Operations and Competitiveness Operations Management - 5 th  Edition Chapter 1 Roberta Russell & Bernard W. Taylor, III
Lecture outline What do operations managers do? Operations function Evolution of operations management Operations management and e–business Globalization and competitiveness Primary topics in operations management Learning objectives for this course
What Do Operations Managers Do? What is operations? a function or system that transforms inputs into outputs of greater value What is a transformation process? a series of activities along a  value chain  extending from supplier to customer activities that do not add value are superfluous and should be eliminated What is operations management? design, operation, and improvement of productive systems
Transformation Process Physical: as in manufacturing operations Locational: as in transportation operations Exchange: as in retail operations Physiological: as in health care Psychological: as in entertainment Informational: as in communication
Operations as a Transformation Process Feedback INPUT  Material Machines Labor Management Capital TRANSFORMATION PROCESS OUTPUT  Goods Services
Operations Function Operations Marketing Finance and accounting Human resources Outside suppliers
How is operations relevant to my major? Accounting Information Technology Management “ As an auditor you must understand the fundamentals of operations management.” “ IT is a tool, and there’s no better place to apply it than in operations.”  “ We use so many things you learn in an operations class—scheduling, lean production, theory of constraints, and tons of quality tools.”
How is operations relevant to my major? Economics Marketing Finance “ It’s all about processes. I live by flowcharts and Pareto analysis.” “ How can you do a good job marketing a product if you’re unsure of its quality or delivery status?” “ Most of our capital budgeting requests are from operations, and most of our cost savings, too.”
Evolution of Operations Management Craft production process of handcrafting products or services for individual customers Division of labor dividing a job into a series of small tasks each performed by a different worker Interchangeable parts standardization of parts initially as replacement parts; enabled mass production
Scientific management systematic analysis of work methods Mass production high-volume production of a standardized product for a mass market Lean production adaptation of mass production that prizes quality and flexibility Evolution of Operations Management (cont.)
Historical Events in Operations Management Henry Ford 1913 Moving assembly line Henry Gantt 1912 Activity scheduling chart Frank and Lillian Gilbreth 1911 Time and motion studies Frederick W. Taylor 1911 Principles of scientific management Scientific Management Eli Whitney 1790 Interchangeable parts Adam Smith 1776 Division of labor James Watt 1769 Steam engine Industrial Revolution Originator Dates Events/Concepts Era
Historical Events in Operations Management  (cont.) Joseph Orlicky, IBM and others 1960s, 1970s Frederick Herzberg 1950s MRP, EDI, EFT, CIM Operations research groups 1950s Simulation, waiting line theory, decision theory, PERT/CPM Remington Rand 1951 Digital computer George Dantzig 1947 Linear programming Operations Research Douglas McGregor 1960s Abraham Maslow 1940s Motivation theories Elton Mayo 1930 Hawthorne studies Human Relations Originator Dates Events/Concepts Era
Historical Events in Operations Management  (cont.) Wickham Skinner,  Robert Hayes 1990s Strategy and operations Michael Hammer, James Champy 1990s Business process reengineering W. Edwards Deming,  Joseph Juran 1980s TQM (total quality management) Taiichi Ohno (Toyota) 1970s JIT (just-in-time) Quality Revolution Originator Dates Events/Concepts Era
Historical Events in Operations Management  (cont.) Internet Revolution Amazon, Yahoo,  eBay, and others 2000s E-commerce ARPANET, Tim Berners-Lee SAP, i2 Technologies, ORACLE, PeopleSoft 1990s Internet, WWW, ERP, supply chain management Numerous countries and companies 1990s 2000s WTO, European Union, and other trade agreements Globalization Originator Dates Events/Concepts Era
Continuum from Goods to Services Source:  Adapted from Earl W. Sasser, R. P. Olsen, and D. Daryl Wyckoff,  Management of Service Operations  (Boston: Allyn Bacon, 1978), p.11.
Operations Management and E-Business Categories of E-Commerce Business Consumer Business Consumer B2B Commerceone.com B2C Amazon.com C2B Priceline.com C2C eBay.com
An Integrated Value Chain Value chain:  set of activities that create and deliver products to customer Manufacturer Supplier Customer Flow of information (customer order) Manufacturer Supplier Customer Flow of information (customer order) Flow of product (order fulfillment)
Impact of E-Business on Operations Management Comparison shopping by customers Direct contact with customers Business processes conducted online Customer expectations escalate; quality must be maintained and costs lowered No more guessing about demand is necessary; inventory costs go down; product and service design improves; build to-order products and services is made possible Transaction costs are lower; customer support costs decrease; e-procurement saves big bucks Benefits of E-Business Impact on Operations
Impact of E-Business on Operations Management (cont.) Access to customers worldwide Middlemen are eliminated Access to suppliers worldwide Demand increases; order fulfillment and logistics become major issues; production moves overseas Logistics change from delivering to a store or distribution center to delivering to individual homes; consumer demand is more erratic and unpredictable than business demand Outsourcing increases; more alliances and partnerships among firms are formed; supply is less certain; global supply chain issues arise Benefits of E-Business Impact on Operations
Impact of E-Business on Operations Management (cont.) Online auctions and e-marketplaces Better and faster decision making Competitive bidding lowers cost of materials; supply needs can be found in one location More timely information is available with immediate access by all stakeholders in decision-making process; customer orders and product designs can be clarified electronically; electronic meetings can be held; collaborative planning is facilitated Benefits of E-Business Impact on Operations
Impact of E-Business on Operations Management (cont.) IT synergy Expanded supply chains Productivity increases as information can be shared more efficiently internally and between trading partners Order fulfillment, logistics, warehousing, transportation and delivery become focus of operations management; risk is spread out; trade barriers fall Benefits of E-Business Impact on Operations
Globalization and Competitiveness Favorable cost Access to international markets Response to changes in demand Reliable sources of supply 14 major trade agreements in 1990s Peak: 26% in 2000 World Trade Compared to World GDP Source:  “Real GDP and Trade Growth of OECD Countries, 2001–03,” International Trade Statistics 2003, World Trade Organization, www.wto.org
Globalization and Competitiveness (cont.) Germany: $26.18 USA: $21.33 Taiwan: $5.41 Mexico: $2.38 China: $0.50 Hourly Wage Rates for Selected Countries Source:  “International Comparisons of Hourly Compensation Costs for Production Workers in Manufacturing,” Bureau of Labor Statistics, U.S. Department of Labor, Updated September 30, 2003.
Globalization and Competitiveness (cont.) Trade with China: Percent of each country‘s trade  Source:  “Share of China in Exports and Imports of Major Traders, 2000 and 2002,” International Trade Statistics 2003, World Trade Organization, www.wto.org
Risks of Globalization Cultural differences Supply chain logistics Safety, security, and stability Quality problems Corporate image  Loss of capabilities
Competitiveness and Productivity Competitiveness degree to which a nation can produce goods and services that meet the test of international markets Productivity ratio of output to input Output sales made, products produced, customers served, meals delivered, or calls answered Input labor hours, investment in equipment, material usage, or square footage
Competitiveness and Productivity (cont.) Measures of Productivity
Changes in Productivity for Select Countries Internet-enabled  productivity - Dot com bust - 9/11 terrorist attacks Source:  “International Comparisons of Manufacturing Productivity and Unit Labor Cost Trends, 2002,” Bureau of Labor Statistics, U.S. Department of Labor, September 2003. U.S. figures for 2002–2003 from “Major Sector Productivity and Costs Index,” Bureau of Labor Statistics, U.S. Department of Labor, March 2004
Become efficient output increases with little or no increase in input Expand both output and input grow with output growing more rapidly Achieve breakthroughs output increases while input decreases Downsize output remains the same and input is reduced Retrench both output and input decrease, with input decreasing at a faster rate Productivity Increase
Competitiveness and Productivity Breakthrough Performance More Efficient Retrench Productivity as a Function of Inputs and Outputs, 2001–2002 Source:  “International Comparisons of Manufacturing Productivity and Unit Labor Cost Trends, 2002,” Bureau of Labor Statistics, U.S. Department of Labor, September 2003
Global Competitiveness Ranking Finland United States Sweden Denmark Taiwan Singapore Switzerland Iceland Norway Australia Source: Global Competitiveness Report 2003–2004 , World Economic Forum, January 2004, www.weforum.org
Operations–Oriented Barriers to Entry Economies of Scale Capital Investment Access to Supply and Distribution Channels Learning Curve
Primary Topics in Operations Management
Primary Topics in Operations Management (cont.)
Operations Strategy Strategy: Chapter 2 Maintaining an operations strategy to support firm’s competitive advantage Quality: Chapters 3 and 4 Focusing on quality in operational decision making Product and Services: Chapter 5 Designing quality products and services Processes, Technologies, and Capacity: Chapter 6 Setting up process so that it works smoothly and efficiently
Operations Strategy (cont.) Facilities: Chapter 7 Setting up facility so that it works smoothly and efficiently Human Resources: Chapter 8 Designing jobs and work to produce quality products Project Management: Chapter 9 Managing complex projects
Supply Chain Management Supply Chain: Chapter 10 Managing supply chain Forecasting: Chapter 11 Predicting customer demand Aggregate Planning: Chapter 12 How much to produce and when to produce it  Inventory Management: Chapter 13 How much to order and when to order
Supply Chain Management (cont.) Resource Planning: Chapter 14 Planning capacity and other resources Lean Production: Chapter 15 Designing efficient production lines Scheduling: Chapter 16 Job and task assignments Waiting Lines: Chapter 17 Minimizing waiting time of customers and products
Learning Objectives of this Course Gain an appreciation of strategic importance of operations in a global business environment Understand how operations relates to other business functions Develop a working knowledge of concepts and methods related to designing and managing operations Develop a skill set for quality and process improvement

operations management

  • 1.
    Operations and CompetitivenessOperations Management - 5 th Edition Chapter 1 Roberta Russell & Bernard W. Taylor, III
  • 2.
    Lecture outline Whatdo operations managers do? Operations function Evolution of operations management Operations management and e–business Globalization and competitiveness Primary topics in operations management Learning objectives for this course
  • 3.
    What Do OperationsManagers Do? What is operations? a function or system that transforms inputs into outputs of greater value What is a transformation process? a series of activities along a value chain extending from supplier to customer activities that do not add value are superfluous and should be eliminated What is operations management? design, operation, and improvement of productive systems
  • 4.
    Transformation Process Physical:as in manufacturing operations Locational: as in transportation operations Exchange: as in retail operations Physiological: as in health care Psychological: as in entertainment Informational: as in communication
  • 5.
    Operations as aTransformation Process Feedback INPUT Material Machines Labor Management Capital TRANSFORMATION PROCESS OUTPUT Goods Services
  • 6.
    Operations Function OperationsMarketing Finance and accounting Human resources Outside suppliers
  • 7.
    How is operationsrelevant to my major? Accounting Information Technology Management “ As an auditor you must understand the fundamentals of operations management.” “ IT is a tool, and there’s no better place to apply it than in operations.” “ We use so many things you learn in an operations class—scheduling, lean production, theory of constraints, and tons of quality tools.”
  • 8.
    How is operationsrelevant to my major? Economics Marketing Finance “ It’s all about processes. I live by flowcharts and Pareto analysis.” “ How can you do a good job marketing a product if you’re unsure of its quality or delivery status?” “ Most of our capital budgeting requests are from operations, and most of our cost savings, too.”
  • 9.
    Evolution of OperationsManagement Craft production process of handcrafting products or services for individual customers Division of labor dividing a job into a series of small tasks each performed by a different worker Interchangeable parts standardization of parts initially as replacement parts; enabled mass production
  • 10.
    Scientific management systematicanalysis of work methods Mass production high-volume production of a standardized product for a mass market Lean production adaptation of mass production that prizes quality and flexibility Evolution of Operations Management (cont.)
  • 11.
    Historical Events inOperations Management Henry Ford 1913 Moving assembly line Henry Gantt 1912 Activity scheduling chart Frank and Lillian Gilbreth 1911 Time and motion studies Frederick W. Taylor 1911 Principles of scientific management Scientific Management Eli Whitney 1790 Interchangeable parts Adam Smith 1776 Division of labor James Watt 1769 Steam engine Industrial Revolution Originator Dates Events/Concepts Era
  • 12.
    Historical Events inOperations Management (cont.) Joseph Orlicky, IBM and others 1960s, 1970s Frederick Herzberg 1950s MRP, EDI, EFT, CIM Operations research groups 1950s Simulation, waiting line theory, decision theory, PERT/CPM Remington Rand 1951 Digital computer George Dantzig 1947 Linear programming Operations Research Douglas McGregor 1960s Abraham Maslow 1940s Motivation theories Elton Mayo 1930 Hawthorne studies Human Relations Originator Dates Events/Concepts Era
  • 13.
    Historical Events inOperations Management (cont.) Wickham Skinner, Robert Hayes 1990s Strategy and operations Michael Hammer, James Champy 1990s Business process reengineering W. Edwards Deming, Joseph Juran 1980s TQM (total quality management) Taiichi Ohno (Toyota) 1970s JIT (just-in-time) Quality Revolution Originator Dates Events/Concepts Era
  • 14.
    Historical Events inOperations Management (cont.) Internet Revolution Amazon, Yahoo, eBay, and others 2000s E-commerce ARPANET, Tim Berners-Lee SAP, i2 Technologies, ORACLE, PeopleSoft 1990s Internet, WWW, ERP, supply chain management Numerous countries and companies 1990s 2000s WTO, European Union, and other trade agreements Globalization Originator Dates Events/Concepts Era
  • 15.
    Continuum from Goodsto Services Source: Adapted from Earl W. Sasser, R. P. Olsen, and D. Daryl Wyckoff, Management of Service Operations (Boston: Allyn Bacon, 1978), p.11.
  • 16.
    Operations Management andE-Business Categories of E-Commerce Business Consumer Business Consumer B2B Commerceone.com B2C Amazon.com C2B Priceline.com C2C eBay.com
  • 17.
    An Integrated ValueChain Value chain: set of activities that create and deliver products to customer Manufacturer Supplier Customer Flow of information (customer order) Manufacturer Supplier Customer Flow of information (customer order) Flow of product (order fulfillment)
  • 18.
    Impact of E-Businesson Operations Management Comparison shopping by customers Direct contact with customers Business processes conducted online Customer expectations escalate; quality must be maintained and costs lowered No more guessing about demand is necessary; inventory costs go down; product and service design improves; build to-order products and services is made possible Transaction costs are lower; customer support costs decrease; e-procurement saves big bucks Benefits of E-Business Impact on Operations
  • 19.
    Impact of E-Businesson Operations Management (cont.) Access to customers worldwide Middlemen are eliminated Access to suppliers worldwide Demand increases; order fulfillment and logistics become major issues; production moves overseas Logistics change from delivering to a store or distribution center to delivering to individual homes; consumer demand is more erratic and unpredictable than business demand Outsourcing increases; more alliances and partnerships among firms are formed; supply is less certain; global supply chain issues arise Benefits of E-Business Impact on Operations
  • 20.
    Impact of E-Businesson Operations Management (cont.) Online auctions and e-marketplaces Better and faster decision making Competitive bidding lowers cost of materials; supply needs can be found in one location More timely information is available with immediate access by all stakeholders in decision-making process; customer orders and product designs can be clarified electronically; electronic meetings can be held; collaborative planning is facilitated Benefits of E-Business Impact on Operations
  • 21.
    Impact of E-Businesson Operations Management (cont.) IT synergy Expanded supply chains Productivity increases as information can be shared more efficiently internally and between trading partners Order fulfillment, logistics, warehousing, transportation and delivery become focus of operations management; risk is spread out; trade barriers fall Benefits of E-Business Impact on Operations
  • 22.
    Globalization and CompetitivenessFavorable cost Access to international markets Response to changes in demand Reliable sources of supply 14 major trade agreements in 1990s Peak: 26% in 2000 World Trade Compared to World GDP Source: “Real GDP and Trade Growth of OECD Countries, 2001–03,” International Trade Statistics 2003, World Trade Organization, www.wto.org
  • 23.
    Globalization and Competitiveness(cont.) Germany: $26.18 USA: $21.33 Taiwan: $5.41 Mexico: $2.38 China: $0.50 Hourly Wage Rates for Selected Countries Source: “International Comparisons of Hourly Compensation Costs for Production Workers in Manufacturing,” Bureau of Labor Statistics, U.S. Department of Labor, Updated September 30, 2003.
  • 24.
    Globalization and Competitiveness(cont.) Trade with China: Percent of each country‘s trade Source: “Share of China in Exports and Imports of Major Traders, 2000 and 2002,” International Trade Statistics 2003, World Trade Organization, www.wto.org
  • 25.
    Risks of GlobalizationCultural differences Supply chain logistics Safety, security, and stability Quality problems Corporate image Loss of capabilities
  • 26.
    Competitiveness and ProductivityCompetitiveness degree to which a nation can produce goods and services that meet the test of international markets Productivity ratio of output to input Output sales made, products produced, customers served, meals delivered, or calls answered Input labor hours, investment in equipment, material usage, or square footage
  • 27.
    Competitiveness and Productivity(cont.) Measures of Productivity
  • 28.
    Changes in Productivityfor Select Countries Internet-enabled productivity - Dot com bust - 9/11 terrorist attacks Source: “International Comparisons of Manufacturing Productivity and Unit Labor Cost Trends, 2002,” Bureau of Labor Statistics, U.S. Department of Labor, September 2003. U.S. figures for 2002–2003 from “Major Sector Productivity and Costs Index,” Bureau of Labor Statistics, U.S. Department of Labor, March 2004
  • 29.
    Become efficient outputincreases with little or no increase in input Expand both output and input grow with output growing more rapidly Achieve breakthroughs output increases while input decreases Downsize output remains the same and input is reduced Retrench both output and input decrease, with input decreasing at a faster rate Productivity Increase
  • 30.
    Competitiveness and ProductivityBreakthrough Performance More Efficient Retrench Productivity as a Function of Inputs and Outputs, 2001–2002 Source: “International Comparisons of Manufacturing Productivity and Unit Labor Cost Trends, 2002,” Bureau of Labor Statistics, U.S. Department of Labor, September 2003
  • 31.
    Global Competitiveness RankingFinland United States Sweden Denmark Taiwan Singapore Switzerland Iceland Norway Australia Source: Global Competitiveness Report 2003–2004 , World Economic Forum, January 2004, www.weforum.org
  • 32.
    Operations–Oriented Barriers toEntry Economies of Scale Capital Investment Access to Supply and Distribution Channels Learning Curve
  • 33.
    Primary Topics inOperations Management
  • 34.
    Primary Topics inOperations Management (cont.)
  • 35.
    Operations Strategy Strategy:Chapter 2 Maintaining an operations strategy to support firm’s competitive advantage Quality: Chapters 3 and 4 Focusing on quality in operational decision making Product and Services: Chapter 5 Designing quality products and services Processes, Technologies, and Capacity: Chapter 6 Setting up process so that it works smoothly and efficiently
  • 36.
    Operations Strategy (cont.)Facilities: Chapter 7 Setting up facility so that it works smoothly and efficiently Human Resources: Chapter 8 Designing jobs and work to produce quality products Project Management: Chapter 9 Managing complex projects
  • 37.
    Supply Chain ManagementSupply Chain: Chapter 10 Managing supply chain Forecasting: Chapter 11 Predicting customer demand Aggregate Planning: Chapter 12 How much to produce and when to produce it Inventory Management: Chapter 13 How much to order and when to order
  • 38.
    Supply Chain Management(cont.) Resource Planning: Chapter 14 Planning capacity and other resources Lean Production: Chapter 15 Designing efficient production lines Scheduling: Chapter 16 Job and task assignments Waiting Lines: Chapter 17 Minimizing waiting time of customers and products
  • 39.
    Learning Objectives ofthis Course Gain an appreciation of strategic importance of operations in a global business environment Understand how operations relates to other business functions Develop a working knowledge of concepts and methods related to designing and managing operations Develop a skill set for quality and process improvement