Multimedia authoring tools and User interface design
The document details the concepts and tools related to multimedia authoring and user interfaces, emphasizing the process of creating multimedia applications and the types of authoring systems available. It covers features of authoring tools, various design issues, and the capabilities of different authoring systems like timeline-based and programmable authoring systems. Additionally, the document discusses design considerations for user interfaces and the integration of multimedia applications, as well as issues related to playback and display of multimedia content.
3
Multimedia Authoring Systems
Itis the process of creating multimedia application.
During authoring, you might need to organize or edit the
elements of your multimedia project, create user interface and
designing interactivity.
This can be achieved through the use of authoring programs /
tools.
4.
Introduction to AuthoringTools
Multimedia authoring tools provide the framework for
organizing and editing the elements of a multimedia project.
Authoring software provides an integrated environment for
combining the content and functions of a project.
It enables the developer to create, edit, and import data.
4
5.
Features of AuthoringTools
Editing and organizing features.
Programming features.
Interactivity features.
Performance tuning and playback features.
Delivery, cross-platform, and Internet playability features.
5
6.
Multimedia Authoring
Multimedia authoringsystems are designed with two primary
target users:
1) Professionals
preparing documents, audio wide distribution stored
messages
and full motion video clips
2) Business users
6
7.
Design issue ofMultimedia Authoring
Display resolution
Data Formula for capturing data
Compression algorithms
Network interfaces
Storage formats
7
8.
Display Resolution
A no.ofdesign issues are considered for handling different
display outputs. They are:
a) Level of standardization on display resolutions.
b)Display protocols standardization.
c) Corporate norms for service degradations
d) Corporate norm's for network traffic degradation as they
related to resolutions issues
8
9.
File Format andData Compression Issues
There are variety of data formats available for image, audio,
and full motion video objects.
Another key design Issue is to standardize on one or two
compression formula for each type of data object.
Ex: Facsimile machines ,CCITT 3,CCITT 4
While doing storage, it is useful to have some information
(attribute information) about the objects.
9
10.
Attribute Information
(i) Compressiontype
(ii) Size of the object
(iii) Object orientation
(iv)Data and time of creation
(v) Source file name
(vi)Version number (if any)
(vii) Required software application to display or playback the
object.
10
11.
Service Degradation Policies
Toaddress these design issues, several policies are possible.
They are:
1. Decline further requests with a message to try later.
2. Provide the playback server but at a lower resolution.
3. Provide the playback service at full resolution but, in the
case of sound and full motion video, drop intermediate frames
11
12.
Design Approach toauthoring
Designing an authoring system spans a number of design
issues. They include:
1.Hypermedia application design specifics,
2.User Interface aspects,
3.embedding/Linking streams of objects to a main document
or presentation,
4.Storage of and access to multimedia objects.
5.Playing back combined streams in a synchronized manner.
12
13.
Types of AuthoringSystems
Dedicated Authority Systems
TimeLine –based authoring
Structured Multimedia Authoring
Programmable Authoring Systems
Multisource Multi-user Authoring Systems
Telephone Authoring systems
13
14.
Dedicated Authoring Systems
Dedicatedauthoring systems are designed for a single user
and generally for single streams.
Designing this type of authoring system is simple, but if it
should be capable of combining even two object streams, it
becomes complex.
The authoring is performed on objects captured by the local
video camera and image scanner or an objects stored in some
form of multimedia object library.
In the case of dedicated authoring system, users need not to be
experts in multimedia or a professional artist.
14
15.
Timeline based AuthoringSystems
In a timeline based authoring system, objects are placed along
a timeline.
The timeline can be drawn on the screen in a window in a
graphic manner, or it created using a script in a manner
similar to a project plan.
But, the user must specify a resource object and position it in
the timeline.
15
16.
Structured Multimedia Authoring
Astructured multimedia authoring approach was presented
by Hardman.
It is an evolutionary approach based on structured object-
level construction of complex presentations.
This approach consists of two stages:
(i) The construction of the structure of a presentation.
(ii) Assignment of detailed timing constraints.
16
17.
A successful structuredauthoring system must provide the
following capabilities for navigating through the structure of
presentation.
1.Ability to view the complete structure.
2.Maintain a hierarchy of objects.
3.Capability to zoom down to any specific component.
4.View specific components in part or from start to finish.
5.Provide a running status of percentage full of the designated length
of the presentation.
6.Clearly show the timing relations between the various components.
7.Ability to address all multimedia types including text, image, audio,
video and frame based digital images
17
18.
Programmable Authoring Systems.
Structuredauthoring tools were not able to allow the authors
to express automatic function for handling certain routine
tasks.
But, programmable authoring system has improved in
providing powerful functions based on image processing and
analysis and embedding program interpreters to use image
processing functions.
The capability of this authoring system is enhanced by
Building user programmability in the authoring tool to
perform the analysis and to manipulate the stream based on
the analysis results.
18
19.
Programmable Authoring Systems.
Theprogrammability allows the following tasks through the
program interpreter rather than manually.
1. Return the time stamp of the next frame.
2. Delete a specified movie segment.
3. Copy or cut a specified movie segment to the clip board .
4. Replace the current segment with clip board contents.
19
20.
Multi-source Multi userAuthoring Systems
Once the object is rendered (display of multimedia object on
the screen) the author can manipulate it and change its
rendering information must be available at the same time for
display.
If there are no limits on network bandwidth and server
performance, it would be possible to assemble required
components on cue at the right time to be rendered.
In addition to the multi-user compositing function A multi
user authoring system must provide resource allocation and
scheduling of multimedia objects.
20
21.
Telephone Authoring Systems
Thereis an application where the phone is linking into
multimedia electronic mail application
1.Telephone can be used as a reading device by providing fill text
to-speech synthesis capability.
2. The phone can be used for voice command input for setting up
and managing voice mail messages.
3. Digitized voice clips are captured via the phone and embedded
in electronic mail messages.
4. As the capability to recognize continuous speech is deploy
phones can be used to create electronic mail.
21
22.
contnd
The telephone authoringsystems support different kinds of
applications:
1. Workstation controls for phone mail.
2. Voice command controls for phone mail.
3. Embedding of phone mail in electric mail.
4. Integration of phone mail and voice messages with e-mail.
5. Voice Synthesis in integrated voice mail and e-mail.
6. Local/Remote continuous speech recognition.
22
23.
Hypermedia Application DesignConsideration
In addition to control of their desktop environments, user also
need control of their system environment.
• The ability to specify a primary server for each object class
within a domain specified by the system administrative.
• A domain can be viewed as a list of servers to which they have
unrestricted access.
• The ability to specify whether all multimedia -objects or only
references should be replicated.
23
24.
• The abilityto specify that the multimedia object should be
retrieved immediately for display versus waiting for a signal to
"play" the object.
• This is more significant if the object must be retrieved from a
remote server.
• Display resolution defaults for each type of graphics or video
object.
24
25.
Essential for goodhypermedia
design:
1.Determining the type of hypermedia application.
2.Structuring the information.
3.Determining the navigation throughout the application.
4.Methodologies for accessing the information.
5.Designing the user interface.
25
26.
Integration of Applications
Thecomputer may be called upon to run a diverse set of
applications, including some combination of the following:
1.Electronic mail.
2.Word processing or technical publishing.
3.Graphics and formal presentation preparation software.
4. Spreadsheet or some other decision support software.
5.Access to a relational on object-oriented database.
26
27.
contd
6.Customized applications directlyrelated to job function:
* Billing
* Portfolio management
* Others.
• Integration of these applications consists of two major themes:
* The appearance of the applications
* The ability of the applications to exchange of data.
27
28.
Common UI andApplication Integration
Microsoft Windows has standardized the user interface for a
large number of applications by providing standardization at
the following levels:
* Overall visual look and feel of the application windows
* Menus
* Dialog Boxes
* Buttons
* Help Features
28
29.
Common UI andApplication Integration
This standardization level makes it easier for the user to
interact with applications designed for the Microsoft Windows
operational environment.
Standardization is being provided for
Object Linking and Embedding (OLE).
Dynamic Data Exchange (DOE).
Remote Procedure Call (RPC).
29
30.
Data Exchange
• TheMicrosoft Windows Clipboard allows exchanging data in any
format.
• It can be used to exchange multimedia objects also.
• We can cut and copy a multimedia objects in one document and
pasting in another.
• These documents can be opened under different applications.
• The windows clipboard allows the following formats to be stored:
Text Bitrmap
Image Sound
Video (AVI format).
30
31.
Distributed Data Access
Fullydistributed data access implies that any application at
any client workstation in the enterprise-wide WAN must be
able to access any data object as if it were local.
Hypermedia Application Design
• Hypermedia applications are applications consisting of
compound objects that include the multimedia objects.
• An authoring application may use existing multimedia
objects or call upon a media editor to CD create new object.
31
32.
Structuring the Information
Agood information structure should consist the following
modelling primitives:
.:. Object types and object hierarchies.
.:. Object representations.
.:. Object connections.
.:. Derived connections and representations.
32
33.
Object Types andObject Hierarchies
• Object types are related with various attributes and
representations of the objects.
• The nature of the information structure determines the functions
that can be performed on that information set.
• The object hierarchy defines a contained-in relationship between
objects.
• The manner in which this hierarchy is approached depends on
whether the document is being created or played back.
33
34.
Object representations
A hypermediaobject is a compound object, consists of some
information elements, including data, text, image, and video.
Since each of these multimedia objects may have its own sub
objects, the design must consider the representation of objects.
Object connection
In the relational model, the connections are achieved through
joins, and in the object oriented models, through pointers
hidden inside objects.
Derived Connections and Representations
Modeling of a hypermedia system should attempt to take
derived objects into consideration for establishing
connectionguidelines.
34
Introduction
There are fourkinds of user interface development tools. They
are
1. Media editors
2. An authoring application
3. Hypermedia object creation
4. Multimedia object locator and browser
A media editor is an application responsible of the creation
and editing of a specific multimedia object .
37.
Navigation through theapplication
• Navigation refers to the sequence in which the application
progresses and objects are created, searched and used.
• Navigation can be of three modes:
(i) Direct mode: It is completely predefined. In this case, the
user needs to know what to expect with successive navigation
actions.
(II) Free-form mode: In this mode the user determines the
next sequence of actions.
(III) Browse mode: In this mode, the user does not know the
precise question and wants to get general information about a
particular topic.
37
38.
Designing user interfaces
Userinterface should be design by following design guidelines
as follows:
1. planning the overall structure of the application.
2. planning the contents of the applications.
3. planning the interactive behavior.
4. planning the look and feel of the application.
38
39.
Interactive behavior ofthe application determines how the
user interacts with the application.
Issues of interactive behavior :
1. Data entry dialog boxes
2.Application designed sequence of operation depicted by
graying or enabling specific menu items
3. Active icons that perform ad hoc tasks (adhoc means
created for particular purpose only)
4. A look and feel of the application depends on a combination
of the metaphor being used to simulate real-life interfaces,
Windows guidelines, ease of use, and aesthetic appeal.
39
40.
Special Metaphors forMultimedia Applications
The organizer metaphor
• One must begin to associate the concept of embedding
multimedia object in the appointment diary or notepad to get
obvious view of the multimedia aspects of the organizer.
• Other use of multimedia object in an organizer is to associate
maps or voice mail directions with addresses in address books.
• The lotus organizer was the first to use a screen
representation of the office diary type organizer.
40
41.
Telephone Metaphor:
• Therole of the telephone was changed b the advent of voice
mail system.
• Voice mail servers convert the analog voice and store it in
digital form.
• With the standards for voice mail file formats and digital
storage of sound for computer. Now, computer system is used
to manage the phone system.
• The two essential components of a phone system are speakers
and microphones. They are included in most personal
computers.
41
42.
Aural User Interface:
•AAural user interface allows computer systems to accept speech
as direct input and provide an oral response to the user
actions.
• To design AUI system first, we have to create an aural desk top
which substitutes voice and ear for the keyboard and display
and be able tomix and match them Aural cues should be able
to represent icons, voice, menus and the windows of graphical
user interface.
• AUI has to address the following issues
1. Recent user memory
2. Attention span
3. Rhythms
4. Quick return to missed oral cues
42
43.
The VCR metaphor:
TheUser interface metaphor for VCR is to draw a TV on
screen and provide live buttons on it for selecting channels,
increasing sound volume and changing channel.
User interface for functions such as video capture, channel
play, and stored video playback is to emulate the camera,
television and VCR on screen Fi5.6 shows all functions of
typical video camera when it is in a video capture mode.
43
44.
Audio/Video Indexing Functions
Indexmarking allowed users to mark the location on tape in
the case of both audio and video to which they may wish to
fast forward are rewind.
Three paradigms for indexing audio and video tapes are
1. Counter identify tape locations, and the user maintains
index listing.
2. Special events are used as index markers.
3. Users can specify locations for index markings and the
system maintains the index.
44
45.
OBJECT DISPLAY PLAYBACKISSUES
IMAGE DISPLAY ISSUES
Scaling:
• Image scaling is performed on the fly after decompression.
• The image is scaled to fit in an application defined window at the
full pixel rate for the window.
• The image may be scaled by using factors. For eg: for the
window 3600 x 4400 pixels can be scaled by a factor of 6 x 10
ie.60 x 440 (60times).
45
46.
Zooming:
• Zooming allowsthe user to see more detail for a specific area of
the image.
• Users can zoom by defining a zoom factor (eg: 2: 1,5: 1 or 10: 1).
These are setup as preselected zoom values.
Rubber banding:
• This is another form of zooming.
• In this case, the user uses a mouse to define two comers of the
rectangle.
• The selected area can be copied to the clipboard, cut, moved or
zoomed.
46
47.
Panning:
• If theimage window is unable to display the full image at the
selected resolution for display.
• The image can be panned left to right or right to left as well as
top to bottom or bottom to top.
• Panning is useful for finding detail that is not visible in the full
image.
Audio Quality:
• Audio files are stored in one of a number of formats, including
WAVE and AVI.
• Playing back audio requires that the audio file server be capable
of playing back data at the rate of 480 kbytes/min
uncompressed or 48kbytes/min for compressed 8 bit sound or
96 kbytes/min for 16 bit sound.
47
48.
Special features forvideo playback
• The playback at a constant rate to ensure proper cadence (the
rise and fall in pitch of a person's voice) is known as
isochronous playback. But isochronous playback is more
complex With video than It is for sound.
Video Frame Interleaving:
• Frame interleaving defines the structure other video file in terms
of the layout of sound and video components.
Programmed Degradation:
• When the client workstation is unable to keep up with the
incoming data, programmed degradation occurs.
• Most video servers are designed to transfer data from storage to
the client at constant rates
48
49.
Scene change FrameDetection:
• The scene we see changes every few seconds or minutes and
it replaced by a new image.
• Even within the same scene, there may be a constant motion
of some objects in a scene.
Reason for scene change detection:
Automating scene change detection is very useful for
browsing through very large video clips to find the exact
frame sequence of interest.
49
50.
Histogram Generation:
• Withina scene, the histogram changes as the subject of the
scene mover.
• For example, if a person is running and the camera pans
the scene, a large part of the scene is duplicated with a little
shift. But if the scene changes from a field to a room, the
histogram changes quite substantially. That is, when a scene
cuts over to a new scene, the histogram changes rapidly.
50
51.
Video scaling, Panningand Zooming:
Scaling:
• Scaling is a feature since users are used in changing
window sizes. When the size of the video window is changed,
scaling take place.
Panning:
• Panning allows the user to move to other parts of the
window.
• Panning is useful in combination with zooming. Only if the
video is being displayed at full resolution and the video
Zooming:
• Zooming implies that the stored number of pixels is greater
than the number that can be displayed in the video window
51
52.
Three Dimensional ObjectDisplay and
VR(Virtual Reality)
• Number of 3D effects are used in home entertainment a
advanced systems used for specialized applications to achieve
find results.
• Let us review the approaches in use to determine the impact
0 multimedia display system design due to these advanced
systems.
52
53.
Planar Imaging Technique:
Theplanar imaging technique, used in computer-aided
tomography (CAT Scan) systems, displays a two dimensional
cut of X-ray images through multidimensional data
specialized display techniques try to project a 3D image
constructed from the 2D data.
Computed tomography has a high range of pixel density and
can be used for a variety of applications. Magnetic resonance
imaging, on theother hand, is not as fast, nor does it provide as
high a pixel density as CT. Ultrasound is the third technique
used for 3D imaging in the medical and other fields.
53