INTRODUCTION
• We callourselves Homo sapiens—man the wise—because our
intelligence is so important to us. For thousands of years, we have tried
to understand how we think; that is, how a mere handful of matter can
perceive, understand, predict, and manipulate a world far larger and
more complicated than itself.
• The field of artificial intelligence, or AI, goes further still: it attempts
not just to understand but also to build intelligent entities.
3.
INTRODUCTION => WHATIS AI?
• In Figure 1.1 we see eight definitions
of AI, laid out along two dimensions.
• The definitions on top are concerned
with THOUGHT PROCESSES and
REASONING, whereas the ones on
the bottom address BEHAVIOR.
• The definitions on the left measure
success in terms of fidelity to
HUMAN performance, whereas the
ones on the right measure against an
ideal performance measure, called
RATIONALITY.
• A system is rational if it does the
“right thing,” given what it knows.
4.
INTRODUCTION WHATIS AI? Acting humanly: The Turing Test approach
The Turing Test, proposed by Alan Turing (1950), was designed to provide a satisfactory operational definition of intelligence. A
computer passes the test if a human interrogator, after posing some written questions, cannot tell whether the written responses
come from a person or from a computer
The computer would need to possess the following capabilities:
• Natural Language Processing to enable it to communicate
successfully in English.
• Knowledge Representation to store what it knows or hears;
• Automated Reasoning to use the stored information to answer
questions and to draw new conclusions;
• Machine Learning to adapt to new circumstances and to detect and
extrapolate patterns.
Total Turing Test includes a video signal so that the interrogator
can test the subject’s perceptual abilities, as well as the
opportunity for the interrogator to pass physical objects “through
the hatch.” To pass the total Turing Test, the computer will need
• Computer Vision to perceive objects, and
• Robotics to manipulate objects and move about.
5.
INTRODUCTION WHATIS AI? Thinking humanly: The cognitive modeling
approach
If we are going to say that a given program thinks like a human, we must have some way of
determining how humans think. We need to get inside the actual workings of human minds. There
are three ways to do this:
1. Through introspection—trying to catch our own thoughts as they go by;
2. Through psychological experiments—observing a person in action; and
3. Through brain imaging—observing the brain in action.
The interdisciplinary field of cognitive science brings
together computer models from AI and experimental
techniques from psychology to construct precise and
testable theories of the human mind.
6.
INTRODUCTION WHATIS AI? Thinking rationally: The “laws of thought”
approach
• The Greek philosopher Aristotle was one of the first to attempt to codify “right thinking,” that
is, irrefutable reasoning processes. His syllogisms provided patterns for argument structures
that always yielded correct conclusions when given correct premises.
• For example, “Socrates is a man; all men are mortal; therefore, Socrates is mortal.”
• These laws of thought were supposed to govern the operation of the mind; their study initiated
the field called logic.
• The so-called logicist tradition within artificial intelligence hopes to build on such programs to
create intelligent systems.
• There are two main obstacles to this approach:
1. First, it is not easy to take informal knowledge and state it in the formal terms required by
logical notation, particularly when the knowledge is less than 100% certain.
2. Second, there is a big difference between solving a problem “in principle” and solving it
in practice.
7.
INTRODUCTION WHATIS AI? Acting rationally: The rational agent approach
• An agent is just something that acts (agent comes from the Latin agere, to do).
• Computer agents are expected to do:
operate autonomously,
perceive their environment,
persist over a prolonged time period,
adapt to change,
create and pursue goals.
• A rational agent is one that acts so as to achieve the best outcome or, when there is uncertainty, the best expected
outcome.
• In the “laws of thought” approach to AI, the emphasis was on correct inferences (conclusions).
• Making correct inferences is sometimes part of being a rational agent, because one way to act rationally is to
reason logically to the conclusion that a given action will achieve one’s goals and then to act on that conclusion.
• On the other hand, correct inference is not all of rationality; in some situations, there is no provably correct thing
to do, but something must still be done.
• There are also ways of acting rationally that cannot be said to involve inference.
8.
THE STATE OFART
• What can AI do today? A concise answer is difficult because there are
so many activities in so many subfields. Here we sample a few
applications:
• Robotic vehicles
• Speech recognition
• Autonomous planning and scheduling
• Game playing
• Spam fighting
• Logistics planning
• Robotics
• Machine Translation
9.
Robotic Vehicles
• Adriverless robotic car named STANLEY sped through the rough terrain of
the Mojave dessert at 22 mph, finishing the 132-mile course first to win the
2005 DARPA Grand Challenge. STANLEY is a Volkswagen Touareg outfitted
with cameras, radar, and laser rangefinders to sense the environment and
onboard software to command the steering, braking, and acceleration
(Thrun, 2006). The following year CMU’s BOSS won the Urban Challenge,
safely driving in traffic through the streets of a closed Air Force base, obeying
traffic rules and avoiding pedestrians and other vehicles.
Speech Recognition
• A traveler calling United Airlines to book a flight can have the entire
conversation guided by an automated speech recognition and dialog
management system.
10.
Autonomous planning andscheduling
• A hundred million miles from Earth, NASA’s Remote Agent program
became the first on-board autonomous planning program to control
the scheduling of operations for a spacecraft (Jonsson et al., 2000).
REMOTE AGENT generated plans from high-level goals specified from
the ground and monitored the execution of those plans—detecting,
diagnosing, and recovering from problems as they occurred.
Successor program MAPGEN (Al-Chang et al., 2004) plans the daily
operations for NASA’s Mars Exploration Rovers, and MEXAR2 (Cesta et
al., 2007) did mission planning—both logistics and science planning—
for the European Space Agency’s Mars Express mission in 2008
11.
Game Playing
• IBM’sDEEP BLUE became the first computer
program to defeat the world champion in a chess
match when it bested Garry Kasparov by a score of
3.5 to 2.5 in an exhibition match (Goodman and
Keene, 1997). Kasparov said that he felt a “new
kind of intelligence” across the board from him.
Newsweek magazine described the match as “The
brain’s last stand.” The value of IBM’s stock
increased by $18 billion. Human champions
studied Kasparov’s loss and were able to draw a
few matches in subsequent years, but the most
recent human-computer matches have been won
convincingly by the computer
12.
Spam fighting
• Eachday, learning algorithms classify over a billion messages as spam,
saving the recipient from having to waste time deleting what, for
many users, could comprise 80% or 90% of all messages, if not
classified away by algorithms. Because the spammers are continually
updating their tactics, it is difficult for a static programmed approach
to keep up, and learning algorithms work best (Sahami et al., 1998;
Goodman and Heckerman, 2004).
13.
Logistics planning
• Duringthe Persian Gulf crisis of 1991, U.S. forces deployed a Dynamic
Analysis and Replanning Tool, DART (Cross and Walker, 1994), to do
automated logistics planning and scheduling for transportation. This
involved up to 50,000 vehicles, cargo, and people at a time, and had
to account for starting points, destinations, routes, and conflict
resolution among all parameters. The AI planning techniques
generated in hours a plan that would have taken weeks with older
methods. The Defense Advanced Research Project Agency (DARPA)
stated that this single application more than paid back DARPA’s 30-
year investment in AI.
14.
Robotics
• The iRobotCorporation has sold over two million Roomba robotic
vacuum cleaners for home use. The company also deploys the more
rugged PackBot to Iraq and Afghanistan, where it is used to handle
hazardous materials, clear explosives, and identify the location of
snipers.
15.
Machine Translation
• Acomputer program automatically translates from Arabic to English,
allowing an English speaker to see the headline “Ardogan Confirms
That Turkey Would Not Accept Any Pressure, Urging Them to
Recognize Cyprus.” The program uses a statistical model built from
examples of Arabic-to-English translations and from examples of
English text totaling two trillion words (Brants et al., 2007). None of
the computer scientists on the team speak Arabic, but they do
understand statistics and machine learning algorithms
Agents and Environment
Anagent is anything that can be viewed as
perceiving its environment through sensors and
SENSOR acting upon that environment through
actuators. This simple idea is illustrated in Figure
2.1. ACTUATOR A human agent has eyes, ears, and
other organs for sensors and hands, legs, vocal
tract, and so on for actuators.
We use the term percept to refer to the agent’s
perceptual inputs at any given instant. An PERCEPT
SEQUENCE agent’s percept sequence is the
complete history of everything the agent has ever
perceived.
18.
Agents and Environment
•Mathematically speaking, we say that an agent’s behavior is AGENT
FUNCTION described by the agent function that maps any given percept
sequence to an action.
• We can imagine tabulating the agent function that describes any given agent;
• Given an agent to experiment with, we can, in principle, construct this table
by trying out all possible percept sequences and recording which actions the
agent does in response. The table is, of course, an external characterization of
the agent. Internally, the agent function for an artificial agent will be
implemented by an AGENT PROGRAM agent program.
• It is important to keep these two ideas distinct. The agent function is an
abstract mathematical description; the agent program is a concrete
implementation, running within some physical system.
19.
The Vacuum-Cleaner World
•This world is so simple that we can describe everything that happens;
it’s also a made-up world, so we can invent many variations. This
particular world has just two locations: squares A and B. The vacuum
agent perceives which square it is in and whether there is dirt in the
square. It can choose to move left, move right, suck up the dirt, or do
nothing. One very simple agent function is the following: if the
current square is dirty, then suck; otherwise, move to the other
square.
Program implements theagent function
tabulated in Fig. 2.3
Function Reflex-Vacuum-Agent([location,status]) return an action
If status = Dirty then return Suck
else if location = A then return Right
else if location = B then return left
22.
Concept of Rationality
Rationalagent
One that does the right thing
= every entry in the table for the agent function is
correct (rational).
What is correct?
The actions that cause the agent to be most successful
So we need ways to measure success.
23.
Performance measure
Performance measure
An objective function that determines
How the agent does successfully
E.g., 90% or 30% ?
An agent, based on its percepts
action sequence :
if desirable, it is said to be performing well.
No universal performance measure for all agents
24.
Performance measure
A generalrule:
Design performance measures according to
What one actually wants in the environment
Rather than how one thinks the agent should behave
E.g., in vacuum-cleaner world
We want the floor clean, no matter how the agent
behave
We don’t restrict how the agent behaves
25.
Rationality
What is rationalat any given time depends on four
things:
The performance measure defining the criterion of success
The agent’s prior knowledge of the environment
The actions that the agent can perform
The agents’s percept sequence up to now
26.
Rational agent
For eachpossible percept sequence,
an rational agent should select
an action expected to maximize its performance measure, given the
evidence provided by the percept sequence and whatever built-in
knowledge the agent has
E.g., an exam
Maximize marks, based on
the questions on the paper & your knowledge
27.
Example of arational agent
Performance measure
Awards one point for each clean square
at each time step, over 10000 time steps
Prior knowledge about the environment
The geography of the environment
Only two squares
The effect of the actions
28.
Actions that canperform
Left, Right, Suck and NoOp
Percept sequences
Where is the agent?
Whether the location contains dirt?
Under this circumstance, the agent is
rational.
Example of a rational agent
29.
An omniscient agent
Knowsthe actual outcome of its actions in
advance
No other possible outcomes
However, impossible in real world
An example
crossing a street but died of the fallen cargo
door from 33,000ft irrational?
Omniscience
30.
Based on thecircumstance, it is rational.
As rationality maximizes
Expected performance
Perfection maximizes
Actual performance
Hence rational agents are not omniscient.
Omniscience
31.
Learning
Does a rationalagent depend on only current
percept?
No, the past percept sequence should also be used
This is called learning
After experiencing an episode, the agent
should adjust its behaviors to perform better for the same job
next time.
32.
Autonomy
If an agentjust relies on the prior knowledge of its
designer rather than its own percepts then the
agent lacks autonomy
A rational agent should be autonomous- it should
learn what it can to compensate for partial or
incorrect prior knowledge.
E.g., a clock
No input (percepts)
Run only but its own algorithm (prior knowledge)
No learning, no experience, etc.
33.
Sometimes, the environmentmay not be the
real world
E.g., flight simulator, video games, Internet
They are all artificial but very complex
environments
Those agents working in these environments are
called
Software agent (softbots)
Because all parts of the agent are software
Software Agents
34.
Task environments
Task environmentsare the problems
While the rational agents are the solutions
Specifying the task environment
PEAS description as fully as possible
Performance
Environment
Actuators
Sensors
In designing an agent, the first step must always be to specify
the task environment as fully as possible.
Use automated taxi driver as an example
35.
Task environments
Performance measure
How can we judge the automated driver?
Which factors are considered?
getting to the correct destination
minimizing fuel consumption
minimizing the trip time and/or cost
minimizing the violations of traffic laws
maximizing the safety and comfort, etc.
36.
Environment
A taxi mustdeal with a variety of roads
Traffic lights, other vehicles, pedestrians, stray
animals, road works, police cars, etc.
Interact with the customer
Task environments
37.
Actuators (for outputs)
Controlover the accelerator, steering, gear
shifting and braking
A display to communicate with the customers
Sensors (for inputs)
Detect other vehicles, road situations
GPS (Global Positioning System) to know where
the taxi is
Many more devices are necessary
Task environments
38.
A sketch ofautomated taxi driver
Task environments
39.
Properties of taskenvironments
Fully observable vs. Partially observable
If an agent’s sensors give it access to the complete state
of the environment at each point in time then the
environment is effectively and fully observable
if the sensors detect all aspects
That are relevant to the choice of action
40.
Partially observable
• Anenvironment might be Partially observable
because of noisy and inaccurate sensors or
because parts of the state are simply missing from
the sensor data.
• Example:
A local dirt sensor of the cleaner cannot tell
Whether other squares are clean or not
41.
Deterministic vs. stochastic
next state of the environment Completely determined
by the current state and the actions executed by the
agent, then the environment is deterministic,
otherwise, it is Stochastic.
Strategic environment: deterministic except for actions
of other agents
• -Cleaner and taxi driver are:
Stochastic because of some unobservable aspects noise or
unknown
Properties of task environments
42.
Episodic vs. sequential
An episode = agent’s single pair of perception & action
The quality of the agent’s action does not depend on other
episodes
Every episode is independent of each other
Episodic environment is simpler
The agent does not need to think ahead
Sequential
Current action may affect all future decisions
• -Ex. Taxi driving and chess.
Properties of task environments
43.
Static vs. dynamic
Adynamic environment is always changing
over time
E.g., the number of people in the street
While static environment
E.g., the destination
Semidynamic
environment is not changed over time
but the agent’s performance score does
Properties of task environments
44.
Discrete vs. continuous
Ifthere are a limited number of distinct states,
clearly defined percepts and actions, the
environment is discrete
E.g., Chess game
Continuous: Taxi driving
Properties of task environments
45.
Single agent VS.multiagent
Playing a crossword puzzle – single agent
Chess playing – two agents
Competitive multiagent environment
Chess playing
Cooperative multiagent environment
Automated taxi driver
Avoiding collision
Properties of task environments
46.
Properties of taskenvironments
Known vs. unknown
This distinction refers not to the environment itslef but to the
agent’s (or designer’s) state of knowledge about the
environment.
-In known environment, the outcomes for all actions are
given. ( example: solitaire card games).
- If the environment is unknown, the agent will have to learn
how it works in order to make good decisions.( example:
new video game).
Structure of agents
Agent= architecture + program
Architecture = some sort of computing device (sensors
+ actuators)
(Agent) Program = some function that implements the
agent mapping = “?”
Agent Program = Job of AI
50.
Agent programs
Input forAgent Program
Only the current percept
Input for Agent Function
The entire percept sequence
The agent must remember all of them
Implement the agent program as
A look up table (agent function)
Agent Programs
P =the set of possible percepts
T= lifetime of the agent
The total number of percepts it receives
Size of the look up table
Consider playing chess
P =10, T=150
Will require a table of at least 10150
entries
T
t
t
P
1
53.
Agent Programs
Despite ofhuge size, look up table does what we
want.
The key challenge of AI
Find out how to write programs that, to the extent
possible, produce rational behavior
From a small amount of code
Rather than a large amount of table entries
E.g., a five-line program of Newton’s Method
V.s. huge tables of square roots, sine, cosine, …
54.
Types of agentprograms
Four types
Simple reflex agents
Model-based reflex agents
Goal-based agents
Utility-based agents
55.
Simple reflex agents
Ituses just condition-action rules
The rules are like the form “if … then …”
efficient but have narrow range of applicability
Because knowledge sometimes cannot be stated explicitly
Work only
if the environment is fully observable
A Simple ReflexAgent in Nature
percepts
(size, motion)
RULES:
(1) If small moving object,
then activate SNAP
(2) If large moving object,
then activate AVOID and inhibit SNAP
ELSE (not moving) then NOOP
Action: SNAP or AVOID or NOOP
needed for
completeness
59.
Model-based Reflex Agents
Forthe world that is partially observable
the agent has to keep track of an internal state
That depends on the percept history
Reflecting some of the unobserved aspects
E.g., driving a car and changing lane
Requiring two types of knowledge
How the world evolves independently of the agent
How the agent’s actions affect the world
60.
Example Table Agent
WithInternal State
Saw an object ahead,
and turned right, and
it’s now clear ahead
Go straight
Saw an object Ahead,
turned right, and object
ahead again
Halt
See no objects ahead Go straight
See an object ahead Turn randomly
IF THEN
61.
Example Reflex AgentWith Internal State:
Wall-Following
Actions: left, right, straight, open-door
Rules:
1. If open(left) & open(right) and open(straight) then
choose randomly between right and left
2. If wall(left) and open(right) and open(straight) then straight
3. If wall(right) and open(left) and open(straight) then straight
4. If wall(right) and open(left) and wall(straight) then left
5. If wall(left) and open(right) and wall(straight) then right
6. If wall(left) and door(right) and wall(straight) then open-door
7. If wall(right) and wall(left) and open(straight) then straight.
8. (Default) Move randomly
start
Goal-based agents
Current stateof the environment is always not
enough
The goal is another issue to achieve
Judgment of rationality / correctness
Actions chosen goals, based on
the current state
the current percept
65.
Goal-based agents
Conclusion
Goal-basedagents are less efficient
but more flexible
Agent Different goals different tasks
Search and planning
two other sub-fields in AI
to find out the action sequences to achieve its goal
Utility-based agents
Goals aloneare not enough
to generate high-quality behavior
E.g. meals in Canteen, good or not ?
Many action sequences the goals
some are better and some worse
If goal means success,
then utility means the degree of success (how
successful it is)
Utility-based agents
it issaid state A has higher utility
If state A is more preferred than others
Utility is therefore a function
that maps a state onto a real number
the degree of success
70.
Utility-based agents
Utility hasseveral advantages:
When there are conflicting goals,
Only some of the goals but not all can be achieved
utility describes the appropriate trade-off
When there are several goals
None of them are achieved certainly
utility provides a way for the decision-making
71.
Learning Agents
After anagent is programmed, can it work
immediately?
No, it still need teaching
In AI,
Once an agent is done
We teach it by giving it a set of examples
Test it by using another set of examples
We then say the agent learns
A learning agent
72.
Learning Agents
Four conceptualcomponents
Learning element
Making improvement
Performance element
Selecting external actions
Critic
Tells the Learning element how well the agent is doing with
respect to fixed performance standard.
(Feedback from user or examples, good or not?)
Problem generator
Suggest actions that will lead to new and informative experiences.