GIS and Web Based Tools to
Streamline Transmission Routing
                   By
           Daniel Belin, AICP
       Ecology & Environment, Inc.
Presentation Topics
• Background
• Corridor Routing Opportunities and
  Challenges
• Benefits of web based GIS Tools for
  Transmission Line Routing
Background
• Resource Planning vs. Transmission
  Routing
• WECC / WGA initiatives
• HVDC emergence
Background
• Resource Planning
  – Reliability modeling (congestion)
  – Corridor separation
  – Load growth scenarios – time horizon
• Transmission Routing
  – Natural resource planning (integrity)
  – Corridor co-location
  – Impact scenarios – time horizon
WECC / WGA
• WECC RTEP - SPSG
• WGA WREZ
• WGA WC DSS
 – Montana CAPS
HVDC Emergence
How do we get power from here to there?




 Source: Wyoming Infrastructure Authority, 2008
Wildlife Issues
Routing Criteria
            • Utilize 20 (+) Corridor Evaluation Criteria
            • Criteria Include:
                   –     Biological Resources                       - Socio Economic Conditions
                   –     Cultural Resources                         - Water Resources
                   –     Geology and Soils                          - Engineering Considerations
                   –     Land Use
Table 1: Corridor Evaluation Criteria
Criterion                                Unit of Measure   Source                                     Date
GEOLOGY AND SOIL RESOURCES
Karst areas                              Square Miles      USGS                                       1984
Seismic Hazards                          Square Miles      National Atlas of the United States/USGS   2002
Slopes greater than 15%                  Square Miles      USGS DEM                                   2009
Landslide Incidence and Susceptibility   Square Miles      National Atlas of the United States/USGS   2001
Earthquakes                              Number            National Atlas of the United States/USGS   2004
Quaternary Faults                        Square Miles      National Atlas of the United States/USGS   2005
Routing Opportunities
Parallel Existing Infrastructure / ROW
• Transmission Line ROW
• Pipelines
• Interstate Highways and State Routes
• Railroads
• Previously disturbed corridors
Non-Parallel Routing
• Utilize Undeveloped Corridors, as needed
Routing Opportunities (Continued)
Transmission Line Constraints
Constraints Include:
• T&E Species Habitat
• Densely Populated
  Areas
• NWRs and SWMAs
• Cultural Resources
• Topography & Soils
• Large Waterbodies
National Wildlife Refuges and
State Wildlife Management Areas
GIS Website Demonstration
 • Hypothetical project in WY
 • Private website linked to GIS data layers and
   variety of base maps
 • Constraint layers visible on base mapping
 • Buffer and measurement functions facilitate
   route analysis
 • Website has an Address search function with
   applications for:
   – Routing and Public Involvement
GIS Website Case Study
     (Continued)


   Corridor Routing Tool
Private GIS Website Benefits
• Ease of Operation
(Web browser Interface)
• Identifies critical issues
  early
• Provides immediate
  analysis through
  buffering and
  measurement
• Helps facilitate public
  involvement
Conclusion
• New paradigm in transmission planning in the US
• Many more factors and stakeholders
• Web based GIS sites expedite routing study tasks
   – Provide critical information early
   – Keep project team coordinated
   – Identify stakeholders quicker
   – Consult with agencies sooner
   – Eliminate costly alternatives proactively
Thank you!
Questions?
Contact:
  Daniel Belin, AICP
  Ecology &Environment
  1501 Lee Highway,
  Suite 306
  Arlington, VA. 22209
  (703) 522-6065
  dbelin@ene.com

GIS tools for transmission line routing

  • 1.
    GIS and WebBased Tools to Streamline Transmission Routing By Daniel Belin, AICP Ecology & Environment, Inc.
  • 2.
    Presentation Topics • Background •Corridor Routing Opportunities and Challenges • Benefits of web based GIS Tools for Transmission Line Routing
  • 3.
    Background • Resource Planningvs. Transmission Routing • WECC / WGA initiatives • HVDC emergence
  • 4.
    Background • Resource Planning – Reliability modeling (congestion) – Corridor separation – Load growth scenarios – time horizon • Transmission Routing – Natural resource planning (integrity) – Corridor co-location – Impact scenarios – time horizon
  • 5.
    WECC / WGA •WECC RTEP - SPSG • WGA WREZ • WGA WC DSS – Montana CAPS
  • 6.
    HVDC Emergence How dowe get power from here to there? Source: Wyoming Infrastructure Authority, 2008
  • 7.
  • 8.
    Routing Criteria • Utilize 20 (+) Corridor Evaluation Criteria • Criteria Include: – Biological Resources - Socio Economic Conditions – Cultural Resources - Water Resources – Geology and Soils - Engineering Considerations – Land Use Table 1: Corridor Evaluation Criteria Criterion Unit of Measure Source Date GEOLOGY AND SOIL RESOURCES Karst areas Square Miles USGS 1984 Seismic Hazards Square Miles National Atlas of the United States/USGS 2002 Slopes greater than 15% Square Miles USGS DEM 2009 Landslide Incidence and Susceptibility Square Miles National Atlas of the United States/USGS 2001 Earthquakes Number National Atlas of the United States/USGS 2004 Quaternary Faults Square Miles National Atlas of the United States/USGS 2005
  • 9.
    Routing Opportunities Parallel ExistingInfrastructure / ROW • Transmission Line ROW • Pipelines • Interstate Highways and State Routes • Railroads • Previously disturbed corridors Non-Parallel Routing • Utilize Undeveloped Corridors, as needed
  • 10.
  • 11.
    Transmission Line Constraints ConstraintsInclude: • T&E Species Habitat • Densely Populated Areas • NWRs and SWMAs • Cultural Resources • Topography & Soils • Large Waterbodies
  • 12.
    National Wildlife Refugesand State Wildlife Management Areas
  • 13.
    GIS Website Demonstration • Hypothetical project in WY • Private website linked to GIS data layers and variety of base maps • Constraint layers visible on base mapping • Buffer and measurement functions facilitate route analysis • Website has an Address search function with applications for: – Routing and Public Involvement
  • 14.
    GIS Website CaseStudy (Continued) Corridor Routing Tool
  • 15.
    Private GIS WebsiteBenefits • Ease of Operation (Web browser Interface) • Identifies critical issues early • Provides immediate analysis through buffering and measurement • Helps facilitate public involvement
  • 16.
    Conclusion • New paradigmin transmission planning in the US • Many more factors and stakeholders • Web based GIS sites expedite routing study tasks – Provide critical information early – Keep project team coordinated – Identify stakeholders quicker – Consult with agencies sooner – Eliminate costly alternatives proactively
  • 17.
    Thank you! Questions? Contact: Daniel Belin, AICP Ecology &Environment 1501 Lee Highway, Suite 306 Arlington, VA. 22209 (703) 522-6065 dbelin@ene.com