Water
Wealth
Work
Health
Learning
The global challenge of work is two-fold.
First, will automation, in its various forms,
destroy jobs? And second, even if not, will
workers be paid enough to sustain the global
economic system? This is why the former US
Treasury Secretary Larry Summers has said
the problem of “good jobs” is the central
problem of the richer economies.
The combination of economic stagnation,
global competition and digital technology
has created something of a social and public
panic about work. We are losing “the race
against the machine,” or reaching “the end
of labor”. But there are two diverging stories
about the future of work, one dystopian,
one utopian, as Flipchart Rick has observed.
On the one hand: it “will revolutionise the
workplace … and enable us to have more
fulfilled working lives.” And on the other:
a future “of factories without people,
of vanishing jobs, of a hollowed out
labour market and … vast profits with
few employees.”
Our present model of work is, broadly,
a creature of the industrial revolution,
dominated by the division of labour, the
supervision of labour, and payment of
workers for their time or their tasks. This
includes so-called “new economy” models
such as Uber, whose casualisation of its
workforce would be recognised by any 19th
or 20th century dock-worker. Some of the
big shifts shaping work reinforce this model.
Others are starting to reshape it, potentially
marking the start of a transition beyond it.
To understand how this is likely to change
over the next decade and beyond, we need
to understand the global landscape of
work. These are a shift towards services, the
globalisation of supply chains, the growth
of ubiquitous technology, an increased
squeeze on resources, and a shift in social
values towards well-being. These pull in
different directions.
Globalisation and digitisation take you
towards rawer forms of capitalism, whereas
resources and values take you towards more
inclusive versions. The way you deliver
services depends on which model of these
two that you prefer. The version of the story
about the future of work you subscribe to
tends to depend on your assumptions about
how these drivers will play out.
The shift to services: The deep shift in the
global economy is in the long-term rise of
services to “become the dominant economic
activity” (UNIDO, 2009). The economists
Timmer and Akkus (2008) describe this as
a “powerful historical pathway of structural
transformation,” which every country follows.
One of the reasons for the long boom in
living standards in the 20th century was
because of the long boom in manufacturing,
futureagenda.org
What do you think? Join In | Add your views into the mix
The Global Challenge
The global challenge of
work is two-fold. First, will
automation, in its various
forms, destroy jobs?
And second, even if not,
will workers be paid enough
to sustain the global
economic system?
Manufacturing vs. Services
One of the reasons for the
long boom in living standards
in the 20th century was
because of the long boom in
manufacturing, the dominant
economic trend for much
of the century. Productivity
growth and economic growth
tends to fall as services
become dominant.
1
The Global Challenge
Energy
Food
Government
Loyalty
Privacy
Resources
Transport
Travel
Water
Wealth
Work
Health
Learning
Andrew Curry - Director, Global Knowledge Lead –
Global Resources,The Futures Company.
The Future of Work
the dominant economic trend for much of the
century. Productivity growth and economic
growth tends to fall as services become
dominant, and the influence of trades unions,
which are effective in maintaining the value
of wages, tends to decline.
The globalisation of the supply chain:
Manufacturing is also tradable, meaning
that it is open to export competition. The
growth of the Asian economies, in particular
China, has been extensively driven by
manufacturing. Taking a long view, Asia’s
share of world production almost doubled
between 1970 to 2008, from 15.5% to 28.5%,
at the expense of Europe and North America.
(Unido, 2009). This growth was driven largely
by the development of containerisation, not
digital technology, because it transformed
shipping costs.
But globalisation is reaching its limits. Wages
in export sectors in both China and India
are now relatively high (a pattern seen in
other emerging economies in the past) and
companies are moving their production
closer to their markets, both anticipating
rising transport costs and wanting to be able
to respond more flexibly to demand.
The other effect of globalisation, of course,
is an increase in migration: more than
500 million people globally now live in a
country they weren’t born in. Economists
generally agree that immigration is good
for economies. Migrants tend to be younger,
more enterprising, and economically active,
and their effect on wages, economic growth
and tax contributions is almost completely
positive. However, in weak labour markets
migration also tends to push down unskilled
wages by increasing competition for
such jobs; such competition is gamed by
unscrupulous employers.
The growth of ubiquitous technology: There
is a widespread fear that the rise of robots -
or more exactly, a combination of computing
power, algorithms and robotics - will destroy
the labour market, even, possibly, the very
idea of labour value. A widely publicised
study by Oxford University academics Carl
Benedikt Frey and Michael Osborne argued
that for the United States jobs are at high
risk of being automated in 47% of the
conventional occupational classifications
(Frey and Osborne, 2013). In The Second
Machine Age, Erik Brynjolfsson and Andy
McAfee suggest a reason: that computing
power is capable of exponential growth in
performance over time, and that we’re just
at the start of that progression. If robotics
did for blue-collar work, then artificial
intelligence will do for white collar work.
This argument, however, tends to miss
the fact that technological innovation,
historically, has created new jobs, typically
after a period of turbulent transition. In his
analysis of the labour market, David Autor
(2014) finds that between 1999 and 2007
“routine task-intensive” jobs were indeed
largely removed by computerisation, while
knowledge jobs (“abstract task-intensive”)
tended to survive or increase where human
knowledge was complemented by computers.
“Manual task-intensive” jobs, at the less-
skilled end of the market, were much less
affected by computerisation, and demand for
them seemed to be rising. Yet their wages
fell. His explanation: labour supply for these
jobs increased because of the collapse in
demand for “routine task-intensive” jobs.
The squeeze on resources: Population and
consumption pressures mean that we are
breaching many of the natural planetary
boundaries. For capitalism this is a new
game: traditionally it has been able to use
resources without worrying much about the
consequences. And after a century of cheap
energy, the long-run trend is up, despite the
current downward blip in the oil price. In
our recent Futures Company report The 21st
Century Business, Jules Peck and I argue that
this resource shift is changing the way that
companies behave; we are moving to post-
sustainability (socially, economically, and
environmentally). An important element is
a shift from consumers to citizens, among
both customers and employees, where the
overall impact of a business matters. An
example: it’s argued that one of the reasons
why McDonald’s sales are slumping among
Millennials is that eating there is depressing,
because of “the feeling that the people
behind the counter, flipping burgers and
taking orders, have dead-end jobs where
they’re treated poorly.”
2
What do you think? Join In | Add your views into the mix
Peak Globalisation
Globalisation is reaching
its limits. Wages in export
sectors in both China and
India are now relatively
high (a pattern seen in other
emerging economies in the
past) and companies are
moving their production
closer to their markets, both
anticipating rising transport
costs and wanting to be able
to respond more flexibly
to demand.
Positive Immigration
More than 500 million
people globally now live in
a country they weren’t born
in. Economists generally
agree that immigration
is good for economies.
Migrants tend to be younger,
more enterprising, and
economically active, and their
effect on wages, economic
growth and tax contributions
is almost completely positive
Technology Takeover
There is a widespread fear
that the rise of robots - or
more exactly, a combination
of computing power,
algorithms and robotics - will
destroy the labour market,
even, possibly, the very idea
of labour value.
Options and Possibilities
Energy
Food
Government
Loyalty
Privacy
Resources
Transport
Travel
Water
Wealth
Work
Health
Learning
3
The shift to wellbeing: One of the long
trends is a trend towards wellbeing,
physical and psychological, individual and
social. This complements one of the strong
workplace trends: that significant competitive
performance is typically produced only
by empowered and engaged employees,
who are intrinsically motivated to work for
the business. This is true of lower-wage
environments as well as higher-wage
businesses.
Striking research by Zeynep Ton (2014)
has found that companies such as Costco
in the United States and Mercadona in
Spain out-perform their sectors – by some
margin - through a combination of better
wages, significant investment in training,
and appropriate technological investment to
support staff. With such a “good jobs” strategy,
increases in wages translate directly into
far larger sales increases. High value work
benefits individuals, businesses, as well as
society as a whole.
What do you think? Join In | Add your views into the mix
Good Jobs
Companies such as Costco
in the United States and
Mercadona in Spain out-
perform their sectors – by
some margin - through a
combination of better wages,
significant investment in
training, and appropriate
technological investment
to support staff. With such a
“good jobs” strategy, increases
in wages translate directly
into far larger sales increases.
High value work benefits
individuals, businesses, as
well as society as a whole.
External Drivers
Much of “the labor market
woes” of the past decade are
not down to computerisation,
but to the financial crisis
and reduced investment
(starting with the dot.com
collapse) and the impact
of globalisation on labour
markets… Many middle-
skill jobs will prove more
resistant to unbundling than
advertised.
The current discussion about the future of
work seems to be monopolised by the version
of the future in which technology destroys
jobs. It has gained an air of inevitability, as
if it is the only possible future. NESTA’s open
minded report suggested that the “robots
hypothesis” resonated because it connected
“two powerful themes in popular culture: the
rapid advance of IT, and the startling growth
in inequality.” But there is a problem: it hasn’t
happened before.
Indeed, the idea that investment in
more productive technologies leads to
unemployment is dismissed by economists
as “the lump of labour fallacy.” In the past,
investment in the new technologies has
created new capacity and new wealth, which
was re-invested to create more, higher value
jobs. If this time is different, we need to
understand why this is so.
There are candidates. Brynjolfsson and
McAfee’s claim that digital technologies are
different because they create exponential
growth is one. Another is that companies
can no longer draw on plentiful resources
or cheap energy to drive new investment
platforms. A third is that previous waves were
driven by manufacturing, which generated
new value through productivity gains
and created the social conditions for
trades unions.
However, it is also the case that this fear
typically recurs after a crisis. It is not
coincidence that Keynes wrote his famous
essay on the challenge of technological
unemployment just after the 1929 crash.
So it is also worth considering reasons why it
might just be a phase. The economic historian
Carlota Perez has a model of technological
development that describes five long waves,
or surges, since the Industrial Revolution.
Each is around 50-60 years and follows an
S-curve pattern; the last quarter of each is
marked by saturated markets, diminishing
investment opportunities and declining
returns. The first part of the 20th century
was dominated by the oil and auto surge;
the latter part by ICT. The ICT wave is now
reaching the turning point at which returns
start to fall.
On this model, finance is looking for new
opportunities, and although it is too early to
say what the next platform will be, and we’re
still 10-15 years away from it, it is possible
to imagine that the next technological surge
might be built around, say, a material such
as graphene.
David Autor concludes that much of “the
labor market woes” of the past decade are
not down to computerisation, but to the
financial crisis and reduced investment
(starting with the dot.com collapse) and the
impact of globalisation on labour markets.
And he suggests that many middle-skill jobs
will prove more resistant to unbundling than
advertised; while computers can do specific
4
What do you think? Join In | Add your views into the mix
tasks, turning collections of tasks into self-
contained jobs, and then automating them,
requires substantial investment. In the long
run, people are both more flexible
and cheaper.
One implication is that the question of
the future of work may actually be about
power in the labour market. This leads
to broadly political interpretations of the
future of working conditions, ranging from
Guy Standing’s formulation of the fragile
“precariat”, facing intermittent, insecure work,
David Weil’s description of the “fissured
workplace”, in which many functions are
sub-contracted, and the rise of campaigns
for the Living Wage. Perhaps the dividing
line is best-expressed in Alex Payne’s widely
circulated open letter to the tech venture
capitalist Marc Andreesen: “You seem to think
everyone’s worried about robots. But what
everyone’s worried about is you, Marc. Not
just you, but people like you. Robots aren’t at
the levers of financial and political influence
today, but folks like you sure are.”
Proposed way forward
Aging
Cities
Commerce
Connectivity
Data
Education
Energy
Food
Government
Loyalty
Privacy
Resources
Transport
Travel
Water
Wealth
Work
Health
Learning
The way forward depends on how you
prefer to read this bifurcation between the
technologists and the sceptics. We don’t know
which group is right: there are no future
facts. But there are some observations that
can help shape our perspectives on this.
The first is that these widely divergent views
are a feature of this point in the technology
cycle. The most the most excitable
projections of the future of the car were
seen at just this point on the oil and auto
curve in the 1950s. The technology S-curve
in Figure 1, based on the work of Carlota
Figure 1
Source: Carlota Perez/ additional analysis by The
Futures Company
5
What do you think? Join In | Add your views into the mix
Perez, helps us to understand why. At this
point, when the S-curve is at or approaching
its second inflection point, people have been
experiencing rapid technological change
for the best part of two generations. The
notion that “the only constant is change” has
become a breathless platitude in the public
discourse. So, the technologists’ perspective
(point ’t’ in Figure 1) is a projection of this
steep ramp. The sceptics note instead sign of
falling returns and declining customer utility
- and see a flattening of the line (point ’s). The
gap is large, and one’s perspective on it is a
matter of worldview, not evidence.
Second, almost all business innovation
and new business value is driven by the
application of knowledge, and the way it is
embedded in individuals, teams, and systems.
The Futures Company has explored this
in recent research with the Association of
Finnish Work on the idea of ‘high value work.’
The important point here is that this is true
of a whole range of knowledge, including
knowledge of service and customers, and
knowledge of culture and place, as well
as technological knowledge. The most
successful businesses use technology to
complement and enhance this knowledge,
not to replace it.
Third, the trend towards is a deep and
powerful one. If Millennials express a desire
for meaningful work, this is also true more
broadly. We are on the cusp of a transition
to a world where, as Hardin Tibbs (2011) has
argued, half of the populations of Europe and
the United States subscribe to post-modern
values (drawing on Inglehart) of autonomy
and diversity. The workplace will not escape
this trend. One way in which this is expressed
is in a transition from consumer or employee
to citizen. Increasingly, anyone with any
degree of choice in the labour market is
choosing employees who recognise them as
a whole person, not just as a unit of labour.
The evidence suggests that the engagement
that the employer gets in return (even, say,
in retail) is a powerful driver of performance
and profitability.
Fourth, the bargain that businesses struck
in the 1980s and 1990s, as they enforced
flexibility and “downsized” headcount, may
turn out to be a Faustian pact. Shedding jobs
and exerting tight control of labour markets
increased short-run profits. But at the same
time that same control squeezed out their
sources of growth. And as both the OECD
(Cingano, 2014) and the IMF (Ostry et al,
2014) have noted recently, wage inequality
has been a further drag on economic growth.
To regain growth, they are likely to have to
increase wages and give back some control
and power to their workforces.
My own best guess is that we are not headed
for long-run technological unemployment. I
have changed my mind about this over the
past year as I have spent more time with the
evidence.
The explanation that seems best to fit
present state of work and labour markets is
that it has been through a “perfect storm”
of a globalised workforce, the deskilling of
routine work (which was highly vulnerable to
automation) and the shift of these workers
into manual or service work, and aggressive
deregulation of labour markets driven by a
neoliberal political agenda.
The discourse around technological
unemployment is not persuasive to me. The
“abstract” jobs (using David Autor’s analysis
above) will be complemented by technology,
and so, in a different way, will be the manual
jobs. Meanwhile, the projected gains from
Artificial Intelligence and analytics are
going to be harder to achieve than currently
anticipated. As an example, big data gets
less useful as the data sets get larger, and
the driverless car, the poster child for the
tech future, is a far tougher proposition
than Google lets on. Meanwhile, these tech
scenarios never seem to include the new
jobs that will emerge as we understand
better the potential of the technologies,
other, sometimes, than as a panic about the
possible speed of change.
But, and it is a big but, we’re only part of the
way through the dislocation to work and to
labour markets caused by this perfect storm.
Things will not get better quickly.
Post Modern Workplaces
We are on the cusp of a
transition to a world where,
half of the populations of
Europe and the United States
subscribe to post-modern
values of autonomy and
diversity. The workplace will
not escape this trend.
Perfect Storm
The explanation that
seems best to fit present
state of work and labour
markets is that it has been
through a “perfect storm” of
a globalised workforce, the
deskilling of routine work
(which was highly vulnerable
to automation) and the
shift of these workers into
manual or service work, and
aggressive deregulation of
labour markets driven by a
neoliberal political agenda.
Impact and implications
Energy
Food
Government
Loyalty
Privacy
Resources
Transport
Travel
Water
Wealth
Work
Health
Learning
6
What do you think? Join In | Add your views into the mix
Looking at the shorter-term impacts, then, it’s
possible to see a range of approaches to this
turbulence in the world of work. Government
have options, largely about whether to
intervene in labour markets to influence work
outcomes, or not. But employers are also
moving to new strategies not out of goodwill
but through self-interest.
These options, highly simplified, are shown
in the matrix (Figure 2), which contrasts
laisser-faire approaches with interventionist
approaches. 		
The race to the bottom: This laisser-faire
option operates on the principle that labour
market flexibility is the secret to increased
employment in a globalised labour market.
In practice, nearly all countries have increased
flexibility and permitted more casualised work
over the past decade - even somewhere with
a strong tradition of labour protection such as
Germany.The evidence increasingly suggests,
however, that the pursuit of low value jobs
leads to a vicious cycle of low productivity, low
investment, low growth, and low tax and social
contribution from business.
This policy approach also involves
government subsidy to employers, as low-paid
workers are supported by state payments. In
the United States, a study showed that the
fast food sector was effectively subsidised to
the tune of $6 billion because its low paid
workers were dependent on food stamps and
subsidised housing. Increasingly this looks like
a political choice that is no longer supported
by economic evidence.
Enlightened self interest: It appears that
employers who pay better and create better
working environments do better financially.
Walmart is a relevant case. Over the last
decade, its share price has been broadly
stagnant, while Costco has outperformed it
“by a considerable margin”, in terms of sales,
earnings or stock market returns. One reason:
according to HBR, far lower staff turnover
means knowledge is kept in the company- and
drives customer engagement. Such employers
also invest in technology to enhance the
performance of their staff, using each to
complement the other.The Spanish retailer
Mercadona similarly invests heavily both in
training and stock management systems.
Wages and labour performance are also
becoming part of businesses’ reputational
capital. See, for example, the increasing
success of the UK Living Wage campaign in
signing up large companies as “living wage
employers”.The public sector can encourage
this, for example by giving tax breaks or other
forms of support to companies who deliver
such commitments, and sharing evidence of
business benefits.
Figure 2
Source: Andrew Curry/The Futures Company
7
Keeping the market honest: Turning to more
interventionist approaches, the state can take
the view that it wants to drive unscrupulous
low-wage employers out of the market as a
way of driving up standards and investment
(because low-wage, employers are unlikely to
commit to training, and have little incentive
to invest in capital equipment, which reduces
productivity.) This leads to approaches such
as enforcing (and increasing) minimum wages,
both through regulation and legal frameworks,
and also through public procurement rules.
Such a policy complements the “enlightened
self-interest” approach by removing free-
riders from the market.Although conventional
wisdom has argued in the past that minimum
wage legislation costs jobs, this seems to be a
weaker effect than claimed.
Re-imagining work: Much of our intervention
in the labour market is driven by a view that it
creates social goods, both from an economic
perspective and also from a social perspective
(over a long period studies have shown that
worklessness produces adverse psychological
and physical effects). But it is possible that
such findings are linked to a set of “modernist”
social values that are rapidly giving way to
“post-materialist” values. Certainly, people with
some income and a degree of social capital
who do not have to work find worthwhile
things to do, including volunteering.This is
part of the argument for the Basic Income:
that as we move to the “post-industrial” world
envisioned by Daniel Bell, in which skills are
more embodied in personal knowledge, that
encouraging traditional work is no longer the
only, or the best, way to get the social benefits
from productive engagement.
The rise of the basic income: Until very
recently, the idea of a basic income, a
minimum sum paid to all people regardless
of their work status, was right of the fringe
of political discourse. But it has been moving
rapidly towards the mainstream.The idea has
deep roots: George Bernard Shaw promoted it
as “a vagabond’s wage” a century ago.
The analysis in this provocation helps to
explain why. It is a policy idea that helps to
improve outcomes whether the technologists
or the sceptics turn out to be right.And in the
meantime it helps to shore up economies, and
individuals, that are struggling in the slow
readjustment of labour markets.
If the “robots” hypothesis is right, we’ll need
a basic income to make the economy work
(markets need people who can afford to buy
products). If the market power argument is
right, then basic income keeps employers
honest, by ensuring they have to pay good
enough wages, in good enough conditions, to
attract and keep their workers. One interesting
side effect is that it would mean that our
fundamental notions of the value of paid
work could be about to shift, for the first time
since the Industrial Revolution.A recurring
feature of the ICT era has been that questions
of power and politics have frequently been
diagnosed as issues of technology.The future
of work is just the same.
What do you think? Join In | Add your views into the mix
Director, Global Knowledge Lead –
Global Resources,The Futures Company.
Lead expert on the Future of Work.
Andrew Curry is a Director at The Futures
Company where he leads the public sector
team, and specializes in futures and scenarios
projects. His career began as a financial
journalist, working for the BBC and Channel
4 News. From there he migrated into new
media where among other activities, Andrew
launched Britain’s first interactive television
channel in the 1990s. His interest in futures
partly developed from arguing with some
of the more fanciful forecasters in the
Lead Expert – Andrew Curry
Minimum Wage
Until very recently, the idea
of a basic income, a minimum
sum paid to all people
regardless of their work
status, was right of the fringe
of political discourse. But
it has been moving rapidly
towards the mainstream.
In an increasingly interconnected, complex
and uncertain world, many organisations
are looking for a better understanding
of how the future may unfold. To do this
successfully, many companies, institutions
and governments are working to improve
their use of strategic foresight in order to
anticipate emerging issues and prepare for
new opportunities.
Experience shows that change often occurs
at the intersection of different disciplines,
industries or challenges. This means that
views of the future that focus on one sector
alone have limited relevance in today’s world.
In order to have real value, foresight needs
to bring together multiple informed and
credible views of emerging change to form
a coherent picture of the world ahead. The
Future Agenda programme aims to do this
by providing a global platform for collective
thought and innovation discussions.
Get Involved
To discuss the future agenda programme and
potential participation please contact:
Dr.Tim Jones
Programme Director
Future Agenda
84 Brook Street, London. W1K 5EH
+44 203 0088 141 +44 780 1755 054
tim.jones@futureagenda.org
@futureagenda
The Future Agenda is the world’s largest open
foresight initiative. It was created in 2009 to
bring together views on the future from many
leading organizations. Building on expert
perspectives that addressed everything from
the future of health to the future of money,
over 1500 organizations debated the big
issues and emerging challenges for the next
decade. Sponsored globally by Vodafone
Group, this groundbreaking programme
looked out ten years to the world in 2020
and connected CEOs and mayors with
academics and students across 25 countries.
Additional online interaction connected over
50,000 people from more than 145 countries
who added their views to the mix. All output
from these discussions was shared via the
futureagenda.org website.
The success of the first Future Agenda
Programme stimulated several organizations
to ask that it should be repeated. Therefore
this second programme is running
throughout 2015 looking at key changes
in the world by 2025. Following a similar
approach to the first project, Future Agenda
2.0 builds on the initial success and adds
extra features, such as providing more
workshops in more countries to gain an
even wider input and enable regional
differences to be explored. There is also
a specific focus on the next generation
including collaborating with educational
organizations to engage future leaders. There
is a more refined use of social networks
to share insights and earlier link-ups with
global media organizations to ensure wider
engagement on the pivotal topics. In addition,
rather than having a single global sponsor,
this time multiple hosts are owning specific
topics wither globally or in their regions of
interest. Run as a not for profit project, Future
Agenda 2.0 is a major collaboration involving
many leading, forward-thinking organisations
around the world.
Context – Why Foresight?
8
What do you think? Join In | Add your views into the mix www.futureagenda.org
About Future Agenda
Future Agenda 1.0 Future Agenda 2.0

Future of work An initial perspective by Andrew Curry of The Futures Company

  • 1.
    Water Wealth Work Health Learning The global challengeof work is two-fold. First, will automation, in its various forms, destroy jobs? And second, even if not, will workers be paid enough to sustain the global economic system? This is why the former US Treasury Secretary Larry Summers has said the problem of “good jobs” is the central problem of the richer economies. The combination of economic stagnation, global competition and digital technology has created something of a social and public panic about work. We are losing “the race against the machine,” or reaching “the end of labor”. But there are two diverging stories about the future of work, one dystopian, one utopian, as Flipchart Rick has observed. On the one hand: it “will revolutionise the workplace … and enable us to have more fulfilled working lives.” And on the other: a future “of factories without people, of vanishing jobs, of a hollowed out labour market and … vast profits with few employees.” Our present model of work is, broadly, a creature of the industrial revolution, dominated by the division of labour, the supervision of labour, and payment of workers for their time or their tasks. This includes so-called “new economy” models such as Uber, whose casualisation of its workforce would be recognised by any 19th or 20th century dock-worker. Some of the big shifts shaping work reinforce this model. Others are starting to reshape it, potentially marking the start of a transition beyond it. To understand how this is likely to change over the next decade and beyond, we need to understand the global landscape of work. These are a shift towards services, the globalisation of supply chains, the growth of ubiquitous technology, an increased squeeze on resources, and a shift in social values towards well-being. These pull in different directions. Globalisation and digitisation take you towards rawer forms of capitalism, whereas resources and values take you towards more inclusive versions. The way you deliver services depends on which model of these two that you prefer. The version of the story about the future of work you subscribe to tends to depend on your assumptions about how these drivers will play out. The shift to services: The deep shift in the global economy is in the long-term rise of services to “become the dominant economic activity” (UNIDO, 2009). The economists Timmer and Akkus (2008) describe this as a “powerful historical pathway of structural transformation,” which every country follows. One of the reasons for the long boom in living standards in the 20th century was because of the long boom in manufacturing, futureagenda.org What do you think? Join In | Add your views into the mix The Global Challenge The global challenge of work is two-fold. First, will automation, in its various forms, destroy jobs? And second, even if not, will workers be paid enough to sustain the global economic system? Manufacturing vs. Services One of the reasons for the long boom in living standards in the 20th century was because of the long boom in manufacturing, the dominant economic trend for much of the century. Productivity growth and economic growth tends to fall as services become dominant. 1 The Global Challenge Energy Food Government Loyalty Privacy Resources Transport Travel Water Wealth Work Health Learning Andrew Curry - Director, Global Knowledge Lead – Global Resources,The Futures Company. The Future of Work
  • 2.
    the dominant economictrend for much of the century. Productivity growth and economic growth tends to fall as services become dominant, and the influence of trades unions, which are effective in maintaining the value of wages, tends to decline. The globalisation of the supply chain: Manufacturing is also tradable, meaning that it is open to export competition. The growth of the Asian economies, in particular China, has been extensively driven by manufacturing. Taking a long view, Asia’s share of world production almost doubled between 1970 to 2008, from 15.5% to 28.5%, at the expense of Europe and North America. (Unido, 2009). This growth was driven largely by the development of containerisation, not digital technology, because it transformed shipping costs. But globalisation is reaching its limits. Wages in export sectors in both China and India are now relatively high (a pattern seen in other emerging economies in the past) and companies are moving their production closer to their markets, both anticipating rising transport costs and wanting to be able to respond more flexibly to demand. The other effect of globalisation, of course, is an increase in migration: more than 500 million people globally now live in a country they weren’t born in. Economists generally agree that immigration is good for economies. Migrants tend to be younger, more enterprising, and economically active, and their effect on wages, economic growth and tax contributions is almost completely positive. However, in weak labour markets migration also tends to push down unskilled wages by increasing competition for such jobs; such competition is gamed by unscrupulous employers. The growth of ubiquitous technology: There is a widespread fear that the rise of robots - or more exactly, a combination of computing power, algorithms and robotics - will destroy the labour market, even, possibly, the very idea of labour value. A widely publicised study by Oxford University academics Carl Benedikt Frey and Michael Osborne argued that for the United States jobs are at high risk of being automated in 47% of the conventional occupational classifications (Frey and Osborne, 2013). In The Second Machine Age, Erik Brynjolfsson and Andy McAfee suggest a reason: that computing power is capable of exponential growth in performance over time, and that we’re just at the start of that progression. If robotics did for blue-collar work, then artificial intelligence will do for white collar work. This argument, however, tends to miss the fact that technological innovation, historically, has created new jobs, typically after a period of turbulent transition. In his analysis of the labour market, David Autor (2014) finds that between 1999 and 2007 “routine task-intensive” jobs were indeed largely removed by computerisation, while knowledge jobs (“abstract task-intensive”) tended to survive or increase where human knowledge was complemented by computers. “Manual task-intensive” jobs, at the less- skilled end of the market, were much less affected by computerisation, and demand for them seemed to be rising. Yet their wages fell. His explanation: labour supply for these jobs increased because of the collapse in demand for “routine task-intensive” jobs. The squeeze on resources: Population and consumption pressures mean that we are breaching many of the natural planetary boundaries. For capitalism this is a new game: traditionally it has been able to use resources without worrying much about the consequences. And after a century of cheap energy, the long-run trend is up, despite the current downward blip in the oil price. In our recent Futures Company report The 21st Century Business, Jules Peck and I argue that this resource shift is changing the way that companies behave; we are moving to post- sustainability (socially, economically, and environmentally). An important element is a shift from consumers to citizens, among both customers and employees, where the overall impact of a business matters. An example: it’s argued that one of the reasons why McDonald’s sales are slumping among Millennials is that eating there is depressing, because of “the feeling that the people behind the counter, flipping burgers and taking orders, have dead-end jobs where they’re treated poorly.” 2 What do you think? Join In | Add your views into the mix Peak Globalisation Globalisation is reaching its limits. Wages in export sectors in both China and India are now relatively high (a pattern seen in other emerging economies in the past) and companies are moving their production closer to their markets, both anticipating rising transport costs and wanting to be able to respond more flexibly to demand. Positive Immigration More than 500 million people globally now live in a country they weren’t born in. Economists generally agree that immigration is good for economies. Migrants tend to be younger, more enterprising, and economically active, and their effect on wages, economic growth and tax contributions is almost completely positive Technology Takeover There is a widespread fear that the rise of robots - or more exactly, a combination of computing power, algorithms and robotics - will destroy the labour market, even, possibly, the very idea of labour value.
  • 3.
    Options and Possibilities Energy Food Government Loyalty Privacy Resources Transport Travel Water Wealth Work Health Learning 3 Theshift to wellbeing: One of the long trends is a trend towards wellbeing, physical and psychological, individual and social. This complements one of the strong workplace trends: that significant competitive performance is typically produced only by empowered and engaged employees, who are intrinsically motivated to work for the business. This is true of lower-wage environments as well as higher-wage businesses. Striking research by Zeynep Ton (2014) has found that companies such as Costco in the United States and Mercadona in Spain out-perform their sectors – by some margin - through a combination of better wages, significant investment in training, and appropriate technological investment to support staff. With such a “good jobs” strategy, increases in wages translate directly into far larger sales increases. High value work benefits individuals, businesses, as well as society as a whole. What do you think? Join In | Add your views into the mix Good Jobs Companies such as Costco in the United States and Mercadona in Spain out- perform their sectors – by some margin - through a combination of better wages, significant investment in training, and appropriate technological investment to support staff. With such a “good jobs” strategy, increases in wages translate directly into far larger sales increases. High value work benefits individuals, businesses, as well as society as a whole. External Drivers Much of “the labor market woes” of the past decade are not down to computerisation, but to the financial crisis and reduced investment (starting with the dot.com collapse) and the impact of globalisation on labour markets… Many middle- skill jobs will prove more resistant to unbundling than advertised. The current discussion about the future of work seems to be monopolised by the version of the future in which technology destroys jobs. It has gained an air of inevitability, as if it is the only possible future. NESTA’s open minded report suggested that the “robots hypothesis” resonated because it connected “two powerful themes in popular culture: the rapid advance of IT, and the startling growth in inequality.” But there is a problem: it hasn’t happened before. Indeed, the idea that investment in more productive technologies leads to unemployment is dismissed by economists as “the lump of labour fallacy.” In the past, investment in the new technologies has created new capacity and new wealth, which was re-invested to create more, higher value jobs. If this time is different, we need to understand why this is so. There are candidates. Brynjolfsson and McAfee’s claim that digital technologies are different because they create exponential growth is one. Another is that companies can no longer draw on plentiful resources or cheap energy to drive new investment platforms. A third is that previous waves were driven by manufacturing, which generated new value through productivity gains and created the social conditions for trades unions. However, it is also the case that this fear typically recurs after a crisis. It is not coincidence that Keynes wrote his famous essay on the challenge of technological unemployment just after the 1929 crash. So it is also worth considering reasons why it might just be a phase. The economic historian Carlota Perez has a model of technological development that describes five long waves, or surges, since the Industrial Revolution. Each is around 50-60 years and follows an S-curve pattern; the last quarter of each is marked by saturated markets, diminishing investment opportunities and declining returns. The first part of the 20th century was dominated by the oil and auto surge; the latter part by ICT. The ICT wave is now reaching the turning point at which returns start to fall. On this model, finance is looking for new opportunities, and although it is too early to say what the next platform will be, and we’re still 10-15 years away from it, it is possible to imagine that the next technological surge might be built around, say, a material such as graphene. David Autor concludes that much of “the labor market woes” of the past decade are not down to computerisation, but to the financial crisis and reduced investment (starting with the dot.com collapse) and the impact of globalisation on labour markets. And he suggests that many middle-skill jobs will prove more resistant to unbundling than advertised; while computers can do specific
  • 4.
    4 What do youthink? Join In | Add your views into the mix tasks, turning collections of tasks into self- contained jobs, and then automating them, requires substantial investment. In the long run, people are both more flexible and cheaper. One implication is that the question of the future of work may actually be about power in the labour market. This leads to broadly political interpretations of the future of working conditions, ranging from Guy Standing’s formulation of the fragile “precariat”, facing intermittent, insecure work, David Weil’s description of the “fissured workplace”, in which many functions are sub-contracted, and the rise of campaigns for the Living Wage. Perhaps the dividing line is best-expressed in Alex Payne’s widely circulated open letter to the tech venture capitalist Marc Andreesen: “You seem to think everyone’s worried about robots. But what everyone’s worried about is you, Marc. Not just you, but people like you. Robots aren’t at the levers of financial and political influence today, but folks like you sure are.” Proposed way forward Aging Cities Commerce Connectivity Data Education Energy Food Government Loyalty Privacy Resources Transport Travel Water Wealth Work Health Learning The way forward depends on how you prefer to read this bifurcation between the technologists and the sceptics. We don’t know which group is right: there are no future facts. But there are some observations that can help shape our perspectives on this. The first is that these widely divergent views are a feature of this point in the technology cycle. The most the most excitable projections of the future of the car were seen at just this point on the oil and auto curve in the 1950s. The technology S-curve in Figure 1, based on the work of Carlota Figure 1 Source: Carlota Perez/ additional analysis by The Futures Company
  • 5.
    5 What do youthink? Join In | Add your views into the mix Perez, helps us to understand why. At this point, when the S-curve is at or approaching its second inflection point, people have been experiencing rapid technological change for the best part of two generations. The notion that “the only constant is change” has become a breathless platitude in the public discourse. So, the technologists’ perspective (point ’t’ in Figure 1) is a projection of this steep ramp. The sceptics note instead sign of falling returns and declining customer utility - and see a flattening of the line (point ’s). The gap is large, and one’s perspective on it is a matter of worldview, not evidence. Second, almost all business innovation and new business value is driven by the application of knowledge, and the way it is embedded in individuals, teams, and systems. The Futures Company has explored this in recent research with the Association of Finnish Work on the idea of ‘high value work.’ The important point here is that this is true of a whole range of knowledge, including knowledge of service and customers, and knowledge of culture and place, as well as technological knowledge. The most successful businesses use technology to complement and enhance this knowledge, not to replace it. Third, the trend towards is a deep and powerful one. If Millennials express a desire for meaningful work, this is also true more broadly. We are on the cusp of a transition to a world where, as Hardin Tibbs (2011) has argued, half of the populations of Europe and the United States subscribe to post-modern values (drawing on Inglehart) of autonomy and diversity. The workplace will not escape this trend. One way in which this is expressed is in a transition from consumer or employee to citizen. Increasingly, anyone with any degree of choice in the labour market is choosing employees who recognise them as a whole person, not just as a unit of labour. The evidence suggests that the engagement that the employer gets in return (even, say, in retail) is a powerful driver of performance and profitability. Fourth, the bargain that businesses struck in the 1980s and 1990s, as they enforced flexibility and “downsized” headcount, may turn out to be a Faustian pact. Shedding jobs and exerting tight control of labour markets increased short-run profits. But at the same time that same control squeezed out their sources of growth. And as both the OECD (Cingano, 2014) and the IMF (Ostry et al, 2014) have noted recently, wage inequality has been a further drag on economic growth. To regain growth, they are likely to have to increase wages and give back some control and power to their workforces. My own best guess is that we are not headed for long-run technological unemployment. I have changed my mind about this over the past year as I have spent more time with the evidence. The explanation that seems best to fit present state of work and labour markets is that it has been through a “perfect storm” of a globalised workforce, the deskilling of routine work (which was highly vulnerable to automation) and the shift of these workers into manual or service work, and aggressive deregulation of labour markets driven by a neoliberal political agenda. The discourse around technological unemployment is not persuasive to me. The “abstract” jobs (using David Autor’s analysis above) will be complemented by technology, and so, in a different way, will be the manual jobs. Meanwhile, the projected gains from Artificial Intelligence and analytics are going to be harder to achieve than currently anticipated. As an example, big data gets less useful as the data sets get larger, and the driverless car, the poster child for the tech future, is a far tougher proposition than Google lets on. Meanwhile, these tech scenarios never seem to include the new jobs that will emerge as we understand better the potential of the technologies, other, sometimes, than as a panic about the possible speed of change. But, and it is a big but, we’re only part of the way through the dislocation to work and to labour markets caused by this perfect storm. Things will not get better quickly. Post Modern Workplaces We are on the cusp of a transition to a world where, half of the populations of Europe and the United States subscribe to post-modern values of autonomy and diversity. The workplace will not escape this trend. Perfect Storm The explanation that seems best to fit present state of work and labour markets is that it has been through a “perfect storm” of a globalised workforce, the deskilling of routine work (which was highly vulnerable to automation) and the shift of these workers into manual or service work, and aggressive deregulation of labour markets driven by a neoliberal political agenda.
  • 6.
    Impact and implications Energy Food Government Loyalty Privacy Resources Transport Travel Water Wealth Work Health Learning 6 Whatdo you think? Join In | Add your views into the mix Looking at the shorter-term impacts, then, it’s possible to see a range of approaches to this turbulence in the world of work. Government have options, largely about whether to intervene in labour markets to influence work outcomes, or not. But employers are also moving to new strategies not out of goodwill but through self-interest. These options, highly simplified, are shown in the matrix (Figure 2), which contrasts laisser-faire approaches with interventionist approaches. The race to the bottom: This laisser-faire option operates on the principle that labour market flexibility is the secret to increased employment in a globalised labour market. In practice, nearly all countries have increased flexibility and permitted more casualised work over the past decade - even somewhere with a strong tradition of labour protection such as Germany.The evidence increasingly suggests, however, that the pursuit of low value jobs leads to a vicious cycle of low productivity, low investment, low growth, and low tax and social contribution from business. This policy approach also involves government subsidy to employers, as low-paid workers are supported by state payments. In the United States, a study showed that the fast food sector was effectively subsidised to the tune of $6 billion because its low paid workers were dependent on food stamps and subsidised housing. Increasingly this looks like a political choice that is no longer supported by economic evidence. Enlightened self interest: It appears that employers who pay better and create better working environments do better financially. Walmart is a relevant case. Over the last decade, its share price has been broadly stagnant, while Costco has outperformed it “by a considerable margin”, in terms of sales, earnings or stock market returns. One reason: according to HBR, far lower staff turnover means knowledge is kept in the company- and drives customer engagement. Such employers also invest in technology to enhance the performance of their staff, using each to complement the other.The Spanish retailer Mercadona similarly invests heavily both in training and stock management systems. Wages and labour performance are also becoming part of businesses’ reputational capital. See, for example, the increasing success of the UK Living Wage campaign in signing up large companies as “living wage employers”.The public sector can encourage this, for example by giving tax breaks or other forms of support to companies who deliver such commitments, and sharing evidence of business benefits. Figure 2 Source: Andrew Curry/The Futures Company
  • 7.
    7 Keeping the markethonest: Turning to more interventionist approaches, the state can take the view that it wants to drive unscrupulous low-wage employers out of the market as a way of driving up standards and investment (because low-wage, employers are unlikely to commit to training, and have little incentive to invest in capital equipment, which reduces productivity.) This leads to approaches such as enforcing (and increasing) minimum wages, both through regulation and legal frameworks, and also through public procurement rules. Such a policy complements the “enlightened self-interest” approach by removing free- riders from the market.Although conventional wisdom has argued in the past that minimum wage legislation costs jobs, this seems to be a weaker effect than claimed. Re-imagining work: Much of our intervention in the labour market is driven by a view that it creates social goods, both from an economic perspective and also from a social perspective (over a long period studies have shown that worklessness produces adverse psychological and physical effects). But it is possible that such findings are linked to a set of “modernist” social values that are rapidly giving way to “post-materialist” values. Certainly, people with some income and a degree of social capital who do not have to work find worthwhile things to do, including volunteering.This is part of the argument for the Basic Income: that as we move to the “post-industrial” world envisioned by Daniel Bell, in which skills are more embodied in personal knowledge, that encouraging traditional work is no longer the only, or the best, way to get the social benefits from productive engagement. The rise of the basic income: Until very recently, the idea of a basic income, a minimum sum paid to all people regardless of their work status, was right of the fringe of political discourse. But it has been moving rapidly towards the mainstream.The idea has deep roots: George Bernard Shaw promoted it as “a vagabond’s wage” a century ago. The analysis in this provocation helps to explain why. It is a policy idea that helps to improve outcomes whether the technologists or the sceptics turn out to be right.And in the meantime it helps to shore up economies, and individuals, that are struggling in the slow readjustment of labour markets. If the “robots” hypothesis is right, we’ll need a basic income to make the economy work (markets need people who can afford to buy products). If the market power argument is right, then basic income keeps employers honest, by ensuring they have to pay good enough wages, in good enough conditions, to attract and keep their workers. One interesting side effect is that it would mean that our fundamental notions of the value of paid work could be about to shift, for the first time since the Industrial Revolution.A recurring feature of the ICT era has been that questions of power and politics have frequently been diagnosed as issues of technology.The future of work is just the same. What do you think? Join In | Add your views into the mix Director, Global Knowledge Lead – Global Resources,The Futures Company. Lead expert on the Future of Work. Andrew Curry is a Director at The Futures Company where he leads the public sector team, and specializes in futures and scenarios projects. His career began as a financial journalist, working for the BBC and Channel 4 News. From there he migrated into new media where among other activities, Andrew launched Britain’s first interactive television channel in the 1990s. His interest in futures partly developed from arguing with some of the more fanciful forecasters in the Lead Expert – Andrew Curry Minimum Wage Until very recently, the idea of a basic income, a minimum sum paid to all people regardless of their work status, was right of the fringe of political discourse. But it has been moving rapidly towards the mainstream.
  • 8.
    In an increasinglyinterconnected, complex and uncertain world, many organisations are looking for a better understanding of how the future may unfold. To do this successfully, many companies, institutions and governments are working to improve their use of strategic foresight in order to anticipate emerging issues and prepare for new opportunities. Experience shows that change often occurs at the intersection of different disciplines, industries or challenges. This means that views of the future that focus on one sector alone have limited relevance in today’s world. In order to have real value, foresight needs to bring together multiple informed and credible views of emerging change to form a coherent picture of the world ahead. The Future Agenda programme aims to do this by providing a global platform for collective thought and innovation discussions. Get Involved To discuss the future agenda programme and potential participation please contact: Dr.Tim Jones Programme Director Future Agenda 84 Brook Street, London. W1K 5EH +44 203 0088 141 +44 780 1755 054 tim.jones@futureagenda.org @futureagenda The Future Agenda is the world’s largest open foresight initiative. It was created in 2009 to bring together views on the future from many leading organizations. Building on expert perspectives that addressed everything from the future of health to the future of money, over 1500 organizations debated the big issues and emerging challenges for the next decade. Sponsored globally by Vodafone Group, this groundbreaking programme looked out ten years to the world in 2020 and connected CEOs and mayors with academics and students across 25 countries. Additional online interaction connected over 50,000 people from more than 145 countries who added their views to the mix. All output from these discussions was shared via the futureagenda.org website. The success of the first Future Agenda Programme stimulated several organizations to ask that it should be repeated. Therefore this second programme is running throughout 2015 looking at key changes in the world by 2025. Following a similar approach to the first project, Future Agenda 2.0 builds on the initial success and adds extra features, such as providing more workshops in more countries to gain an even wider input and enable regional differences to be explored. There is also a specific focus on the next generation including collaborating with educational organizations to engage future leaders. There is a more refined use of social networks to share insights and earlier link-ups with global media organizations to ensure wider engagement on the pivotal topics. In addition, rather than having a single global sponsor, this time multiple hosts are owning specific topics wither globally or in their regions of interest. Run as a not for profit project, Future Agenda 2.0 is a major collaboration involving many leading, forward-thinking organisations around the world. Context – Why Foresight? 8 What do you think? Join In | Add your views into the mix www.futureagenda.org About Future Agenda Future Agenda 1.0 Future Agenda 2.0