Open Source RAD with OpenObject
    PREAMBLE OpenERP is a modern Enterprise Management Software, released under the AGPL license, and featuring CRM,
    HR, Sales, Accounting, Manufacturing, Inventory, Project Management, ... It is based on OpenObject, a modular,
    scalable, and intuitive Rapid Application Development (RAD) framework written in Python.

    OpenObject features a complete and modular toolbox for quickly building applications: integrated Object-
    Relationship Mapping (ORM) support, template-based Model-View-Controller (MVC) interfaces, a report generation
    system, automated internationalization, and much more.

    Python is a high-level dynamic programming language, ideal for RAD, combining power with clear syntax, and a core
    kept small by design.
    Tip: Useful links
    • Main website, with OpenERP downloads: www.openerp.com
    • Functional & technical documentation: doc.openerp.com
    • Community resources: www.launchpad.net/open-object
    • Integration server: test,openobject.com
    • Learning Python: doc.python.org
    • OpenERP E-Learning platform: edu.openerp.com

    Installing OpenERP
    OpenERP is distributed as packages/installers for most platforms, but can of course be installed from the source on
    any platform.
    OpenERP Architecture




    OpenERP uses the well-known client-server paradigm, with different pieces of software acting as client and server
    depending on the desired configuration.Client software
    OpenERP provides a thick desktop client (GTK+) on all platforms, and a web interface is also accessible using any
    modern browser.

    Tip: Installation procedure
    The procedure for installing OpenERP is likely to evolve (dependencies and so on), so make sure to always check the
    specific documentation (packaged & on website) for the latest procedures. See http://doc.openerp.com/install
    Package installation
    Windows         all-in-one installer, and separate installers for server, client, and webserver are on the website
                    openerp-server and openerp-client packages are available via corresponding package manager
    Linux
                    (e.g. Synaptic on Ubuntu)
                    look online for package installers for the GTK client, as well as tutorials for installing the server (e.g.
    Mac
                    devteam.taktik.be)

    Installing from source
    There are two alternatives: using a tarball provided on the website, or directly getting the source using Bazaar
    (distributed Source Version Control). You also need to install the required dependencies (PostgreSQL and a few Python
    libraries – see documentation on doc.openerp.com).
    Compilation tip: OpenERP being Python-based, no compilation step is needed

    Typical bazaar checkout procedure (on Debian-based Linux)
1     $ sudo apt-get install bzr                    # install bazaar version control
2     $ bzr branch lp:openerp                       # retrieve source installer
3     $ cd openerp && python ./bzr_set.py           # fetch code and perform setup
    Database creation
    After installation, run the server and the client. From the GTK client, use File→Databases→New Database to create a
    new database (default super admin password is admin). Each database has its own modules and config, and demo
    data can be included.

    Building an OpenERP module: idea
    CONTEXTThe code samples used in this memento are taken from a hypothetical idea module. The purpose of this
    module would be to help creative minds, who often come up with ideas that cannot be pursued immediately, and are
    too easily forgotten if not logged somewhere. It could be used to record these ideas, sort them and rate them.

                                  Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.            1/18
Note: Modular development
     OpenObject uses modules as feature containers, to foster maintainable and robust development. Modules provide
     feature isolation, an appropriate level of abstraction, and obvious MVC patterns.
     Composition of a module
     A module may contain any of the following elements:
      • business objects: declared as Python classes extending the osv.osv OpenObject class, the persistence of these
      resources is completely managed by OpenObject ;
      • data: XML/CSV files with meta-data (views and workflows declaration), configuration data (modules
      parametrization) and demo data (optional but recommended for testing, e.g. sample ideas) ;
      • wizards: stateful interactive forms used to assist users, often available as contextual actions on resources ;
      • reports: RML (XML format), MAKO or OpenOffice report templates, to be merged with any kind of business data,
      and generate HTML, ODT or PDF reports.

     Typical module structure
     Each module is contained in its own directory within the server/bin/addons directory in the server installation.

     Note: You can declare your own add-ons directory in the configuration file of OpenERP (passed to the server with the
     -c option) using the addons_path option.

 4     addons/
 5      |- idea/                #   The module directory
 6        |- demo/              #   Demo and unit test population data
 7        |- i18n/              #   Translation files
 8        |- report/            #   Report definitions
 9        |- security/          #   Declaration of groups and access rights
10        |- view/              #   Views (forms,lists), menus and actions
11        |- wizard/            #   Wizards definitions
12        |- workflow/          #   Workflow definitions
13        |- __init__.py        #   Python package initialization (required)
14        |- __terp__.py        #   module declaration (required)
15        |- idea.py            #   Python classes, the module's objects

  The __init__.py file is the Python module descriptor, because an OpenERP module is also a regular Python module.
  __init__.py:
16 # Import all files & directories containing python code
17 import idea, wizard, report

   The __terp__.py (may also be named __openerp__.py as of v5.2)is the OpenERP descriptor and contains a single Python
   dictionary with the actual declaration of the module: its name, dependencies, description, and composition.
   __terp__.py:
18 {
19       'name' : 'Idea',
20       'version' : '1.0',
21       'author' : 'OpenERP',
22       'description' : 'Ideas management module',
23       'category': 'Enterprise Innovation',
24       'website': 'http://www.openerp.com',
25       'depends' : ['base'], # list of dependencies, conditioning startup order
26       'update_xml' : [                         # data files to load at module init
27          'security/groups.xml',                # always load groups first!
28          'security/ir.model.access.csv', # load access rights after groups
29          'workflow/workflow.xml',
30          'view/views.xml',
31          'wizard/wizard.xml',
32          'report/report.xml',
33       ],
34       'demo_xml': ['demo/demo.xml'],           # demo data (for unit tests)
35       'active': False,      # whether to install automatically at new DB creation
36 }

     Object Service – ORM
     Key component of OpenObject, the Object Service (OSV) implements a complete Object-Relational mapping layer,
     freeing developers from having to write basic SQL plumbing.
     Business objects are declared as Python classes inheriting from the osv.osv class, which makes them part of the
     OpenObject Model, and magically persisted by the ORM layer.




                                    Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.    2/18
Predefined attributes are used in the Python class to specify a business object's characteristics for the ORM:
   idea.py:
37 from osv import osv, fields
38 class idea(osv.osv):
             idea
39      _name = 'idea.idea'
40      _columns = {
41         'name': fields.char('Title', size=64, required=True, translate=True),
42         'state': fields.selection([('draft','Draft'),
43                   ('confirmed','Confirmed')],'State',required=True,readonly=True),
44         # Description is read-only when not draft!
45         'description': fields.text('Description', readonly=True,
46              states={'draft': [('readonly', False)]} ),
47         'active': fields.boolean('Active'),
48         'invent_date': fields.date('Invent date'),
49         # by convention, many2one fields end with '_id'
50         'inventor_id': fields.many2one('res.partner','Inventor'),
51         'inventor_country_id': fields.related('inventor_id','country',
52                    readonly=True, type='many2one',
53                    relation='res.country', string='Country'),
54         # by convention, *2many fields end with '_ids'
55         'vote_ids': fields.one2many('idea.vote','idea_id','Votes'),
56         'sponsor_ids': fields.many2many('res.partner','idea_sponsor_rel',
57                                                'idea_id','sponsor_id','Sponsors'),
58         'score': fields.float('Score',digits=(2,1)),
59         'category_id' = many2one('idea.category', 'Category'),
60      }
61      _defaults = {
62         'active': lambda *a: 1,               # ideas are active by default
63         'state': lambda *a: 'draft',          # ideas are in draft state by default
64      }
65      def _check_name(self,cr,uid,ids):
66         for idea in self.browse(cr, uid, ids):
67             if 'spam' in idea.name: return False # Can't create ideas with spam!
68         return True
69      _sql_constraints = [('name_uniq','unique(name)', 'Idea must be unique!')]
70      _constraints = [(_check_name,'Please avoid spam in ideas !', ['name'])]
71 idea() # Instantiate the class

                                        Predefined osv.osv attributes for business objects
  _name (required)               business object name, in dot-notation (in module namespace)
  _columns (required)            dictionary {field names → object fields declarations }
  _defaults                      dictionary: { field names → functions providing defaults }
                                  _defaults['name'] = lambda self,cr,uid,context: 'eggs'
  _auto                          if True (default) the ORM will create the database table – set to False to create your own table/view within
                                 the init() method
  _inherit                       _name of the parent business object (for prototype inheritance)
  _inherits                      for multiple / instance inheritance mechanism: dictionary mapping the _name of the parent business objects
                                 to the names of the corresponding foreign key fields to use
  _constraints                   list of tuples defining the Python constraints, in the form
                                 (func_name, message, fields). (→70)
  _sql_constraints               list of tuples defining the SQL constraints, in the form
                                 (name, sql_def, message). (→69)
  _log_access                    If True (default), 4 fields (create_uid, create_date, write_uid, write_date) will be used to log record-level
                                 operations, made accessible via osv's perm_read() function
  _order                         Name of the field used to sort the records in lists (default: 'id')
  _rec_name                      Alternative field to use as name, used by osv's name_get() (default: 'name')
  _sql                           SQL code to create the table/view for this object (if _auto is False) – can be replaced by SQL execution in
                                 the init() method
  _table                         SQL table name to use (default: _name with dots '.' replaced by underscores '_')




                               Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                             3/18
Inheritance mechanisms




ORM field types
Objects may contain 3 types of fields: simple, relational, and functional. Simple types are integers, floats, booleans,
strings, etc. Relational fields represent the relationships between objects (one2many, many2one, many2many).
Functional fields are not stored in the database but calculated on-the-fly as Python functions. Relevant examples in
the idea class above are indicated with the corresponding line numbers (→XX,XX)

                                                               ORM fields types
                                       Common attributes supported by all fields (optional unless specified)
  • string: field label (required)                               • context: dictionary with contextual parameters (for relational fields)
  • required: True if mandatory                                  • change_default: True if field should be usable as condition for default values
  • readonly: True if not editable                               in clients
  • help: help tooltip                                           • states: dynamic changes to this field's common attributes based on the state
  • select: 1 to include in search views and optimize for list   field (→42,46)
  filtering (with database index)
                                                                Simple fields
 boolean(...) integer(...) date(...) datetime(...) time(...)      'active': fields.boolean('Active'),
                                                                  'priority': fields.integer('Priority'),
                                                                  'start_date': fields.date('Start Date'),
 char(string,size,translate=False,..) text(string,                   • translate: True if field values can be translated by users
 translate=False, …)                                                 • size: maximum size for char fields (→41,45)
  Text-based fields
 float(string, digits=None, ...)                                     • digits: tuple (precision, scale) (→58) . If digits is not provided, it's a float, not
  Floating-point value with arbitrary precision and scale            a decimal type.
 selection(values, string, ...)                                      • values: list of values (key-label tuples) or function returning such a list
  Field allowing selection among a set of predefined values          (required) (→42)
 binary(string, filters=None, ...)                                   • filters: optional filename filters
   Field for storing a file or binary content.                      'picture': fields.binary('Picture',
                                                                                                          filters='*.png,*.gif')
 reference(string, selection, size,..)                               • selection: model _name of allowed objects types and corresponding label
  Field with dynamic relationship to any other object,               (same format as values for selection fields) (required)
 associated with an assistant widget                                 • size: size of text column used to store it (as text: 'model_name,object_id')
                                                                     (required)
                                                                    'contact': fields.reference('Contact',[
                                                                            ('res.partner','Partner'),
                                                                            ('res.partner.contact','Contact')], 128)
                                                             Relational fields
       Common attributes supported by relational fields        • domain: optional restriction in the form of arguments for search (see
                                                               search())
 many2one(obj, ondelete='set null', …) (→50)                   • obj: _name of destination object (required)
  Relationship towards a parent object (using a foreign key)   • ondelete: deletion handling, e.g. 'set null', 'cascade', see PostgreSQL
                                                               documentation
 one2many(obj, field_id, …) (→55)                              • obj: _name of destination object (required)
  Virtual relationship towards multiple objects (inverse of    • field_id: field name of inverse many2one, i.e. corresponding foreign key
  many2one)                                                    (required)
 many2many(obj, rel, field1, field2, …) (→56)                  • obj: _name of destination object (required)
  Bidirectional multiple relationship between objects          • rel: relationship table to use (required)
                                                               • field1: name of field in rel table storing the id of the current object (required)
                                                               • field2: name of field in rel table storing the id of the target object (required)


                                   Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                                     4/18
ORM fields types
                                                                 Functional fields
   function(fnct, arg=None, fnct_inv=None, fnct_inv_arg=None, type='float', fnct_search=None, obj=None, method=False,
    store=False, multi=False,…)
    Functional field simulating a real field, computed rather than stored

    • fnct: function to compute the field value (required)
         def fnct(self, cr, uid, ids, field_name, arg, context)
          returns a dictionary { ids→values } with values of type type
    • fnct_inv: function used to write a value in the field instead
         def fnct_inv(obj, cr, uid, id, name, value, fnct_inv_arg, context)
    • type: type of simulated field (any other type besides 'function')
    • fnct_search: function used to search on this field
         def fnct_search(obj, cr, uid, obj, name, args)
         returns a list of tuples arguments for search(), e.g. [('id','in',[1,3,5])]
    • obj: model _name of simulated field if it is a relational field
    • store, multi: optimization mechanisms (see usage in Performance Section)
   related(f1, f2, …, type='float', …) Shortcut field equivalent to browsing chained fields
    • f1,f2,...: chained fields to reach target (f1 required) (→51)
    • type: type of target field
   property(obj, type='float', view_load=None, group_name=None, …)
    Dynamic attribute with specific access rights
    • obj: object (required)
    • type: type of equivalent field

  Tip: relational fields symmetry
  • one2many ↔ many2one are symmetric
  • many2many ↔ many2many are symmetric when inversed (swap field1 and field2)
  • one2many ↔ many2one + many2one ↔ one2many = many2many
  Special / Reserved field names
  A few field names are reserved for pre-defined behavior in OpenObject. Some of them are created automatically by
  the system, and in that case any field with that name will be ignored.
   id                unique system identifier for the object (created by ORM, do not add it)
   name                 defines the value used by default to display the record in lists, etc.
                        if missing, set _rec_name to specify another field to use for this purpose
   active               defines visibility: records with active set to False are hidden by default
   sequence             defines order and allows drag&drop reordering if included in list views
   state                defines life-cycle stages for the object, used for workflows
   parent_id            defines tree structure on records, and enables child_of operator
   parent_left,         used in conjunction with _parent_store flag on object, allows faster access to tree structures (see also Performance
   parent_right         Optimization section)
   create_date,         used to log creator, last updater, date of creation and last update date of the record. disabled if _log_access flag is set to
   create_uid,          False
   write_date,          (created by ORM, do not add them)
   write_uid


  Working with the ORM
   Inheriting from the osv.osv class makes all the ORM methods available on business objects. These methods may be
   invoked on the self object within the Python class itself (see examples in the table below), or from outside the class by
   first obtaining an instance via the ORM pool system.
   ORM usage sample
72 class idea2(osv.osv):
              idea2
73       _name = 'idea.idea'
74       _inherit = 'idea.idea'
75       def _score_calc(self,cr,uid,ids,field,arg,context=None):
76          res = {}
77          # This loop generates only 2 queries thanks to browse()!
78          for idea in self.browse(cr,uid,ids,context=context):
79               sum_vote = sum([v.vote for v in idea.vote_ids])
80               avg_vote = sum_vote/len(idea.vote_ids)
81               res[idea.id] = avg_vote
82          return res
83       _columns = {
84          # Replace static score with average of votes
85          'score':fields.function(_score_calc,type='float',method=True)
86       }
87 idea2()




                                    Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                                5/18
ORM Methods on osv.osv objects
                      OSV generic accessor                 • self.pool.get('object_name') may be used to obtain a model class from
                                                           anywhere
         Common parameters, used by multiple methods       • cr: database connection (cursor)
                                                           • uid: id of user performing the operation
                                                           • ids: list of record ids, or single integer when there is only one id
                                                           • context: optional dictionary of contextual parameters, such as user
                                                           language
                                                                e.g. { 'lang': 'en_US', ... }
create(cr, uid, values, context=None)                                     • values: dictionary of field values for the record
                                                                         idea_id = self.create(cr, uid,
Creates a new record with the specified value                                   { 'name': 'Spam recipe',
Returns: id of the new record                                                      'description' : 'spam & eggs',
                                                                                   'inventor_id': 45,
                                                                                })
search(cr, uid, args, offset=0, limit=None, order=None,                   • args: list of tuples specifying search criteria
 context=None, count=False)                                               • offset: optional number of records to skip
                                                                          • limit: optional max number of records to return
Returns: list of ids of records matching the given criteria               • order: optional columns to sort by (default: self._order)
                                                                          • count: if True, returns only the number of records matching the criteria,
                                                                          not their ids
                                                                         #Operators: =, !=, >, >=, <, <=, like, ilike,
                                                                         #in, not in, child_of, parent_left, parent_right
                                                                         #Prefix operators: '&' (default), '|', '!'
                                                                         #Fetch non-spam partner shops + partner 34
                                                                         ids = self.search(cr, uid,
                                                                                      [ '|', ('partner_id', '!=', 34),
                                                                                          '!', ('name', 'ilike', 'spam'), ],
                                                                                                    order='partner_id')
read(cr, user, ids, fields=None, context=None)                            • fields: optional list of field names to return (default: all fields)
                                                                         results = self.read(cr, uid, [42,43],
Returns: list of dictionaries with requested field values                                              ['name', 'inventor_id'])
                                                                         print 'Inventor:', results[0]['inventor_id']
write(cr, uid, ids, values, context=None)                                 • values: dictionary of field values to update
                                                                         self.write(cr, uid, [42,43],
Updates records with given ids with the given values.                                              { 'name': 'spam & eggs',
Returns: True                                                                                         'partner_id': 24,
                                                                                                   })
copy(cr, uid, id, defaults,context=None)                                  • defaults: dictionary of field values to change before saving the duplicated
                                                                          object
 Duplicates record with given id updating it with defaults values.
 Returns: True
unlink(cr, uid, ids, context=None)                                       self.unlink(cr, uid, [42,43])

 Deletes records with the given ids
 Returns: True
browse(cr, uid, ids, context=None)                                       idea = self.browse(cr, uid, 42)
                                                                         print 'Idea description:', idea.description
Fetches records as objects, allowing to use dot-notation to              print 'Inventor country code:',
browse fields and relations                                               idea.inventor_id.address[0].country_id.code
Returns: object or list of objects requested                             for vote in idea.vote_ids:
                                                                           print 'Vote %2.2f' % vote.vote
default_get(cr, uid, fields, context=None)                                • fields: list of field names

Returns: a dictionary of the default values for fields (set on the       defs = self.default_get(cr,uid,
object class, by the user preferences, or via the context)                                       ['name','active'])
                                                                         # active should be True by default
                                                                         assert defs['active']
perm_read(cr, uid, ids, details=True)                                     • details: if True, *_uid fields are replaced with the name of the user
                                                                          • returned dictionaries contain: object id (id), creator user id (create_uid),
Returns: a list of ownership dictionaries for each requested              creation date (create_date), updater user id (write_uid), update date
record                                                                    (write_date)
                                                                         perms = self.perm_read(cr,uid,[42,43])
                                                                         print 'creator:', perms[0].get('create_uid', 'n/a')




                                   Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                                  6/18
ORM Methods on osv.osv objects
    fields_get(cr, uid, fields=None, context=None)                      • fields: list of field names
                                                                       class idea(osv.osv):
                                                                                 idea
     Returns a dictionary of field dictionaries, each one describing a     (...)
     field of the business object                                          _columns = {
                                                                              'name' : fields.char('Name',size=64)
                                                                              (...)
                                                                           def test_fields_get(self,cr,uid):
                                                                              assert(self.fields_get('name')['size'] == 64)
    fields_view_get(cr, uid, view_id=None, view_type='form',                  • view_id: id of the view or None
      context=None, toolbar=False)                                            • view_type: type of view to return if view_id is None ('form','tree', ...)
                                                                              • toolbar: True to include contextual actions
     Returns a dictionary describing the composition of the requested        def test_fields_view_get(self,cr,uid):
     view (including inherited views and extensions)                           idea_obj = self.pool.get('idea.idea')
                                                                               form_view = idea_obj.fields_view_get(cr,uid)
    name_get(cr, uid, ids, context={})                                       # Ideas should be shown with invention date
     Returns tuples with the text representation of requested objects        def name_get(self,cr,uid,ids):
     for to-many relationships                                                 res = []
                                                                               for r in self.read(cr,uid,ids['name','create_date'])
                                                                                  res.append((r['id'], '%s (%s)' (r['name'],year))
                                                                               return res
    name_search(cr, uid, name='', args=None, operator='ilike',            • name: object name to search for
     context=None, limit=80)                                              • operator: operator for name criterion
                                                                          • args, limit: same as for search())
     Returns list of object names matching the criteria, used to provide # Countries can be searched by code or name
     completion for to-many relationships. Equivalent of search() on def name_search(self,cr,uid,name='',
     name + name_get()                                                              args=[],operator='ilike',context={},
                                                                                    limit=80):
                                                                            ids = []
                                                                            if name and len(name) == 2:
                                                                               ids = self.search(cr, user,
                                                                                       [('code', '=', name)] + args,
                                                                                         limit=limit, context=context)
                                                                            if not ids:
                                                                               ids = self.search(cr, user,
                                                                                       [('name', operator, name)] + args,
                                                                                         limit=limit, context=context)
                                                                            return self.name_get(cr,uid,ids)
    export_data(cr, uid, ids, fields, context=None)                           • fields: list of field names
                                                                              • context may contain import_comp (default: False) to make exported
     Exports fields for selected objects, returning a dictionary with a       data compatible with import_data() (may prevent exporting some fields)
     datas matrix. Used when exporting data via client menu.
    import_data(cr, uid, fields, data, mode='init',                           •   fields: list of field names
     current_module='', noupdate=False, context=None,                         •   data: data to import (see export_data())
     filename=None)                                                           •   mode: 'init' or 'update' for record creation
                                                                              •   current_module: module name
     Imports given data in the given module Used when exporting data          •   noupdate: flag for record creation
     via client menu                                                          •   filename: optional file to store partial import state for recovery

   Tip: use read() through webservice calls, but always browse() internally

   Building the module interface
   To construct a module, the main mechanism is to insert data records declaring the module interface components.
   Each module element is a regular data record: menus, views, actions, roles, access rights, etc.
    Common XML structure
    XML files declared in a module's update_xml attribute contain record declarations in the following form:
 88 <?xml version="1.0" encoding="utf-8"?>
 89 <openerp>
 90     <data>
 91         <record model="object_model_name" id="object_xml_id">
 92           <field name="field1">value1</field>
 93           <field name="field2">value2</field>
 94         </record>
 95         <record model="object_model_name2" id="object_xml_id2">
 96           <field name="field1" ref="module.object_xml_id"/>
 97           <field name="field2" eval="ref('module.object_xml_id')"/>
 98         </record>
 99     </data>
100 </openerp>

   Each type of record (view, menu, action) support a specific set of child entities and attributes, but all share the
   following special attributes:

                                       Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                                     7/18
id         the unique (per module) XML identifier of this record (xml_id)
      ref        used instead of element content to reference another record (works cross-module by prepending the module
                 name)
      eval       used instead of element content to provide value as a Python expression, that can use the ref() method to find
                 the database id for a given xml_id
      Tip: XML RelaxNG validation
      OpenObject validates the syntax and structure of XML files, according to a RelaxNG grammar, found in
      server/bin/import_xml.rng.
      For manual check use xmllint: xmllint –relaxng /path/to/import_xml.rng <file>

   Common CSV syntax
   CSV files can also be added in update_xml, and the records will be inserted by the OSV's import_data() method, using
   the CSV filename to determine the target object model. The ORM automatically reconnects relationships based on the
   following special column names:
    id (xml_id)                  column containing identifiers for relationships
    many2one_field               reconnect many2one using name_search()
    many2one_field:id            reconnect many2one based on object's xml_id
    many2one_field.id            reconnect many2one based on object's database id
    many2many_field              reconnects via name_search(), repeat for multiple values
    many2many_field:id           reconnects with object's xml_id, repeat for multiple values
    many2many_field.id           reconnects with object's database id, repeat for multiple values
    one2many_field/field         creates one2many destination record and sets field value
   ir.model.access.csv
101 "id","name","model_id:id","group_id:id","perm_read","perm_write","perm_create","perm_unlink"
102 "access_idea_idea","idea.idea","model_idea_idea","base.group_user",1,0,0,0
103 "access_idea_vote","idea.vote","model_idea_vote","base.group_user",1,0,0,0
      Menus and actions
      Actions are declared as regular records and can be triggered in 3 ways:
       • by clicking on menu items linked to a specific action
       • by clicking on buttons in views, if these are connected to actions
       • as contextual actions on an object

      Action declaration
104     <record model="ir.actions.act_window" id="action_id">
105         <field name="name">action.name</field>
106         <field name="view_id" ref="view_id"/>
107         <field name="domain">[list of 3-tuples (max 250 characters)]</field>
108         <field name="context">{context dictionary (max 250 characters)}</field>
109         <field name="res_model">object.model.name</field>
110         <field name="view_type">form|tree</field>
111         <field name="view_mode">form,tree,calendar,graph</field>
112         <field name="target">new</field>
113         <field name="search_view_id" ref="search_view_id"/>
114     </record>
      id                        identifier of the action in table ir.actions.act_window, must be unique
      name                      action name (required)
      view_id                   specific view to open (if missing, highest priority view of given type is used)
      domain                    tuple (see search() arguments) for filtering the content of the view
      context                   context dictionary to pass to the view
      res_model                 object model on which the view to open is defined
      view_type                 set to form to open records in edit mode, set to tree for a tree view only
      view_mode                 if view_type is form, list allowed modes for viewing records (form, tree, ...)
      target                    set to new to open the view in a new window
      search_view_id            identifier of the search view to replace default search form (new in version 5.2)

    Menu declaration
    The menuitem entity is a shortcut for declaring an ir.ui.menu record and connect it with a corresponding action via an
    ir.model.data record.
115 <menuitem id="menu_id" parent="parent_menu_id"
116        name="label" action="action_id" icon="icon-code"
117        groups="groupname1,groupname2" sequence="10"/>
      id               identifier of the menuitem, must be unique
      parent           id of the parent menu in the hierarchy
      name             Optional menu label (default: action name)
      action           identifier of action to execute, if any
      icon             icon to use for this menu (e.g. terp-graph, STOCK_OPEN, see doc.opernerp.com)
      groups           list of groups that can see this menu item (if missing, all groups can see it)
      sequence         integer index for ordering sibling menuitems (10,20,30..)

                                        Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.   8/18
Views and inheritance
      Views form a hierarchy. Several views of the same type can be declared on the same object, and will be used
      depending on their priorities. By declaring an inherited view it is possible to add/remove features in a view.

      Generic view declaration
118     <record model="ir.ui.view" id="view_id">
119         <field name="name">view.name</field>
120         <field name="model">object_name</field>
121         <field name="type">form</field> # tree,form,calendar,search,graph,gantt
122         <field name="priority" eval="16"/>
123             <field name="arch" type="xml">
124                 <!-- view content: <form>, <tree>, <graph>, … -->
125             </field>
126     </record>
      id                 unique view identifier
      name               view name
      model              object model on which the view is defined (same as res_model in actions)
      type               view type: form, tree, graph, calendar, search, gantt (search is new in 5.2)
      priority           view priority, smaller is higher (default: 16)
      arch               architecture of the view, see various view types below
    Forms (to view/edit records)
    Forms allow creation/edition or resources, and correspond to <form> elements.
    Allowed elements             all (see form elements below)
127 <form string="Idea form">
128       <group col="6" colspan="4">
129            <group colspan="5" col="6">
130                 <field name="name" select="1" colspan="6"/>
131                 <field name="inventor_id" select="1"/>
132                 <field name="inventor_country_id" />
133                 <field name="score" select="2"/>
134            </group>
135            <group colspan="1" col="2">
136                 <field name="active"/><field name="invent_date"/>
137            </group>
138       </group>
139       <notebook colspan="4">
140            <page string="General">
141                 <separator string="Description"/>
142                 <field colspan="4" name="description" nolabel="1"/>
143            </page>
144            <page string="Votes">
145                 <field colspan="4" name="vote_ids" nolabel="1" select="1">
146                   <tree>
147                      <field name="partner_id"/>
148                      <field name="vote"/>
149                   </tree>
150                 </field>
151            </page>
152            <page string="Sponsors">
153                 <field colspan="4" name="sponsor_ids" nolabel="1" select="1"/>
154            </page>
155       </notebook>
156       <field name="state"/>
157       <button name="do_confirm" string="Confirm" icon="gtk-ok" type="object"/>
158 </form>




                                  Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.   9/18
Form Elements
    Common attributes for all elements:
     • string: label of the element
     • nolabel: 1 to hide the field label
     • colspan: number of column on which the field must span
     • rowspan: number of rows on which the field must span
     • col: number of column this element must allocate to its child elements
     • invisible: 1 to hide this element completely
     • eval: evaluate this Python code as element content (content is string by default)
     • attrs: Python map defining dynamic conditions on these attributes: readonly, invisible, required based on search tuples on other field values
    field                   automatic widgets depending on the corresponding field type. Attributes:
                             • string: label of the field, also for search (overrides field name)
                             • select: 1 to show the field in normal search, 2 for advanced only
                             • nolabel: 1 to hide the field label
                             • required: override required field attribute
                             • readonly: override readonly field attribute
                             • password: True to hide characters typed in this field
                             • context: Python code declaring a context dictionary
                             • domain: Python code declaring list of tuples for restricting values
                             • on_change: Python method call to trigger when value is changed
                             • completion: 1 to enable auto-completion of values when possible
                             • groups: comma-separated list of group (id) allowed to see this field
                             • widget: select alternative widget (one2many_list, many2many, url, email, image, float_time, reference, text_wiki,
                             text_html, progressbar)
    properties              dynamic widget showing all available properties (no attribute)
    button                  clickable widget associated with actions. Specific attributes:
                             • type: type of button: workflow (default), object, or action
                             • name: workflow signal, function name (without parentheses) or action to call (depending on type)
                             • confirm: text of confirmation message when clicked
                             • states: comma-separated list of states in which this button is shown
                             • icon: optional icon (all GTK STOCK icons e.g. gtk-ok)
    separator               horizontal separator line for structuring views, with optional label
    newline                 place-holder for completing the current line of the view
    label                   free-text caption or legend in the form
    group                   used to organise fields in groups with optional label (adds frame)
    notebook, page          notebook elements are tab containers for page elements. Attributes:
                             • name: label for the tab/page
                             • position: tabs position in notebook (inside, top, bottom, left, right)
   Dynamic views
   In addition to what can be done with states and attrs attributes, functions may be called by view elements (via buttons
   of type object, or on_change attributes on fields) to obtain dynamic behavior. These functions may alter the view
   interface by returning a Python map with the following entries:
    value         a dictionary of field names and their updated values
    domain        a dictionary of field names and their updated domains of value
    warning       a dictionary with a title and message to show a warning dialog
    Lists/Trees
    Lists include field elements, are created with type tree, and have a <tree> parent element.
     Attributes                                                • colors: list of colors mapped to Python conditions
                                                               • editable: top or bottom to allow in-place edit
                                                               • toolbar: set to True to display the top level of object hierarchies as a side
                                                               toolbar (example: the menu)
     Allowed elements                                         field, group, separator, tree, button, filter, newline
159 <tree string="Idea Categories" toolbar="1" colors="blue:state==draft">
160       <field name="name"/>
161       <field name="state"/>
162 </tree>
    Calendars
    Views used to display date fields as calendar events (<calendar> parent)
    Attributes                    • color: name of field for color segmentation
                                  • date_start: name of field containing event start date/time
                                  • day_length: length of a calendar day in hours (default: 8)
                                  • date_stop: name of field containing event stop date/time
                                       or
                                  • date_delay: name of field containing event duration
    Allowed elements             field (to define the label for each calendar event)
163 <calendar string="Ideas" date_start="invent_date" color="inventor_id">
164            <field name="name"/>
165 </calendar>
   Gantt Charts
   Bar chart typically used to show project schedule (<gantt> parent element)

                                      Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                           10/18
Attributes              same as <calendar>
      Allowed elements        field, level
                               • level elements are used to define the Gantt chart levels, with the enclosed field used as label for that drill-
                               down level
166     <gantt string="Ideas" date_start="invent_date" color="inventor_id">
167       <level object="idea.idea" link="id" domain="[]">
168          <field name="inventor_id"/>
169       </level>
170     </gantt>
    Charts (Graphs)
    Views used to display statistical charts (<graph> parent element)
    Tip: charts are most useful with custom views extracting ready-to-use statistics
    Attributes                     • type: type of chart: bar, pie (default)
                                   • orientation: horizontal, vertical
    Allowed elements              field, with specific behavior:
                                   • first field in view is X axis, 2nd one is Y, 3rd one is Z
                                   • 2 fields required, 3rd one is optional
                                   • group attribute defines the GROUP BY field (set to 1)
                                   • operator attribute sets the aggregation operator to use for other fields when one field is grouped
                                   (+,*,**,min,max)
171 <graph string="Total idea score by Inventor" type="bar">
172        <field name="inventor_id" />
173        <field name="score" operator="+"/>
174 </graph>
    Search views (new in v5.2)
    Search views are used to customize the search panel on top of list views, and are declared with the search type, and a
    top-level <search> element. After defining a search view with a unique id, add it to the action opening the list view
    using the search_view_id field in its declaration.
     Allowed elements             field, group, separator, label, search, filter, newline, properties
                                   • filter elements allow defining button for domain filters
                                   • adding a context attribute to fields makes widgets that alter the search context (useful for context-sensitive
                                   fields, e.g. pricelist-dependent prices)
175 <search string="Search Ideas">
176       <group col="6" colspan="4">
177         <filter string="My Ideas" icon="terp-partner"
178               domain="[('inventor_id','=',uid)]"
179               help="My own ideas"/>
180         <field name="name" select="1"/>
181         <field name="description" select="1"/>
182         <field name="inventor_id" select="1"/>
183         <!-- following context field is for illustration only -->
184         <field name="inventor_country_id" select="1" widget="selection"
185                                 context="{'inventor_country': self}"/>
186        </group>
187 </search>




    View Inheritance
    Existing views should be modifying through inherited views, never directly. An inherited view references its parent
    view using the inherit_id field, and may add or modify existing elements in the view by referencing them through XPath
    expressions, specifying the appropriate position.
    Tip: XPath reference can be found at www.w3.org/TR/xpath
    position          • inside: placed inside match (default)                   • before: placed before match
                      • replace: replace match                                  • after: placed after match
188 <!-- improved idea categories list -->
189 <record id="idea_category_list2" model="ir.ui.view">
190       <field name="name">id.category.list2</field>
191       <field name="model">ir.ui.view</field>
192       <field name="inherit_id" ref="id_category_list"/>
193       <field name="arch" type="xml">
194          <xpath expr="/tree/field[@name='description']" position="after">
195            <field name="idea_ids" string="Number of ideas"/>
196          </xpath>
197       </field>
198 </record>


                                       Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                        11/18
Reports
   There are several report engines in OpenERP, to produce reports from different sources and in many formats.




   Special expressions used inside report templates produce dynamic data and/or modify the report structure at
   rendering time.
   Custom report parsers may be written to support additional expressions.
   Alternative Report Formats (see doc.openerp.com)
   sxw2rml                       OpenOffice 1.0 templates (.sxw) converted to RML with sxw2rml tool, and the RML rendered in
                                 HTML or PDF
    rml                          RML templates rendered directly as HTML or PDF
    xml,xsl:rml                  XML data + XSL:RML stylesheets to generate RML
    odt2odt                      OpenOffice templates (.odt) used to produce directly OpenOffice documents (.odt) (As of
                                 OpenERP 5.2)
    mako                         Mako template library used to produce HTML output, by embedding Python code and OpenERP
                                 expressions within any text file (As of OpenERP 5.2)
                                                Expressions used in OpenERP report templates
    [[ <content> ]]                double brackets content is evaluated as a Python expression based on the following
                                   expressions
    Predefined expressions:
     • objects contains the list of records to print
     • data comes from the wizard launching the report
     • user contains the current user (as per browse())
     • time gives access to Python time module
     • repeatIn(list,'var','tag') repeats the current parent element named tag for each object in list, making the object
     available as var during each loop
     • setTag('tag1','tag2') replaces the parent RML tag1 with tag2
     • removeParentNode('tag') removes parent RML element tag
     • formatLang(value, digits=2, date=False, date_time=False, grouping=True, monetary=False) can be used to format a date,
     time or amount according to the locale
     • setLang('lang_code') sets the current language and locale for translations
    Report declaration
199 <!-- The following creates records in ir.actions.report.xml model -->
200 <report id="idea_report" string="Print Ideas" model="idea.idea"
201           name="idea.report" rml="idea/report/idea.rml" >
202 <!-- Use addons/base_report_designer/wizard/tiny_sxw2rml/tiny_sxw2rml.py
203           to generate the RML template file from a .sxw template -->
   id                       unique report identifier
   name                     name for the report (required)
   string                   report title (required)
   model                    object model on which the report is defined (required)
   rml, sxw, xml, xsl       path to report template sources (starting from addons), depending on report
   auto                     set to False to use a custom parser, by subclassing report_sxw.rml_parse and declaring the report as follows:
                            report_sxw.report_sxw(report_name, object_model,rml_path,parser=customClass)
   header                   set to False to suppress report header (default: True)
   groups                   comma-separated list of groups allowed to view this report
   menu                     set to True to link the report with the Print icon (default: True)
   keywords                 specify report type keyword (default: client_print_multi)
    Tip: RML User Guide: www.reportlab.com/docs/rml2pdf-userguide.pdf
    Example RML report extract:
204 <story>
205      <blockTable style="Table">
206        <tr>
207          <td><para style="Title">Idea name</para> </td>
208          <td><para style="Title">Score</para> </td>
209        </tr>
210        <tr>
211          <td><para>[[ repeatIn(objects,'o','tr') ]] [[ o.name ]]</para></td>
212          <td><para>[[ o.score ]]</para></td>
213        </tr>
214      </blockTable>
215 </story>




                                 Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                           12/18
Workflows
                                 Workflows may be associated with any object in OpenERP, and are entirely customizable.
                                 Workflows are used to structure and manage the lifecycles of business objects and documents,
                                 and define transitions, triggers, etc. with graphical tools.
                                 Workflows, activities (nodes or actions) and transitions (conditions) are declared as XML
                                 records, as usual. The tokens that navigate in workflows are called workitems.
                                 Workflow declaration
                                 Workflows are declared on objects that possess a state field (see the example idea class in the
                                 ORM section)

216     <record id="wkf_idea" model="workflow">
217         <field name="name">idea.basic</field>
218         <field name="osv">idea.idea</field>
219         <field name="on_create" eval="1"/>
220     </record>
      id                           unique workflow record identifier
      name                         name for the workflow (required)
      osv                          object model on which the workflow is defined (required)
      on_create                    if True, a workitem is instantiated automatically for each new osv record

      Workflow Activities (nodes)
221    <record id="act_confirmed" model="workflow.activity">
222         <field name="name">confirmed</field>
223         <field name="wkf_id" ref="wkf_idea"/>
224         <field name="kind">function</field>
225         <field name="action">action_confirmed()</field>
226    </record>
      id                 unique activity identifier
      wkf_id             parent workflow identifier
      name               activity node label
      flow_start         True to make it a 'begin' node, receiving a workitem for each workflow instance
      flow_stop          True to make it an 'end' node, terminating the workflow when all items reach it
      join_mode          logical behavior of this node regarding incoming transitions:
                          • XOR: activate on the first incoming transition (default)
                          • AND: waits for all incoming transitions to become valid
      split_mode         logical behavior of this node regarding outgoing transitions:
                          • XOR: one valid transition necessary, send workitem on it (default)
                          • OR: send workitems on all valid transitions (0 or more), sequentially
                          • AND: send a workitem on all valid transitions at once (fork)
      kind               type of action to perform when node is activated by a transition:
                          • dummy to perform no operation when activated (default)
                          • function to invoke a function determined by action
                          • subflow to execute the subflow with subflow_id, invoking action to determine the record id of the record for which the
                          subflow should be instantiated. If action returns no result, the workitem is deleted.
                          • stopall to terminate the workflow upon activation
      subflow_id         if kind subflow, id of the subflow to execute (use ref attribute or search with a tuple)
      action             object method call, used if kind is function or subflow. This function should also update the state field of the object, e.g. for a
                         function kind:
                               def action_confirmed(self, cr, uid, ids):
                                       self.write(cr, uid, ids, { 'state' : 'confirmed' })
                                       # … perform other tasks
                                       return True
    Workflow Transitions (edges)
    Conditions are evaluated in this order: role_id, signal, condition expression
227 <record id="trans_idea_draft_confirmed" model="workflow.transition">
228        <field name="act_from" ref="act_draft"/>
229        <field name="act_to" ref="act_confirmed"/>
230        <field name="signal">button_confirm</field>
231        <field name="role_id" ref="idea_manager"/>
232        <field name="condition">1 == 1</field>
233 </record>
      act_from, act_to            identifiers of the source and destination activities
      signal                      name of a button of type workflow that triggers this transition
      role_id                     reference to the role that user must have to trigger the transition (see Roles)
      condition                   Python expression that must evaluate to True for transition to be triggered

                   Tip: The Web client features a graphical workflow editor, via the Customise→Manage Workflows
                   link at the bottom left in lists and forms.

      Security
      Access control mechanisms must be combined to achieve a coherent security policy.

                                        Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                              13/18
Group-based access control mechanisms
      Groups are created as normal records on the res.groups model, and granted menu access via menu definitions.
      However even without a menu, objects may still be accessible indirectly, so actual object-level permissions
      (create,read,write,unlink ) must be defined for groups. They are usually inserted via CSV files inside modules. It is also
      possible to restrict access to specific fields on a view or object using the field's groups attribute.

      ir.model.access.csv
234      "id","name","model_id:id","group_id:id","perm_read","perm_write","perm_create","perm_unlink"
235      "access_idea_idea","idea.idea","model_idea_idea","base.group_user",1,1,1,0
236      "access_idea_vote","idea.vote","model_idea_vote","base.group_user",1,1,1,0
      Roles
      Roles are created as normal records on the res.roles model and used only to condition workflow transitions through
      transitions' role_id attribute.

      Wizards
      Wizards describe stateful interactive sessions with the user through dynamic forms. As of OpenERP v5.0, wizards
      make use of the osv_memory in-memory persistence to allow constructing wizards from regular business objects and
      views.
    Wizard objects (osv_memory)
    In-memory objects are created by extending osv.osv_memory:
237 from osv import fields,osv
238 import datetime
239 class cleanup_wizard(osv.osv_memory):
              cleanup_wizard
240      _name = 'idea.cleanup.wizard'
241      _columns = {
242        'idea_age': fields.integer('Age (in days)'),
243      }
244      def cleanup(self,cr,uid,ids,context={}):
245        idea_obj = self.pool.get('idea.idea')
246        for wiz in self.browse(cr,uid,ids):
247           if wiz.idea_age <= 3:
248             raise osv.except_osv('UserError','Please select a larger age')
249           limit = datetime.date.today()-datetime.timedelta(days=wiz.idea_age)
250           ids_to_del = idea_obj.search(cr,uid, [('create_date', '<' ,
251                     limit.strftime('%Y-%m-%d 00:00:00'))],context=context)
252           idea_obj.unlink(cr,uid,ids_to_del)
253        return {}
254 cleanup_wizard()
    Views
    Wizards use regular views and their buttons may use a special cancel attribute to close the wizard window when
    clicked.
255 <record id="wizard_idea_cleanup" model="ir.ui.view">
256      <field name="name">idea.cleanup.wizard.form</field>
257      <field name="model">idea.cleanup.wizard</field>
258      <field name="type">form</field>
259      <field name="arch" type="xml">
260         <form string="Idea Cleanup Wizard">
261           <label colspan="4" string="Select the age of ideas to cleanup"/>
262           <field name="idea_age" string="Age (days)"/>
263           <group colspan="4">
264            <button string="Cancel" special="cancel" icon="gtk-cancel"/>
265            <button string="Cleanup" name="cleanup" type="object" icon="gtk-ok"/>
266           </group>
267         </form>
268      </field>
269 </record>
    Wizard execution
    Such wizards are launched via regular action records, with a special target field used to open the wizard view in a new
    window.
270 <record id="action_idea_cleanup_wizard" model="ir.actions.act_window">
271      <field name="name">Cleanup</field>
272      <field name="type">ir.actions.act_window</field>
273      <field name="res_model">idea.cleanup.wizard</field>
274      <field name="view_type">form</field>
275      <field name="view_mode">form</field>
276      <field name="target">new</field>
277 </record>




                                   Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.        14/18
WebServices – XML-RPC
    OpenERP is accessible through XML-RPC interfaces, for which libraries exist in many languages.
    Python example
278 import xmlrpclib
279 # ... define HOST, PORT, DB, USER, PASS
280 url = 'http://%s:%d/xmlrpc/common' % (HOST,PORT)
281 sock = xmlrpclib.ServerProxy(url)
282 uid = sock.login(DB,USER,PASS)
283 print "Logged in as %s (uid:%d)" % (USER,uid)
284
285 # Create a new idea
286 url = 'http://%s:%d/xmlrpc/object' % (HOST,PORT)
287 sock = xmlrpclib.ServerProxy(url)
288 args = {
289        'name' : 'Another idea',
290        'description' : 'This is another idea of mine',
291        'inventor_id': uid,
292 }
293 idea_id = sock.execute(DB,uid,PASS,'idea.idea','create',args)

      PHP example
294     <?
295     include('xmlrpc.inc'); // Use phpxmlrpc library, available on sourceforge
296     // ... define $HOST, $PORT, $DB, $USER, $PASS
297     $client = new xmlrpc_client("http://$HOST:$PORT/xmlrpc/common");
298     $msg = new xmlrpcmsg("login");
299     $msg->addParam(new xmlrpcval($DB, "string"));
300     $msg->addParam(new xmlrpcval($USER, "string"));
301     $msg->addParam(new xmlrpcval($PASS, "string"));
302     resp = $client->send($msg);
303     uid = $resp->value()->scalarval()
304     echo "Logged in as $USER (uid:$uid)"
305
306     // Create a new idea
307     $arrayVal = array(
308        'name'=>new xmlrpcval("Another Idea", "string") ,
309        'description'=>new xmlrpcval("This is another idea of mine" , "string"),
310        'inventor_id'=>new xmlrpcval($uid, "int"),
311     );
312     $msg = new xmlrpcmsg('execute');
313     $msg->addParam(new xmlrpcval($DB, "string"));
314     $msg->addParam(new xmlrpcval($uid, "int"));
315     $msg->addParam(new xmlrpcval($PASS, "string"));
316     $msg->addParam(new xmlrpcval("idea.idea", "string"));
317     $msg->addParam(new xmlrpcval("create", "string"));
318     $msg->addParam(new xmlrpcval($arrayVal, "struct"));
319     $resp = $client->send($msg);
320     ?>

      Internationalization
      Each module can provide its own translations within the i18n directory, by having files named LANG.po where LANG is
      the locale code for the country, or country and language combination when they differ (e.g. pt.po and pt_BR.po).
      Translations will be loaded automatically by OpenERP for all enabled languages.
      Developers always use English when creating a module, then export the module terms using OpenERP's gettext POT
      export feature (Administration>Translations>Export a Translation File without specifying a language) , to create the module
      template POT file, and then derive the translated PO files.
      Many IDE's have plugins or modes for editing and merging PO/POT files.

      Tip: The GNU gettext format (Portable Object) used by OpenERP is integrated into LaunchPad, making it an online
      collaborative translation platform, with automatic translation features.

321     |- idea/                #   The module directory
322       |- i18n/              #   Translation files
323         | - idea.pot        #   Translation Template (exported from OpenERP)
324         | - fr.po           #   French translation
325         | - pt_BR.po        #   Brazilian Portuguese translation
326         | (...)

      Tip: By default OpenERP's POT export only extracts labels inside XML records or inside field definitions in Python code,
      but any Python string can be translated by surrounding it with the tools.translate._ method (e.g. _('Label') )




                                    Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.        15/18
Rapid Application Development
      Module recorder
      The base_module_record module can be used to export a set of changes in the form of a new module. It should be used
      for all customizations that should be carried on through migrations and updates. It has 2 modes:
        • Start/Pause/Stop mode, where all operations (on business objects or user interface) are recorded until the recorder
        is stopped or paused.
        • Date- and model-based mode where all changes performed after a given date on the given models (object types)
        are exported. .
      Report Creator (view) and Report Designer (print) modules
      The base_report_creator module can be used to automate the creation of custom statistics views, e.g. to construct
      dashboards. The resulting dashboards can then be exported using the base_module_record module.
      The base_report_designer module can be used in conjunction with the OpenOffice plugin to provide a user-friendly
      interface for selecting data from OpenERP and designing report templates within OpenOffice.
      Quality assessment module
      When writing you module, use the base_module_quality module to test various aspects of your module: coding
      standards, code duplication, code efficiency, etc. (web client only). Make sure to provide a lot of demo data.
    Unit tests
    Unit test files are regular OpenERP XML files, with regular record elements plus an appropriate combination of function,
    workflow and assert elements to test the module's business logic.
    The continuous integration server will automatically execute unit tests and provide feedback. Unit tests can also be
    used as installation checks if you reference the XML file in the update_xml section of your module descriptor.
    idea_unit_test.xml
327 <record id="idea_test_1" model="idea.idea">
328         <field name="name">Unit Test Idea</field>
329         <field name="description">A sample idea for performing tests</field>
330         <field name="invent_date">20100101</field>
331 </record>
332 <assert id="idea_test_1" model="idea.idea" severity="warning"
333           string="New idea is not draft!">
334         <test expr="state">draft</field>
335 </assert>
336 <workflow ref="idea_test_1" model="idea.idea" action="button_confirm"
337           uid="base.user_admin"/>
338 <assert id="idea_test_1" model="idea.idea" severity="warning"
339                    string="Confirm button does not work!">
340         <test expr="state == 'confirmed'"/>
341 </assert>
342 <function model="idea.idea" name="unlink">
343         <value eval="ref('idea_test_1')"/>
344 </function>
345 <assert search="[('name','=','Unit Test Idea']" model="idea.idea" count="0"
346        severity="warning" string="Test data is not deleted (name is unique!)"/>
      Common attributes:
       • model: target object model name
       • id: xml_id of the record to test (assert) or to move in workflow (workflow)
       • uid: optional id of user to perform operation (function or workflow)
      assert             Perform test(s) and fail with given string if tests do not pass.
                          • string: error message in case of test failure
                          • severity: error severity in case of test failure (debug,info,error,warning,critical)
                          • search: domain of search to perform if id is not provided (each record is tested)
                          • count: if search is provided number of expected records (failure if not verified)
                          • <test> children with expr Python expression that must evaluate to True or to the text content of the element. It can use any
                          field of the object, Python built-ins and the ref() method that returns the database id for a given xml_id.
      function           Call method on the given model, passing the value children as arguments.
                          • name: name of method to call
                          • <value> children with Python expressions, that can use the ref() method
      workflow           Send a workflow signal on a given object
                          • ref: xml_id of object to send workflow signal to
                          • action: name of workflow signal to send


      Recurrent jobs
      The ir.cron model is used to setup recurrent tasks.
347     <record id="task_id" model="ir.cron">
348           <field name="name">Task title</field>
349           <field name="user_id" ref="module.user_xml_id">
350           <field name="interval_type">minutes|hours|days|work_days|weeks|months</field>
351           <field name="interval_number" eval="<number>"/>
352           <field name="numbercall" eval="<number,negative for unlimited>"/>
353           <field name="doall" eval="True|False"/> <!-- Repeat missed calls? -->
354           <field name="model">model.name</field>


                                         Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                            16/18
355         <field name="function">name_of_model_function_to_call</field>
356         <field name="args" eval="python code for arguments tuple"/>
357         <field name="priority" eval="<integer,smaller is higher>"/>
358     </record>

      Performance Optimization
      As Enterprise Management Software typically has to deal with large amounts of records, you may want to pay
      attention to the following anti-patterns, to obtain consistent performance:
        • Do not place browse() calls inside loops, put them before and access only the browsed objects inside the loop. The
        ORM will optimize the number of database queries based on the browsed attributes.
        • Avoid recursion on object hierarchies (objects with a parent_id relationship), by adding parent_left and parent_right
        integer fields on your object, and setting _parent_store to True in your object class. The ORM will use a modified
        preorder tree traversal to be able to perform recursive operations (e.g. child_of) with database queries in O(1)
        instead of O(n)
        • Do not use function fields lightly, especially if you include them in tree views. To optimize function fields, two
        mechanisms are available:
           ◦ multi: all fields sharing the same multi attribute value will be computed with one single call to the function, which
           should then return a dictionary of values in its values map
           ◦ store: function fields with a store attribute will be stored in the database, and recomputed on demand when the
           relevant trigger objects are modified. The format for the trigger specification is as follows: store = {'model':
           (_ref_fnct, fields, priority)} (see example below)
359        def _get_idea_from_vote(self,cr,uid,ids,context={}):
360           res = {}
361           vote_ids = self.pool.get('idea.vote').browse(cr,uid,ids,context=context)
362           for v in vote_ids:
363             res[v.idea_id.id] = True # Store the idea identifiers in a set
364           return res.keys()
365        def _compute(self,cr,uid,ids,field_name,arg,context={}):
366           res = {}
367           for idea in self.browse(cr,uid,ids,context=context):
368             vote_num = len(idea.vote_ids)
369             vote_sum = sum([v.vote for v in idea.vote_ids])
370             res[idea.id] = {
371                'vote_sum': vote_sum,
372                'vote_avg': (vote_sum/vote_num) if vote_num else 0.0,
373             }
374           return res
375        _columns = {
376          # These fields are recomputed whenever one of the votes changes
377          'vote_avg': fields.function(_compute, method=True, string='Votes Average',
378            store = {'idea.vote': (_get_idea_from_vote,['vote'],10)},multi='votes'),
379          'vote_sum': fields.function(_compute, method=True, string='Votes Sum',
380            store = {'idea.vote': (_get_idea_from_vote,['vote'],10)},multi='votes'),
381        }

      Community / Contributing
      OpenERP projects are hosted on LaunchPad(LP), where all project resources may be found: Bazaar branches, bug tracking,
      blueprints, roadmap, FAQs, etc. Create a free account on launchpad.net to be able to contribute.
      Launchpad groups
       Group*               Members                                            Bazaar/LP restrictions
       OpenERP Quality Team OpenERP Core Team                                  Can merge and commit on official branches.
       (~openerp)
       OpenERP Commiters    Selected active community members                  Can mark branches to be merged into official branch. Can commit on
       (~openerp-commiter)                                                     extra-addons branch
       OpenERP Drivers      Selected active community members                  Can confirm bugs and set milestones on bugs / blueprints
       (~openerp-drivers)
       OpenERP Community    Open group, anyone can join                        Can create community branches where everyone can contribute
       (~openerp-community)
      *Members of upper groups are also members of lower                       groups




                                   Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.                          17/18
License

Copyright © 2010 Open Object Press. All rights reserved.

You may take electronic copy of this work and distribute it if you don't change the content. You can also print a copy to be
read by yourself only.

We have contracts with different publishers in different countries to sell and distribute paper or electronic based versions of
this work (translated or not) in bookstores. This helps to distribute and promote the Open ERP product. It also helps us to
create incentives to pay contributors and authors with the royalties.

Due to this, grants to translate, modify or sell this work are strictly forbidden, unless OpenERP s.a. (representing Open
Object Press) gives you a written authorization for this.

While every precaution has been taken in the preparation of this work, the publisher and the authors assume no
responsibility for errors or omissions, or for damages resulting from the use of the information contained herein.

Published by Open Object Press, Grand Rosière, Belgium




                              Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18.            18/18

OpenERP Technical Memento

  • 1.
    Open Source RADwith OpenObject PREAMBLE OpenERP is a modern Enterprise Management Software, released under the AGPL license, and featuring CRM, HR, Sales, Accounting, Manufacturing, Inventory, Project Management, ... It is based on OpenObject, a modular, scalable, and intuitive Rapid Application Development (RAD) framework written in Python. OpenObject features a complete and modular toolbox for quickly building applications: integrated Object- Relationship Mapping (ORM) support, template-based Model-View-Controller (MVC) interfaces, a report generation system, automated internationalization, and much more. Python is a high-level dynamic programming language, ideal for RAD, combining power with clear syntax, and a core kept small by design. Tip: Useful links • Main website, with OpenERP downloads: www.openerp.com • Functional & technical documentation: doc.openerp.com • Community resources: www.launchpad.net/open-object • Integration server: test,openobject.com • Learning Python: doc.python.org • OpenERP E-Learning platform: edu.openerp.com Installing OpenERP OpenERP is distributed as packages/installers for most platforms, but can of course be installed from the source on any platform. OpenERP Architecture OpenERP uses the well-known client-server paradigm, with different pieces of software acting as client and server depending on the desired configuration.Client software OpenERP provides a thick desktop client (GTK+) on all platforms, and a web interface is also accessible using any modern browser. Tip: Installation procedure The procedure for installing OpenERP is likely to evolve (dependencies and so on), so make sure to always check the specific documentation (packaged & on website) for the latest procedures. See http://doc.openerp.com/install Package installation Windows all-in-one installer, and separate installers for server, client, and webserver are on the website openerp-server and openerp-client packages are available via corresponding package manager Linux (e.g. Synaptic on Ubuntu) look online for package installers for the GTK client, as well as tutorials for installing the server (e.g. Mac devteam.taktik.be) Installing from source There are two alternatives: using a tarball provided on the website, or directly getting the source using Bazaar (distributed Source Version Control). You also need to install the required dependencies (PostgreSQL and a few Python libraries – see documentation on doc.openerp.com). Compilation tip: OpenERP being Python-based, no compilation step is needed Typical bazaar checkout procedure (on Debian-based Linux) 1 $ sudo apt-get install bzr # install bazaar version control 2 $ bzr branch lp:openerp # retrieve source installer 3 $ cd openerp && python ./bzr_set.py # fetch code and perform setup Database creation After installation, run the server and the client. From the GTK client, use File→Databases→New Database to create a new database (default super admin password is admin). Each database has its own modules and config, and demo data can be included. Building an OpenERP module: idea CONTEXTThe code samples used in this memento are taken from a hypothetical idea module. The purpose of this module would be to help creative minds, who often come up with ideas that cannot be pursued immediately, and are too easily forgotten if not logged somewhere. It could be used to record these ideas, sort them and rate them. Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 1/18
  • 2.
    Note: Modular development OpenObject uses modules as feature containers, to foster maintainable and robust development. Modules provide feature isolation, an appropriate level of abstraction, and obvious MVC patterns. Composition of a module A module may contain any of the following elements: • business objects: declared as Python classes extending the osv.osv OpenObject class, the persistence of these resources is completely managed by OpenObject ; • data: XML/CSV files with meta-data (views and workflows declaration), configuration data (modules parametrization) and demo data (optional but recommended for testing, e.g. sample ideas) ; • wizards: stateful interactive forms used to assist users, often available as contextual actions on resources ; • reports: RML (XML format), MAKO or OpenOffice report templates, to be merged with any kind of business data, and generate HTML, ODT or PDF reports. Typical module structure Each module is contained in its own directory within the server/bin/addons directory in the server installation. Note: You can declare your own add-ons directory in the configuration file of OpenERP (passed to the server with the -c option) using the addons_path option. 4 addons/ 5 |- idea/ # The module directory 6 |- demo/ # Demo and unit test population data 7 |- i18n/ # Translation files 8 |- report/ # Report definitions 9 |- security/ # Declaration of groups and access rights 10 |- view/ # Views (forms,lists), menus and actions 11 |- wizard/ # Wizards definitions 12 |- workflow/ # Workflow definitions 13 |- __init__.py # Python package initialization (required) 14 |- __terp__.py # module declaration (required) 15 |- idea.py # Python classes, the module's objects The __init__.py file is the Python module descriptor, because an OpenERP module is also a regular Python module. __init__.py: 16 # Import all files & directories containing python code 17 import idea, wizard, report The __terp__.py (may also be named __openerp__.py as of v5.2)is the OpenERP descriptor and contains a single Python dictionary with the actual declaration of the module: its name, dependencies, description, and composition. __terp__.py: 18 { 19 'name' : 'Idea', 20 'version' : '1.0', 21 'author' : 'OpenERP', 22 'description' : 'Ideas management module', 23 'category': 'Enterprise Innovation', 24 'website': 'http://www.openerp.com', 25 'depends' : ['base'], # list of dependencies, conditioning startup order 26 'update_xml' : [ # data files to load at module init 27 'security/groups.xml', # always load groups first! 28 'security/ir.model.access.csv', # load access rights after groups 29 'workflow/workflow.xml', 30 'view/views.xml', 31 'wizard/wizard.xml', 32 'report/report.xml', 33 ], 34 'demo_xml': ['demo/demo.xml'], # demo data (for unit tests) 35 'active': False, # whether to install automatically at new DB creation 36 } Object Service – ORM Key component of OpenObject, the Object Service (OSV) implements a complete Object-Relational mapping layer, freeing developers from having to write basic SQL plumbing. Business objects are declared as Python classes inheriting from the osv.osv class, which makes them part of the OpenObject Model, and magically persisted by the ORM layer. Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 2/18
  • 3.
    Predefined attributes areused in the Python class to specify a business object's characteristics for the ORM: idea.py: 37 from osv import osv, fields 38 class idea(osv.osv): idea 39 _name = 'idea.idea' 40 _columns = { 41 'name': fields.char('Title', size=64, required=True, translate=True), 42 'state': fields.selection([('draft','Draft'), 43 ('confirmed','Confirmed')],'State',required=True,readonly=True), 44 # Description is read-only when not draft! 45 'description': fields.text('Description', readonly=True, 46 states={'draft': [('readonly', False)]} ), 47 'active': fields.boolean('Active'), 48 'invent_date': fields.date('Invent date'), 49 # by convention, many2one fields end with '_id' 50 'inventor_id': fields.many2one('res.partner','Inventor'), 51 'inventor_country_id': fields.related('inventor_id','country', 52 readonly=True, type='many2one', 53 relation='res.country', string='Country'), 54 # by convention, *2many fields end with '_ids' 55 'vote_ids': fields.one2many('idea.vote','idea_id','Votes'), 56 'sponsor_ids': fields.many2many('res.partner','idea_sponsor_rel', 57 'idea_id','sponsor_id','Sponsors'), 58 'score': fields.float('Score',digits=(2,1)), 59 'category_id' = many2one('idea.category', 'Category'), 60 } 61 _defaults = { 62 'active': lambda *a: 1, # ideas are active by default 63 'state': lambda *a: 'draft', # ideas are in draft state by default 64 } 65 def _check_name(self,cr,uid,ids): 66 for idea in self.browse(cr, uid, ids): 67 if 'spam' in idea.name: return False # Can't create ideas with spam! 68 return True 69 _sql_constraints = [('name_uniq','unique(name)', 'Idea must be unique!')] 70 _constraints = [(_check_name,'Please avoid spam in ideas !', ['name'])] 71 idea() # Instantiate the class Predefined osv.osv attributes for business objects _name (required) business object name, in dot-notation (in module namespace) _columns (required) dictionary {field names → object fields declarations } _defaults dictionary: { field names → functions providing defaults } _defaults['name'] = lambda self,cr,uid,context: 'eggs' _auto if True (default) the ORM will create the database table – set to False to create your own table/view within the init() method _inherit _name of the parent business object (for prototype inheritance) _inherits for multiple / instance inheritance mechanism: dictionary mapping the _name of the parent business objects to the names of the corresponding foreign key fields to use _constraints list of tuples defining the Python constraints, in the form (func_name, message, fields). (→70) _sql_constraints list of tuples defining the SQL constraints, in the form (name, sql_def, message). (→69) _log_access If True (default), 4 fields (create_uid, create_date, write_uid, write_date) will be used to log record-level operations, made accessible via osv's perm_read() function _order Name of the field used to sort the records in lists (default: 'id') _rec_name Alternative field to use as name, used by osv's name_get() (default: 'name') _sql SQL code to create the table/view for this object (if _auto is False) – can be replaced by SQL execution in the init() method _table SQL table name to use (default: _name with dots '.' replaced by underscores '_') Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 3/18
  • 4.
    Inheritance mechanisms ORM fieldtypes Objects may contain 3 types of fields: simple, relational, and functional. Simple types are integers, floats, booleans, strings, etc. Relational fields represent the relationships between objects (one2many, many2one, many2many). Functional fields are not stored in the database but calculated on-the-fly as Python functions. Relevant examples in the idea class above are indicated with the corresponding line numbers (→XX,XX) ORM fields types Common attributes supported by all fields (optional unless specified) • string: field label (required) • context: dictionary with contextual parameters (for relational fields) • required: True if mandatory • change_default: True if field should be usable as condition for default values • readonly: True if not editable in clients • help: help tooltip • states: dynamic changes to this field's common attributes based on the state • select: 1 to include in search views and optimize for list field (→42,46) filtering (with database index) Simple fields boolean(...) integer(...) date(...) datetime(...) time(...) 'active': fields.boolean('Active'), 'priority': fields.integer('Priority'), 'start_date': fields.date('Start Date'), char(string,size,translate=False,..) text(string, • translate: True if field values can be translated by users translate=False, …) • size: maximum size for char fields (→41,45) Text-based fields float(string, digits=None, ...) • digits: tuple (precision, scale) (→58) . If digits is not provided, it's a float, not Floating-point value with arbitrary precision and scale a decimal type. selection(values, string, ...) • values: list of values (key-label tuples) or function returning such a list Field allowing selection among a set of predefined values (required) (→42) binary(string, filters=None, ...) • filters: optional filename filters Field for storing a file or binary content. 'picture': fields.binary('Picture', filters='*.png,*.gif') reference(string, selection, size,..) • selection: model _name of allowed objects types and corresponding label Field with dynamic relationship to any other object, (same format as values for selection fields) (required) associated with an assistant widget • size: size of text column used to store it (as text: 'model_name,object_id') (required) 'contact': fields.reference('Contact',[ ('res.partner','Partner'), ('res.partner.contact','Contact')], 128) Relational fields Common attributes supported by relational fields • domain: optional restriction in the form of arguments for search (see search()) many2one(obj, ondelete='set null', …) (→50) • obj: _name of destination object (required) Relationship towards a parent object (using a foreign key) • ondelete: deletion handling, e.g. 'set null', 'cascade', see PostgreSQL documentation one2many(obj, field_id, …) (→55) • obj: _name of destination object (required) Virtual relationship towards multiple objects (inverse of • field_id: field name of inverse many2one, i.e. corresponding foreign key many2one) (required) many2many(obj, rel, field1, field2, …) (→56) • obj: _name of destination object (required) Bidirectional multiple relationship between objects • rel: relationship table to use (required) • field1: name of field in rel table storing the id of the current object (required) • field2: name of field in rel table storing the id of the target object (required) Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 4/18
  • 5.
    ORM fields types Functional fields function(fnct, arg=None, fnct_inv=None, fnct_inv_arg=None, type='float', fnct_search=None, obj=None, method=False, store=False, multi=False,…) Functional field simulating a real field, computed rather than stored • fnct: function to compute the field value (required) def fnct(self, cr, uid, ids, field_name, arg, context) returns a dictionary { ids→values } with values of type type • fnct_inv: function used to write a value in the field instead def fnct_inv(obj, cr, uid, id, name, value, fnct_inv_arg, context) • type: type of simulated field (any other type besides 'function') • fnct_search: function used to search on this field def fnct_search(obj, cr, uid, obj, name, args) returns a list of tuples arguments for search(), e.g. [('id','in',[1,3,5])] • obj: model _name of simulated field if it is a relational field • store, multi: optimization mechanisms (see usage in Performance Section) related(f1, f2, …, type='float', …) Shortcut field equivalent to browsing chained fields • f1,f2,...: chained fields to reach target (f1 required) (→51) • type: type of target field property(obj, type='float', view_load=None, group_name=None, …) Dynamic attribute with specific access rights • obj: object (required) • type: type of equivalent field Tip: relational fields symmetry • one2many ↔ many2one are symmetric • many2many ↔ many2many are symmetric when inversed (swap field1 and field2) • one2many ↔ many2one + many2one ↔ one2many = many2many Special / Reserved field names A few field names are reserved for pre-defined behavior in OpenObject. Some of them are created automatically by the system, and in that case any field with that name will be ignored. id unique system identifier for the object (created by ORM, do not add it) name defines the value used by default to display the record in lists, etc. if missing, set _rec_name to specify another field to use for this purpose active defines visibility: records with active set to False are hidden by default sequence defines order and allows drag&drop reordering if included in list views state defines life-cycle stages for the object, used for workflows parent_id defines tree structure on records, and enables child_of operator parent_left, used in conjunction with _parent_store flag on object, allows faster access to tree structures (see also Performance parent_right Optimization section) create_date, used to log creator, last updater, date of creation and last update date of the record. disabled if _log_access flag is set to create_uid, False write_date, (created by ORM, do not add them) write_uid Working with the ORM Inheriting from the osv.osv class makes all the ORM methods available on business objects. These methods may be invoked on the self object within the Python class itself (see examples in the table below), or from outside the class by first obtaining an instance via the ORM pool system. ORM usage sample 72 class idea2(osv.osv): idea2 73 _name = 'idea.idea' 74 _inherit = 'idea.idea' 75 def _score_calc(self,cr,uid,ids,field,arg,context=None): 76 res = {} 77 # This loop generates only 2 queries thanks to browse()! 78 for idea in self.browse(cr,uid,ids,context=context): 79 sum_vote = sum([v.vote for v in idea.vote_ids]) 80 avg_vote = sum_vote/len(idea.vote_ids) 81 res[idea.id] = avg_vote 82 return res 83 _columns = { 84 # Replace static score with average of votes 85 'score':fields.function(_score_calc,type='float',method=True) 86 } 87 idea2() Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 5/18
  • 6.
    ORM Methods onosv.osv objects OSV generic accessor • self.pool.get('object_name') may be used to obtain a model class from anywhere Common parameters, used by multiple methods • cr: database connection (cursor) • uid: id of user performing the operation • ids: list of record ids, or single integer when there is only one id • context: optional dictionary of contextual parameters, such as user language e.g. { 'lang': 'en_US', ... } create(cr, uid, values, context=None) • values: dictionary of field values for the record idea_id = self.create(cr, uid, Creates a new record with the specified value { 'name': 'Spam recipe', Returns: id of the new record 'description' : 'spam & eggs', 'inventor_id': 45, }) search(cr, uid, args, offset=0, limit=None, order=None, • args: list of tuples specifying search criteria context=None, count=False) • offset: optional number of records to skip • limit: optional max number of records to return Returns: list of ids of records matching the given criteria • order: optional columns to sort by (default: self._order) • count: if True, returns only the number of records matching the criteria, not their ids #Operators: =, !=, >, >=, <, <=, like, ilike, #in, not in, child_of, parent_left, parent_right #Prefix operators: '&' (default), '|', '!' #Fetch non-spam partner shops + partner 34 ids = self.search(cr, uid, [ '|', ('partner_id', '!=', 34), '!', ('name', 'ilike', 'spam'), ], order='partner_id') read(cr, user, ids, fields=None, context=None) • fields: optional list of field names to return (default: all fields) results = self.read(cr, uid, [42,43], Returns: list of dictionaries with requested field values ['name', 'inventor_id']) print 'Inventor:', results[0]['inventor_id'] write(cr, uid, ids, values, context=None) • values: dictionary of field values to update self.write(cr, uid, [42,43], Updates records with given ids with the given values. { 'name': 'spam & eggs', Returns: True 'partner_id': 24, }) copy(cr, uid, id, defaults,context=None) • defaults: dictionary of field values to change before saving the duplicated object Duplicates record with given id updating it with defaults values. Returns: True unlink(cr, uid, ids, context=None) self.unlink(cr, uid, [42,43]) Deletes records with the given ids Returns: True browse(cr, uid, ids, context=None) idea = self.browse(cr, uid, 42) print 'Idea description:', idea.description Fetches records as objects, allowing to use dot-notation to print 'Inventor country code:', browse fields and relations idea.inventor_id.address[0].country_id.code Returns: object or list of objects requested for vote in idea.vote_ids: print 'Vote %2.2f' % vote.vote default_get(cr, uid, fields, context=None) • fields: list of field names Returns: a dictionary of the default values for fields (set on the defs = self.default_get(cr,uid, object class, by the user preferences, or via the context) ['name','active']) # active should be True by default assert defs['active'] perm_read(cr, uid, ids, details=True) • details: if True, *_uid fields are replaced with the name of the user • returned dictionaries contain: object id (id), creator user id (create_uid), Returns: a list of ownership dictionaries for each requested creation date (create_date), updater user id (write_uid), update date record (write_date) perms = self.perm_read(cr,uid,[42,43]) print 'creator:', perms[0].get('create_uid', 'n/a') Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 6/18
  • 7.
    ORM Methods onosv.osv objects fields_get(cr, uid, fields=None, context=None) • fields: list of field names class idea(osv.osv): idea Returns a dictionary of field dictionaries, each one describing a (...) field of the business object _columns = { 'name' : fields.char('Name',size=64) (...) def test_fields_get(self,cr,uid): assert(self.fields_get('name')['size'] == 64) fields_view_get(cr, uid, view_id=None, view_type='form', • view_id: id of the view or None context=None, toolbar=False) • view_type: type of view to return if view_id is None ('form','tree', ...) • toolbar: True to include contextual actions Returns a dictionary describing the composition of the requested def test_fields_view_get(self,cr,uid): view (including inherited views and extensions) idea_obj = self.pool.get('idea.idea') form_view = idea_obj.fields_view_get(cr,uid) name_get(cr, uid, ids, context={}) # Ideas should be shown with invention date Returns tuples with the text representation of requested objects def name_get(self,cr,uid,ids): for to-many relationships res = [] for r in self.read(cr,uid,ids['name','create_date']) res.append((r['id'], '%s (%s)' (r['name'],year)) return res name_search(cr, uid, name='', args=None, operator='ilike', • name: object name to search for context=None, limit=80) • operator: operator for name criterion • args, limit: same as for search()) Returns list of object names matching the criteria, used to provide # Countries can be searched by code or name completion for to-many relationships. Equivalent of search() on def name_search(self,cr,uid,name='', name + name_get() args=[],operator='ilike',context={}, limit=80): ids = [] if name and len(name) == 2: ids = self.search(cr, user, [('code', '=', name)] + args, limit=limit, context=context) if not ids: ids = self.search(cr, user, [('name', operator, name)] + args, limit=limit, context=context) return self.name_get(cr,uid,ids) export_data(cr, uid, ids, fields, context=None) • fields: list of field names • context may contain import_comp (default: False) to make exported Exports fields for selected objects, returning a dictionary with a data compatible with import_data() (may prevent exporting some fields) datas matrix. Used when exporting data via client menu. import_data(cr, uid, fields, data, mode='init', • fields: list of field names current_module='', noupdate=False, context=None, • data: data to import (see export_data()) filename=None) • mode: 'init' or 'update' for record creation • current_module: module name Imports given data in the given module Used when exporting data • noupdate: flag for record creation via client menu • filename: optional file to store partial import state for recovery Tip: use read() through webservice calls, but always browse() internally Building the module interface To construct a module, the main mechanism is to insert data records declaring the module interface components. Each module element is a regular data record: menus, views, actions, roles, access rights, etc. Common XML structure XML files declared in a module's update_xml attribute contain record declarations in the following form: 88 <?xml version="1.0" encoding="utf-8"?> 89 <openerp> 90 <data> 91 <record model="object_model_name" id="object_xml_id"> 92 <field name="field1">value1</field> 93 <field name="field2">value2</field> 94 </record> 95 <record model="object_model_name2" id="object_xml_id2"> 96 <field name="field1" ref="module.object_xml_id"/> 97 <field name="field2" eval="ref('module.object_xml_id')"/> 98 </record> 99 </data> 100 </openerp> Each type of record (view, menu, action) support a specific set of child entities and attributes, but all share the following special attributes: Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 7/18
  • 8.
    id the unique (per module) XML identifier of this record (xml_id) ref used instead of element content to reference another record (works cross-module by prepending the module name) eval used instead of element content to provide value as a Python expression, that can use the ref() method to find the database id for a given xml_id Tip: XML RelaxNG validation OpenObject validates the syntax and structure of XML files, according to a RelaxNG grammar, found in server/bin/import_xml.rng. For manual check use xmllint: xmllint –relaxng /path/to/import_xml.rng <file> Common CSV syntax CSV files can also be added in update_xml, and the records will be inserted by the OSV's import_data() method, using the CSV filename to determine the target object model. The ORM automatically reconnects relationships based on the following special column names: id (xml_id) column containing identifiers for relationships many2one_field reconnect many2one using name_search() many2one_field:id reconnect many2one based on object's xml_id many2one_field.id reconnect many2one based on object's database id many2many_field reconnects via name_search(), repeat for multiple values many2many_field:id reconnects with object's xml_id, repeat for multiple values many2many_field.id reconnects with object's database id, repeat for multiple values one2many_field/field creates one2many destination record and sets field value ir.model.access.csv 101 "id","name","model_id:id","group_id:id","perm_read","perm_write","perm_create","perm_unlink" 102 "access_idea_idea","idea.idea","model_idea_idea","base.group_user",1,0,0,0 103 "access_idea_vote","idea.vote","model_idea_vote","base.group_user",1,0,0,0 Menus and actions Actions are declared as regular records and can be triggered in 3 ways: • by clicking on menu items linked to a specific action • by clicking on buttons in views, if these are connected to actions • as contextual actions on an object Action declaration 104 <record model="ir.actions.act_window" id="action_id"> 105 <field name="name">action.name</field> 106 <field name="view_id" ref="view_id"/> 107 <field name="domain">[list of 3-tuples (max 250 characters)]</field> 108 <field name="context">{context dictionary (max 250 characters)}</field> 109 <field name="res_model">object.model.name</field> 110 <field name="view_type">form|tree</field> 111 <field name="view_mode">form,tree,calendar,graph</field> 112 <field name="target">new</field> 113 <field name="search_view_id" ref="search_view_id"/> 114 </record> id identifier of the action in table ir.actions.act_window, must be unique name action name (required) view_id specific view to open (if missing, highest priority view of given type is used) domain tuple (see search() arguments) for filtering the content of the view context context dictionary to pass to the view res_model object model on which the view to open is defined view_type set to form to open records in edit mode, set to tree for a tree view only view_mode if view_type is form, list allowed modes for viewing records (form, tree, ...) target set to new to open the view in a new window search_view_id identifier of the search view to replace default search form (new in version 5.2) Menu declaration The menuitem entity is a shortcut for declaring an ir.ui.menu record and connect it with a corresponding action via an ir.model.data record. 115 <menuitem id="menu_id" parent="parent_menu_id" 116 name="label" action="action_id" icon="icon-code" 117 groups="groupname1,groupname2" sequence="10"/> id identifier of the menuitem, must be unique parent id of the parent menu in the hierarchy name Optional menu label (default: action name) action identifier of action to execute, if any icon icon to use for this menu (e.g. terp-graph, STOCK_OPEN, see doc.opernerp.com) groups list of groups that can see this menu item (if missing, all groups can see it) sequence integer index for ordering sibling menuitems (10,20,30..) Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 8/18
  • 9.
    Views and inheritance Views form a hierarchy. Several views of the same type can be declared on the same object, and will be used depending on their priorities. By declaring an inherited view it is possible to add/remove features in a view. Generic view declaration 118 <record model="ir.ui.view" id="view_id"> 119 <field name="name">view.name</field> 120 <field name="model">object_name</field> 121 <field name="type">form</field> # tree,form,calendar,search,graph,gantt 122 <field name="priority" eval="16"/> 123 <field name="arch" type="xml"> 124 <!-- view content: <form>, <tree>, <graph>, … --> 125 </field> 126 </record> id unique view identifier name view name model object model on which the view is defined (same as res_model in actions) type view type: form, tree, graph, calendar, search, gantt (search is new in 5.2) priority view priority, smaller is higher (default: 16) arch architecture of the view, see various view types below Forms (to view/edit records) Forms allow creation/edition or resources, and correspond to <form> elements. Allowed elements all (see form elements below) 127 <form string="Idea form"> 128 <group col="6" colspan="4"> 129 <group colspan="5" col="6"> 130 <field name="name" select="1" colspan="6"/> 131 <field name="inventor_id" select="1"/> 132 <field name="inventor_country_id" /> 133 <field name="score" select="2"/> 134 </group> 135 <group colspan="1" col="2"> 136 <field name="active"/><field name="invent_date"/> 137 </group> 138 </group> 139 <notebook colspan="4"> 140 <page string="General"> 141 <separator string="Description"/> 142 <field colspan="4" name="description" nolabel="1"/> 143 </page> 144 <page string="Votes"> 145 <field colspan="4" name="vote_ids" nolabel="1" select="1"> 146 <tree> 147 <field name="partner_id"/> 148 <field name="vote"/> 149 </tree> 150 </field> 151 </page> 152 <page string="Sponsors"> 153 <field colspan="4" name="sponsor_ids" nolabel="1" select="1"/> 154 </page> 155 </notebook> 156 <field name="state"/> 157 <button name="do_confirm" string="Confirm" icon="gtk-ok" type="object"/> 158 </form> Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 9/18
  • 10.
    Form Elements Common attributes for all elements: • string: label of the element • nolabel: 1 to hide the field label • colspan: number of column on which the field must span • rowspan: number of rows on which the field must span • col: number of column this element must allocate to its child elements • invisible: 1 to hide this element completely • eval: evaluate this Python code as element content (content is string by default) • attrs: Python map defining dynamic conditions on these attributes: readonly, invisible, required based on search tuples on other field values field automatic widgets depending on the corresponding field type. Attributes: • string: label of the field, also for search (overrides field name) • select: 1 to show the field in normal search, 2 for advanced only • nolabel: 1 to hide the field label • required: override required field attribute • readonly: override readonly field attribute • password: True to hide characters typed in this field • context: Python code declaring a context dictionary • domain: Python code declaring list of tuples for restricting values • on_change: Python method call to trigger when value is changed • completion: 1 to enable auto-completion of values when possible • groups: comma-separated list of group (id) allowed to see this field • widget: select alternative widget (one2many_list, many2many, url, email, image, float_time, reference, text_wiki, text_html, progressbar) properties dynamic widget showing all available properties (no attribute) button clickable widget associated with actions. Specific attributes: • type: type of button: workflow (default), object, or action • name: workflow signal, function name (without parentheses) or action to call (depending on type) • confirm: text of confirmation message when clicked • states: comma-separated list of states in which this button is shown • icon: optional icon (all GTK STOCK icons e.g. gtk-ok) separator horizontal separator line for structuring views, with optional label newline place-holder for completing the current line of the view label free-text caption or legend in the form group used to organise fields in groups with optional label (adds frame) notebook, page notebook elements are tab containers for page elements. Attributes: • name: label for the tab/page • position: tabs position in notebook (inside, top, bottom, left, right) Dynamic views In addition to what can be done with states and attrs attributes, functions may be called by view elements (via buttons of type object, or on_change attributes on fields) to obtain dynamic behavior. These functions may alter the view interface by returning a Python map with the following entries: value a dictionary of field names and their updated values domain a dictionary of field names and their updated domains of value warning a dictionary with a title and message to show a warning dialog Lists/Trees Lists include field elements, are created with type tree, and have a <tree> parent element. Attributes • colors: list of colors mapped to Python conditions • editable: top or bottom to allow in-place edit • toolbar: set to True to display the top level of object hierarchies as a side toolbar (example: the menu) Allowed elements field, group, separator, tree, button, filter, newline 159 <tree string="Idea Categories" toolbar="1" colors="blue:state==draft"> 160 <field name="name"/> 161 <field name="state"/> 162 </tree> Calendars Views used to display date fields as calendar events (<calendar> parent) Attributes • color: name of field for color segmentation • date_start: name of field containing event start date/time • day_length: length of a calendar day in hours (default: 8) • date_stop: name of field containing event stop date/time or • date_delay: name of field containing event duration Allowed elements field (to define the label for each calendar event) 163 <calendar string="Ideas" date_start="invent_date" color="inventor_id"> 164 <field name="name"/> 165 </calendar> Gantt Charts Bar chart typically used to show project schedule (<gantt> parent element) Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 10/18
  • 11.
    Attributes same as <calendar> Allowed elements field, level • level elements are used to define the Gantt chart levels, with the enclosed field used as label for that drill- down level 166 <gantt string="Ideas" date_start="invent_date" color="inventor_id"> 167 <level object="idea.idea" link="id" domain="[]"> 168 <field name="inventor_id"/> 169 </level> 170 </gantt> Charts (Graphs) Views used to display statistical charts (<graph> parent element) Tip: charts are most useful with custom views extracting ready-to-use statistics Attributes • type: type of chart: bar, pie (default) • orientation: horizontal, vertical Allowed elements field, with specific behavior: • first field in view is X axis, 2nd one is Y, 3rd one is Z • 2 fields required, 3rd one is optional • group attribute defines the GROUP BY field (set to 1) • operator attribute sets the aggregation operator to use for other fields when one field is grouped (+,*,**,min,max) 171 <graph string="Total idea score by Inventor" type="bar"> 172 <field name="inventor_id" /> 173 <field name="score" operator="+"/> 174 </graph> Search views (new in v5.2) Search views are used to customize the search panel on top of list views, and are declared with the search type, and a top-level <search> element. After defining a search view with a unique id, add it to the action opening the list view using the search_view_id field in its declaration. Allowed elements field, group, separator, label, search, filter, newline, properties • filter elements allow defining button for domain filters • adding a context attribute to fields makes widgets that alter the search context (useful for context-sensitive fields, e.g. pricelist-dependent prices) 175 <search string="Search Ideas"> 176 <group col="6" colspan="4"> 177 <filter string="My Ideas" icon="terp-partner" 178 domain="[('inventor_id','=',uid)]" 179 help="My own ideas"/> 180 <field name="name" select="1"/> 181 <field name="description" select="1"/> 182 <field name="inventor_id" select="1"/> 183 <!-- following context field is for illustration only --> 184 <field name="inventor_country_id" select="1" widget="selection" 185 context="{'inventor_country': self}"/> 186 </group> 187 </search> View Inheritance Existing views should be modifying through inherited views, never directly. An inherited view references its parent view using the inherit_id field, and may add or modify existing elements in the view by referencing them through XPath expressions, specifying the appropriate position. Tip: XPath reference can be found at www.w3.org/TR/xpath position • inside: placed inside match (default) • before: placed before match • replace: replace match • after: placed after match 188 <!-- improved idea categories list --> 189 <record id="idea_category_list2" model="ir.ui.view"> 190 <field name="name">id.category.list2</field> 191 <field name="model">ir.ui.view</field> 192 <field name="inherit_id" ref="id_category_list"/> 193 <field name="arch" type="xml"> 194 <xpath expr="/tree/field[@name='description']" position="after"> 195 <field name="idea_ids" string="Number of ideas"/> 196 </xpath> 197 </field> 198 </record> Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 11/18
  • 12.
    Reports There are several report engines in OpenERP, to produce reports from different sources and in many formats. Special expressions used inside report templates produce dynamic data and/or modify the report structure at rendering time. Custom report parsers may be written to support additional expressions. Alternative Report Formats (see doc.openerp.com) sxw2rml OpenOffice 1.0 templates (.sxw) converted to RML with sxw2rml tool, and the RML rendered in HTML or PDF rml RML templates rendered directly as HTML or PDF xml,xsl:rml XML data + XSL:RML stylesheets to generate RML odt2odt OpenOffice templates (.odt) used to produce directly OpenOffice documents (.odt) (As of OpenERP 5.2) mako Mako template library used to produce HTML output, by embedding Python code and OpenERP expressions within any text file (As of OpenERP 5.2) Expressions used in OpenERP report templates [[ <content> ]] double brackets content is evaluated as a Python expression based on the following expressions Predefined expressions: • objects contains the list of records to print • data comes from the wizard launching the report • user contains the current user (as per browse()) • time gives access to Python time module • repeatIn(list,'var','tag') repeats the current parent element named tag for each object in list, making the object available as var during each loop • setTag('tag1','tag2') replaces the parent RML tag1 with tag2 • removeParentNode('tag') removes parent RML element tag • formatLang(value, digits=2, date=False, date_time=False, grouping=True, monetary=False) can be used to format a date, time or amount according to the locale • setLang('lang_code') sets the current language and locale for translations Report declaration 199 <!-- The following creates records in ir.actions.report.xml model --> 200 <report id="idea_report" string="Print Ideas" model="idea.idea" 201 name="idea.report" rml="idea/report/idea.rml" > 202 <!-- Use addons/base_report_designer/wizard/tiny_sxw2rml/tiny_sxw2rml.py 203 to generate the RML template file from a .sxw template --> id unique report identifier name name for the report (required) string report title (required) model object model on which the report is defined (required) rml, sxw, xml, xsl path to report template sources (starting from addons), depending on report auto set to False to use a custom parser, by subclassing report_sxw.rml_parse and declaring the report as follows: report_sxw.report_sxw(report_name, object_model,rml_path,parser=customClass) header set to False to suppress report header (default: True) groups comma-separated list of groups allowed to view this report menu set to True to link the report with the Print icon (default: True) keywords specify report type keyword (default: client_print_multi) Tip: RML User Guide: www.reportlab.com/docs/rml2pdf-userguide.pdf Example RML report extract: 204 <story> 205 <blockTable style="Table"> 206 <tr> 207 <td><para style="Title">Idea name</para> </td> 208 <td><para style="Title">Score</para> </td> 209 </tr> 210 <tr> 211 <td><para>[[ repeatIn(objects,'o','tr') ]] [[ o.name ]]</para></td> 212 <td><para>[[ o.score ]]</para></td> 213 </tr> 214 </blockTable> 215 </story> Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 12/18
  • 13.
    Workflows Workflows may be associated with any object in OpenERP, and are entirely customizable. Workflows are used to structure and manage the lifecycles of business objects and documents, and define transitions, triggers, etc. with graphical tools. Workflows, activities (nodes or actions) and transitions (conditions) are declared as XML records, as usual. The tokens that navigate in workflows are called workitems. Workflow declaration Workflows are declared on objects that possess a state field (see the example idea class in the ORM section) 216 <record id="wkf_idea" model="workflow"> 217 <field name="name">idea.basic</field> 218 <field name="osv">idea.idea</field> 219 <field name="on_create" eval="1"/> 220 </record> id unique workflow record identifier name name for the workflow (required) osv object model on which the workflow is defined (required) on_create if True, a workitem is instantiated automatically for each new osv record Workflow Activities (nodes) 221 <record id="act_confirmed" model="workflow.activity"> 222 <field name="name">confirmed</field> 223 <field name="wkf_id" ref="wkf_idea"/> 224 <field name="kind">function</field> 225 <field name="action">action_confirmed()</field> 226 </record> id unique activity identifier wkf_id parent workflow identifier name activity node label flow_start True to make it a 'begin' node, receiving a workitem for each workflow instance flow_stop True to make it an 'end' node, terminating the workflow when all items reach it join_mode logical behavior of this node regarding incoming transitions: • XOR: activate on the first incoming transition (default) • AND: waits for all incoming transitions to become valid split_mode logical behavior of this node regarding outgoing transitions: • XOR: one valid transition necessary, send workitem on it (default) • OR: send workitems on all valid transitions (0 or more), sequentially • AND: send a workitem on all valid transitions at once (fork) kind type of action to perform when node is activated by a transition: • dummy to perform no operation when activated (default) • function to invoke a function determined by action • subflow to execute the subflow with subflow_id, invoking action to determine the record id of the record for which the subflow should be instantiated. If action returns no result, the workitem is deleted. • stopall to terminate the workflow upon activation subflow_id if kind subflow, id of the subflow to execute (use ref attribute or search with a tuple) action object method call, used if kind is function or subflow. This function should also update the state field of the object, e.g. for a function kind: def action_confirmed(self, cr, uid, ids): self.write(cr, uid, ids, { 'state' : 'confirmed' }) # … perform other tasks return True Workflow Transitions (edges) Conditions are evaluated in this order: role_id, signal, condition expression 227 <record id="trans_idea_draft_confirmed" model="workflow.transition"> 228 <field name="act_from" ref="act_draft"/> 229 <field name="act_to" ref="act_confirmed"/> 230 <field name="signal">button_confirm</field> 231 <field name="role_id" ref="idea_manager"/> 232 <field name="condition">1 == 1</field> 233 </record> act_from, act_to identifiers of the source and destination activities signal name of a button of type workflow that triggers this transition role_id reference to the role that user must have to trigger the transition (see Roles) condition Python expression that must evaluate to True for transition to be triggered Tip: The Web client features a graphical workflow editor, via the Customise→Manage Workflows link at the bottom left in lists and forms. Security Access control mechanisms must be combined to achieve a coherent security policy. Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 13/18
  • 14.
    Group-based access controlmechanisms Groups are created as normal records on the res.groups model, and granted menu access via menu definitions. However even without a menu, objects may still be accessible indirectly, so actual object-level permissions (create,read,write,unlink ) must be defined for groups. They are usually inserted via CSV files inside modules. It is also possible to restrict access to specific fields on a view or object using the field's groups attribute. ir.model.access.csv 234 "id","name","model_id:id","group_id:id","perm_read","perm_write","perm_create","perm_unlink" 235 "access_idea_idea","idea.idea","model_idea_idea","base.group_user",1,1,1,0 236 "access_idea_vote","idea.vote","model_idea_vote","base.group_user",1,1,1,0 Roles Roles are created as normal records on the res.roles model and used only to condition workflow transitions through transitions' role_id attribute. Wizards Wizards describe stateful interactive sessions with the user through dynamic forms. As of OpenERP v5.0, wizards make use of the osv_memory in-memory persistence to allow constructing wizards from regular business objects and views. Wizard objects (osv_memory) In-memory objects are created by extending osv.osv_memory: 237 from osv import fields,osv 238 import datetime 239 class cleanup_wizard(osv.osv_memory): cleanup_wizard 240 _name = 'idea.cleanup.wizard' 241 _columns = { 242 'idea_age': fields.integer('Age (in days)'), 243 } 244 def cleanup(self,cr,uid,ids,context={}): 245 idea_obj = self.pool.get('idea.idea') 246 for wiz in self.browse(cr,uid,ids): 247 if wiz.idea_age <= 3: 248 raise osv.except_osv('UserError','Please select a larger age') 249 limit = datetime.date.today()-datetime.timedelta(days=wiz.idea_age) 250 ids_to_del = idea_obj.search(cr,uid, [('create_date', '<' , 251 limit.strftime('%Y-%m-%d 00:00:00'))],context=context) 252 idea_obj.unlink(cr,uid,ids_to_del) 253 return {} 254 cleanup_wizard() Views Wizards use regular views and their buttons may use a special cancel attribute to close the wizard window when clicked. 255 <record id="wizard_idea_cleanup" model="ir.ui.view"> 256 <field name="name">idea.cleanup.wizard.form</field> 257 <field name="model">idea.cleanup.wizard</field> 258 <field name="type">form</field> 259 <field name="arch" type="xml"> 260 <form string="Idea Cleanup Wizard"> 261 <label colspan="4" string="Select the age of ideas to cleanup"/> 262 <field name="idea_age" string="Age (days)"/> 263 <group colspan="4"> 264 <button string="Cancel" special="cancel" icon="gtk-cancel"/> 265 <button string="Cleanup" name="cleanup" type="object" icon="gtk-ok"/> 266 </group> 267 </form> 268 </field> 269 </record> Wizard execution Such wizards are launched via regular action records, with a special target field used to open the wizard view in a new window. 270 <record id="action_idea_cleanup_wizard" model="ir.actions.act_window"> 271 <field name="name">Cleanup</field> 272 <field name="type">ir.actions.act_window</field> 273 <field name="res_model">idea.cleanup.wizard</field> 274 <field name="view_type">form</field> 275 <field name="view_mode">form</field> 276 <field name="target">new</field> 277 </record> Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 14/18
  • 15.
    WebServices – XML-RPC OpenERP is accessible through XML-RPC interfaces, for which libraries exist in many languages. Python example 278 import xmlrpclib 279 # ... define HOST, PORT, DB, USER, PASS 280 url = 'http://%s:%d/xmlrpc/common' % (HOST,PORT) 281 sock = xmlrpclib.ServerProxy(url) 282 uid = sock.login(DB,USER,PASS) 283 print "Logged in as %s (uid:%d)" % (USER,uid) 284 285 # Create a new idea 286 url = 'http://%s:%d/xmlrpc/object' % (HOST,PORT) 287 sock = xmlrpclib.ServerProxy(url) 288 args = { 289 'name' : 'Another idea', 290 'description' : 'This is another idea of mine', 291 'inventor_id': uid, 292 } 293 idea_id = sock.execute(DB,uid,PASS,'idea.idea','create',args) PHP example 294 <? 295 include('xmlrpc.inc'); // Use phpxmlrpc library, available on sourceforge 296 // ... define $HOST, $PORT, $DB, $USER, $PASS 297 $client = new xmlrpc_client("http://$HOST:$PORT/xmlrpc/common"); 298 $msg = new xmlrpcmsg("login"); 299 $msg->addParam(new xmlrpcval($DB, "string")); 300 $msg->addParam(new xmlrpcval($USER, "string")); 301 $msg->addParam(new xmlrpcval($PASS, "string")); 302 resp = $client->send($msg); 303 uid = $resp->value()->scalarval() 304 echo "Logged in as $USER (uid:$uid)" 305 306 // Create a new idea 307 $arrayVal = array( 308 'name'=>new xmlrpcval("Another Idea", "string") , 309 'description'=>new xmlrpcval("This is another idea of mine" , "string"), 310 'inventor_id'=>new xmlrpcval($uid, "int"), 311 ); 312 $msg = new xmlrpcmsg('execute'); 313 $msg->addParam(new xmlrpcval($DB, "string")); 314 $msg->addParam(new xmlrpcval($uid, "int")); 315 $msg->addParam(new xmlrpcval($PASS, "string")); 316 $msg->addParam(new xmlrpcval("idea.idea", "string")); 317 $msg->addParam(new xmlrpcval("create", "string")); 318 $msg->addParam(new xmlrpcval($arrayVal, "struct")); 319 $resp = $client->send($msg); 320 ?> Internationalization Each module can provide its own translations within the i18n directory, by having files named LANG.po where LANG is the locale code for the country, or country and language combination when they differ (e.g. pt.po and pt_BR.po). Translations will be loaded automatically by OpenERP for all enabled languages. Developers always use English when creating a module, then export the module terms using OpenERP's gettext POT export feature (Administration>Translations>Export a Translation File without specifying a language) , to create the module template POT file, and then derive the translated PO files. Many IDE's have plugins or modes for editing and merging PO/POT files. Tip: The GNU gettext format (Portable Object) used by OpenERP is integrated into LaunchPad, making it an online collaborative translation platform, with automatic translation features. 321 |- idea/ # The module directory 322 |- i18n/ # Translation files 323 | - idea.pot # Translation Template (exported from OpenERP) 324 | - fr.po # French translation 325 | - pt_BR.po # Brazilian Portuguese translation 326 | (...) Tip: By default OpenERP's POT export only extracts labels inside XML records or inside field definitions in Python code, but any Python string can be translated by surrounding it with the tools.translate._ method (e.g. _('Label') ) Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 15/18
  • 16.
    Rapid Application Development Module recorder The base_module_record module can be used to export a set of changes in the form of a new module. It should be used for all customizations that should be carried on through migrations and updates. It has 2 modes: • Start/Pause/Stop mode, where all operations (on business objects or user interface) are recorded until the recorder is stopped or paused. • Date- and model-based mode where all changes performed after a given date on the given models (object types) are exported. . Report Creator (view) and Report Designer (print) modules The base_report_creator module can be used to automate the creation of custom statistics views, e.g. to construct dashboards. The resulting dashboards can then be exported using the base_module_record module. The base_report_designer module can be used in conjunction with the OpenOffice plugin to provide a user-friendly interface for selecting data from OpenERP and designing report templates within OpenOffice. Quality assessment module When writing you module, use the base_module_quality module to test various aspects of your module: coding standards, code duplication, code efficiency, etc. (web client only). Make sure to provide a lot of demo data. Unit tests Unit test files are regular OpenERP XML files, with regular record elements plus an appropriate combination of function, workflow and assert elements to test the module's business logic. The continuous integration server will automatically execute unit tests and provide feedback. Unit tests can also be used as installation checks if you reference the XML file in the update_xml section of your module descriptor. idea_unit_test.xml 327 <record id="idea_test_1" model="idea.idea"> 328 <field name="name">Unit Test Idea</field> 329 <field name="description">A sample idea for performing tests</field> 330 <field name="invent_date">20100101</field> 331 </record> 332 <assert id="idea_test_1" model="idea.idea" severity="warning" 333 string="New idea is not draft!"> 334 <test expr="state">draft</field> 335 </assert> 336 <workflow ref="idea_test_1" model="idea.idea" action="button_confirm" 337 uid="base.user_admin"/> 338 <assert id="idea_test_1" model="idea.idea" severity="warning" 339 string="Confirm button does not work!"> 340 <test expr="state == 'confirmed'"/> 341 </assert> 342 <function model="idea.idea" name="unlink"> 343 <value eval="ref('idea_test_1')"/> 344 </function> 345 <assert search="[('name','=','Unit Test Idea']" model="idea.idea" count="0" 346 severity="warning" string="Test data is not deleted (name is unique!)"/> Common attributes: • model: target object model name • id: xml_id of the record to test (assert) or to move in workflow (workflow) • uid: optional id of user to perform operation (function or workflow) assert Perform test(s) and fail with given string if tests do not pass. • string: error message in case of test failure • severity: error severity in case of test failure (debug,info,error,warning,critical) • search: domain of search to perform if id is not provided (each record is tested) • count: if search is provided number of expected records (failure if not verified) • <test> children with expr Python expression that must evaluate to True or to the text content of the element. It can use any field of the object, Python built-ins and the ref() method that returns the database id for a given xml_id. function Call method on the given model, passing the value children as arguments. • name: name of method to call • <value> children with Python expressions, that can use the ref() method workflow Send a workflow signal on a given object • ref: xml_id of object to send workflow signal to • action: name of workflow signal to send Recurrent jobs The ir.cron model is used to setup recurrent tasks. 347 <record id="task_id" model="ir.cron"> 348 <field name="name">Task title</field> 349 <field name="user_id" ref="module.user_xml_id"> 350 <field name="interval_type">minutes|hours|days|work_days|weeks|months</field> 351 <field name="interval_number" eval="<number>"/> 352 <field name="numbercall" eval="<number,negative for unlimited>"/> 353 <field name="doall" eval="True|False"/> <!-- Repeat missed calls? --> 354 <field name="model">model.name</field> Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 16/18
  • 17.
    355 <field name="function">name_of_model_function_to_call</field> 356 <field name="args" eval="python code for arguments tuple"/> 357 <field name="priority" eval="<integer,smaller is higher>"/> 358 </record> Performance Optimization As Enterprise Management Software typically has to deal with large amounts of records, you may want to pay attention to the following anti-patterns, to obtain consistent performance: • Do not place browse() calls inside loops, put them before and access only the browsed objects inside the loop. The ORM will optimize the number of database queries based on the browsed attributes. • Avoid recursion on object hierarchies (objects with a parent_id relationship), by adding parent_left and parent_right integer fields on your object, and setting _parent_store to True in your object class. The ORM will use a modified preorder tree traversal to be able to perform recursive operations (e.g. child_of) with database queries in O(1) instead of O(n) • Do not use function fields lightly, especially if you include them in tree views. To optimize function fields, two mechanisms are available: ◦ multi: all fields sharing the same multi attribute value will be computed with one single call to the function, which should then return a dictionary of values in its values map ◦ store: function fields with a store attribute will be stored in the database, and recomputed on demand when the relevant trigger objects are modified. The format for the trigger specification is as follows: store = {'model': (_ref_fnct, fields, priority)} (see example below) 359 def _get_idea_from_vote(self,cr,uid,ids,context={}): 360 res = {} 361 vote_ids = self.pool.get('idea.vote').browse(cr,uid,ids,context=context) 362 for v in vote_ids: 363 res[v.idea_id.id] = True # Store the idea identifiers in a set 364 return res.keys() 365 def _compute(self,cr,uid,ids,field_name,arg,context={}): 366 res = {} 367 for idea in self.browse(cr,uid,ids,context=context): 368 vote_num = len(idea.vote_ids) 369 vote_sum = sum([v.vote for v in idea.vote_ids]) 370 res[idea.id] = { 371 'vote_sum': vote_sum, 372 'vote_avg': (vote_sum/vote_num) if vote_num else 0.0, 373 } 374 return res 375 _columns = { 376 # These fields are recomputed whenever one of the votes changes 377 'vote_avg': fields.function(_compute, method=True, string='Votes Average', 378 store = {'idea.vote': (_get_idea_from_vote,['vote'],10)},multi='votes'), 379 'vote_sum': fields.function(_compute, method=True, string='Votes Sum', 380 store = {'idea.vote': (_get_idea_from_vote,['vote'],10)},multi='votes'), 381 } Community / Contributing OpenERP projects are hosted on LaunchPad(LP), where all project resources may be found: Bazaar branches, bug tracking, blueprints, roadmap, FAQs, etc. Create a free account on launchpad.net to be able to contribute. Launchpad groups Group* Members Bazaar/LP restrictions OpenERP Quality Team OpenERP Core Team Can merge and commit on official branches. (~openerp) OpenERP Commiters Selected active community members Can mark branches to be merged into official branch. Can commit on (~openerp-commiter) extra-addons branch OpenERP Drivers Selected active community members Can confirm bugs and set milestones on bugs / blueprints (~openerp-drivers) OpenERP Community Open group, anyone can join Can create community branches where everyone can contribute (~openerp-community) *Members of upper groups are also members of lower groups Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 17/18
  • 18.
    License Copyright © 2010Open Object Press. All rights reserved. You may take electronic copy of this work and distribute it if you don't change the content. You can also print a copy to be read by yourself only. We have contracts with different publishers in different countries to sell and distribute paper or electronic based versions of this work (translated or not) in bookstores. This helps to distribute and promote the Open ERP product. It also helps us to create incentives to pay contributors and authors with the royalties. Due to this, grants to translate, modify or sell this work are strictly forbidden, unless OpenERP s.a. (representing Open Object Press) gives you a written authorization for this. While every precaution has been taken in the preparation of this work, the publisher and the authors assume no responsibility for errors or omissions, or for damages resulting from the use of the information contained herein. Published by Open Object Press, Grand Rosière, Belgium Copyright © 2010 Open Object Press - All rights reserved – See license on p. 18. 18/18