@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
MACHINE LEARNING WITH ML.NET
AND AZURE DATA LAKE
ANDY CROSS
Director Elastacloud / Azure MVP / Microsoft Regional Director
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Many thanks to our sponsors & partners!
GOLD
SILVER
PARTNERS
PLATINUM
POWERED BY
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Who am I?
• Andy Cross; andy@elastacloud.com;
@andyelastacloud
• Microsoft Regional Director
• Azure MVP for 7 years
• Co-Founder of Elastacloud, an international Microsoft
Gold Partner specialising in data
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
What am I here to talk about?
• Machine Learning
• A new dotnet approach to data
–ML.NET (https://dotnet.microsoft.com/apps/machinelearning-ai/ml-dotnet)
–Parquet.NET
• Big Data in production
–Relevant tools in Azure for data
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
WHAT IS MACHINE LEARNING?
And what does it mean to say “Artificial Intelligence”
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Machine learning for prediction talk quality
Formal definition: -
"A computer program is said to learn from experience E with
respect to some class of tasks T and performance measure P if its
performance at tasks in T, as measured by P, improves with
experience E.“
E = historical quantities of beer consumed and corresponding
audience ratings
T = predicting talk quality
P = accuracy of the talk quality prediction
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Examples today
• Sentiment analysis of website comments
• Finding mappings of historic taxi fares
• Predicting the most likely group of flowers a certain flower
belongs to
• Time Series
• Image Recognition
• NOTE: We reuse algorithms; to do so in most cases is akin
to writing a new database to write a website – a vast
overreach of engineering
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Machine learning best practice
Machine learning should be approached in a methodical
manner, in this way we are more likely to achieve
accurate, reliable and generalisable models
This is achieved by following best practice for machine
learning
Best practice mostly revolves around how the data is
used
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Machine learning best practice
Data preparation
– Ensure that the feature do not contain future data (aka time-travelling)
– Training, validation and testing data sets
Cross validation
– Think of this as using mini training and testing data sets to find a
model that generalises to the problem
Validation and testing data sets
– Data that the model has never seen before – simulate the future
– Gives a final ‘sanity’ check of our model’s performance
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Model training
Provide an algorithm with the training data set
The algorithm is ‘tuned’ to find the best parameters that
minimise some measure of error
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Model testing
To ensure that our model has not overfit to the training
data it is imperative that we use it to predict values from
unseen data
This is how we ensure that our model is generalisable
and will provide reliable predictions on future data
Use a validation set and test sets
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Validation set
The validation set is randomly chosen data from the same
data that the model is trained with – but not used for training
Used to check that the trained model gives predictions that
are representative of all data
Used to prevent overfitting
Gives a ‘best’ accuracy
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Test set
The test set data should be ‘future’ data
We simulate this by selecting data from the end of the
available time-frame with a gap
Use the trained model to predict for this
More realistic of the model in production
Gives a conservative estimate of the accuracy
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Test 2
= Training data
= Validation data
= Testing data
= Ignored data
01/01/15 13/11/1721/06/17 01/11/17
Test 1
09/06/1704/02/17
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Model training, validation and testing
Train with cross validation to find best parameters
Assess overfitting on validation set
Retrain with best parameters on training data set
Evaluate performance on test data sets
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
HOW DOES THIS RELATE TO BIG DATA?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Distributed Computing
• Break a larger problem into smaller tasks
• Distribute tasks around multiple computation hosts
• Aggregate results into an overall result
• Types of Distributed Compute
– HPC – Compute Bound
– Big Data – IO Bound
• Big Data – Database free at scale IO over flat files
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Freed of historic constraints
• Algorithms such as we’ll see tonight are not new
–From the 1960s many
• The difference is the ability to show the algorithm
more examples
• Removing IO bounds gives us access to more data
• Removing CPU bounds allows us to compute over
larger domains
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Azure Services for Distributed Compute
• Azure Batch
• Azure HDInsight
• Azure Databricks
• Bring your own partitioner
–Azure Functions
–Azure Service Fabric (Mesh)
–Virtual Machines
–ACS/AKS
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
AZURE SERVICES FOR ML
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Various places for ML
• Azure Databricks
• Azure HDInsight
• Azure Data Lake Analytics
• Azure ML
– V1
– V2 with Workbench
– V2 RC no Workbench
• R/Python in many hosts
– Functions
– Batch
– SQL Database
• C# and dotnet hosted in many
places
• Typical Azure DevOps pipelines
more mature for .NET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Azure Databricks
• Databricks Spark hosted as SaaS on Azure
• Focussed on collaboration between data scientists and
data engineers
• Powered by Apache Spark
• Dev in:
–Scala
–Python
–Spark-SQL
–More?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Collaboration in Databricks
Collaborative Editing
Switch between Scala, Python, R & SQL
On notebook comments
Link notebooks with GitHub
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Databricks Notebooks Visuals
Visualisations made easy
Use popular libraries – ggplot, matplotlib
Create a dashboard of pinned visuals
Use Pip, CRAN & JAR packages to add
additional visual tools
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Azure HDInsight
• Multipurpose Big Data platform
• Operates as a host and configurator for various tools
–Hadoop
–Hive
–Hbase
–Kafka
–Spark
–Storm
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
REVOLUTIONISING DATA FOR DOTNET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Landscape
.NET
Utilising System.IO
is unstructured,
our evidence is
that most users
handroll some
form of CSV/TSV
or use JSON
encoding as it is a
safe space.
First stage transcoding
from “something .NET
can write to”
All subsequent data
inspection and
manipulation outside
of .NET
Parquet
Operationalisation
mandates database
rectangularisation to take
advantage of ADO.NET
.NET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Landscape
.NET
Utilising System.IO
is unstructured,
our evidence is
that most users
handroll some
form of CSV/TSV
or use JSON
encoding as it is a
safe space.
Immediately serialize
.NET POCOs to
Parquet
Parquet specific
optimisation and
inspection tools in
.net
Parquet
.NET can read operational
output from ML and Big
Data natively using
Parquet.net
.NETParquet.NET
Machine
Learnin
g for
.NET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
INTRODUCTION TO ML.NET
With Example in Sentiment Analysis with Binary Classifier
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
V1 Stable!!! ML.NET Pipelines
• Library evolving quickly
• Towards common approach in Spark/SciKit-Learn
• LearningPipeline weaknesses:
– Enumerable of actions not common elsewhere
– Logging and State not handled
• Bring in MlContext, Environment and lower level data tools
IDataView
• Not all <0.6.0 features available, so later demos are “Legacy”
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Sentiment Analysis
• By showing examples of content and a Toxic bit flag,
learn that makes things Toxic
• The quality of the model reflects the quality of the
data
–Representation
–Variety
–Breadth
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Testing and Training Data
Sentiment SentimentText
1 ==You're cool== You seem like a really cool guy... *bursts out laughing at sarcasm*.
0 I just want to point something out (and I'm in no way a supporter of the strange old git), but he is referred to as Dear Leader, and his father
was referred to as Great Leader.
1 ==RUDE== Dude, you are rude upload that carl picture back, or else.
0 " : I know you listed your English as on the ""level 2"", but don't worry, you seem to be doing nicely otherwise, judging by the same page -
so don't be taken aback. I just wanted to know if you were aware of what you wrote, and think it's an interesting case. : I would write that
sentence simply as ""Theoretically I am an altruist, but only by word, not by my actions."". : PS. You can reply to me on this same page, as I
have it on my watchlist. "
Tab Separated, two columned data set with headers.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Simple to build classifier
var pipeline = new TextTransform(env, "Text", "Features")
.Append(new LinearClassificationTrainer(env, new
LinearClassificationTrainer.Arguments(),
"Features",
"Label"));
var model = pipeline.Fit(trainingData);
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Evaluation of Models
IDataView testData = GetData(env, _testDataPath);
var predictions = model.Transform(testData);
var binClassificationCtx = new BinaryClassificationContext(env);
var metrics = binClassificationCtx.Evaluate(predictions, "Label");
PredictionModel quality metrics evaluation
------------------------------------------
Accuracy: 94.44%
Auc: 98.77%
F1Score: 94.74%
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Demo
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
DATA
Loading and Transforming data in a pipeline
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Supported Types
• Text (CSV/TSV)
• Parquet
• Binary
• IEnumerable<Τ>
• File sets
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
The problem with flat files
• With no database or storage engine Data is written
arbitrarily to disc
• Format errors
– Caused by bug
– Caused by error
• Inefficiencies
– Compression an afterthought
– GZIP splittable problem
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
More problems with flat files
• Access errors
–Mutability
–Variability between files in a fileset
• Naivety
–Just because brute force scanning is possible doesn’t mean
it’s optimal
–Predicate Push-Down
–Partitioning
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Parquet
• Apache Parque is a file format, primarily driven from
Hadoop Ecosystem, particularly loved by Spark
• Columnar format
• Block
–File
• Row Group
– Column Chunk
» Page
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Designed for Data(!)
• Schemas consistent through file
• Held at the end so can be quickly seeked
• By Convention: WRITE ONCE
• Parallelism:
– Partition workload by File or Row Group
– Read data by column chunk
– Compress per Page
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Parquet.NET
• Until recently no approach available to .NET
– Leading to System.IO to write arbitrary data and then requiring
data engineering to sort the data out
• Libraries for cpp can be used
– Implementation by G-Research called ParquetSharp uses
Pinvoke
• A full .NET Core implementation is Parquet.NET
– https://github.com/elastacloud/parquet-dotnet
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Parq!
• End to end tooling for .NET devs on a platform they’re
familiar with.
• Uses dotnet global tooling
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
DEMO OF PARQUET.NET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
REGRESSION ANALYSIS
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
What is regression?
• Supervised Machine Learning
• Features go to a Label
• Label is a “real value” not a categorical like in
classification
• Regression algorithms generate weights for features
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Taxi Fare Data
• NYC data
• Taxi Fares, Time, Distance, Payment Method etc
• Use these as features and predict the most likely Fare
ahead of time.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Demo
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Evaluation with RMS and r2
Rms = 3.30299146626885
RSquared = 0.885729301000846
Predicted fare: 31.14972, actual fare: 29.5
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
COEFFICIENT OF DETERMINATION
r2 is the proportion of the variance in the dependent variable that is predictable from the
independent variables
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
How good a fit is my line?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Compared to….
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Compared to….
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Compared to….
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
What does it tell us?
• In a multiple-regression model to determine solar energy
production:
– The energy production is the dependent variable (Y)
– The cloud cover level is an independent variable (X1)
– The season of year is an independent variable (X2)
– Y = X1*weightX1 + X2*weightX2
• It’s a coefficient (ratio) of how good my predictions are
versus the amount of variability in my dependent variable.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
How does it do that?
• It measures the relationship between two variables:
– Y-hat : ŷ
• The estimator is based on regression variables, Intercept, X Variable 1 to X
Variable n
• The distance from this estimator (prediction) and the real y value (y- ŷ)
• Squared
– Y-bar : ȳ
• The average value of all Ys
• The distance of the real y value from the mean of all y values (y-ȳ), which is how
much the data varies from average
• Squared
• These two squares are summed, and calculated:
– 1-(((y-ŷ)^2)/((y-ȳ)^2))
– 1-(estimation error/actual distance from average)
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Y is our actual value:
Energy generation
X1 is our first input value
we want to predict from,
X2 our second: Irradiance
Percentage and Days left
until service
The data science team works hard to
understand the data and model it, which
means produce weights for how much
each input variable affects the actual value
If you were to plot out these values
Intercept + X1 * X Variable 1 + X2 * X Variable 2
You would get a straight line like the red one above
(weightX1) (weightX2)
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
To calculate a prediction (called y-hat) we add the intercept to the variable
values multiplied by their modifiers (coefficient)
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
IF we take away the prediction
(estimator) from the actual value we
have the residual, or the size of the
error. If this is too high, the error is
positive, if the number is too low, the
error is negative.
You might sometimes hear data
scientists talking about residuals; these
are the residuals.
It is simply the actual value minus the
prediction.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
We can also measure the difference between
the observed actual value and the average
(mean) of the whole set of actuals.
This gives us a distance measure of variance,
how far the actual varies from the average
value of the actuals. This is a measure of the
variance of the data.
If the number is bigger than average, the
number is positive, if it is smaller than average,
the number is negative.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Both the size of the measures we
just created have a sum of 0,
because some values are bigger
and some smaller than the
actuals. This means when they get
added up they cancel out to 0.
This is correct, but we are trying to
compare the sizes of the errors,
not whether they are above or
below actual, so we need to lose
the sign and make everything
positive.
The way we’ll do that is by times-
ing the number by itself (squaring
the number), as -1*-1 = 1, -2 * -2 =
4 etc
Adding all these up across the set
gives us the sums of squares
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
We then divide the sum of squares of our estimator error by the sum of squares of our distance from average.
The estimator errors are always lower than the variance of the data, and we take the result from 1, to give us a
value like 0.80, which we shouldn’t describe as 80% accurate, but you can think of it along these lines; 80% of
variance is explained by the model.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
ROOT MEAN SQUARED ERROR
RMSE is the average of how far out we are on an estimation by estimation basis
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
How close to my line are my points on average?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
How close to my line are my points on average?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
A measure of the average broadness of the line
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
What does it tell us?
• By comparing the average distance between the estimator ŷ
and the observed actual, we can get a measure of how
close in real world terms we are on average to the actual.
• Unlike r2 which gives an abstract view on variance, RMSE
gives the bounds to the accuracy of our prediction.
• On average, the real value is +/- RMSE from the estimator.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
How do we calculate it?
• It’s very easy and we’ve already done the hard work.
• The MSE part means average of the squared distance
of the estimator from the actual
–=AVERAGE(data[(y-ŷ)^2])
• Since the values were squared, this number is still big;
square rooting this gives us a real world value.
–=SQRT(AVERAGE(data[(y-ŷ)^2]))
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Take the average of the
squared estimator
distance from actual.
Squaring it earlier was
useful, as the non-
squared value averages
out to zero!
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Since the MSE is still in the order of magnitude of the Squares, square root it to give us a real world value
and this is Root Mean Square Error (RMSE).
In this example, the estimate is on average 147.673 away from the actual value.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
THIS MODEL CAN THEREFORE BE
DESCRIBED AS:
BEING ABLE TO DESCRIBE 80% OF
VARIANCE
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
CLUSTERING
Example of the Iris petal detector
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
What is Clustering
• Used to generate groups or clusters of similarities
• Identify relationships that are not evident to humans
• Examples may be:
–Who is a VIP customer?
–Who is cheating in a game?
–How many people are likely to drop out of class?
–Which components in manufacturing are likely to fail?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Example: Iris flower
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Supervised Learning
Definition
- You give the input data (X)
and an output variable (Y)
(labels), and you use an
algorithm to learn the
mapping function from
the input to the output.
Y = f(X)
Techniques
- Classification: you want to
classify a new input value.
- Regression
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Unsupervised Learning
Definition
- You give the input data (X)
and no corresponding
output variables (labels).
Techniques
- Clustering: you want to
discover the inherent
groupings in the data.
- Association: you want to
discover rules that
describe large portions of
your data.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
As easy as omitting the input label
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Choose a clusterer
Hyperparameters
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Demo
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
INTEROPERABILITY
Loading trained models from other frameworks
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
TensorFlow since 0.5.0
• Additional work for:
– CNTK
– Torch
• This means ML.NET can be the OSS, XPLAT host for many
data science frameworks, anywhere that NETCORE runs.
• On devices with Xamarin, on edge devices, on web servers.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Demo
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
SUMMARY
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Input
Files
Stream
Unified Cloud Data Environment
Excel
XML
Other
Landing
Excel
XML
Other
A true copy
of the input
data, used
to trace
linage and
rebuild data
Staging
Validated once
and for all,
optimised for
processing
Parquet
Enriched
Results of
machine
learning
experiments
Parquet
Operationalised
Any combination of modern data
platform to support visualisations
and operational systems
Parquet.NET ML.NET
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
EPILOGUE: THE BUSINESS OF ML
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
The questions to answer
• Opportunity discovery
–What can we do?
• Adoption
–How do I get my company to use this?
• Sustainability
–How do we control costs and/or build a viable price point?
• Measurement
–How do we know it’s generating value?
Build
Use
Profit
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
The end goals
• Providing better customer service and experience
– Better products
– Self-healing and self-improving
• Improving operational processes and resource
consumption
– Faster Time to Market
– Lighter Bill of Materials
– Stronger Supply Chain
• New business models
– Insights from data
– Different pricing models
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
MENTAL MODELS
Dive deeper into strategic modelling with these mental models
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Mental Models
In order to envision the transformation
possibilities, adopt the following mental models.
AI is an extremely focussed entry level clerical
assistant
AI is exceptionally reactive
AI is auditable, repeatable, improvable
AI is resistant of external bias
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
One Million Clerical Workers
What is achievable with a million trained office
workers?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Billy the Kid Reaction
Times
What if all workers can
react and form a course
of action in 1
millisecond?
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Auditable Actions
What if all actions and their impact were measurable
and qualified?
Great companies have high cultures of accountability, it
comes with this culture of criticism […], and I think our
culture is strong on that.
Steve Ballmer
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Cement the views of the Founders
What if the decision making process of the hyper-
successful founders was cemented and eternally
referenceable? Resistant to the distractions of hype and
false promises.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
All tools are Smart Tools
What if every tool used by a business was as
smart as a person. A forklift could tell you the
context of a crate was the wrong weight. A
machine could tell you it was feeling unwell. A
room could tell you someone had left a
dangerous tool in an unsafe state.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
REGARDING MAINTENANCE CONTRACTS
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
JIT Service Regimes
• Migrate from manufacturer led maintenance cycles to
just-in-time
• Use data to establish mean time to failure
• Conditional maintenance
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
AzureML
~ 1 minute telemetry
through dedicated cloud
gateway
Reporting
Alarm
- Machine Learning used in real-time with “Anomaly
Detection” which enables history to be assessed and
false positive spikes in behaviour to be discarded
- Model retraining can occur to help understand
acceptable lowering of efficiency as equipment degrades
over time within acceptable parameters
- Predictions through AI become an
integral part of business reporting
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Supplier efficiency
• Use data to judge the reliability of assets
• Track fault recurrence and resolution speeds
• Contract with SLAs around reducing outages
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
WAREHOUSE AND INVENTORY
MANAGEMENT
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
JIT Warehousing
• Regarding Parts
• JIT Maintenance leads to JIT Warehousing
• Regarding Fuel
• Integrated Data streams including ERP and CRM
• Manage the supply chain and keep the right stock
level
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
G4S Data Science Programme
• G4S plc is a British multinational security services company and operates
an integrated security business in more than 90 countries across the
globe.
• They aim to differentiate G4S by providing industry leading security
solutions that are innovative, reliable and efficient.
• Aim: Predict anomalous card activity in
monitored buildings
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
EPILOGUE II: RUNNING A DSCI TEAM
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Business Understanding
• IDENTIFYING YOUR BUSINESS GOALS
• A problem that your management wants to address
• The business goals
• Constraints (limitations on what you may do, the kinds of solutions that can be
used, when the work must be completed, and so on)
• Impact (how the problem and possible solutions fit in with the business)
• ASSESSING YOUR SITUATION
• Inventory of resources: A list of all resources available for the project.
• Requirements, assumptions, and constraints:
• Risks and contingencies:
• Terminology
• Costs and benefits:
• DEFINING YOUR DATA-MINING GOALS
• Data-mining goals: Define data-mining deliverables, such as models, reports,
presentations, and processed datasets.
• Data-mining success criteria: Define the data-mining technical criteria necessary
to support the business success criteria. Try to define these in quantitative terms
(such as model accuracy or predictive improvement compared to an existing
method).
• PRODUCING YOUR PROJECT PLAN
• Project plan: Outline your step-by-step action plan for the project. (for example,
modelling and evaluation usually call for several back-and-forth repetitions).
• Initial assessment of tools and techniques
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Data Understanding
• GATHERING DATA
• Outline data requirements: Create a list of the types of data necessary to address
the data mining goals. Expand the list with details such as the required time
range and data formats.
• Verify data availability: Confirm that the required data exists, and that you can
use it.
• Define selection criteria: Identify the specific data sources (databases, files,
documents, and so on.)
• DESCRIBING DATA
• Now that you have data, prepare a general description of what you have.
• EXPLORING DATA
• Get familiar with the data.
• Spot signs of data quality problems.
• Set the stage for data preparation steps.
• VERIFYING DATA QUALITY
• The data you need doesn’t exist. (Did it never exist, or was it discarded? Can this
data be collected and saved for future use?)
• It exists, but you can’t have it. (Can this restriction be overcome?)
• You find severe data quality issues (lots of missing or incorrect values that can’t
be corrected).
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Data Preparation
• SELECTING DATA
• Now you will decide which portion of the data that you have is actually going to
be used for data mining.
• The deliverable for this task is the rationale for inclusion and exclusion. In it,
you’ll explain what data will, and will not, be used for further data-mining work.
• You’ll explain the reasons for including or excluding each part of the data that
you have, based on relevance to your goals, data quality, and technical issues
• CLEANING DATA
• The data that you’ve chosen to use is unlikely to be perfectly clean (error-free).
• You’ll make changes, perhaps tracking down sources to make specific data
corrections, excluding some cases or individual cells (items of data), or replacing
some items of data with default values or replacements selected by a more
sophisticated modelling technique.
• CONSTRUCTING DATA
• You may need to derive some new fields (for example, use the delivery date and
the date when a customer placed an order to calculate how long the customer
waited to receive an order), aggregate data, or otherwise create a new form of
data.
• INTEGRATING DATA
• Your data may now be in several disparate datasets. You’ll need to merge some
or all of those disparate datasets together to get ready for the modelling phase.
• FORMATTING DATA
• Data often comes to you in formats other than the ones that are most
convenient for modelling. (Format changes are usually driven by the design of
your tools.) So convert those formats now.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Modelling and Evaluation (Modelling)
• SELECTING MODELING TECHNIQUES
• Modelling technique: Specify the technique(s) that you will use.
• Modelling assumptions: Many modelling techniques are based on certain
assumptions.
• DESIGNING TESTS
• The test in this task is the test that you’ll use to determine how well your model
works. It may be as simple as splitting your data into a group of cases for model
training and another group for model testing.
• Training data is used to fit mathematical forms to the data model, and test data
is used during the model-training process to avoid overfitting
• BUILDING MODEL(S)
• Parameter settings: When building models, most tools give you the option of
adjusting a variety of settings, and these settings have an impact on the structure
of the final model. Document these settings in a report.
• Model descriptions: Describe your models. State the type of model (such as
linear regression or neural network) and the variables used.
• Models: This deliverable is the models themselves. Some model types can be
easily defined with a simple equation; others are far too complex and must be
transmitted in a more sophisticated format.
• ASSESSING MODEL(S)
• Model assessment: Summarizes the information developed in your model
review. If you have created several models, you may rank them based on your
assessment of their value for a specific application.
• Revised parameter settings: You may choose to fine-tune settings that were used
to build the model and conduct another round of modelling and try to improve
your results.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Modelling and Evaluation Cont… (Evaluation)
• EVALUATING RESULTS
• Assessment of results (for business goals): Summarize the results with respect to
the business success criteria that you established in the business-understanding
phase. Explicitly state whether you have reached the business goals defined at
the start of the project.
• Approved models: These include any models that meet the business success
criteria.
• REVIEWING THE PROCESS
• Now that you have explored data and developed models, take time to review
your process. This is an opportunity to spot issues that you might have
overlooked and that might draw your attention to flaws in the work that you’ve
done while you still have time to correct the problem before deployment. Also
consider ways that you might improve your process for future projects.
• DETERMINING THE NEXT STEPS
• List of possible actions: Describe each alternative action, along with the
strongest reasons for and against it.
• Decision: State the final decision on each possible action, along with the
reasoning behind the decision.
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Data Science Conceptual Model – Crisp DM outline Methodology
Business
Understanding
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team
Deployment
• PLANNING DEPLOYMENT
• When your model is ready to use, you will need a strategy for putting it to work
in your business.
• PLANNING MONITORING AND MAINTENANCE
• Data-mining work is a cycle, so expect to stay actively involved with your models
as they are integrated into everyday use.
• REPORTING FINAL RESULTS
• Final report: The final report summarizes the entire project by assembling all the
reports created up to this point, and adding an overview summarizing the entire
project and its results.
• Final presentation: A summary of the final report is presented in a meeting with
management. This is also an opportunity to address any open questions.
• REVIEW PROJECT
• Finally, the data-mining team meets to discuss what worked and what didn’t,
what would be good to do again, and what should be avoided!
@ITCAMPRO #ITCAMP19Community Conference for IT Professionals
Business
Understanding
Data Science Continuous Integration and improvement Cycle
Business
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Business
Understanding
New
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Business
Understanding
New
Objective
Data
Understanding
Data
Preparation
Deployment
Modelling and
Evaluation
Data Science Team Data Science Team Data Science Team

ITCamp 2019 - Andy Cross - Machine Learning with ML.NET and Azure Data Lake

  • 1.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals MACHINE LEARNING WITH ML.NET AND AZURE DATA LAKE ANDY CROSS Director Elastacloud / Azure MVP / Microsoft Regional Director
  • 2.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Many thanks to our sponsors & partners! GOLD SILVER PARTNERS PLATINUM POWERED BY
  • 3.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Who am I? • Andy Cross; andy@elastacloud.com; @andyelastacloud • Microsoft Regional Director • Azure MVP for 7 years • Co-Founder of Elastacloud, an international Microsoft Gold Partner specialising in data
  • 4.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals What am I here to talk about? • Machine Learning • A new dotnet approach to data –ML.NET (https://dotnet.microsoft.com/apps/machinelearning-ai/ml-dotnet) –Parquet.NET • Big Data in production –Relevant tools in Azure for data
  • 5.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals WHAT IS MACHINE LEARNING? And what does it mean to say “Artificial Intelligence”
  • 6.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Machine learning for prediction talk quality Formal definition: - "A computer program is said to learn from experience E with respect to some class of tasks T and performance measure P if its performance at tasks in T, as measured by P, improves with experience E.“ E = historical quantities of beer consumed and corresponding audience ratings T = predicting talk quality P = accuracy of the talk quality prediction
  • 7.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Examples today • Sentiment analysis of website comments • Finding mappings of historic taxi fares • Predicting the most likely group of flowers a certain flower belongs to • Time Series • Image Recognition • NOTE: We reuse algorithms; to do so in most cases is akin to writing a new database to write a website – a vast overreach of engineering
  • 8.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Machine learning best practice Machine learning should be approached in a methodical manner, in this way we are more likely to achieve accurate, reliable and generalisable models This is achieved by following best practice for machine learning Best practice mostly revolves around how the data is used
  • 9.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Machine learning best practice Data preparation – Ensure that the feature do not contain future data (aka time-travelling) – Training, validation and testing data sets Cross validation – Think of this as using mini training and testing data sets to find a model that generalises to the problem Validation and testing data sets – Data that the model has never seen before – simulate the future – Gives a final ‘sanity’ check of our model’s performance
  • 10.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Model training Provide an algorithm with the training data set The algorithm is ‘tuned’ to find the best parameters that minimise some measure of error
  • 11.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Model testing To ensure that our model has not overfit to the training data it is imperative that we use it to predict values from unseen data This is how we ensure that our model is generalisable and will provide reliable predictions on future data Use a validation set and test sets
  • 12.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Validation set The validation set is randomly chosen data from the same data that the model is trained with – but not used for training Used to check that the trained model gives predictions that are representative of all data Used to prevent overfitting Gives a ‘best’ accuracy
  • 13.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Test set The test set data should be ‘future’ data We simulate this by selecting data from the end of the available time-frame with a gap Use the trained model to predict for this More realistic of the model in production Gives a conservative estimate of the accuracy
  • 14.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Test 2 = Training data = Validation data = Testing data = Ignored data 01/01/15 13/11/1721/06/17 01/11/17 Test 1 09/06/1704/02/17
  • 15.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Model training, validation and testing Train with cross validation to find best parameters Assess overfitting on validation set Retrain with best parameters on training data set Evaluate performance on test data sets
  • 16.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals HOW DOES THIS RELATE TO BIG DATA?
  • 17.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Distributed Computing • Break a larger problem into smaller tasks • Distribute tasks around multiple computation hosts • Aggregate results into an overall result • Types of Distributed Compute – HPC – Compute Bound – Big Data – IO Bound • Big Data – Database free at scale IO over flat files
  • 18.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Freed of historic constraints • Algorithms such as we’ll see tonight are not new –From the 1960s many • The difference is the ability to show the algorithm more examples • Removing IO bounds gives us access to more data • Removing CPU bounds allows us to compute over larger domains
  • 19.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Azure Services for Distributed Compute • Azure Batch • Azure HDInsight • Azure Databricks • Bring your own partitioner –Azure Functions –Azure Service Fabric (Mesh) –Virtual Machines –ACS/AKS
  • 20.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals AZURE SERVICES FOR ML
  • 21.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Various places for ML • Azure Databricks • Azure HDInsight • Azure Data Lake Analytics • Azure ML – V1 – V2 with Workbench – V2 RC no Workbench • R/Python in many hosts – Functions – Batch – SQL Database • C# and dotnet hosted in many places • Typical Azure DevOps pipelines more mature for .NET
  • 22.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Azure Databricks • Databricks Spark hosted as SaaS on Azure • Focussed on collaboration between data scientists and data engineers • Powered by Apache Spark • Dev in: –Scala –Python –Spark-SQL –More?
  • 23.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Collaboration in Databricks Collaborative Editing Switch between Scala, Python, R & SQL On notebook comments Link notebooks with GitHub
  • 24.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Databricks Notebooks Visuals Visualisations made easy Use popular libraries – ggplot, matplotlib Create a dashboard of pinned visuals Use Pip, CRAN & JAR packages to add additional visual tools
  • 25.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Azure HDInsight • Multipurpose Big Data platform • Operates as a host and configurator for various tools –Hadoop –Hive –Hbase –Kafka –Spark –Storm
  • 26.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals REVOLUTIONISING DATA FOR DOTNET
  • 27.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Landscape .NET Utilising System.IO is unstructured, our evidence is that most users handroll some form of CSV/TSV or use JSON encoding as it is a safe space. First stage transcoding from “something .NET can write to” All subsequent data inspection and manipulation outside of .NET Parquet Operationalisation mandates database rectangularisation to take advantage of ADO.NET .NET
  • 28.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Landscape .NET Utilising System.IO is unstructured, our evidence is that most users handroll some form of CSV/TSV or use JSON encoding as it is a safe space. Immediately serialize .NET POCOs to Parquet Parquet specific optimisation and inspection tools in .net Parquet .NET can read operational output from ML and Big Data natively using Parquet.net .NETParquet.NET Machine Learnin g for .NET
  • 29.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals INTRODUCTION TO ML.NET With Example in Sentiment Analysis with Binary Classifier
  • 30.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals V1 Stable!!! ML.NET Pipelines • Library evolving quickly • Towards common approach in Spark/SciKit-Learn • LearningPipeline weaknesses: – Enumerable of actions not common elsewhere – Logging and State not handled • Bring in MlContext, Environment and lower level data tools IDataView • Not all <0.6.0 features available, so later demos are “Legacy”
  • 31.
  • 32.
  • 33.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Sentiment Analysis • By showing examples of content and a Toxic bit flag, learn that makes things Toxic • The quality of the model reflects the quality of the data –Representation –Variety –Breadth
  • 34.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Testing and Training Data Sentiment SentimentText 1 ==You're cool== You seem like a really cool guy... *bursts out laughing at sarcasm*. 0 I just want to point something out (and I'm in no way a supporter of the strange old git), but he is referred to as Dear Leader, and his father was referred to as Great Leader. 1 ==RUDE== Dude, you are rude upload that carl picture back, or else. 0 " : I know you listed your English as on the ""level 2"", but don't worry, you seem to be doing nicely otherwise, judging by the same page - so don't be taken aback. I just wanted to know if you were aware of what you wrote, and think it's an interesting case. : I would write that sentence simply as ""Theoretically I am an altruist, but only by word, not by my actions."". : PS. You can reply to me on this same page, as I have it on my watchlist. " Tab Separated, two columned data set with headers.
  • 35.
  • 36.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Simple to build classifier var pipeline = new TextTransform(env, "Text", "Features") .Append(new LinearClassificationTrainer(env, new LinearClassificationTrainer.Arguments(), "Features", "Label")); var model = pipeline.Fit(trainingData);
  • 37.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Evaluation of Models IDataView testData = GetData(env, _testDataPath); var predictions = model.Transform(testData); var binClassificationCtx = new BinaryClassificationContext(env); var metrics = binClassificationCtx.Evaluate(predictions, "Label"); PredictionModel quality metrics evaluation ------------------------------------------ Accuracy: 94.44% Auc: 98.77% F1Score: 94.74%
  • 38.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Demo
  • 39.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals DATA Loading and Transforming data in a pipeline
  • 40.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Supported Types • Text (CSV/TSV) • Parquet • Binary • IEnumerable<Τ> • File sets
  • 41.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals The problem with flat files • With no database or storage engine Data is written arbitrarily to disc • Format errors – Caused by bug – Caused by error • Inefficiencies – Compression an afterthought – GZIP splittable problem
  • 42.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals More problems with flat files • Access errors –Mutability –Variability between files in a fileset • Naivety –Just because brute force scanning is possible doesn’t mean it’s optimal –Predicate Push-Down –Partitioning
  • 43.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Parquet • Apache Parque is a file format, primarily driven from Hadoop Ecosystem, particularly loved by Spark • Columnar format • Block –File • Row Group – Column Chunk » Page
  • 44.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Designed for Data(!) • Schemas consistent through file • Held at the end so can be quickly seeked • By Convention: WRITE ONCE • Parallelism: – Partition workload by File or Row Group – Read data by column chunk – Compress per Page
  • 45.
  • 46.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Parquet.NET • Until recently no approach available to .NET – Leading to System.IO to write arbitrary data and then requiring data engineering to sort the data out • Libraries for cpp can be used – Implementation by G-Research called ParquetSharp uses Pinvoke • A full .NET Core implementation is Parquet.NET – https://github.com/elastacloud/parquet-dotnet
  • 47.
  • 48.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Parq! • End to end tooling for .NET devs on a platform they’re familiar with. • Uses dotnet global tooling
  • 49.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals DEMO OF PARQUET.NET
  • 50.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals REGRESSION ANALYSIS
  • 51.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals What is regression? • Supervised Machine Learning • Features go to a Label • Label is a “real value” not a categorical like in classification • Regression algorithms generate weights for features
  • 52.
  • 53.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Taxi Fare Data • NYC data • Taxi Fares, Time, Distance, Payment Method etc • Use these as features and predict the most likely Fare ahead of time.
  • 54.
  • 55.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Demo
  • 56.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Evaluation with RMS and r2 Rms = 3.30299146626885 RSquared = 0.885729301000846 Predicted fare: 31.14972, actual fare: 29.5
  • 57.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals COEFFICIENT OF DETERMINATION r2 is the proportion of the variance in the dependent variable that is predictable from the independent variables
  • 58.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals How good a fit is my line?
  • 59.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Compared to….
  • 60.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Compared to….
  • 61.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Compared to….
  • 62.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals What does it tell us? • In a multiple-regression model to determine solar energy production: – The energy production is the dependent variable (Y) – The cloud cover level is an independent variable (X1) – The season of year is an independent variable (X2) – Y = X1*weightX1 + X2*weightX2 • It’s a coefficient (ratio) of how good my predictions are versus the amount of variability in my dependent variable.
  • 63.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals How does it do that? • It measures the relationship between two variables: – Y-hat : ŷ • The estimator is based on regression variables, Intercept, X Variable 1 to X Variable n • The distance from this estimator (prediction) and the real y value (y- ŷ) • Squared – Y-bar : ȳ • The average value of all Ys • The distance of the real y value from the mean of all y values (y-ȳ), which is how much the data varies from average • Squared • These two squares are summed, and calculated: – 1-(((y-ŷ)^2)/((y-ȳ)^2)) – 1-(estimation error/actual distance from average)
  • 64.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Y is our actual value: Energy generation X1 is our first input value we want to predict from, X2 our second: Irradiance Percentage and Days left until service The data science team works hard to understand the data and model it, which means produce weights for how much each input variable affects the actual value If you were to plot out these values Intercept + X1 * X Variable 1 + X2 * X Variable 2 You would get a straight line like the red one above (weightX1) (weightX2)
  • 65.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals To calculate a prediction (called y-hat) we add the intercept to the variable values multiplied by their modifiers (coefficient)
  • 66.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals IF we take away the prediction (estimator) from the actual value we have the residual, or the size of the error. If this is too high, the error is positive, if the number is too low, the error is negative. You might sometimes hear data scientists talking about residuals; these are the residuals. It is simply the actual value minus the prediction.
  • 67.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals We can also measure the difference between the observed actual value and the average (mean) of the whole set of actuals. This gives us a distance measure of variance, how far the actual varies from the average value of the actuals. This is a measure of the variance of the data. If the number is bigger than average, the number is positive, if it is smaller than average, the number is negative.
  • 68.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Both the size of the measures we just created have a sum of 0, because some values are bigger and some smaller than the actuals. This means when they get added up they cancel out to 0. This is correct, but we are trying to compare the sizes of the errors, not whether they are above or below actual, so we need to lose the sign and make everything positive. The way we’ll do that is by times- ing the number by itself (squaring the number), as -1*-1 = 1, -2 * -2 = 4 etc Adding all these up across the set gives us the sums of squares
  • 69.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals We then divide the sum of squares of our estimator error by the sum of squares of our distance from average. The estimator errors are always lower than the variance of the data, and we take the result from 1, to give us a value like 0.80, which we shouldn’t describe as 80% accurate, but you can think of it along these lines; 80% of variance is explained by the model.
  • 70.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals ROOT MEAN SQUARED ERROR RMSE is the average of how far out we are on an estimation by estimation basis
  • 71.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals How close to my line are my points on average?
  • 72.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals How close to my line are my points on average?
  • 73.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals A measure of the average broadness of the line
  • 74.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals What does it tell us? • By comparing the average distance between the estimator ŷ and the observed actual, we can get a measure of how close in real world terms we are on average to the actual. • Unlike r2 which gives an abstract view on variance, RMSE gives the bounds to the accuracy of our prediction. • On average, the real value is +/- RMSE from the estimator.
  • 75.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals How do we calculate it? • It’s very easy and we’ve already done the hard work. • The MSE part means average of the squared distance of the estimator from the actual –=AVERAGE(data[(y-ŷ)^2]) • Since the values were squared, this number is still big; square rooting this gives us a real world value. –=SQRT(AVERAGE(data[(y-ŷ)^2]))
  • 76.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Take the average of the squared estimator distance from actual. Squaring it earlier was useful, as the non- squared value averages out to zero!
  • 77.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Since the MSE is still in the order of magnitude of the Squares, square root it to give us a real world value and this is Root Mean Square Error (RMSE). In this example, the estimate is on average 147.673 away from the actual value.
  • 78.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals THIS MODEL CAN THEREFORE BE DESCRIBED AS: BEING ABLE TO DESCRIBE 80% OF VARIANCE
  • 79.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals CLUSTERING Example of the Iris petal detector
  • 80.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals What is Clustering • Used to generate groups or clusters of similarities • Identify relationships that are not evident to humans • Examples may be: –Who is a VIP customer? –Who is cheating in a game? –How many people are likely to drop out of class? –Which components in manufacturing are likely to fail?
  • 81.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Example: Iris flower
  • 82.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Supervised Learning Definition - You give the input data (X) and an output variable (Y) (labels), and you use an algorithm to learn the mapping function from the input to the output. Y = f(X) Techniques - Classification: you want to classify a new input value. - Regression
  • 83.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Unsupervised Learning Definition - You give the input data (X) and no corresponding output variables (labels). Techniques - Clustering: you want to discover the inherent groupings in the data. - Association: you want to discover rules that describe large portions of your data.
  • 84.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals As easy as omitting the input label
  • 85.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Choose a clusterer Hyperparameters
  • 86.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Demo
  • 87.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals INTEROPERABILITY Loading trained models from other frameworks
  • 88.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals TensorFlow since 0.5.0 • Additional work for: – CNTK – Torch • This means ML.NET can be the OSS, XPLAT host for many data science frameworks, anywhere that NETCORE runs. • On devices with Xamarin, on edge devices, on web servers.
  • 89.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Demo
  • 90.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals SUMMARY
  • 91.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Input Files Stream Unified Cloud Data Environment Excel XML Other Landing Excel XML Other A true copy of the input data, used to trace linage and rebuild data Staging Validated once and for all, optimised for processing Parquet Enriched Results of machine learning experiments Parquet Operationalised Any combination of modern data platform to support visualisations and operational systems Parquet.NET ML.NET
  • 92.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals EPILOGUE: THE BUSINESS OF ML
  • 93.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals The questions to answer • Opportunity discovery –What can we do? • Adoption –How do I get my company to use this? • Sustainability –How do we control costs and/or build a viable price point? • Measurement –How do we know it’s generating value? Build Use Profit
  • 94.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals The end goals • Providing better customer service and experience – Better products – Self-healing and self-improving • Improving operational processes and resource consumption – Faster Time to Market – Lighter Bill of Materials – Stronger Supply Chain • New business models – Insights from data – Different pricing models
  • 95.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals MENTAL MODELS Dive deeper into strategic modelling with these mental models
  • 96.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Mental Models In order to envision the transformation possibilities, adopt the following mental models. AI is an extremely focussed entry level clerical assistant AI is exceptionally reactive AI is auditable, repeatable, improvable AI is resistant of external bias
  • 97.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals One Million Clerical Workers What is achievable with a million trained office workers?
  • 98.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Billy the Kid Reaction Times What if all workers can react and form a course of action in 1 millisecond?
  • 99.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Auditable Actions What if all actions and their impact were measurable and qualified? Great companies have high cultures of accountability, it comes with this culture of criticism […], and I think our culture is strong on that. Steve Ballmer
  • 100.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Cement the views of the Founders What if the decision making process of the hyper- successful founders was cemented and eternally referenceable? Resistant to the distractions of hype and false promises.
  • 101.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals All tools are Smart Tools What if every tool used by a business was as smart as a person. A forklift could tell you the context of a crate was the wrong weight. A machine could tell you it was feeling unwell. A room could tell you someone had left a dangerous tool in an unsafe state.
  • 102.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals REGARDING MAINTENANCE CONTRACTS
  • 103.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals JIT Service Regimes • Migrate from manufacturer led maintenance cycles to just-in-time • Use data to establish mean time to failure • Conditional maintenance
  • 104.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals AzureML ~ 1 minute telemetry through dedicated cloud gateway Reporting Alarm - Machine Learning used in real-time with “Anomaly Detection” which enables history to be assessed and false positive spikes in behaviour to be discarded - Model retraining can occur to help understand acceptable lowering of efficiency as equipment degrades over time within acceptable parameters - Predictions through AI become an integral part of business reporting
  • 105.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Supplier efficiency • Use data to judge the reliability of assets • Track fault recurrence and resolution speeds • Contract with SLAs around reducing outages
  • 106.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals WAREHOUSE AND INVENTORY MANAGEMENT
  • 107.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals JIT Warehousing • Regarding Parts • JIT Maintenance leads to JIT Warehousing • Regarding Fuel • Integrated Data streams including ERP and CRM • Manage the supply chain and keep the right stock level
  • 108.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals G4S Data Science Programme • G4S plc is a British multinational security services company and operates an integrated security business in more than 90 countries across the globe. • They aim to differentiate G4S by providing industry leading security solutions that are innovative, reliable and efficient. • Aim: Predict anomalous card activity in monitored buildings
  • 109.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals EPILOGUE II: RUNNING A DSCI TEAM
  • 110.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Business Understanding • IDENTIFYING YOUR BUSINESS GOALS • A problem that your management wants to address • The business goals • Constraints (limitations on what you may do, the kinds of solutions that can be used, when the work must be completed, and so on) • Impact (how the problem and possible solutions fit in with the business) • ASSESSING YOUR SITUATION • Inventory of resources: A list of all resources available for the project. • Requirements, assumptions, and constraints: • Risks and contingencies: • Terminology • Costs and benefits: • DEFINING YOUR DATA-MINING GOALS • Data-mining goals: Define data-mining deliverables, such as models, reports, presentations, and processed datasets. • Data-mining success criteria: Define the data-mining technical criteria necessary to support the business success criteria. Try to define these in quantitative terms (such as model accuracy or predictive improvement compared to an existing method). • PRODUCING YOUR PROJECT PLAN • Project plan: Outline your step-by-step action plan for the project. (for example, modelling and evaluation usually call for several back-and-forth repetitions). • Initial assessment of tools and techniques
  • 111.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Data Understanding • GATHERING DATA • Outline data requirements: Create a list of the types of data necessary to address the data mining goals. Expand the list with details such as the required time range and data formats. • Verify data availability: Confirm that the required data exists, and that you can use it. • Define selection criteria: Identify the specific data sources (databases, files, documents, and so on.) • DESCRIBING DATA • Now that you have data, prepare a general description of what you have. • EXPLORING DATA • Get familiar with the data. • Spot signs of data quality problems. • Set the stage for data preparation steps. • VERIFYING DATA QUALITY • The data you need doesn’t exist. (Did it never exist, or was it discarded? Can this data be collected and saved for future use?) • It exists, but you can’t have it. (Can this restriction be overcome?) • You find severe data quality issues (lots of missing or incorrect values that can’t be corrected).
  • 112.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Data Preparation • SELECTING DATA • Now you will decide which portion of the data that you have is actually going to be used for data mining. • The deliverable for this task is the rationale for inclusion and exclusion. In it, you’ll explain what data will, and will not, be used for further data-mining work. • You’ll explain the reasons for including or excluding each part of the data that you have, based on relevance to your goals, data quality, and technical issues • CLEANING DATA • The data that you’ve chosen to use is unlikely to be perfectly clean (error-free). • You’ll make changes, perhaps tracking down sources to make specific data corrections, excluding some cases or individual cells (items of data), or replacing some items of data with default values or replacements selected by a more sophisticated modelling technique. • CONSTRUCTING DATA • You may need to derive some new fields (for example, use the delivery date and the date when a customer placed an order to calculate how long the customer waited to receive an order), aggregate data, or otherwise create a new form of data. • INTEGRATING DATA • Your data may now be in several disparate datasets. You’ll need to merge some or all of those disparate datasets together to get ready for the modelling phase. • FORMATTING DATA • Data often comes to you in formats other than the ones that are most convenient for modelling. (Format changes are usually driven by the design of your tools.) So convert those formats now.
  • 113.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Modelling and Evaluation (Modelling) • SELECTING MODELING TECHNIQUES • Modelling technique: Specify the technique(s) that you will use. • Modelling assumptions: Many modelling techniques are based on certain assumptions. • DESIGNING TESTS • The test in this task is the test that you’ll use to determine how well your model works. It may be as simple as splitting your data into a group of cases for model training and another group for model testing. • Training data is used to fit mathematical forms to the data model, and test data is used during the model-training process to avoid overfitting • BUILDING MODEL(S) • Parameter settings: When building models, most tools give you the option of adjusting a variety of settings, and these settings have an impact on the structure of the final model. Document these settings in a report. • Model descriptions: Describe your models. State the type of model (such as linear regression or neural network) and the variables used. • Models: This deliverable is the models themselves. Some model types can be easily defined with a simple equation; others are far too complex and must be transmitted in a more sophisticated format. • ASSESSING MODEL(S) • Model assessment: Summarizes the information developed in your model review. If you have created several models, you may rank them based on your assessment of their value for a specific application. • Revised parameter settings: You may choose to fine-tune settings that were used to build the model and conduct another round of modelling and try to improve your results.
  • 114.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Modelling and Evaluation Cont… (Evaluation) • EVALUATING RESULTS • Assessment of results (for business goals): Summarize the results with respect to the business success criteria that you established in the business-understanding phase. Explicitly state whether you have reached the business goals defined at the start of the project. • Approved models: These include any models that meet the business success criteria. • REVIEWING THE PROCESS • Now that you have explored data and developed models, take time to review your process. This is an opportunity to spot issues that you might have overlooked and that might draw your attention to flaws in the work that you’ve done while you still have time to correct the problem before deployment. Also consider ways that you might improve your process for future projects. • DETERMINING THE NEXT STEPS • List of possible actions: Describe each alternative action, along with the strongest reasons for and against it. • Decision: State the final decision on each possible action, along with the reasoning behind the decision.
  • 115.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Data Science Conceptual Model – Crisp DM outline Methodology Business Understanding Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Deployment • PLANNING DEPLOYMENT • When your model is ready to use, you will need a strategy for putting it to work in your business. • PLANNING MONITORING AND MAINTENANCE • Data-mining work is a cycle, so expect to stay actively involved with your models as they are integrated into everyday use. • REPORTING FINAL RESULTS • Final report: The final report summarizes the entire project by assembling all the reports created up to this point, and adding an overview summarizing the entire project and its results. • Final presentation: A summary of the final report is presented in a meeting with management. This is also an opportunity to address any open questions. • REVIEW PROJECT • Finally, the data-mining team meets to discuss what worked and what didn’t, what would be good to do again, and what should be avoided!
  • 116.
    @ITCAMPRO #ITCAMP19Community Conferencefor IT Professionals Business Understanding Data Science Continuous Integration and improvement Cycle Business Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Business Understanding New Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Business Understanding New Objective Data Understanding Data Preparation Deployment Modelling and Evaluation Data Science Team Data Science Team Data Science Team

Editor's Notes

  • #24 Notebooks have a primary language R, Python & Scala Use magic to change language Supports SQL, R, Python & Scala Create table from dataframe in any language to share between spark contexts Easy to pair to translate
  • #25 Treat Notebooks as pseudo-OO call out to function or values in other notebooks, can be combined with if / switch logic etc Chain notebooks passing data frames and resources from one to another Schedule notebooks Plots make easy one line display(dataframe) GUI driven experience between plots with drag and drop Use SQL, R, Python & Scala as primary language Support for popular visual libraries including GGPlot & Matplotlib Pip, R & JAR packages to add additional visuals Interactive Visuals i.e. Plotly Create a Dashboard of pinned visuals