PROGRAMMING FUNDAMENTALS
LECTURE 1
National University of Modern Languages (NUML)
Computer
• A machine which can perform
calculations and make logical decisions
billions of time faster as compared to
human .
• Todays’s fastest computer can perform
thousands of trillions instruction PER
SECOND !
Session 1 2
What is your level of expertise in
Programming?
a) Never programmed before
b) Have taken at least one course in
programming
c) Have done significant
programming
d) I am a master programmer
Applications of Programming
Robotics:
Applications of Programming
Simulation:
Applications of Programming
Scripting:
Mechanical Engineers –
Programming & Software
• https://mechanicalc.com/posts/software-for-mechanical-e
ngineers
• https://www.youtube.com/watch?v=1_1H7G7DqG4
• https://www.youtube.com/watch?v=gHSZ1S9996U
Programming Languages
Pick up the red pen and
place it on the table
Walk 500 meter on First Ave and
then turn right
Very precise instructions that will result in a single, expected outcome.
Programming Languages
• A programming language “tells” the computer
precisely what to do
• Instructions for a specific task are encoded in a
language
• A computer understands these instructions and
performs the task
Programming Languages
Walk 10 feet in a straight line
– Cammina per 10 piedi in linea
retta
– Camine 10 pies en línea recta
– Пройдите 10 футов по прямой
– Siúil 10 troigh i líne dhíreach
Programming Languages
• Three types of programming languages:
– Machine
– Assembly
– High Level
• Assembly and High Level languages are used
more often
• Some examples of high level languages: C++, C#,
Java, Python
The Ideal Way to Do Computing
• The ideal way to ask computer to do something is
to order it in a natural language e.g.
- I want to view this webpage
- Calculate my annual tax
- etc.
• However, today’s computer’s are not intelligent
enough to understand our orders in natural
language completely.
Session 1 2
Where We Are in Computers?
• At the very basic level computers use the concept
of an electrical pulse.
- Low voltage is represented as 0
- High voltage is represented as 1
• To instruct a computer we need ask the computer
in the language of 0s and 1s commonly known as
machine language.
• For instance 73 in a number in natural language in
the language of 0s and 1s, it becomes 1001001
Session 1 5
Machine Language: Our First
Interaction with the Computer
• machine language.
10110011 00011001
01111010 11010001 10010100
10011111 00011001
01011100 11010001 10010000
10111011 11010001 10010110
– Finding an average of two numbers
• Not very intuitive way of working
• Not possible for humans to achieve a lot using machine
language
Session 1 6
One Step Beyond - Assembly Language
• One level above machine language is assembly
language
MOV 0, SUM
MOV NUM, AC
ADD SUM, AC
STO SUM, TOT
• More understandable but still very difficult for
many of us.
• An assembler translates assembly language into
machine language.
Session 1 7
Another Step - High-level
Languages
• High-level languages is another level above
machine language.
X = (Y + Z) / 2
• Much more understandable.
• A compiler translates high-level language
into assembly language.
Session 1 8
Where are we going?
• The next step in computing is to use natural
language over a high-level language.
• But we are still away from it.
• A lot of research needs to be carried out
before we actually see this.
• Until then our task is to use high-level
languages in its best possible ways
Session 1 9
What is Programming?
• When we say “programming” we are
actually referring to the science of
transforming our intentions in a high-level
programming language.
Session 1 10
Back-end Programming Languages
Top Programming Languages
Top Languages wrt Jobs
Introduction to C++
• Where did C++ come from?
- Derived from the C language
• Why the ‘++’?
- ++ is an operator in C++
C++ History
• C developed by Dennis Ritchie at AT&T
Bell Labs in the 1970s.
- Used to maintain UNIX systems
- Many commercial applications written in c
• C++ developed by Bjarne Stroustrup at AT&T
Bell Labs in the 1980s.
- Overcame several shortcomings of C
- Incorporated object oriented programming
- C remains a subset of C++
Object-Oriented Programming
• OOP: Now the dominant way to program, yet it is almost 40
years old! (Simula ’67 and Smalltalk ’72 were the first OOPLs)
- Dr. Alan Kay received ACM's Turing Award, the "Nobel Prize of
Computing,“ in 2003 for Smalltalk, the first complete dynamic OOPL
• It was slow to catch on, but since the mid-90’s everybody’s been
doing it!
• OOP emphasizes objects, which often reflect real-life objects
- have both properties and capabilities
- i.e., they can perform tasks: “they know how to...”
Session 1
How to Learn Programming
• Everybody learns programming at their own
pace.
• So do not be impressed by the person sitting
next to you because he coded a given
program in 20 minutes and you are taking
more than an hour.
• Speed programming does not necessarily
mean quality of the final output.
Session 1
How to Learn Programming (cont’d)
•
1. Writing a good description of the problem.
2. Breaking down the given problem into small pieces.
3. Turning small pieces into pseudo-code.
4. Deciding the integration mechanism of the pieces.
5. Writing the program for each piece.
6. Integrating all the pieces together.
Session 1
Scare of Programming?
• Why most students are afraid of programming
- Paradigm Change
• Programming is totally different paradigm. You are working
on something and you cannot even touch the final output you
can only feel it. It is different then other subjects like Physics,
Chemistry, Biology, etc.
- Peer Pressure
• Some people are naturally good in programming so others
think that this is a natural ability and they cannot learn it.
Session 1
Scare of Programming? (cont’d)
- Lack of Understanding in Fundamental Concepts
• Some people start programming without a clue of what is
going on behind the scene in the computer. As a result they
have a flawed understanding from day one of their
programming experience
- Time Factor: Programming takes a lot of time
• Programming may take a lot of time at the start but once a
person is comfortable with the concepts and has mastered the
basic skills it is just like any other profession.
Session 1
A Word of Advice
• Without good command on programming
any engineering qualification in current era
is almost
“worthless”.
• There is an acute shortage of programmers
in the global market and with time
this shortage is increasing.
Session 1
Class timings
• BS-IT 1st
Semester
– Lecture
• Room 39
• Wednesday 09.00 – 11.35
– Lab
• Computer Science Lab
• Thursday 09.00 – 11.35
Course Outlines
• Introduction to
Programming
• Introduction to C++
• Basic Structure of C++
• Basic input and output
statements
• Operators
• Variables
• Loops
• Decision operators
• Functions
• Arrays & Strings
• Structures
• Pointers
• Files I/O
Course Book
• Object Oriented Programming in C++ by
Robert Lafore
• C++ How to Programme by Dietel and Dietel
• References:
• A Structured Programing Approach Using C++
by Behrouz A. Forouzan
• www.cplusplus.com
CODE OF ETHICS
• All students must come to class on time (Attendance
will be taken in first 15 mins)
• Students should remain attentive during class and
avoid use of Mobile phone, Laptops or any gadgets
• Obedience to all laws, discipline code, rules and
community norms
• Respect peers, faculty and staff through actions and
speech
• Student should not be sleeping during class
• Bring writing material and books
• Class participation is encouraged
Policies
• No extensions in assignment deadlines.
• Exams will be closed book.
• Never cheat.
– “Better fail NOW or else will fail somewhere LATER in life”
• Plagiarism will also have strict penalties.
Adapted from What is Plagiarism PowerPoint
http://mciu.org/~spjvweb/plagiarism.ppt
Courtesy Dr. Khawar
Learning Outcomes
• Enabling Knowledge: The process of designing
algorithmic solutions to computable problems; the syntax
and control structures of a programming language i.e. C++,
which enable you to code these algorithmic solutions using
standard coding conventions
• Critical Thinking and Analysis: Ability to analyze the
requirements for solving simple algorithmic problems.
Learning Outcomes (cont’d)
• Problem Solving: Ability to design and implement
programs to solve simple algorithmic computing problems,
based on analysis of the requirements.
• Communication: Ability to explain key concepts of
algorithmic design, in written form, to IT specialists.
Programming Languages
• Programming Language
– A set of rules, symbols, and special words used to
construct a computer program.
• Machine Language
– The binary representation of the instructions that a computer's hardware can
perform.
• Assembly Language
– A low-level programming language in which a mnemonic is used to represent
each of the machine language instructions for a specific computer.
• High-Level Language
– A computer language that is more understandable and closer to standard
notations than assembly language. It is more close to plain English. C/C++ are
high-level languages.
Programming language rules
• Rules of Syntax which specify how valid instructions are written in
the language.
– They deal with the structure of an instruction
• Rules of Semantics which determine the meaning of the
instructions (what the computer will do in response to the given
instructions).
– They deal with the content of an instruction
Bugs and Debugging
• Programming errors are called bugs
• The process of tracking bugs and correcting them is
called debugging.
• Three kinds of errors can occur in a program:
– syntax errors
– semantic errors
– runtime errors
• It is useful to distinguish between them in order to track them
down more quickly
Syntax errors
• Most languages including c++ can only
execute a program if the program is
syntactically correct; otherwise, the process
fails and returns an error message.
– Syntax refers to the structure of a program and
the rules about that structure.
– For example, in English, a sentence must begin
with a capital letter and end with a period.
this sentence contains a syntax error.
So does this one
Semantic Errors
• Semantic error is an error in the content of a code.
• If there is a semantic error in your program, it will run
successfully, i.e. the computer will not generate any
error messages, but it will not do the right thing.
• The problem is that the program you wrote is not the
program you wanted to write. The meaning of the
program (its semantics) is wrong.
• Identifying semantic errors can be tricky because it
requires you to work backward by looking at the
output of the program and trying to figure out what it
is doing.
Runtime Errors
• The third type of error is a runtime error, so
called because the error does not appear until
you run the program.
• These errors are also called
exceptions because they usually indicate that
something exceptional (and bad) has
happened.
• Runtime errors are rare in the simple
programs so it might be a while before you
encounter one.
Types of Program
• Source Program
– A program written in a human readable version,
which you will write.
• Object Program
– The machine language version of a source
program in 0s and 1s.
• EXE Program
– It is an executable program
Basics of a Typical C++ Environment
Phases of C++ Programs:
1. Edit
2. Preprocess
3. Compile
4. Link
5. Load
6. Execute
Loader
Primary
Memory
Program is created in
the editor and stored
on disk.
Preprocessor program
processes the code.
Loader puts program
in memory.
CPU takes each
instruction and
executes it, possibly
storing new data
values as the program
executes.
Compiler
Compiler creates
object code and stores
it on disk.
Linker links the object
code with the libraries,
Creates an executable
file and stores it on disk
Editor
Preprocessor
Linker
CPU
Primary
Memory
.
.
.
.
.
.
.
.
.
.
.
.
Disk
Disk
Disk
Disk
Disk
A basic program
// ------------------------------------------------------------
/ *hello.cpp is a demonstration program
Welcome to C++*/
#include <iostream>
using namespace std;
void main ( )
{
cout << "Hello C++ World ! n";
}
Preprocessor Directives/
Header File
The using Directive
Comments
A basic program
// ------------------------------------------------------------
/ *hello.cpp is a demonstration program
Welcome to C++*/
#include <iostream>
using namespace std;
void main ( )
{
cout << "Hello C++ World ! n";
}
The main() function
Standard output stream
Insertion Operator
String Constant
Escape Sequence
End of a statement
A basic program
• Programs typically contain the following
elements:
– Descriptive comments (double forward slash // or /* … */)
– Include files
– Functions including exactly one main function
• The main function
– Controls the execution of the program
Output Statements
cout << “Hello C++ World”;
•cout is an object in c++, predefined to display
the standard output stream
•<< insertion operator
– It directs the contents of the variable on its right
to the object on its left
•The output of this program
– Hello C++ World
Output
Escape Sequences
Escape Sequence Character
a Bell (beep)
b Backspace
n Newline
r Return
t Tab
 Backslash
‘ Single quotation mark
“ Double quotation marks
52
Acknowledgements
1. Deitel and Deitel: C++ How to Program, 7th Edition, Prentice Hall Publications
2. Robert Lafore: Object-Oriented Programming in C++, Fourth Edition,
December 2001,Sams Publishing .
3. A Structured Programing Approach Using C++ by Behrouz A. Forouzan
4. www.cplusplus.com
Material
in
these
slides
has
been
taken
from,
the
following
resources

Introduction to the Programing Fundamentals Course.ppt

  • 1.
    PROGRAMMING FUNDAMENTALS LECTURE 1 NationalUniversity of Modern Languages (NUML)
  • 2.
    Computer • A machinewhich can perform calculations and make logical decisions billions of time faster as compared to human . • Todays’s fastest computer can perform thousands of trillions instruction PER SECOND ! Session 1 2
  • 3.
    What is yourlevel of expertise in Programming? a) Never programmed before b) Have taken at least one course in programming c) Have done significant programming d) I am a master programmer
  • 4.
  • 5.
  • 6.
  • 7.
    Mechanical Engineers – Programming& Software • https://mechanicalc.com/posts/software-for-mechanical-e ngineers • https://www.youtube.com/watch?v=1_1H7G7DqG4 • https://www.youtube.com/watch?v=gHSZ1S9996U
  • 8.
    Programming Languages Pick upthe red pen and place it on the table Walk 500 meter on First Ave and then turn right Very precise instructions that will result in a single, expected outcome.
  • 9.
    Programming Languages • Aprogramming language “tells” the computer precisely what to do • Instructions for a specific task are encoded in a language • A computer understands these instructions and performs the task
  • 10.
    Programming Languages Walk 10feet in a straight line – Cammina per 10 piedi in linea retta – Camine 10 pies en línea recta – Пройдите 10 футов по прямой – Siúil 10 troigh i líne dhíreach
  • 11.
    Programming Languages • Threetypes of programming languages: – Machine – Assembly – High Level • Assembly and High Level languages are used more often • Some examples of high level languages: C++, C#, Java, Python
  • 12.
    The Ideal Wayto Do Computing • The ideal way to ask computer to do something is to order it in a natural language e.g. - I want to view this webpage - Calculate my annual tax - etc. • However, today’s computer’s are not intelligent enough to understand our orders in natural language completely. Session 1 2
  • 13.
    Where We Arein Computers? • At the very basic level computers use the concept of an electrical pulse. - Low voltage is represented as 0 - High voltage is represented as 1 • To instruct a computer we need ask the computer in the language of 0s and 1s commonly known as machine language. • For instance 73 in a number in natural language in the language of 0s and 1s, it becomes 1001001 Session 1 5
  • 14.
    Machine Language: OurFirst Interaction with the Computer • machine language. 10110011 00011001 01111010 11010001 10010100 10011111 00011001 01011100 11010001 10010000 10111011 11010001 10010110 – Finding an average of two numbers • Not very intuitive way of working • Not possible for humans to achieve a lot using machine language Session 1 6
  • 15.
    One Step Beyond- Assembly Language • One level above machine language is assembly language MOV 0, SUM MOV NUM, AC ADD SUM, AC STO SUM, TOT • More understandable but still very difficult for many of us. • An assembler translates assembly language into machine language. Session 1 7
  • 16.
    Another Step -High-level Languages • High-level languages is another level above machine language. X = (Y + Z) / 2 • Much more understandable. • A compiler translates high-level language into assembly language. Session 1 8
  • 17.
    Where are wegoing? • The next step in computing is to use natural language over a high-level language. • But we are still away from it. • A lot of research needs to be carried out before we actually see this. • Until then our task is to use high-level languages in its best possible ways Session 1 9
  • 18.
    What is Programming? •When we say “programming” we are actually referring to the science of transforming our intentions in a high-level programming language. Session 1 10
  • 19.
  • 20.
  • 21.
  • 22.
    Introduction to C++ •Where did C++ come from? - Derived from the C language • Why the ‘++’? - ++ is an operator in C++
  • 23.
    C++ History • Cdeveloped by Dennis Ritchie at AT&T Bell Labs in the 1970s. - Used to maintain UNIX systems - Many commercial applications written in c • C++ developed by Bjarne Stroustrup at AT&T Bell Labs in the 1980s. - Overcame several shortcomings of C - Incorporated object oriented programming - C remains a subset of C++
  • 24.
    Object-Oriented Programming • OOP:Now the dominant way to program, yet it is almost 40 years old! (Simula ’67 and Smalltalk ’72 were the first OOPLs) - Dr. Alan Kay received ACM's Turing Award, the "Nobel Prize of Computing,“ in 2003 for Smalltalk, the first complete dynamic OOPL • It was slow to catch on, but since the mid-90’s everybody’s been doing it! • OOP emphasizes objects, which often reflect real-life objects - have both properties and capabilities - i.e., they can perform tasks: “they know how to...” Session 1
  • 25.
    How to LearnProgramming • Everybody learns programming at their own pace. • So do not be impressed by the person sitting next to you because he coded a given program in 20 minutes and you are taking more than an hour. • Speed programming does not necessarily mean quality of the final output. Session 1
  • 26.
    How to LearnProgramming (cont’d) • 1. Writing a good description of the problem. 2. Breaking down the given problem into small pieces. 3. Turning small pieces into pseudo-code. 4. Deciding the integration mechanism of the pieces. 5. Writing the program for each piece. 6. Integrating all the pieces together. Session 1
  • 27.
    Scare of Programming? •Why most students are afraid of programming - Paradigm Change • Programming is totally different paradigm. You are working on something and you cannot even touch the final output you can only feel it. It is different then other subjects like Physics, Chemistry, Biology, etc. - Peer Pressure • Some people are naturally good in programming so others think that this is a natural ability and they cannot learn it. Session 1
  • 28.
    Scare of Programming?(cont’d) - Lack of Understanding in Fundamental Concepts • Some people start programming without a clue of what is going on behind the scene in the computer. As a result they have a flawed understanding from day one of their programming experience - Time Factor: Programming takes a lot of time • Programming may take a lot of time at the start but once a person is comfortable with the concepts and has mastered the basic skills it is just like any other profession. Session 1
  • 29.
    A Word ofAdvice • Without good command on programming any engineering qualification in current era is almost “worthless”. • There is an acute shortage of programmers in the global market and with time this shortage is increasing. Session 1
  • 30.
    Class timings • BS-IT1st Semester – Lecture • Room 39 • Wednesday 09.00 – 11.35 – Lab • Computer Science Lab • Thursday 09.00 – 11.35
  • 31.
    Course Outlines • Introductionto Programming • Introduction to C++ • Basic Structure of C++ • Basic input and output statements • Operators • Variables • Loops • Decision operators • Functions • Arrays & Strings • Structures • Pointers • Files I/O
  • 32.
    Course Book • ObjectOriented Programming in C++ by Robert Lafore • C++ How to Programme by Dietel and Dietel • References: • A Structured Programing Approach Using C++ by Behrouz A. Forouzan • www.cplusplus.com
  • 33.
    CODE OF ETHICS •All students must come to class on time (Attendance will be taken in first 15 mins) • Students should remain attentive during class and avoid use of Mobile phone, Laptops or any gadgets • Obedience to all laws, discipline code, rules and community norms • Respect peers, faculty and staff through actions and speech • Student should not be sleeping during class • Bring writing material and books • Class participation is encouraged
  • 34.
    Policies • No extensionsin assignment deadlines. • Exams will be closed book. • Never cheat. – “Better fail NOW or else will fail somewhere LATER in life” • Plagiarism will also have strict penalties. Adapted from What is Plagiarism PowerPoint http://mciu.org/~spjvweb/plagiarism.ppt Courtesy Dr. Khawar
  • 35.
    Learning Outcomes • EnablingKnowledge: The process of designing algorithmic solutions to computable problems; the syntax and control structures of a programming language i.e. C++, which enable you to code these algorithmic solutions using standard coding conventions • Critical Thinking and Analysis: Ability to analyze the requirements for solving simple algorithmic problems.
  • 36.
    Learning Outcomes (cont’d) •Problem Solving: Ability to design and implement programs to solve simple algorithmic computing problems, based on analysis of the requirements. • Communication: Ability to explain key concepts of algorithmic design, in written form, to IT specialists.
  • 37.
    Programming Languages • ProgrammingLanguage – A set of rules, symbols, and special words used to construct a computer program. • Machine Language – The binary representation of the instructions that a computer's hardware can perform. • Assembly Language – A low-level programming language in which a mnemonic is used to represent each of the machine language instructions for a specific computer. • High-Level Language – A computer language that is more understandable and closer to standard notations than assembly language. It is more close to plain English. C/C++ are high-level languages.
  • 38.
    Programming language rules •Rules of Syntax which specify how valid instructions are written in the language. – They deal with the structure of an instruction • Rules of Semantics which determine the meaning of the instructions (what the computer will do in response to the given instructions). – They deal with the content of an instruction
  • 39.
    Bugs and Debugging •Programming errors are called bugs • The process of tracking bugs and correcting them is called debugging. • Three kinds of errors can occur in a program: – syntax errors – semantic errors – runtime errors • It is useful to distinguish between them in order to track them down more quickly
  • 40.
    Syntax errors • Mostlanguages including c++ can only execute a program if the program is syntactically correct; otherwise, the process fails and returns an error message. – Syntax refers to the structure of a program and the rules about that structure. – For example, in English, a sentence must begin with a capital letter and end with a period. this sentence contains a syntax error. So does this one
  • 41.
    Semantic Errors • Semanticerror is an error in the content of a code. • If there is a semantic error in your program, it will run successfully, i.e. the computer will not generate any error messages, but it will not do the right thing. • The problem is that the program you wrote is not the program you wanted to write. The meaning of the program (its semantics) is wrong. • Identifying semantic errors can be tricky because it requires you to work backward by looking at the output of the program and trying to figure out what it is doing.
  • 42.
    Runtime Errors • Thethird type of error is a runtime error, so called because the error does not appear until you run the program. • These errors are also called exceptions because they usually indicate that something exceptional (and bad) has happened. • Runtime errors are rare in the simple programs so it might be a while before you encounter one.
  • 43.
    Types of Program •Source Program – A program written in a human readable version, which you will write. • Object Program – The machine language version of a source program in 0s and 1s. • EXE Program – It is an executable program
  • 44.
    Basics of aTypical C++ Environment Phases of C++ Programs: 1. Edit 2. Preprocess 3. Compile 4. Link 5. Load 6. Execute Loader Primary Memory Program is created in the editor and stored on disk. Preprocessor program processes the code. Loader puts program in memory. CPU takes each instruction and executes it, possibly storing new data values as the program executes. Compiler Compiler creates object code and stores it on disk. Linker links the object code with the libraries, Creates an executable file and stores it on disk Editor Preprocessor Linker CPU Primary Memory . . . . . . . . . . . . Disk Disk Disk Disk Disk
  • 46.
    A basic program //------------------------------------------------------------ / *hello.cpp is a demonstration program Welcome to C++*/ #include <iostream> using namespace std; void main ( ) { cout << "Hello C++ World ! n"; } Preprocessor Directives/ Header File The using Directive Comments
  • 47.
    A basic program //------------------------------------------------------------ / *hello.cpp is a demonstration program Welcome to C++*/ #include <iostream> using namespace std; void main ( ) { cout << "Hello C++ World ! n"; } The main() function Standard output stream Insertion Operator String Constant Escape Sequence End of a statement
  • 48.
    A basic program •Programs typically contain the following elements: – Descriptive comments (double forward slash // or /* … */) – Include files – Functions including exactly one main function • The main function – Controls the execution of the program
  • 49.
    Output Statements cout <<“Hello C++ World”; •cout is an object in c++, predefined to display the standard output stream •<< insertion operator – It directs the contents of the variable on its right to the object on its left •The output of this program – Hello C++ World
  • 50.
  • 51.
    Escape Sequences Escape SequenceCharacter a Bell (beep) b Backspace n Newline r Return t Tab Backslash ‘ Single quotation mark “ Double quotation marks
  • 52.
    52 Acknowledgements 1. Deitel andDeitel: C++ How to Program, 7th Edition, Prentice Hall Publications 2. Robert Lafore: Object-Oriented Programming in C++, Fourth Edition, December 2001,Sams Publishing . 3. A Structured Programing Approach Using C++ by Behrouz A. Forouzan 4. www.cplusplus.com Material in these slides has been taken from, the following resources