   Traditionally the term personnel management was used to refer to
    the set of activities concerning the workforce which included
    staffing, payroll, contractual obligations and other administrative
    tasks.
   In this respect, personnel management encompasses the range of
    activities that are to do with managing the workforce rather than
    resources.
   Personnel Management is more administrative in nature and the
    Personnel Manager’s main job is to ensure that the needs of the
    workforce as they pertain to their immediate concerns are taken
    care of.
   Further, personnel managers typically played the role of mediators
    between the management and the employees and hence there was
    always the feeling that personnel management was not in tune
    with the objectives of the management.
1.   The procurement function- obtaining of a proper kind
     and number of personnel necessary to accomplish an
     organization’s goals.
2.   The development function- personnel development of
     employees, training.
3.    The compensating function- securing adequate and
     equitable remuneration to personnel.
4.    The Integration function- an “integration” of human
     resources with organization through job enlargement, job
     evaluation, variable compensation plans, disciplinary
     action programs.
5.   The maintenance function- maintaining the physical
     conditions of employees (health and safety measures) and
     employee service programs.
   Human resource management is concerned with the development and
    implementation of people strategies, which are integrated with corporate
    strategies, and ensures that the culture, values and structure of the
    organization, and the quality, motivation and commitment of its members
    contribute fully to the achievement of its goals.

   Definition: HRM is the process of acquiring, training, appraising, and
    compensating employees, and of attending to their labor relations, health
    & safety, and fairness concern.
   With the advent of resource centric organizations in recent decades, it has
    become imperative to put “people first” as well as secure management
    objectives of maximizing the ROI (Return on Investment) on the resources.

   This has led to the development of the modern HRM function which is
    primarily concerned with ensuring the fulfillment of management
    objectives and at the same time ensuring that the needs of the resources are
    taken care of.

   In this way, HRM differs from personnel management not only in its
    broader scope but also in the way in which its mission is defined.

   HRM goes beyond the administrative tasks of personnel management and
    encompasses a broad vision of how management would like the resources
    to contribute to the success of the organization.
   Human Resources are heterogeneous.(Different people, different
    personalities, different needs, attitudes and values).

   Human resources are dynamic and behave differently.(They react to
    the same situation in quite different ways).

   HR are the most important element in an organization. The effective
    utilization of all other resources depend upon the quality of HR.

   The term HR is wider than the term Personnel. HR include all
    dynamic components of all the people at all levels in the
    organization, whereas personnel means the employees working in
    the organization.
   To help organization attain its goals by providing well trained and well
    motivated employees.
   To employ the skills and knowledge of employees efficiently and
    effectively, i.e., to utilize HR effectively.
   To enhance job satisfaction of employees by encouraging and assisting
    every employee to realize his full potential.
   To establish and maintain productive, self-respecting and internally
    satisfying working relationship among all the members of the
    organization.
   To bring about maximum development of individuals by providing
    opportunities for training and development.
   To maintain high morale and good HR within the organization.
   To help maintain ethical policies and behavior inside and outside the
    organization.
   To recognize and satisfy individual needs and group goals by offering
    appropriate monetary and non-monetary incentives.
As managers none of us would like to make the following mistakes:

   To hire the wrong person for the job.
   To experience high turnover .
   To find our people not doing their best.
   To waste time with countless and useless interviews.
   To be quoted under bad example of unsafe practices.
   To have some of your employees think their salaries are unfair and
    inequitable relative to others in the organization.
   To allow a lack of training to undermine your department's effectiveness
   To commit any unfair labor practices .
The Industrial Revolution



     Trade Unionism


 Scientific Management

   Industrial Psychology


      HR Movement


   Behavioral Science

        Employee
         Welfare
   The Industrial Revolution: Development of Machinery, Linking
    power to machines, establishing factories etc.
   Trade Union: Workers formed their unions to improve their lots so
    that management could be forced to redress grievances.
   Scientific Management: F.W. Taylor: (a) development of a true
    science.(b) Scientific selection and training of workers.(C)
    Friendly cooperation between management and workers.(d)
    Development of every worker to hid fullest potential.
   Industrial Psychology: It stressed on matching of employees skills
    with job. Contributions made to analyze the jobs in terms of their
    mental and emotional requirement and development of testing
    devices.
   HR Movement: Researches focused on the attitude and feelings of
    workers and their influence on productivity. The role of informal
    groups in industry were highlighted. It was suggested that
    interpersonal relationships should be improved.
   Behavioral       Science:      Research      in     anthropology
    , sociology, psychology, etc. has provided the subject matter for
    HRM. Behavioral Science era led to the development of new
    techniques of motivation and leadership e.g., employee
    participation, 2 way communication, management by objectives
    etc.

   Employee welfare: With the dawn of welfare era, scope of HRM
    increased.   It    is   not    only   concerned    now     with
    recruitment, selection, and training of employees. It manages
    employee benefits programmes and industrial relations system in
    industry.
   The commodity concept
   The factor of production concept
   The paternalistic concept (Fatherly figure)
   The Humanitarian concept(Employees right to be protected by
    employer as human being)
   The HR Concept (Valuable assets)
   The Emerging Concept (Employees are considered as partners in
    the industry)
   Line manager:- Gives Orders
   Staff Manager:- Gives Advice


HR Managers’ Duties
                                       A coordinate
         A line function                 function




                   Staff function
                 (assist and advise)
Staffing


Training and Development


              Motivation

                  Maintenance
Managerial     Operative
 Function      Function



 Planning
              Procurement


Organizing    Development


              Compensation
Directing

               Integration

Controlling
              Maintenances
Job Analysis

   HR Planning

      Recruitment

          Selection

               Placement

                  Induction

                      Transfer

                           Promotion

                              Separation
Performance Appraisal


             Training


             Executive Development


                        Career Planning &
                          Development
Job Evaluation


      Wage & Salary
      Administration


            Bonus & Incentives


                        Payroll
Motivation

  Job Satisfaction

    Grievance Redressal

         Collective Bargaining

             Conflict Management

                Employees’ Partiicipation

                            Discipline
Health

    Safety

     Social Security

         Welfare Schemes

                HR Records

                       HR Research

                            HR Audit
   Staffing - Process through which organization ensures it always has
    proper number of employees with appropriate skills in right jobs at right
    time to achieve organizational objectives.

   Job analysis - Systematic process of determining skills, duties, and
    knowledge required for performing jobs in organization.

   Human resource planning - Systematic process of matching the internal
    and external supply of people with job openings anticipated in the
    organization over a specified period of time .

   Recruitment - Process of attracting individuals on a timely basis, in
    sufficient numbers, and with appropriate qualifications, to apply for jobs
    with an organization.

   Selection - Process of choosing from a group of applicants the individual
    best suited for a particular position and the organization .
   The process whereby jobs are investigated in sufficient detail to
    enable(a)recruitment of people (b)assessment of the
    performance of people who are already working.

         Job analysis identifies the following information:

   Detailed breakdown of the duties involved in a position.
   Skills, knowledge, attitudes and experience a person should
    bring to the position.
   Environment condition of the job.
Job Description
   Critical skills required for the job
   Tasks or performance standard,
   Responsibilities and disciplinary procedures
   Service condition of the job
   Pay rates
Job Specifications
   Describes the requirements of the person for the job
   Abilities
   Educational qualifications
   Special physical and mental skills
   Training
   Experience and others
   Initial attraction & screening of applicants.

Internal Sources
 Job Posting

 Succession Plans

 Referrals



External Sources
 Ads

 Job Placement Agencies

 Internet

 Placement through Colleges and Universities
Application Evaluation Methods of Selection:
   Interviews
   Tests
   Background Investigations
   Medical Tests
                                      Hiring

This is the process of appointing the person selected for a particular job.


                                    Induction

•Introducing the employee to the organization and the organization’s culture.
•Introducing the employee to his/her job.
Employee training
 Designed to assist employees in acquiring better skills for their current
  jobs.
 Employee development

 Designed to help organization to ensure that it has the necessary talent
  internally for meeting the future human resource needed.
Organization Development

   Deals with facilitating system–wide change in the organization.
   Career development
   Designed to assist employees in advancing their work lives. However, it
    is a responsibility of the individual, not of the organization (employee
    centered).
   Training - Designed to provide learners with knowledge and skills
    needed for their present jobs

   Development - Involves learning that goes beyond today's job; it has
    more long-term focus

   Career development - Formal approach used by organization to ensure
    that people with proper qualifications and experiences are available when
    needed

   Organization development - Planned process of improving organization
    by developing its structures, systems, and processes to improve
    effectiveness and achieving desired goals

   Performance management - Goal-oriented process directed toward
    ensuring organizational processes are in place to maximize productivity
    of employees, teams, and ultimately, the organization
   Performance appraisal - Formal system of review and evaluation of
    individual or team task performance
   An employee’s intrinsic enthusiasm about and drive to accomplish work.

Maintenance-retention of productive employees

   Welfare Administration
   Medical facilities
   Canteen facilities
   Housing facilities
   Transport facilities
   Recreation facilities
   Loan facilities
   Educational facilities
   Various Incentive schemes/clear view of retirement benefit
   Employees who work in safe environment and enjoy good health are
    more likely to be productive and yield long-term benefits to
    organization.

   Safety - Involves protecting employees from injuries caused by work-
    related accidents.

   Health - Refers to employees' freedom from illness and their general
    physical and mental well being.

   Employee assistance programs
   Medical
   Dental
   Accidental
   Educational
   Retirement
   Direct Financial Compensation - Pay that person receives in form of
    wages, salaries, bonuses, and commissions.

   Indirect Financial Compensation (Benefits) - All financial rewards not
    included in direct compensation such as paid vacations, sick leave,
    holidays, and medical insurance.

   Nonfinancial Compensation - Satisfaction that person receives from
    job itself or from psychological and/or physical environment in which
    person works.
   It is concerned with protecting and promoting the physical and
    mental health of employees. For this , several types of fringe
    benefits such as housing, medical aid, educational facilities,
    conveyance facilities etc. are provided.

   Social security measures are provided such as; PF, Pension plans,
    gratuity, maternity benefits disablement allowances, group
    insurance etc.
The Changing Environment of
           HRM
Companies dealing across the nation : Sony, Apple, Nike, Mercedes
Benz, Infosys, TCS etc.
Benefits to the consumer: Variety of products and services at
                         low cost (Ex: From computer to car).

Threat: More competent and knowledgeable people required,
       Outsourced from other countries.

Ex: Indian IITS, Engineers move abroad for projects.
   High- Tech Job: Ex-Skilled machinist required.

   Service Jobs: More intellect people required.

   Knowledge work and Human Capital: The knowledge, education,
    training, skills, and expertise of a firm’s worker.
     (Management Guru Peter Drucker predicted several years ago, “
    the center of gravity in employment is moving fast from manual
    and clerical workers to knowledge workers”).

   Nature of work and facilities provided.(Ex: Same Software
    implication in two different banks but results came different ).

   Work Force     Demographic    Trends:   Age,     Education,   Family
    Background.
Strategic HRM

Creating High-Performance Work system


              Managing technology
What is a Policy:

   A policy is a predetermined course of action established as a guide toward
    accepted objectives and strategies of the organization.

   A vision is formulated, business processes are analyzed, and policy and
    procedure systems to support the vision are born. As policies and
    procedures are written, approved, published, and implemented, the
    company’s vision is articulated.
   Policy manuals are developed to help staff and management teams run
    the organization.

   In best use situations, policies play a strategic role in an organization.

   They are developed in light of the mission and objectives of the company
    and they become the media by which management’s plans, rules, intents,
    and business processes become documented and communicated to all
    staff.

   Carefully drafted and standardized policies and procedures save the
    company countless hours of management time.

   The consistent use and interpretation of such policies, in an evenhanded
    and fair manner, reduces management's concern about legal issues
    becoming legal problems.
   To provide fair, acceptable & efficient leadership

   To provide an opportunity for expansion & voice in management

   To strengthen & appreciate the human assets continuously by providing
    training & developmental programs

   To provide facilities & conditions of work & creation of favorable
    atmosphere for maintaining stability of employment

   To attain an effective utilization of human resources in the achievement
    of organizational goals, etc
Employment Policies
  These are the policies that guide hiring practices, orientation of new
  employees, compliance with employment laws, and confidentiality.
Employment Status & Records
  These are the policies that define such issues as employment
  classifications, access to personnel files and guidance on how
  background checks and performance reviews are to be performed.
Employee Benefits
  These are policies that explain employee benefits such as insurance,
  vacations, holidays, leave, and employee reimbursements.
Payroll
  These are policies that are related to salary and wage administration
  including deductions, pay advances, and time keeping.
Workplace Guidelines
  These policies are quite varied and their purpose range from defining
 certain work arrangements such as flex time and telecommuting to offering
 guidelines on the use of company assets and record retention.

Employee Conduct
  These policies are guidelines that control employer behavior and conduct
 on the job. The mainstay of this section is a code of conduct but also
 important are policies regarding substance abuse, smoking, harassment, and
 workplace violence.

E-Policies
  These policies guide staff in the use of the organization’s information
  technology. Policies defining acceptable and prohibited activities and use
  of e-mail and the Internet make up a majority of these policies
Hrm class ppt

Hrm class ppt

  • 2.
    Traditionally the term personnel management was used to refer to the set of activities concerning the workforce which included staffing, payroll, contractual obligations and other administrative tasks.  In this respect, personnel management encompasses the range of activities that are to do with managing the workforce rather than resources.  Personnel Management is more administrative in nature and the Personnel Manager’s main job is to ensure that the needs of the workforce as they pertain to their immediate concerns are taken care of.  Further, personnel managers typically played the role of mediators between the management and the employees and hence there was always the feeling that personnel management was not in tune with the objectives of the management.
  • 3.
    1. The procurement function- obtaining of a proper kind and number of personnel necessary to accomplish an organization’s goals. 2. The development function- personnel development of employees, training. 3. The compensating function- securing adequate and equitable remuneration to personnel. 4. The Integration function- an “integration” of human resources with organization through job enlargement, job evaluation, variable compensation plans, disciplinary action programs. 5. The maintenance function- maintaining the physical conditions of employees (health and safety measures) and employee service programs.
  • 4.
    Human resource management is concerned with the development and implementation of people strategies, which are integrated with corporate strategies, and ensures that the culture, values and structure of the organization, and the quality, motivation and commitment of its members contribute fully to the achievement of its goals.  Definition: HRM is the process of acquiring, training, appraising, and compensating employees, and of attending to their labor relations, health & safety, and fairness concern.
  • 5.
    With the advent of resource centric organizations in recent decades, it has become imperative to put “people first” as well as secure management objectives of maximizing the ROI (Return on Investment) on the resources.  This has led to the development of the modern HRM function which is primarily concerned with ensuring the fulfillment of management objectives and at the same time ensuring that the needs of the resources are taken care of.  In this way, HRM differs from personnel management not only in its broader scope but also in the way in which its mission is defined.  HRM goes beyond the administrative tasks of personnel management and encompasses a broad vision of how management would like the resources to contribute to the success of the organization.
  • 6.
    Human Resources are heterogeneous.(Different people, different personalities, different needs, attitudes and values).  Human resources are dynamic and behave differently.(They react to the same situation in quite different ways).  HR are the most important element in an organization. The effective utilization of all other resources depend upon the quality of HR.  The term HR is wider than the term Personnel. HR include all dynamic components of all the people at all levels in the organization, whereas personnel means the employees working in the organization.
  • 7.
    To help organization attain its goals by providing well trained and well motivated employees.  To employ the skills and knowledge of employees efficiently and effectively, i.e., to utilize HR effectively.  To enhance job satisfaction of employees by encouraging and assisting every employee to realize his full potential.  To establish and maintain productive, self-respecting and internally satisfying working relationship among all the members of the organization.  To bring about maximum development of individuals by providing opportunities for training and development.  To maintain high morale and good HR within the organization.  To help maintain ethical policies and behavior inside and outside the organization.  To recognize and satisfy individual needs and group goals by offering appropriate monetary and non-monetary incentives.
  • 8.
    As managers noneof us would like to make the following mistakes:  To hire the wrong person for the job.  To experience high turnover .  To find our people not doing their best.  To waste time with countless and useless interviews.  To be quoted under bad example of unsafe practices.  To have some of your employees think their salaries are unfair and inequitable relative to others in the organization.  To allow a lack of training to undermine your department's effectiveness  To commit any unfair labor practices .
  • 9.
    The Industrial Revolution Trade Unionism Scientific Management Industrial Psychology HR Movement Behavioral Science Employee Welfare
  • 10.
    The Industrial Revolution: Development of Machinery, Linking power to machines, establishing factories etc.  Trade Union: Workers formed their unions to improve their lots so that management could be forced to redress grievances.  Scientific Management: F.W. Taylor: (a) development of a true science.(b) Scientific selection and training of workers.(C) Friendly cooperation between management and workers.(d) Development of every worker to hid fullest potential.  Industrial Psychology: It stressed on matching of employees skills with job. Contributions made to analyze the jobs in terms of their mental and emotional requirement and development of testing devices.  HR Movement: Researches focused on the attitude and feelings of workers and their influence on productivity. The role of informal groups in industry were highlighted. It was suggested that interpersonal relationships should be improved.
  • 11.
    Behavioral Science: Research in anthropology , sociology, psychology, etc. has provided the subject matter for HRM. Behavioral Science era led to the development of new techniques of motivation and leadership e.g., employee participation, 2 way communication, management by objectives etc.  Employee welfare: With the dawn of welfare era, scope of HRM increased. It is not only concerned now with recruitment, selection, and training of employees. It manages employee benefits programmes and industrial relations system in industry.
  • 12.
    The commodity concept  The factor of production concept  The paternalistic concept (Fatherly figure)  The Humanitarian concept(Employees right to be protected by employer as human being)  The HR Concept (Valuable assets)  The Emerging Concept (Employees are considered as partners in the industry)
  • 13.
    Line manager:- Gives Orders  Staff Manager:- Gives Advice HR Managers’ Duties A coordinate A line function function Staff function (assist and advise)
  • 15.
    Staffing Training and Development Motivation Maintenance
  • 16.
    Managerial Operative Function Function Planning Procurement Organizing Development Compensation Directing Integration Controlling Maintenances
  • 17.
    Job Analysis HR Planning Recruitment Selection Placement Induction Transfer Promotion Separation
  • 18.
    Performance Appraisal Training Executive Development Career Planning & Development
  • 19.
    Job Evaluation Wage & Salary Administration Bonus & Incentives Payroll
  • 20.
    Motivation JobSatisfaction Grievance Redressal Collective Bargaining Conflict Management Employees’ Partiicipation Discipline
  • 21.
    Health Safety Social Security Welfare Schemes HR Records HR Research HR Audit
  • 22.
    Staffing - Process through which organization ensures it always has proper number of employees with appropriate skills in right jobs at right time to achieve organizational objectives.  Job analysis - Systematic process of determining skills, duties, and knowledge required for performing jobs in organization.  Human resource planning - Systematic process of matching the internal and external supply of people with job openings anticipated in the organization over a specified period of time .  Recruitment - Process of attracting individuals on a timely basis, in sufficient numbers, and with appropriate qualifications, to apply for jobs with an organization.  Selection - Process of choosing from a group of applicants the individual best suited for a particular position and the organization .
  • 23.
    The process whereby jobs are investigated in sufficient detail to enable(a)recruitment of people (b)assessment of the performance of people who are already working. Job analysis identifies the following information:  Detailed breakdown of the duties involved in a position.  Skills, knowledge, attitudes and experience a person should bring to the position.  Environment condition of the job.
  • 24.
    Job Description  Critical skills required for the job  Tasks or performance standard,  Responsibilities and disciplinary procedures  Service condition of the job  Pay rates Job Specifications  Describes the requirements of the person for the job  Abilities  Educational qualifications  Special physical and mental skills  Training  Experience and others
  • 25.
    Initial attraction & screening of applicants. Internal Sources  Job Posting  Succession Plans  Referrals External Sources  Ads  Job Placement Agencies  Internet  Placement through Colleges and Universities
  • 26.
    Application Evaluation Methodsof Selection:  Interviews  Tests  Background Investigations  Medical Tests Hiring This is the process of appointing the person selected for a particular job. Induction •Introducing the employee to the organization and the organization’s culture. •Introducing the employee to his/her job.
  • 27.
    Employee training  Designedto assist employees in acquiring better skills for their current jobs.  Employee development  Designed to help organization to ensure that it has the necessary talent internally for meeting the future human resource needed. Organization Development  Deals with facilitating system–wide change in the organization.  Career development  Designed to assist employees in advancing their work lives. However, it is a responsibility of the individual, not of the organization (employee centered).
  • 28.
    Training - Designed to provide learners with knowledge and skills needed for their present jobs  Development - Involves learning that goes beyond today's job; it has more long-term focus  Career development - Formal approach used by organization to ensure that people with proper qualifications and experiences are available when needed  Organization development - Planned process of improving organization by developing its structures, systems, and processes to improve effectiveness and achieving desired goals  Performance management - Goal-oriented process directed toward ensuring organizational processes are in place to maximize productivity of employees, teams, and ultimately, the organization  Performance appraisal - Formal system of review and evaluation of individual or team task performance
  • 29.
    An employee’s intrinsic enthusiasm about and drive to accomplish work. Maintenance-retention of productive employees  Welfare Administration  Medical facilities  Canteen facilities  Housing facilities  Transport facilities  Recreation facilities  Loan facilities  Educational facilities  Various Incentive schemes/clear view of retirement benefit
  • 30.
    Employees who work in safe environment and enjoy good health are more likely to be productive and yield long-term benefits to organization.  Safety - Involves protecting employees from injuries caused by work- related accidents.  Health - Refers to employees' freedom from illness and their general physical and mental well being.  Employee assistance programs  Medical  Dental  Accidental  Educational  Retirement
  • 31.
    Direct Financial Compensation - Pay that person receives in form of wages, salaries, bonuses, and commissions.  Indirect Financial Compensation (Benefits) - All financial rewards not included in direct compensation such as paid vacations, sick leave, holidays, and medical insurance.  Nonfinancial Compensation - Satisfaction that person receives from job itself or from psychological and/or physical environment in which person works.
  • 32.
    It is concerned with protecting and promoting the physical and mental health of employees. For this , several types of fringe benefits such as housing, medical aid, educational facilities, conveyance facilities etc. are provided.  Social security measures are provided such as; PF, Pension plans, gratuity, maternity benefits disablement allowances, group insurance etc.
  • 33.
  • 34.
    Companies dealing acrossthe nation : Sony, Apple, Nike, Mercedes Benz, Infosys, TCS etc.
  • 35.
    Benefits to theconsumer: Variety of products and services at low cost (Ex: From computer to car). Threat: More competent and knowledgeable people required, Outsourced from other countries. Ex: Indian IITS, Engineers move abroad for projects.
  • 36.
    High- Tech Job: Ex-Skilled machinist required.  Service Jobs: More intellect people required.  Knowledge work and Human Capital: The knowledge, education, training, skills, and expertise of a firm’s worker. (Management Guru Peter Drucker predicted several years ago, “ the center of gravity in employment is moving fast from manual and clerical workers to knowledge workers”).  Nature of work and facilities provided.(Ex: Same Software implication in two different banks but results came different ).  Work Force Demographic Trends: Age, Education, Family Background.
  • 37.
    Strategic HRM Creating High-PerformanceWork system Managing technology
  • 38.
    What is aPolicy:  A policy is a predetermined course of action established as a guide toward accepted objectives and strategies of the organization.  A vision is formulated, business processes are analyzed, and policy and procedure systems to support the vision are born. As policies and procedures are written, approved, published, and implemented, the company’s vision is articulated.
  • 39.
    Policy manuals are developed to help staff and management teams run the organization.  In best use situations, policies play a strategic role in an organization.  They are developed in light of the mission and objectives of the company and they become the media by which management’s plans, rules, intents, and business processes become documented and communicated to all staff.  Carefully drafted and standardized policies and procedures save the company countless hours of management time.  The consistent use and interpretation of such policies, in an evenhanded and fair manner, reduces management's concern about legal issues becoming legal problems.
  • 40.
    To provide fair, acceptable & efficient leadership  To provide an opportunity for expansion & voice in management  To strengthen & appreciate the human assets continuously by providing training & developmental programs  To provide facilities & conditions of work & creation of favorable atmosphere for maintaining stability of employment  To attain an effective utilization of human resources in the achievement of organizational goals, etc
  • 42.
    Employment Policies These are the policies that guide hiring practices, orientation of new employees, compliance with employment laws, and confidentiality. Employment Status & Records These are the policies that define such issues as employment classifications, access to personnel files and guidance on how background checks and performance reviews are to be performed. Employee Benefits These are policies that explain employee benefits such as insurance, vacations, holidays, leave, and employee reimbursements. Payroll These are policies that are related to salary and wage administration including deductions, pay advances, and time keeping.
  • 43.
    Workplace Guidelines These policies are quite varied and their purpose range from defining certain work arrangements such as flex time and telecommuting to offering guidelines on the use of company assets and record retention. Employee Conduct These policies are guidelines that control employer behavior and conduct on the job. The mainstay of this section is a code of conduct but also important are policies regarding substance abuse, smoking, harassment, and workplace violence. E-Policies These policies guide staff in the use of the organization’s information technology. Policies defining acceptable and prohibited activities and use of e-mail and the Internet make up a majority of these policies