Internship Report
“Recruitment and Selection Process “
of NAV INFOTECH
Submitted to,
Submitted by,
PRIYA DUBEY
RUNGTA(R1) COLLEGE BHILAI-RAIPUR
(C.G)
Submitted on,
Subject: Letter of Transmittal
Dear ma’am
With great pleasure I submit my Recruitment and Selection process report on “NAV
INFOTECH”. I have found the study to be quite interesting, beneficial & insightful.
I have tried my level best to prepare an effective & creditable report.
The report contains a detailed study on Recruitment and Selection process & a
look at how it is done in the practical world. Here we have gathered information
through different sources such as websites and actual interviews from my
Supervisor of NAV INFOTECH
I also want to thank you for your support and patience for me and I appreciate the
opportunity provided by you through assigning me to work in this thoughtful project.
Yours sincerely,
PRIYA DUBEY
Acknowledgement
First of all, I would like to thank my Advisor Mrs. BHARTI WALI for her untiring
guidance, help, effort, and suggestion. Really I am thankful to her. Without her
direct guide this report couldn’t be possible. A very dynamic personality, Mrs. wali
constantly inspired me all the time to develop my career and share her knowledge
with us. I shall remain ever grateful to Mrs.wali for her extraordinary gesture and
relentless effort.
I would also like to thank the authority of NAV INFOTECH for helping me by giving
an opportunity to work with them.
INDEX
Title Page No
1. Executive Summery
2. Introduction
a- Objective of the study
b- Methodology, Scope, Limitation,
3. Company overview
a- Mission, Vision, Principles
b- long term vision of the company
c- Job Part
4. Literature Review
a-Discussion about HRM
b- Functional area of HRM
c-Recruitment Process
d- Selection Process
5. NAV INFOTECH Human Resource Division
36
6. Findings
7. Recruitment & Selection Process
8. Analysis
9. Recommendation
10. Conclusion
11. Bibliography
12. Questionarrie
Nav infotech Pvt Ltd.
EXECUTIVE SUMMERY
I have been assigned to complete internship report on “Recruitment and Selection
process of “Nav infotech.” under the guidance of Mrs. Bharti wali.
“Recruitment and Selection process” is a segment of human resource process; As
such I have selected this topic to make it clear. I have divided this report in some
sub segments. As a young intern in a reputed corporate sector like ”Nav infotech”
I have tried my best to go through their Recruitment and Selection process within
little tenure of 45 days.
The report starts with a general introduction “Nav infotech” As well as its purpose,
scope and limitation. Then this report proceeds onto the preliminary talk about “Nav
infotech.” pvt. ltd, I have shown the vision, strategic goal and principles of it.
Afterward here discuss about Nav Infotech pvt.. ltd different Division and
Department. Then it carries on with nav infotech Long Term Vision, CSR activities,
Achievement. Than the report proceeds with the job part, where the jobs which is
done by me is discussed.
After that I continue to my main focus of the report “NAV INFOTECH” Recruitment
and Selection process” describing the different steps of it. The first part is
manpower requisition and each department gives requisition according to its HR
planning to HR Department .
Following steps are arranging written exam, taking one or more interviews, and
finally the medical checkup. A detail elaboration of selection of best candidate has
been added in the project part and the contribution of HR department for selecting
the most eligible employees for Nav Infotech has been highlighted. In this report,
some other important topics of their HR division are also discussed like HR
hierarchy, the environment within the organization and accommodation of a pull of
candidates. After completion of this report it can easily say that efficient, competent
and active part in Recruitment and Selection process take a company to the peak
of the success
CHAPTER -1
Introduction
This is an internship report. MBA Course requires a 45 DAYS attachment with an
organization followed by a report assigned by the supervisor in the organization
and endorsed by the faculty advisor. I took the opportunity to do my internship in
Bhopal “NAV INFOTECH”
Background of the study
There is no doubt that the world of work is rapidly changing. As part of an
organization then, HRM must be equipped to deal with the effects of the changing
world of work. For them this means understanding the implications of globalization,
technology changes, workforce diversity. Changing skill requirements, continuous
improvement initiatives contingent workforce, decentralized work sites and
employee involvement are the issue for confront. Now it is a big challenge for the
HRM to support the organization by providing the best personnel for the suitable
position in shortest possible time. Starting with recognizing the vacancies and
planning for them is a great task. Moreover selecting attracting the suitable
candidates and selecting the best person in time is a challenge.
The cost of the recruitment is significant. So, proper planning and formulate those
plan is the task that require more focus and improvement. Equal opportunity and
sourcing is also a vital part. Realizing this need we tried to find the difference and
similarities between theoretical aspects with the practical steps taken by the
company. We took an attempt to demonstrate the feature for the further
improvement.
Objectives of the Study
Broad Objective:
To know overall about the company of Nav Infotech pvt. ltd and also know each
and every parts of the recruitment and selection process of that company. Specific
Objectives:
1. To focus on major elements of Recruitment ,training and Selection
process.
2. To focus on the process of Recruiting and training selecting
personals.
3. To focus on the updates and the better methods of modern
technique.
Methodology
Source of Information:
1. Primary: The primary information collected through face to face interview,
observation, and by participation in the recruitment and selection process.
2. Secondary: The secondary information collected from website, Magazine,
Memorandum, Journals, books and some other relevant sources.
Both primary and secondary data sources will be used to generate this report.
Primary data sources are scheduled survey, informal discussion with professionals
and observation while working in different desks. The secondary data sources are
different published reports, manuals, price updates and different publications of
“NAV INFOTECH”.
Scope of the research
The report deals with the recruitment and selection process in terms of theoretical
point of view and the practical use. The study will allow learning about the
recruitment and selection issues, importance, modern techniques and models used
to make it more efficient. The study will help to learn the practical procedures
followed by the leading organizations. Moreover the study will help to differentiate
between the practice and the theories that direct to realize how the organization
can improve their recruitment and selection process.
Limitations of the research
The main limitation of the study is the collection of information. Because most of
the information are confidential. So they don’t want to disclose them. And I am not
able to show any forms which they use in the time of joining or we use to upgrade
the files.
CHAPTER-2
COMPANY OVERVIEW
Background of NAV INFOTECH:
Nav Infotech is an IT company, has an expert team of Web Developers and Software
Engineers. Our aim is to deliver world class quality work to our client for any kind of online
business. it’s solutions and software products for the development services and it’s industries.
We specialize in product development and we have put in place processes and technologies
which have helped us deliver a number of desktop and web application software to satisfy
customer and user.
Our Vision:
We shall operate globally and bring the benefits of Information Technology to
improve the productivity of our customers, and the quality of their products
and services.
Our Mission:
NAV INFOTECH was established with a mission to be a client oriented,
technology oriented, people focused, quality oriented, adaptive and innovative
in its approach. Our mission is to promote profitability for our clients and
ourselves by providing superior information services and solutions
Nav Infotech aims to achieve its vision through being number ‘one’ not only in terms
of market share, but also by being an employer of choice with up-to-date knowledge
and products geared to address the ever changing needs of our budding nation.
Principle of nav infotech:
Principles statements define how people want to behave with each other in the
organization. Nav Infotech Limited statement is about how the organization will
value their customers, suppliers, and the internal community. For this reason Nav
Infotech Limited Employees hold themselves accountable to the following guiding
Principles for the organization.
Emotional: Passionate, Creative, Respectful, Open
Functional: Simple, Ethical, Transparent, Ownership
No matter what we do in order to realize our purpose, we hold ourselves
accountable to the following overarching guiding Principles for our organization.
Passionate: We are Passionate-it’s in all of us. Whether visible or hidden within
for whatever reason. Everything we do is about doing the best we can. We are
there for each other and we endeavor to help in every way we can.
Creative: Everything we do we should do in a creative innovative manner. We
bring energy to our work. Our communications demonstrates our creative flair. We
provide creative and imaginative and services to our customers.
Respectful: We are truly respectful to each other, our subordinates, peers,
partners and customers. We treat everyone equally and we allow people to express
their thoughts opinions in a respectful manner.
Open: We have no hidden agendas. We share information freely. We can only be
open with our customers, partners, and stakeholders if we are open with ourselves-
regardless of hierarchy.
Simple: Everything we do and say should be simple and easy to understand. In
terms of communications we make sure the massaging is in plain, simple
language. Our plains are simple and uncomplicated.
Ethical: we are moral, upright, honest, righteous, virtuous, honorable, keeping our
promises in all we say and do. We clearly align to our internal and organizational
code of ethics and code of honor. We will oppose all forms of corruptions.
Transparent: A few key words and phrases sums this up: Honesty, openness,
frankness, no lies, no deceit, no games, easily understood. We are transparent
with our customers, with each other, with our subordinate and peers
Ownership: whilst working individually or correctively, we clearly demonstrate
individual and collective ownership. Making mistakes is clearly part of daily
business as it is part of daily life- as long as we own up to this clear, no culture of
fear.
 Call Waiting and Call Holding
 Call Forwarding
 Call Conferencing
 National Roaming-Both way
 Dedicated Customer Services
 Music
 Entertainment
 Downloads
 Internet & Data Services
 Messaging
 Community & Chat
 Information & Services
 Mobile Assistance
 Education & Career
 Lifestyle
 Call Management etc.
Chain of Command
The organization is headed by its Chief Executive designated as the Managing
Director entrusted with overall responsibilities of business direction of the
organization and leading dynamically towards the attainment of its Vision, Mission
and Goal. Nav Infotech pvt. ltd has established a strong and formidable sales
channel, which consists of direct dealers and its own sales force.
Nav Infotech has following divisions and departments:
 Finance Division
 Information Technology Division
 Technical Division
 Human Resources Division
 Revenue Assurance Department
 Corporate Strategy Department
 Supply Chain Management Department
 Legal & Compliance Department
 MD’s/CEO’s Office
Marketing division constitutes seven units. A brief description of each unit is
given below:
• Brand and A&P:
Brand and A&P denotes to brand and advertising & promotion. This unit deals with
the overall brand management and promotion activities of the company.
• Product Development:
Product development unit is like the R&D unit of a company, which is responsible
for developing new products and services. This unit is closely related to the
marketing research unit.
• Corporate Sales:
Corporate sales unit deals with the sales of products and services to other
companies. The unit makes agreements with different companies to be the
corporate clients of Nav Infotech and only handle the corporate level sales.
• Direct Sales:
Direct sales unit is responsible for the sales of products and services to the mass
customers through the customer service centers.
• Dealer Management:
Dealer management unit oversees the dealers of the company around the country.
• Information Technology Division:
IT division constitutes seven units and they closely work together.
• Value Added Services (VAS)
Value added service is a unit that implements the developed concepts and ideas
of the marketing division. This handles the VAS content providers who are the third
party to the company.
• Billing:
The billing unit is responsible for processing and monitoring the billing systems for
the postpaid users. The unit has a manager who reports to the AGM of IT.
• Rating (postpaid)
This unit is responsible for charging the rates of postpaid services. The unit fixes
per minute and pulse rates and also fix the pulse durations. It has changes the
rates on demand basis.
• Prepaid:
This unit only deals with the prepaid service. It administers the e-fill and scratch
card systems. At the same time, it fixes per-minute and pulse rates and fix the
pulse durations.
• Product Configuration:
This unit is responsible for designing and developing products and services. It
develops the blueprints of the product design.
• Billing Operation Team:
Billing operation team is responsible for administering the entire billing process and
developing required software for collecting bills from postpaid users.
• Customer Relation Management (CRM):
This unit supplies required software to the customer care centers and work with
these centers side by side. The centers usually inform CRM concerning their
necessaries and the unit prepares suitable software for them.
Finance Division:
Financial division has eight units dealing with financial matters of the company.
• Treasury Management:
Corporate finance unit consists of the treasury management and L/C. Treasury
management deals with the inflow and outflow of the company, whereas L/C (letter
of credit) deals with the L/C opening banks and other foreign banks.
• Accounts Payable:
This unit keeps track on the accounts payable of the company.
• Accounts Receivable:
This unit keeps track on the accounts receivable s of the company while preparing
the balance sheet. As Axiata is a large company with thousands of financial
transactions every day, a unit to keep track on the accounts is necessary.
• Core: Account:
Core account is an important unit of the finance division dealing with the budget
and fixed assets. The annual budget of various departments is prepared under the
close observation of this unit.
• Revenue Assurance:
Revenue assurance unit consists of the revenue assurance and fraud
management. Revenue assurance monitors the transactions and assures all
protection of the finances. On the other hand, fraud management protects the
fraudulences take place in the daily transactions.
• Taxation:
Taxation unit takes care of the tax, VAT and tariffs of the company.
• Reporting unit:
The reporting unit reports the entire financial transactions Axiata to the parent
company.
• Costing:
This unit forecasts the costing of different departments and resorts them regarding
the expected expenditure of any alternation.
Technical Division:
The technical division consists of three major units- planning, infrastructure, and
property management.
• Planning:
The planning unit makes plans regarding the technical matters such as the RF,
SWITCH etc. They assure the proper placement of technical devices and
equipments.
• Property Management:
The property management unit manages the technical equipments and assets.
Human Resource Division:
Human resource department is responsible for the recruitment and training of the
employees of the company. They also monitor the performance and handle the
promotion and salary related matters. They also administer the regulations of the
company.
Corporate Strategy Department:
The corporate strategy department determines the long term strategies and short
term plans. All the corporate level policies come from them and they are also
responsible for the implementation.
Corporate Affairs Department:
The corporate affairs department is responsible for the internal and external
synchronization. At on hand, they coordinate with outside companies. Along with
that, they harmonize among the divisions and departments inside the company.
.
Long-Term Vision of the Company:
Nav Infotech strongly believes that subscribers are their most valuable assets.
They have a strong Customer Service Center. To always be with their customers
the Nav Infotech "Help Line' is there.
CHAPTER-3
JOB PART
I am working there as an intern so I don’t have to handle any core responsibilities.
I only look after the supporting work, Written exam Coordination, Calling Interview
for Selected Participants, Coordinating Interviews, Coordinate and help new
employees to complete joining procedures, taking written exam etc and main work
is updating the files of existing employees, creates new employee files.
Update old files: Before all employee files based on paper, which creates lots of
problems to maintain because it need lot of space, paper, cabinet to keep, spend
time to search and main problem was it has risk to lost. So now we convert it from
paper based to computer based. And also search those papers which are missing
and add these.
Creates New Files: At a time more than one people can join in an organization
and all of them have different files which creates by us. Lots of papers we have to
accumulate with new files like joining forms, disclosures forms, declaration forms,
gratuity forms, Conflict of Interest, Medical reports, Pre-employment medical test,
CV with Certificates, Job Advertisement, Manpower Requisition forms, CV
shortening criteria, Tabulation Sheets (1st interview,2nd interview, written test),
Approval note, Appointment Letter etc.
Written exam Coordination: Coordinate written exam in exam period like guard
the candidates in the time of exam. I any candidates feels any kind of problem then
solve it by conducting with the respective officer.
Observation:
• HR Division is very alert for selecting candidates and also the process is
very transparent so that they can choose the best candidates among
applicants.
• In this process there is no nepotism so there are higher possibilities to be
selected without having any back up.
• When they search for any experienced people they give more concentration
on Previous experienced, Educational background, length of services etc
so that they can select the most suitable experienced people.
• When they select entry level candidates than they concentrate more on
proactiveness, creativeness, ideas which related with the post.
• In the time of calling the candidates for interview or written exam, if the
candidates missed then the officers try hard to inform them.
• HR selects candidates from a pull of application so that they can choose
most suitable candidates.
But also the process has some problems like the space for written exam is very
small, so accommodation of all candidates is tough. And the difference between
calling candidates and taking interview is very short so some times it creates
problems to contact with candidates.
Recommendation:
Working environment is very good in Nav Infotech pvt Limited. They are very
friendly to help each other. Any one feels pleasure to work with Nav Infotech group.
If they take corrective decision beginning of starting a work then many mistakes
can be solved. For example: there are many interview rooms are available if tow
of interview room is convert into a written exam room or then no problem will be
arise. If we consider two or three problems then the functioning process are very
good.
CHAPTER-4
The Project
LITERATURE REVIEW on Recruitment
And selectionprocess
History of Human Resource Management
The History of Human Resource Management is the strategic and coherent
approach to the management of an organization's most valued assets - the people
working there who individually and collectively contribute to the achievement of the
objectives of the business. The terms "human resource management" and "human
resources" (HR) have largely replaced the term "personnel management" as a
description of the processes involved in managing people in organizations. Human
Resource management is evolving rapidly. Human resource management is both
an academic theory and a business practice that addresses the theoretical and
practical techniques of managing a workforce. Human resource management has
its roots in the late and early 1900's. When there are less labor then there are more
working with machinery. The scientific management movement began. This
movement was started by Frederick Taylor when he wrote about it a book titled
‘The Principles of Scientific Management’. The book stated, "The principal object
of management should be to secure the maximum prosperity for the employer,
coupled with the maximum prosperity for each employee.” Taylor believed that the
management should use the techniques used by scientist to research and test work
skills to improve the efficiency of the workforce. Also around the same time came
the industrial welfare movement. This was usually a voluntary effort by employers
to improve the conditions in their factories. The effort also extended into the
employee’s life outside of the work place. The employer would try to provide
assistance to employees to purchase a home, medical care, or assistance for
education. The human relations movement is the major influence of the modern
human resource management. The movement focused on how employees group
behavior and how employee feelings. This movement was influenced by the
Hawthorne Studies.
Functional area of HRM
• Human resource auditing
• Human resource strategic planning
• Human resource planning
• Manpower panning
• Recruitment / selection
• Induction
• Orientation
• Training
• Management development
• Compensation development
• Performance appraisals
• Performance management
• Career planning / development
• Coaching
• Counseling’s
• Staff amenities planning
• Event management
• Succession planning
• Talent management
• Safety management
• Staff communication
• Reward
Responsibility of HR department in large organization
Position Job Responsibilities
HR Executive committee, organization planning, HR planning
& policy, Organization development
Manager, recruitment
& employment
Recruiting, Interviewing, Testing, Placement &
Termination
Manager ,
compensation &
benefits
Job analysis and evaluation, surveys, Performance
appraisal, compensation administration, bonus, Profit
sharing plans, Employee benefits.
Manager, Training &
Development
Orientation, Training, Management development, Career
Planning & development
Manager, Employee
relations
EEO relations, contract compliance, staff assistance
programs, Employee counseling.
Table2: Responsibility of HR department
Recruitment
Recruitment refers to the process of attracting, screening, and selecting qualified people
for a job at an organization or firm. It is undertaken by recruiters. It also may be undertaken
by an employment agency or a member of staff at the business or organization looking for
recruits.
Job analysis
The proper start to a recruitment effort is to perform a job analysis, to document
the actual or intended requirement of the job to be performed. This information is
captured in a job description and provides the recruitment effort with the
boundaries and objectives of the search. Oftentimes a company will have job
descriptions that represent a historical collection of tasks performed in the past.
These job descriptions need to be reviewed or updated prior to a recruitment effort
to reflect present day requirements. Starting recruitment with an accurate job
analysis and job description insures the recruitment effort starts off on a proper
track for success.
Sourcing
Sourcing involves the following steps:
Internal sources:
The most common internal sources of internal recruitment are
1. personal recommendations
2. notice boards
3. newsletters
4. memoranda
1) Personal References
The existing employees will probably know their friends or relatives or colleagues
who could successfully fill the vacancy. Approaching them may be highly efficient
method of recruitment but will almost certainly offend other workers who would
have wished to have been considered for the job. To keep employees satisfied
make sure that potentially suitable employees are informed of the vacancy so that
they can apply. Also any one else who is likely to be interested is told about it as
well so that they can apply for the job.
2) Notice Boards
This is the convenient and simple method of passing on important messages to the
existing staff. A job advertisement pinned to a notice board will probably be seen
and read by a sufficient number of appropriate employees at little or no cost.
However many of the staff will probably not learn of the vacancy in this way either
because the notice board poorly located or is full of out dated notices that they
don’t bother to look at it, as they assume there is nothing new to find out. A notice
board must be ensured that it is well sited. Wherever it is been placed it should be
certain that it is seen by every one. It means there must be equal opportunity to
see to it and this happens when they know that just important topical notices are
on display. Attention must be paid to the design and contents of the notice if it is to
catch the eye and make the employee read on and then want to apply for the job.
3) Newsletters
Many companies regularly produce in-house newsletters, magazines or journals
for their staff to read. It is hoped that latest company news sheet is read avidly by
all staff thus ensuring that every one is aware of the job opportunity advertised in
it. Unfortunately this is not always so, because it is sometimes not circulated widely
enough and employees may find it boring and choose not to read it. Newsletter can
be utilized as the source of recruitment if it is convinced that everybody will see a
copy.
4) Memorandum
Possibly the best way of circulating news of the job vacancy is to send
memorandum to department managers to read out to the teams or to write all
employees perhaps enclosing memoranda in wage packets if appropriate.
However it can be a time consuming process to contact staff individually, especially
if there is a large work force. It should also be kept in mind as to in which way the
memorandum is phrased out so that the job appeals to likely applicants.
External sources:
There are many sources to choose from if you are seeking to recruit from outside
the company.
1. word of mouth
2. notices
3. job centers
4. private agencies and consultants
5. education institutions
6. the press
7. radio
8. television
Two or three points are discussed below.
1) Word of Mouth
Existing employees may have friends and relatives who would like to apply for his
job. Recruiting in this way appears to be simple, inexpensive and convenient.
Never use word of mouth as a sole or initial source of recruitment if the work force
is wholly or predominantly of one sex or racial group. Also employing friends and
relatives of present employees may be imprudent because it is not certain that they
are as competent as the current staff.
2) Notices
Displaying notices in and around business premises is a simple and often
overlooked method of advertising a job vacancy. They should be seen by a large
number of passerby’s, some actively looking for work. It can also be inexpensive
with a notice varying from a carefully hand written post card up to a professionally
produced poster. Pay attention to the appearance and contents of the notice if it is
intended that it is applied by the right people.
3) Job Centers
Most large towns have a job center which offers employers a free recruitment
service, trying to match their vacancies to job seekers. Staff will note information
about a post and the types of person sought and then advertise the vacancy of
notice boards within their premises. Job center employees can further help if
requested to do so by issuing and assessing application forms and thus weeding
out those applicants who are obviously unsuitable for the position. Short listed
candidates are then sent out for the employer to interview on his business
premises.
Recruiting internally and externally
Internal Recruiting:
Recruiting from among the existing workforce offers many advantages. Seeing
your employees at work on a day-to-day basis will enable you to evaluate their
particular strengths and weakness accurately and choose the most suitable person
for the position. When the company recruits from within the organization the
employees will feel important and highly valued since it appears that the
organization immediately turns to them whenever a vacancy occurs. Their work
rate and performance should improve as well as they will realize that increasing
job opportunities are available to them if they are industrious and successful at
their jobs. However any method has its own merits and demerits.
Merits
It improves the morale of the employees
The employee is in better positionto evaluate those presently employed
than outside conditions.
It promotes loyalty among the employees, for it gives them a sense of
job security and opportunities of advancement.
These people are tried and can be relied upon
Demerits
It often leads to inbreeding and discourages new blood from entering into
an organization.
There are possibilities that internal sources may “dry up” and it may be
difficult to find the requisite personnel from within an organization.
No innovation are made no new thinking so on new inputs which is very
much essential for the growth of the organization
Usually promotions are based on seniority so the danger is that really
capable hands may not be chosen.
External Recruiting:
When a company is involved in large expansions and is more oriented towards
achieving high growth and high market share, with more focus on quality of the
product and high customer satisfaction then it is inevitable for any organization to
go for external recruiting. External recruiting is nothing but recruiting the people in
your organization from outside the company. It will help the company to make best
use of other sources that are lying outside the organization like for example campus
recruits is an effective and efficient way of recruiting when a company wants new
minds that are more creative and go-getters for any task. If a company wants to
concentrate only on its core activities and wants to relieve the burden of the task
of recruitment then the more feasible option would be third party recruiting or
recruitment process outsourcing RPO. The experienced persons but unemployed
can be recruited into the company which may reduce the training cost if they are
from same industry. Retired and experienced people can yield more by enhancing
their prior experience in new business situations.
Merits
New entrant to the labor force i.e., young mostly inexperienced potential
employee’s fresh graduates or postgraduates can be taken and mould in
accordance with company’s culture.
External recruiting results in best selection from the large sources
In the long run this source proves economical because potential
employees do not extra training.
Many different ways of recruiting is available.
The excess applications generated for current requirement may be
utilized for future vacancies.
Demerits
Extra time is required by the people to adjust them selves to the present
working situations.
If the recruiting is done from large source then it will be more time taking
as the applications generated are more and short listing becomes critical.
Cost of recruiting will be comparatively more than internal recruiting.
Sometimes it creates employee dissatisfaction as there may be
mismatch between the employee expectation with the company and the
company’s expectation with the employee.
Before making a choice and making decisions as to which source should be
adopted for recruiting both the sources should be thoroughly assessed and must
be studied carefully the wide variety of individual sources of recruitment that are
available whether Internal or External. Before choosing any sources make sure
that it gives answer as YES to these following questions:
Recruitment mistakes
There are a number of methods companies should avoid when putting their
recruitment plans into practice. For instance, many businesses have the necessary
talent within their organizations, but are too busy looking outside to recruit the
skilled employees they already have. Others try to look for a mirror-replacement to
the employee they have lost, duplicates with the same attitudes and skills, when
companies can benefit more from employees with new experience and outlooks
on the position. Some employers forget to include their employees in the
recruitment process, or attempt to find the “perfect” employee without noticing the
talents of the job seekers they interview.
Selection
Employee Selection is the process of putting right men on right job. It is a procedure
of matching organizational requirements with the skills and qualifications of people.
Effective selection can be done only when there is effective matching. By selecting
best candidate for the required job, the organization will get quality performance of
employees. Moreover, organization will face less of absenteeism and employee
turnover problems. By selecting right candidate for the required job, organization
will also save time and money. Proper screening of candidates takes place during
selection procedure. All the potential candidates who apply for the given job are
tested.
But selection must be differentiated from recruitment, though these are two phases
of employment process. Recruitment is considered to be a positive process as it
motivates more of candidates to apply for the job. It creates a pool of applicants. It
is just sourcing of data. While selection is a negative process as the inappropriate
candidates are rejected here. Recruitment precedes selection in staffing process.
Selection involves choosing the best candidate with best abilities, skills and
knowledge for the required job.
Essentials of Selection Procedure
The selection process can be successful if the following requirements are satisfied:
1. Someone should have the authority to select. This authority comes
from the employment requisition as developed by an analysis of the work-
load and work force.
2. There must be some standard of personnel with which a prospective
employee may be compared i.e., a comprehensive job description and job
specification should be available beforehand.
3. There must be sufficient number of applicants from whom the
required number of employees may be selected.
PROCESS OF SELECTION
Preliminary Interview or Screening
Application Form
Written test
Employment Test Aptitude Test
Achievement
Comprehensive test Personality
Test
Technical Interviews
Background Checks and Enquiries
Medical examination
Final Selection Decision
The Employee selection Process takes place in following order-
1. Preliminary Interview or Screening
It is used to eliminate those candidates who do not meet the minimum eligibility
criteria laid down by the organization. The skills, academic and family background,
competencies and interests of the candidate are examined during preliminary
interview. Preliminary interviews are less formalized and planned than the final
interviews. The candidates are given a brief up about the company and the job
profile; and it is also examined how much the candidate knows about the company.
2. Application Form
The candidates who clear the preliminary interview are required to fill application
blank. It contains data record of the candidates such as details about age,
qualifications, reason for leaving previous job, experience, etc.
3. Employment Tests
• Written Tests-
Various written tests conducted during selection procedure are aptitude test,
intelligence test, reasoning test, personality test, etc. These tests are used to
objectively assess the potential candidate. They should not be biased.
Classification of Tests on the Basis of Human Behavior
• Aptitude or potential ability test
Such tests are widely used to measure the latent ability of a candidate to
learn new jobs or skills. They will enable us to know whether a candidate if
selected, would be suitable for a job, which may be clerical or mechanical.
These tests may take one of the following forms.
a) Mental or Intelligence Test - measures and enables to know whether
he or she has mental capacity to deal with new problems.
b) Mechanical Aptitude Test - measures the capacity of a person to
learn a particular type of mechanical work. This could help in knowing a
person’s capability for spatial visualization, perceptual speed manual
dexterity, visual motor coordination or integration, visual insights etc.
c) Psychometric tests – these tests measures a persons ability to do a
specific job
• Achievement test
Also known as proficiency tests they measure the skill, knowledge which is
acquired as a result of a training program and on the job experience they
determine the admission feasibility of a candidate and measure what he/she
is capable of doing.
• Personality tests
These tests aim at measuring those basic make up or characteristics of an
individual which are non-intellectual in their nature. In other words they
probe deeply to discover clues to an individual’s value system, his emotional
reactions and maturity and motivation interest his ability to adjust himself to
the illness of the everyday life and his capacity for interpersonal relations
and self image.
4. Comprehensive Interviews
Interviews are a crucial part of the recruitment process for most organizations.
Their purpose is to give the selector a chance to assess the candidate and to
demonstrate their abilities and personality. It’s also an opportunity for an employer
to assess them and to make sure the organization and position are right for the
candidate. An interview is an attempt to secure maximum amount of information
from candidate concerning his suitability for the job under consideration.
5. Technical Interviews - If a candidate has applied for a job or course that requires
technical knowledge (e.g. positions in engineering or IT) it is likely, at some stage in
the selection process, that the candidate will be asked technical questions or have a
separate technical interview to test his/her knowledge. Questions may focus on the
final year project and his/her choice of approach to it or on real/hypothetical technical
problems. It seen that the candidate proves himself/herself but also they admit to what
they don’t know.
6. Background Checks and Enquiries
Offers of appointment are subject to references and security checks. The
references given in the candidate’s application will be taken up and a security
check will be conducted.
Security checks can take a while if the candidate has lived abroad for any period
of time.
7. Medical examination-
Medical tests are conducted to ensure physical fitness of the potential employee.
It will decrease chances of employee absenteeism.
8. Final Selection Decision
Those individuals who perform successfully on the employment tests and the
interviews, and are not eliminated by development of negative information on either
the background investigation or physical examination are now considered to be
eligible to receive an offer of employment. Who makes that employment offer? For
administrative purposes the personnel department should make the offer. But their
role should be only administrative. The actual hiring decision should be made by
the manager in the department that had the position open. A reference check is
made about the candidate selected and then finally he is appointed by giving a
formal appointment letter.
CHAPTER-5
Nav Infotech Human Resource Division
The strategy of Human Resource Division is followed from strategy. The strategy
that followed by HR is described bellow.
Vision
Vision crystallizes their employee focus as the cornerstone of everything they do;
to help their customers get the full benefit if communications services in the
customers daily lives. It describes their ambition for future, sets a common direction
across the group, and shall inspire all employees to imagine how they can
contribute. Their values describe what behaviors are necessary to realize that
vision.
HR is a Critical Enable for Nav Infotech pvt. ltd in the pursuit of its Strategic Goals.
HR is a key to ensuring
An Organization, that provides a competitive advantage by being simple, aligned
and efficient.
A Culture centered on the employee and characterized by diversity, generosity
and an international mindset.
Leaders, Who have a passion for business, excel at empowering people and never
compromise on Nav Infotech ethical standards.
People, Who perform at the peak of their ability because they feel a sense of
mission, accomplishment and growth.
New Hierarchy is given below Old Hierarchy is given below
CHAPTER-6
FINDINGS
Recruitment & Selection at Nav Infotech
As we know, Recruitment refers to the process of finding possible candidates for a
job or function, usually undertaken by recruiters. It also may be undertaken by an
employment agency or a member of staff at the business or organization looking
for recruits. And Selection is a process by which candidates employment are
divided in to two classes those who will be offered employment and those who will
not.
Recruitment and selection is one of the most important for every employee. Cause
by this company makes a person as the member of it. There is a general process
of recruitment and selection that a company should follow. In Bangladesh
perspective many company does not follow any specific process for recruitment
and selection. There are lots of limitations a company face in case of recruitment
and selection process. But the recruitment and selection process must be
developed, modern and fair.
In Nav Infotech recruitment and selection is done by a specific process and which
is very much modern. It starts with the manpower requisition and end with
appointment. And after that Nav Infotech arrange various types of training and
development program for the employees to develop their skill. In true sense Nav
Infotech follow a developed recruitment process for selecting right people in right
place.
Role of Human Resources in Recruitment & Selection Process:
In recruitment and selection process the main role is played by HR division. The
process is start with manpower requisition and end with appointment.
When there is a need of manpower, the required departments send the manpower
requisition to HR consist the approval of MD. Then HR starts the process. The
process include some step or task that done by a sequential order. First step is
manpower requisition. It comes from the division who has vacancies. It can be
replacement or for the new candidates. In the second step the requisition comes
to HR department the particular officer of HR takes approval from the CHRO. Then
the third step starts, HR give advertisement for the job, it can be external or
internal. After collecting CVs HR starts sorting suitable CVs for that post. After
sorting of CV the forth step starts. The forth step is written exam. Written exam
has two parts, one is the HR parts and another is the particular department’s parts.
The candidates must have passed HR part.
When a candidate passed the written exam then he or she gets call for interview.
It is the fifth step of the process. Generally the candidates have to face one
interview but sometimes they have to face two interviews. After interview a
candidate is selected by the interviewers. Then the selected candidate has to go
for medical check up. It is sixth step. Then comes reference check step. Lastly
selected candidates fill up joining forms and then he/she gets the appointment
letter.
This is the procedure that Nav Infotech HR follow to recruit people. Actually in Nav
Infotech the recruitment and selection is totally control by HR Division. HR Division
makes the policy for recruitment and selection and also takes decision sometimes
that a department required manpower. When the requisition comes HR starts the
process.
HR also supervise that Recruitment and Selection are not simply mechanisms for
filling vacancies rather they are viewed as the key factor for suitable placements.
For a better recruitment and selection process HR arrange done some task like
- collecting suitable and better CVs
- arranging written exam
- arranging interviews
- ensure medical tests
- appointment letter and others
Basic Rule of Recruitment in Nav Infotech
For recruitment Nav Infotech HR follow some rules. These rules are set up by HR
for better recruitment and selection. The rules are
 Nav Infotech Recruitment is to hire the right kind of people at the right
place selecting them through an effective process from a pool of candidates
in the job market. Effective recruitment shall ensure the competency and
high quality performance of the whole organization.
 Nav Infotech Pvt Limited Recruitment does not allow any favor or
preferential treatment to any one.
 No one who is below 18 years of age can be hired as an employee
for Nav Infotech on regular, contract or temporary status.
recruitment & Selection Process at Nav Infotech
The Process of recruitment and selection at Nav Infotech is consisting of number
of sequential steps. The following picture can show the process very clearly:
Figure: Recruitment & Selection Process at ROBI
Human Resource planning
Manpower
Requisition Collecting CVs from Sources:
 Internal Sources
 External Sources
- Advertisement
- Internet
- Universities
- Career Fair
Acceptance of Offer
Letter and Joining
procedure
Sorting CVs that are
suitable for the jobOffer Letter
Written Exam
Reference Check
Final Selection
Interviews
(There may be two
interviews)
Medical Test
Recruitment and Selection are not simply mechanisms for filling vacancies rather
they are viewed as the key factor for suitable placements. With a view towards
placing the right person at the position, in Nav Infotech following procedures in
Recruitment and Selection will be practiced:
Human Resource planning will start at the beginning of the year in accordance with
the approved business Plan and budget provisions.
Each Division will submit their month wise recruitment plan to HR for the whole
year and on the basis of such requirement HR Division will prepare the upcoming
recruitment plan of each Division/Department.
Manpower Requisition:
Based on the HR Planning respective Division/Department Head will inform HR on
personnel requirement through Manpower Requisition form, after obtaining
necessary approvals from the Managing Director. Employment Requisition Form
must contain a JTOR (Job Terms of Reference), comprising Job Description and
Job Specifications / Requirements of the position.
Requisition form contain some information like
 Name of the position
 Status of the employment
 Job description
 Job specification
 Approval of the MD
When the approval comes to HR, the process begins by collecting suitable
candidates from sources.
Recruitment Sources
First and foremost step of recruitment is collecting CVs from sources. There are
two sources of recruitment:
 Internal source (within the organization) The external job
market.
Internal Sources
For encouraging the internal candidate, job vacancies in Nav Infotech may be
advertised through internal notices to all Nav Infotech pvt Ltd employees.
Recruitment from the internal source may be through Promotion or delegating
individuals with new assignments. In the case of internal sourcing, HR along with
the concerned Division/Department will identify prospective candidates on the
basis of Individual Capability matching with Competency/Role Profile and will
conduct appropriate tests to select the most suited person.
In internal source Nav Infotech consider mainly three types of employees:
 Contractual
 Part-Time
 Interns / trainers
Contractual employees are those who are working in a contact of six months or
one year. And part-time employees are those who work in Call Center. And also
interns, after completing their internship and completing their graduation can apply
for job.
External Sources
In short external sources mean collecting CVs from outside. Nav Infotech collect a
lot of CVs from outside. Recruitment from external sources will be through
 Executive search – for Senior Managers and Above Positions.
 Advertisements - for managers and below positions.
The CVs are collect by following ways:
 HR CV Box
 Advertisement
 Internet Job Sites
 Employee Reference
 Universities
 Career Fair or Job Fair
 Other
CV Box of Nav Infotech HR:
There is a Box for CV in Nav Infotech HR. In that box anyone can drop his or her
CV in anytime .from the CV Box HR sort out suitable CVs for the required position.
This box is open for everyone who wants to drop their CV. Almost everyday this
box get full of CVs.
It contains about five hundreds of CVs. By this way Nav Infotech HR collect a lot
of CVs for job.
Advertisement:
Advertisement is a well known and world wide accepted source of recruitment. Like
other company Nav Infotech also have a career website from where applicants can
fill up an application forms. When the job requirement is matched with the
applicant’s CV then HR select these applications for recruitment.
Internet:
Internet advertisement is another new source of Recruitment. Now a day every
employee has a website and they collect CVs by internet. Ever there is lots of job
website and company can send advertisement over there. Recently Nav Infotech
lunch a carrier website for the candidates.
Like other company Nav Infotech also give advertisement over net. Generally Nav
Infotech gives advertisement in www.bdjobs.com. The interested candidates
whose profiles match with the requirements can apply for job over the net. By this
way Nav Infotech gets many CVs.
Oral Interview
For the oral interview, competency based structured interview will be conducted.
The standard Interview Assessment Form along with probing questions will be
supplied by HR Division. Position specific structured interview with necessary
Proving Questions and Assessment form can also be developed/ used.
The oral interview may take place in different phases according to the decision of
HR Division and concerned Division/ Department and on the basis of Position:
 Preliminary Interview:
Conducted by the respective immediate Manager and another member from cross
functional area.
 Second Interview or Final Interview:
Conducted by the particular department’s next level managers along with the
respective Divisional/ Departmental Heads.
 Interview of Key Position:
If the recruitment is for any key position/ AGM or above level a final interview must
be conducted with the Managing Director. Sometimes one interview makes the
final result and sometimes there are two interviews. Interviews are arrange by HR.
HR arrange interview for every post even for a tea boy and for a driver. Generally
these interviews are held in HR floor There is a separate room for interview.
These interviews are generally taken by managers of the required division and
there must be an HR person in that interview. In interview the interviewer find out
the fact candidate behavior as well as the ability of the candidate. Interviews also
test the intelligence and smartness of the candidate.
Final Selection
From the interview some suitable candidates comes out. Once the final incumbent
is selected, HR Division (Compensation & Benefit) will initiate the compensation
Plan and will make offer/ process the appointment formalities. This time HR discuss
about few things like:
 Terms and condition of company
 Salary and benefit
 Joining
Final Approval
Like the requisition for appointing candidate the approval of MD is needed. This
time HR sends the approval to MD that these candidates are selected in interview
for this position and they are going to appoint these candidates for the post.
Medical Test
When the MD approved the appointment of the candidate HR call the candidate
for a medical check up. The candidates have to collect a letter for medical from HR
and go for the medical test. The selected candidate must undergo a medical check
up and subject to satisfactory medical report formal appointment letter will be
issued.
Reference Checks
When a candidate is selected for the job, his or her given reference has been
checked by HR. Reference check may be conducted by HR Division upon
acceptance of offer. Subject to satisfactory response joining will be accepted
Appointment or Offer Letter
At last the after the medical test and reference checked, the offer letter for the
candidate has been issued. After that the candidate gets the call that he or she has
been appointed and he or she has to collect the letter from HR.
Acceptance of Offer Letter & Joining Procedure
The joining also has some procedure. In time of joining at first the candidates have
accept the offer letter by signing it. Then he or she has to fill up some forms like,
- HRIS form
- ID Card form
- Declaration
When all this formalities are over the candidate will become one of the member
and start working as an employee
Recruitment Cycle
Human Resources Division will take maximum 50 days to complete a recruitment
process. The break down of the 50 days as follows:
Requisition = 2 days
Advertisement = 14 days
Short listing/Screening = 14 days
Written test = 7 days
Compilation & Approval = 2 days
Reference Check = 7 days
Medical Check = 3 days
Appointment letter = 1 day
Recruitment of Contractual & Others
This policy governs the appointment of individuals on Contract/Causal basis and
through Third Party service providers. Prior to process the employment on the
above category, the Division/ Department concerned must obtain approval from
the Managing Director. The manpower requisition must contain the job
specification with justification of the need along with the period.
Contract Appointment
Jobs which are temporary in nature and is likely to be for a limited period or need
is for a long term but cannot be hired on a permanent basis due to headcount
restrictions. The period of appointment will be of 3 (three) months to maximum 2
(two) years.
A contract appointment should be for a fixed period and will become void
automatically on the end date unless the contract is shortened or extended in
writing prior to the expiration date.
Person appointed on contract may be terminated during the tenure at the discretion
of the employing department with reasons (performance/ redundancy) or without
assigning any cause. A termination clause (with notice period/pay in lieu of) must
be incorporated in the contract.
The division/ department concerned will initiate the recruitment in concert with HR.
Upon finalizing the selection; HR will issue the formal appointment letter.
Employees hired on contract must go for pre-employment medical test and subject
to satisfactory results (fit for work) the incumbent will be allowed to join.
Standard terms and conditions similar to permanent employee especially
adherence of code of business ethics, confidentiality and full time engagement
clauses must be included.
If a contract employee is made permanent (based on performance/capability/
headcount) the service length of that individual will be counted from the first day of
the joining provided the contract period was continuous/uninterrupted.
Salary and benefits will be fixed based on the incumbents’ educational and
professional background. A contract employee will be entitled to same level of
salary and benefits if he/she is hired in a position that already exits in the
permanent payroll.
A contract employee will not be eligible for end service benefits or loan facilities
from the company.
Casual Appointment
Jobs that are totally causal in nature and are required for a short period (maximum
of 12 weeks) to cater the additional influx of work or emergency exigencies or filling
up a permanent position that is temporarily vacant.
Casual appointment should be for a fixed period or until the completion of the
special job/project and cannot be for long periods. Employing divisions/
department must obtain approval form the Division/ Department Head justifying the
need, specifying the number of personnel and the required background. Line
Manager in concert with HR will process the hiring.
No written contract is required. Appointment will be on a daily worked basis.
The line manager will do the necessary arrangements for recruitment and
appointment of Casuals keeping HR & Administration informed.
The principle of hiring should be the best candidate suited to the job/position. No
discrimination will be permitted on the basis of personal relationship regarding
hiring of Casuals. All individuals involved in the hiring process must be sensitive to
the perception of favoritisms and bias.
Salary should be determined based on the incumbent’s background and skills. The
calculated market median for the type/nature of the job should be taken into
account prior to fix the compensation. Casual employee will not be eligible for any
other standard benefits of the company and the payments can be on a
daily/weekly/monthly basis.
Recruitment for Internship
Internship is one of the parts of graduation for student. In case of Bachelor of
Business Administration and Master of Business Administration, it is an obligatory.
For this reason Universities send CVs of student to Nav Infotech for internship.
Recruitment of interns just like the recruitment of contractual. The candidates have
to face the interview and if they get selected then they will appoint as intern.
Generally for internship Nav Infotech ask for CVs to the reputed Universities like
Dhaka University, North South University and BRAC University etc.
The requisition for interns is send by the departmental head or the employee who
need intern. When requisition comes HR sort CVs and then arrange interview.
ANALYSIS
Analysis
Nav Infotech pvt Ltd.
• Nav Infotech pvt. ltd mainly emphases on internal and external
sources for recruitment.
• Internally the organization discloses the positions of the job and
announces it to all current employees. Nature of the position and the
qualification needs for the job is described in the announcement so that the
interested candidates can apply.
• Nav Infotech pvt. ltd recruits the relatives and dependents of the
employee for CV in some cases.
• Another way to find applicants is through employee referrals by other
departments. Informal communication among managers who can lead the
discovery for the best candidates who are working in other department in
the firm.
• Based on employee skills, educational background, experience of
work employee can be recruited in the organization.
• For external sources the organization does advertisement, takes
help from the employment agencies (only for technology department), do
campus recruitment, arrange internship for the students, take employee
from personal contact or by employee leasing.
• Nav Infotech Axiata Company Ltd. has a structured and standard
selection process. This is strictly followed by the selection board that is
empowered by the organization.
• They first screen CVs. This process is done by some selective criteria
which are needed for the company. Then initial interview is held. After that
selective applicants are asking for written test. Those who are successfully
passed the written exam are called for final interview.
• Once the recruitment and selection process is done then the
employees are appointed base on their job description.
• The organization fills the position by promoting the present
employees. But most of the times it recruits from outside
• Interns are recruited based on their performance. Employee leasing
is an option.
Employee Satisfaction
Nav Infotech PVT.Ltd, Nav Infotech maintain a positive relation with employees.
But after my observation of employee satisfaction I have found that some of the
employees are still not satisfied with the current situation of the organization. They
want additional benefits and more allowances for various factors like children
education, Medical allowance, and Marriage allowances.
Q1. Since how many years have you been working with this organization?
98%
1%1%0%
Chart Title
a) 0-5 years
b)5-10 years
c)10-15 years
d) more then 15 years
Q2. Does the organization clearly define the position objectives, requirements and
candidate specifications in the recruitment process ?
Q3. How well are the organisation’s affirmative action needs clarified and supported in the selection
process ?
Q4.Is the organization doing timeliness recruitment and selection process ?
99%
1%
Chart Title
a)yes
b)no
2%3%
95%
Chart Title
a)poor
b)adequate
c)excellent
Q5. Does HR provides an adequate pool of quality applicants ?
Q6. Rate the effectiveness of the interviewing process and other selection instruments,
such as testing ?
99%
1%
Chart Title
a)yes
b) no
99%
1%
Chart Title
a)yes
b) no
Q7.Does the HR team act as a consultant to enhance the quality of the applicant pre-
screening process ?
CHAPTER-8
5%
15%
80%
Chart Title
a)poor
b) adequete
c)excellent
95%
5%
Chart Title
a)yes
b) No
RECOMMENDATIONS
Recommendations
• Strategic planning: Successful employment planning is designed to
identify an organization human resources need. Nav Infotech pvt. ltd can
use software to keep employees update; which type of qualified employees
they have; forecast future requirement of qualified employees like other
MNCs (telco).
• Checking Policy: When the candidates come for interview or written
exam the authority doesn’t check the person with the picture that the
candidates attached with the application.
• Using 3rd party: The company can use 3rd party for all the
department to reduce cost. And it is not possible all time to get the best CV,
in that case 3rd party can help me.
• Vacancy Fill up: Most of the time company filled the vacant position
from outside. But they can fill it by promoting appointment or suitable person
in the organization.
• Emphasizeon internal search: Nav Infotech pvt. ltd basically relied
on external search for recruiting purpose. They must attempt to develop
their own low level employees for higher positions through more internal
search. To do so they must ensure a communication network notifying
interested persons of opportunities, including advertising within the
organization like “position open” bulletin board in every department.
• Job fair: All of these organizations must use open up recruiting
efforts to the external community like job fair through external search. They
can participate in career and job fairs and open houses and must develop
and support educational programs and become more involved with
educational institution that can refer more diverse talent pool.
• Background investigation: HR department should undertake a
background investigation of applicants who appear to offer potential as
employees. They should verify an individual legal status to previous work
through checking credit reference, criminal records and so on.
CHAPTER-9
Conclusion
Conclusion
Recruitment is an important issue for any organization. Recruitment and selection
allows an organization to asses the vacancy and choose the best personnel who
will lead the organization in future. So the organization should give more
emphasize on selecting a person. A person who can carry forwarded the
organization in terms of development, values and ethics. Mainly the precious
resource for any organization is their knowledge based efficient workers. The
organizations should more cautious on this issue to ensure the quality and ethics.
So we can easily find out the Human resource practice, recruitment and selection
process, employee satisfaction and relations at Nav Infotech is a very developed
and effective one. As a multinational company for making the process more
effective Nav Infotech should analyze the recruitment and selection process of
other multinational company of home and abroad. That can make Nav Infotech
perfect in recruiting people and the company will get efficient professionals, that
will increase the productivity as well as revenue.
The most important key source factor of Nav Infotech pvt .Ltd is its efficient human
resource. It is using the state-of-the-art GSM technology and continuously
monitoring its network traffic to ensure network quality. Moreover, its decisions are
based on facts from market research and coverage survey. The company also
monitors it's competitor's activities and is proactive in marketing decisions.
BIBLIOGRAPHY
BIBLIOGRAPHY
Websites
1. www.NAV INFOTech.india.com
2. www.wikipidea.com
3. www.recruitmenyskills.com
4. www.btrc.org/
QUESTIONARRIE
Q1. Since how many years haveyou been working with this organization?
a. 0-5 Years
b. 5-10 Years
c. 10 to 15 Years
d. More than 15 Years
Q2. Does the organization clearly define the position objectives, requirements and
candidate specifications in the recruitment process ?
a. Yes
b. No
Q3. How well are the organization’s affirmativeaction needs clarified and supported in
the selection process?
a. Poor
b. Adequate
c. Excellent
Q4. Is the organization doing timeliness recruitment and Selection process.
a. Yes
b. No
Q5. Does HR provides an adequate pool of quality applicants ?
a. Yes
b. No
Q6. Rate the effectiveness of the interviewing process and other selection instruments,
such as testing?
a. Poor
b. Adequate
c. Excellent
Q7. Does the HR team act as a consultant to enhance the quality of the applicant pre-
screening process?
a. Yes
b. No
Q8. Does HR train hiring employees to make the best hiring decisions?
a. Yes
b. No
Q9. Rate how well HR finds good candidates fromnon-traditional sources when
Necessary?
a. Poor
b. Adequate
c. Excellent
Q10. How would you rate the HR department’s performancein recruitment and
selection?
a. Poor
b. Adequate
c. Excellent
Q11. Does the HR Department is efficient in Selection Policy of the employees ?
a. Yes
b. No
Q12. Does the HR maintains an adequate pool of quality “protected class” applicants?
a. Yes
b. No

Internship report on recruitment and selection process

  • 1.
    Internship Report “Recruitment andSelection Process “ of NAV INFOTECH Submitted to, Submitted by, PRIYA DUBEY RUNGTA(R1) COLLEGE BHILAI-RAIPUR (C.G) Submitted on,
  • 2.
    Subject: Letter ofTransmittal Dear ma’am With great pleasure I submit my Recruitment and Selection process report on “NAV INFOTECH”. I have found the study to be quite interesting, beneficial & insightful. I have tried my level best to prepare an effective & creditable report. The report contains a detailed study on Recruitment and Selection process & a look at how it is done in the practical world. Here we have gathered information through different sources such as websites and actual interviews from my Supervisor of NAV INFOTECH I also want to thank you for your support and patience for me and I appreciate the opportunity provided by you through assigning me to work in this thoughtful project. Yours sincerely, PRIYA DUBEY Acknowledgement First of all, I would like to thank my Advisor Mrs. BHARTI WALI for her untiring guidance, help, effort, and suggestion. Really I am thankful to her. Without her direct guide this report couldn’t be possible. A very dynamic personality, Mrs. wali constantly inspired me all the time to develop my career and share her knowledge
  • 3.
    with us. Ishall remain ever grateful to Mrs.wali for her extraordinary gesture and relentless effort. I would also like to thank the authority of NAV INFOTECH for helping me by giving an opportunity to work with them. INDEX Title Page No 1. Executive Summery 2. Introduction a- Objective of the study b- Methodology, Scope, Limitation, 3. Company overview a- Mission, Vision, Principles b- long term vision of the company
  • 4.
    c- Job Part 4.Literature Review a-Discussion about HRM b- Functional area of HRM c-Recruitment Process d- Selection Process 5. NAV INFOTECH Human Resource Division 36 6. Findings 7. Recruitment & Selection Process 8. Analysis 9. Recommendation 10. Conclusion 11. Bibliography 12. Questionarrie Nav infotech Pvt Ltd.
  • 5.
    EXECUTIVE SUMMERY I havebeen assigned to complete internship report on “Recruitment and Selection process of “Nav infotech.” under the guidance of Mrs. Bharti wali. “Recruitment and Selection process” is a segment of human resource process; As such I have selected this topic to make it clear. I have divided this report in some sub segments. As a young intern in a reputed corporate sector like ”Nav infotech” I have tried my best to go through their Recruitment and Selection process within little tenure of 45 days. The report starts with a general introduction “Nav infotech” As well as its purpose, scope and limitation. Then this report proceeds onto the preliminary talk about “Nav infotech.” pvt. ltd, I have shown the vision, strategic goal and principles of it. Afterward here discuss about Nav Infotech pvt.. ltd different Division and Department. Then it carries on with nav infotech Long Term Vision, CSR activities, Achievement. Than the report proceeds with the job part, where the jobs which is done by me is discussed. After that I continue to my main focus of the report “NAV INFOTECH” Recruitment and Selection process” describing the different steps of it. The first part is manpower requisition and each department gives requisition according to its HR planning to HR Department . Following steps are arranging written exam, taking one or more interviews, and finally the medical checkup. A detail elaboration of selection of best candidate has been added in the project part and the contribution of HR department for selecting the most eligible employees for Nav Infotech has been highlighted. In this report, some other important topics of their HR division are also discussed like HR hierarchy, the environment within the organization and accommodation of a pull of candidates. After completion of this report it can easily say that efficient, competent and active part in Recruitment and Selection process take a company to the peak of the success
  • 6.
    CHAPTER -1 Introduction This isan internship report. MBA Course requires a 45 DAYS attachment with an organization followed by a report assigned by the supervisor in the organization and endorsed by the faculty advisor. I took the opportunity to do my internship in Bhopal “NAV INFOTECH” Background of the study There is no doubt that the world of work is rapidly changing. As part of an organization then, HRM must be equipped to deal with the effects of the changing world of work. For them this means understanding the implications of globalization, technology changes, workforce diversity. Changing skill requirements, continuous improvement initiatives contingent workforce, decentralized work sites and employee involvement are the issue for confront. Now it is a big challenge for the HRM to support the organization by providing the best personnel for the suitable position in shortest possible time. Starting with recognizing the vacancies and planning for them is a great task. Moreover selecting attracting the suitable candidates and selecting the best person in time is a challenge. The cost of the recruitment is significant. So, proper planning and formulate those plan is the task that require more focus and improvement. Equal opportunity and sourcing is also a vital part. Realizing this need we tried to find the difference and similarities between theoretical aspects with the practical steps taken by the company. We took an attempt to demonstrate the feature for the further improvement.
  • 7.
    Objectives of theStudy Broad Objective: To know overall about the company of Nav Infotech pvt. ltd and also know each and every parts of the recruitment and selection process of that company. Specific Objectives: 1. To focus on major elements of Recruitment ,training and Selection process. 2. To focus on the process of Recruiting and training selecting personals. 3. To focus on the updates and the better methods of modern technique. Methodology Source of Information: 1. Primary: The primary information collected through face to face interview, observation, and by participation in the recruitment and selection process. 2. Secondary: The secondary information collected from website, Magazine, Memorandum, Journals, books and some other relevant sources. Both primary and secondary data sources will be used to generate this report. Primary data sources are scheduled survey, informal discussion with professionals and observation while working in different desks. The secondary data sources are different published reports, manuals, price updates and different publications of “NAV INFOTECH”. Scope of the research The report deals with the recruitment and selection process in terms of theoretical point of view and the practical use. The study will allow learning about the recruitment and selection issues, importance, modern techniques and models used
  • 8.
    to make itmore efficient. The study will help to learn the practical procedures followed by the leading organizations. Moreover the study will help to differentiate between the practice and the theories that direct to realize how the organization can improve their recruitment and selection process. Limitations of the research The main limitation of the study is the collection of information. Because most of the information are confidential. So they don’t want to disclose them. And I am not able to show any forms which they use in the time of joining or we use to upgrade the files. CHAPTER-2 COMPANY OVERVIEW
  • 9.
    Background of NAVINFOTECH: Nav Infotech is an IT company, has an expert team of Web Developers and Software Engineers. Our aim is to deliver world class quality work to our client for any kind of online business. it’s solutions and software products for the development services and it’s industries. We specialize in product development and we have put in place processes and technologies which have helped us deliver a number of desktop and web application software to satisfy customer and user. Our Vision: We shall operate globally and bring the benefits of Information Technology to improve the productivity of our customers, and the quality of their products and services. Our Mission: NAV INFOTECH was established with a mission to be a client oriented, technology oriented, people focused, quality oriented, adaptive and innovative in its approach. Our mission is to promote profitability for our clients and ourselves by providing superior information services and solutions Nav Infotech aims to achieve its vision through being number ‘one’ not only in terms of market share, but also by being an employer of choice with up-to-date knowledge and products geared to address the ever changing needs of our budding nation.
  • 10.
    Principle of navinfotech: Principles statements define how people want to behave with each other in the organization. Nav Infotech Limited statement is about how the organization will value their customers, suppliers, and the internal community. For this reason Nav Infotech Limited Employees hold themselves accountable to the following guiding Principles for the organization. Emotional: Passionate, Creative, Respectful, Open Functional: Simple, Ethical, Transparent, Ownership No matter what we do in order to realize our purpose, we hold ourselves accountable to the following overarching guiding Principles for our organization. Passionate: We are Passionate-it’s in all of us. Whether visible or hidden within for whatever reason. Everything we do is about doing the best we can. We are there for each other and we endeavor to help in every way we can. Creative: Everything we do we should do in a creative innovative manner. We bring energy to our work. Our communications demonstrates our creative flair. We provide creative and imaginative and services to our customers. Respectful: We are truly respectful to each other, our subordinates, peers, partners and customers. We treat everyone equally and we allow people to express their thoughts opinions in a respectful manner. Open: We have no hidden agendas. We share information freely. We can only be open with our customers, partners, and stakeholders if we are open with ourselves- regardless of hierarchy. Simple: Everything we do and say should be simple and easy to understand. In terms of communications we make sure the massaging is in plain, simple language. Our plains are simple and uncomplicated. Ethical: we are moral, upright, honest, righteous, virtuous, honorable, keeping our promises in all we say and do. We clearly align to our internal and organizational code of ethics and code of honor. We will oppose all forms of corruptions.
  • 11.
    Transparent: A fewkey words and phrases sums this up: Honesty, openness, frankness, no lies, no deceit, no games, easily understood. We are transparent with our customers, with each other, with our subordinate and peers Ownership: whilst working individually or correctively, we clearly demonstrate individual and collective ownership. Making mistakes is clearly part of daily business as it is part of daily life- as long as we own up to this clear, no culture of fear.  Call Waiting and Call Holding  Call Forwarding  Call Conferencing  National Roaming-Both way  Dedicated Customer Services  Music  Entertainment  Downloads  Internet & Data Services  Messaging  Community & Chat  Information & Services  Mobile Assistance  Education & Career  Lifestyle  Call Management etc. Chain of Command The organization is headed by its Chief Executive designated as the Managing Director entrusted with overall responsibilities of business direction of the organization and leading dynamically towards the attainment of its Vision, Mission and Goal. Nav Infotech pvt. ltd has established a strong and formidable sales channel, which consists of direct dealers and its own sales force.
  • 12.
    Nav Infotech hasfollowing divisions and departments:  Finance Division  Information Technology Division  Technical Division  Human Resources Division  Revenue Assurance Department  Corporate Strategy Department  Supply Chain Management Department  Legal & Compliance Department  MD’s/CEO’s Office Marketing division constitutes seven units. A brief description of each unit is given below: • Brand and A&P: Brand and A&P denotes to brand and advertising & promotion. This unit deals with the overall brand management and promotion activities of the company. • Product Development:
  • 13.
    Product development unitis like the R&D unit of a company, which is responsible for developing new products and services. This unit is closely related to the marketing research unit. • Corporate Sales: Corporate sales unit deals with the sales of products and services to other companies. The unit makes agreements with different companies to be the corporate clients of Nav Infotech and only handle the corporate level sales. • Direct Sales: Direct sales unit is responsible for the sales of products and services to the mass customers through the customer service centers. • Dealer Management: Dealer management unit oversees the dealers of the company around the country. • Information Technology Division: IT division constitutes seven units and they closely work together. • Value Added Services (VAS) Value added service is a unit that implements the developed concepts and ideas of the marketing division. This handles the VAS content providers who are the third party to the company. • Billing: The billing unit is responsible for processing and monitoring the billing systems for the postpaid users. The unit has a manager who reports to the AGM of IT. • Rating (postpaid) This unit is responsible for charging the rates of postpaid services. The unit fixes per minute and pulse rates and also fix the pulse durations. It has changes the rates on demand basis.
  • 14.
    • Prepaid: This unitonly deals with the prepaid service. It administers the e-fill and scratch card systems. At the same time, it fixes per-minute and pulse rates and fix the pulse durations. • Product Configuration: This unit is responsible for designing and developing products and services. It develops the blueprints of the product design. • Billing Operation Team: Billing operation team is responsible for administering the entire billing process and developing required software for collecting bills from postpaid users. • Customer Relation Management (CRM): This unit supplies required software to the customer care centers and work with these centers side by side. The centers usually inform CRM concerning their necessaries and the unit prepares suitable software for them. Finance Division: Financial division has eight units dealing with financial matters of the company. • Treasury Management: Corporate finance unit consists of the treasury management and L/C. Treasury management deals with the inflow and outflow of the company, whereas L/C (letter of credit) deals with the L/C opening banks and other foreign banks. • Accounts Payable: This unit keeps track on the accounts payable of the company. • Accounts Receivable:
  • 15.
    This unit keepstrack on the accounts receivable s of the company while preparing the balance sheet. As Axiata is a large company with thousands of financial transactions every day, a unit to keep track on the accounts is necessary. • Core: Account: Core account is an important unit of the finance division dealing with the budget and fixed assets. The annual budget of various departments is prepared under the close observation of this unit. • Revenue Assurance: Revenue assurance unit consists of the revenue assurance and fraud management. Revenue assurance monitors the transactions and assures all protection of the finances. On the other hand, fraud management protects the fraudulences take place in the daily transactions. • Taxation: Taxation unit takes care of the tax, VAT and tariffs of the company. • Reporting unit: The reporting unit reports the entire financial transactions Axiata to the parent company. • Costing: This unit forecasts the costing of different departments and resorts them regarding the expected expenditure of any alternation. Technical Division: The technical division consists of three major units- planning, infrastructure, and property management. • Planning:
  • 16.
    The planning unitmakes plans regarding the technical matters such as the RF, SWITCH etc. They assure the proper placement of technical devices and equipments. • Property Management: The property management unit manages the technical equipments and assets. Human Resource Division: Human resource department is responsible for the recruitment and training of the employees of the company. They also monitor the performance and handle the promotion and salary related matters. They also administer the regulations of the company. Corporate Strategy Department: The corporate strategy department determines the long term strategies and short term plans. All the corporate level policies come from them and they are also responsible for the implementation. Corporate Affairs Department: The corporate affairs department is responsible for the internal and external synchronization. At on hand, they coordinate with outside companies. Along with that, they harmonize among the divisions and departments inside the company. . Long-Term Vision of the Company: Nav Infotech strongly believes that subscribers are their most valuable assets. They have a strong Customer Service Center. To always be with their customers the Nav Infotech "Help Line' is there.
  • 17.
    CHAPTER-3 JOB PART I amworking there as an intern so I don’t have to handle any core responsibilities. I only look after the supporting work, Written exam Coordination, Calling Interview for Selected Participants, Coordinating Interviews, Coordinate and help new employees to complete joining procedures, taking written exam etc and main work is updating the files of existing employees, creates new employee files. Update old files: Before all employee files based on paper, which creates lots of problems to maintain because it need lot of space, paper, cabinet to keep, spend time to search and main problem was it has risk to lost. So now we convert it from paper based to computer based. And also search those papers which are missing and add these. Creates New Files: At a time more than one people can join in an organization and all of them have different files which creates by us. Lots of papers we have to accumulate with new files like joining forms, disclosures forms, declaration forms, gratuity forms, Conflict of Interest, Medical reports, Pre-employment medical test, CV with Certificates, Job Advertisement, Manpower Requisition forms, CV shortening criteria, Tabulation Sheets (1st interview,2nd interview, written test), Approval note, Appointment Letter etc.
  • 18.
    Written exam Coordination:Coordinate written exam in exam period like guard the candidates in the time of exam. I any candidates feels any kind of problem then solve it by conducting with the respective officer. Observation: • HR Division is very alert for selecting candidates and also the process is very transparent so that they can choose the best candidates among applicants. • In this process there is no nepotism so there are higher possibilities to be selected without having any back up. • When they search for any experienced people they give more concentration on Previous experienced, Educational background, length of services etc so that they can select the most suitable experienced people. • When they select entry level candidates than they concentrate more on proactiveness, creativeness, ideas which related with the post. • In the time of calling the candidates for interview or written exam, if the candidates missed then the officers try hard to inform them. • HR selects candidates from a pull of application so that they can choose most suitable candidates. But also the process has some problems like the space for written exam is very small, so accommodation of all candidates is tough. And the difference between calling candidates and taking interview is very short so some times it creates problems to contact with candidates. Recommendation: Working environment is very good in Nav Infotech pvt Limited. They are very friendly to help each other. Any one feels pleasure to work with Nav Infotech group. If they take corrective decision beginning of starting a work then many mistakes can be solved. For example: there are many interview rooms are available if tow of interview room is convert into a written exam room or then no problem will be arise. If we consider two or three problems then the functioning process are very good.
  • 19.
    CHAPTER-4 The Project LITERATURE REVIEWon Recruitment And selectionprocess History of Human Resource Management The History of Human Resource Management is the strategic and coherent approach to the management of an organization's most valued assets - the people working there who individually and collectively contribute to the achievement of the objectives of the business. The terms "human resource management" and "human resources" (HR) have largely replaced the term "personnel management" as a description of the processes involved in managing people in organizations. Human Resource management is evolving rapidly. Human resource management is both an academic theory and a business practice that addresses the theoretical and practical techniques of managing a workforce. Human resource management has its roots in the late and early 1900's. When there are less labor then there are more working with machinery. The scientific management movement began. This movement was started by Frederick Taylor when he wrote about it a book titled ‘The Principles of Scientific Management’. The book stated, "The principal object of management should be to secure the maximum prosperity for the employer, coupled with the maximum prosperity for each employee.” Taylor believed that the management should use the techniques used by scientist to research and test work skills to improve the efficiency of the workforce. Also around the same time came the industrial welfare movement. This was usually a voluntary effort by employers to improve the conditions in their factories. The effort also extended into the
  • 20.
    employee’s life outsideof the work place. The employer would try to provide assistance to employees to purchase a home, medical care, or assistance for education. The human relations movement is the major influence of the modern human resource management. The movement focused on how employees group behavior and how employee feelings. This movement was influenced by the Hawthorne Studies. Functional area of HRM • Human resource auditing • Human resource strategic planning • Human resource planning • Manpower panning • Recruitment / selection • Induction • Orientation • Training • Management development • Compensation development • Performance appraisals • Performance management • Career planning / development • Coaching • Counseling’s • Staff amenities planning • Event management • Succession planning • Talent management • Safety management • Staff communication • Reward
  • 21.
    Responsibility of HRdepartment in large organization Position Job Responsibilities HR Executive committee, organization planning, HR planning & policy, Organization development Manager, recruitment & employment Recruiting, Interviewing, Testing, Placement & Termination Manager , compensation & benefits Job analysis and evaluation, surveys, Performance appraisal, compensation administration, bonus, Profit sharing plans, Employee benefits. Manager, Training & Development Orientation, Training, Management development, Career Planning & development Manager, Employee relations EEO relations, contract compliance, staff assistance programs, Employee counseling. Table2: Responsibility of HR department Recruitment Recruitment refers to the process of attracting, screening, and selecting qualified people for a job at an organization or firm. It is undertaken by recruiters. It also may be undertaken by an employment agency or a member of staff at the business or organization looking for recruits.
  • 22.
    Job analysis The properstart to a recruitment effort is to perform a job analysis, to document the actual or intended requirement of the job to be performed. This information is captured in a job description and provides the recruitment effort with the boundaries and objectives of the search. Oftentimes a company will have job descriptions that represent a historical collection of tasks performed in the past. These job descriptions need to be reviewed or updated prior to a recruitment effort to reflect present day requirements. Starting recruitment with an accurate job analysis and job description insures the recruitment effort starts off on a proper track for success. Sourcing Sourcing involves the following steps: Internal sources: The most common internal sources of internal recruitment are 1. personal recommendations 2. notice boards 3. newsletters 4. memoranda 1) Personal References The existing employees will probably know their friends or relatives or colleagues who could successfully fill the vacancy. Approaching them may be highly efficient method of recruitment but will almost certainly offend other workers who would have wished to have been considered for the job. To keep employees satisfied make sure that potentially suitable employees are informed of the vacancy so that they can apply. Also any one else who is likely to be interested is told about it as well so that they can apply for the job. 2) Notice Boards This is the convenient and simple method of passing on important messages to the existing staff. A job advertisement pinned to a notice board will probably be seen
  • 23.
    and read bya sufficient number of appropriate employees at little or no cost. However many of the staff will probably not learn of the vacancy in this way either because the notice board poorly located or is full of out dated notices that they don’t bother to look at it, as they assume there is nothing new to find out. A notice board must be ensured that it is well sited. Wherever it is been placed it should be certain that it is seen by every one. It means there must be equal opportunity to see to it and this happens when they know that just important topical notices are on display. Attention must be paid to the design and contents of the notice if it is to catch the eye and make the employee read on and then want to apply for the job. 3) Newsletters Many companies regularly produce in-house newsletters, magazines or journals for their staff to read. It is hoped that latest company news sheet is read avidly by all staff thus ensuring that every one is aware of the job opportunity advertised in it. Unfortunately this is not always so, because it is sometimes not circulated widely enough and employees may find it boring and choose not to read it. Newsletter can be utilized as the source of recruitment if it is convinced that everybody will see a copy. 4) Memorandum Possibly the best way of circulating news of the job vacancy is to send memorandum to department managers to read out to the teams or to write all employees perhaps enclosing memoranda in wage packets if appropriate. However it can be a time consuming process to contact staff individually, especially if there is a large work force. It should also be kept in mind as to in which way the memorandum is phrased out so that the job appeals to likely applicants. External sources: There are many sources to choose from if you are seeking to recruit from outside the company. 1. word of mouth 2. notices 3. job centers 4. private agencies and consultants
  • 24.
    5. education institutions 6.the press 7. radio 8. television Two or three points are discussed below. 1) Word of Mouth Existing employees may have friends and relatives who would like to apply for his job. Recruiting in this way appears to be simple, inexpensive and convenient. Never use word of mouth as a sole or initial source of recruitment if the work force is wholly or predominantly of one sex or racial group. Also employing friends and relatives of present employees may be imprudent because it is not certain that they are as competent as the current staff. 2) Notices Displaying notices in and around business premises is a simple and often overlooked method of advertising a job vacancy. They should be seen by a large number of passerby’s, some actively looking for work. It can also be inexpensive with a notice varying from a carefully hand written post card up to a professionally produced poster. Pay attention to the appearance and contents of the notice if it is intended that it is applied by the right people. 3) Job Centers Most large towns have a job center which offers employers a free recruitment service, trying to match their vacancies to job seekers. Staff will note information about a post and the types of person sought and then advertise the vacancy of notice boards within their premises. Job center employees can further help if requested to do so by issuing and assessing application forms and thus weeding out those applicants who are obviously unsuitable for the position. Short listed candidates are then sent out for the employer to interview on his business premises.
  • 25.
    Recruiting internally andexternally Internal Recruiting: Recruiting from among the existing workforce offers many advantages. Seeing your employees at work on a day-to-day basis will enable you to evaluate their particular strengths and weakness accurately and choose the most suitable person for the position. When the company recruits from within the organization the employees will feel important and highly valued since it appears that the organization immediately turns to them whenever a vacancy occurs. Their work rate and performance should improve as well as they will realize that increasing job opportunities are available to them if they are industrious and successful at their jobs. However any method has its own merits and demerits. Merits It improves the morale of the employees The employee is in better positionto evaluate those presently employed than outside conditions. It promotes loyalty among the employees, for it gives them a sense of job security and opportunities of advancement. These people are tried and can be relied upon Demerits It often leads to inbreeding and discourages new blood from entering into an organization. There are possibilities that internal sources may “dry up” and it may be difficult to find the requisite personnel from within an organization. No innovation are made no new thinking so on new inputs which is very much essential for the growth of the organization Usually promotions are based on seniority so the danger is that really capable hands may not be chosen. External Recruiting: When a company is involved in large expansions and is more oriented towards achieving high growth and high market share, with more focus on quality of the
  • 26.
    product and highcustomer satisfaction then it is inevitable for any organization to go for external recruiting. External recruiting is nothing but recruiting the people in your organization from outside the company. It will help the company to make best use of other sources that are lying outside the organization like for example campus recruits is an effective and efficient way of recruiting when a company wants new minds that are more creative and go-getters for any task. If a company wants to concentrate only on its core activities and wants to relieve the burden of the task of recruitment then the more feasible option would be third party recruiting or recruitment process outsourcing RPO. The experienced persons but unemployed can be recruited into the company which may reduce the training cost if they are from same industry. Retired and experienced people can yield more by enhancing their prior experience in new business situations. Merits New entrant to the labor force i.e., young mostly inexperienced potential employee’s fresh graduates or postgraduates can be taken and mould in accordance with company’s culture. External recruiting results in best selection from the large sources In the long run this source proves economical because potential employees do not extra training. Many different ways of recruiting is available. The excess applications generated for current requirement may be utilized for future vacancies. Demerits Extra time is required by the people to adjust them selves to the present working situations. If the recruiting is done from large source then it will be more time taking as the applications generated are more and short listing becomes critical. Cost of recruiting will be comparatively more than internal recruiting.
  • 27.
    Sometimes it createsemployee dissatisfaction as there may be mismatch between the employee expectation with the company and the company’s expectation with the employee. Before making a choice and making decisions as to which source should be adopted for recruiting both the sources should be thoroughly assessed and must be studied carefully the wide variety of individual sources of recruitment that are available whether Internal or External. Before choosing any sources make sure that it gives answer as YES to these following questions: Recruitment mistakes There are a number of methods companies should avoid when putting their recruitment plans into practice. For instance, many businesses have the necessary talent within their organizations, but are too busy looking outside to recruit the skilled employees they already have. Others try to look for a mirror-replacement to the employee they have lost, duplicates with the same attitudes and skills, when companies can benefit more from employees with new experience and outlooks on the position. Some employers forget to include their employees in the recruitment process, or attempt to find the “perfect” employee without noticing the talents of the job seekers they interview. Selection Employee Selection is the process of putting right men on right job. It is a procedure of matching organizational requirements with the skills and qualifications of people. Effective selection can be done only when there is effective matching. By selecting best candidate for the required job, the organization will get quality performance of employees. Moreover, organization will face less of absenteeism and employee turnover problems. By selecting right candidate for the required job, organization will also save time and money. Proper screening of candidates takes place during
  • 28.
    selection procedure. Allthe potential candidates who apply for the given job are tested. But selection must be differentiated from recruitment, though these are two phases of employment process. Recruitment is considered to be a positive process as it motivates more of candidates to apply for the job. It creates a pool of applicants. It is just sourcing of data. While selection is a negative process as the inappropriate candidates are rejected here. Recruitment precedes selection in staffing process. Selection involves choosing the best candidate with best abilities, skills and knowledge for the required job. Essentials of Selection Procedure The selection process can be successful if the following requirements are satisfied: 1. Someone should have the authority to select. This authority comes from the employment requisition as developed by an analysis of the work- load and work force. 2. There must be some standard of personnel with which a prospective employee may be compared i.e., a comprehensive job description and job specification should be available beforehand. 3. There must be sufficient number of applicants from whom the required number of employees may be selected.
  • 29.
    PROCESS OF SELECTION PreliminaryInterview or Screening Application Form Written test Employment Test Aptitude Test Achievement Comprehensive test Personality Test Technical Interviews
  • 30.
    Background Checks andEnquiries Medical examination Final Selection Decision The Employee selection Process takes place in following order- 1. Preliminary Interview or Screening It is used to eliminate those candidates who do not meet the minimum eligibility criteria laid down by the organization. The skills, academic and family background, competencies and interests of the candidate are examined during preliminary interview. Preliminary interviews are less formalized and planned than the final interviews. The candidates are given a brief up about the company and the job profile; and it is also examined how much the candidate knows about the company. 2. Application Form The candidates who clear the preliminary interview are required to fill application blank. It contains data record of the candidates such as details about age, qualifications, reason for leaving previous job, experience, etc.
  • 31.
    3. Employment Tests •Written Tests- Various written tests conducted during selection procedure are aptitude test, intelligence test, reasoning test, personality test, etc. These tests are used to objectively assess the potential candidate. They should not be biased. Classification of Tests on the Basis of Human Behavior • Aptitude or potential ability test Such tests are widely used to measure the latent ability of a candidate to learn new jobs or skills. They will enable us to know whether a candidate if selected, would be suitable for a job, which may be clerical or mechanical. These tests may take one of the following forms. a) Mental or Intelligence Test - measures and enables to know whether he or she has mental capacity to deal with new problems. b) Mechanical Aptitude Test - measures the capacity of a person to learn a particular type of mechanical work. This could help in knowing a person’s capability for spatial visualization, perceptual speed manual dexterity, visual motor coordination or integration, visual insights etc. c) Psychometric tests – these tests measures a persons ability to do a specific job • Achievement test Also known as proficiency tests they measure the skill, knowledge which is acquired as a result of a training program and on the job experience they determine the admission feasibility of a candidate and measure what he/she is capable of doing. • Personality tests These tests aim at measuring those basic make up or characteristics of an individual which are non-intellectual in their nature. In other words they probe deeply to discover clues to an individual’s value system, his emotional
  • 32.
    reactions and maturityand motivation interest his ability to adjust himself to the illness of the everyday life and his capacity for interpersonal relations and self image. 4. Comprehensive Interviews Interviews are a crucial part of the recruitment process for most organizations. Their purpose is to give the selector a chance to assess the candidate and to demonstrate their abilities and personality. It’s also an opportunity for an employer to assess them and to make sure the organization and position are right for the candidate. An interview is an attempt to secure maximum amount of information from candidate concerning his suitability for the job under consideration. 5. Technical Interviews - If a candidate has applied for a job or course that requires technical knowledge (e.g. positions in engineering or IT) it is likely, at some stage in the selection process, that the candidate will be asked technical questions or have a separate technical interview to test his/her knowledge. Questions may focus on the final year project and his/her choice of approach to it or on real/hypothetical technical problems. It seen that the candidate proves himself/herself but also they admit to what they don’t know. 6. Background Checks and Enquiries Offers of appointment are subject to references and security checks. The references given in the candidate’s application will be taken up and a security check will be conducted. Security checks can take a while if the candidate has lived abroad for any period of time. 7. Medical examination- Medical tests are conducted to ensure physical fitness of the potential employee. It will decrease chances of employee absenteeism.
  • 33.
    8. Final SelectionDecision Those individuals who perform successfully on the employment tests and the interviews, and are not eliminated by development of negative information on either the background investigation or physical examination are now considered to be eligible to receive an offer of employment. Who makes that employment offer? For administrative purposes the personnel department should make the offer. But their role should be only administrative. The actual hiring decision should be made by the manager in the department that had the position open. A reference check is made about the candidate selected and then finally he is appointed by giving a formal appointment letter. CHAPTER-5 Nav Infotech Human Resource Division The strategy of Human Resource Division is followed from strategy. The strategy that followed by HR is described bellow. Vision Vision crystallizes their employee focus as the cornerstone of everything they do; to help their customers get the full benefit if communications services in the customers daily lives. It describes their ambition for future, sets a common direction across the group, and shall inspire all employees to imagine how they can contribute. Their values describe what behaviors are necessary to realize that vision. HR is a Critical Enable for Nav Infotech pvt. ltd in the pursuit of its Strategic Goals. HR is a key to ensuring
  • 34.
    An Organization, thatprovides a competitive advantage by being simple, aligned and efficient. A Culture centered on the employee and characterized by diversity, generosity and an international mindset. Leaders, Who have a passion for business, excel at empowering people and never compromise on Nav Infotech ethical standards. People, Who perform at the peak of their ability because they feel a sense of mission, accomplishment and growth. New Hierarchy is given below Old Hierarchy is given below CHAPTER-6 FINDINGS Recruitment & Selection at Nav Infotech As we know, Recruitment refers to the process of finding possible candidates for a job or function, usually undertaken by recruiters. It also may be undertaken by an employment agency or a member of staff at the business or organization looking for recruits. And Selection is a process by which candidates employment are divided in to two classes those who will be offered employment and those who will not. Recruitment and selection is one of the most important for every employee. Cause by this company makes a person as the member of it. There is a general process of recruitment and selection that a company should follow. In Bangladesh
  • 35.
    perspective many companydoes not follow any specific process for recruitment and selection. There are lots of limitations a company face in case of recruitment and selection process. But the recruitment and selection process must be developed, modern and fair. In Nav Infotech recruitment and selection is done by a specific process and which is very much modern. It starts with the manpower requisition and end with appointment. And after that Nav Infotech arrange various types of training and development program for the employees to develop their skill. In true sense Nav Infotech follow a developed recruitment process for selecting right people in right place. Role of Human Resources in Recruitment & Selection Process: In recruitment and selection process the main role is played by HR division. The process is start with manpower requisition and end with appointment. When there is a need of manpower, the required departments send the manpower requisition to HR consist the approval of MD. Then HR starts the process. The process include some step or task that done by a sequential order. First step is manpower requisition. It comes from the division who has vacancies. It can be replacement or for the new candidates. In the second step the requisition comes to HR department the particular officer of HR takes approval from the CHRO. Then the third step starts, HR give advertisement for the job, it can be external or internal. After collecting CVs HR starts sorting suitable CVs for that post. After sorting of CV the forth step starts. The forth step is written exam. Written exam has two parts, one is the HR parts and another is the particular department’s parts. The candidates must have passed HR part. When a candidate passed the written exam then he or she gets call for interview. It is the fifth step of the process. Generally the candidates have to face one interview but sometimes they have to face two interviews. After interview a candidate is selected by the interviewers. Then the selected candidate has to go
  • 36.
    for medical checkup. It is sixth step. Then comes reference check step. Lastly selected candidates fill up joining forms and then he/she gets the appointment letter. This is the procedure that Nav Infotech HR follow to recruit people. Actually in Nav Infotech the recruitment and selection is totally control by HR Division. HR Division makes the policy for recruitment and selection and also takes decision sometimes that a department required manpower. When the requisition comes HR starts the process. HR also supervise that Recruitment and Selection are not simply mechanisms for filling vacancies rather they are viewed as the key factor for suitable placements. For a better recruitment and selection process HR arrange done some task like - collecting suitable and better CVs - arranging written exam - arranging interviews - ensure medical tests - appointment letter and others Basic Rule of Recruitment in Nav Infotech For recruitment Nav Infotech HR follow some rules. These rules are set up by HR for better recruitment and selection. The rules are  Nav Infotech Recruitment is to hire the right kind of people at the right place selecting them through an effective process from a pool of candidates in the job market. Effective recruitment shall ensure the competency and high quality performance of the whole organization.
  • 37.
     Nav InfotechPvt Limited Recruitment does not allow any favor or preferential treatment to any one.  No one who is below 18 years of age can be hired as an employee for Nav Infotech on regular, contract or temporary status.
  • 38.
    recruitment & SelectionProcess at Nav Infotech The Process of recruitment and selection at Nav Infotech is consisting of number of sequential steps. The following picture can show the process very clearly: Figure: Recruitment & Selection Process at ROBI Human Resource planning Manpower Requisition Collecting CVs from Sources:  Internal Sources  External Sources - Advertisement - Internet - Universities - Career Fair Acceptance of Offer Letter and Joining procedure Sorting CVs that are suitable for the jobOffer Letter Written Exam Reference Check Final Selection Interviews (There may be two interviews) Medical Test
  • 39.
    Recruitment and Selectionare not simply mechanisms for filling vacancies rather they are viewed as the key factor for suitable placements. With a view towards placing the right person at the position, in Nav Infotech following procedures in Recruitment and Selection will be practiced: Human Resource planning will start at the beginning of the year in accordance with the approved business Plan and budget provisions. Each Division will submit their month wise recruitment plan to HR for the whole year and on the basis of such requirement HR Division will prepare the upcoming recruitment plan of each Division/Department. Manpower Requisition: Based on the HR Planning respective Division/Department Head will inform HR on personnel requirement through Manpower Requisition form, after obtaining necessary approvals from the Managing Director. Employment Requisition Form must contain a JTOR (Job Terms of Reference), comprising Job Description and Job Specifications / Requirements of the position. Requisition form contain some information like  Name of the position  Status of the employment  Job description  Job specification  Approval of the MD When the approval comes to HR, the process begins by collecting suitable candidates from sources. Recruitment Sources First and foremost step of recruitment is collecting CVs from sources. There are two sources of recruitment:
  • 40.
     Internal source(within the organization) The external job market. Internal Sources For encouraging the internal candidate, job vacancies in Nav Infotech may be advertised through internal notices to all Nav Infotech pvt Ltd employees. Recruitment from the internal source may be through Promotion or delegating individuals with new assignments. In the case of internal sourcing, HR along with the concerned Division/Department will identify prospective candidates on the basis of Individual Capability matching with Competency/Role Profile and will conduct appropriate tests to select the most suited person. In internal source Nav Infotech consider mainly three types of employees:  Contractual  Part-Time  Interns / trainers Contractual employees are those who are working in a contact of six months or one year. And part-time employees are those who work in Call Center. And also interns, after completing their internship and completing their graduation can apply for job. External Sources In short external sources mean collecting CVs from outside. Nav Infotech collect a lot of CVs from outside. Recruitment from external sources will be through  Executive search – for Senior Managers and Above Positions.  Advertisements - for managers and below positions. The CVs are collect by following ways:  HR CV Box  Advertisement  Internet Job Sites  Employee Reference
  • 41.
     Universities  CareerFair or Job Fair  Other CV Box of Nav Infotech HR: There is a Box for CV in Nav Infotech HR. In that box anyone can drop his or her CV in anytime .from the CV Box HR sort out suitable CVs for the required position. This box is open for everyone who wants to drop their CV. Almost everyday this box get full of CVs. It contains about five hundreds of CVs. By this way Nav Infotech HR collect a lot of CVs for job. Advertisement: Advertisement is a well known and world wide accepted source of recruitment. Like other company Nav Infotech also have a career website from where applicants can fill up an application forms. When the job requirement is matched with the applicant’s CV then HR select these applications for recruitment. Internet: Internet advertisement is another new source of Recruitment. Now a day every employee has a website and they collect CVs by internet. Ever there is lots of job website and company can send advertisement over there. Recently Nav Infotech lunch a carrier website for the candidates. Like other company Nav Infotech also give advertisement over net. Generally Nav Infotech gives advertisement in www.bdjobs.com. The interested candidates whose profiles match with the requirements can apply for job over the net. By this way Nav Infotech gets many CVs. Oral Interview
  • 42.
    For the oralinterview, competency based structured interview will be conducted. The standard Interview Assessment Form along with probing questions will be supplied by HR Division. Position specific structured interview with necessary Proving Questions and Assessment form can also be developed/ used. The oral interview may take place in different phases according to the decision of HR Division and concerned Division/ Department and on the basis of Position:  Preliminary Interview: Conducted by the respective immediate Manager and another member from cross functional area.  Second Interview or Final Interview: Conducted by the particular department’s next level managers along with the respective Divisional/ Departmental Heads.  Interview of Key Position: If the recruitment is for any key position/ AGM or above level a final interview must be conducted with the Managing Director. Sometimes one interview makes the final result and sometimes there are two interviews. Interviews are arrange by HR. HR arrange interview for every post even for a tea boy and for a driver. Generally these interviews are held in HR floor There is a separate room for interview. These interviews are generally taken by managers of the required division and there must be an HR person in that interview. In interview the interviewer find out the fact candidate behavior as well as the ability of the candidate. Interviews also test the intelligence and smartness of the candidate. Final Selection From the interview some suitable candidates comes out. Once the final incumbent is selected, HR Division (Compensation & Benefit) will initiate the compensation
  • 43.
    Plan and willmake offer/ process the appointment formalities. This time HR discuss about few things like:  Terms and condition of company  Salary and benefit  Joining Final Approval Like the requisition for appointing candidate the approval of MD is needed. This time HR sends the approval to MD that these candidates are selected in interview for this position and they are going to appoint these candidates for the post. Medical Test When the MD approved the appointment of the candidate HR call the candidate for a medical check up. The candidates have to collect a letter for medical from HR and go for the medical test. The selected candidate must undergo a medical check up and subject to satisfactory medical report formal appointment letter will be issued. Reference Checks When a candidate is selected for the job, his or her given reference has been checked by HR. Reference check may be conducted by HR Division upon acceptance of offer. Subject to satisfactory response joining will be accepted Appointment or Offer Letter
  • 44.
    At last theafter the medical test and reference checked, the offer letter for the candidate has been issued. After that the candidate gets the call that he or she has been appointed and he or she has to collect the letter from HR. Acceptance of Offer Letter & Joining Procedure The joining also has some procedure. In time of joining at first the candidates have accept the offer letter by signing it. Then he or she has to fill up some forms like, - HRIS form - ID Card form - Declaration When all this formalities are over the candidate will become one of the member and start working as an employee Recruitment Cycle Human Resources Division will take maximum 50 days to complete a recruitment process. The break down of the 50 days as follows: Requisition = 2 days Advertisement = 14 days Short listing/Screening = 14 days Written test = 7 days Compilation & Approval = 2 days Reference Check = 7 days Medical Check = 3 days Appointment letter = 1 day Recruitment of Contractual & Others
  • 45.
    This policy governsthe appointment of individuals on Contract/Causal basis and through Third Party service providers. Prior to process the employment on the above category, the Division/ Department concerned must obtain approval from the Managing Director. The manpower requisition must contain the job specification with justification of the need along with the period. Contract Appointment Jobs which are temporary in nature and is likely to be for a limited period or need is for a long term but cannot be hired on a permanent basis due to headcount restrictions. The period of appointment will be of 3 (three) months to maximum 2 (two) years. A contract appointment should be for a fixed period and will become void automatically on the end date unless the contract is shortened or extended in writing prior to the expiration date. Person appointed on contract may be terminated during the tenure at the discretion of the employing department with reasons (performance/ redundancy) or without assigning any cause. A termination clause (with notice period/pay in lieu of) must be incorporated in the contract. The division/ department concerned will initiate the recruitment in concert with HR. Upon finalizing the selection; HR will issue the formal appointment letter. Employees hired on contract must go for pre-employment medical test and subject to satisfactory results (fit for work) the incumbent will be allowed to join. Standard terms and conditions similar to permanent employee especially adherence of code of business ethics, confidentiality and full time engagement clauses must be included.
  • 46.
    If a contractemployee is made permanent (based on performance/capability/ headcount) the service length of that individual will be counted from the first day of the joining provided the contract period was continuous/uninterrupted. Salary and benefits will be fixed based on the incumbents’ educational and professional background. A contract employee will be entitled to same level of salary and benefits if he/she is hired in a position that already exits in the permanent payroll. A contract employee will not be eligible for end service benefits or loan facilities from the company. Casual Appointment Jobs that are totally causal in nature and are required for a short period (maximum of 12 weeks) to cater the additional influx of work or emergency exigencies or filling up a permanent position that is temporarily vacant. Casual appointment should be for a fixed period or until the completion of the special job/project and cannot be for long periods. Employing divisions/ department must obtain approval form the Division/ Department Head justifying the need, specifying the number of personnel and the required background. Line Manager in concert with HR will process the hiring. No written contract is required. Appointment will be on a daily worked basis. The line manager will do the necessary arrangements for recruitment and appointment of Casuals keeping HR & Administration informed. The principle of hiring should be the best candidate suited to the job/position. No discrimination will be permitted on the basis of personal relationship regarding
  • 47.
    hiring of Casuals.All individuals involved in the hiring process must be sensitive to the perception of favoritisms and bias. Salary should be determined based on the incumbent’s background and skills. The calculated market median for the type/nature of the job should be taken into account prior to fix the compensation. Casual employee will not be eligible for any other standard benefits of the company and the payments can be on a daily/weekly/monthly basis. Recruitment for Internship Internship is one of the parts of graduation for student. In case of Bachelor of Business Administration and Master of Business Administration, it is an obligatory. For this reason Universities send CVs of student to Nav Infotech for internship. Recruitment of interns just like the recruitment of contractual. The candidates have to face the interview and if they get selected then they will appoint as intern. Generally for internship Nav Infotech ask for CVs to the reputed Universities like Dhaka University, North South University and BRAC University etc. The requisition for interns is send by the departmental head or the employee who need intern. When requisition comes HR sort CVs and then arrange interview.
  • 48.
    ANALYSIS Analysis Nav Infotech pvtLtd. • Nav Infotech pvt. ltd mainly emphases on internal and external sources for recruitment. • Internally the organization discloses the positions of the job and announces it to all current employees. Nature of the position and the qualification needs for the job is described in the announcement so that the interested candidates can apply. • Nav Infotech pvt. ltd recruits the relatives and dependents of the employee for CV in some cases. • Another way to find applicants is through employee referrals by other departments. Informal communication among managers who can lead the discovery for the best candidates who are working in other department in the firm. • Based on employee skills, educational background, experience of work employee can be recruited in the organization. • For external sources the organization does advertisement, takes help from the employment agencies (only for technology department), do campus recruitment, arrange internship for the students, take employee from personal contact or by employee leasing. • Nav Infotech Axiata Company Ltd. has a structured and standard selection process. This is strictly followed by the selection board that is empowered by the organization. • They first screen CVs. This process is done by some selective criteria which are needed for the company. Then initial interview is held. After that
  • 49.
    selective applicants areasking for written test. Those who are successfully passed the written exam are called for final interview. • Once the recruitment and selection process is done then the employees are appointed base on their job description. • The organization fills the position by promoting the present employees. But most of the times it recruits from outside • Interns are recruited based on their performance. Employee leasing is an option. Employee Satisfaction Nav Infotech PVT.Ltd, Nav Infotech maintain a positive relation with employees. But after my observation of employee satisfaction I have found that some of the employees are still not satisfied with the current situation of the organization. They want additional benefits and more allowances for various factors like children education, Medical allowance, and Marriage allowances. Q1. Since how many years have you been working with this organization? 98% 1%1%0% Chart Title a) 0-5 years b)5-10 years c)10-15 years d) more then 15 years
  • 50.
    Q2. Does theorganization clearly define the position objectives, requirements and candidate specifications in the recruitment process ? Q3. How well are the organisation’s affirmative action needs clarified and supported in the selection process ? Q4.Is the organization doing timeliness recruitment and selection process ? 99% 1% Chart Title a)yes b)no 2%3% 95% Chart Title a)poor b)adequate c)excellent
  • 51.
    Q5. Does HRprovides an adequate pool of quality applicants ? Q6. Rate the effectiveness of the interviewing process and other selection instruments, such as testing ? 99% 1% Chart Title a)yes b) no 99% 1% Chart Title a)yes b) no
  • 52.
    Q7.Does the HRteam act as a consultant to enhance the quality of the applicant pre- screening process ? CHAPTER-8 5% 15% 80% Chart Title a)poor b) adequete c)excellent 95% 5% Chart Title a)yes b) No
  • 53.
    RECOMMENDATIONS Recommendations • Strategic planning:Successful employment planning is designed to identify an organization human resources need. Nav Infotech pvt. ltd can use software to keep employees update; which type of qualified employees they have; forecast future requirement of qualified employees like other MNCs (telco). • Checking Policy: When the candidates come for interview or written exam the authority doesn’t check the person with the picture that the candidates attached with the application. • Using 3rd party: The company can use 3rd party for all the department to reduce cost. And it is not possible all time to get the best CV, in that case 3rd party can help me. • Vacancy Fill up: Most of the time company filled the vacant position from outside. But they can fill it by promoting appointment or suitable person in the organization. • Emphasizeon internal search: Nav Infotech pvt. ltd basically relied on external search for recruiting purpose. They must attempt to develop their own low level employees for higher positions through more internal search. To do so they must ensure a communication network notifying interested persons of opportunities, including advertising within the organization like “position open” bulletin board in every department. • Job fair: All of these organizations must use open up recruiting efforts to the external community like job fair through external search. They can participate in career and job fairs and open houses and must develop
  • 54.
    and support educationalprograms and become more involved with educational institution that can refer more diverse talent pool. • Background investigation: HR department should undertake a background investigation of applicants who appear to offer potential as employees. They should verify an individual legal status to previous work through checking credit reference, criminal records and so on. CHAPTER-9 Conclusion Conclusion Recruitment is an important issue for any organization. Recruitment and selection allows an organization to asses the vacancy and choose the best personnel who will lead the organization in future. So the organization should give more emphasize on selecting a person. A person who can carry forwarded the organization in terms of development, values and ethics. Mainly the precious resource for any organization is their knowledge based efficient workers. The organizations should more cautious on this issue to ensure the quality and ethics.
  • 55.
    So we caneasily find out the Human resource practice, recruitment and selection process, employee satisfaction and relations at Nav Infotech is a very developed and effective one. As a multinational company for making the process more effective Nav Infotech should analyze the recruitment and selection process of other multinational company of home and abroad. That can make Nav Infotech perfect in recruiting people and the company will get efficient professionals, that will increase the productivity as well as revenue. The most important key source factor of Nav Infotech pvt .Ltd is its efficient human resource. It is using the state-of-the-art GSM technology and continuously monitoring its network traffic to ensure network quality. Moreover, its decisions are based on facts from market research and coverage survey. The company also monitors it's competitor's activities and is proactive in marketing decisions.
  • 56.
    BIBLIOGRAPHY BIBLIOGRAPHY Websites 1. www.NAV INFOTech.india.com 2.www.wikipidea.com 3. www.recruitmenyskills.com 4. www.btrc.org/ QUESTIONARRIE
  • 57.
    Q1. Since howmany years haveyou been working with this organization? a. 0-5 Years b. 5-10 Years c. 10 to 15 Years d. More than 15 Years Q2. Does the organization clearly define the position objectives, requirements and candidate specifications in the recruitment process ? a. Yes b. No Q3. How well are the organization’s affirmativeaction needs clarified and supported in the selection process? a. Poor b. Adequate c. Excellent Q4. Is the organization doing timeliness recruitment and Selection process. a. Yes b. No Q5. Does HR provides an adequate pool of quality applicants ? a. Yes b. No Q6. Rate the effectiveness of the interviewing process and other selection instruments, such as testing? a. Poor b. Adequate c. Excellent Q7. Does the HR team act as a consultant to enhance the quality of the applicant pre- screening process? a. Yes b. No
  • 58.
    Q8. Does HRtrain hiring employees to make the best hiring decisions? a. Yes b. No Q9. Rate how well HR finds good candidates fromnon-traditional sources when Necessary? a. Poor b. Adequate c. Excellent Q10. How would you rate the HR department’s performancein recruitment and selection? a. Poor b. Adequate c. Excellent Q11. Does the HR Department is efficient in Selection Policy of the employees ? a. Yes b. No Q12. Does the HR maintains an adequate pool of quality “protected class” applicants? a. Yes b. No