We’ve made progress at South Walker Creek after signing a Mining Services Agreement late last year with our client, Stanmore Resources Limited.
Action Drill & Blast provides drill services on-site, and Golding’s primary scope includes operating and maintaining eight fleets of heavy mining equipment to remove overburden and mine steel-making coal.
Sam or a great day of integrated us really well with their systems, with their people. It breeds a great culture of safety and productivity. S Walker Creek is a PCI coal mining operation. Golden here. We run truck shovel fleets. So we're operating 7 fleets and some ancillary machines around that. And we do significant portion of the waste movement, stripping and coal mining. The operation itself runs two drag lines and a dozer push as well. We work in with those and assist them and we work in with the coal prep plant. We have some people over there that assist with that. Delivering the coal onto the ROM and allowing the client to process that through. So I'll quick overview of Southwark Creek as we run 5C750 drills, reach drills. We started the contract in October 2022. Until now we were contracted for 120,000 metres a month, but we're up to 130,000 a month, 643 copies too. We've actually achieved the target of 153,000 metres in one of the months during the year. So we are. Tracking pretty well here here at S Walnut Creek.