mtu gensets installed in London data centre with HVO compatibility

This title was summarized by AI from the post below.

As Europe’s data centre industry surges, our mtu backup power solutions are more critical than ever – even in densely built-up urban areas. Two of our mtu 16V 4000 gensets were recently installed within a compact split-level configuration in central London in partnership with AVK-SEG along with remote cooling, mezzanine-mounted radiators and advanced control upgrades. And with HVO compatibility, our gensets offer up to 90% lower CO₂ emissions – a sustainable choice for a greener urban future. https://ow.ly/PWGB50XsJFw #mtuSolutions #DataCentres #BackupPower #Series4000

  • No alternative text description for this image

As always, we really value your vision and the innovative solutions you bring to tackling today’s energy demands and challenges.

Fantastic to see this level of innovation and engineering in data centre power solutions here in Europe. Impressive work as always from Rolls-Royce.

Sasha Kalaj

Sales / Executive Coach/ Educator / Learning Designer / Curriculum Designer / Writer / Historian/ Arts Expert / Customer Service

4d

Thanks for sharing

Like
Reply

...the all-new Silver Ghost.

Like
Reply
Kevin Dunn

Sr lead technician at Evolve

4d

2 we are installing hundreds of 20V4000s on just one small site!

Like
Reply
meschack disanz

Electromechanical master civil engineer HME Technician, Engine Specialist and Technical Trainer

3d

MTU Rolls-Royce solutions the best power generators ever exist 💪💪💪💪

Like
Reply
See more comments

To view or add a comment, sign in

Explore content categories