🚨 A BOM mistake that cost weeks of production…
A BOM mistake that cost weeks of production…

🚨 A BOM mistake that cost weeks of production…

A manufacturer we spoke with recently had their assembly line grind to a halt. Why? A single part in their Bill of Materials (BOM) was listed with the wrong revision level.

Procurement ordered the “right” part — except it didn’t fit the updated design. By the time the error was caught, the result was:

  • Thousands of dollars in wasted materials
  • Weeks of lost time
  • A frustrated customer waiting on delivery

And here’s the reality 👉 this isn’t rare. BOM inaccuracies happen all the time across manufacturing.

So why do BOMs keep going wrong?

🔹 Poor revision control – Teams pulling from outdated versions.

🔹 Manual data entry – Spreadsheets and typos that slip through.

🔹 Disconnected systems – CAD, PLM, ERP not speaking the same language.

🔹 Incomplete info – Placeholders that never get updated.

🔹 Weak change management – Engineering changes not flowing downstream.

🔹 Siloed communication – Every team keeping its own “truth.”

The effect? Production delays, cost overruns, quality issues, and sometimes even compliance failures.

✅ The fix isn’t magic — it’s discipline and integration:

  • A single source of truth for the BOM
  • Strong change control processes
  • Seamless CAD–ERP integration
  • Clear communication across engineering, procurement, and manufacturing

At Jaydu, we help manufacturers turn BOM chaos into clarity with structured, process-driven engineering support.

👉 If BOM mistakes are slowing you down, let’s talk about how to prevent the next costly error before it happens.