Topics
• Classes Of Solutions And Target Solution Consumers
• Product Design Approaches And Methodologies
− Product Design Approaches And Methodologies
− New Product Development (NPD) Stage Gate
− Agile Stage Gate
− eTOM (enhanced Telecom Operations Map)
− Pragmatic Framework
• Outputs From The Solution Design Process
• Application Of Product Development Processes To Solution
Architecture
• Core, Extended And Supporting Product/Solution/Service
Management And Development Capabilities And Practices
August 12, 2024 2
Classes Of Solutions And Target Solution Consumers
• Internal solutions can be
part of or support the
operation and use of
external products and
services, either directly
or indirectly
August 12, 2024 3
Solution
Internal
Solution
Consumers
External
Partners/
Collaborators
External Public
Consumers
Solution Solution
Organisation
Boundary
Direct Indirect
Internal
Use
External
Use
Directly
enabling
the delivery
of the
product/
service
Is the
product/
service
Indirectly
enabling
the delivery
of the
product/
service
Part of the
product/
service
support/
usage
ecosystem
Classes Of Solutions And Target Solution Consumers
• The process by which organisations develop externally
facing commercial products, services and solution is
different to that used to design and implement internal
solutions
August 12, 2024 4
Internal Solution Architecture And External Product
Management
• The internal organisation market is clearly different from the external –
internal solution consumers do not have the same explicit choice as
external consumers
− Internal solution consumers exist to perform specific roles
− They do not have an explicit choice about the solution they use – but they can
resist their introduction in many ways
− Technology solutions exist to assist these specific roles and are more prescriptive
− A sales function is (apparently) not explicitly needed to promote the
product/service/solution
• However, there is no reason why the internal solution selection and design
process should not attempt to mirror that used successfully externally
− Treat internal solution consumers as customers
− Sell products/services/solutions to them to increase their rate of use
− Measure the success of a solution based on modified metrics such as market
penetration/share – level of use/level of satisfaction
− Use product development and management concepts and approaches to assist
with the solution design and select process
August 12, 2024 5
Internal/External Product/Solution/Service
Differences
• External Products/
Solutions/Services
• Commercial objective to be a means
to make money and generate a
positive return on investment
• Speculative endeavour designed to
meet market need at a delivery costs
and product price that generates a
return
• May need to be differentiated from
alternatives and competitors
• Need to be located at the intersection
of what is perceived to be needed or
useful, what works, what customers
will buy and where customers will
view company as a credible provider –
Product Market Fit (PMF)
• Internal Products/
Solutions/Services
• Objectives are to support the
operation of the organisation by
reducing cost, improving efficiency,
increasing automation or meet new
obligations
• Typical alternatives are to perform the
work manually or continue to use
existing
August 12, 2024 6
New External Product/Solution/Service
Development
• New external product/solution/service development
generally starts with partial and imperfect knowledge of:
− The consumer and market needs
− What is needed to fulfil the need in a way that generates a
positive return
− The technologies required to create and support the delivery and
operation the product/solution/service
• Internal product/solution/service development starts with
less uncertainty:
− The need is more well-known
− The range of technology options is more narrow
August 12, 2024 7
Public Service External Products/Solutions/Services
• Public service entities comprise a special case of external
Product/Solution/Service development
• Public service entities are typically monopoly providers of
services
• Services to be provided are typically mandated
• Products/solutions are developed to be the means by
which those mandated services are delivered
August 12, 2024 8
Core, Extended And Supporting Product/Solution/Service
Management And Development Capability Groups
August 12, 2024 9
Develop Vision
and Strategy
Design, Develop
and Manage
Products, Services
and Solutions
Market and Sell
Products, Services
and Solutions
Manage Supply
Chain for
Products, Services
and Solutions
Deliver Products,
Services and
Solutions
Manage Customer
Service
Manage Financial
Resources
Acquire,
Construct, and
Manage Assets,
Facilities Services
Manage External
Relationships,
Procurement,
Supplier and
Partner Services
Develop and
Manage Business,
Knowledge,
Improvement and
Change
Capabilities
Provide Legal,
Regulatory,
Environment,
Health and Safety
Services
Develop and
Manage Human
Capital
Manage
Information
Technology
Supporting And Enabling Capabilities
Extended Capabilities
Core
Capabilities
Manage Product/
Service/Solution
August 12, 2024 10
Enterprise Business Process Model – Common
Structure
• Generally business process models have a core three pillar structure
Vision,
Strategy,
Leadership,
Business
Management
Operational Processes With
Cross Functional Linkages
Management and Support
Processes
August 12, 2024 11
Sample Enterprise Business Process Models –
Common Structure
Vision,
Strategy,
Business
Management
Operational Processes With Cross Functional Linkages
Management and Support Processes
Develop and
Manage
Products and
Services
Market and Sell
Products and
Services
Deliver Products
and Services
Manage
Customer
Service
Human
Resource
Management
Information
Technology
Management
Financial
Management
Facilities
Management
Legal,
Regulatory,
Environment,
Health and
Safety
Management
External
Relationship
Management
Knowledge,
Improvement
and Change
Management
Vision and
Strategy
Business
Planning,
Merger,
Acquisition
Governance,
Compliance,
Risk
Management
Supply Change
Management
Business Process Models And Core, Extended And
Supporting Product Management
• Generic organisation
business process and
capability model maps to
core and extended
product/solution/ service
development capabilities
August 12, 2024 12
Vision,
Strategy,
Business
Management
Operational Processes With Cross Functional Linkages
Management and Support Processes
Develop and
Manage
Products and
Services
Market and Sell
Products and
Services
Deliver Products
and Services
Manage
Customer
Service
Human
Resource
Management
Information
Technology
Management
Financial
Management
Facilities
Management
Legal,
Regulatory,
Environment,
Health and
Safety
Management
External
Relationship
Management
Knowledge,
Improvement
and Change
Management
Vision and
Strategy
Business
Planning,
Merger,
Acquisition
Governance,
Compliance,
Risk
Management
Supply Change
Management
Develop Vision
and Strategy
Design, Develop
and Manage
Products, Services
and Solutions
Market and Sell
Products, Services
and Solutions
Manage Supply
Chain for
Products, Services
and Solutions
Deliver Products,
Services and
Solutions
Manage Customer
Service
Manage Financial
Resources
Acquire,
Construct, and
Manage Assets,
Facilities Services
Manage External
Relationships,
Procurement,
Supplier and
Partner Services
Develop and
Manage Business,
Knowledge,
Improvement and
Change
Capabilities
Provide Legal,
Regulatory,
Environment,
Health and Safety
Services
Develop and
Manage Human
Capital
Manage
Information
Technology
Supporting And Enabling Capabilities
Extended Capabilities
Core
Capabilities
Manage Product/
Service/Solution
External Products/Services/Solutions
• External products/services/solutions generally consist of a
collection of core and extended elements
• External products/services/solutions can be once-off or
continuous, physical or intangible
• At a minimum, the support of the ordering and delivery of the
external products/services/solutions and the management of
their ongoing support will be provided by technology solutions
• At a maximum, the external products/services/solutions will
consist entirely or almost entirely of technology solutions
• The design/development/creation of external
products/services/solutions typically follows a (rigorous)
product development process
• The design of supporting technology solutions typically follows
a less rigorous process
August 12, 2024 13
External Products/Services/Solutions
August 12, 2024 14
Design, Develop
and Manage
Products,
Services and
Solutions
Market and
Sell Products,
Services and
Solutions
Deliver
Products,
Services and
Solutions
Manage
Customer Service
Internal Solution Design
External Product/Service Consumers
Manage
Product/Solution/Service
Lifecycle
External Solution Design/Delivery Activities
External Products/Services/Solutions
• Customers acquire/use externally offered
products/services/solutions
• The development of products/services/solutions is not just
concerned with the core offering: the design process encompasses a
value chain of activities
August 12, 2024 15
Acquire Raw
Inputs and
Constituent
Components
Create/
Assemble/
Acquire
Product/
Service/
Solution
Market and
Sell Product
or Service
Deliver or
Supply
Product or
Service
Service and
Support
Product or
Service
Manage Sourcing
and Supply
Design and
Validate Core
Product/
Service/
Solution
Design and
Validate the
Construction,
Delivery,
Support and
Operations
Landscape
Create
Product/
Service/
Production,
Delivery,
Support
Solutions
Create and Manage
Ancillary, Support
Landscape
Design Extended Delivery and
Support Solution Landscape
Develop/
Enhance
Product or
Service,
Upsell/
Cross-Sell
Manage
Retirement
and
Migration
Value Chain
• The value chain is the series of primary activities and their
associated business processes that act on the raw inputs
and work towards creating and providing the finished
product or service to the target customer
• Value added is the cost at which the product or service is
sold/delivered/operated or provided less the input costs
August 12, 2024 16
Spectrum Of Solutions
August 12, 2024 17
Core
Delivered And
Consumed
Product/
Service/
Solution
Consumed
Product/
Service/
Solution
Ecosystem
Consumed
Product/
Service/
Solution
Management
and Support
Consumed
Product/
Service/
Solution
Development
Organisation
Operation,
Management,
Direct
Support
Organisation
Operation,
Management,
Indirect
Support
Solution Distance From Externally Offered and
Consumed Product/Service/Solution
What The
Organisation
Sells/Provides/
Delivers
Directly Enables Or
Supports The Delivery,
Operation And Use Of
The Delivered Product/
Service/ Solution
Indirectly Enables Or
Supports The Delivery,
Operation And Use Of
The Delivered
Product/Service/
Solution Including
Marketing, Selling, Cross-
Selling, Upselling,
Upgrades, Retirement
And Migration, Customer
Contact, Service and
Contract Management,
Financial Management,
Partner, Supply Chain
Management
Supports The Delivered
Product/Service/
Solution Development
Lifecycle
Solution That Directly
Supports The Enabling
Functions Of The
Organisation
Solution That
Indirectly
Supports The Enabling
Functions Of The
Organisation
External Solution Focus
Internal Solution Focus
Spectrum Of Solutions
• Solutions can be placed on a spectrum from one end
where the external solutions are those the organisation
directly sells/provides to solutions that are part of the
external solution ecosystem to the other end where the
solutions are used internally to directly or indirectly enable
the support functions to operate
August 12, 2024 18
Spectrum Of Solutions
August 12, 2024 19
Core
Delivered And
Consumed
Product/
Service/
Solution
Consumed
Product/
Service/
Solution
Ecosystem
Consumed
Product/
Service/
Solution
Management
and Support
Consumed
Product/
Service/
Solution
Development
Organisation
Operation,
Management,
Direct
Support
Organisation
Operation,
Management,
Indirect
Support
Internal Solution Architecture
Function Tends to Operate
Here
Structured Product/Solution/Service
Development Process Operates Here
Product/Solution/Service Development Can
Overlook Supporting Capabilities and
Solutions Required Here
Different Approaches To Production, Service and
Solution Design And Delivery
August 12, 2024 20
Structured
Development
Processes Followed
for Products/
Solutions/ Services
Targeted At
Consumers
Less Or No
Structured
Development
Processes Followed
for Products/
Solutions/ Services
Targeted At Internal
Consumers
(IT Function) Solution Deployment
August 12, 2024 21
Develop Vision
and Strategy
Design, Develop
and Manage
Products, Services
and Solutions
Market and Sell
Products, Services
and Solutions
Manage Supply
Chain for
Products, Services
and Solutions
Deliver Products,
Services and
Solutions
Manage
Information
Technology
Supporting And Enabling Capabilities
Extended Capabilities
Core
Capabilities
Manage Customer
Service
Manage Product/
Service/Solution
Manage Financial
Resources
Acquire,
Construct, and
Manage Assets,
Facilities Services
Manage
Enterprise Risk,
Compliance,
Remediation and
Resiliency
Manage External
Relationships,
Procurement,
Supplier and
Partner Services
Develop and
Manage Business,
Knowledge,
Improvement and
Change
Capabilities
Provide Legal,
Regulatory,
Environment,
Health and Safety
Services
Develop and
Manage Human
Capital
(IT Function) Solution Deployment
• The IT function acquires, designs, configures, customises
technology solutions for use across the organisation, aim
at both internal and external consumers
• Not all technology solutions the organisation deploys and
uses are overseen by the IT function
• An increasing number of technology solutions bypass the
IT function solution delivery process and are selected and
deployed in an uncontrolled way
August 12, 2024 22
Adopting External Product/Solution/Service
Processes For Internal Use
• External product/solution/service tends to follow a
rigorous process
• Internal solution design and development tends to use a
much less rigorous and well-defined process
August 12, 2024 23
Product Design Approaches And Methodologies
August 12, 2024 24
NPD (New Product Development) Process
• NPD process play a core role in the product/solution/service
development process
• Being good at NPD means being good at:
1. Having a defined NPD strategy with a focus on research and development
and an overall organisation product/solution/service strategy
2. Having an organisation innovation culture with active management support
and associated investment encouraging product/solution/service
development thinking and collaboration with external partners, customers
and suppliers
3. Continuously performing market research and product/solution/service
demand to understand landscape of needs, option and alternatives
4. Having a defined process for new concept assessment against consumer
needs and product/solution/service innovation
5. Having a process to manage, balance, prioritise, suspend and terminate
portfolio of innovation activities and initiatives
6. Having an NPD process incorporating stages and gates to push new
product/solution/service design, development and adoption
7. Tracking, measuring and evaluating product/solution/service performance
evaluation with defined metrics and acting on results
August 12, 2024 25
NPD Process Components And Effectiveness Factors
• Two key aspects of New Product Development
− Process components – constituents of good NPD
− Effectiveness factors – what identifies organisations that are good
at NPD
August 12, 2024 26
NPD Process Components And Effectiveness Factors
August 12, 2024
27
NPD Strategy
Organisation Innovation Culture
Continuously Market Research
Defined Process For New Concept
Assessment
Active Innovation Portfolio
Management
NPD Process
NPD Metrics and Actioning
Active resource (re)allocation based on continuously adjustment of priorities
grounded in rational factors
Effective market research, analysis and decision-making
Effective management of relationships with and collaboration with potential
partners, suppliers and consumers including communications and contract
lifecycle management
Effective testing of product/service/solution hypotheses against rational
factors
Effective identification, understanding and management of actual
product/service/solution risks
Elastic and responsive new product/service/solution process from idea-to-
launch with regular reviews of achievements and delays and results/feedback
analysis
Active reduction of time to introduction to minimise likelihood for drift from
organisation strategy, consumer need and market circumstances
Active financial management including understanding of actual costs and
realistic assessment of value delivered
Effective and capable team including engaged leadership
Product Design And Development Approaches And
Methodologies
• Many approaches and methodologies to product development such as (but not
limited to):
− Agile Stage Gate *
− eTOM (enhanced Telecom Operations Map) *
− Front-End Innovation (FEI)
− Global Enterprise Technology System (GETS)
− Multidisciplinary Design Optimisation (MDO)
− New Concept Development (NCD)
− New Product Development (NPD) Stage Gate *
− Pragmatic Framework *
− Product Management Lifecycle (PLM)
− Technology Acquisition Stage Gate (TASG)
− Technology Development Process (TDP)
− Technology Realisation and Commercialisation (TRC)
− Technology Stage Gate (TechSG)
• This is not intended to be an exhaustive analysis of product design and
development approaches and methodologies
• Stage Gate process is probably the oldest and most well-know
• * Covered in more detail
August 12, 2024 28
Product Design Approaches And Methodologies
• Product design approaches and methodologies are all
largely variants and extensions of the original Stage Gate
process
August 12, 2024 29
Typical High-Level View Of NPD Stage Gate Process
August 12, 2024 30
Concept
Initial
Screening
Preliminary
Market
Assessment
Preliminary
Technical
Assessment
Assessment
and
Decision
Detailed
Marketing
Assessment
Business Analysis
and Business Case
Preparation
Decision
Core and Extended
Component Design
and Prototyping
Development
Review and
Decision
Internal Testing
Customer Testing
Test
Results
Assessment
and
Decision
Trialling and
Test Marketing
Trial and
Test Marketing
Review
Productionisation,
Industrialisation
and Initial
Production
Commercial
Viability
Analysis
Commercialisation,
Production
and Launch
Ongoing Phased
Expansion and
Development,
“Fill the Gaps”
NPD Gates And Gatekeepers
• The gates within the NPD process are points at the end of states where go/kill
decision are based
− Gates are not progress review checkpoints – they are concerned with the survival of the
fittest solutions and the death of the rest
• Effective gates are central to the success of an operational
product/solution/service development process
• The decisions should be based on the latest information available on a
product/solution/service development
• The outputs from the state are reviewed and a decision is made to progress with
the right developments only and stop investing in those that fail
• Gates are effectively the quality control checkpoints in the system
• If a solution passes a gate, this is implicitly a decision to allocate the needed
resources
• One objective of gates is to ensure that the right developments are proceeded
with and that they are done in the right way
• The gatekeeping practices that accompany the gates are core to the performance
and success of the product/solution/service development process
August 12, 2024 31
Potential NPD Gate Issues
• Key gate meeting participants do not attend and do not
delegate
• Insufficient preparation for gate decision meetings
• No decisions made at gate meetings
• Decisions made to proceed but no resources committed
• Informal go/no-go evaluation factors lacking rigour
• Senior decision-makers exert undue influence
• Beloved and cherished projects get favourable treatment
• Kill decisions bypassed
• Gate failure = management failure
August 12, 2024 32
NPD Process – Typical Characteristics
• Each stage in the NPD process aims to minimise the work done,
information gathered and results and outputs generated while
maximising the outcomes needed to make an effective decision
at the subsequent gate
• Each stage involves greater effort being expended than the
previous one and consequently incurs greater cost
• Each stage narrows options, reduces risk, adds knowledge,
decreases uncertainties and eliminate concepts that fail to pass
gate decision-making
• Each stage combines technical and non-technical – business,
marketing, sales – activities in parallel
• Gates incorporate real go/no-go decisions with gatekeepers
who are empowered to make decisions based on agreed and
structured evaluation factors
August 12, 2024 33
NPD Process Progression
• NPD process progresses
along a number of
dimensions
simultaneously to reach
a conclusion
• One possible conclusion
of the process must be
that the development is
abandoned
August 12, 2024 34
Cost and Effort
Increases as Process
Progresses
Number of
Product/
Solution/ Service
Concepts
Reduces
Viable Options
and Alternatives
Within Product/
Solution/ Service
Concepts
Reduces
Risk,
Uncertainties,
Knowledge Gaps
Decrease
NPD Process Progression
August 12, 2024 35
Cost and Effort
Increases as Process
Progresses
Number of
Product/
Solution/ Service
Concepts
Reduces
Viable Options
and Alternatives
Within Product/
Solution/ Service
Concepts
Reduces
Risk,
Uncertainties,
Knowledge Gaps
Decrease
• NPD process is
concerned with moving
in a structured and
controlled way to an
ending
Solution Design Drift
• The longer the duration from solution design to realisation the greater the chance of solution drift due to
many factors such as:
− What is being designed is no longer what the consumer or market needs
− Economic conditions might change the basis for the proposed solution
− Supply chain issues might affect solution delivery
− Competitive landscape might change and undermine the solution design
− Embedded technology changes or newer technology options available
• The more volatile the market the greater the chance of solution design drift and the greater the speed of the
drift
• Compressing design timescales reduces the size and impact of this drift
August 12, 2024 36
Concept
Initial
Screening
Preliminary
Market
Assessment
Preliminary
Technical
Assessment
Assessment
and
Decision
Detailed
Marketing
Assessment
Business
Analysis and
Business Case
Preparation
Decision
Core and
Extended
Component
Design and
Prototyping
Development
Review and
Decision
Internal
Testing
Customer
Testing
Test
Results
Assessment
and
Decision
Trialling and
Test Marketing
Trial and
Test Marketing
Review
Productionisation,
Industrialisation
And
Initial
Production
Commercial
Viability
Analysis
Commercialisation,
Production
and Launch``
Ongoing Phased
Expansion and
Development,
“Fill the Gaps”
Time From Concept To Realisation
Deviation of Designed
Solution from Consumer
or Market Requirements
Data Driven Development (DDD)
• DDD is an extension to the standard NPD process with the
formal inclusion of data collection, analysis and decision-
making, reducing the role of subjectivity and intuition in
the NPD process
• DDD overlays and extends core NPD process stages and
activities with formal data processes
• Effective DDD means defining the data to be collected at
various stages, collecting quality and accurate data,
analysing it and making objective and impartial data-lead
decisions
August 12, 2024 37
DDD Overlay On NPD Stage Gate Process
August 12, 2024 38
Concept
Initial
Screening
Preliminary
Market
Assessment
Preliminary
Technical
Assessment
Assessment
and
Decision
Detailed
Marketing
Assessment
Business Analysis
and Business Case
Preparation
Decision
Core and Extended
Component Design
and Prototyping
Development
Review and
Decision
Internal Testing
Customer Testing
Test
Results
Assessment
and
Decision
Trialling and
Test Marketing
Trial and
Test Marketing
Review
Productionisation,
Industrialisation
and Initial
Production
Commercial
Viability
Analysis
Commercialisation,
Production
and Launch
Ongoing Phased
Expansion and
Development,
“Fill the Gaps”
Data Collection and
Analysis to Identify
Consumer Needs and
Gaps in the Existing
Market
1
Data Analytics to
Forecast Market Trends
and Consumer Activities
to Direct Design Actions
Data Collection and
Analysis to Create
Insights into Product
Development
Data Collection and
Analysis During Product
Trials to Drive Quality
and Consumer
Satisfaction
Formal Specification of
Scenarios and
Structured Data
Collection and Analysis
Data Collection and
Analysis During Product
Development to Allow
Rapid Response to
Changes
Data Collection and
Analysis To Support
Product Changes and
Maximising Market and
Fit and Consumer
Acceptance
Data Collection and
Analysis To Maximise
Return from Product
Enhancement and
Improvement
2 3
4 5
6
7
8
Agile Concerns With Standard Stage Gate Process
• The standard Stage Gate process is concerned with control –
controlling and reducing risk and uncertainty as early in the process
as possible, increasing stability and predictability as the process
proceeds
• The standard Stage Gate process is (largely) linear and sequential
with subsequent work building on previous work and only starting
when previous stages have been completed and gates have been
passed
• Standard Stage Gate is not designed to be reversible – previous
decisions are not intended to be reviewed and changed
• Design decisions can be embedded early in the process and frozen
thereafter, reducing the opportunity for subsequent modification
• Consumer involvement occurs quite late in the Stage Gate process
• The standard Stage Gate process works well for stable and
predictable business environment and does not meet the need for
dynamic and high velocity innovation
August 12, 2024 39
Agile Vs Standard Stage Gate
August 12, 2024 40
Early Fixing Of Product/Solution/Service Design
Introduces Stability And Reduces Cost
The Process Needs To Allow For Change And Adaptation
Even Late in The Design Process To Accommodate New
Requirements
Emphasis On Early Research And Design
Provides A Solid Foundation For Subsequent
Design
Early Agreement On The Design Creates Greater
Management Confidence, Approval And Budget
Allocation
Failure To Involve Solution Consumers Early In The
Processes Means Design Might Not Meet Actual Needs
Sequential State Gate Processes Means Early Decisions
Cannot Be Reversed Even If Circumstances Change
Standard Stage Gate Process Is Concerned With Control
– Controlling And Reducing Risk And Uncertainty As
Early In The Process As Possible, Increasing Stability
And Predictability As The Process Proceeds
Changing Market, Consumer And Technology Environment
And Circumstances Requires Flexibility
Involving Potential Consumers Later In The
Process Avoids Expensive Prototyping And
Rework And Allows A More Complete Design To
Be Presented
Reduced Scope And High Design Sprint Frequency
Decrease The Elapsed Time And Resource
Requirements Of Steps And Enables More Accurate
Estimates Of The Resources Needed
Constant Change Involves In Agile Can Lead To Analysis
And Design Paralysis, Requires More Management Effort
And Increases Cost And Reduces Stability Agile Keeps The Design Open For Longer Means The
Final Design Is Agreed Closer To Delivery
Agile Overlay Of Stage Gate Process
August 12, 2024 41
Concept
Initial
Screening
Preliminary
Market
Assessment
Preliminary
Technical
Assessment
Assessment
and
Decision
Detailed
Marketing
Assessment
Business Analysis
and Business Case
Preparation
Decision
Core and Extended
Component Design
and Prototyping
Development
Review and
Decision
Internal Testing
Customer Testing
Test
Results
Assessment
and
Decision
Trialling and
Test Marketing
Trial and
Test Marketing
Review
Productionisation,
Industrialisation
and Initial
Production
Commercial
Viability
Analysis
Commercialisation,
Production
and Launch
Ongoing Phased
Expansion and
Development,
“Fill the Gaps”
Agile Overlay Of Stage Gate Process
• Introducing agile into the Standard Stage Gate process
allows designs to be revisited
• This introduces complexity that can approach chaos into
the process that needs to be managed assertively
• Risk that the Product/Solution/Service design process
never ends
• Process visibility and progress can be opaque
• Agile emphasis on deliverables at the expense of
documentation can lead to future problems that need to
be managed
August 12, 2024 42
Agile Stage Gate
• The standard Stage Gate process is concerned with control – controlling
and reducing risk and uncertainty as early in the process as possible,
increasing stability and predictability as the process proceeds
• Agile seek to accept uncertainty and the need for change even late in the
process
• The standard Stage Gate process is (largely) linear and sequential with
subsequent work building on previous work and only starting when
previous stages have been completed and gates have been passed
• Standard Stage Gate is not designed to be reversible – previous decisions
are not intended to be reversed
• The Product/Solution/Service development process is essentially
directional if not linear – the process must move from idea to delivery
• The process must also reject unsatisfactory and undeliverable concepts –
endless rework will not make a bad idea good
August 12, 2024 43
Pragmatic Framework
• Pragmatic Institute develops and maintains the Pragmatic
Framework -
https://www.pragmaticinstitute.com/product/framework/
- that is a view of the activities required to construct and
market products consumers want to buy and use
• It is focused on external Products/Solutions/Services
• Elements can be adopted for internal solution architecture
August 12, 2024 44
Pragmatic Framework
August 12, 2024 45
MARKET
Market
Problems
Win/Loss
Analysis
Distinctive
Competencies
Competitive
Landscape
Asset
Assessment
FOCUS
Market
Definition
Distribution
Strategy
Product
Portfolio
Product
Roadmap
BUSINESS
Business Plan
Pricing
Buy, Build or
Partner
Product
Profitability
Innovation
PLANNING
Positioning
Buyer
Experience
Buyer Personas
User Personas
Requirements
Use Scenarios
Stakeholder
Communications
PROGRAMS
Marketing Plan
Revenue Growth
Revenue
Retention
Launch
Awareness
Nurturing
Advocacy
Measurement
ENABLEMENT
Sales Alignment
Content
Sales Tools
Channel Training
SUPPORT
Programs
Operations
Events
Channels
Pragmatic Framework – Potential Gaps
August 12, 2024 46
MARKET FOCUS
Options Analysis
and Design
Solution Business
Plan
Solution Cost
and
Revenue/Return
Evaluate Entire
and Solution
Component
Acquisition
Options
Solution
Measurement
Framework
Definition
Approach to
Ongoing Solution
Innovation and
Solution
Development
Prototyping,
Testing and
Validation
Create and Test
Prototype
Refine Design
based on
Feedback
Technical
Assessment of
Suitability
Refine Financial
Analysis
Decision To
Proceed
Production,
Delivery, Support
and Operations
Landscape
Define Approach
to Production
and Identify
Required
Solutions
Define Approach
to Identify and
Delivery
Required
Solutions
Define Approach
to Support and
Identify Required
Solutions
Define Approach
to Operations
and Identify
Required
Solutions
Define Solution
Delivery
Channels and
Support Tools
Trial Production
and
Implementation
Define Trial
Scope, Purpose
and Metrics
Create and
Implement Trial
Solutions
Measure and
Assess Trial
Results and
Identify Key
Lessons
Update Financial
Analysis, Designs
and Plan
Decision To
Proceed
PLANNING PROGRAMS
Solution Support
and Operations
Measure
Solution
Performance and
Success
Provide and
Monitor Solution
Support
Monitor Solution
Financial Success
Promotion,
Growth,
Development,
Retirement
Solution
Maintenance,
Fixes, Problem
Identification
and Resolution
Solution
Development,
Enhancement
and Lifecycle
Management
Process
Solution Usage
Data Collection
and Analysis
Solution
Feedback
Collection and
Analysis
Monitor and
Manage Solution
Alternatives and
Competitors
Monitor and
Manage
Technology
Changes
Solution
Development
and
Enhancement
Solution
Retirement and
Replacement
ENABLEMENT SUPPORT
Pragmatic Framework – Potential Gaps
• While the Pragmatic Framework is comprehensive, it
contains gaps in the following areas:
− Options Analysis and Design
− Prototyping, Testing and Validation
− Production, Delivery, Support and Operations Landscape
− Trial Production and Implementation
− Solution Support and Operations
− Promotion, Growth, Development, Retirement
August 12, 2024 47
August 12, 2024 48
eTOM (enhanced Telecom Operations Map)
• Provides a detailed process framework for a telecoms utility
companies that can be adopted by non-telecoms organisations
moving to solutions as a service operating model
− Developed by TM Forum - www.tmforum.org
− eTOM -
http://www.tmforum.org/BusinessProcessFramework/1647/home.html
• Reference framework that classifies and defines the business
activities used by a company involved in delivering (online) services
– three major process areas:
− Strategy, Infrastructure and Product – concerned with planning and lifecycle
management
− Operations – concerned the core of operational management
− Enterprise Management – concerned corporate or business support
management
• Offers the potential for non-telecoms companies to learn from an
effective operational framework
August 12, 2024 49
eTOM Business Process Framework Overview
Strategy,
Infrastructure
and Product
Operations
Enterprise
Management
Customer
Strategy, New Ideas, Products And Associated
Supporting Infrastructure Moved to
Production and Steady-State Operations
Fundamental Supporting
Business Processes Needed To
Run Any Business
Operational
Processes – Sales,
Fulfillment,
Assurance, Billing
and Support
August 12, 2024 50
eTOM Business Process Framework - Detail
Strategy, Infrastructure and Product Operations
Strategy and
Commit
Infrastructure
Lifecycle
Management
Product
Lifecycle
Management
Operations
Support and
Readiness
Fulfilment Assurance Billing and
Revenue
Management
Marketing and Offer Management
Service Development and Management
Resource Development and Management
Supply Chain Development Management
Customer Relationship Management
Service Management and Operations
Resource Management and Operations
Supplier/Partner Relationship Management
August 12, 2024 51
Achieving the Potential – New Product/Service/Solution
Innovation Industrialisation and Productisation
Industrialisation
Common
Implementation
and Operation
Approaches
Productisation
Defined Set of
Products/Solutions/
Services
and Packaging/Delivery
Options
• Productisation is a pre-requisite for and an enabler of
industrialisation
August 12, 2024 52
Product, Solution and Service Lifecycle Management
(PSSLM)
• PSSLM is concerned with the functions and processes need
to define, plan, design, build, deliver, maintenance,
manage revise and retirement of all products, solutions
and services in the organisation’s portfolio
− Enable the organisation strategic and business
product/solution/service vision
− Drive internal and customer-oriented processes to meet market
demand and customer expectations
August 12, 2024 53
Product, Solution and Service Lifecycle Management
(PSSLM)
• PSSLM belongs within Strategy, Infrastructure and
Product/Solution/Service (SIPSS) function
• Responsibilities of SIPSS function
−Develop strategy
−Commit to the organisation
−Build and resources infrastructure - supports the
delivery products, solutions and services themselves and
their associated functional processes
−Develop and manage products, solutions and services
−Develop and manage the supply chain
August 12, 2024 54
Strategy, Infrastructure and
Product/Solution/Service (SIPSS) Function
• Innovation – development of new
products/services/solutions lie in SIPSS function
• SIPSS divided into
−Horizontal functional groups
• Marketing and Offer Management
• Service Development and Management
• Resource Development and Management
• Supply Chain Development Management
−Vertical process views
• Strategy and Commit
• Infrastructure Lifecycle Management
• Product, Solution and Service Lifecycle Management
August 12, 2024 55
Strategy, Infrastructure and Product/Solution/Service (SIPSS) -
Horizontal Process Functions and Vertical Process Views
Strategy, Infrastructure and Product/Solution/Service (SIPSS)
Strategy and Commit Infrastructure Lifecycle
Management
Product, Solution and
Service Lifecycle
Management
Marketing and Offer Management
Service Development and Management
Resource Development and Management
Supply Chain Development Management
August 12, 2024 56
Strategy, Infrastructure and Product/Solution/Service
(SIPSS) - Horizontal Process Function Details
Marketing and Offer Management
Service Development and Management
Resource Development and Management
Supply Chain Development Management
Market
Strategy and
Policy
Product and
Offer Portfolio
Planning
Product and
Offer
Capability
Delivery
Marketing
Capability
Delivery
Product and
Offer
Development
and Retirement
Sales
Development
Product
Marketing
Communications
and Promotion
Service
Strategy and
Planning
Service
Capability
Delivery
Service
Development
and Retirement
Resource
Strategy and
Planning
Resource
Capability
Delivery
Resource
Development
and Retirement
Supply Chain
Strategy and
Planning
Supply Chain
Capability
Delivery
Supply Chain
Development
and Change
Management
August 12, 2024 57
SIPSS – Vertical Process Views
Strategy and Commit
Strategy, Infrastructure and
Product/Solution/Service
(SIPSS)
Responsible for the generation of
strategies and establishment of
business commitment in support of
the Infrastructure and
Product/Solution/Service Lifecycle
processes involving all levels of
operation from market, customer
and products/solutions/services,
through the services and the
resources on which these depend to
the involvement of suppliers and
partners in meeting these needs
Infrastructure Lifecycle
Management
Product, Solution and Service
Lifecycle Management
Responsible for the definition,
planning and implementation of all
necessary infrastructures
(application, IT and network), as
well as all other support
infrastructures and business
capabilities (operations centers,
architectures, etc.)
Responsible for the definition,
planning, design and
implementation of all
products/solutions/services in the
organisation’s portfolio to required
profit margins customer satisfaction
and quality commitments,
delivering new and retiring existing
products/solutions/services to the
market
August 12, 2024 58
SIPSS - Horizontal Process Functional Groups
Strategy, Infrastructure and
Product/Solution/Service
(SIPSS)
Marketing and Offer
Management
Service Development and
Management
Resource Development and
Management
Supply Chain Development
Management
Defines strategies, develops new
products/solutions/services, manages existing
products/solutions/services including retirement,
manages pricing, sales and channels and implements
marketing communications and promotion and
offering strategies
Plans, develops and delivers services to operations
domain for product/solution/service creation and
design, managing and assessing the performance of
existing products/solutions/services and ensuring that
capabilities are in place to meet future
product/solution/service demand
Plans, develops and delivers the resources - physical
and non-physical - needed by operations to support
products/solutions/services, manages and assesses the
performance of existing resources and ensures that
capabilities are in place to meet future
products/solutions/services needs
Focuses on the interactions required by the
organisation with suppliers and partners who are
involved in maintaining the supply chain network of
relationships that a service provider manages to source
and deliver products, supports sourcing decisions,
suppliers and partners selection
Outputs From The Solution Design Process
August 12, 2024 59
Outputs From The Solution Design Process
• The purpose of the solution design process is to create a
complete end-to-end solution design covering all the
components that have to be delivered to create a usable,
operable, supportable, maintainable solution that can be
used in multiple ways:
− Create realistic and achievable implementation schedule
− Understand the likely delivery costs and required resources
− Understand solution options and their implications
− Understand possible solution delivery phases
− Pass to technical delivery teams to create low-level technical
designs
August 12, 2024 60
Outputs From The Solution Design Process
August 12, 2024 61
Changes to Existing
Systems
New Custom
Developed
Applications
Acquired and
Reporting and
Analysis Facilities
System Integrations/
Data Transfers/
Exchanges
Acquired and
Customised Software
Products
Changes to Existing
Business Processes
New Business
Processes
Organisational
Changes, Knowledge
Management
Training and
Documentation
New Data Loads
Central, Distributed
and Communications
Infrastructure
Operational
Functions and
Processes
Existing Data
Conversions/
Migrations
Cutover/ Transfer to
Production And
Support
Parallel Runs
Information Storage
Facilities
Sets of Installation
and Implementation
Services
Enhanced Support/
Hypercare
Sets of Maintenance,
Service Management
and Support Services
Application Hosting
and Management
Services
Extended Organisation Change
Extended Technical Delivery
Core Technical Delivery
Outputs From The Solution Design Process
• The output from the solution design process is the set of
core and extended components of specific types required
to deliver an operable and usable solution combined into
an integrated and unified target
• The complete solution is:
August 12, 2024 62
෍
𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕
𝑻𝒚𝒑𝒆 𝟏
𝑵
෍
𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏
𝑴
𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
Solution Phases
• Completion solution
will be delivered in
phases
• Composition of the
solution deliver
phases may change
dynamically in
response to
consumer, business
and market
feedback
• The complete solution over
all its delivery phases is:
August 12, 2024 63
෍
𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕
𝑻𝒚𝒑𝒆 𝟏
𝑵𝟏
෍
𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏
𝑴𝟏
𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
+ ෍
𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕
𝑻𝒚𝒑𝒆 𝟏
𝑵𝟐
෍
𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏
𝑴𝟐
𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
+ ෍
𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕
𝑻𝒚𝒑𝒆 𝟏
𝑵𝟑
෍
𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏
𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏
𝑴𝟑
𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
Solution Component Specific Design And Delivery
Issues – 1/5
August 12, 2024 64
Solution
Component
Type
Description Solution Design
Considerations
Some Questions, Issues and Concerns
Changes to Existing
Systems
Modifications and enhancements to
existing IT systems, either custom
developed or acquired products, that will
form part of the overall solution, including
the definition of the scope of the work.
• What (is the minimum number of)
existing systems need to be changed
to accommodate the new solution?
• Can the proposed work be done
outside those existing systems?
• What are the options for making the
required changes?
• Ease of changing
• Ability to change
• Availability of skills and ability to make changes
• Existing change backlog
• What are the impacts and dependencies on other activities?
• Can the changes be avoided or minimised both in number and size
• How long will the changes take and how much will they cost?
New Custom
Developed
Applications
New custom developed IT applications that
will form part of the overall solution,
including the definition of the scope of the
work.
• What (is the minimum number of)
new custom applications are needed?
• Can the proposed work be done
outside those proposed new
applications?
• What are the options for the new
developments?
• Are customised applications required?
• What development and deployment platform should be used?
• Availability of skills and ability to develop new applications
• What is the long-term support and maintenance plan?
• How will then be interfaced with and used?
• How long will the new applications take and how much will they cost?
Acquired and
Configured/
Customised
Software Products
Packaged IT applications that are
configured and customised that will form
part of the overall solution, including any
product acquisition and supplier and
product evaluation and selection.
• What (is the minimum number of)
new software applications are
needed?
• What are the product options?
• Can existing products be reused?
• What are the configuration and
customisation options?
• What is the process for procuring products from suppliers?
• How good a fit is the proposed product?
• How easily and quickly can the products be implemented and customised
and what skills are needed?
• How are the customisations supported and maintained?
• What are the application and data integration issues?
• Are the products hosted internally or externally?
• What infrastructure is needed to run the product?
• How much will they cost to acquire and operate?
• Availability of skills and ability to develop new applications
System
Integrations/ Data
Transfers/
Exchanges
Scheduled and ad hoc data transfers and
exchanges of different types such, as batch
or real time, between solution components
including data transformations or
application-level integrations such as
application interfaces, remote calls,
messaging interfaces or services with
associated results and data being
communicated. This also includes the
infrastructures required to enable and
support this and its management.
• What (is the minimum number of)
new and changes to existing data
integrations are needed?
• What integration approaches and
tools should be used?
• Can existing integrations and tools be
reused?
• How many integration, data transfers and exchanges are needed?
• What is their format and content?
• What transfer approach(es) are proposed?
• Does the integration infrastructure already exist?
• What integration tools are being proposed?
• What is the proposed frequency of integrations and are they scheduled or
unscheduled?
• Who initiates the integration?
• What is the number of integration transactions and the volumes of data?
Solution Component Specific Design And Delivery
Issues – 2/5
August 12, 2024 65
Solution
Component
Type
Description Solution Design
Considerations
Some Questions, Issues and Concerns
Reporting and
Analysis Facilities
Reporting and analysis facilities including
the implementation and configuration and
customisation of any underlying toolsets,
associated reporting tools and data
structures, specific report and analyses and
related functionality.
• What reports and analyses are
needed?
• What (new and existing) tools are
needed?
• What data is needed for reporting
and analysis?
• How will reports and analyses be
accessed and distributed?
• How repeatable and reproducible will
reports and analyses be?
• Who can access what reports and
analyses and the underlying data?
• Can existing reporting, visualisation and analytics facilities be used or are
new ones required?
• How will reporting and analytics be deployed
• Can existing data reporting structures (data warehouses, data marts) be
used or are new ones required?
• What data extraction, transformation and load facilities are required to
enable and support reporting and analytics?
• How many data sources will be used for reporting
• How much reporting and analysis is required?
Sets of Installation
and
Implementation
Services
Services acquired from third party suppliers
to install, implement, configure and get
operational hardware and software
components of the solution, including the
specification of these services.
• What needs to be installed and
where?
• What are the installation options?
• What solution components require installation and implementation?
• From whom will the services be procured?
• What handover will be required?
• What long-term support arrangements will be required?
• How long with the installation and implementation take?
Information
Storage Facilities
Internally installed data storage
infrastructure, either existing or new, or
externally provided data storage facilities
including their installation, customisation
and provision of data access. This includes
any data storage software such as database
management systems and other elements.
• What data of what types will be
stored?
• What applications are storing data?
• What data security is required?
• How many data storage facilities – hardware and software - will be
required?
• Where will they be located?
• Are they existing or new facilities?
• If they are new, what are the provisioning issues, requirements and costs?
• What are the expected data volumes and throughputs?
• What is the approach to data backup, recovery, retention and archival?
Existing Data
Conversions/
Migrations
Migration of data held in old systems to the
new solution, including data transfer and
aggregation/transformation and the design
and specification of associated target data
structures.
• What is the proposed approach to
the migration(s) and conversion(s)?
• How complex will the migration(s)
and conversion(s) be?
• Who will perform the migration(s)
and conversion(s)?
• How much data needs to be migrated?
• How well-defined is the source data?
• What are the data quality and transformation requirements and issues?
• What data conversion/migration facilities are available?
Solution Component Specific Design And Delivery
Issues – 3/5
August 12, 2024 66
Solution
Component
Type
Description Solution Design
Considerations
Some Questions, Issues and Concerns
New Data Loads
Modifications and enhancements to
existing IT systems, either custom
developed or acquired products, that will
form part of the overall solution, including
the definition of the scope of the work.
• What is the proposed approach to
the new data loads?
• How complex will the new data loads
be?
• Who will perform the new data
loads?
• How much new data is required to make the solution usable?
• Where will the data come from and how much processing is required to
make it usable?
• What is the approach to data governance and management?
• What is the approach to master and reference data management?
Central,
Distributed and
Communications
Infrastructure
Information technology infrastructure,
either installed on-premises or in co-
located or outsourced facilities or provided
by an XaaS arrangement, of any type,
dedicated or shared, that is required to
allow components of the solution to
operate.
• What is the proposed approach to
the design and sourcing of the
communications infrastructure?
• How complex will the new
communications infrastructure?
• Who will provide and configure the
communications infrastructure?
• What technology infrastructure is required?
• Where will the infrastructure be located?
• How much existing infrastructure can be reused?
• What infrastructure installation and configuration services are required?
Cutover/
Transfer to
Production And
Support
Sets of services required to put the solution
and its constituent components into
production including organisational
readiness, go live preparation and
operations acceptance testing.
• Who will manage service transition?
• Will there be multiple phased
transitions over time?
• How long will service transition take?
• What is the approach to transferring the solution to production?
• What is the approach to organisation change management?
Operational
Functions and
Processes
Service management processes required to
enable the solution to operate including
incident, problem, change, service request,
asset and other processes and the
resourcing of the support and operational
functions. This includes the implementation
of new operational processes and the
integration of the solution into existing
processes.
• What will the approach to service
management be?
• Who will perform the required levels
of service management?
• What service management processes need to be updated to
accommodate the operation of the solution?
• Who will made the service management process changes?
• What changes – training, staffing, new structures - need to be made the
operational functions to accommodate the solution?
• Who will made the operational function changes?
Solution Component Specific Design And Delivery
Issues – 4/5
August 12, 2024 67
Solution
Component
Type
Description Solution Design
Considerations
Some Questions, Issues and Concerns
Enhanced Support/
Hypercare
Immediately after the solution goes live, an
enhanced level of support may be required
for a defined interval or until defined exit
criteria have been met. This includes the
definition of the hypercare required and
how long it should last.
• What will the approach to initial
hypercare be?
• Who will perform the hypercare?
• What level of enhanced support will be required after the solution goes
live?
• What will be the approach to providing enhanced support?
• How long will enhanced support be required for?
• What are the exit deciding factors to stop the enhanced support?
• Who will provide enhanced support?
Sets of
Maintenance,
Service
Management and
Support Services
Different solution components will require
different types of maintenance and support
arrangements. These services may be
provided internally or acquired from
external suppliers. This includes the design
and specification of the support and
maintenance arrangement and their
acquisition from third parties and the
implementation of the arrangements.
• What will the approach to solution
component maintenance, support
and management?
• What maintenance, support and
management services will be
insourced and outsourced?
• What service levels will be required?
• How automated will component
maintenance be?
• How will upgrades be handled?
• What solution components will require maintenance services?
• Who will provide the maintenance services?
• What is the scope and extent of the maintenance services?
• What maintenance service transition is required?
• How will the maintenance services be managed and reported on?
• What solution components will require support services?
• Who will provide the support services?
• What is the scope and extent of the support services?
• What support service transition is required?
• How will the support services be managed and reported on?
Application Hosting
and Management
Services
Some of the solution components may be
hosted outside the organisation either
through cloud service providers or
outsourcing arrangements. This includes
the design and specification of the hosting
services and their acquisition.
• What are the options for externally
hosted solution components?
• What will the selection evaluation
factors be?
• What will the approach be to
integration?
• How will security be handled?
• What solution components will be hosted externally?
• Who will provide the hosting services?
• What connectivity will be required to the hosting service provider(s)?
• How will security be managed?
• What hosting model(s) will be adopted?
• How will the hosting services be managed and reported on?
Parallel Runs
If the solution replaces or extends an
existing solution, the old and new solutions
may need to operate in parallel for a
defined interval or until defined exit criteria
have been met. This includes the definition
of the parallel run processes, the exit
criteria and the additional resources
needed to perform the parallel runs.
• What will the approach be to the
parallel operation of the existing and
new be, if needed?
• How long will parallel runs be?
• How will the results of the parallel run(s) be evaluated?
• What will be the evaluation factors used to exit the parallel run(s)?
• What resources will be required to perform the parallel run(s)
Solution Component Specific Design And Delivery
Issues – 5/5
August 12, 2024 68
Solution
Component
Type
Description Solution Design
Considerations
Some Questions, Issues and Concerns
Changes to Existing
Business Processes
Solutions exist to enable business processes
to be operated. Existing business processes
may need to be redesigned to take
advantage of or to efficiently use the
facilities of the solution and its
components. This includes the redesign of
the processes, the implementation of those
changes and any process or standards
documentation and training required.
• Is there an inventory of business
processes that need to be changed?
• What are the options for business
process change?
• What existing business processes will need to be changed to support the
use the solution?
• Who will design, validate and implement the changed business processes?
• What training will be required in the changed business processes?
• What additional material will be required to support the changed business
processes?
New Business
Processes
New business processes may need to be
defined, either entirely new ones or ones to
replace existing processes, to operate the
solution. This includes the redesign of the
processes, the implementation of those
changes and any process or standards
documentation and training required.
• Is there an inventory of new business
processes that need to be created?
• What are the options for
implementing and operating the
required new business processes?
• What new business processes will need to be implemented to support the
use the solution?
• Which existing business processes will be replaced by the new processes,
if any?
• Who will design, validate and implement the new business processes?
• What training will be required in the new business processes?
• What additional material will be required to support the new business
processes?
Organisational
Changes,
Knowledge
Management
Organisation changes may be required to
operate the solution. This can include
additional resources or redeployment of
existing resources, new role types, new
organisation structures and new locations.
This includes the design of these
organisation changes. New knowledge
management facilities may be required to
support the business operation and use of
the solution.
• Who will be responsible for defining
and agreeing the required
organisation changes?
• What are the options for
implementing and operating
organisation changes?
• What organisational changes – new or changed functions, new locations,
new or changed roles – will be required to enable the effective use of the
solution?
• What effort will be required to implement the changes?
• What approach to organisation change management will be adopted?
• What approach to knowledge management will be adopted?
• What knowledge management facilities will be required?
• How will knowledge management be initially loaded with information?
Training and
Documentation
Training and supporting documentation
may be required across some or all of the
solution components at different levels and
aimed at different solution consumer types,
both business and operational.
• Who will be responsible for defining
and agreeing the required training
and documentation?
• What are the options for sourcing the
training and documentation?
• How much training of what types and formats will be required?
• What approach to training will be adopted?
• What documentation of what types will be required?
Application Of Product Development Processes To
Solution Architecture
August 12, 2024 69
Product Management And Solution Architecture
• Solution architecture can use the product management
approach in two ways:
1. To ensure that the process to design the solution takes account
of the wider solution operational and deployment landscape
• Treat the solution design and implementation as a more commercial
exercise that regards internal solution consumers as customers
2. To manage the process for deciding which solutions should
proceed to implementation using a rational stage-gate process
August 12, 2024 70
Internal Solution Design And Delivery And The
Stage/Gate Process
• When used internally within organisations, the stage/gate
process typically operates in a much-reduced format
− Gates are treated largely as progress review checkpoints – they
are not concerned with the survival of the fittest solutions and
the cancellation of the rest
− There tends not to be any portfolio solution assessment
August 12, 2024 71
Solution Delivery Of The Internal IT Function Needs
To Mirror That Of The Organisation
August 12, 2024 72
Manage Information Technology
Develop Vision
and Strategy
Design, Develop
and Manage
Products, Services
and Solutions
Market and Sell
Products, Services
and Solutions
Manage Supply
Chain for
Products, Services
and Solutions
Deliver Products,
Services and
Solutions
Manage Customer
Service
IT Function Delivering Solutions to Other Business Functions
IT Function Delivering Solutions to Other Business Functions
Solution Pipelines And Horizons
• Need structured process to manage the pipelines of solutions
needed by the organisation
• The sum of the solution pipelines represent the portfolio of
current and future solution
• The pipeline process is also concerned with allocating sufficient
resources to long-term research and speculative solution
identification
• Use production development and management concepts and
approaches to assist with managing the solution design and
selection process
• One of the concerns regarding the product development stage
gate process is that too many projects pass gates with too few
resources to move the portfolio of projects forward
August 12, 2024 73
Short-Term
Mid-Term
Longer-Term
Long-Term
Solution Pipelines
• Solution architecture function needs to maintain multiple solution pipelines, each
with different timelines reflecting solution implementation priorities
• Not all solutions reach the end of their pipeline and are implemented
• Solutions can move between pipelines as priorities change
React to immediate organisation, market and
regulatory needs and changes, defend the
organisation, replace existing ageing/inefficient
solutions, mandatory upgrades
Focus on organisation growth, expansion,
diversification, development, creation and
delivery of new products and services, develop
target solution landscape and roadmap
Research and development,
grow through partnerships,
plan for growth and change
scenarios
Blue-sky explorations,
defensive planning
against seismic and
tectonic changes, take
risks
August 12, 2024 74
Applying Stage Gate Processes To Solution Pipelines
• A structured
product stage
gate process
can be used to
manage the
prioritisation
of projects
within and
across the
various
solution
pipelines
August 12, 2024 75
Solution Horizons
• Solution pipelines
apply to different
time horizons
• Multiple balances
are required
between short term
anticipation, to
planned
diversification, new
relationships and
strategy
development to
investment in
research and
planning to long-
term risk taking and
experimentation
August 12, 2024 76
Short-
Term
Mid-
Term
Longer-
Term
Long-
Term
Core, Extended And Supporting Product/Solution/Service
Management And Development Capabilities And Practices
August 12, 2024 77
Core, Extended And Supporting Product/Solution/Service
Management And Development Capabilities And Practices
August 12, 2024 78
Design,
Develop and
Manage
Products,
Services and
Solutions
Engineering and
Technical
Expertise
Innovation and
Adaptability
Lifecycle
Management
Product and
Service Design
Project
Management
Quality
Management
Sales and
Marketing
Expertise
Market and
Sell Products
and Services
Bid and Proposal
Management
Competitive
Intelligence
Contract
Negotiation and
Management
Cost Estimation
and Pricing
Market
Research,
Analysis and
Customer
Understanding
Proposal Writing
and Presentation
Skills
Relationship
Building,
Networking and
Customer
Engagement
Sales Strategy
Development
Technical
Expertise and
Solution/Service
Design
Manage
Supply Chain
for Products
and Services
Efficient
Material
Planning and
Procurement
Inventory
Management
and Tracking
Just-in-Time (JIT)
Delivery
Logistics and
Transportation
Material
Handling
Equipment
Procurement
and Sourcing
Reverse
Logistics, Waste
Goods
Management
Supplier
Relationship
Management
Supply Chain
Visibility and
Analytics
Sustainability
and Ethical
Practices
Finance and
Project
Integration
Warehouse and
Distribution
Management
Deliver
Production
and Services
Delivery Project
Management
Solution Delivery
Impact
Assessments
Quality Control
and Assurance
Resource
Planning and
Allocation
Stakeholder
Engagement and
Collaboration
Sustainable
Design Practices
Supply Chain
Collaboration
and
Management
Manage
Customer
Service
Customer
Relationship
Management
Effective
Communication
Empathy and
Customer Focus
Knowledge and
Expertise
Measurement
and Feedback
Analysis
Multichannel
Support
Problem Solving
and Conflict
Resolution
Process
Improvement
Core, Extended And Supporting Product/Solution/Service
Management And Development Capabilities And Practices
• These describe the key generic capabilities required across
the major capability groups:
− Design, Develop and Manage Products, Services and Solutions
− Market and Sell Products and Services
− Manage Supply Chain for Products and Services
− Deliver Production and Services
− Manage Customer Service
• This presents an alternative view of the capabilities
required to be good at the spectrum of solution design and
delivery-related activities
• This approach is intended to be comprehensive and
detailed
August 12, 2024 79
Core, Extended And Supporting Product/Solution/Service
Management And Development Capability Groups
• Capabilities
and their
practices map
to the
previously
identified core
and extended
capability
groups
August 12, 2024 80
Structure Of Streams, Capabilities And Practices
• Each capability
within each stream
has a defined set of
practices that
comprise what is
required within that
capability
• The practices for
each capability are
initially listed in
isolation
• The important
cross-capability
practices can then
be identified
Stream
Capability Capability Capability Capability
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Individual
Capability
Practice
Common
Practice
Across
Capability
Common
Practice
Across
Capability
Common
Practice
Across
Capability
Common
Practice
Across
Capability
Design, Develop and Manage Products, Services and
Solutions Capabilities and Practices
• This expands the capability Design, Develop and Manage
Products, Services and Solutions capability group into its
constituent capabilities and practices and provides more
detail on the
• This is the core solution design capabilities within the
extended set of solution-related capability groups
August 12, 2024 82
Design, Develop and Manage Products, Services
and Solutions Capabilities
August 12, 2024 83
Product,
Solution and
Service
Development
Technical
Expertise
Lifecycle
Management
Product,
Solution and
Service Design
Product,
Solution and
Service
Delivery
Management
Product,
Solution and
Service
Quality
Management
Sales and
Marketing
Expertise
Innovation
and
Adaptability
Core Solution Management And Development
Capabilities Generalised Model
• Generalised model consists of the following key capability areas:
1. Product, Solution and Service Development Technical Expertise
2. Innovation and Adaptability
3. Lifecycle Management
4. Product, Solution and Service Design
5. Product, Solution and Service Delivery Management
6. Product, Solution and Service Quality Management
7. Sales and Marketing Expertise
• This is a logical view - these are not discrete capabilities – there are
overlaps
• There are many ways to define key capabilities – this is one way
− Focus on the substance and content of the capabilities rather than on the
superficial structure
• This represents a set of skills, capabilities, talents and proficiencies
an organisation needs to possess to
August 12, 2024 84
Design, Develop and Manage Products, Services and
Solutions Capabilities and Practices
August 12, 2024 85
Design, Develop and Manage Products, Services and Solutions Capabilities and Practices
Product, Solution and Service
Development Technical
Expertise
Strategic Planning and Vision
Talent Acquisition,
Development and
Management
Standardisation and Best
Practices
Technology Adoption and
Integrated Technology
Platforms
Quality Assurance and Control
Risk Management
Collaboration and
Communication
Sustainability and
Environmental Responsibility
Innovation and R&D
Project Management and
Execution
Performance Metrics and KPIs
Regulatory Compliance
Supply Chain and Vendor
Management
Continuous Improvement
Client and Stakeholder
Engagement
Crisis and Risk Preparedness
Data Analytics and Reporting
Budget and Resource
Management
Ethical and Responsible
Practices
Adaptability and Resilience
Customer-Centric Approach
Cybersecurity
Ecosystem Partnerships
Innovation and Adaptability
Strategic Alignment
Cross-Functional Collaboration
Innovation Culture
Research and Development
Investment
Idea Management
Technology Scouting
Customer-Centric Innovation
Innovation Teams
Prototyping and Rapid Testing
Agile Project Management
Open Innovation
Data-Driven Decision-Making
Change Management
Intellectual Property
Management
Resource Allocation
Innovation Metrics and KPIs
Sustainability and
Environmental Innovation
Market Research and
Competitive Analysis
Continuous Improvement
Regulatory Compliance
Scenario Planning
Technology Adoption
Lifecycle Management
Strategic Alignment
Cross-Functional Collaboration
Clear Product and Service
Lifecycle Phases
Standardised Processes
Lifecycle Cost Management
Lifecycle Documentation
Quality Assurance and Testing
Sustainability Integration
Regulatory Compliance
Continuous Improvement
Lifecycle Metrics and KPIs
Customer Feedback
Integration
Supplier, Vendor, Partner and
Sub-Contractor Management
Risk Management
Change Management
Employee Training and
Development
Lifecycle Assessment and
Reporting
Innovation Integration
Asset Management
End-of-Life Planning
Data Management and
Analytics
Digital Twin Technology
Technology Adoption
Standardisation and
Modularisation
Cybersecurity
Scalability
Product, Solution and Service
Design
Strategic Alignment
Cross-Functional Collaboration
Customer-Centric Approach
Clear Design Processes
Design Thinking and
Innovation
User Experience (UX) Design
Sustainability Integration
Regulatory Compliance
Quality Assurance and Testing
Rapid and Iterative
Prototyping and Simulation
Data-Driven Design
Change Management
Resource and Budget
Management
Risk Management
Innovation Metrics and KPIs
Talent Development
Supplier and Sub-Contractor
Collaboration
Market Research and
Competitive Analysis
Continuous Improvement
Innovation Integration
Value Engineering
Modular Design
Lifecycle Cost Analysis
Scalability
Product, Solution and Service
Delivery Management
Strategic Alignment
Leadership and Governance
Digital Integration
Cross-Functional Collaboration
Project Management
Methodology
Customer-Centric Approach
Project Planning and
Scheduling
Resource Allocation
Risk Management
Quality Assurance and Control
Change Management
Performance Metrics and KPIs
Stakeholder Communication
Contract and Vendor
Management
Project Management Software
Project Documentation and
Knowledge Management
Lessons Learned and
Continuous Improvement
Regulatory Compliance
Sustainability Integration
Conflict Resolution
Budget and Cost Control
Resource and Workforce
Development
Cybersecurity
Product, Solution and Service
Quality Management
Strategic Alignment
Leadership and Governance
Digital Integration
Quality Standards and Metrics
Risk-Based Quality
Assessment
Supplier and Subcontractor
Quality
Documentation and
Traceability
Continuous Improvement
Change Management
Data Analytics and Reporting
Sustainability and
Environmental Quality
Regulatory Compliance
Quality Culture
Customer-Centric Quality
Innovation and Research
Benchmarking and Best
Practices
Third-Party Certification
Quality Audits and Inspections
Root Cause Analysis
Transparency and Reporting
Sales and Marketing Expertise
Strategic Alignment
Market Research and Analysis
Cross-Functional Collaboration
Customer-Centric Approach
Digital Marketing Strategy and
Social Media Engagement
Data-Driven Decision-Making
Personalisation
Marketing Technology
Collaboration with Technical
Teams
Content Marketing and
Thought Leadership
Sales Enablement
Lead Generation and
Nurturing
International Expansion
Strategy
Partnerships and Alliances
Sustainability and Green
Practices
Customer Feedback and
Satisfaction
Brand Management
Regulatory Compliance
Budget and ROI Analysis
Innovation and Technology
Adoption
Case Studies and Testimonials
Local Market Adaptation
Design, Develop and Manage Products, Services and
Solutions Capabilities and Practices
• Generalised and comprehensive set of capabilities and
their constituent practices
• A framework such as this can be used for both external
and internal solution development
• It can be used to identify those practices that are relevant
to your organisation and its solution delivery
circumstances – internal or external, the importance of
those practices and their current state of implementation
and operation
August 12, 2024 86
Design, Develop and Manage Products, Services and
Solutions Capabilities and Practices Assessment
• An assessment can
identify what
practices to focus on
establishing or
improving
• You can map phased
target future state(s)
and define the
activities and tasks
required to achieve
them
• You can then look at
acquiring and
implementing
technologies that
support the efficient
operation of those
practices
August 12, 2024 87
Practices That Are
Important To Solution
Design For Your
Organisation
Practices That Are
Poorly Performing
Or Not
Implemented Or
Operated
Practices That Are
Relevant To Your
Organisation
Practices Within Capability – Product, Solution and
Service Development Technical Expertise
August 12, 2024 88
Strategic Planning and Vision Develop a clear and forward-looking strategy for the Engineering and Technical Expertise capability that aligns with the company's overall goals and market
demands and define a vision for digital transformation within your industry
Talent Acquisition, Development
and Management
Recruit, develop and retain top engineering and technical talent and foster and provide a culture of continuous learning and skill development/professional
development to keep your team up to date with the latest industry trends
Standardisation and Best Practices Establish standardised processes and best practices for design, construction and operation across subsidiaries, ensure knowledge sharing and transfer between
different units, stay updated on global product and solution design and development standards, best practices and industry benchmarks and align your operations
with these standards to ensure consistency and quality across subsidiaries, ensure that innovative solutions can be scaled up and standardised for broader use
across different subsidiaries and regions and develop clear implementation guidelines
Technology Adoption and
Integrated Technology Platforms
Stay current with emerging technologies in product and solution design and development and engineering and invest in digital tools) and other software that
streamline processes
Quality Assurance and Control Implement rigorous quality control processes to ensure high standards in product and solution design and development and operations and continuously monitor
and improve quality
Risk Management Develop robust risk assessment and mitigation strategies for product and solution design and development and operational phases and ensure compliance with
local regulations and safety standards
Collaboration and Communication Foster strong communication, knowledge sharing, cross-functional teamwork and collaboration between subsidiaries, departments and sub-contractors and use
project management tools and software for efficient communication
Sustainability and Environmental
Responsibility
Incorporate sustainable product and solution design and development practices and stay informed of and compliant with environmental regulations and
certifications and aim for green certifications
Innovation and R&D Invest in research and development to stay at the forefront of industry innovation and encourage teams to propose and pilot new technologies and methods to test
and validate new technologies and processes before full-scale implementation and collect data and feedback to refine and improve your innovations
Project Management and Execution Implement efficient project management processes to ensure projects are delivered on time and within budget
Performance Metrics and KPIs Define key performance indicators (KPIs) to measure the effectiveness of the Engineering and Technical Expertise function and regularly assess and report on these
metrics
Regulatory Compliance Stay up-to-date with local, national and international regulations and ensure all projects and operations comply with legal requirements
Supply Chain and Vendor
Management
Establish strong relationships with sub-contractors and suppliers and implement vendor evaluation and management processes
Continuous Improvement Encourage a culture of continuous improvement and learning and regularly review and optimise processes and practices
Client and Stakeholder Engagement Keep clients and stakeholders informed and engaged throughout the project lifecycle and seek feedback to drive improvements
Crisis and Risk Preparedness Develop contingency plans for crisis situations, such as natural disasters or unexpected delays
Data Analytics and Reporting Utilise data analytics to make informed decisions and identify trends insights into product and solution design and development processes, cost management and
project performance and create insightful reports for better decision-making
Budget and Resource Management Efficiently allocate resources and manage budgets for different projects and monitor financial performance closely and design cost-effective solutions and monitor
costs carefully to ensure a competitive edge in the market
Ethical and Responsible Practices Uphold ethical and responsible business practices, such as fair labour, diversity and community engagement
Adaptability and Resilience Be prepared to adapt to changing market conditions, technological advancements and unforeseen challenges
Customer-Centric Approach Focus on understanding and meeting the needs of your customers and use customer feedback to improve your products and services continually
Cybersecurity Invest in robust cybersecurity measures to protect sensitive project data and intellectual property
Ecosystem Partnerships Collaborate with technology providers, startups and industry associations to gain insights and access cutting-edge solutions
Practices Within Capability – Innovation and
Adaptability
August 12, 2024 89
Strategic Alignment Develop a clear strategic vision that emphasises innovation, research and adaptability as core elements of your organisation's culture and business
model and ensure that the Innovation and Adaptability capability aligns with your function's strategic goals and the broader company's mission and
overarching company objectives
Cross-Functional Collaboration Foster collaboration and information sharing between your function and other departments, such as R&D, Operations and Marketing
Innovation Culture Cultivate an innovation-focused culture that encourages engineers, architects, project managers and other teams to generate and explore new
ideas, take calculated risks and learn from failures
Research and Development
Investment
Allocate a dedicated budget for research and development initiatives, including the exploration of new product and solution materials, methods
and technologies and establish a dedicated Research and Development team with expertise in product and solution technology and emerging
opportunities and challenges
Idea Management Implement an idea management system to capture, evaluate and prioritise innovative ideas from employees and stakeholders
Technology Scouting Regularly scan the market for emerging technologies, materials and product and solution creation methods that can enhance your products and
services
Customer-Centric Innovation Engage with customers to understand their evolving needs and preferences and use this feedback to drive innovation in product and service design
Innovation Teams Form dedicated innovation teams or task forces responsible for researching, testing and implementing innovative solutions
Prototyping and Rapid Testing Develop a process for rapid prototyping and testing of new product and service concepts to validate their feasibility and desirability
Agile Project Management Adopt agile methodologies to improve project flexibility and responsiveness to change during the design and development phases
Open Innovation Foster a culture of open innovation and explore collaborations and opportunities for co-innovation with external partners, startups, universities and
research institutions to leverage their expertise and technologies, set up innovation labs or centres to experiment with new technologies and
product and solution design and development methods
Data-Driven Decision-Making Utilise data analytics to inform product and service design decisions, customer feedback analysis and performance tracking
Change Management Develop a structured change management strategy to ensure a smooth transition when implementing new technologies, processes, or products
Intellectual Property
Management
Implement clear policies for managing intellectual property generated through innovation, including patents and licensing
Resource Allocation Allocate resources, such as funding and talent, to support innovation efforts effectively and prioritise projects based on strategic goals
Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of innovation initiatives and R&D efforts and regularly review
and refine your approach based on these metrics
Sustainability and
Environmental Innovation
Incorporate sustainability and environmental considerations such as green and eco-friendly product and solution design and development
technologies into your product and service innovation efforts
Market Research and
Competitive Analysis
Stay informed about market trends, competitor innovations and emerging customer needs and use this information to identify opportunities for
product and service development
Continuous Improvement Establish a process for continuously reviewing and optimising your innovation practices
Regulatory Compliance Ensure that innovative products and services adhere to local and international regulatory requirements
Scenario Planning Develop scenarios and contingency plans to anticipate potential market changes and disruptions
Technology Adoption Keep a close watch on emerging product and solution design and development technologies and evaluate the feasibility of adopting these
technologies into your projects
Practices Within Capability – Lifecycle Management
August 12, 2024 90
Strategic Alignment Ensure that your product, solution and service design capability aligns with your function's strategic goals and supports the overall company strategy
Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, operations, marketing and R&D, to ensure seamless product, solution and
service development and delivery
Customer-Centric Approach Prioritise understanding customer needs and preferences through market research and feedback and integrate customer feedback into the design process
Clear Design Processes Develop standardised design processes that define key stages, responsibilities and deliverables for product, solution and service design
Design Thinking and Innovation Implement design thinking principles and methodologies to understand end-users' needs, pain points and preferences and to encourage innovative, user-centred
solutions and create a culture that values and promotes innovation
User Experience (UX) Design Invest in UX design tools and skills to enhance the usability and user satisfaction of products and services
Sustainability Integration Incorporate sustainable design practices, such as using eco-friendly materials and energy-efficient solutions
Regulatory Compliance Ensure that designs comply with local, national and international regulations and standards
Quality Assurance and Testing Implement robust quality control and testing procedures throughout the design process to maintain high standards
Rapid and Iterative Prototyping and
Simulation
Use rapid prototyping and iterative design techniques and simulation tools to quickly test and refine design concepts to allow for continuous improvements based
on feedback and real-world testing
Data-Driven Design Utilise data analytics to make informed design decisions and track performance
Change Management Develop a structured approach to manage changes in product, solution and service design and development
Resource and Budget Management Efficiently allocate resources and manage budgets for design projects
Risk Management Identify and mitigate design-related risks, such as cost overruns or design flaws
Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of design initiatives
Talent Development Invest in training and development programs to enhance the skills and knowledge of your design team
Supplier and Sub-Contractor
Collaboration
Build strong relationships with suppliers and sub-contractors to ensure the timely and cost-effective sourcing of resources, components, materials and services
Market Research and Competitive
Analysis
Stay informed about market trends, competitor offerings and emerging technologies
Continuous Improvement Establish processes for ongoing review and optimisation of design practices based on feedback and lessons learned
Innovation Integration Continuously seek opportunities to integrate innovations and improvements into product, solution and service design
Value Engineering Implement value engineering practices to optimise product and solution design and development for cost efficiency without compromising quality
Modular Design Explore modular product and solution design and development methods to increase flexibility and scalability while reducing costs to speed up design and
development processes and facilitate future expansions or adaptations
Lifecycle Cost Analysis Consider the total cost of ownership over the lifecycle of your products and solutions that includes not only initial design and development costs but also operating
and maintenance expenses
Scalability Ensure that your Product, Solution and Service Design capability is scalable to accommodate growth, both in terms of projects and geographic expansion
Practices Within Capability – Product, Solution and
Service Design
August 12, 2024 91
Strategic Alignment Ensure that your product, solution and service design capability aligns with your function's strategic goals and supports the overall company strategy
Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, operations, marketing and R&D, to ensure seamless product, solution and
service development and delivery
Customer-Centric Approach Prioritise understanding customer needs and preferences through market research and feedback and integrate customer feedback into the design process
Clear Design Processes Develop standardised design processes that define key stages, responsibilities and deliverables for product, solution and service design
Design Thinking and Innovation Implement design thinking principles and methodologies to understand end-users' needs, pain points and preferences and to encourage innovative, user-centred
solutions and create a culture that values and promotes innovation
User Experience (UX) Design Invest in UX design tools and skills to enhance the usability and user satisfaction of products and services
Sustainability Integration Incorporate sustainable design practices, such as using eco-friendly materials and energy-efficient solutions
Regulatory Compliance Ensure that designs comply with local, national and international regulations and standards
Quality Assurance and Testing Implement robust quality control and testing procedures throughout the design process to maintain high standards
Rapid and Iterative Prototyping and
Simulation
Use rapid prototyping and iterative design techniques and simulation tools to quickly test and refine design concepts to allow for continuous improvements based
on feedback and real-world testing
Data-Driven Design Utilise data analytics to make informed design decisions and track performance
Change Management Develop a structured approach to manage changes in product, solution and service design and development
Resource and Budget Management Efficiently allocate resources and manage budgets for design projects
Risk Management Identify and mitigate design-related risks, such as cost overruns or design flaws
Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of design initiatives
Talent Development Invest in training and development programs to enhance the skills and knowledge of your design team
Supplier and Sub-Contractor
Collaboration
Build strong relationships with suppliers and sub-contractors to ensure the timely and cost-effective sourcing of resources, components, materials and services
Market Research and Competitive
Analysis
Stay informed about market trends, competitor offerings and emerging technologies
Continuous Improvement Establish processes for ongoing review and optimisation of design practices based on feedback and lessons learned
Innovation Integration Continuously seek opportunities to integrate innovations and improvements into product, solution and service design
Value Engineering Implement value engineering practices to optimise product and solution design and development for cost efficiency without compromising quality
Modular Design Explore modular product and solution design and development methods to increase flexibility and scalability while reducing costs to speed up design and
development processes and facilitate future expansions or adaptations
Lifecycle Cost Analysis Consider the total cost of ownership over the lifecycle of your products and solutions that includes not only initial design and development costs but also operating
and maintenance expenses
Scalability Ensure that your Product, Solution and Service Design capability is scalable to accommodate growth, both in terms of projects and geographic expansion
Practices Within Capability – Product, Solution and
Service Delivery Management
August 12, 2024 92
Strategic Alignment Ensure that your Project Management capability aligns with your function's strategic goals and supports the company's overall strategy
Leadership and Governance Appoint experienced project managers and establish a Project Management Office (PMO) to oversee project management functions, set standards and provide
governance
Digital Integration Incorporate digital tools and technologies such as project management software, digital interaction and sharing platforms for collaboration and data analytics to
enhance project planning, execution and monitoring
Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, design, operations and procurement, to facilitate seamless project execution
Project Management Methodology Establish a clear and standardised project management methodology, which defines project phases, processes, roles and responsibilities
Customer-Centric Approach Focus on understanding and meeting the evolving needs of your clients and regularly engage with clients to gather feedback and enhance customer satisfaction
Project Planning and Scheduling Develop comprehensive project plans and schedules that include key milestones and deadlines
Resource Allocation Efficiently allocate resources, including personnel and budget, to meet project requirements
Risk Management Identify and assess project risks, develop mitigation strategies and establish a risk management plan
Quality Assurance and Control Implement rigorous quality control processes to ensure that project deliverables meet the specified standards
Change Management Develop a structured approach to manage changes in project scope, schedule, or budget
Performance Metrics and KPIs Define key performance indicators (KPIs) to measure project performance and regularly assess and report on these metrics
Stakeholder Communication Maintain open and transparent communication with all project stakeholders, including clients, subcontractors and internal teams
Contract and Vendor Management Establish robust contract and vendor management practices for dealing with subcontractors and suppliers
Project Management Software Utilise project management software and tools to streamline processes, monitor progress and track project performance
Project Documentation and
Knowledge Management
Maintain comprehensive project and knowledge documentation, including project plans, reports and issue logs
Lessons Learned and Continuous
Improvement
Encourage a culture of learning by capturing and applying lessons learned from previous projects
Regulatory Compliance Ensure that projects comply with local, national and international regulations and safety standards
Sustainability Integration Incorporate sustainability considerations into project management, such as environmentally friendly product and solution design and development practices
Conflict Resolution Client Satisfaction and Feedback
Budget and Cost Control Implement strategies for controlling project budgets and costs to prevent overruns
Resource and Workforce
Development
Invest in training and development programs to enhance the skills and knowledge of your project management team
Cybersecurity Prioritise cybersecurity to protect sensitive project data and ensure the security of digital project management systems
Practices Within Capability – Product, Solution and
Service Quality Management
August 12, 2024 93
Strategic Alignment Align your Quality Management capability with the company's strategic goals and digital transformation initiatives and ensure that quality is a fundamental
component of the company's mission
Leadership and Governance Appoint experienced quality managers to oversee quality control and assurance processes and stablish a Quality Management Office (QMO) or similar governance
structure to centralise and coordinate quality efforts
Digital Integration Leverage digital tools, such as quality management software and sensors, to monitor and manage quality in real-time and use and data analytics to identify and
address quality issues
Quality Standards and Metrics Develop and maintain a comprehensive set of quality standards and metrics specific to the your industry and ensure that these standards are consistently applied
across all subsidiaries and projects
Risk-Based Quality Assessment Implement a risk-based approach to quality assessment, where higher-risk areas receive more thorough quality inspections and monitoring
Supplier and Subcontractor Quality Establish clear quality expectations for subcontractors and suppliers, monitor their compliance and performance closely and be selective in choosing suppliers and
materials that meet your quality standards and align with your sustainability goals
Documentation and Traceability Maintain detailed records of all quality-related activities and changes to ensure traceability and accountability throughout the project lifecycle
Continuous Improvement Embrace a culture of continuous improvement in quality management and regularly review and refine quality processes based on data and feedback
Change Management Recognise that digital transformation may involve significant changes in how quality is managed and implement change management strategies to help teams adapt
to new technologies and methodologies
Data Analytics and Reporting Utilise data analytics tools to track quality performance, identify trends and make data-driven decisions and develop clear and actionable quality reports to
communicate status and areas for improvement
Sustainability and Environmental
Quality
Integrate sustainability and environmental considerations into your quality management processes and ensure that product and solution design and development
practices are aligned with eco-friendly standards
Regulatory Compliance Stay up to date with relevant regulations and standards in the countries where you operate and ensure that your quality management practices meet or exceed
these requirements
Quality Culture Promote a culture of quality throughout the organisation and encourage all employees to take responsibility for the quality of their work
Customer-Centric Quality Focus on understanding and meeting the evolving quality expectations of clients and engage with clients regularly to gain feedback and improve their satisfaction
Innovation and Research Invest in research and development to explore and adopt emerging quality management technologies, such as IoT for quality monitoring, AI for predictive quality
analysis and advanced testing equipment
Benchmarking and Best Practices Benchmark your quality management practices against industry best practices and look to adopt and adapt successful strategies used by other leading companies
Third-Party Certification Pursue third-party certifications and quality awards to demonstrate your commitment to quality
Quality Audits and Inspections Conduct regular quality audits and inspections to monitor and verify the effectiveness of quality management practices
Root Cause Analysis Develop a process for identifying and addressing the root causes of quality issues to prevent their recurrence
Transparency and Reporting Communicate openly about quality initiatives, issues and progress with relevant stakeholders
Practices Within Capability – Sales and Marketing
Expertise
August 12, 2024 94
Strategic Alignment Ensure that your Sales and Marketing Expertise capability aligns with your function's strategic goals and the overall company strategy
Market Research and Analysis Invest in comprehensive market research to understand industry trends, customer needs and emerging technologies and continuously monitor the market and
competition to identify opportunities and threats
Cross-Functional Collaboration Foster collaboration and information sharing between the Sales and Marketing team and other departments, such as engineering, design and operations, to align
strategies and support successful project implementation
Customer-Centric Approach Develop a deep understanding of your customers' needs and preferences and tailor your products, services and solutions to meet their specific requirements
Digital Marketing Strategy and
Social Media Engagement
Embrace digital marketing techniques, including online presence(s), content marketing, SEO, social media and email marketing, to reach a broader audience and
engage with potential clients and engage with customers and industry peers through social media platforms to build brand awareness and credibility
Data-Driven Decision-Making Utilise data analytics to gain insights into customer behaviour and preferences and use this data to make informed decisions about your marketing strategies
Personalisation Implement personalisation in your marketing efforts to deliver targeted messages and offers to different customer segments
Marketing Technology Invest in marketing automation tools and customer relationship management (CRM) systems to streamline marketing and sales processes and enhance customer
management
Collaboration with Technical Teams Foster strong collaboration between your sales and marketing teams and technical teams responsible for product and service development and ensure alignment
between what's marketed and what's delivered
Content Marketing and Thought
Leadership
Develop thought leadership content to establish your company as an industry authority and share valuable insights, case studies and research to build trust with
potential clients
Sales Enablement Equip your sales teams with the tools and knowledge they need to effectively communicate the value of your products and services and provide ongoing training
and resources
Lead Generation and Nurturing Implement lead generation strategies to attract potential clients and nurture them through the sales funnel and develop clear processes for handling leads and
converting them into customers
International Expansion Strategy Create a clear strategy for expanding into new European markets, taking into account local regulations, market dynamics and cultural considerations
Partnerships and Alliances Explore strategic partnerships and alliances with complementary companies to expand your reach and offer bundled solutions
Sustainability and Green Practices Emphasise your company's commitment to sustainability and green building practices in your marketing efforts, as these aspects are increasingly important to
clients and regulatory bodies
Customer Feedback and Satisfaction Collect and analyse customer feedback to continuously improve your products and services Use testimonials and case studies to showcase your successful projects
Brand Management Develop a strong brand identity and ensure consistency in branding across all subsidiaries and monitor and protect your brand's reputation
Regulatory Compliance Stay informed about the regulatory requirements in each European country where you operate and ensure that your marketing and sales practices comply with local
laws
Budget and ROI Analysis Implement a rigorous budgeting and ROI analysis process to measure the effectiveness of marketing and sales efforts and adjust strategies based on performance
data
Innovation and Technology
Adoption
Stay at the forefront of technology adoption in marketing, such as AI-powered marketing solutions and augmented reality for showcasing products and solutions
Case Studies and Testimonials Showcase successful projects and client testimonials to build trust and credibility
Local Market Adaptation Tailor your sales and marketing strategies to meet the specific requirements and cultural nuances of different European countries
Capability And Practice Assessment
Capability
Practice Within
Capability
Select Your View on
the Degree of
Practice
Automation by
Technology
Select Your
View on the
Current State of
Operation
Select Your View
on the Importance
of the Practice
Select Your View
on the Desired
Optimum State of
Operation
Select Your View
on the Priority
Select Your View
on How Satisfied
You Are With
Current Operation
Common Practices Across Capabilities
• There are practices that are common across the key capabilities:
− Change Management
− Continuous Improvement
− Cross-Functional Collaboration
− Customer-Centric Approach
− Cybersecurity
− Data Analytics and Reporting
− Data-Driven Decision-Making
− Digital Integration
− Innovation Integration
− Innovation Metrics and KPIs
− Leadership and Governance
− Market Research and Competitive Analysis
− Performance Metrics and KPIs
− Quality Assurance and Control
− Quality Assurance and Testing
− Regulatory Compliance
− Resource Allocation
− Risk Management
− Scalability
− Strategic Alignment
− Sustainability Integration
− Technology Adoption
• These are common skills that underpin many solution design capabilities
• This is one input into the Relevance/Importance/Not or Poorly Implemented or Operated triad
August 12, 2024 96
Design, Develop and Manage Products, Services and Solutions
Capability Group – Common Cross-Capability Practices – Relative
Importance
• You can prioritise the common
practices:
− Change Management
− Continuous Improvement
− Cross-Functional Collaboration
− Customer-Centric Approach
− Cybersecurity
− Data Analytics and Reporting
− Digital Integration
− Innovation Integration
− Leadership and Governance
− Market Research and
Competitive Analysis
− Performance Metrics and KPIs
− Quality Assurance and Control
− Regulatory Compliance
− Resource Allocation
− Risk Management
− Scalability
− Strategic Alignment
− Sustainability Integration
− Technology Adoption
hange anage ent
on nuous
pro e ent
ross Fun onal
olla ora on
usto er entri
pproa h
erse u
ata nal s
and epor ng
igital
ntegra on
nno a on
ntegra on
eadership
and
Go ernan e
ar et
esear h
and
o pe
erfor a
etri s
and s
ualit ssuran e
and ontrol
egulator
o plian e
esou
llo a
is anage ent
ala
trategi
lign ent
ustaina
ntegra on
e hnolog
dop on
Summary
• The application of product development approaches for external
consumer-focussed products/solutions/services is long established and
widely used
• There are many such product development approaches and methodologies
• While there is substantial potential to apply these product development
approaches to internal solution design and implementation, this is done in
a very limited way with none of the kill outcomes present in the gate
component of a stage/gate process
• Solution architecture can use the product management approach in two
ways:
− To ensure that the process to design the solution takes account of the wider
solution operational and deployment landscape
• Treat the solution design and implementation as a more commercial exercise that regards
internal solution consumers as customers
− To manage the process for deciding which solutions should proceed to
implementation using a rational stage-gate process
• The role of the solution architect is ideally placed to perform these
functions effectively
August 12, 2024 98
More Information
Alan McSweeney
http://ie.linkedin.com/in/alanmcsweeney
https://www.amazon.com/dp/1797567616
12 August 2024 99

The Solution Architect As Product Manager.pdf

  • 1.
    The Solution ArchitectAs Product Manager Alan McSweeney http://ie.linkedin.com/in/alanmcsweeney https://www.amazon.com/dp/1797567616
  • 2.
    Topics • Classes OfSolutions And Target Solution Consumers • Product Design Approaches And Methodologies − Product Design Approaches And Methodologies − New Product Development (NPD) Stage Gate − Agile Stage Gate − eTOM (enhanced Telecom Operations Map) − Pragmatic Framework • Outputs From The Solution Design Process • Application Of Product Development Processes To Solution Architecture • Core, Extended And Supporting Product/Solution/Service Management And Development Capabilities And Practices August 12, 2024 2
  • 3.
    Classes Of SolutionsAnd Target Solution Consumers • Internal solutions can be part of or support the operation and use of external products and services, either directly or indirectly August 12, 2024 3 Solution Internal Solution Consumers External Partners/ Collaborators External Public Consumers Solution Solution Organisation Boundary Direct Indirect Internal Use External Use Directly enabling the delivery of the product/ service Is the product/ service Indirectly enabling the delivery of the product/ service Part of the product/ service support/ usage ecosystem
  • 4.
    Classes Of SolutionsAnd Target Solution Consumers • The process by which organisations develop externally facing commercial products, services and solution is different to that used to design and implement internal solutions August 12, 2024 4
  • 5.
    Internal Solution ArchitectureAnd External Product Management • The internal organisation market is clearly different from the external – internal solution consumers do not have the same explicit choice as external consumers − Internal solution consumers exist to perform specific roles − They do not have an explicit choice about the solution they use – but they can resist their introduction in many ways − Technology solutions exist to assist these specific roles and are more prescriptive − A sales function is (apparently) not explicitly needed to promote the product/service/solution • However, there is no reason why the internal solution selection and design process should not attempt to mirror that used successfully externally − Treat internal solution consumers as customers − Sell products/services/solutions to them to increase their rate of use − Measure the success of a solution based on modified metrics such as market penetration/share – level of use/level of satisfaction − Use product development and management concepts and approaches to assist with the solution design and select process August 12, 2024 5
  • 6.
    Internal/External Product/Solution/Service Differences • ExternalProducts/ Solutions/Services • Commercial objective to be a means to make money and generate a positive return on investment • Speculative endeavour designed to meet market need at a delivery costs and product price that generates a return • May need to be differentiated from alternatives and competitors • Need to be located at the intersection of what is perceived to be needed or useful, what works, what customers will buy and where customers will view company as a credible provider – Product Market Fit (PMF) • Internal Products/ Solutions/Services • Objectives are to support the operation of the organisation by reducing cost, improving efficiency, increasing automation or meet new obligations • Typical alternatives are to perform the work manually or continue to use existing August 12, 2024 6
  • 7.
    New External Product/Solution/Service Development •New external product/solution/service development generally starts with partial and imperfect knowledge of: − The consumer and market needs − What is needed to fulfil the need in a way that generates a positive return − The technologies required to create and support the delivery and operation the product/solution/service • Internal product/solution/service development starts with less uncertainty: − The need is more well-known − The range of technology options is more narrow August 12, 2024 7
  • 8.
    Public Service ExternalProducts/Solutions/Services • Public service entities comprise a special case of external Product/Solution/Service development • Public service entities are typically monopoly providers of services • Services to be provided are typically mandated • Products/solutions are developed to be the means by which those mandated services are delivered August 12, 2024 8
  • 9.
    Core, Extended AndSupporting Product/Solution/Service Management And Development Capability Groups August 12, 2024 9 Develop Vision and Strategy Design, Develop and Manage Products, Services and Solutions Market and Sell Products, Services and Solutions Manage Supply Chain for Products, Services and Solutions Deliver Products, Services and Solutions Manage Customer Service Manage Financial Resources Acquire, Construct, and Manage Assets, Facilities Services Manage External Relationships, Procurement, Supplier and Partner Services Develop and Manage Business, Knowledge, Improvement and Change Capabilities Provide Legal, Regulatory, Environment, Health and Safety Services Develop and Manage Human Capital Manage Information Technology Supporting And Enabling Capabilities Extended Capabilities Core Capabilities Manage Product/ Service/Solution
  • 10.
    August 12, 202410 Enterprise Business Process Model – Common Structure • Generally business process models have a core three pillar structure Vision, Strategy, Leadership, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes
  • 11.
    August 12, 202411 Sample Enterprise Business Process Models – Common Structure Vision, Strategy, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes Develop and Manage Products and Services Market and Sell Products and Services Deliver Products and Services Manage Customer Service Human Resource Management Information Technology Management Financial Management Facilities Management Legal, Regulatory, Environment, Health and Safety Management External Relationship Management Knowledge, Improvement and Change Management Vision and Strategy Business Planning, Merger, Acquisition Governance, Compliance, Risk Management Supply Change Management
  • 12.
    Business Process ModelsAnd Core, Extended And Supporting Product Management • Generic organisation business process and capability model maps to core and extended product/solution/ service development capabilities August 12, 2024 12 Vision, Strategy, Business Management Operational Processes With Cross Functional Linkages Management and Support Processes Develop and Manage Products and Services Market and Sell Products and Services Deliver Products and Services Manage Customer Service Human Resource Management Information Technology Management Financial Management Facilities Management Legal, Regulatory, Environment, Health and Safety Management External Relationship Management Knowledge, Improvement and Change Management Vision and Strategy Business Planning, Merger, Acquisition Governance, Compliance, Risk Management Supply Change Management Develop Vision and Strategy Design, Develop and Manage Products, Services and Solutions Market and Sell Products, Services and Solutions Manage Supply Chain for Products, Services and Solutions Deliver Products, Services and Solutions Manage Customer Service Manage Financial Resources Acquire, Construct, and Manage Assets, Facilities Services Manage External Relationships, Procurement, Supplier and Partner Services Develop and Manage Business, Knowledge, Improvement and Change Capabilities Provide Legal, Regulatory, Environment, Health and Safety Services Develop and Manage Human Capital Manage Information Technology Supporting And Enabling Capabilities Extended Capabilities Core Capabilities Manage Product/ Service/Solution
  • 13.
    External Products/Services/Solutions • Externalproducts/services/solutions generally consist of a collection of core and extended elements • External products/services/solutions can be once-off or continuous, physical or intangible • At a minimum, the support of the ordering and delivery of the external products/services/solutions and the management of their ongoing support will be provided by technology solutions • At a maximum, the external products/services/solutions will consist entirely or almost entirely of technology solutions • The design/development/creation of external products/services/solutions typically follows a (rigorous) product development process • The design of supporting technology solutions typically follows a less rigorous process August 12, 2024 13
  • 14.
    External Products/Services/Solutions August 12,2024 14 Design, Develop and Manage Products, Services and Solutions Market and Sell Products, Services and Solutions Deliver Products, Services and Solutions Manage Customer Service Internal Solution Design External Product/Service Consumers Manage Product/Solution/Service Lifecycle External Solution Design/Delivery Activities
  • 15.
    External Products/Services/Solutions • Customersacquire/use externally offered products/services/solutions • The development of products/services/solutions is not just concerned with the core offering: the design process encompasses a value chain of activities August 12, 2024 15 Acquire Raw Inputs and Constituent Components Create/ Assemble/ Acquire Product/ Service/ Solution Market and Sell Product or Service Deliver or Supply Product or Service Service and Support Product or Service Manage Sourcing and Supply Design and Validate Core Product/ Service/ Solution Design and Validate the Construction, Delivery, Support and Operations Landscape Create Product/ Service/ Production, Delivery, Support Solutions Create and Manage Ancillary, Support Landscape Design Extended Delivery and Support Solution Landscape Develop/ Enhance Product or Service, Upsell/ Cross-Sell Manage Retirement and Migration
  • 16.
    Value Chain • Thevalue chain is the series of primary activities and their associated business processes that act on the raw inputs and work towards creating and providing the finished product or service to the target customer • Value added is the cost at which the product or service is sold/delivered/operated or provided less the input costs August 12, 2024 16
  • 17.
    Spectrum Of Solutions August12, 2024 17 Core Delivered And Consumed Product/ Service/ Solution Consumed Product/ Service/ Solution Ecosystem Consumed Product/ Service/ Solution Management and Support Consumed Product/ Service/ Solution Development Organisation Operation, Management, Direct Support Organisation Operation, Management, Indirect Support Solution Distance From Externally Offered and Consumed Product/Service/Solution What The Organisation Sells/Provides/ Delivers Directly Enables Or Supports The Delivery, Operation And Use Of The Delivered Product/ Service/ Solution Indirectly Enables Or Supports The Delivery, Operation And Use Of The Delivered Product/Service/ Solution Including Marketing, Selling, Cross- Selling, Upselling, Upgrades, Retirement And Migration, Customer Contact, Service and Contract Management, Financial Management, Partner, Supply Chain Management Supports The Delivered Product/Service/ Solution Development Lifecycle Solution That Directly Supports The Enabling Functions Of The Organisation Solution That Indirectly Supports The Enabling Functions Of The Organisation External Solution Focus Internal Solution Focus
  • 18.
    Spectrum Of Solutions •Solutions can be placed on a spectrum from one end where the external solutions are those the organisation directly sells/provides to solutions that are part of the external solution ecosystem to the other end where the solutions are used internally to directly or indirectly enable the support functions to operate August 12, 2024 18
  • 19.
    Spectrum Of Solutions August12, 2024 19 Core Delivered And Consumed Product/ Service/ Solution Consumed Product/ Service/ Solution Ecosystem Consumed Product/ Service/ Solution Management and Support Consumed Product/ Service/ Solution Development Organisation Operation, Management, Direct Support Organisation Operation, Management, Indirect Support Internal Solution Architecture Function Tends to Operate Here Structured Product/Solution/Service Development Process Operates Here Product/Solution/Service Development Can Overlook Supporting Capabilities and Solutions Required Here
  • 20.
    Different Approaches ToProduction, Service and Solution Design And Delivery August 12, 2024 20 Structured Development Processes Followed for Products/ Solutions/ Services Targeted At Consumers Less Or No Structured Development Processes Followed for Products/ Solutions/ Services Targeted At Internal Consumers
  • 21.
    (IT Function) SolutionDeployment August 12, 2024 21 Develop Vision and Strategy Design, Develop and Manage Products, Services and Solutions Market and Sell Products, Services and Solutions Manage Supply Chain for Products, Services and Solutions Deliver Products, Services and Solutions Manage Information Technology Supporting And Enabling Capabilities Extended Capabilities Core Capabilities Manage Customer Service Manage Product/ Service/Solution Manage Financial Resources Acquire, Construct, and Manage Assets, Facilities Services Manage Enterprise Risk, Compliance, Remediation and Resiliency Manage External Relationships, Procurement, Supplier and Partner Services Develop and Manage Business, Knowledge, Improvement and Change Capabilities Provide Legal, Regulatory, Environment, Health and Safety Services Develop and Manage Human Capital
  • 22.
    (IT Function) SolutionDeployment • The IT function acquires, designs, configures, customises technology solutions for use across the organisation, aim at both internal and external consumers • Not all technology solutions the organisation deploys and uses are overseen by the IT function • An increasing number of technology solutions bypass the IT function solution delivery process and are selected and deployed in an uncontrolled way August 12, 2024 22
  • 23.
    Adopting External Product/Solution/Service ProcessesFor Internal Use • External product/solution/service tends to follow a rigorous process • Internal solution design and development tends to use a much less rigorous and well-defined process August 12, 2024 23
  • 24.
    Product Design ApproachesAnd Methodologies August 12, 2024 24
  • 25.
    NPD (New ProductDevelopment) Process • NPD process play a core role in the product/solution/service development process • Being good at NPD means being good at: 1. Having a defined NPD strategy with a focus on research and development and an overall organisation product/solution/service strategy 2. Having an organisation innovation culture with active management support and associated investment encouraging product/solution/service development thinking and collaboration with external partners, customers and suppliers 3. Continuously performing market research and product/solution/service demand to understand landscape of needs, option and alternatives 4. Having a defined process for new concept assessment against consumer needs and product/solution/service innovation 5. Having a process to manage, balance, prioritise, suspend and terminate portfolio of innovation activities and initiatives 6. Having an NPD process incorporating stages and gates to push new product/solution/service design, development and adoption 7. Tracking, measuring and evaluating product/solution/service performance evaluation with defined metrics and acting on results August 12, 2024 25
  • 26.
    NPD Process ComponentsAnd Effectiveness Factors • Two key aspects of New Product Development − Process components – constituents of good NPD − Effectiveness factors – what identifies organisations that are good at NPD August 12, 2024 26
  • 27.
    NPD Process ComponentsAnd Effectiveness Factors August 12, 2024 27 NPD Strategy Organisation Innovation Culture Continuously Market Research Defined Process For New Concept Assessment Active Innovation Portfolio Management NPD Process NPD Metrics and Actioning Active resource (re)allocation based on continuously adjustment of priorities grounded in rational factors Effective market research, analysis and decision-making Effective management of relationships with and collaboration with potential partners, suppliers and consumers including communications and contract lifecycle management Effective testing of product/service/solution hypotheses against rational factors Effective identification, understanding and management of actual product/service/solution risks Elastic and responsive new product/service/solution process from idea-to- launch with regular reviews of achievements and delays and results/feedback analysis Active reduction of time to introduction to minimise likelihood for drift from organisation strategy, consumer need and market circumstances Active financial management including understanding of actual costs and realistic assessment of value delivered Effective and capable team including engaged leadership
  • 28.
    Product Design AndDevelopment Approaches And Methodologies • Many approaches and methodologies to product development such as (but not limited to): − Agile Stage Gate * − eTOM (enhanced Telecom Operations Map) * − Front-End Innovation (FEI) − Global Enterprise Technology System (GETS) − Multidisciplinary Design Optimisation (MDO) − New Concept Development (NCD) − New Product Development (NPD) Stage Gate * − Pragmatic Framework * − Product Management Lifecycle (PLM) − Technology Acquisition Stage Gate (TASG) − Technology Development Process (TDP) − Technology Realisation and Commercialisation (TRC) − Technology Stage Gate (TechSG) • This is not intended to be an exhaustive analysis of product design and development approaches and methodologies • Stage Gate process is probably the oldest and most well-know • * Covered in more detail August 12, 2024 28
  • 29.
    Product Design ApproachesAnd Methodologies • Product design approaches and methodologies are all largely variants and extensions of the original Stage Gate process August 12, 2024 29
  • 30.
    Typical High-Level ViewOf NPD Stage Gate Process August 12, 2024 30 Concept Initial Screening Preliminary Market Assessment Preliminary Technical Assessment Assessment and Decision Detailed Marketing Assessment Business Analysis and Business Case Preparation Decision Core and Extended Component Design and Prototyping Development Review and Decision Internal Testing Customer Testing Test Results Assessment and Decision Trialling and Test Marketing Trial and Test Marketing Review Productionisation, Industrialisation and Initial Production Commercial Viability Analysis Commercialisation, Production and Launch Ongoing Phased Expansion and Development, “Fill the Gaps”
  • 31.
    NPD Gates AndGatekeepers • The gates within the NPD process are points at the end of states where go/kill decision are based − Gates are not progress review checkpoints – they are concerned with the survival of the fittest solutions and the death of the rest • Effective gates are central to the success of an operational product/solution/service development process • The decisions should be based on the latest information available on a product/solution/service development • The outputs from the state are reviewed and a decision is made to progress with the right developments only and stop investing in those that fail • Gates are effectively the quality control checkpoints in the system • If a solution passes a gate, this is implicitly a decision to allocate the needed resources • One objective of gates is to ensure that the right developments are proceeded with and that they are done in the right way • The gatekeeping practices that accompany the gates are core to the performance and success of the product/solution/service development process August 12, 2024 31
  • 32.
    Potential NPD GateIssues • Key gate meeting participants do not attend and do not delegate • Insufficient preparation for gate decision meetings • No decisions made at gate meetings • Decisions made to proceed but no resources committed • Informal go/no-go evaluation factors lacking rigour • Senior decision-makers exert undue influence • Beloved and cherished projects get favourable treatment • Kill decisions bypassed • Gate failure = management failure August 12, 2024 32
  • 33.
    NPD Process –Typical Characteristics • Each stage in the NPD process aims to minimise the work done, information gathered and results and outputs generated while maximising the outcomes needed to make an effective decision at the subsequent gate • Each stage involves greater effort being expended than the previous one and consequently incurs greater cost • Each stage narrows options, reduces risk, adds knowledge, decreases uncertainties and eliminate concepts that fail to pass gate decision-making • Each stage combines technical and non-technical – business, marketing, sales – activities in parallel • Gates incorporate real go/no-go decisions with gatekeepers who are empowered to make decisions based on agreed and structured evaluation factors August 12, 2024 33
  • 34.
    NPD Process Progression •NPD process progresses along a number of dimensions simultaneously to reach a conclusion • One possible conclusion of the process must be that the development is abandoned August 12, 2024 34 Cost and Effort Increases as Process Progresses Number of Product/ Solution/ Service Concepts Reduces Viable Options and Alternatives Within Product/ Solution/ Service Concepts Reduces Risk, Uncertainties, Knowledge Gaps Decrease
  • 35.
    NPD Process Progression August12, 2024 35 Cost and Effort Increases as Process Progresses Number of Product/ Solution/ Service Concepts Reduces Viable Options and Alternatives Within Product/ Solution/ Service Concepts Reduces Risk, Uncertainties, Knowledge Gaps Decrease • NPD process is concerned with moving in a structured and controlled way to an ending
  • 36.
    Solution Design Drift •The longer the duration from solution design to realisation the greater the chance of solution drift due to many factors such as: − What is being designed is no longer what the consumer or market needs − Economic conditions might change the basis for the proposed solution − Supply chain issues might affect solution delivery − Competitive landscape might change and undermine the solution design − Embedded technology changes or newer technology options available • The more volatile the market the greater the chance of solution design drift and the greater the speed of the drift • Compressing design timescales reduces the size and impact of this drift August 12, 2024 36 Concept Initial Screening Preliminary Market Assessment Preliminary Technical Assessment Assessment and Decision Detailed Marketing Assessment Business Analysis and Business Case Preparation Decision Core and Extended Component Design and Prototyping Development Review and Decision Internal Testing Customer Testing Test Results Assessment and Decision Trialling and Test Marketing Trial and Test Marketing Review Productionisation, Industrialisation And Initial Production Commercial Viability Analysis Commercialisation, Production and Launch`` Ongoing Phased Expansion and Development, “Fill the Gaps” Time From Concept To Realisation Deviation of Designed Solution from Consumer or Market Requirements
  • 37.
    Data Driven Development(DDD) • DDD is an extension to the standard NPD process with the formal inclusion of data collection, analysis and decision- making, reducing the role of subjectivity and intuition in the NPD process • DDD overlays and extends core NPD process stages and activities with formal data processes • Effective DDD means defining the data to be collected at various stages, collecting quality and accurate data, analysing it and making objective and impartial data-lead decisions August 12, 2024 37
  • 38.
    DDD Overlay OnNPD Stage Gate Process August 12, 2024 38 Concept Initial Screening Preliminary Market Assessment Preliminary Technical Assessment Assessment and Decision Detailed Marketing Assessment Business Analysis and Business Case Preparation Decision Core and Extended Component Design and Prototyping Development Review and Decision Internal Testing Customer Testing Test Results Assessment and Decision Trialling and Test Marketing Trial and Test Marketing Review Productionisation, Industrialisation and Initial Production Commercial Viability Analysis Commercialisation, Production and Launch Ongoing Phased Expansion and Development, “Fill the Gaps” Data Collection and Analysis to Identify Consumer Needs and Gaps in the Existing Market 1 Data Analytics to Forecast Market Trends and Consumer Activities to Direct Design Actions Data Collection and Analysis to Create Insights into Product Development Data Collection and Analysis During Product Trials to Drive Quality and Consumer Satisfaction Formal Specification of Scenarios and Structured Data Collection and Analysis Data Collection and Analysis During Product Development to Allow Rapid Response to Changes Data Collection and Analysis To Support Product Changes and Maximising Market and Fit and Consumer Acceptance Data Collection and Analysis To Maximise Return from Product Enhancement and Improvement 2 3 4 5 6 7 8
  • 39.
    Agile Concerns WithStandard Stage Gate Process • The standard Stage Gate process is concerned with control – controlling and reducing risk and uncertainty as early in the process as possible, increasing stability and predictability as the process proceeds • The standard Stage Gate process is (largely) linear and sequential with subsequent work building on previous work and only starting when previous stages have been completed and gates have been passed • Standard Stage Gate is not designed to be reversible – previous decisions are not intended to be reviewed and changed • Design decisions can be embedded early in the process and frozen thereafter, reducing the opportunity for subsequent modification • Consumer involvement occurs quite late in the Stage Gate process • The standard Stage Gate process works well for stable and predictable business environment and does not meet the need for dynamic and high velocity innovation August 12, 2024 39
  • 40.
    Agile Vs StandardStage Gate August 12, 2024 40 Early Fixing Of Product/Solution/Service Design Introduces Stability And Reduces Cost The Process Needs To Allow For Change And Adaptation Even Late in The Design Process To Accommodate New Requirements Emphasis On Early Research And Design Provides A Solid Foundation For Subsequent Design Early Agreement On The Design Creates Greater Management Confidence, Approval And Budget Allocation Failure To Involve Solution Consumers Early In The Processes Means Design Might Not Meet Actual Needs Sequential State Gate Processes Means Early Decisions Cannot Be Reversed Even If Circumstances Change Standard Stage Gate Process Is Concerned With Control – Controlling And Reducing Risk And Uncertainty As Early In The Process As Possible, Increasing Stability And Predictability As The Process Proceeds Changing Market, Consumer And Technology Environment And Circumstances Requires Flexibility Involving Potential Consumers Later In The Process Avoids Expensive Prototyping And Rework And Allows A More Complete Design To Be Presented Reduced Scope And High Design Sprint Frequency Decrease The Elapsed Time And Resource Requirements Of Steps And Enables More Accurate Estimates Of The Resources Needed Constant Change Involves In Agile Can Lead To Analysis And Design Paralysis, Requires More Management Effort And Increases Cost And Reduces Stability Agile Keeps The Design Open For Longer Means The Final Design Is Agreed Closer To Delivery
  • 41.
    Agile Overlay OfStage Gate Process August 12, 2024 41 Concept Initial Screening Preliminary Market Assessment Preliminary Technical Assessment Assessment and Decision Detailed Marketing Assessment Business Analysis and Business Case Preparation Decision Core and Extended Component Design and Prototyping Development Review and Decision Internal Testing Customer Testing Test Results Assessment and Decision Trialling and Test Marketing Trial and Test Marketing Review Productionisation, Industrialisation and Initial Production Commercial Viability Analysis Commercialisation, Production and Launch Ongoing Phased Expansion and Development, “Fill the Gaps”
  • 42.
    Agile Overlay OfStage Gate Process • Introducing agile into the Standard Stage Gate process allows designs to be revisited • This introduces complexity that can approach chaos into the process that needs to be managed assertively • Risk that the Product/Solution/Service design process never ends • Process visibility and progress can be opaque • Agile emphasis on deliverables at the expense of documentation can lead to future problems that need to be managed August 12, 2024 42
  • 43.
    Agile Stage Gate •The standard Stage Gate process is concerned with control – controlling and reducing risk and uncertainty as early in the process as possible, increasing stability and predictability as the process proceeds • Agile seek to accept uncertainty and the need for change even late in the process • The standard Stage Gate process is (largely) linear and sequential with subsequent work building on previous work and only starting when previous stages have been completed and gates have been passed • Standard Stage Gate is not designed to be reversible – previous decisions are not intended to be reversed • The Product/Solution/Service development process is essentially directional if not linear – the process must move from idea to delivery • The process must also reject unsatisfactory and undeliverable concepts – endless rework will not make a bad idea good August 12, 2024 43
  • 44.
    Pragmatic Framework • PragmaticInstitute develops and maintains the Pragmatic Framework - https://www.pragmaticinstitute.com/product/framework/ - that is a view of the activities required to construct and market products consumers want to buy and use • It is focused on external Products/Solutions/Services • Elements can be adopted for internal solution architecture August 12, 2024 44
  • 45.
    Pragmatic Framework August 12,2024 45 MARKET Market Problems Win/Loss Analysis Distinctive Competencies Competitive Landscape Asset Assessment FOCUS Market Definition Distribution Strategy Product Portfolio Product Roadmap BUSINESS Business Plan Pricing Buy, Build or Partner Product Profitability Innovation PLANNING Positioning Buyer Experience Buyer Personas User Personas Requirements Use Scenarios Stakeholder Communications PROGRAMS Marketing Plan Revenue Growth Revenue Retention Launch Awareness Nurturing Advocacy Measurement ENABLEMENT Sales Alignment Content Sales Tools Channel Training SUPPORT Programs Operations Events Channels
  • 46.
    Pragmatic Framework –Potential Gaps August 12, 2024 46 MARKET FOCUS Options Analysis and Design Solution Business Plan Solution Cost and Revenue/Return Evaluate Entire and Solution Component Acquisition Options Solution Measurement Framework Definition Approach to Ongoing Solution Innovation and Solution Development Prototyping, Testing and Validation Create and Test Prototype Refine Design based on Feedback Technical Assessment of Suitability Refine Financial Analysis Decision To Proceed Production, Delivery, Support and Operations Landscape Define Approach to Production and Identify Required Solutions Define Approach to Identify and Delivery Required Solutions Define Approach to Support and Identify Required Solutions Define Approach to Operations and Identify Required Solutions Define Solution Delivery Channels and Support Tools Trial Production and Implementation Define Trial Scope, Purpose and Metrics Create and Implement Trial Solutions Measure and Assess Trial Results and Identify Key Lessons Update Financial Analysis, Designs and Plan Decision To Proceed PLANNING PROGRAMS Solution Support and Operations Measure Solution Performance and Success Provide and Monitor Solution Support Monitor Solution Financial Success Promotion, Growth, Development, Retirement Solution Maintenance, Fixes, Problem Identification and Resolution Solution Development, Enhancement and Lifecycle Management Process Solution Usage Data Collection and Analysis Solution Feedback Collection and Analysis Monitor and Manage Solution Alternatives and Competitors Monitor and Manage Technology Changes Solution Development and Enhancement Solution Retirement and Replacement ENABLEMENT SUPPORT
  • 47.
    Pragmatic Framework –Potential Gaps • While the Pragmatic Framework is comprehensive, it contains gaps in the following areas: − Options Analysis and Design − Prototyping, Testing and Validation − Production, Delivery, Support and Operations Landscape − Trial Production and Implementation − Solution Support and Operations − Promotion, Growth, Development, Retirement August 12, 2024 47
  • 48.
    August 12, 202448 eTOM (enhanced Telecom Operations Map) • Provides a detailed process framework for a telecoms utility companies that can be adopted by non-telecoms organisations moving to solutions as a service operating model − Developed by TM Forum - www.tmforum.org − eTOM - http://www.tmforum.org/BusinessProcessFramework/1647/home.html • Reference framework that classifies and defines the business activities used by a company involved in delivering (online) services – three major process areas: − Strategy, Infrastructure and Product – concerned with planning and lifecycle management − Operations – concerned the core of operational management − Enterprise Management – concerned corporate or business support management • Offers the potential for non-telecoms companies to learn from an effective operational framework
  • 49.
    August 12, 202449 eTOM Business Process Framework Overview Strategy, Infrastructure and Product Operations Enterprise Management Customer Strategy, New Ideas, Products And Associated Supporting Infrastructure Moved to Production and Steady-State Operations Fundamental Supporting Business Processes Needed To Run Any Business Operational Processes – Sales, Fulfillment, Assurance, Billing and Support
  • 50.
    August 12, 202450 eTOM Business Process Framework - Detail Strategy, Infrastructure and Product Operations Strategy and Commit Infrastructure Lifecycle Management Product Lifecycle Management Operations Support and Readiness Fulfilment Assurance Billing and Revenue Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Customer Relationship Management Service Management and Operations Resource Management and Operations Supplier/Partner Relationship Management
  • 51.
    August 12, 202451 Achieving the Potential – New Product/Service/Solution Innovation Industrialisation and Productisation Industrialisation Common Implementation and Operation Approaches Productisation Defined Set of Products/Solutions/ Services and Packaging/Delivery Options • Productisation is a pre-requisite for and an enabler of industrialisation
  • 52.
    August 12, 202452 Product, Solution and Service Lifecycle Management (PSSLM) • PSSLM is concerned with the functions and processes need to define, plan, design, build, deliver, maintenance, manage revise and retirement of all products, solutions and services in the organisation’s portfolio − Enable the organisation strategic and business product/solution/service vision − Drive internal and customer-oriented processes to meet market demand and customer expectations
  • 53.
    August 12, 202453 Product, Solution and Service Lifecycle Management (PSSLM) • PSSLM belongs within Strategy, Infrastructure and Product/Solution/Service (SIPSS) function • Responsibilities of SIPSS function −Develop strategy −Commit to the organisation −Build and resources infrastructure - supports the delivery products, solutions and services themselves and their associated functional processes −Develop and manage products, solutions and services −Develop and manage the supply chain
  • 54.
    August 12, 202454 Strategy, Infrastructure and Product/Solution/Service (SIPSS) Function • Innovation – development of new products/services/solutions lie in SIPSS function • SIPSS divided into −Horizontal functional groups • Marketing and Offer Management • Service Development and Management • Resource Development and Management • Supply Chain Development Management −Vertical process views • Strategy and Commit • Infrastructure Lifecycle Management • Product, Solution and Service Lifecycle Management
  • 55.
    August 12, 202455 Strategy, Infrastructure and Product/Solution/Service (SIPSS) - Horizontal Process Functions and Vertical Process Views Strategy, Infrastructure and Product/Solution/Service (SIPSS) Strategy and Commit Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management
  • 56.
    August 12, 202456 Strategy, Infrastructure and Product/Solution/Service (SIPSS) - Horizontal Process Function Details Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Market Strategy and Policy Product and Offer Portfolio Planning Product and Offer Capability Delivery Marketing Capability Delivery Product and Offer Development and Retirement Sales Development Product Marketing Communications and Promotion Service Strategy and Planning Service Capability Delivery Service Development and Retirement Resource Strategy and Planning Resource Capability Delivery Resource Development and Retirement Supply Chain Strategy and Planning Supply Chain Capability Delivery Supply Chain Development and Change Management
  • 57.
    August 12, 202457 SIPSS – Vertical Process Views Strategy and Commit Strategy, Infrastructure and Product/Solution/Service (SIPSS) Responsible for the generation of strategies and establishment of business commitment in support of the Infrastructure and Product/Solution/Service Lifecycle processes involving all levels of operation from market, customer and products/solutions/services, through the services and the resources on which these depend to the involvement of suppliers and partners in meeting these needs Infrastructure Lifecycle Management Product, Solution and Service Lifecycle Management Responsible for the definition, planning and implementation of all necessary infrastructures (application, IT and network), as well as all other support infrastructures and business capabilities (operations centers, architectures, etc.) Responsible for the definition, planning, design and implementation of all products/solutions/services in the organisation’s portfolio to required profit margins customer satisfaction and quality commitments, delivering new and retiring existing products/solutions/services to the market
  • 58.
    August 12, 202458 SIPSS - Horizontal Process Functional Groups Strategy, Infrastructure and Product/Solution/Service (SIPSS) Marketing and Offer Management Service Development and Management Resource Development and Management Supply Chain Development Management Defines strategies, develops new products/solutions/services, manages existing products/solutions/services including retirement, manages pricing, sales and channels and implements marketing communications and promotion and offering strategies Plans, develops and delivers services to operations domain for product/solution/service creation and design, managing and assessing the performance of existing products/solutions/services and ensuring that capabilities are in place to meet future product/solution/service demand Plans, develops and delivers the resources - physical and non-physical - needed by operations to support products/solutions/services, manages and assesses the performance of existing resources and ensures that capabilities are in place to meet future products/solutions/services needs Focuses on the interactions required by the organisation with suppliers and partners who are involved in maintaining the supply chain network of relationships that a service provider manages to source and deliver products, supports sourcing decisions, suppliers and partners selection
  • 59.
    Outputs From TheSolution Design Process August 12, 2024 59
  • 60.
    Outputs From TheSolution Design Process • The purpose of the solution design process is to create a complete end-to-end solution design covering all the components that have to be delivered to create a usable, operable, supportable, maintainable solution that can be used in multiple ways: − Create realistic and achievable implementation schedule − Understand the likely delivery costs and required resources − Understand solution options and their implications − Understand possible solution delivery phases − Pass to technical delivery teams to create low-level technical designs August 12, 2024 60
  • 61.
    Outputs From TheSolution Design Process August 12, 2024 61 Changes to Existing Systems New Custom Developed Applications Acquired and Reporting and Analysis Facilities System Integrations/ Data Transfers/ Exchanges Acquired and Customised Software Products Changes to Existing Business Processes New Business Processes Organisational Changes, Knowledge Management Training and Documentation New Data Loads Central, Distributed and Communications Infrastructure Operational Functions and Processes Existing Data Conversions/ Migrations Cutover/ Transfer to Production And Support Parallel Runs Information Storage Facilities Sets of Installation and Implementation Services Enhanced Support/ Hypercare Sets of Maintenance, Service Management and Support Services Application Hosting and Management Services Extended Organisation Change Extended Technical Delivery Core Technical Delivery
  • 62.
    Outputs From TheSolution Design Process • The output from the solution design process is the set of core and extended components of specific types required to deliver an operable and usable solution combined into an integrated and unified target • The complete solution is: August 12, 2024 62 ෍ 𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝑻𝒚𝒑𝒆 𝟏 𝑵 ෍ 𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏 𝑴 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
  • 63.
    Solution Phases • Completionsolution will be delivered in phases • Composition of the solution deliver phases may change dynamically in response to consumer, business and market feedback • The complete solution over all its delivery phases is: August 12, 2024 63 ෍ 𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝑻𝒚𝒑𝒆 𝟏 𝑵𝟏 ෍ 𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏 𝑴𝟏 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋 + ෍ 𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝑻𝒚𝒑𝒆 𝟏 𝑵𝟐 ෍ 𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏 𝑴𝟐 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋 + ෍ 𝒊 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝑻𝒚𝒑𝒆 𝟏 𝑵𝟑 ෍ 𝒋 = 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝟏 𝑴𝟑 𝑺𝒐𝒍𝒖𝒕𝒊𝒐𝒏 𝑪𝒐𝒎𝒑𝒐𝒏𝒆𝒏𝒕 𝒊 𝒋
  • 64.
    Solution Component SpecificDesign And Delivery Issues – 1/5 August 12, 2024 64 Solution Component Type Description Solution Design Considerations Some Questions, Issues and Concerns Changes to Existing Systems Modifications and enhancements to existing IT systems, either custom developed or acquired products, that will form part of the overall solution, including the definition of the scope of the work. • What (is the minimum number of) existing systems need to be changed to accommodate the new solution? • Can the proposed work be done outside those existing systems? • What are the options for making the required changes? • Ease of changing • Ability to change • Availability of skills and ability to make changes • Existing change backlog • What are the impacts and dependencies on other activities? • Can the changes be avoided or minimised both in number and size • How long will the changes take and how much will they cost? New Custom Developed Applications New custom developed IT applications that will form part of the overall solution, including the definition of the scope of the work. • What (is the minimum number of) new custom applications are needed? • Can the proposed work be done outside those proposed new applications? • What are the options for the new developments? • Are customised applications required? • What development and deployment platform should be used? • Availability of skills and ability to develop new applications • What is the long-term support and maintenance plan? • How will then be interfaced with and used? • How long will the new applications take and how much will they cost? Acquired and Configured/ Customised Software Products Packaged IT applications that are configured and customised that will form part of the overall solution, including any product acquisition and supplier and product evaluation and selection. • What (is the minimum number of) new software applications are needed? • What are the product options? • Can existing products be reused? • What are the configuration and customisation options? • What is the process for procuring products from suppliers? • How good a fit is the proposed product? • How easily and quickly can the products be implemented and customised and what skills are needed? • How are the customisations supported and maintained? • What are the application and data integration issues? • Are the products hosted internally or externally? • What infrastructure is needed to run the product? • How much will they cost to acquire and operate? • Availability of skills and ability to develop new applications System Integrations/ Data Transfers/ Exchanges Scheduled and ad hoc data transfers and exchanges of different types such, as batch or real time, between solution components including data transformations or application-level integrations such as application interfaces, remote calls, messaging interfaces or services with associated results and data being communicated. This also includes the infrastructures required to enable and support this and its management. • What (is the minimum number of) new and changes to existing data integrations are needed? • What integration approaches and tools should be used? • Can existing integrations and tools be reused? • How many integration, data transfers and exchanges are needed? • What is their format and content? • What transfer approach(es) are proposed? • Does the integration infrastructure already exist? • What integration tools are being proposed? • What is the proposed frequency of integrations and are they scheduled or unscheduled? • Who initiates the integration? • What is the number of integration transactions and the volumes of data?
  • 65.
    Solution Component SpecificDesign And Delivery Issues – 2/5 August 12, 2024 65 Solution Component Type Description Solution Design Considerations Some Questions, Issues and Concerns Reporting and Analysis Facilities Reporting and analysis facilities including the implementation and configuration and customisation of any underlying toolsets, associated reporting tools and data structures, specific report and analyses and related functionality. • What reports and analyses are needed? • What (new and existing) tools are needed? • What data is needed for reporting and analysis? • How will reports and analyses be accessed and distributed? • How repeatable and reproducible will reports and analyses be? • Who can access what reports and analyses and the underlying data? • Can existing reporting, visualisation and analytics facilities be used or are new ones required? • How will reporting and analytics be deployed • Can existing data reporting structures (data warehouses, data marts) be used or are new ones required? • What data extraction, transformation and load facilities are required to enable and support reporting and analytics? • How many data sources will be used for reporting • How much reporting and analysis is required? Sets of Installation and Implementation Services Services acquired from third party suppliers to install, implement, configure and get operational hardware and software components of the solution, including the specification of these services. • What needs to be installed and where? • What are the installation options? • What solution components require installation and implementation? • From whom will the services be procured? • What handover will be required? • What long-term support arrangements will be required? • How long with the installation and implementation take? Information Storage Facilities Internally installed data storage infrastructure, either existing or new, or externally provided data storage facilities including their installation, customisation and provision of data access. This includes any data storage software such as database management systems and other elements. • What data of what types will be stored? • What applications are storing data? • What data security is required? • How many data storage facilities – hardware and software - will be required? • Where will they be located? • Are they existing or new facilities? • If they are new, what are the provisioning issues, requirements and costs? • What are the expected data volumes and throughputs? • What is the approach to data backup, recovery, retention and archival? Existing Data Conversions/ Migrations Migration of data held in old systems to the new solution, including data transfer and aggregation/transformation and the design and specification of associated target data structures. • What is the proposed approach to the migration(s) and conversion(s)? • How complex will the migration(s) and conversion(s) be? • Who will perform the migration(s) and conversion(s)? • How much data needs to be migrated? • How well-defined is the source data? • What are the data quality and transformation requirements and issues? • What data conversion/migration facilities are available?
  • 66.
    Solution Component SpecificDesign And Delivery Issues – 3/5 August 12, 2024 66 Solution Component Type Description Solution Design Considerations Some Questions, Issues and Concerns New Data Loads Modifications and enhancements to existing IT systems, either custom developed or acquired products, that will form part of the overall solution, including the definition of the scope of the work. • What is the proposed approach to the new data loads? • How complex will the new data loads be? • Who will perform the new data loads? • How much new data is required to make the solution usable? • Where will the data come from and how much processing is required to make it usable? • What is the approach to data governance and management? • What is the approach to master and reference data management? Central, Distributed and Communications Infrastructure Information technology infrastructure, either installed on-premises or in co- located or outsourced facilities or provided by an XaaS arrangement, of any type, dedicated or shared, that is required to allow components of the solution to operate. • What is the proposed approach to the design and sourcing of the communications infrastructure? • How complex will the new communications infrastructure? • Who will provide and configure the communications infrastructure? • What technology infrastructure is required? • Where will the infrastructure be located? • How much existing infrastructure can be reused? • What infrastructure installation and configuration services are required? Cutover/ Transfer to Production And Support Sets of services required to put the solution and its constituent components into production including organisational readiness, go live preparation and operations acceptance testing. • Who will manage service transition? • Will there be multiple phased transitions over time? • How long will service transition take? • What is the approach to transferring the solution to production? • What is the approach to organisation change management? Operational Functions and Processes Service management processes required to enable the solution to operate including incident, problem, change, service request, asset and other processes and the resourcing of the support and operational functions. This includes the implementation of new operational processes and the integration of the solution into existing processes. • What will the approach to service management be? • Who will perform the required levels of service management? • What service management processes need to be updated to accommodate the operation of the solution? • Who will made the service management process changes? • What changes – training, staffing, new structures - need to be made the operational functions to accommodate the solution? • Who will made the operational function changes?
  • 67.
    Solution Component SpecificDesign And Delivery Issues – 4/5 August 12, 2024 67 Solution Component Type Description Solution Design Considerations Some Questions, Issues and Concerns Enhanced Support/ Hypercare Immediately after the solution goes live, an enhanced level of support may be required for a defined interval or until defined exit criteria have been met. This includes the definition of the hypercare required and how long it should last. • What will the approach to initial hypercare be? • Who will perform the hypercare? • What level of enhanced support will be required after the solution goes live? • What will be the approach to providing enhanced support? • How long will enhanced support be required for? • What are the exit deciding factors to stop the enhanced support? • Who will provide enhanced support? Sets of Maintenance, Service Management and Support Services Different solution components will require different types of maintenance and support arrangements. These services may be provided internally or acquired from external suppliers. This includes the design and specification of the support and maintenance arrangement and their acquisition from third parties and the implementation of the arrangements. • What will the approach to solution component maintenance, support and management? • What maintenance, support and management services will be insourced and outsourced? • What service levels will be required? • How automated will component maintenance be? • How will upgrades be handled? • What solution components will require maintenance services? • Who will provide the maintenance services? • What is the scope and extent of the maintenance services? • What maintenance service transition is required? • How will the maintenance services be managed and reported on? • What solution components will require support services? • Who will provide the support services? • What is the scope and extent of the support services? • What support service transition is required? • How will the support services be managed and reported on? Application Hosting and Management Services Some of the solution components may be hosted outside the organisation either through cloud service providers or outsourcing arrangements. This includes the design and specification of the hosting services and their acquisition. • What are the options for externally hosted solution components? • What will the selection evaluation factors be? • What will the approach be to integration? • How will security be handled? • What solution components will be hosted externally? • Who will provide the hosting services? • What connectivity will be required to the hosting service provider(s)? • How will security be managed? • What hosting model(s) will be adopted? • How will the hosting services be managed and reported on? Parallel Runs If the solution replaces or extends an existing solution, the old and new solutions may need to operate in parallel for a defined interval or until defined exit criteria have been met. This includes the definition of the parallel run processes, the exit criteria and the additional resources needed to perform the parallel runs. • What will the approach be to the parallel operation of the existing and new be, if needed? • How long will parallel runs be? • How will the results of the parallel run(s) be evaluated? • What will be the evaluation factors used to exit the parallel run(s)? • What resources will be required to perform the parallel run(s)
  • 68.
    Solution Component SpecificDesign And Delivery Issues – 5/5 August 12, 2024 68 Solution Component Type Description Solution Design Considerations Some Questions, Issues and Concerns Changes to Existing Business Processes Solutions exist to enable business processes to be operated. Existing business processes may need to be redesigned to take advantage of or to efficiently use the facilities of the solution and its components. This includes the redesign of the processes, the implementation of those changes and any process or standards documentation and training required. • Is there an inventory of business processes that need to be changed? • What are the options for business process change? • What existing business processes will need to be changed to support the use the solution? • Who will design, validate and implement the changed business processes? • What training will be required in the changed business processes? • What additional material will be required to support the changed business processes? New Business Processes New business processes may need to be defined, either entirely new ones or ones to replace existing processes, to operate the solution. This includes the redesign of the processes, the implementation of those changes and any process or standards documentation and training required. • Is there an inventory of new business processes that need to be created? • What are the options for implementing and operating the required new business processes? • What new business processes will need to be implemented to support the use the solution? • Which existing business processes will be replaced by the new processes, if any? • Who will design, validate and implement the new business processes? • What training will be required in the new business processes? • What additional material will be required to support the new business processes? Organisational Changes, Knowledge Management Organisation changes may be required to operate the solution. This can include additional resources or redeployment of existing resources, new role types, new organisation structures and new locations. This includes the design of these organisation changes. New knowledge management facilities may be required to support the business operation and use of the solution. • Who will be responsible for defining and agreeing the required organisation changes? • What are the options for implementing and operating organisation changes? • What organisational changes – new or changed functions, new locations, new or changed roles – will be required to enable the effective use of the solution? • What effort will be required to implement the changes? • What approach to organisation change management will be adopted? • What approach to knowledge management will be adopted? • What knowledge management facilities will be required? • How will knowledge management be initially loaded with information? Training and Documentation Training and supporting documentation may be required across some or all of the solution components at different levels and aimed at different solution consumer types, both business and operational. • Who will be responsible for defining and agreeing the required training and documentation? • What are the options for sourcing the training and documentation? • How much training of what types and formats will be required? • What approach to training will be adopted? • What documentation of what types will be required?
  • 69.
    Application Of ProductDevelopment Processes To Solution Architecture August 12, 2024 69
  • 70.
    Product Management AndSolution Architecture • Solution architecture can use the product management approach in two ways: 1. To ensure that the process to design the solution takes account of the wider solution operational and deployment landscape • Treat the solution design and implementation as a more commercial exercise that regards internal solution consumers as customers 2. To manage the process for deciding which solutions should proceed to implementation using a rational stage-gate process August 12, 2024 70
  • 71.
    Internal Solution DesignAnd Delivery And The Stage/Gate Process • When used internally within organisations, the stage/gate process typically operates in a much-reduced format − Gates are treated largely as progress review checkpoints – they are not concerned with the survival of the fittest solutions and the cancellation of the rest − There tends not to be any portfolio solution assessment August 12, 2024 71
  • 72.
    Solution Delivery OfThe Internal IT Function Needs To Mirror That Of The Organisation August 12, 2024 72 Manage Information Technology Develop Vision and Strategy Design, Develop and Manage Products, Services and Solutions Market and Sell Products, Services and Solutions Manage Supply Chain for Products, Services and Solutions Deliver Products, Services and Solutions Manage Customer Service IT Function Delivering Solutions to Other Business Functions IT Function Delivering Solutions to Other Business Functions
  • 73.
    Solution Pipelines AndHorizons • Need structured process to manage the pipelines of solutions needed by the organisation • The sum of the solution pipelines represent the portfolio of current and future solution • The pipeline process is also concerned with allocating sufficient resources to long-term research and speculative solution identification • Use production development and management concepts and approaches to assist with managing the solution design and selection process • One of the concerns regarding the product development stage gate process is that too many projects pass gates with too few resources to move the portfolio of projects forward August 12, 2024 73
  • 74.
    Short-Term Mid-Term Longer-Term Long-Term Solution Pipelines • Solutionarchitecture function needs to maintain multiple solution pipelines, each with different timelines reflecting solution implementation priorities • Not all solutions reach the end of their pipeline and are implemented • Solutions can move between pipelines as priorities change React to immediate organisation, market and regulatory needs and changes, defend the organisation, replace existing ageing/inefficient solutions, mandatory upgrades Focus on organisation growth, expansion, diversification, development, creation and delivery of new products and services, develop target solution landscape and roadmap Research and development, grow through partnerships, plan for growth and change scenarios Blue-sky explorations, defensive planning against seismic and tectonic changes, take risks August 12, 2024 74
  • 75.
    Applying Stage GateProcesses To Solution Pipelines • A structured product stage gate process can be used to manage the prioritisation of projects within and across the various solution pipelines August 12, 2024 75
  • 76.
    Solution Horizons • Solutionpipelines apply to different time horizons • Multiple balances are required between short term anticipation, to planned diversification, new relationships and strategy development to investment in research and planning to long- term risk taking and experimentation August 12, 2024 76 Short- Term Mid- Term Longer- Term Long- Term
  • 77.
    Core, Extended AndSupporting Product/Solution/Service Management And Development Capabilities And Practices August 12, 2024 77
  • 78.
    Core, Extended AndSupporting Product/Solution/Service Management And Development Capabilities And Practices August 12, 2024 78 Design, Develop and Manage Products, Services and Solutions Engineering and Technical Expertise Innovation and Adaptability Lifecycle Management Product and Service Design Project Management Quality Management Sales and Marketing Expertise Market and Sell Products and Services Bid and Proposal Management Competitive Intelligence Contract Negotiation and Management Cost Estimation and Pricing Market Research, Analysis and Customer Understanding Proposal Writing and Presentation Skills Relationship Building, Networking and Customer Engagement Sales Strategy Development Technical Expertise and Solution/Service Design Manage Supply Chain for Products and Services Efficient Material Planning and Procurement Inventory Management and Tracking Just-in-Time (JIT) Delivery Logistics and Transportation Material Handling Equipment Procurement and Sourcing Reverse Logistics, Waste Goods Management Supplier Relationship Management Supply Chain Visibility and Analytics Sustainability and Ethical Practices Finance and Project Integration Warehouse and Distribution Management Deliver Production and Services Delivery Project Management Solution Delivery Impact Assessments Quality Control and Assurance Resource Planning and Allocation Stakeholder Engagement and Collaboration Sustainable Design Practices Supply Chain Collaboration and Management Manage Customer Service Customer Relationship Management Effective Communication Empathy and Customer Focus Knowledge and Expertise Measurement and Feedback Analysis Multichannel Support Problem Solving and Conflict Resolution Process Improvement
  • 79.
    Core, Extended AndSupporting Product/Solution/Service Management And Development Capabilities And Practices • These describe the key generic capabilities required across the major capability groups: − Design, Develop and Manage Products, Services and Solutions − Market and Sell Products and Services − Manage Supply Chain for Products and Services − Deliver Production and Services − Manage Customer Service • This presents an alternative view of the capabilities required to be good at the spectrum of solution design and delivery-related activities • This approach is intended to be comprehensive and detailed August 12, 2024 79
  • 80.
    Core, Extended AndSupporting Product/Solution/Service Management And Development Capability Groups • Capabilities and their practices map to the previously identified core and extended capability groups August 12, 2024 80
  • 81.
    Structure Of Streams,Capabilities And Practices • Each capability within each stream has a defined set of practices that comprise what is required within that capability • The practices for each capability are initially listed in isolation • The important cross-capability practices can then be identified Stream Capability Capability Capability Capability Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Individual Capability Practice Common Practice Across Capability Common Practice Across Capability Common Practice Across Capability Common Practice Across Capability
  • 82.
    Design, Develop andManage Products, Services and Solutions Capabilities and Practices • This expands the capability Design, Develop and Manage Products, Services and Solutions capability group into its constituent capabilities and practices and provides more detail on the • This is the core solution design capabilities within the extended set of solution-related capability groups August 12, 2024 82
  • 83.
    Design, Develop andManage Products, Services and Solutions Capabilities August 12, 2024 83 Product, Solution and Service Development Technical Expertise Lifecycle Management Product, Solution and Service Design Product, Solution and Service Delivery Management Product, Solution and Service Quality Management Sales and Marketing Expertise Innovation and Adaptability
  • 84.
    Core Solution ManagementAnd Development Capabilities Generalised Model • Generalised model consists of the following key capability areas: 1. Product, Solution and Service Development Technical Expertise 2. Innovation and Adaptability 3. Lifecycle Management 4. Product, Solution and Service Design 5. Product, Solution and Service Delivery Management 6. Product, Solution and Service Quality Management 7. Sales and Marketing Expertise • This is a logical view - these are not discrete capabilities – there are overlaps • There are many ways to define key capabilities – this is one way − Focus on the substance and content of the capabilities rather than on the superficial structure • This represents a set of skills, capabilities, talents and proficiencies an organisation needs to possess to August 12, 2024 84
  • 85.
    Design, Develop andManage Products, Services and Solutions Capabilities and Practices August 12, 2024 85 Design, Develop and Manage Products, Services and Solutions Capabilities and Practices Product, Solution and Service Development Technical Expertise Strategic Planning and Vision Talent Acquisition, Development and Management Standardisation and Best Practices Technology Adoption and Integrated Technology Platforms Quality Assurance and Control Risk Management Collaboration and Communication Sustainability and Environmental Responsibility Innovation and R&D Project Management and Execution Performance Metrics and KPIs Regulatory Compliance Supply Chain and Vendor Management Continuous Improvement Client and Stakeholder Engagement Crisis and Risk Preparedness Data Analytics and Reporting Budget and Resource Management Ethical and Responsible Practices Adaptability and Resilience Customer-Centric Approach Cybersecurity Ecosystem Partnerships Innovation and Adaptability Strategic Alignment Cross-Functional Collaboration Innovation Culture Research and Development Investment Idea Management Technology Scouting Customer-Centric Innovation Innovation Teams Prototyping and Rapid Testing Agile Project Management Open Innovation Data-Driven Decision-Making Change Management Intellectual Property Management Resource Allocation Innovation Metrics and KPIs Sustainability and Environmental Innovation Market Research and Competitive Analysis Continuous Improvement Regulatory Compliance Scenario Planning Technology Adoption Lifecycle Management Strategic Alignment Cross-Functional Collaboration Clear Product and Service Lifecycle Phases Standardised Processes Lifecycle Cost Management Lifecycle Documentation Quality Assurance and Testing Sustainability Integration Regulatory Compliance Continuous Improvement Lifecycle Metrics and KPIs Customer Feedback Integration Supplier, Vendor, Partner and Sub-Contractor Management Risk Management Change Management Employee Training and Development Lifecycle Assessment and Reporting Innovation Integration Asset Management End-of-Life Planning Data Management and Analytics Digital Twin Technology Technology Adoption Standardisation and Modularisation Cybersecurity Scalability Product, Solution and Service Design Strategic Alignment Cross-Functional Collaboration Customer-Centric Approach Clear Design Processes Design Thinking and Innovation User Experience (UX) Design Sustainability Integration Regulatory Compliance Quality Assurance and Testing Rapid and Iterative Prototyping and Simulation Data-Driven Design Change Management Resource and Budget Management Risk Management Innovation Metrics and KPIs Talent Development Supplier and Sub-Contractor Collaboration Market Research and Competitive Analysis Continuous Improvement Innovation Integration Value Engineering Modular Design Lifecycle Cost Analysis Scalability Product, Solution and Service Delivery Management Strategic Alignment Leadership and Governance Digital Integration Cross-Functional Collaboration Project Management Methodology Customer-Centric Approach Project Planning and Scheduling Resource Allocation Risk Management Quality Assurance and Control Change Management Performance Metrics and KPIs Stakeholder Communication Contract and Vendor Management Project Management Software Project Documentation and Knowledge Management Lessons Learned and Continuous Improvement Regulatory Compliance Sustainability Integration Conflict Resolution Budget and Cost Control Resource and Workforce Development Cybersecurity Product, Solution and Service Quality Management Strategic Alignment Leadership and Governance Digital Integration Quality Standards and Metrics Risk-Based Quality Assessment Supplier and Subcontractor Quality Documentation and Traceability Continuous Improvement Change Management Data Analytics and Reporting Sustainability and Environmental Quality Regulatory Compliance Quality Culture Customer-Centric Quality Innovation and Research Benchmarking and Best Practices Third-Party Certification Quality Audits and Inspections Root Cause Analysis Transparency and Reporting Sales and Marketing Expertise Strategic Alignment Market Research and Analysis Cross-Functional Collaboration Customer-Centric Approach Digital Marketing Strategy and Social Media Engagement Data-Driven Decision-Making Personalisation Marketing Technology Collaboration with Technical Teams Content Marketing and Thought Leadership Sales Enablement Lead Generation and Nurturing International Expansion Strategy Partnerships and Alliances Sustainability and Green Practices Customer Feedback and Satisfaction Brand Management Regulatory Compliance Budget and ROI Analysis Innovation and Technology Adoption Case Studies and Testimonials Local Market Adaptation
  • 86.
    Design, Develop andManage Products, Services and Solutions Capabilities and Practices • Generalised and comprehensive set of capabilities and their constituent practices • A framework such as this can be used for both external and internal solution development • It can be used to identify those practices that are relevant to your organisation and its solution delivery circumstances – internal or external, the importance of those practices and their current state of implementation and operation August 12, 2024 86
  • 87.
    Design, Develop andManage Products, Services and Solutions Capabilities and Practices Assessment • An assessment can identify what practices to focus on establishing or improving • You can map phased target future state(s) and define the activities and tasks required to achieve them • You can then look at acquiring and implementing technologies that support the efficient operation of those practices August 12, 2024 87 Practices That Are Important To Solution Design For Your Organisation Practices That Are Poorly Performing Or Not Implemented Or Operated Practices That Are Relevant To Your Organisation
  • 88.
    Practices Within Capability– Product, Solution and Service Development Technical Expertise August 12, 2024 88 Strategic Planning and Vision Develop a clear and forward-looking strategy for the Engineering and Technical Expertise capability that aligns with the company's overall goals and market demands and define a vision for digital transformation within your industry Talent Acquisition, Development and Management Recruit, develop and retain top engineering and technical talent and foster and provide a culture of continuous learning and skill development/professional development to keep your team up to date with the latest industry trends Standardisation and Best Practices Establish standardised processes and best practices for design, construction and operation across subsidiaries, ensure knowledge sharing and transfer between different units, stay updated on global product and solution design and development standards, best practices and industry benchmarks and align your operations with these standards to ensure consistency and quality across subsidiaries, ensure that innovative solutions can be scaled up and standardised for broader use across different subsidiaries and regions and develop clear implementation guidelines Technology Adoption and Integrated Technology Platforms Stay current with emerging technologies in product and solution design and development and engineering and invest in digital tools) and other software that streamline processes Quality Assurance and Control Implement rigorous quality control processes to ensure high standards in product and solution design and development and operations and continuously monitor and improve quality Risk Management Develop robust risk assessment and mitigation strategies for product and solution design and development and operational phases and ensure compliance with local regulations and safety standards Collaboration and Communication Foster strong communication, knowledge sharing, cross-functional teamwork and collaboration between subsidiaries, departments and sub-contractors and use project management tools and software for efficient communication Sustainability and Environmental Responsibility Incorporate sustainable product and solution design and development practices and stay informed of and compliant with environmental regulations and certifications and aim for green certifications Innovation and R&D Invest in research and development to stay at the forefront of industry innovation and encourage teams to propose and pilot new technologies and methods to test and validate new technologies and processes before full-scale implementation and collect data and feedback to refine and improve your innovations Project Management and Execution Implement efficient project management processes to ensure projects are delivered on time and within budget Performance Metrics and KPIs Define key performance indicators (KPIs) to measure the effectiveness of the Engineering and Technical Expertise function and regularly assess and report on these metrics Regulatory Compliance Stay up-to-date with local, national and international regulations and ensure all projects and operations comply with legal requirements Supply Chain and Vendor Management Establish strong relationships with sub-contractors and suppliers and implement vendor evaluation and management processes Continuous Improvement Encourage a culture of continuous improvement and learning and regularly review and optimise processes and practices Client and Stakeholder Engagement Keep clients and stakeholders informed and engaged throughout the project lifecycle and seek feedback to drive improvements Crisis and Risk Preparedness Develop contingency plans for crisis situations, such as natural disasters or unexpected delays Data Analytics and Reporting Utilise data analytics to make informed decisions and identify trends insights into product and solution design and development processes, cost management and project performance and create insightful reports for better decision-making Budget and Resource Management Efficiently allocate resources and manage budgets for different projects and monitor financial performance closely and design cost-effective solutions and monitor costs carefully to ensure a competitive edge in the market Ethical and Responsible Practices Uphold ethical and responsible business practices, such as fair labour, diversity and community engagement Adaptability and Resilience Be prepared to adapt to changing market conditions, technological advancements and unforeseen challenges Customer-Centric Approach Focus on understanding and meeting the needs of your customers and use customer feedback to improve your products and services continually Cybersecurity Invest in robust cybersecurity measures to protect sensitive project data and intellectual property Ecosystem Partnerships Collaborate with technology providers, startups and industry associations to gain insights and access cutting-edge solutions
  • 89.
    Practices Within Capability– Innovation and Adaptability August 12, 2024 89 Strategic Alignment Develop a clear strategic vision that emphasises innovation, research and adaptability as core elements of your organisation's culture and business model and ensure that the Innovation and Adaptability capability aligns with your function's strategic goals and the broader company's mission and overarching company objectives Cross-Functional Collaboration Foster collaboration and information sharing between your function and other departments, such as R&D, Operations and Marketing Innovation Culture Cultivate an innovation-focused culture that encourages engineers, architects, project managers and other teams to generate and explore new ideas, take calculated risks and learn from failures Research and Development Investment Allocate a dedicated budget for research and development initiatives, including the exploration of new product and solution materials, methods and technologies and establish a dedicated Research and Development team with expertise in product and solution technology and emerging opportunities and challenges Idea Management Implement an idea management system to capture, evaluate and prioritise innovative ideas from employees and stakeholders Technology Scouting Regularly scan the market for emerging technologies, materials and product and solution creation methods that can enhance your products and services Customer-Centric Innovation Engage with customers to understand their evolving needs and preferences and use this feedback to drive innovation in product and service design Innovation Teams Form dedicated innovation teams or task forces responsible for researching, testing and implementing innovative solutions Prototyping and Rapid Testing Develop a process for rapid prototyping and testing of new product and service concepts to validate their feasibility and desirability Agile Project Management Adopt agile methodologies to improve project flexibility and responsiveness to change during the design and development phases Open Innovation Foster a culture of open innovation and explore collaborations and opportunities for co-innovation with external partners, startups, universities and research institutions to leverage their expertise and technologies, set up innovation labs or centres to experiment with new technologies and product and solution design and development methods Data-Driven Decision-Making Utilise data analytics to inform product and service design decisions, customer feedback analysis and performance tracking Change Management Develop a structured change management strategy to ensure a smooth transition when implementing new technologies, processes, or products Intellectual Property Management Implement clear policies for managing intellectual property generated through innovation, including patents and licensing Resource Allocation Allocate resources, such as funding and talent, to support innovation efforts effectively and prioritise projects based on strategic goals Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of innovation initiatives and R&D efforts and regularly review and refine your approach based on these metrics Sustainability and Environmental Innovation Incorporate sustainability and environmental considerations such as green and eco-friendly product and solution design and development technologies into your product and service innovation efforts Market Research and Competitive Analysis Stay informed about market trends, competitor innovations and emerging customer needs and use this information to identify opportunities for product and service development Continuous Improvement Establish a process for continuously reviewing and optimising your innovation practices Regulatory Compliance Ensure that innovative products and services adhere to local and international regulatory requirements Scenario Planning Develop scenarios and contingency plans to anticipate potential market changes and disruptions Technology Adoption Keep a close watch on emerging product and solution design and development technologies and evaluate the feasibility of adopting these technologies into your projects
  • 90.
    Practices Within Capability– Lifecycle Management August 12, 2024 90 Strategic Alignment Ensure that your product, solution and service design capability aligns with your function's strategic goals and supports the overall company strategy Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, operations, marketing and R&D, to ensure seamless product, solution and service development and delivery Customer-Centric Approach Prioritise understanding customer needs and preferences through market research and feedback and integrate customer feedback into the design process Clear Design Processes Develop standardised design processes that define key stages, responsibilities and deliverables for product, solution and service design Design Thinking and Innovation Implement design thinking principles and methodologies to understand end-users' needs, pain points and preferences and to encourage innovative, user-centred solutions and create a culture that values and promotes innovation User Experience (UX) Design Invest in UX design tools and skills to enhance the usability and user satisfaction of products and services Sustainability Integration Incorporate sustainable design practices, such as using eco-friendly materials and energy-efficient solutions Regulatory Compliance Ensure that designs comply with local, national and international regulations and standards Quality Assurance and Testing Implement robust quality control and testing procedures throughout the design process to maintain high standards Rapid and Iterative Prototyping and Simulation Use rapid prototyping and iterative design techniques and simulation tools to quickly test and refine design concepts to allow for continuous improvements based on feedback and real-world testing Data-Driven Design Utilise data analytics to make informed design decisions and track performance Change Management Develop a structured approach to manage changes in product, solution and service design and development Resource and Budget Management Efficiently allocate resources and manage budgets for design projects Risk Management Identify and mitigate design-related risks, such as cost overruns or design flaws Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of design initiatives Talent Development Invest in training and development programs to enhance the skills and knowledge of your design team Supplier and Sub-Contractor Collaboration Build strong relationships with suppliers and sub-contractors to ensure the timely and cost-effective sourcing of resources, components, materials and services Market Research and Competitive Analysis Stay informed about market trends, competitor offerings and emerging technologies Continuous Improvement Establish processes for ongoing review and optimisation of design practices based on feedback and lessons learned Innovation Integration Continuously seek opportunities to integrate innovations and improvements into product, solution and service design Value Engineering Implement value engineering practices to optimise product and solution design and development for cost efficiency without compromising quality Modular Design Explore modular product and solution design and development methods to increase flexibility and scalability while reducing costs to speed up design and development processes and facilitate future expansions or adaptations Lifecycle Cost Analysis Consider the total cost of ownership over the lifecycle of your products and solutions that includes not only initial design and development costs but also operating and maintenance expenses Scalability Ensure that your Product, Solution and Service Design capability is scalable to accommodate growth, both in terms of projects and geographic expansion
  • 91.
    Practices Within Capability– Product, Solution and Service Design August 12, 2024 91 Strategic Alignment Ensure that your product, solution and service design capability aligns with your function's strategic goals and supports the overall company strategy Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, operations, marketing and R&D, to ensure seamless product, solution and service development and delivery Customer-Centric Approach Prioritise understanding customer needs and preferences through market research and feedback and integrate customer feedback into the design process Clear Design Processes Develop standardised design processes that define key stages, responsibilities and deliverables for product, solution and service design Design Thinking and Innovation Implement design thinking principles and methodologies to understand end-users' needs, pain points and preferences and to encourage innovative, user-centred solutions and create a culture that values and promotes innovation User Experience (UX) Design Invest in UX design tools and skills to enhance the usability and user satisfaction of products and services Sustainability Integration Incorporate sustainable design practices, such as using eco-friendly materials and energy-efficient solutions Regulatory Compliance Ensure that designs comply with local, national and international regulations and standards Quality Assurance and Testing Implement robust quality control and testing procedures throughout the design process to maintain high standards Rapid and Iterative Prototyping and Simulation Use rapid prototyping and iterative design techniques and simulation tools to quickly test and refine design concepts to allow for continuous improvements based on feedback and real-world testing Data-Driven Design Utilise data analytics to make informed design decisions and track performance Change Management Develop a structured approach to manage changes in product, solution and service design and development Resource and Budget Management Efficiently allocate resources and manage budgets for design projects Risk Management Identify and mitigate design-related risks, such as cost overruns or design flaws Innovation Metrics and KPIs Define and track key performance indicators (KPIs) to measure the success and impact of design initiatives Talent Development Invest in training and development programs to enhance the skills and knowledge of your design team Supplier and Sub-Contractor Collaboration Build strong relationships with suppliers and sub-contractors to ensure the timely and cost-effective sourcing of resources, components, materials and services Market Research and Competitive Analysis Stay informed about market trends, competitor offerings and emerging technologies Continuous Improvement Establish processes for ongoing review and optimisation of design practices based on feedback and lessons learned Innovation Integration Continuously seek opportunities to integrate innovations and improvements into product, solution and service design Value Engineering Implement value engineering practices to optimise product and solution design and development for cost efficiency without compromising quality Modular Design Explore modular product and solution design and development methods to increase flexibility and scalability while reducing costs to speed up design and development processes and facilitate future expansions or adaptations Lifecycle Cost Analysis Consider the total cost of ownership over the lifecycle of your products and solutions that includes not only initial design and development costs but also operating and maintenance expenses Scalability Ensure that your Product, Solution and Service Design capability is scalable to accommodate growth, both in terms of projects and geographic expansion
  • 92.
    Practices Within Capability– Product, Solution and Service Delivery Management August 12, 2024 92 Strategic Alignment Ensure that your Project Management capability aligns with your function's strategic goals and supports the company's overall strategy Leadership and Governance Appoint experienced project managers and establish a Project Management Office (PMO) to oversee project management functions, set standards and provide governance Digital Integration Incorporate digital tools and technologies such as project management software, digital interaction and sharing platforms for collaboration and data analytics to enhance project planning, execution and monitoring Cross-Functional Collaboration Foster collaboration and communication with other departments, such as engineering, design, operations and procurement, to facilitate seamless project execution Project Management Methodology Establish a clear and standardised project management methodology, which defines project phases, processes, roles and responsibilities Customer-Centric Approach Focus on understanding and meeting the evolving needs of your clients and regularly engage with clients to gather feedback and enhance customer satisfaction Project Planning and Scheduling Develop comprehensive project plans and schedules that include key milestones and deadlines Resource Allocation Efficiently allocate resources, including personnel and budget, to meet project requirements Risk Management Identify and assess project risks, develop mitigation strategies and establish a risk management plan Quality Assurance and Control Implement rigorous quality control processes to ensure that project deliverables meet the specified standards Change Management Develop a structured approach to manage changes in project scope, schedule, or budget Performance Metrics and KPIs Define key performance indicators (KPIs) to measure project performance and regularly assess and report on these metrics Stakeholder Communication Maintain open and transparent communication with all project stakeholders, including clients, subcontractors and internal teams Contract and Vendor Management Establish robust contract and vendor management practices for dealing with subcontractors and suppliers Project Management Software Utilise project management software and tools to streamline processes, monitor progress and track project performance Project Documentation and Knowledge Management Maintain comprehensive project and knowledge documentation, including project plans, reports and issue logs Lessons Learned and Continuous Improvement Encourage a culture of learning by capturing and applying lessons learned from previous projects Regulatory Compliance Ensure that projects comply with local, national and international regulations and safety standards Sustainability Integration Incorporate sustainability considerations into project management, such as environmentally friendly product and solution design and development practices Conflict Resolution Client Satisfaction and Feedback Budget and Cost Control Implement strategies for controlling project budgets and costs to prevent overruns Resource and Workforce Development Invest in training and development programs to enhance the skills and knowledge of your project management team Cybersecurity Prioritise cybersecurity to protect sensitive project data and ensure the security of digital project management systems
  • 93.
    Practices Within Capability– Product, Solution and Service Quality Management August 12, 2024 93 Strategic Alignment Align your Quality Management capability with the company's strategic goals and digital transformation initiatives and ensure that quality is a fundamental component of the company's mission Leadership and Governance Appoint experienced quality managers to oversee quality control and assurance processes and stablish a Quality Management Office (QMO) or similar governance structure to centralise and coordinate quality efforts Digital Integration Leverage digital tools, such as quality management software and sensors, to monitor and manage quality in real-time and use and data analytics to identify and address quality issues Quality Standards and Metrics Develop and maintain a comprehensive set of quality standards and metrics specific to the your industry and ensure that these standards are consistently applied across all subsidiaries and projects Risk-Based Quality Assessment Implement a risk-based approach to quality assessment, where higher-risk areas receive more thorough quality inspections and monitoring Supplier and Subcontractor Quality Establish clear quality expectations for subcontractors and suppliers, monitor their compliance and performance closely and be selective in choosing suppliers and materials that meet your quality standards and align with your sustainability goals Documentation and Traceability Maintain detailed records of all quality-related activities and changes to ensure traceability and accountability throughout the project lifecycle Continuous Improvement Embrace a culture of continuous improvement in quality management and regularly review and refine quality processes based on data and feedback Change Management Recognise that digital transformation may involve significant changes in how quality is managed and implement change management strategies to help teams adapt to new technologies and methodologies Data Analytics and Reporting Utilise data analytics tools to track quality performance, identify trends and make data-driven decisions and develop clear and actionable quality reports to communicate status and areas for improvement Sustainability and Environmental Quality Integrate sustainability and environmental considerations into your quality management processes and ensure that product and solution design and development practices are aligned with eco-friendly standards Regulatory Compliance Stay up to date with relevant regulations and standards in the countries where you operate and ensure that your quality management practices meet or exceed these requirements Quality Culture Promote a culture of quality throughout the organisation and encourage all employees to take responsibility for the quality of their work Customer-Centric Quality Focus on understanding and meeting the evolving quality expectations of clients and engage with clients regularly to gain feedback and improve their satisfaction Innovation and Research Invest in research and development to explore and adopt emerging quality management technologies, such as IoT for quality monitoring, AI for predictive quality analysis and advanced testing equipment Benchmarking and Best Practices Benchmark your quality management practices against industry best practices and look to adopt and adapt successful strategies used by other leading companies Third-Party Certification Pursue third-party certifications and quality awards to demonstrate your commitment to quality Quality Audits and Inspections Conduct regular quality audits and inspections to monitor and verify the effectiveness of quality management practices Root Cause Analysis Develop a process for identifying and addressing the root causes of quality issues to prevent their recurrence Transparency and Reporting Communicate openly about quality initiatives, issues and progress with relevant stakeholders
  • 94.
    Practices Within Capability– Sales and Marketing Expertise August 12, 2024 94 Strategic Alignment Ensure that your Sales and Marketing Expertise capability aligns with your function's strategic goals and the overall company strategy Market Research and Analysis Invest in comprehensive market research to understand industry trends, customer needs and emerging technologies and continuously monitor the market and competition to identify opportunities and threats Cross-Functional Collaboration Foster collaboration and information sharing between the Sales and Marketing team and other departments, such as engineering, design and operations, to align strategies and support successful project implementation Customer-Centric Approach Develop a deep understanding of your customers' needs and preferences and tailor your products, services and solutions to meet their specific requirements Digital Marketing Strategy and Social Media Engagement Embrace digital marketing techniques, including online presence(s), content marketing, SEO, social media and email marketing, to reach a broader audience and engage with potential clients and engage with customers and industry peers through social media platforms to build brand awareness and credibility Data-Driven Decision-Making Utilise data analytics to gain insights into customer behaviour and preferences and use this data to make informed decisions about your marketing strategies Personalisation Implement personalisation in your marketing efforts to deliver targeted messages and offers to different customer segments Marketing Technology Invest in marketing automation tools and customer relationship management (CRM) systems to streamline marketing and sales processes and enhance customer management Collaboration with Technical Teams Foster strong collaboration between your sales and marketing teams and technical teams responsible for product and service development and ensure alignment between what's marketed and what's delivered Content Marketing and Thought Leadership Develop thought leadership content to establish your company as an industry authority and share valuable insights, case studies and research to build trust with potential clients Sales Enablement Equip your sales teams with the tools and knowledge they need to effectively communicate the value of your products and services and provide ongoing training and resources Lead Generation and Nurturing Implement lead generation strategies to attract potential clients and nurture them through the sales funnel and develop clear processes for handling leads and converting them into customers International Expansion Strategy Create a clear strategy for expanding into new European markets, taking into account local regulations, market dynamics and cultural considerations Partnerships and Alliances Explore strategic partnerships and alliances with complementary companies to expand your reach and offer bundled solutions Sustainability and Green Practices Emphasise your company's commitment to sustainability and green building practices in your marketing efforts, as these aspects are increasingly important to clients and regulatory bodies Customer Feedback and Satisfaction Collect and analyse customer feedback to continuously improve your products and services Use testimonials and case studies to showcase your successful projects Brand Management Develop a strong brand identity and ensure consistency in branding across all subsidiaries and monitor and protect your brand's reputation Regulatory Compliance Stay informed about the regulatory requirements in each European country where you operate and ensure that your marketing and sales practices comply with local laws Budget and ROI Analysis Implement a rigorous budgeting and ROI analysis process to measure the effectiveness of marketing and sales efforts and adjust strategies based on performance data Innovation and Technology Adoption Stay at the forefront of technology adoption in marketing, such as AI-powered marketing solutions and augmented reality for showcasing products and solutions Case Studies and Testimonials Showcase successful projects and client testimonials to build trust and credibility Local Market Adaptation Tailor your sales and marketing strategies to meet the specific requirements and cultural nuances of different European countries
  • 95.
    Capability And PracticeAssessment Capability Practice Within Capability Select Your View on the Degree of Practice Automation by Technology Select Your View on the Current State of Operation Select Your View on the Importance of the Practice Select Your View on the Desired Optimum State of Operation Select Your View on the Priority Select Your View on How Satisfied You Are With Current Operation
  • 96.
    Common Practices AcrossCapabilities • There are practices that are common across the key capabilities: − Change Management − Continuous Improvement − Cross-Functional Collaboration − Customer-Centric Approach − Cybersecurity − Data Analytics and Reporting − Data-Driven Decision-Making − Digital Integration − Innovation Integration − Innovation Metrics and KPIs − Leadership and Governance − Market Research and Competitive Analysis − Performance Metrics and KPIs − Quality Assurance and Control − Quality Assurance and Testing − Regulatory Compliance − Resource Allocation − Risk Management − Scalability − Strategic Alignment − Sustainability Integration − Technology Adoption • These are common skills that underpin many solution design capabilities • This is one input into the Relevance/Importance/Not or Poorly Implemented or Operated triad August 12, 2024 96
  • 97.
    Design, Develop andManage Products, Services and Solutions Capability Group – Common Cross-Capability Practices – Relative Importance • You can prioritise the common practices: − Change Management − Continuous Improvement − Cross-Functional Collaboration − Customer-Centric Approach − Cybersecurity − Data Analytics and Reporting − Digital Integration − Innovation Integration − Leadership and Governance − Market Research and Competitive Analysis − Performance Metrics and KPIs − Quality Assurance and Control − Regulatory Compliance − Resource Allocation − Risk Management − Scalability − Strategic Alignment − Sustainability Integration − Technology Adoption hange anage ent on nuous pro e ent ross Fun onal olla ora on usto er entri pproa h erse u ata nal s and epor ng igital ntegra on nno a on ntegra on eadership and Go ernan e ar et esear h and o pe erfor a etri s and s ualit ssuran e and ontrol egulator o plian e esou llo a is anage ent ala trategi lign ent ustaina ntegra on e hnolog dop on
  • 98.
    Summary • The applicationof product development approaches for external consumer-focussed products/solutions/services is long established and widely used • There are many such product development approaches and methodologies • While there is substantial potential to apply these product development approaches to internal solution design and implementation, this is done in a very limited way with none of the kill outcomes present in the gate component of a stage/gate process • Solution architecture can use the product management approach in two ways: − To ensure that the process to design the solution takes account of the wider solution operational and deployment landscape • Treat the solution design and implementation as a more commercial exercise that regards internal solution consumers as customers − To manage the process for deciding which solutions should proceed to implementation using a rational stage-gate process • The role of the solution architect is ideally placed to perform these functions effectively August 12, 2024 98
  • 99.