Prepared by Asfaw Wassie
HUMAN RESOURCE
MANAGEMENT:
Chapter- 4
Prepared by Asfaw Wassie
 Introduction
 Meaning & Definition of HRM
 Scope of HRM
 HRM-Functions and Objectives
 HRM Roles
 Differences between PM & HRM
Prepared by Asfaw Wassie
“It takes knowledgeable,
people to run a business”
Prepared by Asfaw Wassie
“It takes conscientious,
People to run a business”
Prepared by Asfaw Wassie
“It takes motivated
people to run a business”
Prepared by Asfaw Wassie
It takes knowledgeable,
conscientious, and
motivated people to run a
business successfully
Prepared by Asfaw Wassie
HRM makes all this
possible!!!
Prepared by Asfaw Wassie
Why is HR critical to firm success?
 Service industry is expanding
 Low quality HR leads to low quality customer service.
 In the 21st century effective knowledge management
translates into competitive advantage and profits.
 Knowledge comes from a firm’s people.
Prepared by Asfaw Wassie
“The War for Talent”
 “In the new economy, competition is global, capital is
abundant, ideas are developed quickly and cheaply, and
people are willing to change jobs often. In that kind of
environment… all that matters is talent… superior talent
will be tomorrow’s prime source of competitive advantage.”
Chambers, E. et al. (1998)
“The War for Talent.”
McKinsey Quarterly, 2-15
Prepared by Asfaw Wassie
Extraordinary People,
Ordinary Performance?
?
Performance
Extraordinary Ordinary
Extraordinary
Ordinary
Quality of People
Prepared by Asfaw Wassie
Ordinary People,
Extraordinary Performance?

Performance
Extraordinary Ordinary
Extraordinary
Ordinary
Quality of People
Prepared by Asfaw Wassie
Two Mysteries
 How have some companies achieved extraordinary performance
with people who are no different from those employed by the
competition?
 If what they are doing is so understandable, why haven’t their
competitors simply replicated them and achieved similar
competitive advantages?
Prepared by Asfaw Wassie
Competitive Advantage through People
 A worldwide study of the automobile industry showed that people-
centered practices were associated with almost twice the productivity
and quality as conventional mass production.
 Similar studies in steel, apparel, semiconductors, and oil refining
industries reveal similar positive effects for people-centered practices.
 A study of IPOs among 136 firms showed that people-centered
practices were associated with a 42% higher survival rate.
Prepared by Asfaw Wassie
Top Performing Stocks: 1972-1992
Company Percent Increase
 Southwest Airlines 21,775%
 Wal-Mart 19,807%
 Tyson Foods 18,118%
 Circuit City 16,410%
 Plenum Publishing 15,689%
Money, October, 1992
Prepared by Asfaw Wassie
 “I’ve tried to create a culture of caring for people in the
totality of their lives, not just at work. There’s no magic
formula. It’s like building a giant mosaic--it takes
thousands of little pieces…The intangibles are more
important than the tangibles. Someone can go out and
buy airplanes from Boeing and ticket counters, but they
can’t buy our culture, our esprit de corps.”
Herb Kelleher
CEO Southwest
WSJ8/31/99
HR and Performance
Prepared by Asfaw Wassie
Prepared by Asfaw Wassie
What is HRM?
•HRM is concerned with the people’s dimension
in the organization
•Facilitating the competencies and retention of
skilled force
• Developing management systems that
promote commitment
• Developing practices that foster team work
• Making employees feel valued and rewarded.
Prepared by Asfaw Wassie
Definitions
 HRM refers to acquisition, retention, motivation and
maintenance of Human Resources in an organization. David. A.
Decenzo & Stephen P.Robbins
 HRM is the planning, organising, directing & controlling of
the procurement, development, compensation, integration,
maintenance and separation of human resources to the end
that individual, organizational and social objectives are
accomplished. Edward Flippo
 “… a strategic approach to managing employment relations
which emphasises that leveraging people’s capabilities is
critical to achieving sustained competitive
advantage, this being achieved through a distinctive set of
integrated employment policies, programmes and practices”.
Bratton and Gold
Prepared by Asfaw Wassie
Scope of HRM
 Very Vast
 Covers all major
activities in the
working life of a
worker
-from time an
individual enters
into an organization
until he or she leaves
comes under the
purview of HRM
Prospects
of HRM
HRM
Nature of
HRM
Industrial
Relations
Employee
Maintenance
Employee
Hiring
Employee
&
Executive
Remunera
tion
Employee
Motivation
Prepared by Asfaw Wassie
Functions of HR
MANAGERIAL
FUNCTIONS
Planning
Organizing
Directing
Controlling
OPERATIVE
FUNCTIONS
Staffing
Development
Compensation
Motivation
Maintenance
Integration
Emerging Issues
Prepared by Asfaw Wassie
Operative functions of HR
STAFFING Job analysis, HRP, Recruitment,
Selection, Placement, Induction,
Internal Mobility
DEVELOPMENT
Competency profiling, Training and
development, Performance &
potential management, Career
management, …
COMPENSATION
& MOTIVATION
Job design, Work scheduling, Job
evaluation, Compensation
administration, Incentives and
benefits
Prepared by Asfaw Wassie
Operative functions of HR
(contd.)
MAINTENANCE
Health, Safety, Welfare,
Social security
INTEGRATION
Employment relations, Grievance,
Discipline, Trade unions,
Participation, Collective
bargaining
EMERGING
ISSUES
HRIS, HR audit, International
HRM, Workforce Diversity
Prepared by Asfaw Wassie
Source: HR Department Benchmarks and Analysis Survey 2004
(Washington, DC: Bureau of National Affairs, 2004), 21. To purchase
this publication and find out more about other BNA HR solutions visit
http://hrcenter.bna.com or call 800-372-1033. Used with permission.
HR Activities
Prepared by Asfaw Wassie
Management of Human Capital
In Organizations
 Physical, Financial, Intangible and
 Human Capital
 The collective value of the capabilities, knowledge,
skills, life experiences, and motivation of an
organizational workforce.
 Also known as intellectual capital.
 Core Competency
 A unique capability that creates high value and
differentiates an organization from its competition.
 HR competencies: a source of competitive advantage.
Prepared by Asfaw Wassie
Human Capital in Organizations
Human Capital
The collective value of the
capabilities, knowledge,
skills, life experiences, and
motivation of an
organizational workforce.
Core Competency
A unique capability that
creates high value and
differentiates an organization
from its competition.
Prepared by Asfaw Wassie
HR Management Roles
 Administrative Role
 Clerical and administrative support operations (e.g.,
payroll and benefits work)
 Technology is transforming how HR services are delivered.
 Outsourcing HR services to reduce HR staffing costs
 Operational and Employee Advocate Role
 “Champion” for employee concerns
 Employee crisis management
 Responding to employee complaints
Prepared by Asfaw Wassie
Changing Roles of HR Management
Note: Example percentages are based on various surveys.
Prepared by Asfaw Wassie
Strategic Role for HR
 Strategic Role
 “Contributing at the Table” to organizational results
 HR becomes a strategic business partner by:
 Focusing on developing HR programs that enhance organizational
performance.
 Involving HR in strategic planning at the onset.
 Participating in decision making on mergers, acquisitions, and
downsizing.
 Redesigning organizations and work processes
 Accounting and documenting the financial results of HR activities.
 Some HR people get this, some don’t…CEOs want those
that do and oust those that don’t
Prepared by Asfaw Wassie
Operational to Strategic Transformation of HR
Prepared by Asfaw Wassie
HR Technology
 Human Resource Management System (HRMS)
 An integrated system providing information used by HR
management in decision making.
 Purposes (Benefits) of HRMS
 Administrative and operational efficiency in compiling HR
data
 Availability of data for effective HR strategic planning
 Uses of HRMS
 Automation of payroll and benefit activities
 EEO/affirmative action tracking
 HR Workflow: increased access to HR information
Prepared by Asfaw Wassie
Uses of an HRMS
 HRMS
 Bulletin boards
 What information will be available and what is information
needed?
 Data access
 To what uses will the information be put?
 Employee self-service
 Who will be allowed to access to what information?
 Extended linkage
 When, where, and how often will the information be needed?
Prepared by Asfaw Wassie
JOB ANALYSIS
and
HR PLANNING
________________________
Chapter Three
Prepared by Asfaw Wassie
What is a job?
 Job
 Group of related activities and duties
 Made up of tasks
 Tasks
 Basic elements of jobs
 “what gets done”
Prepared by Asfaw Wassie
JOB ANALYSIS INFORMATION HIERARCHY
TASK DUTY
POSITION
ELEMENT
JOB
JOB
FAMILY
OCCUPATION
CAREER
Smallest
unit into
which
work can
be
divided
Distinct
work
activity
Number
of tasks
Prepared by Asfaw Wassie
What is Job Analysis?
 Job analysis (JA) systematically collects, evaluates, and
organizes information about jobs
 JA identifies behaviors, knowledge, skills, and abilities
(KSAs) that are critical to a job
Prepared by Asfaw Wassie
What is the purpose of JA?
 JA lays the foundation for HRM systems:
 Selection
 Selection system developed to assess key KSAs
 Ensures that it is job-related
 Training
 Gaps in KSAs of new hires represent training needs
 Performance Appraisal
 Job analysis establishes performance standards
Prepared by Asfaw Wassie
What is the purpose of JA?
 Compensation
 Relative worth of jobs measured via job evaluation
 JA helps you to select the right ee, evaluate the ee fairly,
compensate, and train the appropriate skills to the appropriate
ees
 JA also ensures your system is legally defensible and perceived as
fair (procedural justice)
Prepared by Asfaw Wassie
Steps in Job Analysis Process
 Phase 1: Preparation for job analysis
1. Familiarization with the organization and its jobs
2. Determine the uses of the JA information (selection, training?)
3. Identify what jobs need to be analyzed
• Critical to success of the organization
• Difficult to learn
• New technology
Prepared by Asfaw Wassie
Steps in Job Analysis Process
Phase 2: Collection of JA information
1. Source of Job Data
 Job incumbents, supervisors, subordinates, customers
 Existing job descriptions
 Manuals, publications
 National Occupational Classification
Prepared by Asfaw Wassie
Steps in Job Analysis Process
2. Data collection instrument design
 Gather information systematically
 Often involves questionnaire, checklist
 Use same questionnaire for similar jobs
 Different jobs may require different instrument
 Information gathered:
 Status, key duties/tasks, KSAs, working conditions,
performance standards
Prepared by Asfaw Wassie
Steps in Job Analysis Process
3. Data collection method
 Job performance
 Observation
 Face-to-face interviews
 Questionnaires
 Employee log/diary
 Combination of above
 No “best” approach
 Trade-offs are: accuracy, time, and cost
Prepared by Asfaw Wassie
Existing JA Methods
 Position Analysis Questionnaire (PAQ)
 Functional Job Analysis (FJA)
 Critical Incident Technique (CIT)
Prepared by Asfaw Wassie
Position Analysis Questionnaire
(PAQ): McCormick (1972)
 Developed because of criticism that JA relied on
observation – not quantifiable
 Detailed questionnaire (tasks)
 Determines extent to which each task is applicable
to target job
 Using a 5-point scale
Prepared by Asfaw Wassie
Functional Job Analysis (FJA)
 Fine & Wiley (1971)
 Focuses on task statements
 Task statements include:
 What? - What gets done (the action/behaviour)
 To whom or what? - The object of the action
 Why? - Purpose of the action
 How? - What facilitates the action?
Prepared by Asfaw Wassie
Functional Job Analysis
 Tasks are rated on scales reflecting varying degrees of
involvement with Things, Data, and People as well as
math, language, etc. requirements
 Each scale is arranged hierarchically
 E.g., People scale ranges from “taking instructions” to
“leadership”
Prepared by Asfaw Wassie
Critical Incident Technique
 Flanagan (1949)
 Identifies behaviors that indicate success or failure on the job
 Effective vs ineffective behaviors
 Critical Incidents include:
 Context - in which the incident occurred
 Behaviour - exactly what the individual did that was effective or
ineffective
 Consequences - of the behaviour and whether or not
consequences were in the employee’s control
Prepared by Asfaw Wassie
Developing Critical Incidents
 Interview with people familiar with the job
 E.g., supervisors, subordinates, customers
 Ask them to describe specific incidents of effective / ineffective
behaviour by incumbents of target job
 Incident context – What led up to the incident (background)?
What was the situation?
 Behaviour – What exactly did the person do that was effective /
ineffective?
 Consequence - What was the outcome of the behaviour?
Prepared by Asfaw Wassie
Using Critical Incidents
 Critical incidents are collected
 Critical incidents that are similar in context are
grouped into a behavioral item
 2 critical incidents
1. Rewarding employees for good performance
2. Publicly praising for good performance
 Could be grouped into a behavioral item “Praise/reward
subordinates for effective performance”
Prepared by Asfaw Wassie
Using Critical Incidents
 Similar behavioral items are grouped into a
meaningful behavioral criterion
 2 behavioral items
1. “Praise/reward employees…”
2. “Counseling, giving advice to subordinates”
 Combine to form the behavioral criterion “Interactions
with subordinates”
 These form basis of selection system (e.g., interview),
performance appraisal instrument, etc.
Prepared by Asfaw Wassie
Steps in Job Analysis Process
Phase 3: Uses of JA information
1. Job descriptions—Task requirements
 Statement that explains duties working conditions, etc. of a job
2. Job specifications—Person requirements
 Statement of what a job demands of the incumbent
 E.g., knowledge, skills, abilities (KSAs) and other characteristics
required to perform job
Prepared by Asfaw Wassie
Steps in Job Analysis Process
Phase 3: Uses of JA information
3. Performance standards
 What is expected of workers
 JA may provide performance standards for job where
performance is readily quantified, measurable, etc.
 All of these uses form foundation for various HRM systems
Prepared by Asfaw Wassie
Human Resource Planning
(HRP)
Prepared by Asfaw Wassie
TOPICS TO BE COVERED
 Definition of HRP
 Importance of HRP
 Steps of HRP
 Job Analysis
 HRP Process
-Organizational objectives
-HRP needs forecasting
-HRP Supply forecasting
-HR Programming
-HR Plan Implementation
-Control & Evaluation
Prepared by Asfaw Wassie
Definition :
process by which an organization
ensures that it has the right number &
kind of people at the right place and at
the right time, capable of effectively and
efficiently completing those tasks that
help the organization achieve its overall
objectives.
Prepared by Asfaw Wassie
Importance
Each Organization needs personnel with necessary
qualifications, skills, knowledge, experience & aptitude .
 Need for Replacement of Personnel - Replacing old, retired
or disabled personnel.
 Meet manpower shortages due to labor turnover -
 Meet needs of expansion / downsizing programs - As a
result of expansion of IT companies the demand for IT professionals are
increasing.
Prepared by Asfaw Wassie
 Cater to Future Personnel Needs - Avoid surplus or
deficiency of labor.
 Nature of present workforce in relation with Changing
Environment - helps to cope with changes in
competitive forces, markets, technology, products and
government regulations.
Prepared by Asfaw Wassie
Steps of HRP
1. Interfacing with strategic planning and scanning the
environment
2. Taking an inventory of the company’s current human resources
3. Forecasting the demand for human resources
4. Forecasting the supply of human resources both from within the
organization and in the external labor market
5. Comparing forecasts of demand and supply
6. Planning the actions needed to deal with anticipated shortages or
overages
7. Feeding back such information into the strategic planning
process
Prepared by Asfaw Wassie
THE STRATEGIC ROLE OF HUMAN
RESOURCE PLANNING
 Developmental Planning for Strategic Leadership
 there is currently more interest in succession planning today
than there has been during the past 30 years.
 Because of the rapidly changing environments in which
companies must compete, there is concern that there will be a
shortage of individuals with the requisite skills and talents who
can lead companies in the twenty-first century.
 Succession planning, as well as other forms of human resource
planning, is becoming more critical to the successful
formulation and implementation of strategies.
Prepared by Asfaw Wassie
 Assessment of Strategic Alternatives:
 information regarding critical employee knowledge bases provides
important input for strategy formulation.
 given a particular strategic alternative, it is useful for human
resource executives, as well as other executives, to be able to forecast
the human resources necessary to carry out various strategies.
Prepared by Asfaw Wassie
 Adding Value:
 Despite some positive research results, it is typically
difficult to quantify value added in human resource
management.
 The results of some human resource programs and
policies undoubtedly have major impacts on morale and
motivation, although they are not easily translated into
dollars and cents.
Prepared by Asfaw Wassie
MANAGERIAL ISSUES IN
PLANNING
 Personal Implications
 the planning process will have normally required the
human resource manager to communicate with other
managers, senior executives, and staff members about
the future human resource environment and the
associated staffing issues.
 Also, senior managers will have greater confidence that
the manager has thought through the implications of
potential demand and supply relationships and there is
less chance that the company will be unprepared in the
future.
Prepared by Asfaw Wassie
 Changing Receptivity Toward Planning
 The turbulent business environment in which
companies currently operate is obviously a difficult time
in which to plan.
 However, there is substantive evidence that companies
have increased their emphasis on human resource
planning, but with some trend shifts.
Prepared by Asfaw Wassie
 Growing restrictions on Lay off:
 growing restrictions on employers’ abilities to lay off
employees also will serve as an additional incentive for
human resource planning.
Prepared by Asfaw Wassie
HRP Process - Determination of Quality of Personnel
Job Analysis
 process of collecting and studying information relating to
the operations and responsibilities of a specific job.
 determination of tasks which comprise the job and of skills,
knowledge, abilities and responsibilities required of the
worker for a successful performance and which differentiates
one job from all others.
 products of Job Analysis are Job Description & Job
Specification
Prepared by Asfaw Wassie
HRP Process - Determination of Quantity of Personnel
Organizational Objectives
HR Programming
HR Needs Forecast HR Supply Forecast
HRP Implementation
Control & Evaluation
Surplus - Restricted Hiring,
Lay Off, Reduced Hours
Shortage - Recruitment &
Selection
Prepared by Asfaw Wassie
Organizational Objectives & Policies
 Downsizing / Expansion
 Acquisition / Merger / Sell-out
 Technology upgradation / Automation
 New Markets & New Products
 External Vs Internal hiring
 Training & Re-training
Prepared by Asfaw Wassie
HR Demand Forecast
process of estimating future quantity and quality of manpower
required for an organisation.
 External factors - competition, laws &
regulation, economic climate, changes in
technology and social factors
 Internal factors - budget constraints,
production levels, new products & services,
organizational structure & employee separations
Prepared by Asfaw Wassie
Some techniques
 Rules of Thumb, and the Delphi Technique
 Rules of thumb are simple guidelines that are used to predict
demand for human resources.
 “bottom-up” approach in which unit managers estimate their
specific human resource needs for the next period.
 The Delphi technique, an iterative judgment refinement technique
based on the collection of expert opinion, is sometimes categorized
as a qualitative demand forecasting technique.
Prepared by Asfaw Wassie
 Operations Research and Management Science
Techniques:
 Linear programming, integer programming, and
network optimization techniques can be used to
determine optimal personnel flows through
organizations.
 The use of such planning techniques runs counter to the
trend toward more reliance on less sophisticated
approaches.
Prepared by Asfaw Wassie
 Regression Analysis:
 Regression analysis is a robust statistical technique
having applicability to forecasting demand for human
resources.
 Multiple regression analysis allows the forecaster to
control for several potential influences on the number
of employees needed in a particular specialty.
Prepared by Asfaw Wassie
HR Supply Forecast
process of estimating future quantity and quality of
manpower available internally & externally to an
organisation.
Supply Analysis
 Existing Human Resources
 Internal Sources of Supply
 External Sources of Supply
Prepared by Asfaw Wassie
Existing Human Resources
Capability / Skills Inventory using HR Information System
General Information -
Name: Present Address: Department:
Sex: Designation:
DOB: DOJ:
Marital Salary:
Status: Permanent Address: Grade:
Qualification -
Degree/Diploma Institution Class Year of Pass
Experience/Skills -
Job Title/ Organisation Brief Skill/
Appointment Responsibilities Specialisation
Outstanding Achievement / Additional Information -
Awards Performance Disciplinary Action
Promotions Merit Rating Absenteeism
Achievements
Career Plans:
Prepared by Asfaw Wassie
Some techniques
 Replacement Charts:
 describe a company’s organizational structure in terms
of individuals occupying various managerial and
professional positions.
Prepared by Asfaw Wassie
Prepared by Asfaw Wassie
 Succession Planning:
 Succession planning tends to be directed toward a longer-range
time horizon and is more focused on development. It is also more
concerned with the development of pools of potential
replacements, as opposed to individuals.
 involves more elaborate planning for skill development of potential
replacements, is more systematic in the assessment of potential
replacements and their developmental needs
Prepared by Asfaw Wassie
 Markov Analysis:
 Provides a practical and versatile technique for
forecasting internal supply. As such, the techniques can
serve the strategic purpose of evaluating the availability
of human resources required for different strategies.
Prepared by Asfaw Wassie
Prepared by Asfaw Wassie
 Renewal Models:
 These models reflect the movement or flow of
employees through companies as they are “pulled”
upward to fill vacancies in higher-level job categories
 Age cohorts or job category can be the focus of analysis.
Prepared by Asfaw Wassie
 Computer Simulations:
 Simulations have the advantage of allowing the forecaster to create
a number of different future scenarios by altering the values of the
simulation’s parameters.
 Through this process, the forecaster can determine variations in
forecasted values according to different formulations of future
conditions and can plan alternative courses of actions to reduce
uncertainty and manage risk.
Prepared by Asfaw Wassie
SELECTING FORECASTING
TECHNIQUES
 Purpose of Planning
 Organizational Characteristics
 Industry Characteristics
 Environmental Turbulence: companies with
moderate levels of workforce volatility are more
inclined to engage in human resource planning.
 Other Considerations: cost, time horizon, level of
sophistication, availability of appropriate data,
availability of detailed data,….
Prepared by Asfaw Wassie
HR Programming
Balancing Demand and Supply
 Vacancies filled in by the right employee at the
right time
Prepared by Asfaw Wassie
HR Plan Implementation
 Recruitment, Selection & Placement
 Training & Development
 Retraining & Redeployment
 Retention Plan
 Downsizing Plan
Prepared by Asfaw Wassie
Control & Evaluation
Are Budgets, Targets & Standards met?
Responsibilities for Implementation &
Control
Reports for Monitoring HR Plan
Prepared by Asfaw Wassie
HRM Project
Students are required to visit a business organization
and conduct the following assessment:
1. Assess how HR is viewed by the top management
and the attention given to HR Department
2. Assess the HR practices and functions of the
organization in detail
3. Assess how HR functions and practices are coherent
and integrated.
4. Assess the link between the business strategies and
HR strategies.

CH-4 HRM.ppt

  • 1.
    Prepared by AsfawWassie HUMAN RESOURCE MANAGEMENT: Chapter- 4
  • 2.
    Prepared by AsfawWassie  Introduction  Meaning & Definition of HRM  Scope of HRM  HRM-Functions and Objectives  HRM Roles  Differences between PM & HRM
  • 3.
    Prepared by AsfawWassie “It takes knowledgeable, people to run a business”
  • 4.
    Prepared by AsfawWassie “It takes conscientious, People to run a business”
  • 5.
    Prepared by AsfawWassie “It takes motivated people to run a business”
  • 6.
    Prepared by AsfawWassie It takes knowledgeable, conscientious, and motivated people to run a business successfully
  • 7.
    Prepared by AsfawWassie HRM makes all this possible!!!
  • 8.
    Prepared by AsfawWassie Why is HR critical to firm success?  Service industry is expanding  Low quality HR leads to low quality customer service.  In the 21st century effective knowledge management translates into competitive advantage and profits.  Knowledge comes from a firm’s people.
  • 9.
    Prepared by AsfawWassie “The War for Talent”  “In the new economy, competition is global, capital is abundant, ideas are developed quickly and cheaply, and people are willing to change jobs often. In that kind of environment… all that matters is talent… superior talent will be tomorrow’s prime source of competitive advantage.” Chambers, E. et al. (1998) “The War for Talent.” McKinsey Quarterly, 2-15
  • 10.
    Prepared by AsfawWassie Extraordinary People, Ordinary Performance? ? Performance Extraordinary Ordinary Extraordinary Ordinary Quality of People
  • 11.
    Prepared by AsfawWassie Ordinary People, Extraordinary Performance?  Performance Extraordinary Ordinary Extraordinary Ordinary Quality of People
  • 12.
    Prepared by AsfawWassie Two Mysteries  How have some companies achieved extraordinary performance with people who are no different from those employed by the competition?  If what they are doing is so understandable, why haven’t their competitors simply replicated them and achieved similar competitive advantages?
  • 13.
    Prepared by AsfawWassie Competitive Advantage through People  A worldwide study of the automobile industry showed that people- centered practices were associated with almost twice the productivity and quality as conventional mass production.  Similar studies in steel, apparel, semiconductors, and oil refining industries reveal similar positive effects for people-centered practices.  A study of IPOs among 136 firms showed that people-centered practices were associated with a 42% higher survival rate.
  • 14.
    Prepared by AsfawWassie Top Performing Stocks: 1972-1992 Company Percent Increase  Southwest Airlines 21,775%  Wal-Mart 19,807%  Tyson Foods 18,118%  Circuit City 16,410%  Plenum Publishing 15,689% Money, October, 1992
  • 15.
    Prepared by AsfawWassie  “I’ve tried to create a culture of caring for people in the totality of their lives, not just at work. There’s no magic formula. It’s like building a giant mosaic--it takes thousands of little pieces…The intangibles are more important than the tangibles. Someone can go out and buy airplanes from Boeing and ticket counters, but they can’t buy our culture, our esprit de corps.” Herb Kelleher CEO Southwest WSJ8/31/99
  • 16.
  • 17.
    Prepared by AsfawWassie What is HRM? •HRM is concerned with the people’s dimension in the organization •Facilitating the competencies and retention of skilled force • Developing management systems that promote commitment • Developing practices that foster team work • Making employees feel valued and rewarded.
  • 18.
    Prepared by AsfawWassie Definitions  HRM refers to acquisition, retention, motivation and maintenance of Human Resources in an organization. David. A. Decenzo & Stephen P.Robbins  HRM is the planning, organising, directing & controlling of the procurement, development, compensation, integration, maintenance and separation of human resources to the end that individual, organizational and social objectives are accomplished. Edward Flippo  “… a strategic approach to managing employment relations which emphasises that leveraging people’s capabilities is critical to achieving sustained competitive advantage, this being achieved through a distinctive set of integrated employment policies, programmes and practices”. Bratton and Gold
  • 19.
    Prepared by AsfawWassie Scope of HRM  Very Vast  Covers all major activities in the working life of a worker -from time an individual enters into an organization until he or she leaves comes under the purview of HRM Prospects of HRM HRM Nature of HRM Industrial Relations Employee Maintenance Employee Hiring Employee & Executive Remunera tion Employee Motivation
  • 20.
    Prepared by AsfawWassie Functions of HR MANAGERIAL FUNCTIONS Planning Organizing Directing Controlling OPERATIVE FUNCTIONS Staffing Development Compensation Motivation Maintenance Integration Emerging Issues
  • 21.
    Prepared by AsfawWassie Operative functions of HR STAFFING Job analysis, HRP, Recruitment, Selection, Placement, Induction, Internal Mobility DEVELOPMENT Competency profiling, Training and development, Performance & potential management, Career management, … COMPENSATION & MOTIVATION Job design, Work scheduling, Job evaluation, Compensation administration, Incentives and benefits
  • 22.
    Prepared by AsfawWassie Operative functions of HR (contd.) MAINTENANCE Health, Safety, Welfare, Social security INTEGRATION Employment relations, Grievance, Discipline, Trade unions, Participation, Collective bargaining EMERGING ISSUES HRIS, HR audit, International HRM, Workforce Diversity
  • 23.
    Prepared by AsfawWassie Source: HR Department Benchmarks and Analysis Survey 2004 (Washington, DC: Bureau of National Affairs, 2004), 21. To purchase this publication and find out more about other BNA HR solutions visit http://hrcenter.bna.com or call 800-372-1033. Used with permission. HR Activities
  • 24.
    Prepared by AsfawWassie Management of Human Capital In Organizations  Physical, Financial, Intangible and  Human Capital  The collective value of the capabilities, knowledge, skills, life experiences, and motivation of an organizational workforce.  Also known as intellectual capital.  Core Competency  A unique capability that creates high value and differentiates an organization from its competition.  HR competencies: a source of competitive advantage.
  • 25.
    Prepared by AsfawWassie Human Capital in Organizations Human Capital The collective value of the capabilities, knowledge, skills, life experiences, and motivation of an organizational workforce. Core Competency A unique capability that creates high value and differentiates an organization from its competition.
  • 26.
    Prepared by AsfawWassie HR Management Roles  Administrative Role  Clerical and administrative support operations (e.g., payroll and benefits work)  Technology is transforming how HR services are delivered.  Outsourcing HR services to reduce HR staffing costs  Operational and Employee Advocate Role  “Champion” for employee concerns  Employee crisis management  Responding to employee complaints
  • 27.
    Prepared by AsfawWassie Changing Roles of HR Management Note: Example percentages are based on various surveys.
  • 28.
    Prepared by AsfawWassie Strategic Role for HR  Strategic Role  “Contributing at the Table” to organizational results  HR becomes a strategic business partner by:  Focusing on developing HR programs that enhance organizational performance.  Involving HR in strategic planning at the onset.  Participating in decision making on mergers, acquisitions, and downsizing.  Redesigning organizations and work processes  Accounting and documenting the financial results of HR activities.  Some HR people get this, some don’t…CEOs want those that do and oust those that don’t
  • 29.
    Prepared by AsfawWassie Operational to Strategic Transformation of HR
  • 30.
    Prepared by AsfawWassie HR Technology  Human Resource Management System (HRMS)  An integrated system providing information used by HR management in decision making.  Purposes (Benefits) of HRMS  Administrative and operational efficiency in compiling HR data  Availability of data for effective HR strategic planning  Uses of HRMS  Automation of payroll and benefit activities  EEO/affirmative action tracking  HR Workflow: increased access to HR information
  • 31.
    Prepared by AsfawWassie Uses of an HRMS  HRMS  Bulletin boards  What information will be available and what is information needed?  Data access  To what uses will the information be put?  Employee self-service  Who will be allowed to access to what information?  Extended linkage  When, where, and how often will the information be needed?
  • 32.
    Prepared by AsfawWassie JOB ANALYSIS and HR PLANNING ________________________ Chapter Three
  • 33.
    Prepared by AsfawWassie What is a job?  Job  Group of related activities and duties  Made up of tasks  Tasks  Basic elements of jobs  “what gets done”
  • 34.
    Prepared by AsfawWassie JOB ANALYSIS INFORMATION HIERARCHY TASK DUTY POSITION ELEMENT JOB JOB FAMILY OCCUPATION CAREER Smallest unit into which work can be divided Distinct work activity Number of tasks
  • 35.
    Prepared by AsfawWassie What is Job Analysis?  Job analysis (JA) systematically collects, evaluates, and organizes information about jobs  JA identifies behaviors, knowledge, skills, and abilities (KSAs) that are critical to a job
  • 36.
    Prepared by AsfawWassie What is the purpose of JA?  JA lays the foundation for HRM systems:  Selection  Selection system developed to assess key KSAs  Ensures that it is job-related  Training  Gaps in KSAs of new hires represent training needs  Performance Appraisal  Job analysis establishes performance standards
  • 37.
    Prepared by AsfawWassie What is the purpose of JA?  Compensation  Relative worth of jobs measured via job evaluation  JA helps you to select the right ee, evaluate the ee fairly, compensate, and train the appropriate skills to the appropriate ees  JA also ensures your system is legally defensible and perceived as fair (procedural justice)
  • 38.
    Prepared by AsfawWassie Steps in Job Analysis Process  Phase 1: Preparation for job analysis 1. Familiarization with the organization and its jobs 2. Determine the uses of the JA information (selection, training?) 3. Identify what jobs need to be analyzed • Critical to success of the organization • Difficult to learn • New technology
  • 39.
    Prepared by AsfawWassie Steps in Job Analysis Process Phase 2: Collection of JA information 1. Source of Job Data  Job incumbents, supervisors, subordinates, customers  Existing job descriptions  Manuals, publications  National Occupational Classification
  • 40.
    Prepared by AsfawWassie Steps in Job Analysis Process 2. Data collection instrument design  Gather information systematically  Often involves questionnaire, checklist  Use same questionnaire for similar jobs  Different jobs may require different instrument  Information gathered:  Status, key duties/tasks, KSAs, working conditions, performance standards
  • 41.
    Prepared by AsfawWassie Steps in Job Analysis Process 3. Data collection method  Job performance  Observation  Face-to-face interviews  Questionnaires  Employee log/diary  Combination of above  No “best” approach  Trade-offs are: accuracy, time, and cost
  • 42.
    Prepared by AsfawWassie Existing JA Methods  Position Analysis Questionnaire (PAQ)  Functional Job Analysis (FJA)  Critical Incident Technique (CIT)
  • 43.
    Prepared by AsfawWassie Position Analysis Questionnaire (PAQ): McCormick (1972)  Developed because of criticism that JA relied on observation – not quantifiable  Detailed questionnaire (tasks)  Determines extent to which each task is applicable to target job  Using a 5-point scale
  • 44.
    Prepared by AsfawWassie Functional Job Analysis (FJA)  Fine & Wiley (1971)  Focuses on task statements  Task statements include:  What? - What gets done (the action/behaviour)  To whom or what? - The object of the action  Why? - Purpose of the action  How? - What facilitates the action?
  • 45.
    Prepared by AsfawWassie Functional Job Analysis  Tasks are rated on scales reflecting varying degrees of involvement with Things, Data, and People as well as math, language, etc. requirements  Each scale is arranged hierarchically  E.g., People scale ranges from “taking instructions” to “leadership”
  • 46.
    Prepared by AsfawWassie Critical Incident Technique  Flanagan (1949)  Identifies behaviors that indicate success or failure on the job  Effective vs ineffective behaviors  Critical Incidents include:  Context - in which the incident occurred  Behaviour - exactly what the individual did that was effective or ineffective  Consequences - of the behaviour and whether or not consequences were in the employee’s control
  • 47.
    Prepared by AsfawWassie Developing Critical Incidents  Interview with people familiar with the job  E.g., supervisors, subordinates, customers  Ask them to describe specific incidents of effective / ineffective behaviour by incumbents of target job  Incident context – What led up to the incident (background)? What was the situation?  Behaviour – What exactly did the person do that was effective / ineffective?  Consequence - What was the outcome of the behaviour?
  • 48.
    Prepared by AsfawWassie Using Critical Incidents  Critical incidents are collected  Critical incidents that are similar in context are grouped into a behavioral item  2 critical incidents 1. Rewarding employees for good performance 2. Publicly praising for good performance  Could be grouped into a behavioral item “Praise/reward subordinates for effective performance”
  • 49.
    Prepared by AsfawWassie Using Critical Incidents  Similar behavioral items are grouped into a meaningful behavioral criterion  2 behavioral items 1. “Praise/reward employees…” 2. “Counseling, giving advice to subordinates”  Combine to form the behavioral criterion “Interactions with subordinates”  These form basis of selection system (e.g., interview), performance appraisal instrument, etc.
  • 50.
    Prepared by AsfawWassie Steps in Job Analysis Process Phase 3: Uses of JA information 1. Job descriptions—Task requirements  Statement that explains duties working conditions, etc. of a job 2. Job specifications—Person requirements  Statement of what a job demands of the incumbent  E.g., knowledge, skills, abilities (KSAs) and other characteristics required to perform job
  • 51.
    Prepared by AsfawWassie Steps in Job Analysis Process Phase 3: Uses of JA information 3. Performance standards  What is expected of workers  JA may provide performance standards for job where performance is readily quantified, measurable, etc.  All of these uses form foundation for various HRM systems
  • 52.
    Prepared by AsfawWassie Human Resource Planning (HRP)
  • 53.
    Prepared by AsfawWassie TOPICS TO BE COVERED  Definition of HRP  Importance of HRP  Steps of HRP  Job Analysis  HRP Process -Organizational objectives -HRP needs forecasting -HRP Supply forecasting -HR Programming -HR Plan Implementation -Control & Evaluation
  • 54.
    Prepared by AsfawWassie Definition : process by which an organization ensures that it has the right number & kind of people at the right place and at the right time, capable of effectively and efficiently completing those tasks that help the organization achieve its overall objectives.
  • 55.
    Prepared by AsfawWassie Importance Each Organization needs personnel with necessary qualifications, skills, knowledge, experience & aptitude .  Need for Replacement of Personnel - Replacing old, retired or disabled personnel.  Meet manpower shortages due to labor turnover -  Meet needs of expansion / downsizing programs - As a result of expansion of IT companies the demand for IT professionals are increasing.
  • 56.
    Prepared by AsfawWassie  Cater to Future Personnel Needs - Avoid surplus or deficiency of labor.  Nature of present workforce in relation with Changing Environment - helps to cope with changes in competitive forces, markets, technology, products and government regulations.
  • 57.
    Prepared by AsfawWassie Steps of HRP 1. Interfacing with strategic planning and scanning the environment 2. Taking an inventory of the company’s current human resources 3. Forecasting the demand for human resources 4. Forecasting the supply of human resources both from within the organization and in the external labor market 5. Comparing forecasts of demand and supply 6. Planning the actions needed to deal with anticipated shortages or overages 7. Feeding back such information into the strategic planning process
  • 58.
    Prepared by AsfawWassie THE STRATEGIC ROLE OF HUMAN RESOURCE PLANNING  Developmental Planning for Strategic Leadership  there is currently more interest in succession planning today than there has been during the past 30 years.  Because of the rapidly changing environments in which companies must compete, there is concern that there will be a shortage of individuals with the requisite skills and talents who can lead companies in the twenty-first century.  Succession planning, as well as other forms of human resource planning, is becoming more critical to the successful formulation and implementation of strategies.
  • 59.
    Prepared by AsfawWassie  Assessment of Strategic Alternatives:  information regarding critical employee knowledge bases provides important input for strategy formulation.  given a particular strategic alternative, it is useful for human resource executives, as well as other executives, to be able to forecast the human resources necessary to carry out various strategies.
  • 60.
    Prepared by AsfawWassie  Adding Value:  Despite some positive research results, it is typically difficult to quantify value added in human resource management.  The results of some human resource programs and policies undoubtedly have major impacts on morale and motivation, although they are not easily translated into dollars and cents.
  • 61.
    Prepared by AsfawWassie MANAGERIAL ISSUES IN PLANNING  Personal Implications  the planning process will have normally required the human resource manager to communicate with other managers, senior executives, and staff members about the future human resource environment and the associated staffing issues.  Also, senior managers will have greater confidence that the manager has thought through the implications of potential demand and supply relationships and there is less chance that the company will be unprepared in the future.
  • 62.
    Prepared by AsfawWassie  Changing Receptivity Toward Planning  The turbulent business environment in which companies currently operate is obviously a difficult time in which to plan.  However, there is substantive evidence that companies have increased their emphasis on human resource planning, but with some trend shifts.
  • 63.
    Prepared by AsfawWassie  Growing restrictions on Lay off:  growing restrictions on employers’ abilities to lay off employees also will serve as an additional incentive for human resource planning.
  • 64.
    Prepared by AsfawWassie HRP Process - Determination of Quality of Personnel Job Analysis  process of collecting and studying information relating to the operations and responsibilities of a specific job.  determination of tasks which comprise the job and of skills, knowledge, abilities and responsibilities required of the worker for a successful performance and which differentiates one job from all others.  products of Job Analysis are Job Description & Job Specification
  • 65.
    Prepared by AsfawWassie HRP Process - Determination of Quantity of Personnel Organizational Objectives HR Programming HR Needs Forecast HR Supply Forecast HRP Implementation Control & Evaluation Surplus - Restricted Hiring, Lay Off, Reduced Hours Shortage - Recruitment & Selection
  • 66.
    Prepared by AsfawWassie Organizational Objectives & Policies  Downsizing / Expansion  Acquisition / Merger / Sell-out  Technology upgradation / Automation  New Markets & New Products  External Vs Internal hiring  Training & Re-training
  • 67.
    Prepared by AsfawWassie HR Demand Forecast process of estimating future quantity and quality of manpower required for an organisation.  External factors - competition, laws & regulation, economic climate, changes in technology and social factors  Internal factors - budget constraints, production levels, new products & services, organizational structure & employee separations
  • 68.
    Prepared by AsfawWassie Some techniques  Rules of Thumb, and the Delphi Technique  Rules of thumb are simple guidelines that are used to predict demand for human resources.  “bottom-up” approach in which unit managers estimate their specific human resource needs for the next period.  The Delphi technique, an iterative judgment refinement technique based on the collection of expert opinion, is sometimes categorized as a qualitative demand forecasting technique.
  • 69.
    Prepared by AsfawWassie  Operations Research and Management Science Techniques:  Linear programming, integer programming, and network optimization techniques can be used to determine optimal personnel flows through organizations.  The use of such planning techniques runs counter to the trend toward more reliance on less sophisticated approaches.
  • 70.
    Prepared by AsfawWassie  Regression Analysis:  Regression analysis is a robust statistical technique having applicability to forecasting demand for human resources.  Multiple regression analysis allows the forecaster to control for several potential influences on the number of employees needed in a particular specialty.
  • 71.
    Prepared by AsfawWassie HR Supply Forecast process of estimating future quantity and quality of manpower available internally & externally to an organisation. Supply Analysis  Existing Human Resources  Internal Sources of Supply  External Sources of Supply
  • 72.
    Prepared by AsfawWassie Existing Human Resources Capability / Skills Inventory using HR Information System General Information - Name: Present Address: Department: Sex: Designation: DOB: DOJ: Marital Salary: Status: Permanent Address: Grade: Qualification - Degree/Diploma Institution Class Year of Pass Experience/Skills - Job Title/ Organisation Brief Skill/ Appointment Responsibilities Specialisation Outstanding Achievement / Additional Information - Awards Performance Disciplinary Action Promotions Merit Rating Absenteeism Achievements Career Plans:
  • 73.
    Prepared by AsfawWassie Some techniques  Replacement Charts:  describe a company’s organizational structure in terms of individuals occupying various managerial and professional positions.
  • 74.
  • 75.
    Prepared by AsfawWassie  Succession Planning:  Succession planning tends to be directed toward a longer-range time horizon and is more focused on development. It is also more concerned with the development of pools of potential replacements, as opposed to individuals.  involves more elaborate planning for skill development of potential replacements, is more systematic in the assessment of potential replacements and their developmental needs
  • 76.
    Prepared by AsfawWassie  Markov Analysis:  Provides a practical and versatile technique for forecasting internal supply. As such, the techniques can serve the strategic purpose of evaluating the availability of human resources required for different strategies.
  • 77.
  • 78.
    Prepared by AsfawWassie  Renewal Models:  These models reflect the movement or flow of employees through companies as they are “pulled” upward to fill vacancies in higher-level job categories  Age cohorts or job category can be the focus of analysis.
  • 79.
    Prepared by AsfawWassie  Computer Simulations:  Simulations have the advantage of allowing the forecaster to create a number of different future scenarios by altering the values of the simulation’s parameters.  Through this process, the forecaster can determine variations in forecasted values according to different formulations of future conditions and can plan alternative courses of actions to reduce uncertainty and manage risk.
  • 80.
    Prepared by AsfawWassie SELECTING FORECASTING TECHNIQUES  Purpose of Planning  Organizational Characteristics  Industry Characteristics  Environmental Turbulence: companies with moderate levels of workforce volatility are more inclined to engage in human resource planning.  Other Considerations: cost, time horizon, level of sophistication, availability of appropriate data, availability of detailed data,….
  • 81.
    Prepared by AsfawWassie HR Programming Balancing Demand and Supply  Vacancies filled in by the right employee at the right time
  • 82.
    Prepared by AsfawWassie HR Plan Implementation  Recruitment, Selection & Placement  Training & Development  Retraining & Redeployment  Retention Plan  Downsizing Plan
  • 83.
    Prepared by AsfawWassie Control & Evaluation Are Budgets, Targets & Standards met? Responsibilities for Implementation & Control Reports for Monitoring HR Plan
  • 84.
    Prepared by AsfawWassie HRM Project Students are required to visit a business organization and conduct the following assessment: 1. Assess how HR is viewed by the top management and the attention given to HR Department 2. Assess the HR practices and functions of the organization in detail 3. Assess how HR functions and practices are coherent and integrated. 4. Assess the link between the business strategies and HR strategies.