Agile Automation at Scale
Process
Discovery
Process
Prioritization
Automation
Assessment
•Automation Potential
•ROI / Benefits
•Epics / Stories
Automation
Pipeline
Process
Definition (PDD)
Solution Design
(SDD)
DevelopmentTesting
Ready for
Deployment
Automation
Delivery
Sprint
Planning
Built-In
Quality
2-week
sprints
Cross-functional Teams
• Scrum Master
• Product Owner
• Business SMEs
• Developer
• Tester
• Business Analyst
• Architect
• Enablers
Best Practices
• Build / Release
management
• Bot store (reusability)
• Automation Pipeline
drives Architectural
Runway
• KT for Digital Workforce
Management and Support
Architectural
Runway
Create RPA
Awareness
Demand
Generation
Driven by…
• Executive
Sponsors
• Automation
Champions
Discovery
Process
Inventory
Approved
Opportunities
Prioritized
Processes
Initial Discovery
Ongoing
Nominations
Prioritization
Model
Approval for
Automation
Pipeline
Who’s involved?
• Department Heads
• Process Owners
• Process SMEs
• Automation Business
Analysts
• Solution Architects
• Enablers
Key Success Factors
• Understanding of process automation
• Effective channels for submission of
opportunities and feedback
• Workflow to track progress of each
opportunity and manage approvals
3www.hexaware.com | © Hexaware Technologies. All rights reserved.
Generating demand
• What is RPA?
Creating awareness about the capabilities and benefits of process automation will jumpstart
demand generation and facilitate discovery of opportunities across departments and teams
Leverage executive sponsorship and automation champions to evangelize
RPA and create widespread awareness of process automation and its
benefits
• Identifying suitable use cases
• Benefits of automation
• Tools used to automate
• Types of automation
• RPA in action! (Bring a demo)
• Goals & objectives of automation program
• How to recommend a process for automation
4www.hexaware.com | © Hexaware Technologies. All rights reserved.
Generating demand
Creating awareness about the capabilities and benefits of process automation will jumpstart
demand generation and facilitate discovery of opportunities across departments and teams
Leverage executive sponsorship and automation champions to evangelize RPA and create widespread awareness of
process automation and its benefits
Identifying suitable use cases
What is RPA?
Benefits of automation
Tools used to automate
Types of automation
RPA in action! (Bring a demo)
Goals & objectives of automation
program
How to recommend a process for
automation
5www.hexaware.com | © Hexaware Technologies. All rights reserved.
Assessing opportunities and building the pipeline
Process
Inventory
Approved
Opportunities
Prioritized
Processes
Automation
Pipeline
Initial Discovery
• Identify initial areas of focus Build
process inventory for each area of
focus
• Populate prioritization model and
adjust weightages
• Get prioritized list of processes
that are candidates for automation
Process Automation Opportunity Discovery Workflow
Ongoing Nominations
• Create medium for accepting
automation requests from users
• Nominated processes enter a
workflow for evaluation and
approval of requests
• Implement a feedback mechanism
for suggested opportunities
Prioritization of opportunities in
process inventory
Prioritization approach is based on 4
main dimensions:
• Process Complexity
• Volume
• Operational Complexity
• Risk
Ranking of most suitable candidates
for immediate automation
Identify candidates that require
process improvement or
standardization prior to automating
Deep-dive into prioritized
opportunities to validate suitability for
automation and potential benefits
• Process walkthrough
• Step-by-step automation analysis
• Design high-level solution
• Calculate ROI and build business
case
Output from the automation
assessment
• Step-by-step automation analysis
• Current state process maps
• Future state process maps
• Business case with ROI
• Initial Epics/Stories with SP
estimates
Who’s involved?
• Department Heads
• Process Owners
• Process SMEs
• Automation Business
Analysts
• Solution Architects
• Enablers
Key Success Factors
• Understanding of process
automation
• Effective channels for
submission of opportunities
and feedback
• Workflow to track progress
of each opportunity and
manage approvals
6www.hexaware.com | © Hexaware Technologies. All rights reserved.
Automation
Assessment
Process
Prioritization
Process
Discovery
Assessing opportunities and building the pipeline
Initial Discovery
• Identify initial areas of focus Build
process inventory for each area of
focus
• Populate prioritization model and
adjust weightages
• Get prioritized list of processes that
are candidates for automation
Ongoing Nominations
• Create medium for accepting
automation requests from users
• Nominated processes enter a
workflow for evaluation and approval
of requests
• Implement a feedback mechanism
for suggested opportunities
Prioritization of opportunities in process
inventory
Prioritization approach is based on 4
main dimensions:
• Process Complexity
• Volume
• Operational Complexity
• Risk
Ranking of most suitable candidates for
immediate automation
Identify candidates that require process
improvement or standardization prior to
automating
Deep-dive into prioritized opportunities
to validate suitability for automation and
potential benefits
• Process walkthrough
• Step-by-step automation analysis
• Design high-level solution
• Calculate ROI and build business
case
Output from the automation assessment
• Step-by-step automation analysis
• Current state process maps
• Future state process maps
• Business case with ROI
• Initial Epics/Stories with SP
estimates
Process
Inventory
Approved
Opportunities
Prioritized
Processes
Automation
Pipeline
Who’s involved?
• Department Heads
• Process Owners
• Process SMEs
• Automation Business
Analysts
• Solution Architects
• Enablers
Key Success Factors
• Understanding of process
automation
• Effective channels for
submission of opportunities
and feedback
• Workflow to track progress
of each opportunity and
manage approvals
Process Automation Opportunity Discovery Workflow
7www.hexaware.com | © Hexaware Technologies. All rights reserved.
Agile automation delivery
Scrum Team
Daily
Scrum
Product
Backlog
Sprint
Backlog
Sprint
Planning
Sprint
Review
(Bot)
Increment
Sprint
Retrospective
• Approved processes
from Automation
Pipeline
• A process is an Epic,
broken down to smaller
stories
• Scrum Master
• Product Owner
• Development Team (4
to 8 members)
• Architect
• Developer
• Tester
• Business Analyst
• Potentially
releasable process
automation solution
(bot)
• Must be “Done”
• Inspect and adapt
• Bot increment
demo to
stakeholders
• 2-week
Sprints
8www.hexaware.com | © Hexaware Technologies. All rights reserved.
Agile automation delivery – keys to success
The Automation Pipeline and Product Backlog must provide transparency and visibility into
architectural enablement requirements for upcoming work (e.g. RPA licensing, RPA
infrastructure, access to business applications, test data, etc.)
Epics may be prioritized based on business value of automation for each process, while
stories must maintain a logical sequence based on order of processing steps
Keystroke-level process details and requirements must be captured and documented for each
story during the Sprint
Clear definition of “Done”
Continuous Build/Release Management for Bots
Effective handover to production support
• Requirements and solution
design documentation
created and approved
• Test cases, Test coverage (if
applicable)
• No known defects
• Acceptable quality as
defined by Product Owner
• Approved by Product Owner
Sample Definition of
“Done”
9www.hexaware.com | © Hexaware Technologies. All rights reserved.
Agile Automation Delivery – Keys to SuccessSuccessfulAutomation
Delivery
The Automation Pipeline and Product Backlog must provide transparency and visibility
into architectural enablement requirements for upcoming work (e.g. RPA licensing, RPA
infrastructure, access to business applications, test data, etc.)
Epics may be prioritized based on business value of automation for each process, while
stories must maintain a logical sequence based on order of processing steps
Keystroke-level process details and requirements must be captured and documented for
each story during the Sprint
Clear definition of “Done”
Continuous Build/Release Management for Bots
Effective handover to production support
• Requirements and solution design
documentation created and approved
• Test cases, Test coverage (if
applicable)
• No known defects
• Acceptable quality as defined by
Product Owner
• Approved by Product Owner
Sample Definition of “Done”
10www.hexaware.com | © Hexaware Technologies. All rights reserved.
Phase 2:
Implement CoE
•Build phase 2 pilot bots across BUs
•Manage Global Automation Pipeline
•Build Automation Library
•Employee Re-skilling strategy
•RPA delivery Team Training
•Operationalize CoE
Automation CoE enablement
Program Approach
• Establishment of a scalable operating model for the deployment of Robotic Process Automation
(“RPA”), by implementing an Automation CoE and Global Automation Pipeline Management
• Duration: 12 weeks
• Program executed in 4 workstreams:
– WS 1 – RPA tool selection
– WS 2 – Robotic Program Design
– WS 3 – Pilot Bot development
– WS 4 – Opportunity Assessment
Key assessment areas within financial services:-
• Title Management
• Centralized and consolidated automated follow-
ups for title
• Lien registration and release
• Account Maintenance
• Periodic Reporting
• Insurance follow-up
• Corporate Branch Functions
• Payment Reconciliation
• Manual floor-planning for co-part auctions
• Business Development
• Overline Requests
• Temporary Increase Requests
Fortune 750 vehicle financial services organization
About the Client
Global Fortune 750 company that is into institutional vehicle
auctions and Independent dealer vehicle floorplan financing
Objectives
• Leverage internal resources, partner capabilities and best
practices to launch a global Center of Excellence Automation
• Establish a Global Automation Pipeline
• Generate Quick Wins targeting key automation opportunities
Deliverables
Phase 1:
Establish CoE Organization
•Identify and recommend a suitable RPA Tool
•Develop a detailed program design draft.
•Creating RPA CoE structure with key roles & RACI &
staffing plan
•Automation Assessment to identify Quick Wins &
strategic roadmap for RPA deployment
•CoE Standard Operating Procedures
•Training on Prioritization and Assessment
•Organization Change Management Plan
•Create Benefit Realization Tracker
•COE Launch Plan
•Build Pilot Bot for 1 BU
11www.hexaware.com | © Hexaware Technologies. All rights reserved.
Innovative Services
Passionate Employees
Delighted Customers
Thank you
www.hexaware.com
12www.hexaware.com | © Hexaware Technologies. All rights reserved.
Scrum Team in the context of automation development
The Product
Owner
• Sole person
responsible for
managing the Product
Backlog
• Works closely with
process SMEs
The Development
Team
• Architect
• Developer
• Tester
• Business Analyst
Development
Team Size
• 4 to 8 members
The Scrum
Master
• Responsible for
promoting and
supporting Scrum
• Serves the PO,
Development Team
and the Organization
The Scrum Team delivers potentially releasable process automation solutions
incrementally and iteratively based on the definition of “Done”.
13www.hexaware.com | © Hexaware Technologies. All rights reserved.
Scrum Events in the context of automation development
The Sprint
• Typically time-box
of 2 weeks
• Contains
Planning, Daily
Scrums,
development
work, Sprint
Review, and
Retrospective
Sprint
Planning
• Time-box of 4
hours
• What can be
done
• How will it get
done
• Sprint Goal
Daily Scrum
• Time-box of 15
min
• What was done
yesterday
• What will be done
today
• Impediments to
meeting the Sprint
Goal
Sprint Review
• Time-box of 2
hours
• Inspect the
Increment and
adapt the Product
Backlog
• Bot increment
demo to
stakeholders
Sprint
Retrospective
• Time-box of 2
hours
• Scrum team self-
inspection and
improvement
planning for
upcoming sprints
All Scrum Events are applicable to automation delivery. The Sprint is the
container for all other events, and all events are time-boxed.
14www.hexaware.com | © Hexaware Technologies. All rights reserved.
Scrum Artifacts in the context of automation development
Product Backlog
• Ordered list of everything that is
known to be needed in the
automation solution
• Lists all requirements, processing
steps, enhancements, and fixes
that are required to automate the
process
• An end-to-end process may be
considered an Epic that may be
reduced to logical groups of steps
and functionality as backlog items
Sprint Backlog
• Set of Product Backlog items
selected for the Sprint
• Plan for delivering the product
Increment and realizing the Sprint
Goal
Increment
• Sum of all the Product Backlog
items completed during a Sprint
plus the value of the increments
of all previous Sprints
• An increment may be one or
more components of a bot, or a
fully functional bot
• An increment must be “Done” at
the end of the Sprint.
All Scrum Artifacts are applicable to automation delivery, and provide
transparency and opportunities for inspection and adaptation.
15www.hexaware.com | © Hexaware Technologies. All rights reserved.
Automate
Everything
Cloudify
Everything
Transform
Customer
Experience
To transform how IT
services are delivered and to
be the first IT services
company
in the world where
half the Workforce
is Digital
OurStrategy
Focussed Growth
Aspirations
Automation First
DNA
OurApproach
Culture of Bottom
Up Innovation
Constantly Delighting
Customers
Outcomes
Industry Leading
Revenue Growth
607 Mn (FY 2017)
Rated #1 Service
Provider in Europe
for last two years
Disruptive Trends Require a Next Gen Focused Partner
Hexaware Introduction
16www.hexaware.com | © Hexaware Technologies. All rights reserved.
Alliances and
Partnerships
with Vendors
Hexaware IP to
Accelerate RPA
Adoption
Digital Operations
Command Centre
Configuration
Manager
RoboBank Unified Screen
Making it Real
IA ConsultantsRPA Projects
75+ 360+ 600+
Existing
Consultants
Scale up by end of
Dec 2019
Hexaware RPA
Research Lab
to enable quick time to
market and faster benefit
realization
Delivered + In
Progress
Solutions
• RPA
• AI / ML
Back Office
• Virtual Assistants
• Conversational Bot
Front Office
• Multi-channel Customer
Interaction Platforms
• Analytics
• OCR / ICR
Functionality
Enablers • NLP & NLG
450+ Bots ( LIVE ) 100+ Bots (in progress) 120+ Bots (in pipeline)
Hexaware’s
RPA Practice
Statistics
Hexaware’s Automation Practice Overview
17www.hexaware.com | © Hexaware Technologies. All rights reserved.
HiPAS Service Offerings
Maturity Level Assessment &
Consulting
CoE Setup/
Factory Model
Develop POC’s Staff – Aug
Implementation
Services +
Licenses
Bot
Management &
Support
Operational &
Transactional
Analytics
Initialization: Wants to start
Automation journey
Intermediate: Few PoC Bots
built with internal resources,
but needs to scale
Industrialized Automation
CoE: Deployed multiple Bots
but want to reduce costs
Advisory Implementation Management
Immediate
Need
Future
Need

Automation CoE at Scale Using Agile to build RPA

  • 1.
    1www.hexaware.com | ©Hexaware Technologies. All rights reserved.
  • 2.
    2www.hexaware.com | ©Hexaware Technologies. All rights reserved. Agile Automation at Scale Process Discovery Process Prioritization Automation Assessment •Automation Potential •ROI / Benefits •Epics / Stories Automation Pipeline Process Definition (PDD) Solution Design (SDD) DevelopmentTesting Ready for Deployment Automation Delivery Sprint Planning Built-In Quality 2-week sprints Cross-functional Teams • Scrum Master • Product Owner • Business SMEs • Developer • Tester • Business Analyst • Architect • Enablers Best Practices • Build / Release management • Bot store (reusability) • Automation Pipeline drives Architectural Runway • KT for Digital Workforce Management and Support Architectural Runway Create RPA Awareness Demand Generation Driven by… • Executive Sponsors • Automation Champions Discovery Process Inventory Approved Opportunities Prioritized Processes Initial Discovery Ongoing Nominations Prioritization Model Approval for Automation Pipeline Who’s involved? • Department Heads • Process Owners • Process SMEs • Automation Business Analysts • Solution Architects • Enablers Key Success Factors • Understanding of process automation • Effective channels for submission of opportunities and feedback • Workflow to track progress of each opportunity and manage approvals
  • 3.
    3www.hexaware.com | ©Hexaware Technologies. All rights reserved. Generating demand • What is RPA? Creating awareness about the capabilities and benefits of process automation will jumpstart demand generation and facilitate discovery of opportunities across departments and teams Leverage executive sponsorship and automation champions to evangelize RPA and create widespread awareness of process automation and its benefits • Identifying suitable use cases • Benefits of automation • Tools used to automate • Types of automation • RPA in action! (Bring a demo) • Goals & objectives of automation program • How to recommend a process for automation
  • 4.
    4www.hexaware.com | ©Hexaware Technologies. All rights reserved. Generating demand Creating awareness about the capabilities and benefits of process automation will jumpstart demand generation and facilitate discovery of opportunities across departments and teams Leverage executive sponsorship and automation champions to evangelize RPA and create widespread awareness of process automation and its benefits Identifying suitable use cases What is RPA? Benefits of automation Tools used to automate Types of automation RPA in action! (Bring a demo) Goals & objectives of automation program How to recommend a process for automation
  • 5.
    5www.hexaware.com | ©Hexaware Technologies. All rights reserved. Assessing opportunities and building the pipeline Process Inventory Approved Opportunities Prioritized Processes Automation Pipeline Initial Discovery • Identify initial areas of focus Build process inventory for each area of focus • Populate prioritization model and adjust weightages • Get prioritized list of processes that are candidates for automation Process Automation Opportunity Discovery Workflow Ongoing Nominations • Create medium for accepting automation requests from users • Nominated processes enter a workflow for evaluation and approval of requests • Implement a feedback mechanism for suggested opportunities Prioritization of opportunities in process inventory Prioritization approach is based on 4 main dimensions: • Process Complexity • Volume • Operational Complexity • Risk Ranking of most suitable candidates for immediate automation Identify candidates that require process improvement or standardization prior to automating Deep-dive into prioritized opportunities to validate suitability for automation and potential benefits • Process walkthrough • Step-by-step automation analysis • Design high-level solution • Calculate ROI and build business case Output from the automation assessment • Step-by-step automation analysis • Current state process maps • Future state process maps • Business case with ROI • Initial Epics/Stories with SP estimates Who’s involved? • Department Heads • Process Owners • Process SMEs • Automation Business Analysts • Solution Architects • Enablers Key Success Factors • Understanding of process automation • Effective channels for submission of opportunities and feedback • Workflow to track progress of each opportunity and manage approvals
  • 6.
    6www.hexaware.com | ©Hexaware Technologies. All rights reserved. Automation Assessment Process Prioritization Process Discovery Assessing opportunities and building the pipeline Initial Discovery • Identify initial areas of focus Build process inventory for each area of focus • Populate prioritization model and adjust weightages • Get prioritized list of processes that are candidates for automation Ongoing Nominations • Create medium for accepting automation requests from users • Nominated processes enter a workflow for evaluation and approval of requests • Implement a feedback mechanism for suggested opportunities Prioritization of opportunities in process inventory Prioritization approach is based on 4 main dimensions: • Process Complexity • Volume • Operational Complexity • Risk Ranking of most suitable candidates for immediate automation Identify candidates that require process improvement or standardization prior to automating Deep-dive into prioritized opportunities to validate suitability for automation and potential benefits • Process walkthrough • Step-by-step automation analysis • Design high-level solution • Calculate ROI and build business case Output from the automation assessment • Step-by-step automation analysis • Current state process maps • Future state process maps • Business case with ROI • Initial Epics/Stories with SP estimates Process Inventory Approved Opportunities Prioritized Processes Automation Pipeline Who’s involved? • Department Heads • Process Owners • Process SMEs • Automation Business Analysts • Solution Architects • Enablers Key Success Factors • Understanding of process automation • Effective channels for submission of opportunities and feedback • Workflow to track progress of each opportunity and manage approvals Process Automation Opportunity Discovery Workflow
  • 7.
    7www.hexaware.com | ©Hexaware Technologies. All rights reserved. Agile automation delivery Scrum Team Daily Scrum Product Backlog Sprint Backlog Sprint Planning Sprint Review (Bot) Increment Sprint Retrospective • Approved processes from Automation Pipeline • A process is an Epic, broken down to smaller stories • Scrum Master • Product Owner • Development Team (4 to 8 members) • Architect • Developer • Tester • Business Analyst • Potentially releasable process automation solution (bot) • Must be “Done” • Inspect and adapt • Bot increment demo to stakeholders • 2-week Sprints
  • 8.
    8www.hexaware.com | ©Hexaware Technologies. All rights reserved. Agile automation delivery – keys to success The Automation Pipeline and Product Backlog must provide transparency and visibility into architectural enablement requirements for upcoming work (e.g. RPA licensing, RPA infrastructure, access to business applications, test data, etc.) Epics may be prioritized based on business value of automation for each process, while stories must maintain a logical sequence based on order of processing steps Keystroke-level process details and requirements must be captured and documented for each story during the Sprint Clear definition of “Done” Continuous Build/Release Management for Bots Effective handover to production support • Requirements and solution design documentation created and approved • Test cases, Test coverage (if applicable) • No known defects • Acceptable quality as defined by Product Owner • Approved by Product Owner Sample Definition of “Done”
  • 9.
    9www.hexaware.com | ©Hexaware Technologies. All rights reserved. Agile Automation Delivery – Keys to SuccessSuccessfulAutomation Delivery The Automation Pipeline and Product Backlog must provide transparency and visibility into architectural enablement requirements for upcoming work (e.g. RPA licensing, RPA infrastructure, access to business applications, test data, etc.) Epics may be prioritized based on business value of automation for each process, while stories must maintain a logical sequence based on order of processing steps Keystroke-level process details and requirements must be captured and documented for each story during the Sprint Clear definition of “Done” Continuous Build/Release Management for Bots Effective handover to production support • Requirements and solution design documentation created and approved • Test cases, Test coverage (if applicable) • No known defects • Acceptable quality as defined by Product Owner • Approved by Product Owner Sample Definition of “Done”
  • 10.
    10www.hexaware.com | ©Hexaware Technologies. All rights reserved. Phase 2: Implement CoE •Build phase 2 pilot bots across BUs •Manage Global Automation Pipeline •Build Automation Library •Employee Re-skilling strategy •RPA delivery Team Training •Operationalize CoE Automation CoE enablement Program Approach • Establishment of a scalable operating model for the deployment of Robotic Process Automation (“RPA”), by implementing an Automation CoE and Global Automation Pipeline Management • Duration: 12 weeks • Program executed in 4 workstreams: – WS 1 – RPA tool selection – WS 2 – Robotic Program Design – WS 3 – Pilot Bot development – WS 4 – Opportunity Assessment Key assessment areas within financial services:- • Title Management • Centralized and consolidated automated follow- ups for title • Lien registration and release • Account Maintenance • Periodic Reporting • Insurance follow-up • Corporate Branch Functions • Payment Reconciliation • Manual floor-planning for co-part auctions • Business Development • Overline Requests • Temporary Increase Requests Fortune 750 vehicle financial services organization About the Client Global Fortune 750 company that is into institutional vehicle auctions and Independent dealer vehicle floorplan financing Objectives • Leverage internal resources, partner capabilities and best practices to launch a global Center of Excellence Automation • Establish a Global Automation Pipeline • Generate Quick Wins targeting key automation opportunities Deliverables Phase 1: Establish CoE Organization •Identify and recommend a suitable RPA Tool •Develop a detailed program design draft. •Creating RPA CoE structure with key roles & RACI & staffing plan •Automation Assessment to identify Quick Wins & strategic roadmap for RPA deployment •CoE Standard Operating Procedures •Training on Prioritization and Assessment •Organization Change Management Plan •Create Benefit Realization Tracker •COE Launch Plan •Build Pilot Bot for 1 BU
  • 11.
    11www.hexaware.com | ©Hexaware Technologies. All rights reserved. Innovative Services Passionate Employees Delighted Customers Thank you www.hexaware.com
  • 12.
    12www.hexaware.com | ©Hexaware Technologies. All rights reserved. Scrum Team in the context of automation development The Product Owner • Sole person responsible for managing the Product Backlog • Works closely with process SMEs The Development Team • Architect • Developer • Tester • Business Analyst Development Team Size • 4 to 8 members The Scrum Master • Responsible for promoting and supporting Scrum • Serves the PO, Development Team and the Organization The Scrum Team delivers potentially releasable process automation solutions incrementally and iteratively based on the definition of “Done”.
  • 13.
    13www.hexaware.com | ©Hexaware Technologies. All rights reserved. Scrum Events in the context of automation development The Sprint • Typically time-box of 2 weeks • Contains Planning, Daily Scrums, development work, Sprint Review, and Retrospective Sprint Planning • Time-box of 4 hours • What can be done • How will it get done • Sprint Goal Daily Scrum • Time-box of 15 min • What was done yesterday • What will be done today • Impediments to meeting the Sprint Goal Sprint Review • Time-box of 2 hours • Inspect the Increment and adapt the Product Backlog • Bot increment demo to stakeholders Sprint Retrospective • Time-box of 2 hours • Scrum team self- inspection and improvement planning for upcoming sprints All Scrum Events are applicable to automation delivery. The Sprint is the container for all other events, and all events are time-boxed.
  • 14.
    14www.hexaware.com | ©Hexaware Technologies. All rights reserved. Scrum Artifacts in the context of automation development Product Backlog • Ordered list of everything that is known to be needed in the automation solution • Lists all requirements, processing steps, enhancements, and fixes that are required to automate the process • An end-to-end process may be considered an Epic that may be reduced to logical groups of steps and functionality as backlog items Sprint Backlog • Set of Product Backlog items selected for the Sprint • Plan for delivering the product Increment and realizing the Sprint Goal Increment • Sum of all the Product Backlog items completed during a Sprint plus the value of the increments of all previous Sprints • An increment may be one or more components of a bot, or a fully functional bot • An increment must be “Done” at the end of the Sprint. All Scrum Artifacts are applicable to automation delivery, and provide transparency and opportunities for inspection and adaptation.
  • 15.
    15www.hexaware.com | ©Hexaware Technologies. All rights reserved. Automate Everything Cloudify Everything Transform Customer Experience To transform how IT services are delivered and to be the first IT services company in the world where half the Workforce is Digital OurStrategy Focussed Growth Aspirations Automation First DNA OurApproach Culture of Bottom Up Innovation Constantly Delighting Customers Outcomes Industry Leading Revenue Growth 607 Mn (FY 2017) Rated #1 Service Provider in Europe for last two years Disruptive Trends Require a Next Gen Focused Partner Hexaware Introduction
  • 16.
    16www.hexaware.com | ©Hexaware Technologies. All rights reserved. Alliances and Partnerships with Vendors Hexaware IP to Accelerate RPA Adoption Digital Operations Command Centre Configuration Manager RoboBank Unified Screen Making it Real IA ConsultantsRPA Projects 75+ 360+ 600+ Existing Consultants Scale up by end of Dec 2019 Hexaware RPA Research Lab to enable quick time to market and faster benefit realization Delivered + In Progress Solutions • RPA • AI / ML Back Office • Virtual Assistants • Conversational Bot Front Office • Multi-channel Customer Interaction Platforms • Analytics • OCR / ICR Functionality Enablers • NLP & NLG 450+ Bots ( LIVE ) 100+ Bots (in progress) 120+ Bots (in pipeline) Hexaware’s RPA Practice Statistics Hexaware’s Automation Practice Overview
  • 17.
    17www.hexaware.com | ©Hexaware Technologies. All rights reserved. HiPAS Service Offerings Maturity Level Assessment & Consulting CoE Setup/ Factory Model Develop POC’s Staff – Aug Implementation Services + Licenses Bot Management & Support Operational & Transactional Analytics Initialization: Wants to start Automation journey Intermediate: Few PoC Bots built with internal resources, but needs to scale Industrialized Automation CoE: Deployed multiple Bots but want to reduce costs Advisory Implementation Management Immediate Need Future Need