IT control • Emphasises regulatory compliance, helps organisations to increase the value attained from IT March 23, 2010 52
  • 53.
    ISO 38500 (CorporateGovernance of Information Technology) • Framework for governance of IT to assist senior management to understand and fulfill their legal, regulatory and ethical obligations in relation to the organisation’s use of IT • Based on Austrailian standard AS 8015 for corporate governance of information and communication technology • Encompasses establish responsibilities, plan to best support the organisation, acquire validly, ensure performance when required, ensure conformance with rules and ensure respect for human factors March 23, 2010 53
  • 54.
    ISO 27000 /(Information Security Management System) • Family of 27000 standards for information security • ISO 27001 specifies a management system to bring information security under management control • Examine information security risks, taking account of the threats, vulnerabilities and impacts • Design and implement information security controls to address those risks that are deemed unacceptable • Implement management process to ensure that the controls continue to meet information security requirements March 23, 2010 54
  • 55.
    Open Compliance andEthics Group • OCEG Framework contains the GRC Capability Model – specified in the OCEG Red Book • Provides comprehensive and detailed practices for an integrated GRC system − Achieve business objectives − Enhance organisational culture − Increase stakeholder confidence − Prepare and protect the organisation − Prevent, detect and reduce adversity − Motivate and inspire desired conduct − Improve responsiveness and efficiency − Optimise economic and social value March 23, 2010 55
  • 56.
    IT Baseline ProtectionCatalogs • Collection of documents from the German Federal Office for Security in Information Technology • Includes standard security measures for typical IT systems with normal protection needs • Component catalog defines overall aspects of IT, infrastructure, IT systems, networks and IT applications • Threat catalog details potential threats to IT systems • measures catalog define measures necessary to achieve baseline protection March 23, 2010 56
  • 57.
    Business Management andSupport Frameworks Information Technology and Related Frameworks Business Management and Support MOF (Microsoft BISL (Business Operations Information Framework) Service Library) March 23, 2010 57
  • 58.
    MOF (Microsoft OperationsFramework) • Contains practices, principles, and activities that provide guidelines for achieving reliability for IT solutions and services • Provides question-based guidance that allows you to determine what is needed now as well as activities that will keep the IT organisation running efficiently and effectively in the future • Creates an environment where business and IT can work together toward operational maturity using a proactive model that defines processes and standard procedures to gain efficiency and effectiveness • Covers activities and processes involved in managing IT services: definition, development, operation, maintenance and retirement March 23, 2010 58
  • 59.
    BISL (Business InformationService Library) • Public domain standard for functional and and information management • Describes processes within business information management at the strategy, management, and operations level • Establishes a bridge between IT and business processes and between business information administrators and information managers • Identifies processes at three levels: operations, management, and strategic • Covers operations management, functionality management, change management and transition, planning and control, financial management, demand management, contract management, develop information strategy, develop information organisation strategy and information coordination March 23, 2010 59
  • 60.
    Business Analysis Frameworks Information Technology andRelated Frameworks Business Analysis Structured Business Systems Analysis Body Analysis and of Knowledge Design (BABOK) Method (SSADM) March 23, 2010 60
  • 61.
    Business Analysis Bodyof Knowledge (BABOK) • Developed by the IIBA (International Institute of Business Analysis) • BABOK is the collection of knowledge within the profession of Business Analysis and reflects generally accepted practice • Describes business analysis areas of knowledge, their associated activities and tasks and the skills necessary to be effective in their execution • Identifies currently accepted practices • Recognises business analysis is not the same as software requirements • Defined and enhanced by the professionals who apply it • Captures the knowledge required for the practice of business analysis as a profession March 23, 2010 61
  • 62.
    Structured Systems Analysisand Design Method (SSADM) • Systems approach to the analysis and design of information systems • Waterfall approach incorporates document-led approach to system design • Includes − Logical Data Modelling − Data Flow Modelling − Entity Behaviour Modelling March 23, 2010 62
  • 63.
    Enterprise Architecture Frameworks Information Technology andRelated Frameworks Enterprise Architecture NASCIO EAMM Department of Ministry of TOGAF (The Federal (NASCIO Defense Defence Open Group Enterprise Enterprise Architecture Architectural Zachman Architecture Architecture Architecture Framework Framework Framework) (FEA) Maturity (DoDAF) (MODAF) Model) March 23, 2010 63
  • 64.
    TOGAF (The OpenGroup Architecture Framework) • TOGAF is a framework - a detailed method and a set of supporting tools — for developing an enterprise architecture − TOGAF is not itself an architecture • Architecture design is a technically complex process and the design of mixed, multivendor architectures is particularly complex • TOGAF plays an important role in helping to demystify and reduce the risk in the architecture development process • TOGAF provides a platform for adding value and enables users to build genuinely open systems-based solutions to address their business issues and needs • Because TOGAF has a detailed implementation framework, the project to implement it and the associated time and cost can be defined more exactly • Framework can be customised to suit the requirements of the organisation • TOGAF has a broad coverage and a business focus and seeks to ensure that IT delivers what the business needs • TOGAF focuses on both the “what” and the “how” March 23, 2010 64
  • 65.
    Department of DefenseArchitecture Framework (DoDAF) • Framework for developing and representing architecture descriptions that ensure a common denominator for understanding, comparing, and integrating architectures • Establishes data element definitions, rules, and relationships and a baseline set of products for consistent development of systems, integrated or federated architectures March 23, 2010 65
  • 66.
    Ministry of DefenceArchitectural Framework (MODAF) • Framework defining a standardised way of creating enterprise architecture • Defines architectural views covering the strategic goals of the enterprise and the people, processes and systems that deliver those goals March 23, 2010 66
  • 67.
    Zachman • Zachman Framework for Enterprise Architecture defines a collection of perspectives involved in enterprise architecture • Provides a logical structure for classifying and organising the descriptive representations of an enterprise • High level framework March 23, 2010 67
  • 68.
    Federal Enterprise Architecture(FEA) • Methodology for information technology acquisition, use and disposal • Contains a set of reference models − Performance Reference Model − Business Reference Model − Service Component Reference Model − Data Reference Model − Technical Reference Model March 23, 2010 68
  • 69.
    NASCIO EAMM (NASCIOEnterprise Architecture Maturity Model) • Developed by National Association of State Chief Information Officers (NASCIO) • Provides a path for architecture and procedural improvements within an organisation • Framework combines business and environment processes and representations to allow planning and development of an architecture blueprint • Designed to improve information sharing across government boundaries, as well as to position government enterprises for the digital government age and the advantages and opportunities that technology presents March 23, 2010 69
  • 70.
    Summary • Large number of potentially very useful frameworks and methodologies existing as point solutions • Need to select the most appropriate framework to suit your needs • Need to integrate frameworks into IT operations and delivery structure March 23, 2010 70
  • 71.
    More Information Alan McSweeney alan@alanmcsweeney.com March 23, 2010 71