Webinar - Project Management Best Practices
Completing Every Project on Time and on Budget
With - Chris DeVany
CEO, Trainer, Author and Avid Traveler
FEBRUARY 15th, 2018
11:00 AM EDT | 04:00 PM UTC
www.invensislearning.com
2
About Invensis Learning
Invensis Learning is a leading certification training provider for individuals and enterprises globally. Our
expertise in providing globally-recognized IT & Technical certification courses has enabled us to be one of
the trusted certification training partners for many Fortune 500 organizations and Government institutions
worldwide. Invensis Learning has trained and certified thousands of professionals across a wide-range of
categories such as IT Service Management, Project Management, Quality Management, IT Security and
Governance, Cloud Computing, DevOps, Agile Project Management, and Digital Courses. Invensis
Learning’s certification training programs adhere to global standards such as PMI, TUV SUD, AXELOS,
ISACA, DevOps Institute, and PEOPLECERT.
3
Housekeeping
 The webinar will last up to 60 minutes
 You can ask questions throughout the Webinar, using the Chat panel on the right hand
side of the slide. These will be answered during the Q&A session towards the end.
 Post webinar, a recorded copy will be sent to your email
4
Speaker Profile
Chris DeVany
CEO, Trainer, Author and Avid Traveler
Chris DeVany is the founder and president of Pinnacle Performance
Improvement Worldwide. He has published numerous articles in
the fields of surviving mergers and acquisitions, surviving change,
project management, management, sales, team-building, leadership,
ethics, customer service, diversity and work-life balance, in
publications ranging from ASTD/Performance In Practice to Customer
Service Management. His book, “90 Days to a High-Performance
Team”, has helped and continued to help thousands of executives,
managers and team leaders improve performance. Chris holds
degrees in management studies and organizational behavior from
Boston University. He has traveled to 22 countries and 47 states in
the course of his career.
5
Learning Objectives
 Manage projects consistently
 To raise awareness to the process of Project Management
 Acquire or enhance project management skills
 To increase communication Skills
6
Methodology
 Present the process
 Apply it to a project
7
Why Use Project Management?
 To save us time, energy and frustration
 To give our internal customers more time to be spent with external customers
 Gets product to market faster
 Improves the quality of our work lives
 To meet Corporate Goals
8
What is Project Management?
… the negotiation of commitments from specialized resources
and the guidance of those resources toward specific business
objectives within a wider organizational strategy.
9
Why Project Management?
To eliminate
“reinventing the
wheel” by
standardizing routine
project work
To reduce the
number of tasks that could
potentially be overlooked
during the project
To minimize risk of
project failure
To ensure that customer
requirements are met in an
efficient manner
To promote teamwork
and cross-functional
accountability
10
What is a Project?
A temporary endeavor, undertaken to create a unique product or service
(PMBOK definition).
11
Project Life Cycle
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement
4.0
Control
5.0
Complete
Project
12
Initiate the Project
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement
4.0
Control
5.0
Complete
Project
13
1.0 Initiate the Project
1.0
Initiate
Project
1.1
Assemble
Core Team
1.3
Conduct
Preliminary
Planning
1.4
Validate
Project
Initiation
1.2
Build Core
Team
Ownership
Charter
from
Executive
Sponsor
Past Lessons
Learned
INPUTS
14
1.1 Assemble Core Team
Identify 6 – 9 Core Team members:
 Project Manager works with Project Leader, Project Executive Sponsor and Functional
Leaders to assign resources for each functional area to be represented on the Core
Team based on best available match of required skills
 Verify availability of proposed Core Team members
 Create Core Team organization chart
 Project Manager holds one-on-one discussions with Core Team members to prepare
them for involvement with project initiation and planning
1.0
Initiate
Project
15
Core team
 Provides strategic direction for the project by utilizing their decision making authority to
bring resolution to issues raised by the various sub-teams involved in the development of
the product.
 Delivers the product against the established timeline by escalating any
issues/concerns/decisions affecting their ability to deliver against the timeline to the
management team and executive sponsor managing the budget for the development
project
What might a Core Team Structure look like?
17
Project Leader/Manager Responsibility
Back up
• Guides the establishment of the vision and tone for the team
• Participates in the development of the team’s strategic direction and maintains the team alignment
• Major Content Owner for Team
• Primary Overall Strategic Leadership
• Ensure Project Plan Allows Rapid and
Robust Time to Market
• Know Skills/Resources Needed
• Issue Resolution/Risk Identification
• Ensures Sound Decisions
Project LeaderProject Manager
• Major Process Owner for Team
• Minutes/Agendas/Meetings
• Communication: Center of Team
Communication Plan
• Tools of the PM Trade
• Project Plan
• Resources Management
• Resolution of Issues - Facilitation
• Financial
• Integration
18
1.2 Build Core Team Ownership
 Review Inputs
 Develop the Project Overview Statement - POS
 Identify stages and milestones
 Develop Influencer Assessment:
 Develop Communication Plan:
1.0
Initiate
Project
19
Project Overview Statement
Project
Name:
Parent
Project Code:
Project
Manager:
Project
Leader:
Core Stakeholders:
Goal/Mission: Who are we, What is the main deliverable and for whom?
Organizational objective this achieves
Objectives (Deliverables)
Major Activities/ Groups of activities
Potential Obstacles Contingencies
Critical Success Factors
Budget:
Time Frame:
Prepared By (Team
Members):
Date:
Revision:
Approved By Core
Stakeholder
Group:
Date
Finish the Statement:
This project will be completed when ...
21
Relating Goal to Corp Objective
Product Leadership -- example of strategy
Objective #2
P 1 P2 P3 P4 P5 P6 P7
Objective #1
22
Responsibility Assignment Matrix
Major
Activity
PM PL TM1 TM2 TM.x
I=Input required, P= Participate, A= Accountable, R= Review, S: Sign off
23
Communication
24
Understanding the Communication Process
Intended Message > Encoded Message
You (background past experiences,
organizational pressures, personality,
self-image, etc.)
Perceived message > decoded message
The other person (background, past
experiences, personality, self image, etc.
Actual Message
Content, tone, body language facial
expression, context, etc.
There are
potential
sources of error
every step of
the way
25
Communication
 WHY: One of most important factors in ensuring successful completion of project
deliverables.
 WHO: Sponsor, Stakeholders, Team members
 HOW: Written Reports, Meetings, Schedules, Databases, One - on - One
 TOOL: Communication documentation
26
Influencer Assessment
 Identification of people who can have an impact on the project, either positive or negative
and the action plan used to manage their influence.
 Revisited and revised as necessary
 Used to generate a project communication plan
27
Influencer Assessment
Influencer Reason Action
Plan
Responsibility Due
Date
Status
28
Communication Plan
 Provides a protocol for communication with project sponsors, stakeholders and team
members provides information regarding the audience.
 Should be developed upon initiation of the project team and should be used to manage
communication activities.
29
Communication Plan/History
Audience
Group
Purpose / Key
Message
Delivery
Vehicle
Developer
/Owner
Date Feedback/ Comments
Steering
Committee
Update steering
committee on progress
towards achieving next
milestone
Presentation Project Manager 09/15/16 Document the meeting
30
2.0 Create An Integrated Development Plan
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan Project
3.0
Implement
4.0
Control
5.0
Complete
Project
31
2.0 Process to Plan the Project
2.1
Organize Full
Project Team
2.2
Develop
Detailed Sub-
Team Plans
2.3
Rigorously
Revise Project
Plan
Initial Budget
Estimate
INPUTS
Formal
Approval from
Sponsor
Continued on next
page
Top-Down Project
Plan
Plan
Project
32
2.0 Process to Plan the Project (continued)
Plan
Project
2.4
Validate the
Estimate
2.7
Initiate Team
Member
Performance
2.6
Assign
Resources to
Tasks
2.5
Establish Other
Resources
2.1
Organize Full
Project Team
33
2.1 Organize the Full Project Team
 Determine resource requirements and assignments for
each Sub-Team
 Create organization chart for Full Team
 Conduct Project Kick-Off meeting
 Plan for education and motivation for Team members
Plan
Project
34
_____
____
___________________
_____
____
_____
_____
____
_____
________
= Individual
Contributors
= Team
Full Project Team
Empowered Multi-
functional Team
Core Team
X
X
HR
Procurement
Travel Finance
Project Leader
Project Manager
Executive Sponsor
35
2.2 Develop Detailed Sub-Team Plans
 Review major activities, objectives, and Project Plan defined by Core Team
 State all assumptions
Plan
Project
Develop
Sub-Team
POS
ID
Activities
Determine
Duration
Create
Schedule
Determine
Resources
Cost
Estimates
Major
Milestones
ImplementationRisk
36
Develop a sub-team POS
 All Sub-team members present
 Alignment with the Core Team POS
37
2.2 Develop Detailed Sub-Team Plans
 Review major activities, objectives, and Project Plan defined by Core Team
 State all assumptions
Develop
Sub-Team
POS
ID
Activities
Determine
Duration
Create
Schedule
Determine
Resources
Cost
Estimates
Major
Milestones
ImplementationRisk
Plan
Project
38
Identify Relationships/Dependencies
Predecessors and Successors
Finish-to-Start
Start-to-Start
Finish-to-Finish
From Task must finish before to
task can start
From Task must start before to
task can start
From Task must finish before to
task can finish
39
2.2 Develop Detailed Sub-Team Plans
 Review major activities, objectives, and Project Plan defined by Core Team
 State all assumptions
Plan
Project
Develop
Sub-Team
POS
ID
Activities
Determine
Duration
Create
Schedule
Determine
Resources
Cost
Estimates
Major
Milestones
ImplementationRisk
40
Establishing a Milestone Schedule
A schedule established so that you can track major activities of a project to get an overall
determination of how a project is doing.
Guideline for milestones
< 1 year
Project length
greater than 1 year
41
Critical Path Method
Critical Path: The sequence of activities having zero float.
Float: The amount of delay that could be tolerated in the starting time or completion time of
an activity without causing a delay in the completion of the project.
Project Planning and Control--Advanced Management Services, 1998.
42
2.7 Manage Full Team Member Performance
 Train:
• Analysis of skills needed vs. skills available
• Team Training
• Project Comprehension
 Motivate:
• How will this project benefit you as individual?
• How could this project hurt you?
• Why do you want to create the proposed change?
• What will be your role in this project?
• What could make you want to leave this project before its completion?
 Manage:
• Ongoing meetings
• Performance Measurements
• Accountability
Plan
Project
43
Metrics
Application Roll out
1. 100 users set up
2. < 10 help desk calls
3. < 5 bug fixes
4. % of requirements met
5. 90% trained
Setting up a new location
1. All users set up
2. < 10 help desk calls
44
Transition to Implementation
 Finalized and approved Project Plan
 All resources secured
 Prepared to execute (in a focused way)
45
3.0 Implement
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement
4.0
Control
5.0
Complete
Project
46
3.0 Process to Implement
Implement
3.4
Present
Report
3.1
Execute
the plan
3.2
Generate
Status
Reports
47
Progress Updates
 Executing tasks
 Milestones by Project Report
 Communicating on variances
 Highlighting critical issues and solutions
 Monitor against the plan
Implement
48
Implement Contingencies
 Risks identified
 Contingency plans reviewed and executed
 Evaluate impact on plan
 Continue on course
49
Report Project Status
 Communicate project status to Project Executive Sponsor or Full Team members
 Report project status to Project Executive Sponsor or Full Team members at key time
points
Implement
50
Monthly Report by Project
Goals Baseline Current Days Reason for Change Critical Issues
Variance
ID Task Name
20 First Dose in First Human
65 Decision t o Move t o next Stage
85 First Patient Treat ed in Eff icacy St udy
140 End of Phase II Meeting (Hematological)
246 End of Phase II Meeting (Solid Tumor)
420 Decision t o Move t o Pivotal
453 NDA Meeting For Mult iple Myeloma
454 Decision t o Move t o Submission (Hemat ologic)
480 NDA Meeting For Solid Tumor
481 Decision t o Move t o Submission (Solid)
484 File Hematological
486 Decision t o Launch (Hemat ologic)
488 File Solid Tumors
490 Decision t o Launch (Solid)
492 Launch Solid Hematological
493 Launch Solid Tumors
10/7
12/18
2/26
5/13
9/23
9/24
1/19
1/20
10/12
10/13
2/19
8/20
11/12
5/16
8/23
5/17
H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1
1998 1999 2000 2001 2002 2003 2004 2005 200
Financial Report
51
Status Meetings
 Discuss and Resolve Issues
 Make Decisions
 Discuss the work for the upcoming time period between meetings
52
Implementation Tools
 Problem Solving
 Decision Making
 Conflict Management
53
Integrating Control
 Occurs during implementation
 Way to manage changes during a project
 Provides documentation to changes in scope, budget and resources
54
4.0 Control
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement 4.0
Control
5.0
Complete
Project
55
4.0 Control Project
Control
4.2
Present
Report
4.1
Change
Control
OUTPUT
Decision to Continue
to Move Project
Forward or to
Terminate Project
56
4.0 Change Control
Procedures in place to manage changes in:
 Scope
 Schedule
 Cost
 Quality
 Risk
 Contract Administration
Control
57
Change Control Process
 Identify Change
 Assess Impact on the Project
 Evaluate options
 Communicate desired actions
 Gain approval
 Adjust plan according to change
 Document Change
58
ID Change/Assess Impact
Proposed Description of Change Item (include reason for change)
Estimate Effect on Schedule Duration (+/- days) __________
Estimated effect on Budget: ________________
Estimated effect on Resources (More/Less) Quantity: ________________Type:
____________________
Additional Tasks
needed:________________________________________________________________________________________
_________________________________________________________________________________________________
________________________________________________________________
59
Evaluate Options/Gain Approval
Authorization
Change Order Enacted: No ______ Yes _____
___________________________ ___________ _____________________ _______
Project Leader Date Stakeholder Date
___________________________ ___________
Project Manager Date
60
Adjust Plan/Document
Finalize
Actions
Timeline Adjusted
Budget Adjusted
Risk Plan Adjusted
Communication to affected resources
61
Change Log
Change Item Control Log
Change
Order
Number
Date
Initiated
Date
Action
Taken
Approved
(Yes/No)
Cost
Change
+/-
Delay/
Acceleratio
n From/To
Work
Started
Work
Complete
d
62
5.0 Complete the Project
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement
4.0
Control
5.0
Complete
Project
63
5.0 Process to Complete the Project
6.3
Transfer
Project
Ownership
6.2
Finalize
Document
ation
6.4
Release
Resources
Decision to
Terminate
Project or
Approval of
Project
Completion
INPUTS 6.1
Conduct
Lessons
Learned
Complete
Project
64
Lessons Learned: Sponsor Meeting
 Review the commitments that were made
 Solicit feedback on customers’ satisfaction
• review and approval process
• how effectively project resources were used
• quality and frequency of progress reports
• project process
65
Lessons Learned: Team Input
 Hold a project team meeting to review:
• The objectives and deliverables for the project
• Review and approval process
• Team membership
• Compare “actual” to plan
• Develop improvement ideas
 Ask:
• “What went well?”
• “What would we do differently?”
66
Finalize Documentation
 Create the Executive Summary
 Attach reports on project variances; feedback from the customer, sponsor and team;
lessons learned; and recommendations for future projects
 Distribute the report and archive it
67
Transfer Project Ownership
 Provide project documentation
 Provide contacts
68
Release Resources
 Celebrate
 Hand out rewards for achieved metrics
 Move onto next assignment
69
Project Life Cycle
Plan the Execution Perform the Tasks Achieve
the
Results
1.0
Initiate
Project
2.0
Plan
Project
3.0
Implement
4.0
Control
5.0
Complete
Project
70
Learning Objectives
 Manage projects consistently
 To raise awareness to the process of Project Management
 Acquire or enhance project management skills
 To increase communication Skills
71
Exclusive Offer for Webinar Attendees
Get up to 20% discount on PMP Exam Prep Training and
PRINCE2 Certification Training exclusively for webinar
attendees. Click on the ‘Offer’ in your panel and fill in the
form to block your seat now and pay later.
This offer is available only for the
next 24 Hours
For On-site Group Training requests, email us at
corporate@invensislearning.com
Block Your Seat Now
and
Pay Later
72
Questions
 Now the Session is open for Question and Answers
 Please drop your questions in the Q & A panel
73
Thank you for joining us...
Thank
you!
74
CONTACT INVENSIS LEARNING
Email Us:
© Copyright 2018 Invensis Learning. Invensis®
is a registered trademark of Invensis Technologies Pvt Ltd.
support@invensislearning.com
www.invensislearning.com
USA +1-910-726-3695 | IND +91-96-2020-0784
UK +44 2033-223-280 | Germany +49 2119-5987-989
Switzerland +41-22-518-2042 | Hong Kong +852-5803-9039

Project Management Best Practices - Tips and Techniques

  • 1.
    Webinar - ProjectManagement Best Practices Completing Every Project on Time and on Budget With - Chris DeVany CEO, Trainer, Author and Avid Traveler FEBRUARY 15th, 2018 11:00 AM EDT | 04:00 PM UTC www.invensislearning.com
  • 2.
    2 About Invensis Learning InvensisLearning is a leading certification training provider for individuals and enterprises globally. Our expertise in providing globally-recognized IT & Technical certification courses has enabled us to be one of the trusted certification training partners for many Fortune 500 organizations and Government institutions worldwide. Invensis Learning has trained and certified thousands of professionals across a wide-range of categories such as IT Service Management, Project Management, Quality Management, IT Security and Governance, Cloud Computing, DevOps, Agile Project Management, and Digital Courses. Invensis Learning’s certification training programs adhere to global standards such as PMI, TUV SUD, AXELOS, ISACA, DevOps Institute, and PEOPLECERT.
  • 3.
    3 Housekeeping  The webinarwill last up to 60 minutes  You can ask questions throughout the Webinar, using the Chat panel on the right hand side of the slide. These will be answered during the Q&A session towards the end.  Post webinar, a recorded copy will be sent to your email
  • 4.
    4 Speaker Profile Chris DeVany CEO,Trainer, Author and Avid Traveler Chris DeVany is the founder and president of Pinnacle Performance Improvement Worldwide. He has published numerous articles in the fields of surviving mergers and acquisitions, surviving change, project management, management, sales, team-building, leadership, ethics, customer service, diversity and work-life balance, in publications ranging from ASTD/Performance In Practice to Customer Service Management. His book, “90 Days to a High-Performance Team”, has helped and continued to help thousands of executives, managers and team leaders improve performance. Chris holds degrees in management studies and organizational behavior from Boston University. He has traveled to 22 countries and 47 states in the course of his career.
  • 5.
    5 Learning Objectives  Manageprojects consistently  To raise awareness to the process of Project Management  Acquire or enhance project management skills  To increase communication Skills
  • 6.
    6 Methodology  Present theprocess  Apply it to a project
  • 7.
    7 Why Use ProjectManagement?  To save us time, energy and frustration  To give our internal customers more time to be spent with external customers  Gets product to market faster  Improves the quality of our work lives  To meet Corporate Goals
  • 8.
    8 What is ProjectManagement? … the negotiation of commitments from specialized resources and the guidance of those resources toward specific business objectives within a wider organizational strategy.
  • 9.
    9 Why Project Management? Toeliminate “reinventing the wheel” by standardizing routine project work To reduce the number of tasks that could potentially be overlooked during the project To minimize risk of project failure To ensure that customer requirements are met in an efficient manner To promote teamwork and cross-functional accountability
  • 10.
    10 What is aProject? A temporary endeavor, undertaken to create a unique product or service (PMBOK definition).
  • 11.
    11 Project Life Cycle Planthe Execution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 12.
    12 Initiate the Project Planthe Execution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 13.
    13 1.0 Initiate theProject 1.0 Initiate Project 1.1 Assemble Core Team 1.3 Conduct Preliminary Planning 1.4 Validate Project Initiation 1.2 Build Core Team Ownership Charter from Executive Sponsor Past Lessons Learned INPUTS
  • 14.
    14 1.1 Assemble CoreTeam Identify 6 – 9 Core Team members:  Project Manager works with Project Leader, Project Executive Sponsor and Functional Leaders to assign resources for each functional area to be represented on the Core Team based on best available match of required skills  Verify availability of proposed Core Team members  Create Core Team organization chart  Project Manager holds one-on-one discussions with Core Team members to prepare them for involvement with project initiation and planning 1.0 Initiate Project
  • 15.
    15 Core team  Providesstrategic direction for the project by utilizing their decision making authority to bring resolution to issues raised by the various sub-teams involved in the development of the product.  Delivers the product against the established timeline by escalating any issues/concerns/decisions affecting their ability to deliver against the timeline to the management team and executive sponsor managing the budget for the development project
  • 16.
    What might aCore Team Structure look like?
  • 17.
    17 Project Leader/Manager Responsibility Backup • Guides the establishment of the vision and tone for the team • Participates in the development of the team’s strategic direction and maintains the team alignment • Major Content Owner for Team • Primary Overall Strategic Leadership • Ensure Project Plan Allows Rapid and Robust Time to Market • Know Skills/Resources Needed • Issue Resolution/Risk Identification • Ensures Sound Decisions Project LeaderProject Manager • Major Process Owner for Team • Minutes/Agendas/Meetings • Communication: Center of Team Communication Plan • Tools of the PM Trade • Project Plan • Resources Management • Resolution of Issues - Facilitation • Financial • Integration
  • 18.
    18 1.2 Build CoreTeam Ownership  Review Inputs  Develop the Project Overview Statement - POS  Identify stages and milestones  Develop Influencer Assessment:  Develop Communication Plan: 1.0 Initiate Project
  • 19.
    19 Project Overview Statement Project Name: Parent ProjectCode: Project Manager: Project Leader: Core Stakeholders: Goal/Mission: Who are we, What is the main deliverable and for whom? Organizational objective this achieves Objectives (Deliverables) Major Activities/ Groups of activities Potential Obstacles Contingencies Critical Success Factors Budget: Time Frame: Prepared By (Team Members): Date: Revision: Approved By Core Stakeholder Group: Date
  • 20.
    Finish the Statement: Thisproject will be completed when ...
  • 21.
    21 Relating Goal toCorp Objective Product Leadership -- example of strategy Objective #2 P 1 P2 P3 P4 P5 P6 P7 Objective #1
  • 22.
    22 Responsibility Assignment Matrix Major Activity PMPL TM1 TM2 TM.x I=Input required, P= Participate, A= Accountable, R= Review, S: Sign off
  • 23.
  • 24.
    24 Understanding the CommunicationProcess Intended Message > Encoded Message You (background past experiences, organizational pressures, personality, self-image, etc.) Perceived message > decoded message The other person (background, past experiences, personality, self image, etc. Actual Message Content, tone, body language facial expression, context, etc. There are potential sources of error every step of the way
  • 25.
    25 Communication  WHY: Oneof most important factors in ensuring successful completion of project deliverables.  WHO: Sponsor, Stakeholders, Team members  HOW: Written Reports, Meetings, Schedules, Databases, One - on - One  TOOL: Communication documentation
  • 26.
    26 Influencer Assessment  Identificationof people who can have an impact on the project, either positive or negative and the action plan used to manage their influence.  Revisited and revised as necessary  Used to generate a project communication plan
  • 27.
    27 Influencer Assessment Influencer ReasonAction Plan Responsibility Due Date Status
  • 28.
    28 Communication Plan  Providesa protocol for communication with project sponsors, stakeholders and team members provides information regarding the audience.  Should be developed upon initiation of the project team and should be used to manage communication activities.
  • 29.
    29 Communication Plan/History Audience Group Purpose /Key Message Delivery Vehicle Developer /Owner Date Feedback/ Comments Steering Committee Update steering committee on progress towards achieving next milestone Presentation Project Manager 09/15/16 Document the meeting
  • 30.
    30 2.0 Create AnIntegrated Development Plan Plan the Execution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 31.
    31 2.0 Process toPlan the Project 2.1 Organize Full Project Team 2.2 Develop Detailed Sub- Team Plans 2.3 Rigorously Revise Project Plan Initial Budget Estimate INPUTS Formal Approval from Sponsor Continued on next page Top-Down Project Plan Plan Project
  • 32.
    32 2.0 Process toPlan the Project (continued) Plan Project 2.4 Validate the Estimate 2.7 Initiate Team Member Performance 2.6 Assign Resources to Tasks 2.5 Establish Other Resources 2.1 Organize Full Project Team
  • 33.
    33 2.1 Organize theFull Project Team  Determine resource requirements and assignments for each Sub-Team  Create organization chart for Full Team  Conduct Project Kick-Off meeting  Plan for education and motivation for Team members Plan Project
  • 34.
    34 _____ ____ ___________________ _____ ____ _____ _____ ____ _____ ________ = Individual Contributors = Team FullProject Team Empowered Multi- functional Team Core Team X X HR Procurement Travel Finance Project Leader Project Manager Executive Sponsor
  • 35.
    35 2.2 Develop DetailedSub-Team Plans  Review major activities, objectives, and Project Plan defined by Core Team  State all assumptions Plan Project Develop Sub-Team POS ID Activities Determine Duration Create Schedule Determine Resources Cost Estimates Major Milestones ImplementationRisk
  • 36.
    36 Develop a sub-teamPOS  All Sub-team members present  Alignment with the Core Team POS
  • 37.
    37 2.2 Develop DetailedSub-Team Plans  Review major activities, objectives, and Project Plan defined by Core Team  State all assumptions Develop Sub-Team POS ID Activities Determine Duration Create Schedule Determine Resources Cost Estimates Major Milestones ImplementationRisk Plan Project
  • 38.
    38 Identify Relationships/Dependencies Predecessors andSuccessors Finish-to-Start Start-to-Start Finish-to-Finish From Task must finish before to task can start From Task must start before to task can start From Task must finish before to task can finish
  • 39.
    39 2.2 Develop DetailedSub-Team Plans  Review major activities, objectives, and Project Plan defined by Core Team  State all assumptions Plan Project Develop Sub-Team POS ID Activities Determine Duration Create Schedule Determine Resources Cost Estimates Major Milestones ImplementationRisk
  • 40.
    40 Establishing a MilestoneSchedule A schedule established so that you can track major activities of a project to get an overall determination of how a project is doing. Guideline for milestones < 1 year Project length greater than 1 year
  • 41.
    41 Critical Path Method CriticalPath: The sequence of activities having zero float. Float: The amount of delay that could be tolerated in the starting time or completion time of an activity without causing a delay in the completion of the project. Project Planning and Control--Advanced Management Services, 1998.
  • 42.
    42 2.7 Manage FullTeam Member Performance  Train: • Analysis of skills needed vs. skills available • Team Training • Project Comprehension  Motivate: • How will this project benefit you as individual? • How could this project hurt you? • Why do you want to create the proposed change? • What will be your role in this project? • What could make you want to leave this project before its completion?  Manage: • Ongoing meetings • Performance Measurements • Accountability Plan Project
  • 43.
    43 Metrics Application Roll out 1.100 users set up 2. < 10 help desk calls 3. < 5 bug fixes 4. % of requirements met 5. 90% trained Setting up a new location 1. All users set up 2. < 10 help desk calls
  • 44.
    44 Transition to Implementation Finalized and approved Project Plan  All resources secured  Prepared to execute (in a focused way)
  • 45.
    45 3.0 Implement Plan theExecution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 46.
    46 3.0 Process toImplement Implement 3.4 Present Report 3.1 Execute the plan 3.2 Generate Status Reports
  • 47.
    47 Progress Updates  Executingtasks  Milestones by Project Report  Communicating on variances  Highlighting critical issues and solutions  Monitor against the plan Implement
  • 48.
    48 Implement Contingencies  Risksidentified  Contingency plans reviewed and executed  Evaluate impact on plan  Continue on course
  • 49.
    49 Report Project Status Communicate project status to Project Executive Sponsor or Full Team members  Report project status to Project Executive Sponsor or Full Team members at key time points Implement
  • 50.
    50 Monthly Report byProject Goals Baseline Current Days Reason for Change Critical Issues Variance ID Task Name 20 First Dose in First Human 65 Decision t o Move t o next Stage 85 First Patient Treat ed in Eff icacy St udy 140 End of Phase II Meeting (Hematological) 246 End of Phase II Meeting (Solid Tumor) 420 Decision t o Move t o Pivotal 453 NDA Meeting For Mult iple Myeloma 454 Decision t o Move t o Submission (Hemat ologic) 480 NDA Meeting For Solid Tumor 481 Decision t o Move t o Submission (Solid) 484 File Hematological 486 Decision t o Launch (Hemat ologic) 488 File Solid Tumors 490 Decision t o Launch (Solid) 492 Launch Solid Hematological 493 Launch Solid Tumors 10/7 12/18 2/26 5/13 9/23 9/24 1/19 1/20 10/12 10/13 2/19 8/20 11/12 5/16 8/23 5/17 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 1998 1999 2000 2001 2002 2003 2004 2005 200 Financial Report
  • 51.
    51 Status Meetings  Discussand Resolve Issues  Make Decisions  Discuss the work for the upcoming time period between meetings
  • 52.
    52 Implementation Tools  ProblemSolving  Decision Making  Conflict Management
  • 53.
    53 Integrating Control  Occursduring implementation  Way to manage changes during a project  Provides documentation to changes in scope, budget and resources
  • 54.
    54 4.0 Control Plan theExecution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 55.
    55 4.0 Control Project Control 4.2 Present Report 4.1 Change Control OUTPUT Decisionto Continue to Move Project Forward or to Terminate Project
  • 56.
    56 4.0 Change Control Proceduresin place to manage changes in:  Scope  Schedule  Cost  Quality  Risk  Contract Administration Control
  • 57.
    57 Change Control Process Identify Change  Assess Impact on the Project  Evaluate options  Communicate desired actions  Gain approval  Adjust plan according to change  Document Change
  • 58.
    58 ID Change/Assess Impact ProposedDescription of Change Item (include reason for change) Estimate Effect on Schedule Duration (+/- days) __________ Estimated effect on Budget: ________________ Estimated effect on Resources (More/Less) Quantity: ________________Type: ____________________ Additional Tasks needed:________________________________________________________________________________________ _________________________________________________________________________________________________ ________________________________________________________________
  • 59.
    59 Evaluate Options/Gain Approval Authorization ChangeOrder Enacted: No ______ Yes _____ ___________________________ ___________ _____________________ _______ Project Leader Date Stakeholder Date ___________________________ ___________ Project Manager Date
  • 60.
    60 Adjust Plan/Document Finalize Actions Timeline Adjusted BudgetAdjusted Risk Plan Adjusted Communication to affected resources
  • 61.
    61 Change Log Change ItemControl Log Change Order Number Date Initiated Date Action Taken Approved (Yes/No) Cost Change +/- Delay/ Acceleratio n From/To Work Started Work Complete d
  • 62.
    62 5.0 Complete theProject Plan the Execution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 63.
    63 5.0 Process toComplete the Project 6.3 Transfer Project Ownership 6.2 Finalize Document ation 6.4 Release Resources Decision to Terminate Project or Approval of Project Completion INPUTS 6.1 Conduct Lessons Learned Complete Project
  • 64.
    64 Lessons Learned: SponsorMeeting  Review the commitments that were made  Solicit feedback on customers’ satisfaction • review and approval process • how effectively project resources were used • quality and frequency of progress reports • project process
  • 65.
    65 Lessons Learned: TeamInput  Hold a project team meeting to review: • The objectives and deliverables for the project • Review and approval process • Team membership • Compare “actual” to plan • Develop improvement ideas  Ask: • “What went well?” • “What would we do differently?”
  • 66.
    66 Finalize Documentation  Createthe Executive Summary  Attach reports on project variances; feedback from the customer, sponsor and team; lessons learned; and recommendations for future projects  Distribute the report and archive it
  • 67.
    67 Transfer Project Ownership Provide project documentation  Provide contacts
  • 68.
    68 Release Resources  Celebrate Hand out rewards for achieved metrics  Move onto next assignment
  • 69.
    69 Project Life Cycle Planthe Execution Perform the Tasks Achieve the Results 1.0 Initiate Project 2.0 Plan Project 3.0 Implement 4.0 Control 5.0 Complete Project
  • 70.
    70 Learning Objectives  Manageprojects consistently  To raise awareness to the process of Project Management  Acquire or enhance project management skills  To increase communication Skills
  • 71.
    71 Exclusive Offer forWebinar Attendees Get up to 20% discount on PMP Exam Prep Training and PRINCE2 Certification Training exclusively for webinar attendees. Click on the ‘Offer’ in your panel and fill in the form to block your seat now and pay later. This offer is available only for the next 24 Hours For On-site Group Training requests, email us at corporate@invensislearning.com Block Your Seat Now and Pay Later
  • 72.
    72 Questions  Now theSession is open for Question and Answers  Please drop your questions in the Q & A panel
  • 73.
    73 Thank you forjoining us... Thank you!
  • 74.
    74 CONTACT INVENSIS LEARNING EmailUs: © Copyright 2018 Invensis Learning. Invensis® is a registered trademark of Invensis Technologies Pvt Ltd. support@invensislearning.com www.invensislearning.com USA +1-910-726-3695 | IND +91-96-2020-0784 UK +44 2033-223-280 | Germany +49 2119-5987-989 Switzerland +41-22-518-2042 | Hong Kong +852-5803-9039